Xiaoling xu portfolio

Page 1

protfolio xiaoling xu 2009-2016


TAIBEI PORT ART CENTER

history

immigration memory

taipei port

evolement

A building to record the history and a momument to early settlement of Taiwan Island

taipei port art center 1

This is a studio project in Taipei Port where has an impressive history of immigrants who brought the flourish for Taipei City, In this project, I tried to design an art center respecting the history and showing the spirit of the immigrants. Team memberďźšXiaoling XuďźŒ Yuqiang Ben. My work: Base investigation, conceptual design, modeling, rendering, plan drawing, video production.


The History “Bali”, formerly known as Bali Tapenkeng, formerly is the community land of Pingpu Ketagalan Bali Tapenkeng Club (Parrigon) . Due to its geographical location, it was the portal for mainland immigrants came to Taiwan in the 18th century. In 1683, Qing Empire occpupied Taiwan, and adapt restriction policies for entering Taiwan. So that it brought a large number of illegal immigrants.

main facade view

The Site main facade

Due to difficulites of crossing the strait, nearly 60 percent of them will be drowning to death. However, Han Chinese still kept crossing the strait to Taiwan and settle in Taiwan. During the period Qing dynasty ruled Taiwan of two hundred years, Han Chinese immigrants shaped the social development graduatelly. Therefore, Taiwan has a saying: “six dead, three stay, one goes back.” Han Chinese immigrant community is gradually growing and setting root in Taiwan, which led to later development of Taiwan.

view

represent this history through contem-

view entrance

winter wind Taipei Port

During 1796-1796 (JiaQing 1st and 2nd Year) , there was a continuous storm, causing sediment clogging the harbor. Therefore, it start to decline. However, in this design, I attempted to record and

view

summer wind Taiwan Island

poary architectural language, because I think this spirit should never be forgotten.

the site and its history

2


TAIBEI PORT ART CENTER The seashell shape of the building was meant to imitate the image of the painting of fish migration in the ocean. The spirit of the early immigrants to the Taiwan island is represented in this painting. They swum accross the ocean, fought with the mother sea, in order to get to a piece of the land where they can put the root and build their life on. They are the ones who brought the culture, the tradition and new life to Taiwan, and they should not be forgotten.

3

the INSPIRATION OF GEOMETRY


There is many advantages of implementing the seashell shape in our building which located in the middle of the ocean. They situated according to local mirco-climate and capture the primary wind to ventilate the building as well as providing great thermal performance in the humid and hot summer. Providing options to use the gradient angles walls in a variety of ways: 1. Close to the vertical angle is usually used as high windows, 2. At the low angle, it could be used as connection space of indoor and outdoor . 3. Low-angle slope roof can be used as outdoor performance space.

There is a bridge connecting the mainland and the island where the center is located. It is a vehicular and pedestrian bridge acrosing the water. The high speed vehicular flow is guided to go the lower floor of the building and get into the parking garage directly. It opens up a full floor of pedestrian walking deck on the upper floor.

The thermal study of the seashell building shape The program organization of the building

Exhibition space

The traffic and pedestrian flow separation design The sectional organization of traffic and pedestrian relationship approaching the building

1,Streamline appearance

Artists’ studio

1,Streamline appearance

Restaurant

1,Streamline appearance

2,Back staircase

Ring corridor

2,Back staircase

3,Glass system

the constituent elements 1,Streamline appearance

the rendering

2,Back staircase

3,Glass system

4,Steel rail

the constituent elements

elements

4 5,Circular traffic


TAIBEI PORT ART CENTER

5

the RENDERING


1

1 2

1

1

1 1

1

3

1

2

2

3

2 11

1

5

55

1 2

3

1 1

22

3 3

2

3

3

3

1

1

1

2

2

3 3

4

4

4

THE INTEIRIOR OF LOBB

4

THE 1ST FLOOR PLAN

the floor plans 1 1

12

THE B2 FLOOR PLAN

THE B1 FLOOR PLAN

1 1

1

2

1.theater 2.exhibition area

2

THE 2ND FLOOR PLAN

1

1

1 3

1

33

2

1

1

3

1

1

1

1 2

3

22

THE 3RD FLOOR PLAN

the floor plans the floor plans and interior the floor plans

1

2

5

4

1.artists’ studio 2 2.restaurant 3.exhibition area

3

1

THE INTEIRIOR OFINTEIRIOR LOBBY THE OF LOB

4 THE INTEIRIOR OF LOBBY

THE INTEIRIOR OF LOBBY

6

4


CULTURAL CENTER DESIGN

city stage

visual connection

display

changchun

A City Center that offers a platform for its people to meet, to perform, to be seen...

cultural center design The project is to create a gathering place to the people who live in this city, to bring their life back to the nature, the artistic environment, the life stage and...

7


I was trying to create a very pleasant , open and interesting place for the people who come to the

cultural center.

I paid a lot of attention to the space between interior and exterior. In order to create a very interesting public space for the community. The platform created by cutting out the central portion of the massing, this central courtyard is a very great focus point of the project. On the other hand, the twisted shape also provide an opportunity for many huge sloped surface, which are accessible from the grade, through a walkable slope, which forms the stage

of the city

.

I also paid attention to the relationship between the building and the landscaping. And used very simple elevation articulation to make the building standsout as a clean and consise form. There are theaters, swimming pool and exhibition spaces in the building. They are allocated surrounding the central courtyard, which can be used as a outdoor stage. It is a perfect combination of form and function.

1 The Massing: The project is located at northeastern of China where is very cold in winter. For thermal consideration, the massing should be compact.

the problems

2 The Height: Rise the east side to increase river-facing building volume, and lower the west side to relieve the tension to the existing residential buildings.

3 Visual Connection: To create a platform and maintain the visual connection between the existing residential building to the canal.

8


CULTURAL CENTER DESIGN

The Theater

Exhibition

Swimming Pool 1 The Stage of the City: The cultural center is not only a place for people to visit, it is also stage for them to interact, perform and express. It is a stage of the city.

9

2 The Sloped Roof: The sloped roof of the building itself is an open park for access.

3 The Sloped Roof and Central Court yard: The integration of interior and exterior spaces, to provide a central court yard to serve as the stage for the city.

the concept


8 12

12

7

6

9 1 1. Lobby 2. Lap Pool 3. Pool 4. Theater 5. Theater Lobby 6. Dinning Hall 7. Kitchen 8. Storage 9. Locker Room 10. Back of House 11. Office 12. Multi-functional Room

I

9

2

5 3 I

4

11 10

THE FIRST FLOOR PLAN

I - I SECTION

the DRAWINGs

10


SPORT-BUSINESS ENPERIENCE CENTER 1. Eco Restaurant 2. Hotel 3. Commercial pedestrian 4. Information Center 5. Theater 6. Art Walk 7. Sport Walk 8. Industrial Meseum 9. Art Meseum 10. Civil Center 11. Serviced apartment 12. Sunken Plaza 13. performance Plaza 14. Eco Plaza 15. Mixed Use Complex 16. Residential Community I 17. Residential community II

experience cold-weather-strategy reorganization Changchun A Unique Place that offers multiple layers of experience to people...

sport - business experience center 11 2

This is a single building design derive from the urban design project I did for my thesis project (tractor factory master planning )in my fifth year. The design kept developing the concept brought up in the master plan and implemented into a architecture scale.


There are a lot of neighborhoods around the base but the lack of public sports and entertainment facilities. It brings the opportunities of sports consumption. The rise of online shopping have a huge impact for the retail store. The proposal for solving these problems is to design a space for both of sports and commercial. Combining sport space, commercial street and sport experience space, this sport-business experience center will sell sporting goods, provides exercise space, as well as offers great experience, and thus to become a hot spot for the community.

The schools around the site

The commercial around the site

Public facilities around the site

1 The Existing Factory Structure

the concept

2 To Existing Factory Structure: - maintain the structure and take a advantage of the big span structure to allocate sport space which require high ceiling height.

3 The Commercial Street: Plug in the commercial street to organize the flow.

4 The Product Experience Space: Insert the experience space in between the sport space and commercial street.

12


SPORT-BUSINESS ENPERIENCE CENTER

gyms

experience units

1 Typical retail street typology

13

retail

2 Activated street space

2 Volume broken-down and generate secondary streets.

2 Experience units plugged in

2 Themes added and different zones are generated

the concept


The strategies for cold weather:

skage board field commodities display

1. To simplify the building massing in order to gain lower S ratio. S = F0/V0 S: The massing ratio, F0: Building Envelop area, V0: Building volume The lower the S, the lower the energy comsuption. The simpler the building shape, the lower the S.

existing roof system and its addition

2. Take the advantages of using PV panel on the roof. The annual sunlight hours in Changchun is about 2200-3000. The energy each PV panel gain annually is 42005400MJ.

retail massing addtion structure second floor corridor

3. The elevator tower brings the chimney effect to the building to increase the natural ventilation of the building, so that to decrease the energy usage throughout the year. Closing up the semi outdoor space in winter, as well as using high-performance insulation also help for using less energy.

pedestrian exsting factory structure (preserved) gym

the system

weather strategy

14


SPORT-BUSINESS ENPERIENCE CENTER

gym

THE renderings

15 2

THE elevations


the color pencil drawing

THE elevations

16 2


KALEIDOSCOPE - MIXED CITY HUB

URBAN design

memory

stage

renovation

changchun

A Renovation project to Recreate An Oasis To The People Who used to live here

Kaleidoscope - MIXED CITY hub This is an old city block renovation project to bring people’s life back to the street, the ally, and the gargen.

17


The site is a void of urbanization of Changchun city. With the relocation of the locomotive plant, workers/residents moved out. Year after year, the community going down turn. The community lose its vitality and attractiveness. Street is the most attractive part of urban life . Street, as the public space, is the skeleton of the city, as well as stage of urban public life. The colorful life of the city is the collective memory of its people, which has been lossing during the rapid urbanization.

1

Road System contrast in the density of grid

Existing Buildings - large scale factories nearby

Historical Buildings - close to the site

Building Height - 2-3 stories lowrise buildings

Intersections

Green Space speading out and insufficient

Vacancies- large amount of unoccupied spaces

The Fabric contrast between industrial and residential

3 2 4

The kaleidoscope is the Metaphor of rich public life. Streets become the stage, the people becomes the actors, actress and audience. The colorful

piece of kaleidoscope is the pieces of the events in the city life. Art is no longer distinguish from the daily, but to become numerous real clips of people’s life. In here, life and art collide, streets and theater coexist, which make people return to the public life, creating a kaleidoscope of the city. Street is the most attractive element in the city life.

1 Existing residents are: retired factory workers immigrate workers poor people

the problems

2 Existing site is: lack of public facilities full of non-permitted constructions with low land use efficiency

3 the open space is: occupied and boiler room cramped by storages in a triangle shape

4 the infrastructure is: old and lack of well maintainence lack of urban planning and no vibrant street lack of sanitary equipment

18


KALEIDOSCOPE - MIXED CITY HUB The concept of urban kaleidoscope, is to create a space to get people back to street life, to perceive the art of life , to inject new vitality to hte community. Transform the community into an urbanized, industrial, historical texture, reflecting the regional culture. Preserve most residential and add prefabricated housing units. And to complete the functionality of the community by introducing retail and commercial. After transformation, the upper part of the building turned into house, while the lower part maintain as the retail store. The multiple level of pedestrican that connect the whole community form a new way of shopping. Remove the temporary strucutures in the middle of the community, build a new theater, improve the pedestrian system, all of which contribute to make a new community space a kaleidoscope of contemporary city living. The nature of the architecture and the city is t provide a space for what occur within. I think caring for the people, and the place for people to meet, for event to occur are the eternal object for urbanism and architecture.

The scale of the industrial blocks

Preserved buildings

Additions

Renovated buildings

New landscape

Four theaters - evenly spread out throughout the community

The connection of all four theaters to connect the whole communicty

Elevated building base - the impact radius of the event has been expanded, a boaderless community

The pedestrian connects the whole community The fabric of the historical elements

place + time + individual + event = the life space = the container for life to TAKE PLACE

cafe: a social place

19

farm: to grow vegetables

life stage : for spontaneous performance

residence addition : a combination of retail and living space

pedestrian: to connect people and space

storefront: to extend to the street

garden: a relax and social space

community center: a relax and social space

theater: a community art center

cinema: a temporary setup place for weekends

understanding the problems 30


the new roof system the redidence addition system

the sky bridge pedestrian

the plugged in public spaces the existing building system

the garden system

the open space system

the system overlaid

early morning

morning

the proposed programs

afternoon

evening

at night

mid-night

20


KALEIDOSCOPE - MIXED CITY HUB

The Stage

The Green

The Green

The Cafe

The Pedestrian

21

THE residential design

THE PLUGGED-IN SPACES

32


TRACTOR FACTORY MASTER PLANNING

city fabric

mixed-use border-less factory renovation

changchun

The rejuvenation of a run-down industrial community that brought its vital life back...

tractor factory master planning This is my thesis project in the fifth year. It is a very good conclusion for my undergraduate study, and also is the proof of my persuit of exploring the relationship between people and its city, the impact to human life by urbanization, the understanding of human scale, as well as the driving force that shape our community.

22


TRACTOR FACTORY MASTER PLANNING The site is located in the old town of Changchun City. The three axis of the city is the most upcoming development area of the city. The site is within 10km radius of the landscape corridor (Yitong River Wetland) and the commercial corridor. Under the new planning policy, this area has great potential to become the regional, cultural and commercial center. The goal of the project is to explore the possitibility

of the redevelopment of the site, by integrating new components systematically.

1 The traffic arround the site are very heavy. But the roads are narrow and congested.

23

2 The existing Diesel Engine Factory is a self-closed campus. It has lower density but not open to public.

3 Because of the enclosed campus, connection in the north-south direction is blocked by the factory.

4 The scale of the factory building is overwhleming to the residential neighborhoods.

the problems


Linear narrow existing streets

Activate the neighborhood and create more public spaces

Homogeneous Grid of green spaces

Staggered and permeate the green belt

Overwhelming existing building scale

Down scale the building volume and reorganize the road system, so that to expand the traffic capcity

the spatial organization Sport

Art

Retail

Commercial

Sport

The pedestrian will connect and activate all four main program groups of sport, art, retail and commercial complex.

Art

Retail

Commercial

Pedestrian cut into the program groups. The interaction between the pedestrians and the different quality of the program groups create interesting spaces.

The space topology development according to specified programs.

the program integration

Introduce the connectors to the system, which connect the green spaces, open spaces and buildings, so that to activate the connection in the north-south orientation.

THE connector concept

24


TRACTOR FACTORY MASTER PLANNING the GENERATION OF DESIGN The connectors

Structural Framing of the factories

The buildings

To preserve the building per evulation

To integrate the green spaces and public spaces

To maintain the green corridors in a proper scale along the eastwest axis

To layout new buildings and adjust the public spaces accordingly

To break the volume of the big factory building to spread out and form public spaces inbetween

To plug in connectors to circulate the public space system

The Pedestrian

The Greem System

Road system Road System

Traffic Control

Zoning Map

The factories

25

the systems overlaid

The connector system

The Green System


1. Eco Restaurant 2. Hotel 3. Commercial pedestrian 4. Information Center 5. Theater 6. Art Walk 7. Sport Walk 8. Industrial Meseum 9. Art Meseum 10. Civil Center 11. Serviced apartment 12. Sunken Plaza 13. performance Plaza 14. Eco Plaza 15. Mixed Use Complex 16. Residential Community I 17. Residential community II

THE MASTER PLAN

26


THE FLOATING CITY

Skyway

connection

Bridge as space

hongkong

A container that combines skyway system, shopping mall and street market.

The Floating 27

City

In this thesis project, I explored a new form of skyway system in Hongkong. Combining the corridors with shopping malls, street market as well as public spaces. The skyway system link the buildings in different levels, creating a multi-level city.


City research — hong kong Urbanism Urbanism in Hong Kong is a result of a combination of top-down planning and bottom-up solutions, a unique collaboration between pargmatic thinking and comprehensive masterplanning, played out in threedimentional space. Footbridge networks throughout the city that grew piecemeal, built by different parties at different times to serve different immdiate needs, enventually formed an extensice network and became a prevailing development model for the city’s largescale urban projects. Ambiguous public space In Hong Kong, social space has been increasingly alienated from public control to the point that corporate power is close to being in command of all significant open spaces in urban areas. Public space are disapearing.

1

Jardin House

Ambiguous public area

2 Executive Centre

Buildings

3

Central Plaza

4

Hongkong Convention & Exhibition Center

Surroundings

28


THE FLOATING CITY

LOWER DENSITY

LOWER DENSITY MORE PUBLIC SPACE

LOWER DENSITY

PUBLIC SPACE LOWERMORE DENSITY

MORE PUBLIC SPACE

MORE PUBLIC SPACE

The concept

commercial buildings

connectors as public space

street market

shopping mall

Site

Victoria Harbor

M

an

Yiu

St

The site is located near the Central subway station in Hong Kong, The site has a complicated context. It is surrounded by the International Financial Center, office buildings, and waterfront recreation facilities. In addition, the site is well connected to the skyway system and it is very accessible to the surronding areas by walking.

Sit

e

Lung

Wo

Rd

Conn

augh

t Rd

Centr

al

Tourists Office workers Residents

skyway subway station

Shoppers

site

Site

29

Circulation

Entrance

Street Market Shopping Mall Skyway

Street Market Shopping Mall Skyway


Flexibility The area of street market provide a flexible place for activities. It could serve the market as well as the restaurants in the shopping mall. Also, it could become the public place for people to gathering.

393.0

98.4 32.8

1-1 Section

3rd Floor Plan

30


建筑主要朝向效果图 BUILDING PERSPECTIVE

I learned so much during the internship. First of all, there was an insight into the top commercial design company working environment and atmosphere. It is a very great experience. Secondly, I learned a lot knowledge and experience beyond that of school books, including the real project submittal, as well as effective teamwork. Finally, of course, there is an opportunity to know a wide variety of very good designers, many of whom are graduates from GSD, as well as PHD candidates from Tongji University architecture school, and such.

29

Overall, I feel very grateful to our school for giving me this opportunity to take on a five months internship.

the internship program in GENSLER SHANGHAI 2013/06 - 2013/08 SHANGHAI GENSLER

I helped for two projects for preparing schematic design presentation package, And a very interesting group research for commercial office buildings. Besides that, I also got invloved to the construction documentation for a residential project. It was a very produtive internship program in Gensler and I was very lucky to be part of it.

31


轨道交通分析 TRANSPORTATION ANALYSIS

建筑主要朝向效果图 BUILDING PERSPECTIVE

基地周边交通分析 SITE SURROUNDING ANALYSIS

基地分析 SITE ANALYSIS

基地分析 SITE ANALYSIS

基地位于滨江新城核心区域,东临湘江风光带,西临潇湘北 路,.滨江新城交通规划有“三纵九横”道路网络及三个地铁站 点,并且通过四条过江道路与河东实现对接,交通便利。未来该 区域将有100万平方米的商业商务建筑群建成,集中打造国际 级都市综合体。建成后将容纳就业人口约35万,居住人口约22 万。将成为长沙复合型新都会中心。

长沙轨道交通又名长沙地铁,于2009年正式启动建设。地铁1 、2号线有序推进 3、4号线计划年内开工.地铁一号线至13年 6月结构施工完成,二号线已全线贯通.至2018年底长沙市将建 成总规模142.03km的地铁线网。其中地铁四号线从基地西侧穿 过。城区主干道有五一路、芙蓉路、韶山路、东风路、解放 路、长沙大道、三一大道、中山路、黄兴路、湘江路、潇湘大 道、万家丽路、人民路和“六桥三环”。

基地五分钟步行范围内可达湘江,十分钟步行范围可达地铁站 和公交站。区域交通十分便利。 双 河 路 Shuanghe Road

长望路站 ChangwangRoad Station

长 望 路 ChangwangRoad 水

Metro Line 1 地铁一号线 Metro Line 2 地铁二号线

s

Main Road 城市重要道路 Metro Line 1 地铁一号线

e

Metro Line 3 地铁三号线

River

SITE

路 b 北 湘 n g 潇 i a X i a o x

Intercity Railway 城际铁路

ng 河 Liuya

围 stan 范 di 行 e 步 bl 钟 alka 分 W 五 IN 5M 含 光 路 H anguang Road

Changsha West Bus Station

i

长沙火车站 Changsha Railway Station

基地 茶 山 路 Chashan Road

Riverside G rener y

路 杉 银 Yinshan Road

长沙汽车西站

基地

湘江 XI ang River

道 观 景 ands cape L R a 江i d e od 滨e r S R i v

谷 岳 路 Guyue Road

坦 山 路 Tanshan Road 10MI 十分 N Wa 钟步 lka 行范 ble dis 围 tan s

基地 Site

Metro Line 4 地铁四号线

R

Metro Line 4 地铁四号线

o a

机场方向

d

Metro Line 5 地铁五号线 Metro Line 6 地铁六号线

To Airport

Metro Line 6 地铁六号线

茶山路站 Chashan Road Station

Bus Station 公交车站

安 居 路 Anju Road

Trunk Road 城市主干道

银 盆 岭 路 Yinpanling Road

26

29

25

总平面 SITE PLAN

建筑平面 FLOOR PLAN

鸟瞰效果图 AERIAL

上海浦东发展银行长沙支行办公楼 滨江新城片区C-3-3-1(南)地块 PN: 51.7482.000 PROJECT OVERVIEW 地块规划控制条件 PLANNING 控规

PROPOSED 设计

PROGRAM DATE 项目时间

6.5

38.66 %

≥20 %

N/A %

TYPE 类型:

Mixed Use 综合建筑

Office/Retail 办公/ 配套商业

PARKING TYPE 车库类型:

Underground Garage 地面停车/地下车库

Underground Garage 15% Surface 地下/15%地上

PARKING COUNT 车位数量:

400 320 80

392

Below-grade 地下

MAXIMUM BUILDING HEIGHT 限高:

Elevation (m)

Floor to Floor Heights (m)

楼层名称

楼层标高(米)

层高(米)

1 2 3

99.95/20.1 m

2

Retail GFA (m²) 商业建筑 面积 (平方米)

6.00

2,949

4.50

2,100

4.50

15.60

5

Office GFA (m²) 办公建筑 面积 (平方米)

0.60 6.60 11.10

4

GFA (m²) 楼层建筑 面积(平方米)

0

2,100

4.50

20.10

2,623

4.20

Remark 附注

2,949

分行对外营业

2,100

分行对外营业

2,100

分行对外营业

1,780

分行技术

塔楼

1,780

分行技术

塔楼

8

32.70

9

4.20

36.90

10

1,780

4.20

41.10

11

78.90

4.20

83.10

4.20 4.20

91.50

8.00

1,780

1,780 分行行政办公

1,780 1,780

PE 4

PE 5

竖向管井

景观广场

塔楼

塔楼 塔楼

87.30

PE 3

塔楼

1,780 分行行政办公 1,780 分行行政办公

19

PE 2

塔楼

1,780 1,780

20

SHAFT

PE 1

塔楼

4.20 4.20

21

SE 2

办公楼入口

茶山东路 CHASHANDONG ROAD

塔楼

70.50 74.70

Main Roof

合用前室

塔楼

1,780 总行物业管理 1,780 总行物业管理 1,780 总行物业管理 1,780 总行物业管理 1,780 总行物业管理

17 18

屋顶 Bulkhead Roof 楼电梯间屋顶 Sub-Total 合计

VESTIBULE

塔楼

1,780 总行物业管理

1,780 1,780 1,780 1,780 1,780

管事房

管事房

WC - M 男厕所

SHAFT 竖向管井

塔楼

1,780 总行物业管理

1,780

4.20 4.20 4.20 4.20 4.20

办公 OFFICE 高度HEIGHT: 99.5m 层数No.of FLOOR: 21

塔楼

1,780 总行物业管理

1,780

4.20

49.50 53.70 57.90 62.10 66.30

1,780 总行物业管理

1,780

4.20

45.30

12

JAN.

JAN.

女厕所

SE 1

合用前室

ELC 强电间

裙房

1,780 1,780

13

VESTIBULE TEL 弱电间

裙房

4.20 4.20

14

SHAFT WC - F AHU 空调机房

PE 6

PE 7

营业厅入口 BANKING HALL ENTRANCE

塔楼

24.30 28.50

15

密控制

裙房

1,780 分行员工活动

6 7

16

--

地下停车 入口 RAMP

营业厅 BANKING HALL 高度HEIGHT: 20.1m 层数No.of FLOOR: 4

裙房

2,623 分行员工活动

1,780

管理

管事房

150 m

CLASS A OFFICE 甲级办公

Floor Level

行物

Security Level--Tightly Contral 安全等

JAN.

59

NO. FLOOR BELOW GRADE

Properties Management

地下停车入口 RAMP

333

PROPOSED BUILDING HEIGHT 建筑高度:

放 --控制

Core 核心筒

城市绿廊 GARDEN VIEW CORRIDOR

潇湘中路 XIAOXIANGZHONG ROAD

≤50 %

GREENERY REQ. 绿化率:

--

Public Corridor 公共走廊

40,032.3 m² 12,570.0 m²

BUILDING DENSITY 建筑密度:

/大堂

Security Level--Contral 安全等

5.2 52,602.3

49,585 m²

放空

Security Level--Open 安全等

7,628.53 m²

Above-Grade 地上

BUILDING A 建筑 A Signage

Public Space

2013 June

SITE AREA 总基地面积: FLOOR AREA RATIO 容积率: GROSS FLOOR AREA 总建筑面积: GFA ABOVE GRADE 地上建筑面积: GFA BELOW GRADE 地下建筑面积:

塔楼

1,780 分行行政办公

塔楼

1,780 分行行政办公

塔楼

Max. HT 150m 限高150米

99.50 40,032

0

40,032

Ground Floor Plan 地面层平面图 1:300

28

27

Public Space

放空

建筑平面 FLOOR PLAN

/大堂

Security Level--Open 安全等

--

Security Level--Contral 安全等

33

建筑剖面 BUILDING SECTION

建筑立面 ELEVATIONS

--控制

Public Corridor 公共走廊 Core 核心筒 行物

Properties Management

管理

Security Level--Tightly Contral 安全等

密控制

--

Public Space

放空

/大堂

Security Level--Open 安全等

--

Security Level--Contral 安全等

放 --控制

Public Corridor 公共走廊 Core 核心筒 Properties Management

行物

管理

Security Level--Tightly Contral 安全等

WC - M

SHAFT TEA RM.

JAN.

茶水间

WC - M

管事房

SHAFT TEA RM.

SHAFT

女厕所

TEL

合用前室

JAN.

SHAFT

管事房

TEA RM.

合用前室

SHAFT 竖向管井

弱电间

VESTIBULE

SE 2

SE 2

WC - F

SE 1

女厕所

VESTIBULE

VESTIBULE

合用前室

TEL

ELC

女厕所

TEL

VESTIBULE 合用前室

SHAFT 竖向管井

弱电间

SE 2 ELC

SE 2 ELC

强电间

PE3

PE 4

SHAFT

PE 5

PE 1

PE 2

PE3

管事房

WC - F

SE 1

合用前室

合用前室

SHAFT 竖向管井

弱电间

强电间

PE 2

JAN.

茶水间

WC - M 男厕所

AHU 空调机房

VESTIBULE

合用前室

VESTIBULE

TEA RM. 茶水间

WC - M 男厕所

AHU 空调机房

WC - F

SE 1

VESTIBULE

女厕所

SHAFT 竖向管井

PE 1

密控制

管事房

空调机房

WC - F

SE 1

合用前室

ELC 强电间

SHAFT

--

JAN.

茶水间

男厕所

AHU

男厕所

AHU 空调机房

VESTIBULE TEL 弱电间

强电间

PE 5

PE 4

竖向管井

竖向管井

PE 1

SHAFT

PE 2

PE3

PE 5

PE 4

Eighth to Sixteenth Floor Plan - Layout 4 八层到十六层平面图 - 布局四 1:300

SHAFT

TEA RM.

PE 5

PE 4

分行副总经理办公室

分行副总经理办公室

分行总经理办公室

Seventeenth to Tw T entieth Floor Plan 十七层到二十层平面图 1:300

T enty -first Floor Plan Tw 二十一层平面图 1:300

JAN.

茶水间

WC - M

PE3

PE 2

竖向管井

分行副总经理办公室

Eighth to Sixteenth Floor Plan - Layout 3 八层到十六层平面图 - 布局三 1:300

PE 1

SHAFT

竖向管井

管事房

男厕所

AHU 空调机房

PE 6

VESTIBULE

WC - F

SE 1

VESTIBULE

女厕所

合用前室

合用前室

PE 7

TEL

SHAFT 竖向管井

弱电间

SE 2 ELC

强电间

STAFF SHOWER 银行员工淋浴室

PE 2

SHAFT

PE 3

PE 4

PE 5

竖向管井

STAFF LOCKER ROOM 银行员工更衣室

Public Space

放空

MANAGEMENT OFFICE 管理办公

MANAGEMENT OFFICE 管理办公

MANAGEMENT OFFICE 管理办公

/大堂

Security Level--Open 安全等

--

MEP 设备

MEP 设备

Security Level--Contral 安全等

--控制

MEP 设备

Public Corridor 公共走廊 VESTIBULE

VESTIBULE

前室

前室

TEA RM.

SHAFT

Core 核心筒

PARKING 30 STALLS

JAN.

茶水间

WC - M

SHAFT

管事房

TEA RM.

JAN.

茶水间

WC - M

男厕所

AHU

管事房

男厕所

AHU

空调机房

空调机房

MEP 设备

PE 6

停车 12辆 VESTIBULE PE 7

WC - F

SE 1

VESTIBULE

女厕所

VESTIBULE

合用前室

合用前室

TEL

保管箱库/操作间

WC - F

VESTIBULE

女厕所

合用前室

SHAFT 竖向管井

弱电间

SE 2

管理

ELC

强电间

SAFE OPERATION RM

SE 1

合用前室

TEL

SHAFT 竖向管井

弱电间

行物

Properties Management

SE 2

MEP 设备

ELC 强电间

MEP 设备

Section 剖面 1:400

LOADING DOCK

Security Level--Tightly Contral 安全等 SHAFT

PE 1

PE 2

PE 3

PE 4

竖向管井

MECHANICAL PARKING 168 STALLS

机械停车库 196辆

SAFE STORAGE RM 保管箱库

CASH COUNTING

SECURITY ROOM

整点室

PE 5

卸货平台

密控制

--

SHAFT

PE 1

PE 2

PE 3

PE 4

PE 5

竖向管井

South Elevation 南立面

AFFAIR HANDOVER RM 业务交接室

保安室

CASH LOADING 卸款区

CASH BOX VAULT 款箱库

MEP

CASH LOADING

设备

卸款区

East Elevation 东立面

North Elevation 北立面

West Elevation 西立面

MEP 设备

VESTIBULE

VESTIBULE

前室

前室

B1 Floor Plan B1 层平面图 1:400

B2 Floor Plan B2 层平面图 1:400

电梯系统 ELEVATOR SYSTEMS

幕墙系统 FACADE SYSTEMS

银行办公+管理物业模式 BANK + LEASE MODE

全银行使用模式 BANK ONLY MODE

银行行政楼层

银行行政楼层

spd bank design

银行行政楼层

总行管理物业

3

3 1:50

37

36

35

Changsha, China Schematic Design Package

1:50

银行办公区域

银行办公区域

银行办公区域

大堂 / 营业厅

大堂 / 营业厅

地下室 B1,B2

地下室 B1,B2

大堂 / 营业厅

地下室 B1,B2

VIP电梯

VIP电梯

38

银行营业厅用电梯 银行办公区用电梯 总行管理物业用电梯

银行营业厅用电梯

银行营业厅用电梯 消防电梯

银行办公区用电梯 总行管理物业用电梯 消防电梯

银行办公区用电梯 总行管理物业用电梯 消防电梯

32 39


建筑主要朝向效果图 BUILDING PERSPECTIVE I helped putting together the presentation package of the office tower project. It is the first time I ever worked on a real project. I was very nervous and afaird of making any mistakes. It is proved that extra attention to any technical detail is the only way to avoid mistakes. My supervisor taught me a lot, as well as how to work with other team member, as well as working in the office’s international wide server system. This is something you will never learn from a book, or school work.

鸟瞰效果图 AERIAL

29 28

33

the final renderings


xiaoling xu WUSTL


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.