Carden & Godfrey Small Architecture practice, in central London Specialising on Conservation and Restoration 2006 - 2011
Honorable Artillery Company, City of London - Museum Refurbishment - 3D visualisations, detailing and general arrangement drawing
3
Honorable Artillery Company, City of London - Museum Refurbishment - 3D visualisations, detailing and general arrangement drawing
4
Tidebrook Church - Extension and Interior Alterations - Planning Permissions, Technical Design, Building Control Approval, Tender process, Contract Administration.
5
Rochester Cathedral, Kent - Interior alterations, stone repairs and restoration. - CAD Technician, Detailedm technical design, liaise with manufacturers
6
St Mary’s Church, Whatlington, East Sussex - Complete restoration following devastating fire. Medieval roof trusses uncovered, Victorian conversion removed and original church restored.
7
Jo Townshend Architects Micro practice located in south-east London Small projects, mainly residential 2012 - 2016
8
Grove Hall Court, London - Mansion block restoration and interior alterations - Building control approvals, client liaison, contract administration, meetings and design development with consultants and fabricators
9
Grove Hall Court, London - Mansion block restoration and interior alterations - 3D Visualisation built in Vectorworks, finished in Photoshop
10
Grove Hall Court, London - Marquetry and metalwork
11
Grove Hall Court, London - Joinery packages.
12
Grove Hall Court, London - Lighting design.
13
Chepstow Place, London - Basement extension and interior alterations to town house
14
Corner Green, Blackheath - Rear extension to existing end of terrace house - Planning permissions, Building control approval, technical design and Tender process.
15
Corner Green, Blackheath - Rear extension to existing end of terrace house - Discreet relationship to existing garden wall in conservation area
16
Corner Green, Blackheath - Rear extension to existing end of terrace house - use of roof light to separate original house with the new extension.
17
New Penthouse, Belsize Park, London - Lead designer and contract administrator through all RIBA stages.
18
New Penthouse, Belsize Park, London - Image built in Vectorworks and finished in Photoshop
19
New Penthouse, Belsize Park, London - Interior of living space
20
New Penthouse, Belsize Park, London - Roof terrace
21
New Penthouse, Belsize Park, London - Renewal of common parts, including new curtain wall system to Atrium
22
750
1140 W-4
1800
2050 W-5
RL-4
1160 W-2
220x63mm 'I' joists @ 400cts
BED 2 220x63mm 'I' joists @ 400cts
BATHROOM
460
RWP
L1/106
103/C/337
220x63mm 'I' joists @ 400cts
C/L
103/C/337
350
SVP+ aav 521
RL-1 roof light over
1160 W-3
K1/116
103/C/335
RWP
440
103/C/417
103/C/332
103/C/331
Coping
750
ID-7
ID-6 M4/110 M4/108
RWP 521
M1/108
402 C
900
F1/304
900 M1/102 H2/106
ENT. LOBBY
103/C/336
RL- 3
103/C/332
1350
402 B
L1/102
G2/118
ID-9
BED 1
F1/304 F1/304
220x63mm 'I' joists @ 400cts
ID-1
402 A
220x63mm 'I' joists @ 400cts
ID-8
220x63mm 'I' joists @ 400cts
N1/102
W-1
Hoist structure
C/L
SD-3
1350
ID-2
HWS SVP+ aav
2030
1100
C/L
220x63mm 'I' joists @ 400cts
103/C/336
ID-5
coats cupb'd ID-4
ID-3
M4/104
roof light over Water
RWP
EN SUITE
Boiler
103/C/334
103/C/333
103/C/333
M1/108
CWS
services cupb'd Boost. Pump
RL-2
103/C/334
220x63mm 'I' joists @ 400cts
1240
LIVING/ DINING/ KITCHEN
750
UFH
VENT. SHAFT
R1/102 G2/104
Roof access hatch
220x63mm 'I' joists @ 400cts
401 A
401 B
SD-2
RWP
401 C
K1/118
L1/116
SD-1
2300
2300
1190
1190
Brise Soleil over
L1/102
Brise Soleil over
Q1/138 L3/102
e jo@jotownshend.com www.jotownshend.com
103/C/339
103/C/339
TERRACE
L1/110 F1/304 M1/116
103/C/338
103/C/331
1 Cresswell Park, London, SE3 9RD t + 44 (0) 208 318 3434 m + 44 (0) / 07970 428 606
N
Jo Townshend Architect
TERRACE
2500
NOTES: - Refer to 103/C/100 - 109 for exist. drwgs - Refer to M&E information for electrics, drainage and services - Refer to Struct. Eng's. information for structure - Refer to NBS spec. for clause information - Refer to 103/C/510 for finishes schedule
Coping
0m
1m
3m
rev:
C5
project title:
date:
103/C/335
06/11/2015
notes:
Bathroom wall setting out
drwg title:
PROPOSED 6th Floor Plan
paper size: file: A3
scale:
103-2 Antrim Grove 1:50@A3
date: Apr-15
drwg nos: 103 /C/ 306
rev: C5
Aluminum gutter
RWP
RWP
RL-1
Falls
EXT.
Rooflight
Fixed Rooflight
RL-4 Openable Rooflight
EXT.
Mansafe system by Latchways or similar approved L1/106
RWP
Falls PV panels
EXT.
RL-2
PV panels
PV panels
Falls
Fixed Rooflight
AOV
14m2
Automatic opening vent
Aluminum gutter
M1/108
Aluminum gutter
Lift overrun details to be agreed
EXT.
RWP
2000 G2/108
RL- 3 Fixed Rooflight
J1/104
Falls
R1/102
2000
Roof access hatch
AOV
Exact new AOV location TBC L1/116
RWP
L1/112
Aluminum gutter
Brise soleil
L1/110
NOTES: - Refer to 103/C/100 - 109 for exist. drwgs - Refer to M&E information for electrics, drainage and services - Refer to Struct. Eng's. information for structure - Refer to NBS spec. for clause information
e jo@jotownshend.com www.jotownshend.com
For COMAR drawings see 550-567
1 Cresswell Park, London, SE3 9RD t + 44 (0) 208 318 3434 m + 44 (0) / 07970 428 606
0m
1m
3m
N
Jo Townshend Architect
F1/304
rev:
C2
project title:
date:
-
notes:
GENERAL UPDATE
drwg title:
PROPOSED Roof Plan + Structure
paper size: file: A3
scale:
103-2 Antrim Grove 1:50@A3
date: Apr-15
drwg nos: 103 /C/ 310
rev: C2
J1/104 G2/108
R1/102
DF A2
DF A2
H2/106 600
DF A2
DF A2
L1/112
413 A
line of ring beam beyond
U/S O. Ring beam +2100 N1/102
12 brick courses
1100
TERRACE access only
2775
L1/102
F1/106
2315
2100
2417
2372
line of lift shaft lining beyond
M1/104
L1/116
KITCHEN/ LIVING ROOM
W-4
TERRACE
SD-2
750
FFL +0
EFL -65 G2/102
460
G2/104
1015
413
BOE
B
FLAT NO.9 BELOW
M4/104
Q1/138
F1/106
NOTES: - Refer to 103/C/100 - 109 for exist. drwgs - Refer to M&E information for electrics, drainage and services - Refer to Struct. Eng's. information for proposed and existing structure - Refer to NBS spec. for clause information
Jo Townshend Architect
e jo@jotownshend.com www.jotownshend.com
1 Cresswell Park, London, SE3 9RD t + 44 (0) 208 318 3434 m + 44 (0) / 07970 428 606
rev: 0
1m
1.5m
C3
project title:
date:
07/07/2015
notes:
Dims Added
drwg title:
Section A-A- Section thru' Kitchen+Living+Terrace
paper size: file: A3
103-2 Antrim Grove
scale: 1:20
date: Jul-14
drwg nos: 103 /C/ 331
rev: C3
Structure to engineer's dwg
J1/104
MIN HEIGHT OF LIFT +3200 OVERRUN TBC BY LIFT SUPPLIER
L1/106
410
RL-2
A
G2/108
R1/102
DF A2
G2/106
DF A2
DF A2
DF A2
U/S O. RING BEAM +2100
line of ring beam beyond
M1/106
H2/106 DF A2
DF A2
M1/104
M1/108
K1/116
DF A2
L1/116
2417
2315
2100
2775
F1/106 DF A2
DF A2
DF A2
W-2
ID-3
ID-2
LIFT SHAFT
ENTRANCE LOBBY
W-3
405
750
KITCHEN INSTALLATION OF KITCHEN AND SECOND FIX NOT AS PART OF THIS CONTRACT
TERRACE 410 B
DF A2
DF A2
FFL +0
G2/102
460
G2/104
EFL -65
415
NOTES: - Refer to 103/C/100 - 109 for exist. drwgs - Refer to M&E information for electrics, drainage and services - Refer to Struct. Eng's. information for proposed and existing structure - Refer to NBS spec. for clause information
Jo Townshend Architect
e jo@jotownshend.com www.jotownshend.com
M4/104
1 Cresswell Park, London, SE3 9RD t + 44 (0) 208 318 3434 m + 44 (0) / 07970 428 606
rev: 0
1m
1.5m
C3
project title:
date:
07/07/2015
notes:
Dims added
drwg title:
Section B-B - Section thru' lift shaft
paper size: file: A3
Q1/138
F1/106
103-2 Antrim Grove
scale: 1:20
date: Jul-14
drwg nos: 103 /C/ 332
rev: C3
1
A
2
3
A M1/106 Plasterboard dry lining on metal studs
L1/102 Proprietary windows
K1/118 Wood and wood based trim
SHS post to Structural Engineer's details
FOR NOTES REFER TO 103/T/410
15mm PIR insulation to external face of SHS post
H2/106 Aluminium composite cladding system
Reflected ceiling plan of soffit panels to SW and NW glazed corners
outline of sliding panel
B NOTES: - Refer to 103/C/305 for key - Refer to M&E information for electrics, drainage and services - Refer to Struct. Eng's. information for proposed and existing structure - Refer to schedules for finishes - Refer to NBS spec. for clause information
Jo Townshend Architect
e jo@jotownshend.com www.jotownshend.com
A 1 Cresswell Park, London, SE3 9RD t + 44 (0) 208 318 3434 m + 44 (0) / 07970 428 606
1
0m
B
300mm
rev:
C3
project title:
date:
07/03/16
notes:
Clarification of Soffit mtg. detail
drwg title:
2
C
PLAN DETAIL - Corner Post / Sliding Door
paper size: file: A3
B
103-2 Antrim Grove
3
scale:
date:
1:5@A3
Jul-14
drwg nos: 103 /C/ 402
rev: C3
R1/102 Eaves rainwater drainage
FOR NOTES REFER TO 103/T/410
FOR NOTES REFER TO 103/T/410
J1/104 Single layer polymeric membrane roof covering
insect mesh to protect vent holes
G2/108 Timber joist flat roof structure
M1/104 Plasterboard backing to ceilings
180
N1/102 Curtain rail
SITE DIM. 12mm TBC W/ manufacturer Air tightness membrane lapped vapour control layer
Insect mesh protecting continuous 10mm vent gap
'bird's beak' behind
L1/102 Proprietary windows
10mm TBC W/ manufacturer
A
C/L
B Velfac cill Double sided adhesive tape L bracket behind
1:1 - S/O Detail of cladding panels 'bird's beak' behind
10mm TBC W/ manufacturer K1/118 Wood and wood based trim
12mm TBC W/ manufacturer
15mm paintable PVCu shadow gap bead fixed and finished as manufacturer's instructions
SITE DIM C/L Velfac cill
fixing lug by VELFAC
'L' Bracket
M1/106 Plasterboard dry lining on metal studs NOTES: - Refer to 103/C/335 for key - Refer to M&E information for electrics, drainage and services - Refer to Struct. Eng's. information for proposed and existing structure - Refer to schedules for finishes - Refer to NBS spec. for clause information
Jo Townshend Architect
H2/106 Aluminium composite cladding system
SCALE
1 Cresswell Park London SE3 9RD
0m
C5 rev:
0208 318 3434 07970 428 606
500mm
04/03/16 date:
notes:
Cladding Details updated following Saracan mtg.
drwg title: paper size:
project title:
2 Antrim Grove, NW3 4XR
A3
Typical Window Detail file:
scale:
date:
103-2 Antrim Grove
1:5
Jul-14
drwg nos: 103 /C/ 411
FOR NOTES REFER TO 103/T/410
FOR NOTES REFER TO 103/T/410
R1/102 Eaves rainwater drainage
J1/104 Single layer polymeric membrane roof covering
H2/106 Aluminium composite cladding system G2/108 Timber joist flat roof structure
Outline of brise soleil bracket beyond
M1/104 Plasterboard backing to ceilings
Outline of soffit downlights beyond
N1/102 Curtain rail
600mm projection from cladding
M1/106 Plasterboard dry lining on metal studs
fixing lug by VELFAC Air tightness membrane lapped vapour control layer
FOR NOTES REFER TO 103/C/401
259
85
50 outline of sliding sash
460
Weather seal in line with frame nosing
A
L1/102 Proprietary windows
PU insulation
B
114mm V200 frame
M4/104 Resin flooring
VCL continued along threshold opening
0
Single ply membrane continued
FFL
Kebony board special
185
65
-65
T/O Deck
Q1/138 Timber decking
FOR NOTES REFER TO 103/T/415
G2/104 Timber joist upper floor structure
G2/102 Timber joist floor structure for roof terrace
F1/104 External solid walling
NOTES: - Refer to 103/C/331 for key - Refer to M&E information for electrics, drainage and services - Refer to Struct. Eng's. information for proposed and existing structure - Refer to schedules for finishes - Refer to NBS spec. for clause information
Jo Townshend Architect
0m
SCALE
1 Cresswell Park London SE3 9RD
C4 rev:
0208 318 3434 07970 428 606
500mm
07/03/2016 date:
notes:
Cladding Details updated following Saracan mtg.
drwg title: paper size:
project title:
2 Antrim Grove, NW3 4XR
A3
*KEY* Typical Threshold & Brise Soleil Detail file:
scale:
date:
103-2 Antrim Grove
1:50
Jul-14
drwg nos: 103 /C/ 413
L1/112 Brise soleil
Structure to Engineer's details
L1/116 Glass balustrading to parapet
Upper 380mm section of 15mm toughened glass with a clear finish
414
Lower 720mm section of 15mm toughened glass with a transluscent finish
A
F1/368 Precast concrete sills
Stainless steel fixing to clamp glass to parapet wall
720
1100
F1/338 Flexible DPC
F1/104 External solid walling
100
IP rated LED light glass to light perimeter of terrace
FOR NOTES REFER TO 103/C/415
Q1/138 Timber decking
TERR. NOTES REFER TO 103/T/415
Liquid applied DPC to comply with the British Standard Code of Practice CP 102:1973: Protection of buildings against water from the ground, Sections 1005 and 1007. Sovereign Hey'di K11 Tanking System - or similar approved G2/102 Timber joist floor structure for roof terrace
200
NOTES: - Refer to 103/C/331 for key - Refer to M&E information for electrics, drainage and services - Refer to Struct. Eng's. information for proposed and existing structure - Refer to schedules for finishes - Refer to NBS spec. for clause information
Jo Townshend Architect
1 Cresswell Park London SE3 9RD e jo@jotownshend.com www.jotownshend.com
0m
SCALE
C2 rev:
0208 318 3434 07970 428 606
500mm
10/11/2015 date:
notes:
DPC Updated
drwg title: paper size:
project title:
2 Antrim Grove, NW3 4XR
A3
Terrace Parapet + Balustrade Detail file:
scale:
date:
103-2 Antrim Grove
1:50
Jul-14
drwg nos: 103 /C/ 414 C2
1
2
3
G2/118 Timber stud internal partition structure
M1/106 Plasterboard dry lining to masonry
M4/110 Rigid tiling to walls
M1/102 Plasterboard backing to timber framed walls and partitions
M1/110 Rigid tiling to walls
M1- 312, 604 & 346
A
A
EXISTING MASONRY LIFT SHAFT FOR NOTES REFER TO 103/C/410
M4/106 flexible tiling to floors
G2/104 Timber joist upper floor structure
G2/104 Timber joist upper floor structure
M4/104 Resin flooring
M4/106 flexible tiling to floors
G2/104 Timber joist upper floor structure
K1/118 Wood and wood based trim
refer to Structural Engineer's details
B
B
A
B
C
NOTES: - Refer to 103/C/333, 335, 334 for key - Refer to M&E information for electrics, drainage and services - Refer to Struct. Eng's. information for proposed and existing structure - Refer to schedules for finishes - Refer to NBS spec. for clause information
Jo Townshend Architect
e jo@jotownshend.com www.jotownshend.com
1 Cresswell Park, London, SE3 9RD t + 44 (0) 208 318 3434 m + 44 (0) / 07970 428 606
1
0m
300mm
rev:
C1
project title:
date:
05/05/2015
notes:
FOR CONSTRUCTION
drwg title:
paper size: file: A3
2
Typical Floor Details 103-2 Antrim Grove
3
scale:
date:
1:20@A3
Jul-14
drwg nos: 103 /C/ 416
rev: C1
Searles Road, south London - Maximising potential of roof space, converting studio flat into two-bed apartment. Lead designer and contract administrator through all RIBA stages.
23
Sudbourne Road, Brixton, London - Lead design and contract administrator through all RIBA stages.
24
Sudbourne Road, Brixton, London - Green roof and roof light.
25
Sudbourne Road, Brixton, London - Joinery package included movable kitchen/DJ unit, built in kitchen and dining area.
26
B
B 2. PLAN Stainless steel rod
A
1. ELEVATION A
2440
18
370
277
Stainless steel worktop
C
C
A
40
135 2. ELEVATION B
4. ELEVATION C Drawer units
250
825
40
Handle can be used as a conduit for cables at parties
1000
c/l
180 deg. opening with stay
formica - silver
walnut Stainless steel wrap around
135
40
eq. a
18
155
30
eq. a
eq. b
935
540
c/l
1000
walnut slatted shelf
c/l
580
40
Cable tidy - Brushed stainless steel walnut
eq. b
30
40
40
walnut legs
Castors with brake
2. PLAN - ELECTRICAL
Brushed stainless steel, albany range from MK logic or simliar approved. Spring loaded hinged lid to be mounted flush with surface
Brushed stainless steel, albany range from MK logic or simliar approved. two double sockets within the sub woofer cupboard and two externally facing
118_SK171214_JS01
44 Sudbourne Rd
3 no. 150mm raised planters and landscaping Q10 rad
42 Sudbourne Rd
Title Block 170109_JS
15500
MUSIC ROOM
LIVING ROOM
coats
TV
rad
drying
wm/ td
storage
storage
GM
40 Sudbourne Rd
Make good access path, 2no. front gates and garden area to rear Q10
1. LANDSCAPING PLAN 1:100
401
301
401
Reinstate fence and gate /Q10 RWP /R10 Kitchen /N11 304
303
Replace Patio Doors /L20
Rooflight above /L10
MUSIC ROOM
Reinstate Music Room M60
A D 211 B C
Paving to form flush threshold and landscaping to entire rear garden /Q10 412
Retain and restore exposed brick wall F10
coats
rad
drying
412
wm/ td
Rear Patio Doors /L20 Client Table
Floor Build Up /E10 Storage /N10
storage
302
Wall Build Up and Finishes /F10 /Z21 Reinstate fences and gate /Q10 Make good affected rear garden area Q10
To line up with no. 40
e jo@jotownshend.com www.jotownshend.com
Upstairs, Art Building The Conservatoire 19-21 Lee Road London SE3 9RQ t +44 (0) 208 318 3434 m + 44 (0) 7970 428 606
SCALE
0
1m
3m
N
2. GA PLAN 1:50
notes: project title:
FOR TENDER
42 Sudbourne Road, SW2 5AH
initials:
JS
drawing title: checked:
JS
scale:
1:50
paper size:
A3
Proposed Ground Floor Plan
file:
issue date:
118 Sheet AH.vwx
28/2/17
drwg nos:
118 /
201
/
T1
Title Block 170109_JS
412
412
412
Brick on Edge /F10
Rooflight /L10
Brick on End /F10
Roof Build Up /H21
600 Rear Patio Doors /L20
Floor Build Up /E10
Slot Drain /R10 Landscaping /Q10 411
e jo@jotownshend.com www.jotownshend.com
Upstairs, Art Building The Conservatoire 19-21 Lee Road London SE3 9RQ t +44 (0) 208 318 3434 m + 44 (0) 7970 428 606
SCALE
0
1m
3m
notes: project title:
FOR TENDER
42 Sudbourne Road, SW2 5AH
initials:
JS
drawing title: checked:
JS
scale:
1:50
paper size:
A3
file:
Proposed Long Section issue date:
118 Sheet AH.vwx
28/2/17
drwg nos:
118 /
214
/
T1
Title Block 170109_JS
Brick on Edge /F10
Rooflight /L10
Roof Build Up /Q37
Cavity Wall /F10
Replace Patio Doors /L20
Floor Build Up
See Structural Engineer’s Drawings for Details
No.42 Sudbourne Rd
No.40 Sudbourne Rd
e jo@jotownshend.com www.jotownshend.com
Upstairs, Art Building The Conservatoire 19-21 Lee Road London SE3 9RQ t +44 (0) 208 318 3434 m + 44 (0) 7970 428 606
SCALE
0
1m
3m
notes: project title:
411
No.44 Sudbourne Rd
FOR TENDER
42 Sudbourne Road, SW2 5AH
initials:
JS
drawing title: checked:
JS
scale:
1:50
paper size:
A3
file:
Proposed Short Section issue date:
118 Sheet AH.vwx
28/2/17
drwg nos:
118 /
215
/
T1
Mcdonald Architects Medium Sized Practice Commercial and Residential
27
Time & Life Building, Central London - High end retail brand headquarters, working as a part of the design team to assist with technical design and on site delivery
28
Time & Life Building, Central London - Panorama 01
29
Time & Life Building, Central London - Panorama 02
30
Time & Life Building, Central London - Stair Detail
31
mcdonald Second Floor
7-9 Melody Lane
.CO.UK
London
N5 2BQ
t +44 (0)20 7281 2200
mcdonald Second Floor
7-9 Melody Lane
.CO.UK
London
N5 2BQ
t +44 (0)20 7281 2200
mcdonald Second Floor
7-9 Melody Lane
.CO.UK
London
N5 2BQ
t +44 (0)20 7281 2200
PT-AS3e1
PT-AS3
PT-** PT-AS3e2
CF 4703L
CF 4703ZA
CF 4703ZA
CF 5303TA
CF 5303TA
CF 4703ZA
CF 4703ZA
CF 5303TA
CF 4703ZA
CF 5303TA
CF 4703L
82.00.312
CF 4703ZA
PT-**
H
℄
Black Timber
Black Timber
PT-BL
PT-BL PT-CN
PT-AS2e
PT-**
PT-CN
e PT-BL
PT-BL
PT-**
PT-**
PT-**
H PT-BL
PT-BL
PT-AS1
PT-BL
PT-BL
PT-AS1e
PT-BQ
e PT-BL
PT-BL
PT-AS1
PT-BK13
e PT-BM
PT-BM
PT-BM
e PT-BM
PT-BM
e PT-BM
PT-AY
PT-AS4e
PT-BM
e PT-BM
PT-BM
PT-BM
e PT-BN
PT-BM
PT-AY
PT-BK15
e PT-BN
PT-BM
PT-BM
e PT-BM
PT-BM
e PT-BM
mcdonald Second Floor
PT-BM
e PT-BM
PT-BM
PT-BM
e PT-BM
PT-BM
7-9 Melody Lane
.CO.UK
London
N5 2BQ
t +44 (0)20 7281 2200
Herno Flagship Store, Central London - Shop refurbishment, feasibility, planning and technical design
32
Herno Flagship Store, Central London - Ground Floor
33
Herno Flagship Store, Central London - Front Elevation
34
Personal Projects
35
Chester Road, Walthamstow, London - Loft conversion to our home in Walthamstow, including full interior renovation - mainly self build on a shoestring.
36
Chester Road, Walthamstow, London - Rooflight and sidelight
37
Redundant Architects Recreation Association, London - Award winning self funded open workshop created during the 2008 economic crash to give redundant architects space and tools to realise self initiated projects.
38
HDM3
MAGISTERIUM
SET:
STAGE 3 BAD WOLF
SCALE: 1:50@A3
DATE:
28/04/2021
176
DWG:
ALIGN
ALIGN
ALIGN
ALIGN
ALIGN
ALIGN
TB C
1. SIDE ELEVATION
SET NO.
DWG NO
24 SET:
MAGISTERIUM
DETAIL:STAIRCASE
176
LOCATION/ STAGE STAGE 3 BAD WOLF SCALE:
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
28/04/2021
28/04/2021
1:50@A3
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
DATE REVISED:
SET:
MAGISTERIUM
STAGE 3 BAD WOLF
SCALE:
DATE:
26/04/2021
DWG:
133
900
Ø 350
1:20@A0
200
HDM3
ALIGN W/ SHADOW GAP
200
Ø 350
PA
L RA
LE
L
14
200
1
35
900
900
Ø 350
TBC ON SITE
900
200
4464
90°
2418
Ø 350
ALIGN W/ FRONT OF STEP
35
150 150 C/L
1. SIDE ELEVATION
2. CROSS SECTION
3. HANDRAIL FIXING DETAILS TO FOLLOW
Ø 104 Ø 104
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
230
1
Ø 104
4. PLAN
SET:
24
133
DRAWN BY:
DATE DRAWN:
DATE ISSUED: REVISION:
Joe Swift
26/04/2021
26/04/2021
A
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC
DIRECTOR CAMERA
5. 3D VIS. NTS
DWG NO
LOCATION/STAGE: STAGE 3 BAD WOLF SCALE: 1:20@A0
MAGISTERIUM
DETAIL: STAIRCASE
MACPHAIL'S WALL
SET NO.
PROPS GRAPHICS CONSTRUCTION
LIGHTING LOCATIONS HEALTH & SAFETY
VFX SFX
PRODUCTION ART DEPT APPROVAL:
PRODUCTION PRODUCTION DESIGNER DOP
DATE REVISED: 26/04/2021
SET:
MAGISTERIUM
STAGE 3 BAD WOLF
SCALE:
1:10@A0
DATE:
14/04/2021
DWG:
122
2 B
HDM3
5MM WATERJET CUT BRASS SYMBOL WITH LAMINATE TYPE 2 BACK PANEL BEHIND LAMINATE TYPE 1 TO DOOR STYLE VAC-FORM TEXTURED SURFACE - ANTIQUE BRONZE BRUSHED EFFECT
5MM BRASS HANDLE
5MM TYPE 2 LAMINATE FIXED TO BACK OF BRASS CUT OUT
LAMINATE TYPE 1 TO DOOR STYLE EXTRUDED BRASS PULL HANDLE TO FULL HEIGHT OF DOOR
28 SEE DRAWING 2 FOR HANDLE AND SYMBOL DETAILS
C/L
C/L OF HEIGHT OF DOOR 3 C
3 C 3
13
9
11
20
40
67
5MM THK BRASS DOHEC SURROUND
8 A
4. HANDLE ELEVATION 35 1:5
ZONE OF TEXTURED MATERIAL
347
21
8 C
28
5 56
31
8 C
STRUCTURAL ZONE 24 24
HANDLE/MOTIF ZONE
187
2 B
5. HANDLE PLAN CC 1:5
TEXTURED SURFACE ZONE
8 A
HINGE TYPE: DORMA RTS85 AND SHALLOW FLOOR PIVOT DOOR CLOSER - W/ HOLD OPEN - EXACT DETAILS TBC
3. ELEVATION 1:10
140
ALIGN WALL W/ BACK EDGE OF LEAF
DOOR STILE LAMINATE TYPE 1
FOLDED BRASS 'U' HANDLE
69
DOOR STILE LAMINATE TYPE 1
HARDWOOD DOOR STILE
5
31
HARDWOOD DOOR STILE
35
2. SECTION BB 1:10
20
1. ISOMETRIC 1:10
5
36
PLAN AA
2.Z 108 TO C/L OF PIVOT
24
187
X
24
61 APP. 1390 CLEAR OPENING
21
19 5
TEXTURED PANEL BY BARRY
382
SHADOW GAP
5 19
CUT BRASS 'C' HANDLE
DOOR REVEAL
ALIGN WALL W/ BACK EDGE OF LEAF
STRUCTURAL CENTRAL PANEL
CUT BRASS SYMBOL
8. PLANS 1:10
108 TO C/L OF PIVOT
PLAN CC
69
7. PIVOT HINGE NTS
2.Y
20
2.X
1800
1800
X
2600
LAMINATED BACKING PANEL BEHIND CUT BRASS SYMBOL - LAMINATE TYPE 2
HARDWOOD DOOR STILE
69
TEXTURED PANEL BY BARRY
BRASS TRIM
Z
10 A
2600
3050
6. PLAN DETAILS 1:2
10 A
SET:
9 SIZE TYPES 1:20
UPSTAIRS SMALL - APP. 1390MM CLEAR OPENING
UPSTAIRS LARGE - APP. 2205MM CLEAR OPENING
10. GRAPHIC INTENTION NTS
DWG NO
24
122
LOCATION/STAGE: STAGE 3 BAD WOLF SCALE: 1:10@A0
MAGISTERIUM
DETAIL: DUPLICATE DOOR DETAILS
DOWNSTAIRS STANDARD - APP. 1390MM CLEAR OPENING
SET NO.
DRAWN BY:
DATE DRAWN:
DATE ISSUED: REVISION:
Joe Swift
14/04/2021
14/04/2021
B
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC
DIRECTOR CAMERA
PROPS GRAPHICS CONSTRUCTION
LIGHTING LOCATIONS HEALTH & SAFETY
VFX SFX
PRODUCTION ART DEPT APPROVAL:
PRODUCTION PRODUCTION DESIGNER DOP
DATE REVISED: 22/03/2021
HDM3
SET:
MAGISTERIUM
'DUPLICATE`
STAGE 3 BAD WOLF
SCALE:
1:10@A0
DATE:
12/04/2021
DWG:
113
3D VIS. 01 NTS
1. VISUALISATIONS HINGE TYPE: DORMA RTS85 AND SHALLOW FLOOR PIVOT DOOR CLOSER - W/ HOLD OPEN
10 A
10 A
PIVOT HINGE
5. PIVOT HINGE NTS 6. ISOMETRIC 1:10
8. SECTION BB
9. ELEVATION 1:10
PLAN AA
2. HANDLE ELEVATION 1:5 10 A
10 A
10 A
10 A
10 A
10. PLANS 1:10
10 A
3. HANDLE PLAN 1:5 D10
D21
D20
D09
D11
D19 D17
D01
D18
OPEN OVER WIND BAG OVER
D16
D27
D25 D25
SEE DRAWING 086 FOR DETAILS TO THIS AREA
C/L
D08
D14
D13
D12
D02
D27
SEE DRAWING 090 FOR DETAILS TO THIS AREA
D15 D24
5
D22
D0
D22
D07
D03 D04
D23 D23
D06
SET:
4. KEY PLAN GROUND FLOOR
24
113
LOCATION/STAGE: STAGE 3 BAD WOLF SCALE: 1:10@A0
MAGISTERIUM
DETAIL: DUPLICATE DOOR DETAILS DRAWN BY:
DATE DRAWN:
DATE ISSUED: REVISION:
Joe Swift
12/04/2021
12/04/2021
B
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC
DIRECTOR CAMERA
PROPS GRAPHICS CONSTRUCTION
LIGHTING LOCATIONS HEALTH & SAFETY
VFX SFX
PRODUCTION ART DEPT
4. KEY PLAN GROUND FLOOR
DWG NO
D26
D26 D24
SET NO.
APPROVAL:
PRODUCTION PRODUCTION DESIGNER DOP
DATE REVISED: 22/03/2021
HDM3
MAGISTERIUM
SET:
STAGE 3 BAD WOLF
SCALE: 1:2@A3
DATE:
12/04/2021
35
DWG:
112
35
15 15
15 15
ALIGN
C/L
VARIES VARIES 01. HEAD DETAIL 1:2
02. HEAD DETAIL 1:2 C/L
DOOR LEAF
METAL SHEET VENEER TO BE APPLIED TO REVEALS
15 15
35 15 15
VARIES
ALIGN
03. JAMB DETAIL 'A' 1:2
04. JAMB DETAIL 'B' 1:2
B B
A
B B
B
A
B
B
OPEN OVER
B
A A
A
B D27
B
SEE DRAWING 086 FOR DETAILS TO THIS AREA
C/L
A
B
WIND BAG OVER
D25
SEE DRAWING 090 FOR DETAILS TO THIS AREA
A
A
B D26
D24
B D22
B B
B
D23
B
05. KEY PLAN GROUND 1:400
B SET NO.
B
06. KEY PLAN FIRST 1:400
DWG NO
112
24 SET:
MAGISTERIUM
DETAIL: DOOR REVEALS
LOCATION/ STAGE STAGE 3 BAD WOLF SCALE:
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
12/04/2021
12/04/2021
1:2@A3
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
DATE REVISED:
SET:
MAGISTERIUM
STAGE 3 BAD WOLF
SCALE:
1:10@A0
DATE:
12/04/2021
DWG:
111
8 E
HDM3
10 D
'PENANCE`
3D VIS. 01 NTS
10 D
3D VIS. 02 NTS
Ø 1046
0
30
1. VISUALISATIONS 76
200
Ø 572
200 Ø 415 559
10 C
123
112
178
50
10 C 0 30
198
90
167
138 68
39 5
S1
50
RADIUS = 1896
2 53
83
112
S2 67 0
8
217
298
162
S3 82
53
192 3 83
933
S4 64
10 B
HINGE TYPE: DORMA RTS85 AND SHALLOW FLOOR PIVOT DOOR CLOSER
ANTIQUE BRASS SYMBOL
94 5
10 B
217
10 A
8 E
24
10 A
S5
15 64 66
10
934
ANTIQUE BRASS FULL HEIGHT HANDLE
9. ELEVATION 1:10
TEXTURED PANEL TBC BRASS INLAY
24
MAIN DOOR FINISH TBC
2. HANDLE ELEVATION 1:5
SCULPTED TEXTURED PANEL
75
15 64
EXTRUDED SECTION S5 MAIN DOOR FINISH TBC BRASS INLAY
ANTIQUE BRASS FULL HEIGHT HANDLE
PLAN AA
TIMBER OUTER FRAME
PIVOT HINGE 96
6. ISOMETRIC 1:10
5 65
50
5. PIVOT HINGE NTS
ANTIQUE BRASS SYMBOL
1826
PLAN BB
3 45
3. HANDLE PLAN 1:5
422
PLAN CC
D10
D11
D19 D17
PLAN DD
5
35
35
° .00 5 3 1
SET:
4. KEY PLAN GROUND FLOOR
7. PLAN SEE DRAWING 8. SECTION EE 112 FOR DETAILS 1:20
50
35
65
71
11. DODEC SECTIONS 1:1
DWG NO
24
111
DRAWN BY:
DATE DRAWN:
DATE ISSUED: REVISION:
Joe Swift
12/04/2021
12/04/2021
B
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC
DIRECTOR CAMERA
FACE OF DOOR
SET NO.
LOCATION/STAGE: STAGE 3 BAD WOLF SCALE: 1:10@A0
MAGISTERIUM
DETAIL: PENANCE DOOR DETAILS
TIMBER
BRASS
307
D06
BRASS
5
D0
TIMBER
D04
TO PIVOT POINT
D07
D03
TIMBER
37
23
BRASS
5
S5
15
D08
D14
D13
5
S4
15
D12
S3
10
D02
S2
10
10
D15
S1
10
10. PLANS 1:10
D16
38
D01
D18
30
D20
D09
D21
3654
ALIGN
PROPS GRAPHICS CONSTRUCTION
LIGHTING LOCATIONS HEALTH & SAFETY
VFX SFX
PRODUCTION ART DEPT APPROVAL:
PRODUCTION PRODUCTION DESIGNER DOP
DATE REVISED: 22/03/2021
HDM3
SET:
MAGISTERIUM
SIZE A
STAGE 3 BAD WOLF
SCALE:
1:20@A0
DATE:
OPENING SIZE
SIZE E
PENANCE
OPENING SIZE
REF
PROCESSIONAL
SIZE
PRACTICAL? FINISH
DUPLICATE (UPSTAIRS)
DUPLICATE (MACPHAIL'S FIRST FLOOR)
3660
1800
2600
OPENING SIZE
OPENING SIZE
OPENING SIZE
OPENING SIZE
OPENING SIZE
75
2440
D01
A
NO
DUPLICATE
2
D02
A
YES
DUPLICATE
2 !! FIRE EXIT !!
D03
A
NO
DUPLICATE
2
D04
A
NO
DUPLICATE
2
D05
A
NO
DUPLICATE
2
D06
A
NO
DUPLICATE
2 !! FIRE EXIT !!
D07
A
NO
DUPLICATE
2
D08
B
YES
DUPLICATE
2 !! FIRE EXIT !!
D09
A
NO
DUPLICATE
2
D10
A
NO
DUPLICATE
2
D11
A
NO
DUPLICATE
2
D12
A
YES
DUPLICATE
4
D13
B
YES
PROCESSIONAL
4
D14
C
YES
PENANCE
4
D15
A
YES
DUPLICATE
4
D16
A
YES
DUPLICATE
4
D17
(A)
D18
A
NO
DUPLICATE
2
D19
A
NO
DUPLICATE
2
D20
NUMBER NOT USED
D21
A
YES
DUPLICATE
4
D22
D
YES
DUPLICATE
2 !! FIRE EXIT !!
D23
E
NO
DUPLICATE
2 DEEP REVEAL FOR CAMERA PROVIDE FALL PROTECTION BEHIND
D24
E
YES
DUPLICATE
4
D25
E
NO
DUPLICATE
2 PROVIDE FALL PROTECTION BEHIND
D26
D
NO
DUPLICATE
2 PROVIDE FALL PROTECTION BEHIND
D27
D
YES
DUPLICATE
2 !! FIRE EXIT !!
LEAVE OPEN - NO DOOR
440
1ST
1. OPENING SIZES
D21P
D18x
D01
64
4. SCHEDULE
TBC
TBC
TBC
50
TOTAL LEAF FACES
remove
remove
D19
TOTAL LEAFS
D10 D09
D11
FACES NOTES
GRD
1800
remove
106
SCHEDULE
2600
OPENING SIZE
3660
SIZE D
D17
remove TBC
D08P
D14P
D13P
D02P
D12P
D16P change for smaller?
'PENANCE` SEE 111 FOR DETAILS
D07
D03
D15P
remove TBC
remove TBC
D
HINGE TYPE 2
P 05
D06P
2. KEY PLAN GROUND FLOOR FALL PROTECTION REQD.
'PROCESSIONAL' SEE 129 FOR DETAILS
D25
!!
HINGE TYPE 2: DORMA RTS85 AND SHALLOW FLOOR PIVOT DOOR CLOSER
5. HINGE TYPE - SEE DRAWING 112 FOR DOOR REVEAL DETAILS
C/L
D27P
D26
D24P
!! 'DUPLICATE' SEE 122 FOR DETAILS
6. DESIGN TYPES D23
!!
FALL PROTECTION REQD.
3. KEY PLAN FIRST FLOOR
SET:
KEY FALL PROTECTION REQD.
D22P
3050
DWG:
SIZE C
SIZE B
DUPLICATE
19/04/2021
!! FALL PROTECTION REQD. D27P D26
SUFFICIENT PROTECTION TO BE INSTALLED TO REAR OF DOOR TO PROTECT FROM FALLING PRACTICAL DOOR REFERENCE NON - PRACTICAL DOOR REFERENCE
DWG NO
24
106
LOCATION/STAGE: STAGE 3 BAD WOLF SCALE: 1:20@A0
MAGISTERIUM
DETAIL: DOOR SCHEDULE
REMOVE DOOR TBC OR DO WHATEVER THE NOTE SAYS
SET NO.
DRAWN BY:
DATE DRAWN:
DATE ISSUED: REVISION:
Joe Swift
19/04/2021
19/04/2021
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC
DIRECTOR CAMERA
PROPS GRAPHICS CONSTRUCTION
LIGHTING LOCATIONS HEALTH & SAFETY
VFX SFX
PRODUCTION ART DEPT APPROVAL:
PRODUCTION PRODUCTION DESIGNER DOP
DATE REVISED:
MAGISTERIUM
SET:
165
440
STAGE 3 BAD WOLF
320
SCALE: AS DRAWN
440
320
05/05/2021
DATE:
440
178
DWG:
320
440
165
105
95
70 SEE DETAIL PLAN
1. PLAN 1:10 165
BOOK REST 81
BOOK REST
28
0
BOOK STOP
138
ALIGN
6
6
20
6MM SQUARE BOOK STOP
244 EXISTING SHELF
6
70
430
105
HDM3
3. PLAN DETAIL 1:5
EDGE OF SHELF
SET NO.
DWG NO
24 SET:
2. PLAN DETAIL 1:1
MAGISTERIUM
DETAIL: Book Display
178
LOCATION/ STAGE STAGE 3 BAD WOLF SCALE:
AS DRAWN
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
DATE REVISED:
Joe Swift
05/05/2021
05/05/2021
05/05/2021
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
A
HDM3
MAGISTERIUM
SET:
TOTEM UNIT
STAGE 3 BAD WOLF
SCALE: 1:5@A3
DATE:
15/04/2021
DWG:
132
BASE UNIT
MAIN UNIT
HEAD UNIT
HEAD UNIT
ISOMETRIC
18 18
92
12
6
23
ISOMETRIC
12 137
18 18 54
18
137
6
ISOMETRIC
394
2 open
ELEVATION
65
64
PLAN
9
12
59
99
46
381
9
32
12 48
100
18
18 15
165
18 15 18
182
46
47
32
12
100
47
ELEVATION
9
18 15 6
18 15 18
2565
MAIN UNITS
ELEVATION
PLAN
394
100
12 48 41 52
SET NO.
ELEVATION
PLAN
36
60
9 9
15
9 9
12
BASE UNIT
18 15
DWG NO
24 SET:
MAGISTERIUM
DETAIL: MACPHAIL'S BLOCKS
132
LOCATION/ STAGE STAGE 3 BAD WOLF SCALE:
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
15/04/2021
15/04/2021
1:5@A3
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
DATE REVISED:
HDM3
BOMB ROOM
SET:
STAGE 3 BAD WOLF
ALIGN
240
40 100 40
AS DRAWN@A1
DATE:
24/06/2021
312
EQ.
C/L EQ. EQ.
6MM TOUGHENED GLASS
Hinge Reference
6
hdm3
Scale: 1:10
magisterium
section A-A
EQ.
695
DWG:
EQ.
EQ.
SCALE:
EQ.
C HANDLE DETAILS TO FOLLOW
EQ.
2100
EQ.
C/L
150
B
1100
Door Furniture Ref
830
7
Scale: 1:10
20
ALIGN
60
351
210
20 EQ.
384
EQ.
C/L
25
C/L
2
Scale: 1:10
Internal Elevation
3
Scale: 1:10
External Elevation
4
Scale: 1:10
Internal 3D Vis.
5
Scale: 1:5
External Elevation Scale: 1:5
C/L
SIDE ELEVATION
60
Section
137
1900 mm
300 mm
plan EXTERIOR
9mm
GLASS
Handle Details
8
Scale: 1:5
900 mm
existing
2090 mm
A3
m
6MM TOUGHENED
9 mm
9m
holes
9mm
900
Ø2mm
910 mm 1900 mm
floating flattage with double-clad prac.door
TRIPLE WEIGHT CONCEALED BALL BEARING PRISON HINGES FULL SURFACE FIXED BB852 BY STANLEY
ISOMETRIC
300 mm
73
350
35
169
276
11
3
35
35
Plan
Scale: 1:5
10
Detail
Scale: Actual Size
5
9
9mm
3
INTERIOR
9
1
PLAN
SET:
BOMB ROOM
finish :
DETAIL: Cell Room Door
existing wall Location Plan Scale: 1:50
SET NO.
DWG NO
24 3110 mm
312
LOCATION/STAGE: STAGE 3 BAD WOLF SCALE: AS DRAWN@A1
DRAWN BY:
DATE DRAWN:
DATE ISSUED: REVISION:
Joe Swift
24/06/2021
24/06/2021
DATE REVISED:
- concrete throughout to ma - 35mm shadow gap all-aroun DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC PROPS GRAPHICS CONSTRUCTION VFX SFX
DIRECTOR CAMERA LIGHTING LOCATIONS HEALTH & SAFETY PRODUCTION ART DEPT
notes
:
FLOOR - board over existing CHAMFERS - on all concrete APPROVAL:
PRODUCTION
PRODUCTION DESIGNER
please check all DOP measurements on site
HDM3
MAGISTERIUM
SET:
1
STAGE 3 BAD WOLF
SCALE:
3
[Drawing Title]
[Drawing Title] Scale: 1:10
AS DRAWN@A1
DATE:
4
14/06/2021
DWG:
279
[Drawing Title] Scale: 1:10
Scale: 1:10
3 279
1 279
1 279
SET:
MAGISTERIUM
DETAIL: BOMB ROOM TRANSITION SPACE
3 279
2
[Drawing Title] Scale: 1:10
SET NO.
DWG NO
24
279
LOCATION/STAGE: STAGE 3 BAD WOLF SCALE: AS DRAWN@A1
DRAWN BY:
DATE DRAWN:
DATE ISSUED: REVISION:
Joe Swift
14/06/2021
19/04/2021
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC PROPS GRAPHICS CONSTRUCTION VFX SFX
DIRECTOR CAMERA LIGHTING LOCATIONS HEALTH & SAFETY PRODUCTION ART DEPT APPROVAL:
PRODUCTION PRODUCTION DESIGNER DOP
DATE REVISED:
MAGISTERIUM
SET:
STAGE 3 BAD WOLF
173
173
173
AS DRAWN@A1
DATE:
14/06/2021
DWG:
296
173 25
141
173
SCALE:
141
141
86 86 86 86
96 25 141
141
USER SIGN
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
50 1 2 3 4 5 6
1 2 3 4 5 6
1 2 3 4 5 6
1 2 3 4 5 6
150
150
150
150
150 25 96
1 2 3 4 5 6
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
150
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
171
171 25 150
75 75
150
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
171
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
10 20 30 40 50 60 70 80 90 100
25 128
10 20 30 40 50 60 70 80 90 100
190
HDM3
862
862
862
862
862
KEY KEYPAD 1 2 3 4 5 6 10 20 30 40 50 60 70 80 90 100
1
SWITCHBOARD ELEVATIONS Scale: 1:10
SET NO.
DWG NO
24
296
PRESSURE GUAGE BIG NOB AVERAGE NOB GRAPHIC BIG LIGHT/BUTTON SMALL LIGHT/BUTTON
SET:
MAGISTERIUM
DETAIL: BOMB ROOM SWITCHBOARD
LOCATION/STAGE: STAGE 3 BAD WOLF SCALE: AS DRAWN@A1
DRAWN BY:
DATE DRAWN:
DATE ISSUED: REVISION:
Joe Swift
14/06/2021
19/04/2021
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC PROPS GRAPHICS CONSTRUCTION VFX SFX
DIRECTOR CAMERA LIGHTING LOCATIONS HEALTH & SAFETY PRODUCTION ART DEPT APPROVAL:
PRODUCTION PRODUCTION DESIGNER DOP
DATE REVISED:
4W011
4W011
BAR
4W011
4W011
4W026
4W026
here?
4W011 4W011 4W011 4W011 4W011 4W011 4W011
4W011
BAR
4W011
4W011
BAR
4W011
4W011
MAGISTERIUM
SET:
STAGE 3 BAD WOLF
SCALE: 1:20@A2
DATE:
26/05/2021
DWG:
217
D
D
C
35
C
C
C
MIN. 400
B
B
B
A
A
CHAINED BOOKS
CHAINED BOOKS 18
B
1.ELEVATION
2.SECTION 18 APPROX. 2370 EXISTING OPENING
35
18
18
B
4.CONTEXT
MIN. 400
HDM3
FLOATER LOCATED IN EXISTING OPENING
3.PLAN
SET NO.
DWG NO
24 SET:
MAGISTERIUM
DETAIL:PAV'S BOOKSHELF
217
LOCATION/ STAGE STAGE 3 BAD WOLF SCALE:
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
26/05/2021
22/04/2021
1:20@A2
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
DATE REVISED:
MAGISTERIUM
SET:
STAGE 3 BAD WOLF
SCALE: AS DRAWN@A2 DATE:
22/04/2021
DWG:
158
18
C/L
5
EQ.
HDM3
5
EQ.
18
02. 3D VIS. NTS 395 818 O/A
290
115
ALIGN
ALIGN C/L OF BLOCK JOIN EQ.
01. DETAIL 1:1
C/L OF BLOCK JOIN
8
EQ.
EQ.
24
19 O/A
C/
1
L
EQ.
C/L OF BLOCK JOIN EQ.
190 287 132
SHADOW GAP
35
°
03. ELEVATION 1:20
59
EQ.
2570
C/L OF BLOCK JOIN
C/L OF BLOCK JOIN SET NO.
ALIGN
DWG NO
24 SET:
MAGISTERIUM
DETAIL:MACPHAIL'S GATES
158
LOCATION/ STAGE STAGE 3 BAD WOLF SCALE:
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
22/04/2021
22/04/2021
AS DRAWN@A2
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
DATE REVISED:
HDM3
SET:
DUNRAVEN
DUNRAVEN BAY
SCALE:
1:10@A0
DATE:
07/06/2021
DWG:
074
60
BLACK POWDER COATED ALUMINIUM FRAME
6MM TOUGHENED GLASS 6
60
40
900 35
30
256
104
940
83
CONSOLE - FINISH TBC.
192
60
657
BLACK POWDER COATED ALUMINIUM FRAME
640
610
REMOVE EXISTING NIB
892
EQ. A
B
1100
222
A
6505
DETAIL B 1750
153
1040
REMOVE EXISTING WALL
B
FLOATER
1040
04. DETAIL A 1:5
EXISTING STRUCTURAL STEEL C/L
SET:
DUNRAVEN
DETAIL: Bomb Room
20
60
ALIGN
CONSOLE 1
60
60
ALIGN
CONSOLE 2
2300
Ø 200
60
460 162
880
2350
510
162
3900
EQ. A
612
305
L
153
OF
T IG H
FLOATER
2440
RO
ALIGN
REMOVE EXISTING WALL
A
162
EQ. A
DETAIL A
SET NO.
DWG NO
18
074
LOCATION/STAGE: DUNRAVEN BAY SCALE: 1:10@A0
DRAWN BY:
DATE DRAWN:
DATE ISSUED: REVISION:
Joe Swift
07/06/2021
19/04/2021
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC PROPS GRAPHICS CONSTRUCTION VFX SFX
DIRECTOR CAMERA LIGHTING LOCATIONS HEALTH & SAFETY PRODUCTION ART DEPT APPROVAL:
PRODUCTION PRODUCTION DESIGNER DOP
DATE REVISED:
HDM3 ART DEPT.
SET: GRAPHICS BAD WOLF SCALE: 1:10@A2 DATE: 23/03/2021 DWG: 071 1578
1300
4 071
660
4 071
Isometric
6 660
BRICH FACED FURNITURE GRADE PLY TO BE USED THROUGHOUT AND FINISHED WITH MATT OSMO OIL
918
Top Plan Scale: 1:10
Side Elevation Scale: 1:10
MIN. 166
2
HAFELE DZ9301-0034 DRAWER RUNNERS FOR 864MM EXTENSION OR SIMILAR
420
Material Choice
7
40
1118
1
Scale: 1:20
Scale: NTS
176
PLOTTER
OPEN
SET NO.
DWG NO
-400
SET:
100
OPEN
3
Front Elevation Scale: 1:10
4
Section
Scale: 1:10
ART DEPT.
DETAIL: Art Dept. Plan Chest
HEAVY DUTY CASTER WHEELS WITH BRAKES APPROPRIATE FOR WEIGHT: WEIGHT TBC.
071
LOCATION/STAGE: GRAPHICS BAD SCALE: WOLF 1:10@A2
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
23/03/2021
23/03/2021
DATE REVISED:
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC
DIRECTOR CAMERA LIGHTING LOCATIONS HEALTH & SAFETY PRODUCTION ART DEPT APPROVAL:
PROPS GRAPHICS CONSTRUCTION VFX SFX PRODUCTION PRODUCTION DESIGNER DOP
MAGESTERIUM
SET: STAGE 3 BAD WOLF
SCALE:
1:50@A0
DATE: 01/04/2021
DWG: 092
D10
D09
D11
DRAWING TO FOLLOW D21
SEE DRAWING 066 FOR DETAILS TO THIS AREA
D19
OPEN OVER
D18
D17
OPEN OVER
LIGHTWELL A D01
OPEN OVER
460
WIND BAG OVER
D16
D25 2475
2550
8395
2040
400
3150
SEE DRAWING 090 FOR DETAILS TO THIS AREA
D08
SEE DRAWING 094 FOR DETAILS TO THIS AREA D14
SEE DRAWING 086 FOR DETAILS TO THIS AREA
D13
D12
C/L
D02
3150
D27
OPEN OVER
D26
SEE DRAWING 075 FOR DETAILS TO THIS AREA
D15
263
460
LIGHTWELL A
OPEN BELOW
230
OPEN OVER
LIGHTWELL B
D04
230
2600 2270
2225
230 STAIR DIMENSIONS AND DETAILS TBC DO NOT BUILD
1220
460
SEE DRAWING 073 FOR DETAILS TO THIS AREA
D07
2225
OPEN BELOW
4725
D03
D24
D22
HDM3
2988 D0
5
D06
1. PLAN
SET:
MAGESTERIUM
DETAIL: Magesterium Masterplan 1st Plan
SET NO.
DWG NO
24
092
LOCATION/STAGE: STAGE 3 BAD WOLF SCALE: 1:50@A0
DRAWN BY:
DATE DRAWN:
DATE ISSUED: REVISION:
Joe Swift
01/04/2021
01/04/2021
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC
DIRECTOR CAMERA
PROPS GRAPHICS CONSTRUCTION
LIGHTING LOCATIONS HEALTH & SAFETY
VFX SFX
PRODUCTION ART DEPT APPROVAL:
PRODUCTION PRODUCTION DESIGNER DOP
DATE REVISED:
MAGISTERIUM
SET:
STAGE 3 BAD WOLF
SCALE:
1:50@A0
DATE:
19/03/2021
DWG: 64
305
1220
01. SECTION AA 1:50@A0
473
305
2175
1220
B
10
820
02. SECTION BB 1:50@A0
00 10
00
410
OPEN
OPEN
OPEN
OPEN
473
355
OPEN
OPEN
41 0
OPEN
OPEN
OPEN
OPEN
420
OPEN
OPEN
A
0 41
OPEN
355
355
OPEN
410
45.
25
00°
10 00
00
10
2175
25
06. CHAMFERED CORNER DETAIL SECTION 1:1@A0
03. REFLECTED CEILING PLAN 1:50@A0
B
All internal corners to be square
00°
All external corners to be chamfered to 45 degress
25
45.
A
OPEN
820
353
Dashed line denotes face of wall under
355
HDM3
25
Dashed line indicates shadow gap and wall below
SET NO.
150
419
24 SET:
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
19/03/2021
19/03/2021
DATE REVISED:
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC
DIRECTOR CAMERA
05. DETAIL SECTION 1:5@A0
64
LOCATION/STAGE: STAGE 3 BAD WOLF SCALE: 1:50@A0
MAGISTERIUM
DETAIL: MAGISTERIUM CEILING
04. PERSPECTIVE V_01 NTS
DWG NO
PROPS GRAPHICS CONSTRUCTION
LIGHTING LOCATIONS HEALTH & SAFETY
VFX SFX
PRODUCTION ART DEPT APPROVAL:
PRODUCTION PRODUCTION DESIGNER DOP
MAGESTERIUM
35MM SHADOW GAP AS ELSEWHERE
01. SECTION
SCALE: 1:100@A3
DATE:
30/03/2021
DWG:
089
TIMBER ARM TBC
3900
FOR SECTION DETAILS REFER TO DRAWING 090
STAGE 3 BAD WOLF
SET:
2745
HDM3
02. ELEVATION
35MM SHADOW GAP AS ELSEWHERE
A 4065
2020
3110
2800
3110
2020
4065
2280
900
3145
03. PLAN A
X
X
04. 3D VISUALISATION
05. LOCATION PLAN
READ IN CONJUNCTION 066,087&90 SET NO.
DWG NO
24 SET:
MAGESTERIUM
089
LOCATION/ STAGE STAGE 3 BAD WOLF
DETAIL: Nth Corridor NORTH WALL 1 SCALE: DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
30/03/2021
30/03/2021
1:100@A3
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
DATE REVISED:
MAGESTERIUM
SET: 845
STAGE 3 BAD WOLF
SCALE: 1:20@A3
DATE:
30/03/2021
DWG:
090
343 15°
354 545
237
15°
610
2000
TIMBER ARM DETAIL TBC
610
2745
3900
900
35
2240
HDM3
01. SECTION AA
2090 CORRIDOR
02. LOCATION PLAN 1:500@A3
READ IN CONJUNCTION 066,087&89 SET NO.
DWG NO
24 SET:
MAGESTERIUM
090
LOCATION/ STAGE STAGE 3 BAD WOLF
DETAIL: Nth Corridor NORTH WALL 2 SCALE: DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
30/03/2021
30/03/2021
1:20@A3
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
DATE REVISED:
ART DEPT.
HDM3
STAGE 3 BAD WOLF
SET:
SCALE: 1:50@A3
DATE:
24/03/2021
DWG:
073
CEILING OVER WITH ROOFLIGHT
1220
DOOR DETAIL TO FOLLOW
3050
CONTROL ROOM DIVIDER, INCLUDING GLAZING - DETAILS TO FOLLOW
02. SECTION BB 610
B
01. SECTION AA
150
35MM SHADOW GAP AS ELSEWHERE
2750
610
1135
1800
825
2250
2750
CONTROL ROOM DIVIDER, INCLUDING GLAZING - DETAILS TO FOLLOW
40
900
16
C/L
A
1800
6300
A
DOOR DETAIL TO FOLLOW
C/L
610
THIS DOORWAY CONNECTS TO PENANCE/BOMB CORRIDOR DWG. NO. 75
2250
Float 2440
EDGE OF VOID IN CEILING IN LINE CONTROL ROOM GLAZING
1100
1100
610
3760
610
150
3300
Float 3760 B
SET NO.
03. PLAN
DWG NO
24 SET:
073
LOCATION/ STAGE STAGE 3 BAD WOLF
ART DEPT.
DETAIL: Bomb Room
SCALE:
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
24/03/2021
24/03/2021
1:50@A3
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
DATE REVISED:
PICNIC
SET:
SCALE: 1:5@A2
DATE:
17/05/2021
DWG:
208
279
10
788
3 18 3
26 10 17
54
8
9 40 3
BAD WOLF
10
3
305
23
38
38
675
3
35
12
18
3
23
3
36
23
37
95
725
458
26
15
01. FRONT ELEVATION
02. SIDE ELEVATION
865
03. PLAN
595
633
234 165
HDM3
04. REAR ELEVATION
SET NO.
DWG NO
-SET:
208
LOCATION/ STAGE BAD WOLF
PICNIC
DETAIL:CHEESY V's WINE COOLER
SCALE:
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Sweaty Hoop
17/05/2021
17/05/2021
1:5@A2
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
DATE REVISED:
MAGISTERIUM
HDM3
SET:
STAGE 3 BAD WOLF
SCALE: AS DRAWN
DATE:
21/06/2021
DWG:
274
6 274
1230 900 7 274
24
305
7 274
6 274
1
PLAN 01 Scale: 1:10
CONCRETE CAPPING PIECE 320
1150
2
POLISHED STAINLESS STEEL CUTTING BLADES
1965
VOID TO EXTEND THRU' CEILING VOID
130
24
100
100
PLAN 02 Scale: 1:10
BLACK METAL GUARD POSTS ALIGN W/ EXTG. CEILING
13
44
103
1200
04
Scale: 1:10
DETAIL 7
50
3086
03
02
PLAN 04 Scale: 1:10
900
4
BRUSHED STAINLESS STEEL POSTS AND LINTOL
PLAN 03 960
3
87
550
13
24
305
1150
01 1230
76
550
BLADES AND CUTTING MECHANISM DETAILS TO FOLLOW
CONCRETE BASE
5
DETAIL 7 Scale: 1:5
6
SECTION AA Scale: 1:20
7
SECTION BB Scale: 1:20
08. 3D VIS. NTS
SET NO.
DWG NO
24 SET:
MAGISTERIUM
DETAIL:INTERCISION GUILLOTINE
274
LOCATION/ STAGE STAGE 3 BAD WOLF SCALE:
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
21/06/2021
21/06/2021
AS DRAWN
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
DATE REVISED:
SET:
STAGE 3 BAD WOLF
SCALE:
2NO. OF:
AS DRAWN@A1
DATE:
24/06/2021
CABLING BY SET DEC.
LOCATION
C/L
PEDESTAL 36MM THICK COPPER PEDESTAL BASE
PEDESTAL BASE
100 68
271
C/L OF PEDESTAL AND BASE
COPPER PLATE 53
DWG:
TBC
BOMB ROOM
68
5
EQ.
INTERCISION GUILLOTINE BY SET DEC.
250
580
EQ.
ALIGN W/ CORNER OF CEILING OPENING 580
04. SETTING OUT PLAN 1:50
25
01. PEDESTAL PLAN 1:5
2MM COPPER WIRING EXTENDING FROM INSIDE CONCRETE BOX - TERMINATION POINT DETAILING TBC.
36MM THICK COPPER PEDESTAL BASE PLATE
15
12NO. 4MM DIA. HOLES
25MM COPPER BAR
CABLING BY SET DEC.
50MM DIA. BLACK CABLING
15
15
1200
COPPER PLATE
1200
01. PEDESTAL PLAN 1:5 05. PEDESTAL BASE PLAN 1:10 (2no.)
35
35 25 35
25
18
25
50 COPPER TO ALL SIDES
325
500
50 40
50
SET:
BOMB ROOM
02. PEDESTAL SECTION 1:5
50 10
40
DETAIL: INTERCISION PEDESTAL
03. PEDESTAL ISOMETRIC 1:5
36
HDM3
SET NO.
DWG NO
24
271
LOCATION/STAGE: STAGE 3 BAD WOLF SCALE: AS DRAWN@A1
DRAWN BY:
DATE DRAWN:
DATE ISSUED: REVISION:
Joe Swift
24/06/2021
24/06/2021
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC PROPS GRAPHICS CONSTRUCTION VFX SFX
DIRECTOR CAMERA LIGHTING LOCATIONS HEALTH & SAFETY PRODUCTION ART DEPT APPROVAL:
PRODUCTION PRODUCTION DESIGNER DOP
DATE REVISED:
HDM3
DUNRAVEN
SET:
Dunraven Bay
SCALE: 1:20@A3
01/06/2021
DATE:
DWG:
230
MIN. 40MM SQUARE TO ALL EXTERNAL CORNERS TO ALLOW SCULPTED CORNERS
D
D
MM SCULPTING ZONE TO ALL SIDES
1150
305
RETAINING WALL
TOURIST SIGN
TOURIST SIGN
RETAINING WALL
1. SECTION BB
2. SECTION AA C
A
MM SCULPTING ZONE
RETAINING WALL
305
2600
1415
TOURIST SIGN
A
TO ALL SIDES
RETAINING WALL
805
A
40 MM SCULPTING ZONE 40MM
TO ALL SIDES
40MM 40 MM SCULPTING ZONE TO ALL SIDES
3210
3. SECTION CC
C
4. PLAN DD
A
KEY EXTG. STRUCTURE SET NO.
PRPSD FLATTAGE SET:
5. 3D VISUALISATION NTS.
6. EXAMPLE OF RANDOM RUBBLE BUILT TO COURSE
DWG NO
18 DUNRAVEN
DETAIL: Bench Disguise
230
LOCATION/ STAGE Dunraven Bay SCALE:
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
01/06/2021
24/03/2021
1:20@A3
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
DATE REVISED:
DUNRAVEN
HDM3
SET:
Dunraven Bay
SCALE: 1:20@A3
DATE:
01/06/2021
DWG:
232
1100 MIN. 40MM SQUARE TO ALL EXTERNAL CORNERS TO ALLOW SCULPTED CORNERS
D
800
1275
1290
253
D
1842 1. SECTION BB
EN
UL
S IO
PT
NE
IN G
DZ
ZO
ON
C
2080
NE
302
SC
B
60 MM
E
A
1250
A
142
1842 3. SECTION CC
820
343
ALIGN 253
D IM
1210
FROM EACH SURFACE
OF
MM
APPROX. 110
ID E
40
349
TS
1100
OU
2. SECTION AA
142 B 4. PLAN DD
C
261
KEY EXTG. STRUCTURE SET NO.
DWG NO
18 PRPSD FLATTAGE 5. 3D VISUALISATION NTS.
6. EXAMPLE OF RANDOM RUBBLE BUILT TO COURSE
SET:
DUNRAVEN
DETAIL: Tourist Display Disguise
232
LOCATION/ STAGE Dunraven Bay SCALE:
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
01/06/2021
24/03/2021
1:20@A3
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
DATE REVISED:
SET: BACKLOT BAD WOLF
SCALE:
1:20@A1
DATE:
22/03/2021
00 25
12 50
50 12
01.SIDE ELEVATION
DWG: 69
2600
EXT ENCAMPMENT
2165
HDM3
1250
03.CENTRAL TIMBER POST
04.PLAN 1:50@A1
SET NO.
DWG NO
0050 SET:
EXT ENCAMPMENT
DETAIL: TENT_03
LOCATION/STAGE: BACKLOT BAD WOLF SCALE: 1:20@A1
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
22/03/2021
22/03/2021
DATE REVISED:
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC PROPS GRAPHICS CONSTRUCTION VFX SFX
DIRECTOR CAMERA LIGHTING LOCATIONS HEALTH & SAFETY PRODUCTION ART DEPT
03.3D VISUALISATION
69
APPROVAL:
PRODUCTION PRODUCTION DESIGNER DOP
EXT ENCAMPMENT
SET: BACKLOT BAD WOLF
SCALE:
1:20@A1
DATE:
22/03/2021
DWG: 67
1794
3000
HDM3
01.SIDE ELEVATION
02.FRONT ELEVATION 7.25°
4555
3905
168
9
3 514
5000
246
3205
5000
6
4555
05.FLATTENED COMPONENT 03.PARTIAL PLAN
05.COR-TEN STEEL MATERIAL
20.00° SET NO.
DWG NO
0050 SET:
EXT ENCAMPMENT
DETAIL: TENT_01
04.PLAN 1:50@A1
LOCATION/STAGE: BACKLOT BAD WOLF SCALE: 1:20@A1
DRAWN BY:
DATE DRAWN:
DATE ISSUED:
Joe Swift
22/03/2021
22/03/2021
DATE REVISED:
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
SET DEC PROPS GRAPHICS CONSTRUCTION VFX SFX
DIRECTOR CAMERA LIGHTING LOCATIONS HEALTH & SAFETY PRODUCTION ART DEPT
07.3D VISUALISATION
67
APPROVAL:
PRODUCTION PRODUCTION DESIGNER DOP
EXT ENCAMPMENT
SET: BACKLOT BAD WOLF
SCALE:
1:20@A1
DATE:
22/03/2021
DWG: 68
2195
140
HDM3
1794
3000
3115
50
138
01.SIDE ELEVATION
70
02.FRONT ELEVATION
03.CENTRAL TIMBER POST
NOTES: READ THIS DRAWING IN CONJUNCTION WITH DRAWING 67
5000
SET NO.
DWG NO
0050 EQ.
EQ.
EQ.
EQ.
EQ.
SET:
EQ.
EXT ENCAMPMENT
DETAIL: TENT_02 DATE DRAWN:
DATE ISSUED:
Joe Swift
22/03/2021
22/03/2021
1830
DATE REVISED:
DIRECTOR:
PRODUCTION DESIGNER:
----
Joel Collins
APPROVAL:
03.3D VISUALISATION
LOCATION/STAGE: BACKLOT BAD WOLF SCALE: 1:20@A1
DRAWN BY:
SET DEC PROPS GRAPHICS CONSTRUCTION VFX SFX
DIRECTOR CAMERA LIGHTING LOCATIONS HEALTH & SAFETY PRODUCTION ART DEPT
04.PLAN 1:50@A1
68
PRODUCTION PRODUCTION DESIGNER DOP