Allison Caja Design Portfolio Fall 2009 - Present
Sheet Index
1
Collaborative Arts Studio
13
Law Firm
5
LaunchHouse
15
The Cube
7
Department Store
17
Color’s Effect on Patterns
11
Selected Sketches
19
Picture Geometries
Collaborative Arts Studio Page 1
Forth Year - Interior Design Studio
Objective: Take a selected space in the Halle building located in downtown Cleveland. Project is made to display the learned skills throughout the last four years in an application that the student is particularly interested in, so long as the end use services the area appropriately. Completed with Revit, Rhino, and Adobe Creative Suite. Online Presentation at: http://prezi.com/user/akcaja/. Duration of project: 3 months.
Spring 2013
Page 2
Page 3
Forth Year - Interior Design Studio
Spring 2013
Page 4
Selected Details.
Rendered view of the Reception. Rendered view of the Atrium.
Panoramic view of the Atrium.
Rendered view of the Gift Shop.
Rendered view of the Painting Room.
LaunchHouse Renovation Page 5
Fourth Year - Interior Design Studio
Objective: Renovate the existing space to better suite the needs of the current tenant. The current tenant, LaunchHouse, is a business accelerator located in Shaker Heights, Ohio. No existing construction needs to remain in tact. Completed with Revit, Adobe Creative Suite, and a Physical Model. Duration of project: 3 months.
First and Second Floor Plans
Fall 2012
Rendered view of the rooftop patio and garden.
Page 6
Rendered view of the second floor conference room.
Department Store and Restaurant Third Year - Interior Design Studio
Page 7
Objective: Take an existing construction in Florence’s city center and renovate it to a new department store. Each floor of the department store is to be divided among groups for the design. Completed with AutoCAD 2011, Google SketchUp 8, Kerkythea 2008, Hand Renderings, Adobe Creative Suite, and a Physical Model. Duration of project: 4 months.
Fourth floor rendered plan.
Terrace rendered plan.
Spring 2012
Rendered view of the department store.
Page 8
Rendered view of the fourth floor restaurant.
Page 9
Rendered view of the terrace waiting lounge.
Third Year - Interior Design Studio
Rendered view of the terrace bar.
Spring 2012
Page 10
Terrace waiting lounge fire pit.
Terrace lounge booths. Terrace lounge table.
Retractable canopy system for the terrace.
Free standing merchandise shelving
Wall mounted merchandise shelving.
Selected Sketches Page 11
San Marco
Third Year - Sketching and Drawing
Piazzale Michelangelo
Page 12
Spring 2012
S.S. Annunziata
Bardini Gardens
Law Firm Page 13
Third Year - Interior Design Studio
Objective: Create an efficient space plan for a law firm office. Only one elevator lobby is in use and the law firm will occupy the entire floor. Completed with AutoCAD. Duration of project: 3 weeks.
Floor plan with room names.
Fall 2011
Page 14
Furniture plan.
The Cube Page 15
Second Year - Architectural Design Studio
Objective: To define a 9x9x9 Cube by using three volumes of a lesser size. Lines are to be pulled only from the three forms. Mediums used to construct the three forms are limited to wood, vellum, and wood stick. Duration of Project: 6 weeks.
Fall 2010
Page 16
Color’s Effect on Patterns Page 17
First Year - Color Theory and Application
Combination of two seperate projects. Completed with acrylic on bristol. Project 1 shows the difference in a pattern when using Primary, Secondary and Tertiary colors as opposed to a Monochromatic color scheme. Project 2 examines more color combination possibilities and how they effect the perception of the pattern. Duration of combined projects: 2 months.
Monochrome
Primary, Secondary, & Tertiary
Fall 2009
Multiple Color Values
Page 18
Analogous Colors
Contrasting Colors
Picture Geometries Page 19
First Year - Interior Design Studio
Objective: Take an image and examine the geometries of it. Select from your analysis lines that stand out and create a 3D form from those lines. Materials used include acetate, black foamcore, and wood. Duration of project: 2 months.
Fall 2009
Page 20