Wang Yiwen Application to MArch Bio-Integrated Design Student number: 20150602 Hefei University of Technology E-mailďźšwangyiwen07@163.com Phone:+86 18225605839
WangYiwen Tel:18225605839 E-mail:wangyiwen08@163.com Address:Anhui,Wuhu
Education
Extracurricular Activities
Sep.2013-June.2017 Hefei University of Technology Bachelor of Engineering,in Landscape Architecture GPA:3.25 Major Course: Site Design(90);Principles of Urban and Rural Planning B(92);Hand-painted Performance B(90);Garden plant application A(86);History of Chinese and Foreign Architecture(88);Planning of Urban Green Space System(84);Urban Design(85);Landscape Ecology(85);Planning and Design of Landscape Architecture 2(91);
Sep.2014-June.2015
University-level association of HFUT-College students painting and calligraphy association Vice minister of Painting creative department
Jul.2014
Participate in poster design of chunhua society
Apr.2014
College basketball activity organizer and planner
Software Skills
Practice Apr.2018-Aug.2019 SHENZHEN DONGDA LANDSCAPE DESIGN CO.,LTD Founded in 2001,Dongda Landscape Design originated from SoutheastUniversity Design Institute and now ranks one of the top landscape design institutes in China.
Adobe Photoshop | Auto CAD | Adobe InDesign | Adobe Illustrator | Sketch up | Rhinoceros | Vary for Sketch up & Rhinoceros | Lumion | GIS | Ecotect
Honors Mar.2015 Sep.2014 May.2014
The fourth national college students art performance activities| Second prize in group A People's Scholarship | Second Prize The 17th campus painting and calligraphy competition | Second prize of painting group
Languages English | Chinese
Professional Experience Apr.2018-Aug.2019
SHENZHEN DONGDA LANDSCAPE DESIGN CO.,LTD Assistant to the program designer, responsible for the preliminary intention of the program, typesetting, modeling, expanding the preliminary design of the assistant work. Projects: Jiangxi Shangrao ‘SHIGUANG PARK’ business landscape | 2018-2019 | Under construction (typesetting,modeling,Scheme expansion) Licha Town rural revitalization environmental landscape upgrade design project | 2019 (typesetting,plan model,Scheme expansion,construction drawing) Landscape design of Jiaozhou east-west channel road | 2018 (typesetting,plan model,Scheme expansion) Landscape concept design of Jiaozhou citizen park | 2018-2019 |Under construction (typesetting,plan model,Scheme expansion)
CET4,CET6 Pass
Hobbies Sketching writing Singing visiting exhibition Cities exploration
CONTENT
01
Detail design
Play in an abandoned field /Urban Ecology and Recreation System Planning
An arcadia with several mines /Pit geopark design
02
/Urban design based on Socially Restorative Urbanism
03
/Land art landscape installation
04
Intertwined lives
Witness
Other works Hand Painted|Rapid design|Model making|Photographs
02
08
12
16
20
01
01
Play in an abandoned field /Urban Ecology and Recreation System Planning Pioneer Experiment in ECOLOGICAL RESTORATION of Abandoned Land, a COUNTRY PARK sandwiched between cities. Team Work Huainan City, Anhui ,China 930 ha Junfeng,Li (Tutor) March. 2017 - June. 2017
Retro Town Mine Geopark The Green Net: Ecological restoration of abandoned land
Farmland Park
The ecological network pattern of mountains, fields and water is formed, and the ecological greenway wedge enters the northern and southern cities.
Mountain
Industrial and mining culture land
Field
Educational Park
Wetland
The Tourism Net: Leisure and Tourism Planning The north-south ecological trail attracts the surrounding people, and the recreational train connects six creative parks from west to east.
Water
Project background Huainan is a city with many mountains and rivers, rich in coal resources and a long history of mining. Today, municipalities are faced with mineral depletion, environmental degradation and industrial transformation due to economic development.
Location The project is located in the eastern part of shungeng mountain in Huainan, which is sandwiched between the old town and the new town. It has a superior geographical position and abundant resources. With the development of urbanization and the improvement of people's material life, it is necessary to make use of the site resources for restoration or use and build an urban country park to help solve the problems faced by urban development.
02
1970
Historical Evolution 1950
Established according to the mine,an important industrial city.
The growing town The old town Site The new town
We build a city here!
We have nothing to do except minning.
The process of industrialization: a further increase
1980
2000
Resource exhaustion abandoned mining area.
Damaged area, serious pollution.
Pollution keeps us from breathing!
2010
Emergency: Abandoned land reconstruction We really need a renovation to change our life.
Upper level Planning Up Planning
Land Use
Transport
Tourism
Fuyang
Water System Huaihe
Bengbu
Luan
Main Road Highway Railway
Residential land Commercial land Industrial land green land educational land water
Residential land 50% Green land 25% Commercial land & schools 5% Factories 20%
park entertainments attractions
Hefei
Convenient transportation in the north,close to train station and highway entrance.
Eco System
way to travel purpose provincial tourist
water
out-of-province tourist
An important part of tourist attractions. The main population is local citizens.
Inside the city lack of water.
Site Ecological Analysis
Production of green space Protective greenbelt Ecological Recreation green land Public green space Ecological green land water
Part of the ecological corridor, to improve the urban heat island effect and provide habitat for living things, a planned country park.
Ecological sensitivity analysis
Mountain and forest
Pastoral
Water plants
Trees
Altitude: high in the south and low in the north.
Shrubs Grass Current land use: land use property chaos.
water
We are connec ted ecological corridors and mountain range ďź
c o n n ec t
Water system: No large-scale construc tion shall be carried out within 50m of the water buffer zone.
pastoral mountain range
We need to lead-in green between cities! l e a d -i n
Forest community Aquatic community Residential community Farmland community
Ecological sensitivities: lighter areas are suitable for construction
The site is high in the south and low in the north, so water flows converge on the northern side of the site. Most of the green space in the middle is pastoral, and the south mountain is the east part of shungeng mountain range. The whole site forms the pattern of mountain, trees, field and water.
Site Key Issues Mountain and mine pit
Soil Pollution
Water
Pastoral
Lack of vegetation
Construction Waste
Barren land
Single Vegetation
Water Eutrophication
03
Methodology:Tourism Resources Test Valueable resources Result
Site resources evaluation
Suitable for travel? <The production and application of ROS theory>
<Tourism resources classificationďź&#x152;investigation and evaluation>
STEP1 Space partition
STEP1 Tourism resources classification
Fo u r c a t e g o r i e s a n d 1 0 s m a l l c a t e g o r i e s w a s classification according to <Tourism resources classification, investigation and evaluation>.
The site is divided into 9 areas according to the current road and land use. 1 The existing wetland 2 A restricted area 3 Memorial Hall 4 farmland 5 Natural lakes 6 Near the scenic spot 7 Residential areas and market 8 Farmland 9 Mines and mountains STEP2 Evaluation standard
STEP2 Site Investigation
22 representative resources in the site were selected, and these resources were divided into categories below.
Terrestrial resources Human trace
mountains
A1
A2
The choice of the following icons were scored as criteria.
Accessibility
Infrastructure Water resources Natural lakes
Wetland
Mine lake
B1
B2
B3
Acceptable to tourists
Unrecreational development
Human activity intervention STEP3 Get the type of land
The higher the total score, the higher the tourism development level of the site.
Biological resources The woods
Arable land
C1
C2
0
5
10
Primitive area
15
20
Semiprimitive Rural area area
25
Urban area
Conclusion
Site and Relics Industrial site
Cultural sites
D1
D2
It is concluded that the six sites with high evaluation scores need to be developed.And the field is divided into seven zones based on scores and evaluations.
Land Type 20
15 B2-1
STEP3 Evaluation The value of tourism and recreation, historical and cultural value, scientific value, scale, abundance, preservation integrity, popularity and influence, suitable duration/ scope of use, and environmental protection and safety were selected to score. The higher the score, the higher the resource value.
D2-1
10
C2-1
5
A1-5
0 1
Rural area
04
D1-4
2
Semiprimitive area
3
Urban area
4
Semiprimitive area
5
Semiprimitive area
6
Rural area
7
Rural area
8
9
Semiprimitive Primitive area area
D2-2
Master Plan 1 1
9
1
2 3
2 9 4
1
2 10 5
2
2 1
2
9 6
9 7
1 2 1
1 9
11 9
1
Main Entrance
2
Leisure Station
3
Train line
4
Wetland Park
5
Educational park
6
Farmland park
7
Industrial and mining cultural park
8
Mine geopark
9
Train Station
10
Trash Collection
11
Retro Town
12
Exist Village
12
2 8 12
1
1
2
1
Concept Ecological restoration-Create green network
recreation planning-Built Tourism system
1
Three ecosystems restoration
2
2
Transverse green belts in series
North-south green trails
Add leisure parks and leisure stations
3
3 Aquatic ecosystem Farmland ecosystem Mountain ecosystem
Country Park Project-Intergrate
1
Green space system extension
Green trails Small train tour Stations Leisure Parks
1.Horizontal -ecological restoration 2.Longitudinal - recreational greenway small train tour line
05
Programme Facility
School Basketball
Entertainment
Picnic
Fishing Villa Memorial Sculputure Concert
Shopping
Shopping Agricultural market Memorial pavilion Concert
Villa
Cemetery
fishing
Memory
Converted plant
Farm
Yoga Field
Basketball
Family reunion
Memory Running
Retro town
Picnic
Village
Family Entertainment Photography Riding
Photography Romantic date
Photography
Pit Geopark
Mountain biking
Field
Climbing
Train station Farm experience
Photography
Ecological education
Leisure station Children's activities
Space zones
trees water leisure space
06
Tram system
Main station Station train line
Train station section
Village
Ecological Restoration
Strategy Healthy soil: Natural repair
Middle soil pollution: Planting pioneer vegetation
Strategy Garbage removal
Sever soil pollution: Turns the soil to grow
Site clearance,natural repair
Ecological restoration of basic vegetation
The establishment of animal and plant ecosystems
Year1
Year5
Year10
Strategy
Returning farmland to forest
Site clearance,garbage removal
Returning farmland to forest
The establishment of farmland ecosystem
interceptďź&#x161; Collected runoff rainwater
Year1
Year5
Year10
Precipitation Purification reservoir
Purification: Aquatic vegetation
Collected runoff rainwater and clean up the debris in the water
Aquatic plant level purification
Aquatic ecosystems are established
Year1
Year5
Year10
07
D e t a i l An arcadia with several mines design /Pit geopark design
Concept Ecological restoration-Green space
A case study of using different planting for pit restoration and bring a variety of activities related to the mine.
Site Condition This land was originally a mining pit, and the deeper pit has formed a small mining pit lake, which has serious ecological problems. At the same time, the fractured terrain and unique mining pit landscape caused by mining provide opportunities and challenges for recreation planning. Most characteristic: six mines
mine pits green space trees water
Recreation planning-Tourism space
existing forest Pits left by mining existing field existing water existing road Planned walking space Planned Road Traffic line main entrance
good sight views
Pit GeoPark Project-Roads
Site Analysis low
high
N
high
low
S
Elevation Analysis good sightview deep pit shallow pit
08
Slope Analysis different slopes: various planting measures
Slope direction Analysis different forms: various photophobic plants
main road secondary road
Site Plan
25m 50m
100m
200m
1 2
4 3
5 16 7 6
14 1
Visitor center
2
Train Station
3
Restored village
4
Viewing plank road
5
Hill stands
6
Leisure lawn
7
Mine lake
8
Central pavilion
9
Climbing wall
15 8 9 13 12
11
10
10 Trestle 11 Viewing platform 12 Botanical garden pavilion 13 Ramp botanical garden 14 Mine and lake botanical garden 15 Ladder botanical garden 16 Promenade
09
Ecological Restoration Strategy STEP1 Site clearance
STEP2 Topographic finishing
Scattered piles of exposed rock.
Clean up the rocks to mountain vertical plane.
The pool of water was dug into a pit lake.
Shallow pits are backfilled with construction waste.
Flat uneven land.
Physical barrier reinforcement.
Ladder to repair.
STEP3 Phytoremediation
2 Slope:>70
Slope:60-70
Slope:40-60
Slope:20-40
Slope:0-20
Vertical bare mountain for natural restoration.
Insert solid grass piles to plant more developed roots.
Stepped repair, ladder-like restoration, planting herbs and shrubs.
Place solid grids, plant herbs, shrubs, and small and medium-sized trees.
Tiered vegetation restoration.
1' 1 2'
Key mine pit repair
cleaning
cleaning
diging
cleaning
cleaning
cleaning seeding
seeding
seeding
seeding
seeding
diging
planting
seeding
planting
seeding
seeding
seeding
planting
seeding
planting
1
1' woodand
2
2' lawn
lake
lawn
lake
flowerbed
woodland
Plant species selection Lake/Wetland
10
Grassland
Woodland
grassland
woodland
woodland
lake
woodland
ladder garden
Recreation Strategy
Recreational trail
Perspective
Children's play activity trail
Mountain road
Quiet recreational trail
Outlook
ladder garden woodland grassland flowerbed
Wow!What a beautiful scenery!
The landscape grass here is so beautiful! Here seems to be able to climb the walkway view.
What a long street!
Suitable for walking. The lawn here allows me to play with pets at ease.
I ride my bicycle after here, good!
Quiet recreational trail
I love it here! Rock climbing! Can also play games with friends!
'
Rock climbing tower
11
02
Intertwined lives
/Urban design based on Socially Restorative Urbanism Socially Restorative Urbanism Personal Work Sheffieldďź&#x152;England 930 ha Jiayue,Jiang 12/2019-1/2020
Store recruit builds atmosphere feeling.
Facade plant boundary.
Rich the boundary of the waterfront promenade.
eyes
The richness of the interface along the street.
building
Street corner
Street
Waterfront stands Waterfront trail
The design aims to use the theoretical framework based on experimental landscape research (SRU) to combine architecture and outdoor space, blurring the boundary between the two, hoping to increase interpersonal interaction and social interaction with interactive public space. Once an industrial heartland, Kelham Island is one of Sheffield's oldest manufacturing bases. Many factories are now being converted into shopping malls, breweries and galleries, but there is still plenty of vacant and developing land for urban design. Through the analysis of the behavior activities of different groups of people, the streets with the most potential for multiple activities are selected and their building boundaries are scored to obtain the transformation vitality points and nodes, hoping to create a more lasting vitality community.
12
Waterfront green space
River building
Project background
Site Condition-Existing attractions and vacant area world war ii
tool production reservoir collapse
tableware production
cholera
population growth slums
Sheffieldďź&#x161; industrial city, tableware production, tool production - industrial background. Crisis: reservoir collapse, cholera, population growth, slums, world war ii - the need to live.
Peddler Night Market: To c r e a t e d i v e r s e s t r e e t s a n d communities, provide space and soil for small creative industries and community activities, and support and develop more sustainable forms of economic and social functioning.
Kelham Island Museum: This museum is a treat. Numerous excellent displays, working e n gi n e s, a n d h e l p f u l s t a f f. Informative for a variety of age groups. Good selection of books on industry and Sheffield history. Easy access from the tram line or by walking along the river path.
millennium gallery shepherd mall
Reconstruction: housing project, shepherd mall, university games, millennium g a l l e r y, p l a z a - o p e n s p a c e planning. housing project
university games plaza-open space planning
We n e e d to reuse! open
dynamic
Ariseďź&#x161; Small creative industries, activity space
boring idle
Kelham Island Brewery In 1990 the brewer y was opened on purpose -built premises on Alma Street by the owner of the Fat Cat public house, Dave Wickett.
Vision: To c r e a t e d i v e r s e s t r e e t s a n d communities, provide space and soil for small creative industries and community activities, and support and develop more sustainable forms of economic and social functioning.
Opportunities: Lots of empty land between cities.
Regional Context-Nature of the land Green space Residential area Road river Urban idle space Main entrance
Wall painting: There are some artist's paintings on the wall near the church.
Urban road City Life Christian Church: City Life International is a multicultural church in Sheffield affiliated with the Assemblies of God.
Main street Associated Street Potential activity pavement Potential activity area
13
Character development-functional requirements Action route
Strategy Accessory function
The most important thing is to have a venue where we can hold activities.
Skate square
Action route
I n e e d s o m e w h e re to get more sun and have afternoon tea.
Walk dog street
Step 1 Identify main blocks,and active nodes. What a long street! Suitable for walking.
Outside chairs Wow!there's a little place here for a good rest.
Flea Market Local Residents
Students nearby Stopping point
Action route
Stopping point
Place of activity
Action route
Step 1 Identify main blocks. This street is the most representative of the deepening design. Painting wall
Action route
I can rest here in the sun. It's very comfortable. I can draw here or listen to music.
Safety eyes
If only there were a place or a wall to make art.
Step 2 Add parklets.
Place of activity
Action route
I need a drink. I have nowhere to go.
Step 3 Rich boundary. Art square
Street Corner
Open space with great activity potential Open space with middle activity potential Group of activity
Artist Stopping point
Action route
drunkard
Place of activity
Stopping point
Transitional Edge Potential Evaluation
Action route
Step 1 Identify active nodes.
Articulation-Monotonous Material use,hard unbroken facade with no benches. Distinctiveness-Segments are lack of distinctiveness,similar atmosphere and sensory prominence with surrounding surroundings. Appropriateness-Easily recognizable in existing segments.
Occupation-Very limited opportunities for people to sit;stop;linger or engage. Te m p o r a l i t y - G r e a t c a p a c i t y f o r c h a n g e s w i t h i n segments,easily to shift their functions. Open-ness-Accessibility and social engagement are very limited across segments
Place of activity
I can sit here and have a cup of coffee and look at the crowd.
The high score:Dynamic node The middle score:Stay and pass The low score:connection
Step 4 Activity node detail modification.
The small stage is very attractive ! Here good lively!
1
14
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Perspective Step 2
Step4 Activity node detail modification.
Add parklets.
After
Before
Form parking lots and people's street life in a friendly way node1
node2
node1 Waterfront trail-Students nearby
Waterfront trail-Students nearby
node3
node2 Parking lot
Step 3
Leisure square-Local Residents
Rich boundary.
Through complicated driving routes, adding urban furniture, urban plants and other measures node3 Places of historic interest
Art exhibition block-Artist
node4
node4 Idle street corners
The corner square-Drunkard
15
03
Witness /Land art landscape installation Let nature to witness the growth of children
Type:Personal Work Locationďź&#x161;Sichuan,China Instructorďź&#x161;Zhongyi,Zhang Time:12/2019-1/2020
See the world through children's eyes
Diurnal Story Early in the morning, dew dripped over the grassy slopes around the ship.
16
Nocturnal Story At night, I lie in the boat and watch the stars.
Background
Strategy
Children's entertainment under human intervention Play area
The game purpose
Game mode
Game material
Step 1 Dig ground, build the platform, lay the stairs. Learning skills-Too utilitarian
Accelerated urbanizationSmall space
Electronic games-Lack of communication with par tnersďź&#x152; children are no longer creators.
Step 2 Added game stairs and decks.
Step 3
Step 4
Add climbing and decorating facilities.
Finnished.
Finished toys-Too technologize
Plan
Noninterference entertainment Play area
The game purpose
Game mode
Game material
1m
For happiness and for growthHealthy growth of children
In the natural-Borderless space
Independent play-Children design and participate in games
2m
4m
Materials from nature
Concept How can we design facilities that are more suitable for children to play in?
Variable factor
--What matters is not the facilities but the natural environment.
Phenomena
Play
Game
growth
The height change
Children
Children's curiosit y and imagination need to look to nature for answers. Perspective Looking down Witness
Sunny
Heads up Look up
Rainy weather Nature
morning evening
Twilight Four seasons
Spring Summer Autumn
The natural environment can witness the growth of the child and form the memory of the site.
Winter
17
Bird view Spring
Section
18
Summer
Autumn
Winter
Perspective Looking down
Slide down
Heads up
Climb
Look up
19
04
20
Other works Hand Painted | Photographs
1
2
3
1 Colorful trees
2 Small animal
3 Photos of my travel
21