INERTIAL CONFINEMENT FUSION IGNITION AND HIGH YIELD
Complete development of advanced ignition platform
Complete National Ignition Campaign
ENGINEERING CAMPAIGN Validate and quantify UGTs
SECURE TRANSPORTATION ASSET
TECHNICAL BASE AND FACILITIES RLUOB construction complete
S T OC KP IL E
S T E WA R D S H IP
Occupy the Kansas City plant
DAWN (.5 pFLOPS) in production Roadrunner Supercomputer achieves petaFLOP computing
Rocky Flats closed
STOCKPILE STEWARDSHIP
1st axis of DARHT operational
Delivery of Sequoia platform
Cielo delivered to LANL
Mound Lab closed
TVA begins to irradiate TPBARS rodsin Watts Bar unit 1
Complete W88 pit build TVA ships TBARS to Savannah River
1st experiment using both DARHT axes
Lab Directors meet with Vice-President Biden LANL contract transition
President Obama Prague Speech President Obama awarded Nobel Peace Prize
LLNL contract transition
NNSA issues Record of Decision on Complex Transformation
Complete UPF and CMRR-NF
Increase PF-4 Plutonium capability Facility and demonstrate pit reuse
Sequoia (20 pFLOPS) in production
Complete Cielo security and performance upgrade Begin work on W87 pits
Pinellas Plant closed LANSCE pRad dedicated
Occupy the RLUOB
P R OGR AM
ADVANCED SIMULATION AND COMPUTING
Complete Armored Tractor replacements
Complete Pantex HE Pressing Facility project
Reduce deployed nuclear weapons to between 1,700 and 2,200
Subcritical experiments conducted at U1A Nevada
Administration issues Nuclear Posture Review Secretary of Defense Gates visits LANL New START ratified by U.S. Senate
Complete W76-1 LEP
Produce B61 LEP first production unit
Produce W78 LEP first production unit