Portfolio Alexandra Garner
2
ALEXANDRA GARNER
garner.alexandra94@gmail.com
Education UNIVERSITY OF MARYLAND COLLEGE PARK ·
B.S. of Architecture; Minor in Sustainability
Anticipated May 2017
· GPA 3.7 THE CATHOLIC UNIVERSITY OF AMERICA ·
B.S. of Architecture
Aug 2012- May 2014
· GPA 3.65
Professional Experience
Skills
ARCHITECTURAL INTERN
·
Photoshop
·
Illustrator
·
InDesign
Bignell Watkins Hasser Architects Annapolis, MD May 2016- Present · · ·
Develop and produce schematic designs
Develop and coordinate construction drawings
Wise Choice Construction, LLC.
Hughesville, MD
·
Manage payroll and office documentsv
·
File and deal with permit processing
·
· Rhino
Creating Revit office standards
CONSTRUCTION ADMINISTRATIVE ASSISTANT
Proficiency
· Feb- May 2014
Develop company's marketing website
Revit
· Sketchup ·
AutoCAD
·
Model Making
· Sketching
VISUAL DISPLAY INTERN
Anthropologie Annapolis, MD ·
Conceptualize written design criteria in a swift manner
·
Install and document store displays
·
Design and build visual display pieces for the store
Feb-Aug 2012
Display Intern Blog
alexandthegreatbigwindow.wordpress.com ARCHITECTURAL INTERN
Laurence Abell and Associates
LaPlata, MD
·
Scan and file both physical and digital media documents
·
Update digital materials library (Photoshop)
· ·
Document existing buildings and conditions
Develop schematic design drawings, into the construction document phase
3
CONTENTS
1 2 3 4
MIXED-USE BUILDING UNIVERSITY OF MARYLAND FALL 2016
CHILDRENS LIBRARY UNIVERSITY OF MARYLAND SPRING 2016
SOUNDROOM
UNIVERSITY OF MARYLAND SPRING 2016
4 5 6
BREWERY
THE CATHOLIC UNIVERSITY OF AMERICA SPRING 2013
MULTIMEDIA WORK CUA / UMD 2012 - PRESENT
PROFESSIONAL WORK 2016-PRESENT
5
1
6
MIXEDUSE BUILDING UNIVERSITY OF MARYLAND SPRING 2016
DURATION:4 WEEKS
This project was located in the historic neighborhood of Mt. Vernon in Baltimore, MD. The goal was to create a mixed use multi-family housing project, that would respect the surrounding historic context, The challenge of the project was not only creating a sense of community but additionally relating back to the historic context of the neighborhood.
8
First Floor Plan
One Bed Apt.
Studio Apt.
Two Bed Apt.
9
Program
Site
10
North Charles Elevation
Concept
Read Street Perspective
Read Elevation
11
Courtyard Perspective
12
Courtyard Section
North Charles Perspective
Transverse Section
13
2
14
CHILDRENS LIBRARY UNIVERSITY OF MARYLAND SPRING 2016
DURATION:4 WEEKS
In this project we chose what specialized libarart we wanted to design. I chose a children's library, after completing our site analysis and realizing there was a large number of children under the age of 12 in the area. However there wasn't much for them to do within the city of Frederick, this library provides the safe space for activity and growth in the sense of community between the children of Frederick.
15
Context Influence Diagram
16
Massing Diagram
Site Plan
Lower Level Plan
Ground Level Plan
Upper Level Plan
17
Welcome and Play Area Perspective
18 8
South Elevation
Section Perspective
Section B West Elevation
19
Stacks Perspective
20 10
South Elevation
Atrium Perspective
West Elevation
21 11
3
22
SOUND ROOM
UNIVERSITY OF MARYLAND SPRING 2016 DURATION:3 WEEKS
The purpose of this project was to create practice and performance spaces for underground musicans in the H st area of Washington, D.C.. Initially the design was executed as an interiors project. We were eventually provided a site, Eventually, the project evolved to the exterior, creating a cohesive language from the interior to the facade.
23
PARTI The concept for this project was to take the idea of three music notes and use them to represent the
three different recording studios.
The notes/ rooms exist as organized spaces surrounded by the noise of
the interior skin, that create a vibrant performance space on the first floor.
Longitudional Section
Ground Floor Day Perspective
24
Ground Floor Night Perspective
Ground Floor Plan
First Floor Plan
Second Floor Plan
25
Vertical Organization
26
Daytime Elevation
Organization
Context
Nightime Elevation
Center Edge
27
4
28
BREWERY
THE CATHOLIC UNIVERSITY OF AMERICA SPRING 2014 DURATION:8 WEEKS
We were given the client, D.C. Brau Brewery located in Washington, D.C. They needed a larger facility that could better accomodate their growign buisness and allow for tours without disrupting the brewing process. Research was essential in understanding the brewing process and incorporatign that into the concept of the design and the walkthrough of the spaces.
The process of brewing beer, transforming unrefined raw materials into a refined beverage, is a merical that has taken place form hundreds of years. This miracle begins in the barley fields, a beauty all in its own. Much like the brewing process the barley fields mimics this same language of chaos and order. At close inspection the overlapping barley stalks convey a sense of chaos as one's perception moves outwards the orderly nature of the crop rows become evident. This building mimics this same experience in relation to the brewing process.
30 14
First Floor Plan
Second Floor Plan
Basement Plan
31
Longitudinal Section
Final Model West Elevation
32
Final Model NW Street Corner
Interior Lobby Vingettes Looking Towards Brewhouse
33 17
5
MULT-MEDIA WORK CUA / UMD
2012 - PRESENT
"I prefer drawing to talking. Drawing is faster and leaves less room for lies." -Le Corbusier
34
American Indian Museum Washington D.C. Graphite 90 min
Site Sketch Key Bridge Georgetown D.C. Graphite 10 min
35
36
Meeting the Maker CUA Spring 2014 Graphite 5 hours
Union Station Washington D.C. Graphite 40 min
National Building Museum Column Detail Washington D.C. Graphite 60 min
37
ANTHROPOLOGIE VISUAL DISPLAY INTERNSHIP Blog Link : alexandthegreatbigwindow.wordpress.com Feburary- May 2015
EARTH DAY RAINFOREST DISPLAY : 3 Weeks
The goal of the installation was to raise awareness of deforrestaion in the rainforrest for Earth Day. We used
newspaper to create the pieces to demonstrate the
connection between deforestation and the media that we used.
34
Salme Spring Display 2 Weeks
Lolita Spring Display 1 Week
As an Antrhopologie intern I learned to create space in a different light. This forced me to not just create space within the pieces but understand how the pieces occupied space and were experienced from multipule angles. I
truely belive that my experiences at Anthropologie enhanced and widend 40
my understanding of space as a designer.
Hardware Merchandise Display 1 Week
Salme Summer Transformation 2 Weeks
41
6
24 42
PROFESSIONAL WORK
BIGNELL WATKINS HASSER ARCHITECTS, PC SUMMER 2016
A 6,500 SF retail pad building for an existing retail development project. The goal of this project was to incorporate similar styles and details existing on site. This project became the Revit reference standard for the firm. My roles were finalizing the schematic design and producing the DD and CD drawings for submission.
25 43
.1
A
C
A.2
4
1
A3.2
A3.1
1
B
A2.1
3
4
A3.4
A3.1
2
C
A3.4
C.9
D Revision Schedule # Date 1 2
81' - 7 1/2"
6 3/4"
1' - 6 1/4" 4' - 0"
PERMIT /BI SET
40' - 0"
3' - 0"
9' - 0"
2' - 0"
H
ELECTRICAL SERVICE
1
23' - 4"
30' - 0"
81' - 4"
1 A3.5
81' - 10 3/4"
A3.1
2 A3.1 80' - 6 3/4"
2
1 A3.4
37' - 7 3/4"
SLAB LEAVE-OUT
2
2.9
3' - 4"
2.4
38' - 5 3/4"
A2.1
3
I 4' - 0"
38' - 5 3/4"
10" METAL STUDS @ 16" O.C. 2
3
14' - 0 1/4"
2' - 0"
Sim
A5.2
17' - 6 3/4"
25' - 0"
3
3' - 5"
4x8 F.R.T. PLYWOOD
1
A3.5
6 3/4" 4' - 0"
ELECTRICAL PANELS. SEE ELEC DWGS.
1
3 A5.1
2.9
25' - 0" 2
52' - 0 3/4"
1' - 7"
J
30' - 6"
4' - 0"
3
4' - 0"
GAS METER
H
Client:
2
REGENCY CENTE
4
Sim
Location:
1.5 40' - 0"
7 A5.1
E
9"
1.6
4"
2' - 1 3/4"
4' - 0"
1.7
2 A1.1
1' - 4"
4' - 0"
1.8
2' - 0"
3' - 4"
1' - 6 1/4"
A3.5
19' - 4 1/2"
A2.1
15' - 0"
2
4 A3.3
4' - 0"
E
FDC
B 1 A5.1 1' - 6 1/4"
1' - 6 1/4" 4' - 0"
18' - 4"
4' - 0" 3' - 4"
3' - 4"
23' - 10"
25' - 0"
8 3/4"
4' - 0"
30' - 6"
1' - 4"
16' - 10"
16' - 0 3/4"
1A C
D
9"
5 A5.1
16' - 0 3/4"
9 1/4"
6 3/4"
4' - 0"
Project:
SHOPS AT STONEW BUILDING I
3
1.4 1.2
FLOOR PLAN
1
Drawn by: AG
25' - 0"
80' - 6"
Project No: 02086.50
A
44
A.1 A.3
1
1
A3.3
A3.1
A.8
2
3
3
A3.3
A3.3
A3.2
A.9
B
3 A2.1
Ground Floor Plan 1
FLOOR PLAN
1
4
A3.2
A3.1
C
C.2
2 A3.2
C.8
C.9
1
8180 STONEWALL SHOPS GAINSVILLE, VIRGI PRINCE WILLIAM CO
A3.1
6 3/4"
4"
4" 1
A
2' - 3 1/4"
19' - 0"
4"
2 1/4"
1' - 4"
1.1
WATER SERVICE & BACKFLOW PREVENTER
4' - 0"
2' - 1 3/4"
6"
2' - 1 3/4"
1.3
1
FIRE SERVICE& BACKFLOW PREVENTER
2
2' - 0"
A3.1
1' - 6 1/4"
F
1' - 3"
18' - 4"
25' - 0"
3
19' - 0"
4 A3.4
Revision
9/30/16 PERMIT COMMENTS 11/18/16 REVISION 2
3' - 4"
6 3/4"
1' - 6 1/4"
17' - 6 3/4"
10' - 0"
25' - 0" 4' - 0"
6" 5' - 0"
6 3/4"
56' - 0 3/4"
1' - 0 1/4" TO INSIDE FACE OF STUD
25' - 6 3/4"
Date: 08/
D
A
B-2
1
A3.3
A3.1
A.9
1' - 4"
1
B
2
ROWLOCK
4"
A
P-1
B-1 A.2
SOLDIER
3' - 0"
B-1
A3.3
T.O. TOWER 27' - 4"
P-1 G 4' - 8"
M-1 LT1
B-1
CMU-2
B-1
C J
C J CMU-2 E
LOOR 2' - 0"
2' - 0" 9"
4' - 0"
17' - 6 3/4"
CMU-2
25' - 6 3/4"
9" 2' - 0"
P-1
1
3
1.4
COMPOSITE WOOD DECKING P-1 TREX SELECY 1x 5.5' E-1 COLOR TBD. T.O. SIDE TOWERS 24' - 0"
EXTERIOR LIGHTING LEGEND SEE ELEC. DWGS. FOR LIGHITNG PLAN & LIGHT FIX. SCHED.
T.O. MAIN BLDG. 21' - 4" AREA OF 5/8" PWD SHEATHING FOR SIGNAGE BY OTHERS
LT-1
DECORATIVE WALL SCONCE LIGHT FIXTURE
LT-2
SURFACE MOUNTED LIGHT FIXTURE W/ EMERGENCY BACKUP AS REQ'D BY CODE B-1
LT-3
SURFACE MOUNTED FLOOD LIGHT FIXTURE
LT-4
RECESSED DOWNLIGHT LIGHT FIXTURE
B-2
STOREFRONT 10' - 0"
LT1
B FINISH FLOOR GENERAL NOTES: 0' - 0" FOR CANOPIES, TRELLISES AND LOUVERS, SEE SPECIFICATION SECTION 05215-ARCHITECTURALLY EXPOSED STRUCTURAL STEEL. CMU-1 ST-1
2 A3.1 4 A3.3
1 2
1.5
2
2 1
1.8
1.8
A3.5
2 A3.5
2
1
A3.1
A3.4
1.5
4
3
A3.4
A3.1
1.4
1 3 P-1
E-1 E-2 S-1 B-1
T.O. TOWER 27' - 4"
AREA OF 5/8" PWD SHEATHING FOR LT2 SIGNAGE BY OTHERS
AW-1B-2 1' - 4"
E-2
9/30/16 PERMIT C 11/18/16 REVISION
FRONT (SOUTH) ELEVATION 1/8" = 1'-0"
3
3
Revision Schedule # Date
CMU-2
4 A3.1
A3.5
A3.1
23' - 9 3/8"
G
1' - 4"
EQ
EQ
23' - 9 3/8" EQ
S-1
C J
M-1 E-1
1' - 4"
C J
EQ
PER
T.O. MAIN BLDG. 21' - 4"
B-1TOWERS T.O. SIDE 24' - 0"
T.O. B-1 MAIN BLDG. 21' - 4"
AW-1 C J J C
C J
B-1
E
C J
LT1 B-1
ST-1 LT-2 ON WALL
CMU-2 LT1
FINISH FLOOR 0' - 0"
GAS METER A
CMU-2
CMU-2 FINISH FLOOR 0' - 0"
B-2 H
F
2
ST-1
A3.1
2
3 A3.1
H ELEC PANELS
MIN
CMU-2A
3 A3.1
B-2
WD1
B-1 SIDE (WEST) ELEVATION 2 1/8" = 1'-0"
CMU-2
A3.1
4
LT2
SIDE(EAST) ELEVATION 1/8" = 1'-0"
JST BRG FRONT 16' - 8"STOREFRONT 10' - 0" B-2
E-1 S-1
CMU-1 STOREFRONT 10' - 0" CMU-2 LT1
3' - 0"
M-2
CMU-1 6 A2.1
Elevation
B-1
CMU-2
AREA OF 5/8" PWD SHEATHING FOR SIGNAGE BY OTHERS T.O. SIDE TOWERS P-1 24' - 0" T.O. T.O. TOWER MAIN BLDG. 27' - 21' 4" - 4"
P-1
WD-1
STONE VENEER MANU: ELDORADO STONE STYLE: SHADOW ROCK COLOR: WILLOW NOTE: PROVIDE FLAT SURFACE FOR ALL LIGHTS
S-1
E-1
CMU-1
1
SIDETOWER_ELV 1/4" = 1'-0"
3
STOREFRONT 10' - 0"
D
E-2 AW-1
ST-1
FDC
Elevation
JST BRG FRONT 16' - STOREFRONT 8" 10' - 0" B-1
AWNING COLOR: #4328 BEAUFORT ALPINE/ BEIGE BAR FRAME COLOR: CHAMPAGNE
AW-1
S-1
P-1
A3.1
B-2
EXTERIOR PAINT MANU: BENJAMIN MOORE COLOR: TO MATCH ADJACENT 2 C.8 C.9 SURFACE A3.2
STOREFRONT MANU: KAWNEER COLOR: CHAMPAGNE
CMU-2
1
E-1
A3.2
C
3
T.O. SIDE TOWERS 24' - 0"
A3.3
4' - 0"
ST-1 A3.1
6
C.2 3
ST-1
2' - 0"
D
FINISH FLOOR 0' - 0"
C 3
FINISH FLOOR 0' - 0"
16' - 0 3/4"
CMU-1
A3.1
STOREFRONT 10' - 0"
STOREFRONT 10' - 0"
LT1
A3.2
8' - 0"
T.O. MAIN BLDG. 21' - 4"
4
MASONRY UNIT MANU: BETCO SUPREME STYLE: GROUND FACE SIZE: 2 SOAP COLOR: #2-8364 (WHITE)
8' - 0"
B-2
2' - 0"
AREA OF 5/8" PWD SHEATHING FOR SIGNAGE BY OTHERS
RONT
P-1 1 24' - 0"
4"
B-2
ROWLOCK
M-2
14' - 4"
B-1
8' - 4 1/16"
2' - 0"
8' - 3 3/4"
CMU-2A
3' - 4"
PWD FOR SIGNAGE
6' - 0"
TOWER ELV_NORTH 1/4" =S-1 1'-0"
5
B-2
M-1
FINISH FLOOR 0' - 0"
Client:
REGE
CMU-2
5 A2.1 FLOOR FINISH 0' - 0"
Location:
8180 STONE GAINS 45 27 PRINCE
Project:
1.1 3' - 6" 1' - 11 3/4"
F.O. STUD
F.O. FRAMING
1' - 0" 6 1/4"
C.9
2' - 0" 3' - 2"
B-2
11"
STEEL BEAM. SEE STRUCTURAL DWGS.
STOREFRONT 10' - 0"
6" 9"
10 A5.2
1' - 3" 5' - 9"
Location:
F.O. STUD
F.O. STUD
1' - 8" 3' - 2"
1' - 0"
1' - 6" 5' - 10"
STEEL WIND GIRT & SAG RODS. SEE STRUCTURAL DWGS. BATT INSULATION (R-19) BTWN STUDS, TYP. STOREFRONT 10' - 0"
ARCHITECTURAL STEEL TRELLIS. SEE STRUCT DWGS.
1' - 3" 3' - 0"
2' - 6"
10' - 0"
10' - 0"
9 A5.2
2" SOAP BLOCK, TYP. FINISH FLOOR 0' - 0"
Date: 08/16/2016
MASONRY FOUNDATION. GROUT FILL CMU CELLS BELOW GRADE, TYP. SEE STRUCTURAL DWGS.
CONCRETE FOOTING. SEE STRUCTURAL DWGS.
1' - 0"
3"
1' - 3"
Wall Sections 1
WALL SECTION 5 1/2" = 1'-0"
SLAB EDGE
SLAB EDGE
Project No: 02086.50
CONCRETE SLAB W/ VAPOR BARRIER & GRAVEL BASE. SEE STRUCTURAL DWGS.
CONT 2" RIGID INSULATION (R-10), 2FT MIN. DEPTH, TYP.
A3.3
1' - 0" 3"
1 2' - 0"
1' - 3"
4
WALL SECTION 8 1/2" = 1'-0"
1 A5.3
2' - 8"
Drawn by: AG
GROUT FILL CAVITY BELOW FLASHING.
CONT 2" RIGID INSULATION (R-10), 2FT MIN. DEPTH, TYP.
CONCRETE FOOTING. SEE STRUCTURAL DWGS.
Sim SLAB EDGE
MASONRY FOUNDATION. GROUT FILL CMU CELLS BELOW GRADE, TYP. SEE STRUCTURAL DWGS.
FINISH FLOOR 0' - 0"
SEE STRUCT DWGS.
1/2" THERMAL EXPANSION JOINT FULL DEPTH OF SLAB. TOP W/ SEALANT
ALUMINUM STOREFRONT SYSTEM W/ 1" INSULATED GLASS, TYP.
CONCRETE SLAB W/ VAPOR BARRIER & GRAVEL BASE. SEE STRUCTURAL DWGS.
SEE STRUCT DWGS.
Sim
2' - 8"
3' - 4"
STEEL BEAM. SEE STRUCTURAL DWGS.
SHOPS AT STONEWALL BUILDING I
CONCRETE SIDEWALK. SEE CIVIL DWGS.
CONCRETE FOOTING. SEE STRUCTURAL DWGS.
46
F.O. STUD
B.O.S. 1 10' - 0 3/4"
8180 STONEWALL SHOPS SQUARE 2 GAINSVILLE, VIRGINIA A5.2 PRINCE WILLIAM COUNTY
2" SOAP BLOCK, TYP.
CONT 2" RIGID INSULATION (R-10), 2FT MIN. DEPTH, TYP.
SEE STRUCT DWGS.
FINISH FLOOR 0' - 0"
STEEL JOISTS. SEE STRUCTURAL DWGS.
Project:
8" 8"
2' - 8"
3' - 4"
1 A5.3
CONCRETE SLAB W/ VAPOR BARRIER & GRAVEL BASE. SEE STRUCTURAL DWGS.
LK. SEE
NSION OF ANT TION. ELLS P. SEE S.
ROWLOCK. SEE ELEVATIONS
WALL SECTIONS
ALUMINUM STOREFRONT SYSTEM W/ 1" INSULATED GLASS, TYP. 3' - 4"
BELOW
THRU-WALL METAL FLASHING W/ MORTAR NET & WEEP HOLES @ 16" OC
REGENCY CENTERS
PERFORATED METAL PANEL IN 2x2 ANGLE FRAME, PAINTED.
2' - 8"
AR NET 6" OC
PRE-FINISHED STEEL ROD & TURNBUCKLE HANGERS FASTENED TO STEEL PLATES. SEE STRUCTURAL DWGS.
T.O.S.
TURE.
E OVER ON 5/8" G ON 6" .C.
STEEL WIND GIRT & SAG RODS. SEE STRUCTURAL DWGS.
20' - 10"
B-1
1' - 4"
6' - 9"
Client:
RIGID INSULATION (R-25)
SOLDIER COURSE. SEE ELEVATIONS
BATT INSULATION (R-19) BTWN STUDS, TYP.
11' - 0"
10' - 11"
3' - 4"
2' - 8"
OURSE
14' - 9"
MEMBRANE ROOFING SYSTEM OVER RIGID INSULATION (R-25) ON 1 1/2" METAL DECK.
ROWLOCK. SEE ELEVATIONS
STEEL BEAM. SEE STRUCTURAL DWGS.
PLATE
T.O.STEEL
STOREFRONT 10' - 0"
FACE BRICK W/AIR SPACE OVER WEATHER BARRIER ON 5/8" GYPSUM SHEATHING ON 6" MTL STUDS @ 16" O.C.
RIGID INSULATION (R-25) OVER METAL DECK
8 A5.3 1' - 3"
STEEL TUBE ALIGNED W/ HANGING RODS. SEE STRUC DWGS.
8"
AR NET 6" OC
LINTEL HT. 14' - 1" STEEL BEAM. SEE STRUCTURAL DWGS.
22' - 4"
2' - 8" B-2
SEE
THRU-WALL METAL FLASHING W/ MORTAR NET & WEEP HOLES @ 16" OC
CAVITY VENT WEEPS @ 16" O.C. TYP.
PERMIT /BID SET
JST BRG FRONT 16' - 8"
3" DIA. VENTS @ 10' O.C. (PROVIDE MIN 2 VENTS PER PARAPET)
PRE-FINISHED METAL FLASHING
24' - 0"
STEEL JOISTS. SEE STRUCTURAL DWGS.
28' - 4"
TL
PRE-FINISHED STEEL ROD & TURNBUCKLE HANGERS FASTENED TO STEEL PLATES. SEE STRUCTURAL DWGS.
Sim
STEEL CHANNEL. SEE STRUCTURAL DWGS.
EIFS ARCH OVER FACE BRICK. SEE ELEVATIONS.
JST BRG FRONT 16' - 8"
2" EIFS ON 5/8" GYPSUM SHEATHING ON LIGHT GAUGE METAL FRAMING 6 A5.3
8"
B-2
8' - 4"
PROVIDE 5/8" EXT. GRADE PLYWOOD BACKING FOR SIGNAGE. SEE ELEVATIONS. PROVIDE POWER. SEE ELEC DWGS.
RIGID INSULATION (R-25) OVER METAL DECK
MEMBRANE ROOFING SYSTEM OVER 5/8" GYPSUM SHEATHING. OVER KICKERS.
13 A5.3 MEMBRANE ROOFING SYSTEM OVER 5/8" GYPSUM SHEATHING. WRAP OVER TOP OF PARAPET BLOCKING, TYP.
14' - 0"
FACE BRICK W/AIR SPACE OVER WEATHER BARRIER ON 5/8" GYPSUM SHEATHING ON 6" MTL STUDS @ 16" O.C.
STEEL CHANNEL FRAME W/ METAL STUD INFILL. SEE STRUCTURAL DWGS.
SPACE RRIER
5' - 0"
Sim
8"
2' - 0"
9 A5.3
EIFS BRACKET. SEE ELEVATIONS.
5' - 7"
STEEL ANGLE. SEE STRUCTURAL DWGS.
3" DIA. VENTS @ 10' O.C. (PROVIDE MIN 2 VENTS PER PARAPET)
T.O. TOWER BR 22' - 4" 13' - 7"
6"
PRE-FINISHED METAL COPING
28' - 4"
S @ 16"
22' - 10"
6" 4"
T.O. SIDE TOWERS 24' - 0"
3' - 0"
T.O. STEEL T.O. TOWER BR 22' - 4"
F.R.T. WD BLOCKING, TYP. PRE-FINISHED METAL COPING
T.O. SIDE TOWERS 24' - 0"
ALUMINUM STOREFRONT SYSTEM W/ 1" INSULATED GLASS, TYP.
2' - 0" 6"
DWGS. PERMIT COMMENTS MEMBRANE ROOFING SYSTEM OVER 5/8" GYPSUM SHEATHING. WRAP OVER TOP OF PARAPET BLOCKING, TYP.
9/30/16
1
6" 1' - 1 1/2"
1' - 0"
STEEL TUBE. SEE STRUCTURAL DWGS.
AL R.T. ING
6"
F.O. STUD
1' - 0"
1' - 0"
TEXTURED FINISH OVER F.R.T. PLYWOOD
TUBE FRAME TOP & Revision Schedule STEEL BOTTOM OF CHANNELS, TYP. SEERevision STRUCTURAL # Date 1
EIFS BRACKET. SEE ELEVATIONS.
4' - 9"
4' - 0"
STEEL JOISTS. SEE STRUCTURAL DWGS. STEEL BEAM. SEE STRUCTURAL DWGS.
T.O. TOWER 27' - 4"
RECESSED DOWNLIGHT LIGHT FIXTURE. SEE ELEC DWGS.
3' - 6"
1' - 0"
T.O. TOWER 27' - 4"
1.2
2' - 7 1/2" 6"
RIGID INSULATION (R-25) OVER METAL DECK
1' - 0"
EL ANGLE. SEE UCTURAL DWGS.
F.O. STUD
PRE-FINISHED METAL FASCIA W/CLEATS
F.O. STUD
10 A5.3
FINISHED METAL CIA W/CLEATS
1
1' - 0"
2' - 0"
1' - 6 1/4"
3
6
WALL SECT 1/2" = 1'-0"
6 3/4" 1' - 1" 6 1/4"
3 5/8"
2' - 1"
Revis #
1' - 0" 6" FUTURE INTERIOR FINISH. BY OTHERS
1
9
EDGE OF SLAB
6" 3 1/4"
1
6 3/4"
6 3/4" 1 1/2" FURRING. SEE STRUCTURAL DWGS. 4" CMU W/AIR SPACE OVER WEATHER BARRIER ON 5/8" GYPSUM SHEATHING ON 6" MTL STUDS @ 16" O.C.
3
5/8"
1' - 0"
2"
1 1/2"
F.O. STOREFRONT
1' - 0"
1' - 3"
EDGE OF SLAB TYP.
6" 6" 6 1/4"
1' - 6 1/4"
5/8"
CONT AIR/MOISTURE BARRIER OVER 5/8" GYPSUM SHEATHING
1.2
2' - 1"
3 5/8"
STRUCTURAL DWGS.
BOTTOM OF CHANNELS, TYP. SEE STRUCTURAL DWGS.
FUTURE INTERIOR FINISH. BY OTHERS
)
1 1/4"
STRUCTURAL DWGS.
O.C.
2.9
12" METAL STUDS @ 16" O.C. SEE STRUC DWGS. 4' - 0"
STEEL COLUMN. SEE STRUCTURAL DWGS.
8 3/4"
C
ALUMINUM STOREFRONT SYSTEM W/ 1" INSULATED GLASS, TYP. SEALANT & BACKER ROD, TYP
C.2 5
SIDE PILASTER CMU 1 1/2" = 1'-0"
3
REAR PILASTER CMU 1 1/2" = 1'-0"
A.2 2' - 1"
2' - 1"
1' - 6 3/16"
6 5/8" 1' - 3"
3 3/8"
4 5/8"
2"
F.O. STOREFRONT
CMU
6" METAL STUDS @ 16" O.C. SEE STRUC DWGS.
1.4
CMU BELOW
STEEL COLUMN. SEE STRUCTURAL DWGS.
FUTURE INTERIOR FINISH. BY OTHERS
1 1/2" FURRING. SEE STRUCTURAL DWGS.
12" METAL STUDS @ 16" O.C. SEE STRUC DWGS.
CONT AIR/MOISTURE BARRIER OVER 5/8" GYPSUM SHEATHING
STEEL COLUMN. SEE STRUCTURAL DWGS.
CAST STONE VENEER SYSTEM OVER WEATHER BARRIER ON 5/8" GYPSUM SHEATHING ON 12" MTL STUDS @ 16" O.C. 1' - 7 7/8"
Cli 1.4
Lo
81
1' - 11"
CONT AIR/MOISTURE BARRIER OVER 5/8" GYPSUM SHEATHING
FUTURE INTERIOR FINISH. BY OTHERS
1' - 10 7/8"
1 1/2" FURRING. SEE STRUCTURAL DWGS.
12" METAL STUDS @ 16" O.C. SEE STRUC DWGS.
4" CMU W/AIR SPACE OVER WEATHER BARRIER ON 5/8" GYPSUM SHEATHING ON 6" MTL STUDS @ 16" O.C.
STEEL COLUMN. SEE STRUCTURAL DWGS.
3"
6" METAL STUDS @ 16" O.C. SEE STRUC DWGS. STEEL COLUMN. SEE STRUCTURAL DWGS.
1 1/4"
ALUMINUM STOREFRONT SYSTEM W/ 1" INSULATED GLASS, TYP.
FACE BRICK W/AIR SPACE OVER WEATHER BARRIER ON 5/8" GYPSUM SHEATHING ON 6" MTL STUDS @ 16" O.C.
ALUMINUM STOREFRONT SYSTEM W/ 1" INSULATED GLASS, TYP.
3 5/8"
5/8"
8 1/8"
SILL BELOW
6 13/16" 1 5/16"
Pr
3"
CMU BELOW
1' - 8"
1' - 11" 4' - 0"
C.8
1' - 0"
C.9
2"
4' - 0"
1.2
2' - 1"
5/8"
3 1/4"
1
9"
6 3/4"
4 3/4" 2"
SHIM AS REQ FACE BRICK W/AIR SPACE OVER WEATHER BARRIER ON 5/8" GYPSUM SHEATHING ON 6" MTL STUDS @ 16" O.C.
1
EDGE OF SLAB
6"
SHIM AS REQUIRED
1' - 1 1/2"
EDGE OF SLAB TYP.
1' - 3"
F.O. STOREFRONT 1' - 0"
3' - 11 7/8" 1' - 6 1/4"
1.2
2' - 1"
1' - 0"
EDGE OF SLAB. TYP.
SEALANT & BACKER ROD, TYP
1' - 1" 6 3/4"
1' - 3"
F.O. STOREFRONT 1' - 0"
ALUMINUM STOREFRONT SYSTEM W/ 1" INSULATED GLASS, TYP.
SEALANT & BACKER ROD, TYP ALUMINUM STOREFRONT SYSTEM W/ 1" INSULATED GLASS, TYP.
Pro
1' - 0" EDGE OF SLAB
1' - 11"
4" CMU W/AIR SPACE OVER WEATHER BARRIER ON 5/8" GYPSUM SHEATHING ON 6" MTL STUDS @ 16" O.C.
2' - 1"
4' - 0"
C.8
C.9
Plan Details 2
CORNER PILASTER_ STONE 1 1/2" = 1'-0"
1
Dra
CORNER PILASTER_ CMU 1 1/2" = 1'-0"
47