TKU EA3 portfolio
content
analysis & design specification
plan , section & elevation
models
rendering
analysis & design specification
VR(virtual reality)虛擬實境
沉浸 immersion
小說《虛擬實境》 電影《頭腦風暴(Brainstorm)》、《割草者》、 《一級玩家》一級玩家
構想 imagination
互動 interaction
遊戲、醫療、飛行仿真和作戰訓練
巨大量體
1
2
2 1
3 4
可穿越大樓
城市隙縫
轉角人群聚集
3
4
削減
削減量體
量體通透
diagrid structure system
Sport Centre Jules Ladoumegue / Dietmar Feichtinger Archite Architects Dietmar Feichtinger Architectes
Location 39P Route des Petits Ponts, 75019 Sport Centre Jules Ladoumegue / Dietmar Feichtinger Architectes
Design Team Ingérop, Osmose, Empreinte Oasiis, Peutz & Associés Architects Dietmar Feichtinger Architectes Location 39P Routearea des 10.516 Petits Ponts, 75019 Paris, France Floor m² (gym 6 260 m², Design Team Ingérop, Osmose, Empreinte Roubaix, Exterior planning 27 000 m² Oasiis, Peutz & Associés Floor area10.516 m² (gym 6 260 m², tennis 4 256 m²) Exterior planning 27 000 m²
etmar Feichtinger Architectes
ects Dietmar Feichtinger Architectes on 39P Route des Petits Ponts, 75019 Paris, France n Team Ingérop, Osmose, Empreinte Roubaix, Oasiis, Peutz & Associés area10.516 m² (gym 6 260 m², tennis 4 256 m²) or planning 27 000 m²
tennis
es 142
aris, France
oubaix,服務核類型 服務核類型
256 m²) 邊核型 邊核型
142
8.4 Multi-Tenants 142 8.4 Multi-Tenants
8.4 Multi-Tenants 8.4 Multi-Tenants
8.4 Multi-Tenants 142 8.4 Multi-Tenants
8.4 Multi-Tenants 8.4 Multi-Tenants When dealing When with one dealing tenantwith perone floor, tenant it is easier per floor, it is easier
to locate a receptionist to locate space. a receptionist However, space. when However, Open Plan Open Plan when multi-tenants careful planning more careful is planning is When dealing with When onedealing tenant per withfloor, one tenant it dealing is easier per with floor, multi-tenants it dealing is easier withmore Core Core to locate a receptionist to locate space. a receptionist However,space. when However, when required to keep required the separate to keepoffices the separate independent offices independent Open Plan Open Plan dealing with multi-tenants dealing with more multi-tenants careful planning more allowing careful is planning is share common while while them allowing to them to share program, common program,
特徵: 特徵: 當樓地板面積增大時,核外還需要逃生設 當樓地板面積增大時,核外還需要逃生 Reception Spaces Reception Spaces required to keeprequired the separate to keep offices the separate independent offices independent such as rest rooms such and as rest means rooms of egress. and means of egress. 施、設備管道等。 施、設備管道等。
次標次標
while allowing them whiletoallowing share common them to program, share common program, such as rest rooms such and as means rest rooms of egress. and means of egress.
If two or more If tenants two oroccupy more tenants a space, occupy it becomes a space, it becomes necessary toitcreate necessary a dedicated to create reception a dedicated space reception space If two or more tenants If two or occupy more atenants space,occupy it becomes a space, becomes for each tenant. forThis each creates tenant.the This need creates for a the cor-need for a cor-
necessary to create necessary a dedicated to create reception a dedicated spacereception space Private Spaces Private Spaces for each tenant. for This each creates tenant. theThis needcreates forridor a corthe need forridor a corconnecting theconnecting different offices. the different offices. In these In these
外核型 外核型
1
In these these ridor connectingridor the different connecting offices. the different offices. Common Spaces Common layouts youIncan layouts find two youofcan the find same two types of the ofOpen same types ofOpen Spaces layouts you can layouts find twoyou of the cansame find two types of of the same types of layouts dividedlayouts in one divided floor or in two one orCore floor moreor different two orCore more different
特徵: 特徵: 具有幾乎和單核型相同的特徵。 具有幾乎和單核型相同的特徵。 office configurations office configurations in one floor. These in one office floor. These office Corridor Corridor
layouts divided in layouts one floor divided or two in one or more floordifferent or two or more different
office configurations officeinconfigurations one floor. These in one office floor. These office
floors are usually floors taken areup usually by smaller taken firms up bywho smaller firms who Reception Spaces Reception Spaces
floors are usuallyfloors takenare upusually by smaller taken firms up by who smaller firms who
3
don’t need an entire don’t need floor an to themselves. entire floor toThis themselves. can This can 將設備從核引入辦公室時受到結構限制。 將設備從核引入辦公室時受到結構限制
don’t need an entire don’tfloor needtoan themselves. entire floorThis to themselves. can This can
createon a bigger create profiton a forbigger developers, profit for depending developers, on dependingFour on Tena create a bigger profit createfora developers, bigger profit depending for developers, depending
how they are charging how can theythe arerented charging space. the They rentedcan space. They can how they are charging how they theare rented charging space. the They rented can space. They
防災上不利。當樓地板面積增大需要副核 防災上不利。當樓地板面積增大需要副
charge various charge offices the various for use offices on the for common use on the common charge the various charge offices thefor various use on offices the common for use the on the common space, making profit space, onmaking what would profitnormally on what be would normally be on space, making space, profit making what would profit on normally what would be normally be
中央核型中央核型
charged once bycharged chargingonce it two, by three charging or charged even it two, three or by even four four once once charged charging it two, by charging three or iteven two, four three or even four Open Spaces Open Spaces times. times.
times.
times. 特徵: 特徵: Reception Spaces Reception Spaces Common EgressCommon Egress 標準層樓地板面積: 標準層樓地板面積:
1
Private Spaces Private Spaces
Two Tenant Mixed Tw G的有效率高,以出租型的辦公大樓可以 G的有效率高,以出租型的辦公大樓可 形成最經濟的計畫 形成最經濟的計畫
兩端核型兩端核型
特徵:
特徵:
防災上有利 防災上有利 Open Spaces
Open Spaces
Reception Reception Spaces Spaces Common Egress Common Egress
其他型 其他型
Private Spaces
1
Private Spaces
特徵: 特徵: M、N為分散型,在防災上有利。 M、N為分散型,在防災上有利。
Two Tenant Mixe
Open Plan
Open Plan
Core
Core
1
Open Plan
1
1
2
2
1
Open Plan
Reception Spaces Reception Spaces
2
次標次標
2
Two Tenant Open TwoPlans Tenant Open Plans
enant Open Two Plans Tenant Open Plans
Private SpacesPrivate Spaces
1
1
Common Open Spaces Open 1 2 Common 2 Spaces Open Plan
1
1Open 2 Plan
2
Core
Core
Open Plan
Open Plan
Core Core
Core
Corridor
Open Plan Corridor
Open Plan
3 Reception Spaces Spaces Reception 3 4 Reception 4 SpacesReception Spaces
3
4
4
2
2
Multi-Tenants Perspective Multi-Tenants Perspective In this perspective we In this see perspective just one of many we see config just one of many config urations in which a multi-tenant urations in which floor plan a multi-tenant can be floor plan can be laid out. It shows thelaid approach out. It shows that needs the approach to be that needs to be
Reception Reception 2 Spaces 1 2 Spaces
Common Egress Common Egress
considered when arriving considered to thewhen offices. arriving As well to as the offices. As well as
1
2
1
2
the very different atmospheres the very different created atmospheres within each created within each office as a result of the office layout. as a result of the layout.
Private SpacesPrivate Spaces Private Spaces
nant s Mixed-Plans
Reception Spaces Core
Core Open Plan
Private Spaces
Reception Spaces
Open Plan
Two Tenant Mixed-Plans Two Tenant Mixed-Plans
Tenant 4
Tenant 3 Multi-Tenant Perspective
1 2
Tenant ns Mixed-Plans
Tenant 4
Tenant 3
Multi-Tenant Perspective
2
Open Spaces Open Spaces Reception Spaces Reception Spaces Common Egress Common Egress
1
2
Two Tenant Open Two Plans Tenant Open Plans
Two Tenant OpenTwo Plans Tenant Open Plans
Open Spaces Open Spaces
2
小結 小結
Reception Spaces Reception Spaces
Four Tenant Mixed-Plans Four Tenant Mixed-Plans
xed-Plans Four Tenant Mixed-Plans
1
Open Plan
Open Plan
Core
1
1
2
Private SpacesPrivate Spaces
Two Tenant Mixed-Plans Two Tenant Mixed-Plans
2
動線分割
主管辦公室
會議室 高層會議室 辦公室 研究、辦公
洗手間
機能分層
三星VR企業總部
三星員工休息空間 大型會議空間
出租層
出租層員工休息空間
對外商業空間
0
2
4
8
12m
plan ,section & elevation
site plan
0
2
4
8
12m
B1
plan
B2
B3
0
2
4
8
12m
1F
3F
2F
4F
0
2
4
8
12m
5F
7F
6F
8F
0
2
4
8
12m
9F
10 F
11 F
12 F
0
2
4
8
12m
13 F
14 F
15 F
16 F
0
2
4
8
12m
17 F
18 F
19 F
20 F
0
2
4
8
12m
21 F
22 F
0
2
4
8
12m
northern section
0
2
4
8
12m
western section
0
2
4
8
12m
southern elevation
0
2
4
8
12m
western elevation
0
2
4
8
12m
northern elevation
0
2
4
8
12m
eastern elevation
0
2
4
8
12m
models
structural model
final model
rendering
外觀透視
室內透視