Pranabanti Karmaakar_Landscape Portfolio_UK_2022

Page 1

Portfolio|PK



LOWER DON VALLEY, Landscape Planning|2018 Sheffield |U.K.

Lower Don Valley has a very mixed character with the mix of industrial, post-industrial, private suburbs and commercial character zones. But most importantly it is the flagbearer of Sheffield’s rich history of industrialization especially the Steel industry. But lately Lower Don Valley is degenerating, it’s once bustling industries are now mostly at the end of its days.Many of the industries have been demolished and the lands have been converted to brownfields. With the upcoming HS2 at the edge of the lower don valley a major transformation is inevitable. The project requires to envisage a vision and a longterm strategy to rejuvinates the Lower Don Valley The Vision for Lower Don Valley is to create a landscape planning and land use framework which is adaptable, resilient and multidimensional yet deeply culturally rooted.









PARK DESIGN-A Narrative Approach, Landscape Design|2018

Almere |Netherlands. Studio Co-ordinator - Adrian Gueze|West 8

The site , a 40 ha arable land is within the Urban farming campus ,the land dedicated for Floriade 2022 in Almere, the newest city of the Netherlands. Almere is aspiring to build a legacy based on the asset of innovating the garden city concept by incorporating new themes such as sustainability, ecology and food, it successfully applied for hosting the next International Garden Festival; Floriade. Thus the scope was to design a park which acts as an epicenter for the Floriade . The brief was to create a narrative which seamlessly marries the existing context of farming ,food and sustainability with one’s individual reflection and memories on the same.

THE SONG OF THE ROAD The Pioneers, the first community of men in Almere ,is almost synonymous to it’s journey. They came from different countries at the wake of the WW2 to this newly built land from sea. They moulded the barren waste to the arable productive polders as we presently see it, nurturing farmlands and livestock and making it their Home . The produce from this land reached nations worldwide making the polders one of the most highly exporting land globally. But due to the proximity of Almere to Amsterdam, there is the advent of globalization and rapid urbanization. The lurking danger of losing its identity and democracy is strong. This fear within pioneers and people of Almere had been felt when for the first time a populist party with a nationalist agenda had been elected within Almere. Thus this is a time to look within, to take a few steps back and try to picture the future from a distance. To look into what should be and can be retained to keep the legacy going. Is there a more ecological and sustainable way possible to balance out it’s rapid urbanization? The park embodies the journey of Almere through these very phases of the past, present and future of Almere.


concept strategy

Water Strategy

2 PHYTOREMEDIATION THROU . RYE/WHEAT/BARLEY

RYE/WHEAT/BARLEY

FRUIT FARM

INTERACTION /EDUCATION

ENTRY PLAZA

LIVESTOCK

FRUIT FARM

1 NATURAL DRAINAGE OF THE SITE

2

WILL BE DIRECTED TO THE LAKE

ENTRY PLAZA INTERACTION /EDUCATION FRUIT FARM

CANAL NETWORK

PHYTOREMEDIATION THROU

LIVESTOCK

INTERACTION /EDUCATION

ENTRY PLAZA VEGETABLE

VEGETABLE

masterplan

15 5

2

17

14

The journey within the park starts from an organic wooded environment which is unknown to the polders as it gradually moves into the vastness and nothingness of the moorland of the open sculpture park represnting the earliest form of Almere.Then the landform starts to mould into fruit orchards and agricultural land moving upwards to look at the future more clearly where the bird island and butterfly garden awaits.

16 12

20 13

19

11 2

8 9

10 8

9

6

4 7

3 1

siteplan

2

1


UGH THE CANAL SYSTEM AND ISLANDS WHICH WILL COME TO THE LAKE GRASSES FOR PHYTOREMEDIATION

UGH THE CANAL SYSTEM

18 3

5

GRASSES FOR PHYTOREMEDIATION

3

floodable promenade


visualization|lake

LAWN

LAKE PROMENADE

AMPHITHEATRE

LAKE


BIRD ISLAND

BUTTERFLY HOSTING HOUSE

DECK FOR BOAT RIDES TO THE ADJOINING FARMS

OPEN SCULPTURE MUESUEM

URBAN FARMIMG AWARENESS CENTRE


visualization|orchard /fruit farming



visualization|bird island



Tower Hamlet Cemetery Park, London |2019



Placed in an almost obscured corner of London Borough with a high deprivation rate is the Tower Hamlet Cemetery Park. However it once lived in its full glory and was originally designed as one of the seven garden cemeteries in London. With the passage of time the identity of the cemetery faced a lot of redefinition. The cemetery was bombed five times during world war 2 with its chapels and many areas getting demolished. Many areas were dug out and bodies were reburied again. In some places the graves go up to 30m of depth with dead bodies piled up together. It also has areas which are concrecrated and till date almost well preserved. The cemetery had a final change of identity when the burial practice closed down in 1966 and due to lack of ownership and subsequent funds the cemetery was converted into a nature reserve in 2000. It has since then metamorphosed into a biodiversity haven. However with time the surrounding and the borough has also changed and once the local residents who’d find solace in the act of private bereavement moved away and in came people from different countries. Over the years this process continued and today the borough has 70 percent immigrants as residents. These residents don’t feel a connection to this place. This haven doesn’t act as a fulfillment to the existing green space crunch the borough has. This project revisits the cemetery design to create mostly low key interventions to build a relationship between these new residents and the natural cemetery as both of the stakeholders have a lot to offer each other. The design primarily builds upon the intrinsic quality of the primitive melancholy the site possessess, this liaison between nature and death takes the user into the journey from darkness to light, from sorrow to expiration, from the fear of loss to the promise of life everlasting.


Existing Character of the site.


DESIGN STRATEGY The design focuses on five major aspects The Accesses/thresholds which connects the cemetery to the outside world along with the plaza for public memorial. Highlighting the thresholds and making the access more seamless. Next are the Edges, making the edges more visually permeable to create awareness towards the place yet physically constrained to maintain safety. Reiterating the Paths through the existing tombstone areas with significantly reducing daylight by planting more trees to create a narrow almost borderline tunnel effect to throw people into these subsequent bouts of lighted zone to create more emphasis on some key areas which acts as important Nodes for eg creating the tree enclosure on the footprint of the damaged chapels. Finally the focus area which will be dedicated to memorialization. Those will house the two dense dark high canopied tall woodland areas situated in the southern side of the site and the wildflower bowl.





SECTIONS


Section AA The entrances are weaved in with the surrounding urban fabric creating table top with same or similar materiality to create a seamless transition.Loose foliage high canopied trees with seasonal interest like cherry and maple will be used to welcome residents inside.


Section EE


The existing paths are reinstated with fast growing lime trees to create a narrower effect. Some areas wooden tunnels are used to make the feeling more strong. The intermediate glades where there were some important monuments or structures ,planting is used in those areas to create a sense of definition.


BEECH WOODLAND

In the focused area lies the woodlands for memorization. Each tree in the woodland will be dedicated to individual mourning with residents able to own and personalize them with certain dimensional and materialistic restrictions on memorialization. The woodland symbolises equality we share in death and also attempts to invest the conduct of daily lives with communal consciousness.


LARCH WOODLAND


The memorial woodland creates a kind of enclosure to the bowl. Th screen to the viaduct. The meadow will have a mixed planting of self like red valerian. The red valerian blooms from early spring to late will have a loose gravel pathway and the topsoil will also have grav impart colour during the winters.The stream of valerian will continue where a wooden bench will be placed.


he dark almost opaque woodland creates a full visual and part auditory f seeding annuals, perennials and grasses creating a year round interest summer imparting a sweet fragrance and attracting lots of butterflies. It vel to restrict the unwanted growth. The grasses will create structure and e upwards to the top of the mound and will fade out within the woodland




Chatsworth RHS flowershow Long border competition | 2019

Peaked Senses is Inspired from the our first experience at the

moors of the Peak District and supports the ‘Moors for the Future Partnership’, an initiative to-wards creating awareness and conserving the moorland. The design showcases how rhythm, pattern and repetition of native moorland species like heather, molinia and buckler fern can create a canvas of soothing color and airy tonality for a resilient and lowmaintenance garden. The design aims at inspiring appreciation for unique native habi-tats like the moors, with the species curated to recreate the moors at the Peak District.







Court lodge, Ashford Office Work A high quality, attractive and sustainable community which delivers tangible benefits both locally and more widely across Ashford. A development which integrates effectively into the new community at Chilmington Green and delivers wholesale biodiversity enhancement at a District Scale through the realisation of Discovery Park (East).

Illustrative Masterplan







ST HELEN’S MOORISH-STITCH ‘a garden by McArthurGlen Designer Outlet York Office work

The project requirements centred on the creation of garden for the Bloom! Festival in York - “A fun floral festival celebrating 250 years of the Ancient Society of York Florists”1, whilst meeting the client’s brief to sensitively promote the company’s core fashion retail business. The garden needed to be of York and for York, it fundamentally needed to connect people to plants and to their environment and include a sense of fun or playfulness. In terms of its scope the garden needed to command full use of its setting in order to create an impact whilst also being deferential to York’s attractiveness as a visitor destination. Practically, the installation needed to be in flower during the festival and capable of being relocated from York to the Designer Outlet (out of town shopping centre) in order to extend its lifetime beyond the 4 days of the festival. In addition, we felt that the garden needed to actively promote the benefits of urban greening, a philosophy that runs at the heart of our work. The final concept sought to combine planting inspired by the north York Moors, i.e. a sense of place and the desire to connect people with their environment, with a modular ‘stitch’ pattern, referencing fashion design. The added play on the word ‘Moorish’ to describe something luscious or tasty applied both to the garden but also its context, being surrounded by well-known restaurants.





92 Leyton Green Road, London Office work

The Landscape General Arrangement plan for the site has been drawn up to create a high quality setting for the proposed residential development. Pedestrian access to the site is from Leyton Green Road and Matlock Road. All communal pedestrian entrance routes to the proposed buildings to be paved in clay pavers. The same paving continues through the communal ground fl oor zone of the buildings into the Central Courtyard space. The Central Courtyard forms a high quality communal space within the proposed development, providing opportunities for residents to meet, socialise and relax. It also provides informal play opportunities for the Under 5’s. Play spaces mainly aimed at the Under 5’s and 5-11 years age ranges have been situated at the northern corner of the site. This areas provides opportunities for creative, natural play in a setting among both existing retained trees and proposed trees and planting areas. In addition to these communal spaces, each ground fl oor dwelling has a private amenity space. These spaces accommodate a cycle store and external storage structure, covered by a sedum roof. In order to provide a contrast to the communal areas the patios have a concrete slab paving finish.


KEY Existing trees retained

Areas of proposed ornamental planting with trees. To include grasses, herbaceous, shrubs & climbers

Areas of grass

Red/ brindle dutch clay pavers to footways within shared spaces Private patios with slab paving, brick wall & cycle store/ storage cupboard with planted roof

Resin bound gravel

LIVINGSTONE COURT

Light grey pavers to vehicular running surface and disabled parking bays.

Area of grass containing elements of 5 to 11 years play equipment

Boundary Treatments -To provide privacy and softened with planting

Boundary wall to follow profile of existing surfacing/ building to ensure minimal damage is caused to the adjacent Category C trees

Area of grass and planting which contain elements of incidental under 5s play

Existing brick wall to the perimeter of the site retained and made good

Elements of informal under 5s play throughout the shared space; in areas of paving and within the planting

Clay pavers continue through the building in the communal area at ground level.

Materials - Durable and of a limited palette LEYTON GREEN

Communal bin store

ROAD

Gated vehicle access, for disabled residents only

Gated pedestrian, substation and binstore accesses

Davis Landscape Architecture

15 Iliffe Yard, London, SE17 3QA 020 7277 1035 www.davisla.com mail@davisla.com |

Client

Jerram Falkus Job Title

92 Leyton Green Road Two disable residents parking spaces

AD

CK RO

MATLO

Drawing Title

Landscape General Arrangement Plan Scale : 1:200@A1 Date : 29/11/2019

Indicative Shared Space with Play Images

Drawing No. : L0615L01B


Planting Design

The trees selected for this scheme have been chosen for their suitability for the proposed locations, both in terms of eventual size and environmental requirements. A selection of large, medium and small sized native and non native trees have been chosen. They have been selected for their ability to provide year round interest in the form of attractive fl owers, branch form and autumn leaf colour. Root defl ectors along with soil cells to give more volume of soil for tree-root growth to be installed for proposed trees in hard landscape areas or next to buildings/utilities. The planting selected will provide year round interest in the form of fl ower, spring and autumn leaf colour, berries and evergreen foliage during the winter months. A dynamic element is added through the fresh vigorous growth during the spring and early summer months, summer and autumn fl owering and dying back or providing attractive seed heads during the winter months. This also enhances play value through creating opportunities to observe the changing of the seasons. The species selected will tolerate a variety of light conditions, from shade to full sunlight. They have also been selected for their robustness. A few of their number are native species, which will provide benefit to our native fauna.


NOTES:

Key:

1. This drawing is to be read in conjunction with all relevant contract documentation from the design team, with any conflicting information to be brought to the attention of Davis Landscape Ltd in writing before commencing on site.

Planning Boundary. Root protection area of existing trees to be retained. Works in Root protection Area to comply with BS5837 Trees in relation to construction. Refer Arboriculturist report.

2, The contractor is to check and verify all levels and dimensions before construction. Any discrepancies are to be brought to the attention of Davis Landscape Ltd in writing before commencing on site.

600mm topsoil for trees. Q28/335A

3. All dimensions in mm, unless otherwise stated.

500mm topsoil beneath the subbase of surfacing in soil cells. Q28/335B.

4. Do not scale from this drawing.

400mm topsoil for hedge and shrubs adjacent to hard-landscape. Q28/335A.

5. All sub base and concrete specification, fixings, brackets & the like to Engineers' details & specification.

300mm topsoil for hedge and shrubs. Q28/335A.

6. We are not liable for the detailed design of above ground drainage, ground drainage, sub-bases, foundations, retaining structures, fall from height barriers and building waterproofing details.

300mm topsoil for turf. Q28/335A.

7. All proprietary products shall be installed in accordance with manufacturers written instructions.

50mm topsoil for cultivation. Cultivation in root protection areas of existing trees to comply with BS5837. Q28/335A.

8. Submit Shop drawings for Davis Landscape Ltd approval before constructing any bespoke landscape item.

Top soil to make up level difference between existing and proposed levels. Depth varies between 50mm-240mm. Q28/335A.

2 BED C0.02

e

Cycle stor

Plant room 1 BED C0.01 3 BED E0.03

BLOCK C

3 BED B0.05

3 BED E0.02

BLOCK E

4991

3 BED B0.04

3 BED E0.01

BLOCK B

3 BED B0.03

4991

3 BED D0.02

2655

3 BED B0.02

3 BED D0.01

ad

reen Ro

Leyton G

BLOCK D

elchair

3 BED Whe B0.01

Switchroom

e

Cycle stor

Sub Stn

Stage 4

BLOCK A Rev

Bin store

Plant room

T2 T1

eelchair

1 BED Wh A0.02

Description

Date

18.03.20 SJ

Extent of soil cells changed to suit drainage and M&E services runs Tender issue

Davis

By

28.02.20 SJ

Landscape Architecture

15 Iliffe Yard, London, SE17 3QA 020 7277 1035 mail@davisla.com I www.davisla.com Client

Job Title

Leyton Green Road Drawing Title

Soils Plan

ad

ck Ro

Matlo

0

1

5

10 m

Scale :

1:100@A0

Drawn : SJ

Date :

24/01/2020

Checked : SJ

Drawing No. : LGR-DLA-ZZ-LS-DR-L-9404 DLA No. :

L0651L04A

(T2)



NOTES:

Key: Planning Boundary

1. This drawing is to be read in conjunction with all relevant contract documentation from the design team, with any conflicting information to be brought to the attention of Davis Landscape Ltd in writing before commencing on site.

Existing trees retained. For tree species refer Arboriculturist tree report.

2, The contractor is to check and verify all levels and dimensions before construction. Any discrepancies are to be brought to the attention of Davis Landscape Ltd in writing before commencing on site.

T1-T5

C4

C4

3. All dimensions in mm, unless otherwise stated. 4. Do not scale from this drawing.

S6

Proposed hedge planting. Refer planting schedule for species and density.

S1-S6

Proposed shrubs planting. Refer planting schedule for species and density.

H1-H10

Proposed Herbaceous planting. Refer planting schedule for species and density.

G1-G4

Proposed Grasses planting. Refer planting schedule for species and density.

1 No. T5 Tree

G3

Proposed trees. Refer planting schedule for tree species.

He1-He2

Proposed climbers. Refer planting schedule for species and density. Strained wires for climbers at 225mm centres. Galvanised Hooks fixed to boundary walls.

C1-C4

S3 C2

C2

S4

MX2

All the planting and trees should be sourced from reputable UK suppliers.

1 No. T5 Tree

1 No. T4Tree

Planting Schedule Trees Key

C3

F

F

C3

MX2

1 No. T5 Tree

T1 T2 T3 T4 T5 Hedge Key

2 No. T4 Tree

Shrubs Key

1 No. T5 Tree MX2

C1

C1

Standard (semi mature) 3x Standard (extra heavy) 3x Standard (heavy) 3x Standard (semi mature) 4x Standard (extra heavy) 3x

Height cm 40-60 40-60

Cont size bare root 3L

Height cm

Clear stem

Root Cdn

Spacing

500-550 450-500 350-425 min 400 min 450

min 200 min 200 175-200 min 200 min 200

Rootball Rootball Rootball Rootball Rootball

as shown as shown as shown as shown as shown

Habit Breaks bushy -Branched 6

Cont size

Spacing Specification plant in double staggered rows 350 mm apart. 6/lin. m plant in double staggered rows 350 mm apart. 6/lin. m

Spec

No breaks

Spacing

Sev. Shoots

2

5/m2

-

4/m2

S1

Name Hedera helix 'Green Ripple'

40-60

C

2L

S2

Mahonia japonica

30-40

C

3L

Leader

S3

Philadelphus 'Manteau d'Hermine' Sarcococca humillis

C C

3L 3L

Branched Bushy

4 6

4/m2

S4

30-40 20-30

S5 S6

Viburnum x bodnantense Viburnum opulus

40-60 20-30

C C

3L 3L

Branched Bushy

4 3

4/m2 4/m2

Spec

No breaks

Spacing

Height cm

Rt Cdn

Girth 20-25 18-20 12-14 20-25 18-20

5/m2

Herbaceous Planting Key

MX2

1 No. T2 Tree

S5

T2

MX2

1

MX1

1 No. T5 Tree

Name

Rt Cdn

Anemone × hybrida 'Honorine Jobert'

Cont size

Spacing

H1 H2

C

1L

Dryopteris filix-mas

5/m2

C

1.5 L

5/m2

H3

Euphorbia amygdaloides robbiae

C

0.5 L

5/m2

H4

Geranium macrorrhizum

C

1L

5/m2

H5 H6 H7 H8 H9 H10

Helleborus orientalis Iris foetidissima Iris pseudacorus Phlomis russeliana Rudbecia fulgida 'Goldstrum' Sedum spectabile

C

1L

C

0.5 L

5/m2 5/m2

C C

1L 1L

5/m2 5/m2

C C

1L 1L

5/m2 5/m2

Grasses

C3

MX

C3

Form

Acer campestre 'Streetwise' Alnus incana Aurea Amelanchier x grandiflora 'Robin Hill' Betula pendula Sorbus aucuparia 'Streetwise'

Name Carpinus betulus Viburnum tinus 'Eve Price'

He1 He2

1 No. T2 Tree

Age

Name

1 No. T2 Tree

H1

S4

Key

Name

G1 G2 G3 G4

Deschampsia flexuosa Luzula sylvatica Miscanthus sinensis 'Gracillimus' Pennisetum alopecuroides 'Hameln'

Rt Cdn

Cont size

Spacing

C C C

0.5 L 0.5 L 1L

7/m2 7/m2 5/m2

C

1L

5/m2

Planting mix MX1-H1(25%)+H2(15%)+H5(25%)+H6(15%)+G2(20%) Planting mix MX2-H3(20%)+H4(30%)+H7(20%)+H9(20%)+G2(20%)

1 No. T5 Tree

Climbers

C2

MX1

Key

1 No. T2 Tree

T5

Lift

H1

S4

2

BLOCK C

H4 S2

He

H4

Riser

MX1 H3

He2

2L

Several shoots

3

1/lin. m

C

2L

Several shoots

60-80 60-80

C C

3L 2L

Several shoots Several shoots

3 3 2

1/lin. m 1/lin. m

1/lin. m

MX1

C3

S2

Cont size

C

40-60

Cycle Stor

1 No. T2 Tree

H3

Rt Cdn

40-60

Jasminum polyanthum Lonicera periclymenum

Plant Room

He2

MX1

S2

Height cm

Clematis armandii Hedera colchica 'Dentata Variegata'

C3 C4

e

T5

G4

Name

C1 C2

Smoke Shaf

t

He2

He2

G1 T4

H8

H10 T4

H4

BLOCK E

He2

T4

G4

H8

H8

T1 BLOCK B

He2

D

D

T4

T4

T4 G1

S4

T4

H8

H10

T4 H4

G1

He2

reen Ro Leyton G

BLOCK D

T4

T4

He2

T4

H8 G4

He2

T4 H2

S4

S1

S4

He1 S1

Switch Rm. Lift

He2

S1

Refuse Store

e

BLOCK A

S1

He2

Substatio

n

3 No. T1 Trees

Cycle Stor

He2

ad es

6 No. T3 Tre

2 No. T1 Trees

H8

He1

S6

Rev

Description

Date

By

S4 S4

B A

5 No. replacement trees added 3 No. additional T4 trees added

Davis S6

S5

15.01.21 SJ 25.08.20 SJ

Landscape Architecture

15 Iliffe Yard, London, SE17 3QA 020 7277 1035 mail@davisla.com I www.davisla.com Client

S5 Job Title

He2 S6 He2

Leyton Green Road

He2

Drawing Title

Planting Plan

T1

ck

Matlo

Road

Scale :

1:100@A0

Drawn : SJ

Date :

18/03/2020

Checked : SJ

Drawing No. : L0651L07

Rev. : B


+24.01

+23.66

LGR-DLA-ZZ-LS-DR-L-9403, LGR-DLA-ZZ-LS-DR-L-9404, LGR-DLA-ZZ-LS-DR-L-9405, LGR-DLA-ZZ-LS-DR-L-9406 and specification LGR-DLA-ZZ-LS-SP-L-9491

1:40

Bedding and subbase to Engineer's detail.

DPC to Engineer's detail.

Footing to Engineer's detail

50 mm bark mulch. Q28/155

Bedding and subbase to Engineer's detail.

600mm top soil for trees. Q28/335A

Twinwall geonet or similar laid over StrataCell structure. Q31/505A

Plastic open reinforcing mesh, 20mm aperture or similar laid below and sides of StrataCells structureexcept wherever it faces planting bed. Q31/505A

Geotextile membrane laid over and sides of StrataCell structure except wherever it faces planting bed. Q31/505A

200mm minimum depth of gravel for drainage. Q31/505A

Free draining subsoil. Q28/335C

cale 1:20@A1 2m

StrataCell structure or similar of 2 module deep with Rootsoil 20 (Q28/335B) or similar approved. Q31/505A

Cycle store

BLOCK C

Horizontal root barrier above attenuation tank.

BLOCK E

BLOCK B

01 Leyton Green

BLOCK D

Road

P5 - 400x400x50mm PC concrete flag paving for Private Patios. Conservation textured by Marshall's (Tel: 0370 241 2463) or similar approved. Colour: Silver Grey. Bond: Stack. Q25/315A

en in

BLOCK A

CS1-Cycle store / storage enclosure to Architect's detail. P5 paving to be continued in the enclosure.

ion. Q52/320D

. Refer to

ck Road

Matlo

Section Location Plan

+24.77 T.O.W.

ritish standard Colour: Natural. ng to Q10/110C

N.T.S

Stage 4

n bound gravel ur: Bauxite buff.

Rev

Description

Date

By

KEY: (0.00)

Block D0.02 Proposed tree. Refer to planting plan .Timber stakes(Q31/550A) to be placed parallel to the wall to avoid any clash with the wall footings.

0.00

CS1-Cycle store / storage enclosure to Architect's detail. P5 paving to be continued in the enclosure.

+23.46

DPC to Architect's detail.

P5 - 400x400x50mm PC concrete flag paving for Private Patios. Conservation textured by Marshall's (Tel: 0370 241 2463) or similar approved. Colour: Silver Grey. Bond: Stack. Q25/315A

+23.17

+23.17

T1

Davis

+23.17 F.F.L.

28.02.20 SJ

Landscape Architecture

TOK

Proposed planting. Refer to Client planting plan.

Job Title

ttenuation tank Engineer's detail.

Leyton Green Road

Bedding and subbase to Engineer's detail.

Block B0.03

K2 - 50x150mm British standard Drawing Natural.Title channel edging . Colour: Laid flush.Haunching toDetail 06 Engineer's detail. Q10/110C

Footing to Engineer's detail

DPC to Architect's detail.

P6 - 6 -10mm resin bound gravel Scale : As Shown@A1 (permeable). Colour: Bauxite buff. Q23/225 Date : 24/02/2020

DPC to Engineers detail. +24.01

+24.01 F.F.L.

cale 1:20@A1

+24.01

Break Line

Aeration/Irrigation perforated pipe. Q31/512

Bedding and subbase to Engineer's detail.

Drawn : PK Checked : SJ

Drawing No. : LGR-DLA-ZZ-LS-DR-L-9453

2m

DLA No. : +23.66 Bedding and subbase to Engineer's detail.

L0615D06

1:40

DPC to Engineer's detail.

Footing to Engineer's detail

50 mm bark mulch. Q28/155

Bedding and subbase to Engineer's detail.

600mm top soil for trees. Q28/335A Free draining subsoil. Q28/335C

01A

L-9453

Scale 1:20@A1

Section 0

0.2

0.5

1

Twinwall geonet or similar laid over StrataCell structure. Q31/505A

Geotextile membrane laid over and sides of StrataCell structure except wherever it faces planting bed. Q31/505A

2m

StrataCell structure or similar of 2 module deep with Rootsoil 20 (Q28/335B) or similar approved. Q31/505A

Proposed tree seen in elevation

Break Line

Plastic open reinforcing mesh, 20mm aperture or similar laid below and sides of StrataCells structureexcept wherever it faces planting bed. Q31/505A 200mm minimum depth of gravel for drainage. Q31/505A

Horizontal root barrier above attenuation tank.

P5 - 400x400x50mm PC concrete flag paving for Private Patios. Conservation textured by Marshall's (Tel: 0370 241 2463) or similar approved. Colour: Silver Grey. Bond: Stack. Q25/315A

CS1-Cycle store / storage enclosure to Architect's detail. P5 paving to be continued in the enclosure.

PL5 seen in elevation. Q52/320D Proposed Planting. Refer to planting plan.

+24.77 T.O.W.

K2 - 50x150mm British standard channel edging . Colour: Natural. Laid flush.Haunching to Engineer's detail. Q10/110C P6 - 6 -10mm resin bound gravel (permeable). Colour: Bauxite buff. Q23/225

Block D0.02

1:40

DPC to Architect's detail.

+23.46

+23.17

Bedding and subbase to Engineer's detail.

50 mm bark mulch. Q28/155

Plastic open reinforcing mesh,

600mm top soil for trees. Q28/335A Free draining subsoil. Q28/335C

below and sides of StrataCells

faces planting bed. Q31/505A

Attenuation tank to Engineer's detail.

Footing to Engineer's detail

Gravel layer wrapped in geotextile above root barrier of attenuation tank with perforated landdrain connected to positive outlet . To Engineer's detail.

gravel for drainage. Q31/505A

01B

L-9452

0

DPC to Engineers detail.

Scale 1:20@A1

Section 0.2

0.5

1

Bedding and subbase to Engineer's detail.

2m

+23.17

FFL TOW

15 Iliffe Yard, London, SE17 3QA 020 7277 1035 mail@davisla.com I www.davisla.com

+25.61 T.O.W.

+25.61 T.O.W.

Tender issue

+23.17 F.F.L.

(T1)


Footpath

+(23.12)

Fall

+23.17

1:60

Existing tarmac to be reinstated after installation of K2 kerb.

9. Read in conjunction with Davis Landscape Architecture drawings LGR-DLA-ZZ-LS-DR-L-9401, LGR-DLA-ZZ-LS-DR-L-9402, LGR-DLA-ZZ-LS-DR-L-9403, LGR-DLA-ZZ-LS-DR-L-9404, LGR-DLA-ZZ-LS-DR-L-9405, LGR-DLA-ZZ-LS-DR-L-9406 and specification LGR-DLA-ZZ-LS-SP-L-9491

+23.17 F.F.L.

Bedding and subbase to Engineer's detail.

Twinwall geonet or similar laid over StrataCell structure. Q31/505A

Subbase to Engineer's detail.

Geotextile membrane around Strata cell except where it faces planting bed. Q31/505A

Cell structure or similar of 2 module deep with 20 (Q28/335B) or similar approved. Q31/505A. Plastic open reinforcing mesh, 20mm aperture or similar laid below and sides of StrataCells structure except where it faces planting bed. Q31/505A 200mm minimum depth of gravel for draining. Wrapped in Geotextile linear. Q31/505A .

2 BED C0.02

Cycle store

Plant room 1 BED C0.01 3 BED E0.03

BLOCK C

3 BED B0.05

3 BED E0.02

02 Proposed tree. Refer to planting plan .

BLOCK E 3 BED B0.04

01 3 BED E0.01

BLOCK B

3 BED B0.03

3 BED D0.02

Road Leyton Green

BLOCK D 3 BED B0.02

3 BED D0.01

3 BED Wheelchair B0.01

K2 - 50x150mm British standard channel edging by Marshalls (Tel: 0370 241 2463) or similar approved. Colour: Natural. Laid flush. Q10/110C

Switchroom

B7G - Mild steel vertical bar lockable gate (RAL 9005). Height to match adjacent wall height. Q41/110A Cycle store

Sub Stn

BLOCK A Bin store

Plant room

1 BED Wheelchair A0.02

B7 - 1.2 m high brick wall. Brick to match building facade. Brick on edge on coping. F10

+24.37 T.O.W.

ck Road

Proposed hedge. Refer to planting plan.

+24.37 T.O.W.

Matlo

Section Location Plan PLANNING BOUNDARY

+24.37 T.O.W.

N.T.S

Stage 4

Aeration/Irrigation perforated pipe. Q31/512

KEY: (0.00)

Rev Description

Date

By

0.00 FFL

Timber stakes. Q31/550A.

TOW B7 - 1.2Fall m high brick wall. Brick to match building facade. Brick on edge on coping. F10.

K2 - 50x150mm British standard channel edging by Marshalls or similar approved. Colour: Natural. Laid flush. Haunching to Engineer's detail. Q10/110C

28/155

P2 - 200x64x85mm non permeable clay paving. Bruno DF by Wienerberger or similar approved. Colour: Red. Bond: Stretcher. Q24/120A Plastic open reinforcing mesh, K2- 50x150mm British standard 20mm aperture or similar laid channel edging. Colour: Natural. below and sides of StrataCells Laid flush. Haunching to Engineer's structure except where it faces detail. Q10/110C planting bed. Q31/505A

Bedding and subbase to Engineer's detail.

8/335A

re free aining.

Twinwall geonet or similar laid over StrataCell structure. Q31/505A

T1

P5 - 400x400x50mm PC concrete flag paving for Private Patios. Conservation textured by Marshall's (Tel: 0370 241 2463) or similar approved. Colour: Silver Grey. Bond: Stack. Q25/315A

B7G - Mild steel vertical bar lockable gate (RAL 9005). Height to match adjacent wall height. Q41/110A

Davis

200mm minimum depth of gravel for draining. Wrapped in Geotextile linear. Q31/505A.

Footpath

Landscape Architecture

Client Block D0.02 50 mm bark mulch. Q28/155

Job Title

Leyton Green Road

600mm top soil for trees. Q28/335A Break existing subsoil as necessary to ensure free draining.

Drawing Title

DPC to Architect's detail.

Detail 05 +(23.12)

Fall

28.02.20 SJ

15 Iliffe Yard, London, SE17 3QA 020 7277 1035 mail@davisla.com I www.davisla.com

+24.37 T.O.W.

Existing tarmac retained

Leyton Green Road Geotextile membrane around laid over Strata cell structure.No Geotextile to the sides facing planting bed. Q31/505A

Tender issue

+23.17

1:60

StrataCell structure or similar of 2 module deep with Rootsoil 20 (Q28/335B) or similar approved. Q31/505A

+23.17 F.F.L.

Scale :

As Shown@A1

Date :

24/02/2020

Drawn : PK Checked : SJ

Drawing No. : LGR-DLA-ZZ-LS-DR-L-9452 DLA No. :

Existing tarmac to be reinstated after installation of K2 kerb.

(T1)

L0615D05

Bedding and subbase to Engineer's detail.

Twinwall geonet or similar laid over StrataCell structure. Q31/505A

Subbase to Engineer's detail.

Geotextile membrane around Strata cell except where it faces planting bed. Q31/505A StrataCell structure or similar of 2 module deep with Rootsoil 20 (Q28/335B) or similar approved. Q31/505A. Plastic open reinforcing mesh, 20mm aperture or similar laid below and sides of StrataCells structure except where it faces planting bed. Q31/505A

01

L-9452

Scale 1:20@A1

Section 0

0.2

0.5

1

200mm minimum depth of gravel for draining. Wrapped in Geotextile linear. Q31/505A .

2m

Proposed tree. Refer to planting plan .

P2 - 200x64x85mm non permeable clay paving. Bruno DF by Wienerberger or similar approved. Colour: Red. Bond: Stretcher. P2a: 90° herringbone. Q24/120A

Proposed tree. Refer to planting plan .

K2 - 50x150mm British standard channel edging . Colour: Natural. Laid flush. Haunching to Engineer's detail. Q10/110C

B7G - Mild steel vertical bar lockable gate (RAL 9005). Height to match adjacent wall height. Q41/110A K2 - 50x150mm British standard channel edging by Marshalls (Tel: 0370 241 2463) or similar approved. Colour: Natural. Laid flush. Q10/110C

B7 - 1.2 m high brick wall. Brick to match building facade. Brick on edge on coping. F10

B7 - 1.2 m high brick wall. Brick to match building facade. Brick on edge on coping. F10

Proposed hedge. Refer to planting plan.

+24.37 T.O.W.

+24.37 T.O.W.

Proposed hedge. Refer to planting plan.

+24.37 T.O.W.

Aeration/Irrigation perforated pipe. Q31/512

Aeration/Irrigation perforated pipe. Q31/512

Timber stakes. Q31/550A.

Timber stakes. Q31/550A.

Fall

50 mm bark mulch. Q28/155

600mm top soil for trees. Q28/335A

Break existing subsoil as necessary to ensure free draining.

Bedding and subbase to Engineer's detail. Twinwall geonet or similar laid over StrataCell structure. Q31/505A Geotextile membrane around laid over Strata cell structure.No Geotextile to the sides facing planting bed. Q31/505A

02

L-9452

Section 0

Scale 1:20@A1 0.2

0.5

1

2m

StrataCell structure or similar of 2 module deep with Rootsoil 20 (Q28/335B) or similar approved. Q31/505A

Plastic open reinforcing mesh, 20mm aperture or similar laid below and sides of StrataCells structure except where it faces planting bed. Q31/505A 200mm minimum depth of gravel for draining. Wrapped in Geotextile linear. Q31/505A.

50 mm bark mulch. Q28/155 600mm top soil for trees. Q28/335A Break existing subsoil as necessary to ensure free draining.

TOK


LGR-DLA-ZZ-LS-DR-L-9404, LGR-DLA-ZZ-LS-DR-L-9405, LGR-DLA-ZZ-LS-DR-L-9406 and specification LGR-DLA-ZZ-LS-SP-L-9491

All works in Root Protection Areas to comply with BS5837. Footing to Engineer's detail.Engineers to coordinate footing with Arboriculturist.

50mm topsoil for cultivation. Cultivation in root protection areas of existing trees to comply with BS5837. Q28/335A. Existing ground level.

DPC to Engineers detail.

02

Cycle store

01

BLOCK C

BLOCK E

ng brick wall to be retained + 900mm high solid timber top. Fixing of trellis to wall to Engineer's detail. ght : 2.1m high minimum. Brick wall to be rendered

BLOCK B

BLOCK D

Leyton Green

colour. F10, M20/19A and Q40/310C

Road

P1-200x64x80mm permeable clay paving. Aquata by Wienerberger or similar approved. Colour: Red. Bond: Stretcher. Q24/124A

BLOCK A

K2 -5 0x150mm British standard channel edging . Colour: Natural. Laid flush. Haunching to Engineer's detail. Q10/110C

ck Road

Matlo

Section Location Plan

Stage 4

Proposed planting. Refer to planting plan.

1:3 m

N.T.S

Rev

Description

Date

By

ax slop

24.02

e

P5a: Conservation priora permeable flag paving. Q25/315A

Proposed hedge. Refer to planting plan.

Existing ground level. Bedding and subbase to Engineer's detail.

B12 - 1.6 m high brick wall. Brick to match building facade. Brick on edge on coping. F10,

50mm topsoil for cultivation. Cultivation in root protection areas of existing trees to comply with BS5837. Q28/335A.

+24.97 T.O.W.

T1

28.02.20 SJ

Landscape Architecture

15 Iliffe Yard, London, SE17 3QA 020 7277 1035 mail@davisla.com I www.davisla.com

Existing Trees retained.

Client

+24.97 T.O.W.

Top soil to make up level difference between existing and proposed levels. Depth varies between 50mm-240mm. Q28/335A.

Tender issue

Davis

Proposed planting. Refer to planting plan.

All works in Root Protection Areas to comply with BS5837.

Job Title

Leyton Green Road Drawing Title

Detail 09

Block E0.03

+(23.73)

DPC to Architect's detail.

DLA No. :

Bedding and subbase to Engineer's detail.

All works in Root Protection Areas to comply with BS5837. Footing to Engineer's detail.Engineers to coordinate footing with Arboriculturist.

50mm topsoil for cultivation. Cultivation in root protection areas of existing trees to comply with BS5837. Q28/335A. Existing ground level.

DPC to Engineers detail.

01

Scale 1:20@A1

Section 0

0.2

0.5

1m

2m

B9-Existing brick wall to be retained + 900mm high solid timber trellis on top. Fixing of trellis to wall to Engineer's detail. Total height : 2.1m high minimum. Brick wall to be rendered

+26.12 T.O.W.

in white colour. F10, M20/19A and Q40/310C

P1-200x64x80mm permeable clay paving. Aquata by Wienerberger or similar approved. Colour: Red. Bond: Stretcher. Q24/124A

K2 -5 0x150mm British standard channel edging . Colour: Natural. Laid flush. Haunching to Engineer's detail. Q10/110C

Proposed planting. Refer to planting plan.

Topographical Information not available 1:3 m

ax slop

+24.02

e

+(23.79)

Existing ground level. Bedding and subbase to Engineer's detail.

50mm topsoil for cultivation. Cultivation in root protection areas of existing trees to comply with BS5837. Q28/335A. Top soil to make up level difference between existing and proposed levels. Depth varies between 50mm-240mm. Q28/335A. All works in Root Protection Areas to comply with BS5837.

02

L-9456

As Shown@A1 24/01/2020

Drawn : PK Checked : SJ

Drawing No. : LGR-DLA-ZZ-LS-DR-L-9456 +23.37

+23.37 F.F.L.

L-9456

Scale : Date :

Section

Scale 1:20@A1

L0615D09

(T1)


LGR-DLA-ZZ-LS-DR-L-9402, LGR-DLA-ZZ-LS-DR-L-9403, LGR-DLA-ZZ-LS-DR-L-9404, LGR-DLA-ZZ-LS-DR-L-9405, LGR-DLA-ZZ-LS-DR-L-9406 and specification LGR-DLA-ZZ-LS-SP-L-9491

e

ax slop

+24.05

1:3 m

All works in Root Protection Areas to comply with BS5837.

Twinwall geonet or similar laid over StrataCell structure. Q31/505A Geotextile membrane around laid over Strata cell structure.No Geotextile to the sides facing planting bed. Q31/505A

50 mm bark mulch. Q28/155 600mm top soil for trees. Q28/335A Foundation condition to be assessed by Engineers and provide underpinning if required.

Break existing subsoil as necessary to ensure free draining.

StrataCell structure or similar of 2 module deep with Rootsoil 20 (Q28/335B) or similar approved. Q31/505A

Cycle store

Plastic open reinforcing mesh, 20mm aperture or similar laid below and sides of StrataCells structure except where it faces planting bed. Q31/505A

BLOCK C

200mm minimum depth of gravel for drainage. Q31/505A

BLOCK E

BLOCK B

01

BLOCK D

Leyton Green

Bedding and subbase to Engineer's detail.

Road

B5-1.2 m high brick wall + 900mm mild steel vertical bar railing on top (RAL 9005). Total height : 2.1m high minimum from adjacent ground level outside site boundary. Brick to match building facade. Brick on edge on coping. Fixing to railing to wall to Engineer's detail. F10 & Q41/110A.

Aeration/Irrigation perforated pipe. Q31/512

02 BLOCK A

Proposed planting. Refer to planting plan. +25.54 T.O.W.

K2 - 50x150mm British standard channel edging . Colour: Natural. Laid flush.Haunching to Engineer's detail. Q10/110C

ck Road

PLANNING BOUNDARY

Matlo

- 200x64x85mm non permeable clay paving. uno DF by Wienerberger or similar approved. Colour: Red. Bond: Stretcher. Q24/120A

Section Location Plan +27.15 T.O.W.

around laid tructure.No sides facing Q31/505A

odule deep r approved. Q31/505A

cing mesh, nd sides of es planting Q31/505A

Stage 4

B3-Existing brick wall to be retained and made good if necessary. Height of existing wall to be increased to 1.2m + bar railing on top (RAL 9005). 900mm mild steel vertical Rev Description Total height : 2.1m high minimum from adjacent ground level outside site boundary. Brick on edge on coping. F10, Q41/110A.

Proposed tree. Refer to planting plan +24.34 F.F.L.

4.24

subbase to eer's detail.

N.T.S

Date

By

Proposed planting. Refer to planting plan. T1

Aeration/Irrigation perforated pipe. Q31/512

Proposed planting. Refer to planting plan.

Proposed plating.Refer to planting plan.

Client Existing level

+(25.05)

Job Title

Foundation to Engineer's detail.

Leyton Green Road

P2 - 200x64x85mm non permeable clay paving. Bruno DF by Wienerberger or similar approved. 50 mm bark mulch. Q28/155 Colour: Red. Bond: Stretcher. Q24/120A 600mm top soil for trees. Q28/335A

Block B0.01

DPC to Architect's detail.

Timber stakes.Q31/550A.

+(24.57)

ax

+24.05

Break existing subsoil as necessary to ensure free draining.

+24.01

+24.01 F.F.L.

um depth of . Q31/505A

28.02.20 SJ

Landscape Architecture

15 Iliffe Yard, London, SE17 3QA 020 7277 1035 mail@davisla.com I www.davisla.com

K2 - 50x150mm British to Engineers detail. standard channelDPC edging or similar approved. Haunching to Engineer's detail. Colour: Natural. Laid flush. Q10/110C

K2 - 50x150mm British standard channel edging or similar approved. Haunching to Engineer's detail. Colour: Natural. Laid flush. Q10/110C

Tender issue

Davis

1:3 m

slope

Drawing Title

Detail 10

Scale :

As Shown@A1

Date :

24/02/2020

Drawn : PK Checked : SJ

Drawing No. : LGR-DLA-ZZ-LS-DR-L-9457

similar laid r StrataCell Q31/505A

DLA No. :

Twinwall geonet or similar laid over StrataCell structure. Q31/505A Geotextile membrane around laid over Strata cell structure.No Geotextile to the sides facing planting bed. Q31/505A

50 mm bark mulch. Q28/155

400mm topsoil for hedge and shrubs adjacent to hard-landscape. Q28/335A.

Break existing subsoil as necessary to ensure free draining.

01

L-9457

0.2

0.5

1

50 mm bark mulch. Q28/155 600mm top soil for trees. Q28/335A Foundation condition to be assessed by Engineers and provide underpinning if required.

Break existing subsoil as necessary to ensure free draining.

Plastic open reinforcing mesh, 20mm aperture or similar laid below and sides of StrataCells structure except where it faces planting bed. Q31/505A

Scale 1:20@A1

Section 0

StrataCell structure or similar of 2 module deep with Rootsoil 20 (Q28/335B) or similar approved. Q31/505A

L0615D10 All works in Root Protection Areas to comply with BS5837.

2m

200mm minimum depth of gravel for drainage. Q31/505A Bedding and subbase to Engineer's detail.

Aeration/Irrigation perforated pipe. Q31/512 Proposed planting. Refer to planting plan.

K2 - 50x150mm British standard channel edging . Colour: Natural. Laid flush.Haunching to Engineer's detail. Q10/110C

Bin Store

B5-1.2 m high brick wall + 900mm mild steel vertical bar railing on top (RAL 9005). Total height : 2.1m high minimum from adjacent ground level outside site boundary. Brick to match building facade. Brick on edge on coping. Fixing to railing to wall to Engineer's detail. F10 & Q41/110A.

P2 - 200x64x85mm non permeable clay paving. Bruno DF by Wienerberger or similar approved. Colour: Red. Bond: Stretcher. Q24/120A

DPC to Architect's detail.

+25.54 T.O.W.

PLANNING BOUNDARY

Proposed tree. Refer to planting plan .Timber stakes (Q31/550A) to be placed parallel to the wall to avoid any clash with the wall footings.

+24.34 F.F.L. +24.24 F.F.L.

+24.24

DPC to Engineers detail.

Bedding and subbase to Engineer's detail.

Geotextile membrane around laid over Strata cell structure.No Geotextile to the sides facing planting bed. Q31/505A

Foundation to Engineer's detail.

StrataCell structure or similar of 2 module deep with Rootsoil 20 (Q28/335B) or similar approved. Q31/505A

02

L-9457

Plastic open reinforcing mesh, 20mm aperture or similar laid below and sides of StrataCells structure except where it faces planting bed. Q31/505A

Scale 1:20@A1

Section 0

0.2

0.5

1

2m

200mm minimum depth of gravel for drainage. Q31/505A Twinwall geonet or similar laid over StrataCell structure. Q31/505A

50 mm bark mulch. Q28/155

600mm top soil for trees. Q28/335A Break existing subsoil as necessary to ensure free draining.

(T1)


Letterhead Road Office work

The Landscape General Arrangement plan for the site has been drawn up to create a high quality setting for the proposed residential development. As shown within Section 3.0, one main vehicular entrance point takes drivers from Leatherhead Road to the square area. Parking for the development has been located at basement level within the Leatherhead Road facing blocks, whereas units around the proposed square have street level parking. Pedestrian access to the site is via routes leading through the building on ground floor level, onto a shared pedestrian/vehicular surface around the Green. The Green is the key communal space within the proposed development, whereas private spaces have been provided at the Leatherhead Road frontage and in the form of private back gardens to houses.


Landscape General Arrangement 1:250@A3






Phoenix House Office work

The Landscape General Arrangement plan for the ground level has been drawn up to create a high-quality setting for the proposed development. Accessibility was considered by Architect’s at an early stage of the design process which informed landscape decisions. There is no vehicular access into the development. Pedestrian access will be from Amity Grove public footpath to the front of the site. The development has a proposal for cycle parking at the basement level. To delineate private space from public space, structural planting like a hedge along with low railing has been proposed to the front of the development. Hedge will offer a soft green frontage to the development, Metal railing will provide a hard edge initially restricting any misuse of space and as the hedge establishes in the future it will cover the railing and will make it a green frontage. Development will have an open court at the entrance along with a row of trees to give a sense of arrival, trees will help to soften the building elevation. The frontcourt will also have an ornamental mixture of shrubs and herbaceous planting and will be paved in dutch clay pavers to blend with the building and to contrast from public space, clay pavers will continue in the communal areas of the building on the ground floor. Private gardens have been designed to high standards with the concrete paving mix to add value and character to the space. To avoid shady gardens tree planting has not been proposed. The proposal includes climber planting with strained wires to support them on boundary and building walls, Climbers planting will help to soften up the elevation creating a green background and along with ornamental shrubs and herbaceous planting will create a space to relax and contemplate. Seasonal leaf colour change and different flowering times of planting will add variety to the space. Proposal includes timber top warm to touch seating for some gardens.





Edith walk, Great Malvern Office work The site is approximately 0.45 Ha in size. Currently the main proportion of the site is formed of hardstanding areas for private parking. Existing vegetation comprises of groups of trees which have been surveyed and assessed to understand their value and condition. These are mainly set within dense mixed shrub areas. The site is approximately 0.45 Ha in size. Currently the main proportion of the site is formed of hardstanding areas for private parking. Existing vegetation comprises of groups of trees which have been surveyed and assessed to understand their value and condition. These are mainly set within dense mixed shrub areas . One main vehicular entrance point has been located on Edith Walk. Vehicular access from Bellevue Terrace to the nearby car park outside the site boundary has been retained, with controlled access. Pedestrian access to the site is via footpaths leading from Edith Walk, and via the existing retained stepped route from Bellevue Terrace. Parking for the units has been located on street level to the front of each house. Parking have also been located adjacent to the block of flats, including two disabled bays. The private front gardens, including patios for House 01-07, provide defensible space for residents, and private gardens have also been provided at the rear of each of the units.







B2

K4

K4 L

L 1100

REFUSE STORE 1 L

140

L

140

L

1100

L

K2

K4

P1

Fp1

K4 P1

K4

ive

Tp

Tp

K4

Tp

K1-D K K 3

K4

B1 B 5

K4

P7

P2

B6

P1

F5

P7

B6

Tp

F5 S 1

P7

Tp

1

trance

17

K6

Lob

by 1

ck

1

Fp1

9

10

Unit

P1

K7

7

8

Unit

0.10

Entra Lob nce by

0.4

/1.1

0

0.10

A

Entran ce Lob by

Lob

0.4A

GF BL

by 2

OCK

826

Unit

Fp

1

0.1A

K7

0.14

K6

B6

K6

A

/1.1

4

P1

Unit

1.15

Entra Lob nce by

1.15

A

/0.1

5

P5

Tp

P7

P6 Fp2 +K6

Fp2

+K6

P1

Tp

P2 P2

K4

B1

P2

Tp

P2 P2

K2

P

Fp

Tp

P2

P8

Fp2 P7

P1

Tp

K4 K4

P8

Tp

K

K4

K1-D

K4

P1

K4

K4

K4

K4

P7 K K3 -D K1 P5 P8

P6

Fp2

P1

P2

P1

Unit

Entra Lob nce by

0.14

P1

B1

d

L

P7

K4

P2

trance

Tp

P1

P2 P2

Roa

K6

K6

Tp

P2

in En

Tp

Tp P2

2 Ma

K6

P1

Tp

K4

P2

K6

P1 K6

K6

Block

B6

K6 P7

Tp

B1

Tp

Tp

P1

P2

Tp

P1

P7

P1

P1

B6

1100

P2a K7D K

Tp

K4

K4

Tp

K7F

K6

P7 P1

P2

P1

Tp

Tp

P2a K7D K

K6

K6

L

P1

L

S1

Tp

L

L L

140

140

A

P1 B6

L 1100

0L 110 L 1100 L 1100 L 1100

P2

1100

K6

En Lob 0.13

Tp P1

0.11

Unit

P2

L

L

Unit

Fp3

P6

Fp3 P1

1100

0L 140

Fp1

Fp3 K7 Tp

K6

K6

A

P6

P1

1100

P7

Tp

110

K6

1.1

Entra Lob nce by

L L 1100 L 1100 L 1100 1100

P2

K6

K6

Tp

REFUSE STORE 2

CS2

L

P1

K7

0.1/

0.11

K7

P2

Unit

0.2

Fp1

(48)

CS1

K7

P2

P6 Fp3

1100

K7

CYCLE STORE 2

P7

Tp

Fp1

K7

K7 P2 K7

P2

P6 Fp3

K6

K7

L

P1 Tp

K7

P2

1100

P7

B1

Entra Lob nce by

Entran ce Lob by

Unit

K7 P1

B1

0.3

Tp

K7

K4

Blo 18

in En

K4

rive

rt D

K4

/1.9

K4

P2

P2

K4

1

19

1 Ma

K4

Albe

B1

0.9

Entran ce Lob by

P7

Tp

K4

Stair

Block

P1

P2

K4

Unit

Entran ce Lob by

0.2A

Tp

B1

S1

K7

Tp

K4

by

0.3A

Tp

B1

Entran ce Lob by

0.8A

Lob

6

P2

Tp

P2

P2

yth

nce

by 3

P1

P2

Fors

0.5

Entra

0.5A

K6

K4

P1

Tp P2

P2

Unit 0.7 / 1.7

Lob

F5

P2

P2

P2

6

P1

B6

Tp

F4

0.9A

P2

P2

/ 1.

826

K4

P2

K2

Unit 0.8 /1.8

0.7A

0.6

P1

Tp

P2

Entran ce Lob by

Unit

Unit

Tp

F1

F4

Entra Lob nce by

B6

F5

K2

0.6A

Tp

P1

F4

P1

P2 P7

F1 K2

P3

Tp

P1

F4

Fp2

P6

K6

K4

K1-D K K2 P5

B5

K2

P3

P2

P1 P8

P3a

P3a

+K1

B5

t Dr

P1

P3a

+K1 K2

Albe r

Tp P2

B5

F1

L

Fp1

1100

P2

P8

F1

K2

L

K6

B1

K4

1100

P3

1100

L

CS2

L

P3

1100

Fp2

L

Fp1

1100

1100

B2

L

Fp1

1100

+K4

B1

1100

Office work

B2

L

Fp1

1100

K4

K4

B1

B2

Fp1

Wells Court, Woking

P2

P

K4 B1

General Arrangement Plan

Key:

Fors

yth

P3a

Existing trees to be retained. Works in Root protection Area to comply with BS5837 Trees in relation to construction. P4 Proposed trees. Refer planting plan for species. P5 Proposed planting, see planting plan for species and density.

G

Proposed grass/turf. Q30/405.

Surfacing: Bedding and subbase to Engineer's detail. P1

P2

P3

Existing concrete block paving to be retained and make good if necessary. Engineer's to assess structural stability of the surfacing for its intended use. Colour: Grey Existing black tarmac to be retained and make good if necessary. Engineer's to assess structural stability of the surfacing for its intended use. P2a - New tarmac to match existing. 400x400mm PC concrete flag paving for private patios/gardens. Conservation textured by Marshall's (Tel: 0370 241 2463) or similar approved. Colour: Silver Grey. Bond: Stack. Q25/315A. 400x400mm PC concrete permeable flag paving in the root

P6 P7

P8

P9 Tp

d

Key:

Key: Planning Boundary

Roa

Planning Boundary 400x400mm PC concrete permeable flag paving in the root protection area of existing trees to be retained. Conservation textured by Marshall's (Tel: 0370 241 2463) or similar approved. Colour: Silver Grey. Q25/315A. 6 -10mm resin bound gravel for communal path. Colour: Bauxite buff. Q23/225. Part M compliant, 2 rows minimum, 400x400mm PC concrete Blister paving to uncontrolled crossing. Blister paving by Marshall's (Tel: 0370 241 2463) or similar approved. Colour: Buff. Bond: Stack. Q25/320A. Antislip composite decking to the private patios. Q55/380. Install to manufacturer's written recommendations Existing surfacing to be painted with anti slip paint to demarcate pedestrian route with white pedestrian symbol. Colour: Blue with white strip on both side of pedestrian path. Q10/395A. 240x160x80mm concrete paving at the pedestrian entrance. Mistral by Marshalls or similar approved. Colour mix: 70% Silver grey + 20% Charcoal + 10%Graphite. Bond: Stretcher. Q24/110A. Minimum 100mm deep gravel margin wrapped in geotextile on three sides except on top of gravel. Thermoplastic line markings to demarcate parking bays and wheelchair symbol. Existing line markings including diamond shape parking demarcation to be retained where possible and make good where necessary. Q10/395.

Kerbs, Edging and Steps: Footing/haunching to Engineers' detail.

Planning Boundary Kerbs, Edging and Steps: Footing/haunching to Engin K1

Proposed 125x255mm British standard bulln by Marshalls (Tel: 0370 241 2463) or similar Colour: Natural. K1-DK : Drop kerb. Q10/110

K2

Proposed 50x150mm British standard chann Marshalls (Tel: 0370 241 2463) or similar ap Natural. Laid flush. Q10/110C.

K3

Proposed 125x255mm British Standard conc By Marshalls (Tel: 0370 241 2463) or similar Use 150mm depth channel in root protection

K4

Existing concrete kerb to be retained and ma Engineer's to assess structural stability of the

K6

Existing concrete block kerb to be retained a Engineer's to assess structural stability of the

K7

Proposed concrete block kerb. Kerb to match concrete block kerbs. K7F- Kerb laid flush. K

S1

Existing steps to be retained and make good assess structural stability of the steps for its Building Control to confirm whether steps ca permitted development or whether Part M re handrail and harzard warning paving is requi


F2

NOTES:

F3

Tp P1

F2

P2

K4

K4

Tp

P7

Tp P1

F2

Entran ce Lob by A

3

6

A

7

9 8

17

3 GF BL

OCK

0.32

A

3

A

Block

Entra Lob nce by

2

3 Ma

in Ent

/1.1

A

Tp

Tp

B6

Tp

P6 Fp3 +K6

Fp1

B6

Fp3

P6

Tp

+K7 Fp3

Fp1

Tp

0L

1100

0L

L 1100

Tp

K7

Tp

Tp

Tp

Tp

Tp

Tp

Tp

Tp

Tp

K4

P2

K4

K4

K4

K4 Key:

B4

B5

B6

B1

P2

Rev

Description

B1

B1

yth

s or

F

ad

Ro

-

Existing 0.8m high brick boundary wall to be retained and make good if necessary. Engineer's to assess structural stability of all the walls and provide structural support including underpinning if necessary. Existing 1m high brick boundary wall to be retained and make good if necessary. Engineer's to assess structural stability of all the walls and provide structural support including underpinning if necessary. Existing 0.9m high brick boundary wall to be retained and make good if necessary. Engineer's to assess structural stability of all the walls and provide structural support including underpinning if necessary.

F1

Key:

F2

F3

Fp

Existing 2.5 m high brick pier to be retained and make good if necessary. Engineer's to assess structural stability of all the walls and provide structural support including underpinning if necessary. Proposed 1.5m high new section of curved (3m radius) brick wall with brick piers in the end and development branding to emphasize entrance in to site. Brick to match existing B1 wall with brick on edge coping. F10 Existing brick planter wall to be retained and make good if necessary. Engineer's to assess structural stability of all the walls and provide structural support including underpinning if necessary. Planters to have weep holes to ensure free draining for planting to thrive. Existing 2.3m high chain link fencing to be retained and make good where

G1 F4

F5

Planning2.3m Boundary Existing high chain link fencing to be retained and make good where necessary. Engineer's to assess structural stability of the fence for its intended use.

Planning Boundary Street Furniture CS1

Cycle store enclosure to Architect's detail. Surfacing to be continued in the enclosure. Existing surfacing to be retained where possible

Existing 2m high timber close board fence to be retained and make good where necessary. Engineer's to assess structural stability of the fence for its intended use.

CS2

Existing 1.8m high timber close board fence to be retained and make good where necessary. Engineer's to assess structural stability of the fence for its intended use.

Refuse store enclosure to Architect's detail. Surfacing to be continued in the enclosure. Existing surfacing to be retained where possible

Se1

Timber top warm to touch bench. Q50/220A

Se2

Timber top warm to touch picnic table and seating. Q50/230A

Bo

Vehicle bollard to protect building. Q50/190A

Proposed timber close board fence to private patios/gardens. Height varies. Fp1- 1.2m high, Fp2-1.1m high and Fp3 - 600mm high, Building Finish Floor Level (FFL) information not available on topographical survey, If the level difference between FFL and external surfacing is greater than 600mm FP3 fence to be minimum 1100mm high to comply with Part K requirements. All fence to comply with Part K where there is vertical drop greater than 600mm. Q40/310A Single leaf lockable gate to match adjacent Fp fence. Q40/310A 100mm treated timber posts touching each other or treated railway sleeper to be introduced locally as necessary to achieve maximum 1:3 slope in the planting. 1.1m high Part K compliant mild steel (RAL 9005) vertical bar barrier for health & safety.

-

Davis

Key:

Boundary BoundaryPlanning Treatment: Wall and footing to Engineers' detail.

B3

B1

K4

P2

B1

B2

B1

P2

P2 P2

P2

P2 P2

Tp

P2

B1

B1

P2

ad

Ro

P2 P2

Tp

d if necessary. Engineer's to intended use. an be retained as existing under equirements like contrast nosing, ired.

P1

th

sy

r Fo

P2

Tp

h the existing K6 K7DK: Drop kerb.

P1

P7

P2

ake good where necessary. e kerb for its intended use.

and make good where necessary. e kerb for its intended use.

P7

Tp

crete channel laid flush. r approved. Q10/110B. n areas.

P1

Tp

P2

B1

K4

nel edging by pproved. Colour:

K6

L

P1

P2

B1

nose upstand concrete kerb approved. 0A.

P7

L

P1

P2

P1

P7

110

L 1100

P2

neers' detail.

L

L

1100

Tp

1100

K6

K7

110

P7

P2

tion

P2

L 1100 1100

L

K7

L

L

1100

P2

sta

K4

Tp

1100

1100

L

B3

K4

K6

L

Ref u Sto seCS2 rag e3

Tp

P1

Tp

P1

P7

P1

K6

140

K6

P7 K6

P7

K6

B4

K4

K6

Tp

B3

Tp

P7

K6

K6

Sub

P2

Tp

K2 K2 K3 K1 P5 P8 -D K K1 P1

K4

P7

K6

P1

K6

Bo

P2

P2

Bo

P7

P1

Bo

Tp

140

P2

P2

Tp

Bo

P1

P2 P7

Fp3

P2

K6

+K6

P2

P1

P6

+K6

F5

P6

Fp2

Fp3

P2

K

-D

P2

P2

Tp

Bo

F5

P7 P7

K7

Fp2 P7

P2

P1

P7

Bo

P2

F5

P6 K6

+K6

P2

A

P1

Fp1

Fp3

F5

Entran ce Lob by

0.17

p2+

P6

0.30

P2

Tp

K1

K4

P2

B6

8

B6

+K6

P6

/1.1

Fp1

A

+K7

0.18

P1

P2

Tp

K2

Un

Entran it 0. ce 18 Lob by

Unit 0.17 /1.1 7

P2

Tp

K4

Fp1

Fp3

6

Unit

Tp

0.30

P6

/1.1

A

P2

P7

P2

Fp1

Entran ce Lob by

Fp1

A

by 2

Entran ce Lob by

P1

9

Entran ce Lob by

0.19

Lob

Unit 0.16

0.16

Tp

P6

A

0.19

P1

rance

0.31

Unit

P2

Tp

P7

K4

RK

K4

ASSUMED BEARING LOAD BLOCKWO

9

F3

ck

by 1

/1.2

by 3

K4

Blo

Lob

0.29

Lob

Fp3

10

P2

Tp

K4

K4

9

Unit

Unit 0. /1.3 31 2

8

Tp

K4

Entran ce Lob by 0.29

7

P2

P7

Tp

18

/1.3

Entran ce Lob by

Unit 0. /1.2 21 1

19

P1

P7

Tp

2

1

Fp1 +K6

Stair

0.32

P1

K4

Unit

P2

Tp

0.28

10

0.21

Fp3

Fp1

P6 +K6 Entra Lob nce by

8

K4

K2

P3

Fp1 +K2

K2 2

/1.2

K4

e

A

t 0.13

0.28

F3

OCK

ntranc bby

ck

1

P6 Fp3 +K6

19

A

K4

+K2

K2

Fp1

Blo

18

17

Entran ce Lob by

K4

Fp1

K2

K2 K2

Fp1 Fp1

K2

K2

K2

Fp1 Fp1

2

0.22

A

P2

Tp

K4

K2

K2

F2

/1.2

0.20

P1

P7

K4

K2

K2

K2 K2

K2

G1

K2 K2

K2 K2

0.22

Entran ce Lob by

GF BL

Tp

K4

Unit

Unit

Unit 0. /1.2 20 0

A

by 3

F3

12

Entran ce Lob by

0.12

Lob

Bo

Bo

P2

P7

7

A

/ 1.

Tp

/1.2

Entra Lob nce by

0.12

K4

A

P2

P1

Bo

0.27

0.26

0.27

Unit

P2

Tp

Bo

Unit

Entran ce Lob by

by 4

3

Tp

Bo

Fp1

K1

Lob

/1.2

P2

P7 P7

Bo

F3

K

Bo P7 Bo

Unit 0.26 /1.2 6

A

0.23

Tp

-D

P3

A

A

Entran ce Lob by

0.23

Unit

P2

P1

Unit 0.25 /1.2 5 Entran ce Lob by 0.25

Entra Lob nce by 0.24

P3

P7

Fp3 Bo P6

P2

Tp

K4

Fp3

F3

Fp3

K4

K2 P5

K1

K2 G1

Fp1

4

1

Fp

K2 1 G

K4

P4

K3

Fp1

K2

P2

Tp

K -D K1

P4

K2

K2 G1

F3

P7

Fp1 /1.2

Tp

K1

K2

P6

0.24

P2

P1

K

Fp Fp1

Unit

K4

Tp

-D K1

P3

P5

P4 K2

8. Submit Shop d Architecture Ltd a bespoke landsca

P2

K3

K2

P4

Fp1

Fp1

P6

P3

P3

K2

G1

K2 G1

P4

G K2

K2

Fp1

Tp

K2 K2 P4 K2

P3

G

K2

K2

K2 1 Fp

Fp1

Se1

K2

G1

K2

1 Fp

K2

Fp1

P4 K2

K2

Fp3 P6

P4

Se1

G

K1

P4

7. All proprietary accordance with

P2

K -D

G

G1

K2

K4

6. We are not liab ground drainage, foundations, reta and building wate

P2

Tp

P1

P7

K1

P4

G

K2 P4

K2

P2

Tp

Tp

P2

K2 K2

K2

G

Tp

P7

P2

G

F3

Tp

P2

K1

G

K2

K2

K2

P4

P4

G

P2

P1

Se2

Se1

K2

G

Se1

K2

G1

G

G

Se1

P4

Tp

Tp

P2

K1

P4

P4

P3

K1

G

Se1

K2

p1

G

P2

P7

K4

F1

K2

1

1

Se

K1

Exis ti Plan ng t Ro om

P9

5. All sub base an brackets & the lik

K4

K1

F4 P 9

P3

4. Do not scale fr

P2

Tp K1

F1 K2

F3

P7

3. All dimensions

P2

Tp

CS1

4

2, The contractor dimensions befor to be brought to t writing before com

P2

K4

F2

K4

K4

K4 P2

1. This drawing is relevant contract with any conflictin attention of Davis commencing on s

General Notes

   

  

For proposed planting scheme refer Planting Plan. For Topsoil depth refer Soils plan For drainage refer Drainage Engineer's drawing. All lighting and Services and Watering points (Bib tap) for plants to M&E Engineer's detail. All the cycle stores to have bip tap for manual irrigation of communal planting with 100m long hose pipe. All private gardens to have bip tap or suitable kitchen tap to connect hose pipe. For Bin/Cycle store enclosure refer Architect's drawing. All the manhole covers in the hard landscape to be recessed to allow for surfacing/paving to be laid inside it. Hatching represent only extent of paving.

15 Iliffe Yard, Lon 020 7277 1035 mail@davisla.com Client

Shall do We

Job Title

Wells Court,

Drawing Title

Landscape G

Scale :

1:200@

Date :

20.11.20

Drawing No. : L0


96 urnu no. of H m ti nus e3 plan 'Eve tin Pric g e') (Lon 46 no. o icera f nitid S1 plan a 'M ti aigru ng n')

(Vib

64 urnu no. of H m ti nus e3 plan tin 'Eve Pric g e') He3

(Vib

(Vib 132 no .o urnu m ti f He3 nus p 'Eve lanting Pric e') He3 He3

He3

L

1100

L

110

0L 1100

L

S1

1100

L

140

REFUSE STORE 1

L

L

140

L

(Vib 129 no .o urnu m ti f He3 p nus 'Eve lanting Pric e') He3

110

0L

1100

L 1100

L

He3

1100

S1

Albe rt D rive

o. o

11 n

o. o

f G1

f G1

plan

ting

plan

ting

He3 He3

28 n He3 (Sa o. of S4 rcoc occ plantin aC onfu g sa)

(Jara

He3

He3

hu) Entra En tra nce Lob nce Lob by by

0.6A 0.6A

va ic

hu)

Unitit Un 0.66 0. //

G1

65 n (Sa o. of S4 rcoc occ plantin aC onfu g sa)

Entra En trance nce

0.5A 0.5A

Entra En trance Lob nce Lob by by

0.8A 0.8A

Lob Lob by by

Stair Sta ir 11

Block Blo ck 11 Main Ma in En Entra trance nce

S1

1717

He3

7

8

1

10 10

Unit Un it 0. 0.10 10 /1 /1.1 .100

Entra En tra nce Lob nce Lob

Lob Lob by 2 by 2

GF GF BLOC BL OCK K 11

S4

Entra En trance Lob nce Lob by by

0.3A 0.3A

Unitit Un 0.33 0.

Entra En tra nce Lob nce Lob by by

Entran En tra ce Lob nce Lob by by

0.1A 0.1A

0.2A 0.2A

Unitit Un 0.1/ 0. 1/1. 1.11

Unit Un it 0. 0.22

S4

S4

S3

S3

L

1100

1100

L

0L

1100

1100

L

L

REFUSE STORE 2

110

1100

L

1100

L

L

140

1100

L

L

L

Block Blo ck 22 Main Ma in En Entra trance nce

Lob Lob by 1 by 1

He3

1100

G1

L

S1

S4

Lob Lob by by Entran En tra ce Lob nce Lob by

0.13 by 0.13 AA

Unit Un it 0. 0.13 13

H4

1100

1100

L

L

110

1100

0L

L

1100

S3 He3 S1

140

140

Unit Un it 0. 0.11 11

S4

L

(48)

S3

S4

S4 116 n (Sa o. of S rcoc 4 pla 24 n occ a C nting onfu (Sa o. of S4 rcoc sa) 25 n occ plantin aC o. o onfu g f G1 sa) plan 29 n ting o. o (Jara f G1 va ic plan ting hu) (Jara va ic (Ge 21 no. hu) raniu o m m f H4 pla n acro rrhiz ting um) L

1100 L 1100

rive

CYCLE STORE 2

Enttra En rance Lob nce Lob by

0.11 by 0.11 AA

S4

S1

rt D

Albe

lauro 61 no cera . of S sus 3 'Ott plantin o Lu g yke n)

G1

S1 He3

99

by 0.10 by 0.10 AA

Entran En tra ce Lob nce Lob by by

826 826

nus

ck

7

8

He

(Pru

1818

1

66

Lob Lob by 1 by 1

lauro 61 no cera . of S sus 3 'Ott plantin o Lu yke g n)

Blo 1919

1

0.4A 0.4A

nus

Unitit Un 0.99 0. /1.9 /1 .9 Entra En trance Lob nce Lob by by

0.9A 0.9A

826 826

(Pru

Unit Un it 0.88 0. /1.8 /1 .8

Unit Un it 0.77 0. / 1.77 / 1.

Lob Lob by 3 by 3

Unitit Un 0.44 0.

1 (Ace no. of T r sa cch 1 Tree arin um)

Entra Ent ce Lob rannce Lob by by

0.7A 0.7A

1.66 1.

Unit Un it 0. 0.55

G1 (Vib 420 no .o urnu m ti f He3 p nus 'Eve lanting 3 Pric (Lon 65 no. e') of S icera nitid 1 plan a 'M ti aigru ng n')

4 (Os 0 no. o f man thus He2 pla burk nting woo dii) 20 n o (Ela . of He 1 eag nus plantin ebb g inge 20 i) (Os no. o f man thus He2 pla burk nting woo dii)

va ic

(Jara

S4 He3 S1

L

23 n (Sa o. of S4 rcoc occ plantin aC onfu g sa) S4

11 n

He3

S4 He3

L

He3

1100

He2

1100

H

He3

He3 1100

S1

S3

Unit Un it 0. 0.14 14 /1 /1.1 .144

Entran En tra ce Lob nce Lob by

0.14 by 0.14 AA

39 n (Sa o. of S4 rcoc occ plantin aC onfu g sa)

S1

Entra En tra nce Lob nce Lob

He3

by 1.15 by Unitit 1.15 Un AA 1.15 1. 15 /0 /0.1 .155

S4

Unit Un it 0.16 0. 16 /1.1 /1 .166 Enttra En rance Lob nce Lob by

0.16 by 0.16 AA

S4 S1 He3

(Pru

nus

S1

He3

lauro 88 no cera . of S 3 sus 'Ott plantin o Lu g yke n)

yth

42 n (Sa o. of S4 rcoc occ plantin aC onfu g sa)

S4

S1

Fors

44 n (Sa o. of S4 rcoc occ plantin aC onfu g sa)

S1

He3

Roa

d

S1 He3

S1

3n (Be o. of T3 tula pen tree dula )

He3

S1

Planting Plan Fors

yth

Roa

d

Planting Schedule Trees/Specimen Shrub Key T1 T2 T3 T4 T5 T6

Clear stem

Root Cdn

Spacing

Quantity

min 450 200/250

min 200 min 200 min 200 min 200 Multistem

Rootball Rootball Rootball Rootball Container

as shown as shown as shown as shown as shown

min 450

min 200

Rootball

as shown

4 2 11 3 1 2

Name

Form

Age

Girth

Height cm

Acer saccharinum Amelanchier lamarkii Betula pendula Carpinus betulus Magnolia soulangeana Prunus subhirtella 'Autumnalis'

Standard (Ex heavy) Standard (Ex heavy) Standard (Ex heavy) Standard (Ex heavy)

3x 3x 3x

18-20 18-20 18-20 18-20 -

min 450 min 450 min 450

18-20

Standard (Ex heavy)

3x 4x

Hedge Key

Name

Cont size

Spec

No breaks

Spacing

Quantity

He1 He2

Elaeagnus ebbingei Osmanthus burkwoodii

40-60 40-60

C C

3L 3L

Bushy Bushy

4 4

6/lin. m 6/lin. m

165 357

He3

Viburnum tinus 'Eve Price'

40-60

C

3L

Bushy

6

6/lin. m

2199

Height cm

Rt Cdn

Grasses Key G1

Nam Jara

Herbaceous Key Nam

Shrubs Key

Name

S1 S2

Lonicera nitida 'Maigrun' Mahonia japonica

30-40 30-40D

S3

Prunus laurocerasus 'Otto Luyken'

30-40

Height cm

S4

Sarcococca Confusa

20-30

S5

Viburnum bodnantense 'Dawn'

30-40D

Cont size

Spec

No breaks

Spacing

Quantity

Bushy

6

C

3L 3L 3L

6 3

1161 21

C

Bushy Bushy

5/m2 5/m2

C

3L

Bushy

6

4/m2 5/m2

457 785

C

3L

Bushy

3

4/m2

45

Rt Cdn C

H1 H2 H3 H4 H5 H6 H7

Ane Berg Ger Ger Iris Pers Salv


NOTES:

Key:

1. This drawing is to be rea relevant contract documen with any conflicting informa attention of Davis Landsca commencing on site.

Planning Boundary Existing trees retained.

3

He

45 n

no.

18 n

o. o

of H

f H5

e3 p

H2

lanti

o. o

ng (V

(Iris

iburn

etula

(Be

rgen

'Len

um

pen

dula

ia c

tAW

S3

gno 1 no. o lia s f oula T5 tre 82 n e nge o ana (Ela . of He ) 1 eag nus plantin ebb g inge i) 36 n o. o H1 f H1 plan He2 ting

He1

He1

2

H1

He2

He1

7

9

3 no

. of

33 n (Sa o. of S4 rcoc occ plantin aC onfu g sa)

Blo

ck

1

Entra Ent ce Lob rannce Lob by 0.28 by 0.28 AA

3

T3 tr

ee (B

etula

pen

dula

)

6

7

9

88

S4

GF GF BLOC BL OCK K 33

Entra Ent ce Lob rannce Lob by

(Vib 444 no .o urnu m ti f He3 p nus 'Eve lanting Pric e')

3 He

6

1010

0.32 by 0.32 AA

3 no (Ace . of T1 p r sa cch lanting arin um) 3 He

1

0.22 by 0.22 AA

Entra En tra nce Lob nce Lob

by 0.21 by 0.21 AA

7. All proprietary products accordance with manufact

8. Submit Shop drawings f approval before constructin item.

Unitit Un 0.27 0. 27 /1 /1.2 .277

Entra Ent ce Lob rannce Lob by

0.26 by 0.26 AA

Unit Un it 0. 0.28 28 /1 /1.2 .288

Entra Ent ce Lob rannce Lob by

Entra Ent ce Lob rannce Lob by

0.20 by 0.20 AA

36 n (Sa o. of S4 rcoc occ plantin aC onfu g sa) 20 n o (Be . of H2 rgen plan ia c 1 no ordif ting . o (Be tula f T3 tre olia) e pen dula ) 16 n o (Sa . of S4 rcoc pla (Vib 32 no occa C nting .o urnu o m ti f He3 nfusa) p nus 'Eve lanting Pric 18 e') (Os 6 no. o f man thus He2 pla burk nting woo He2 dii)

Entran En tra ce Lob nce Lob

1919

6. We are not liable for the ground drainage, ground d foundations, retaining struc and building waterproofing

Proposed herbaceous planting. Refer planting schedule for species and density.

by 0.27 by 0.27 AA

1818

4. Do not scale from this d

5. All sub base and concre brackets & the like to Engin

All the planting and trees should be sourced from reputable UK suppliers.

Unitit Un 0.26 0. 26 /1.2 /1 .266

Lob Lob by 4 by 4

3. All dimensions in mm, u

Proposed grasses. Refer planting schedule for species and density.

Unit Un it 0.2 0. 255 /1.2 /1 .255 0.25 by 0.25 AA

Entra En trance Lob nce Lob by

Unitit Un 0.21 0. /1.2 /1 .211 21

H2

da')

S1-S5

Proposed shrubs planting. Refer planting schedule for species and density.

3 He

ybri

0.23 by 0.23 AA

Unit Un it 0. 0.20 /1.2 /1 .200 20

1717

ne h

Entra Ent ce Lob rannce Lob by

Entra En trance Lob nce Lob by

0.24 by 0.24 AA

Unitit Un 0.22 0. 22 /1 /1.2 .222

1818

3

He

emo

He2

1 (Os 6 no. o f man thus He2 pla burk nting UnUnitit 0.23 0. woo 23 /1 /1.2 .233 dii) 9 no (Os man . of He 2 pla thus burk nting woo dii)

Unitit Un 0.32 0. 32 /1 /1.3 .333 1919

11

S4

He2

1717

Stair Sta ir 22

(An

24 n o (Ela . of He 1 eag nus plantin ebb g inge 1 i) (Os 3 no. o f man thus He2 pla Un burk ntinUngitit 0.0.2424 /1/1.2.2 44 woo dii)

2

2

He

Unitit Un 0.12 0. 12// 1.12 1. 12

GF GF BLOC BL OCK K 22

H H6

3 He S4

He2

e3

He2

He

He2 19 n o man . of He 2p thus burk lanting woo dii)

(Os

yy 33

1 (Am ela no. o 29 n nchier f T2 tre rsic o. of H lamark e aria 6 ii amp plantin ) lexic g a 'Fire ulis tail')

(Pe

(Ma

Proposed hedge planting. Refer planting schedule for species and density.

H1-H7

3 He

e2

He2

Entran En tra ce Lob nce Lob by

3

He

He1-He3

G1

3 He

S5

S2

0.12 by 0.12 AA

1 no . (Pru of T6 tre n 'Autu us sub e mna hirtell a lis') 9 no .o (Ge raniu f H3 p m 'J lantin ohn g son 's Blue ')

H3

plan 27 n H7 o. o ting fH (G mac eraniu 4 rorr 39 n hizu m m) o (Ela . of He 3 1 eag plan 5 no. o nus planti f H7 1 ting (Pru no. of ebbin ng (S ge T nus nem alvia su 6 tree i) oros a) 'Autu bhirtell mna a li s He1 15 n') He1 o H6 (Be . of H2 rgen p (Pe ia c lanting rsic ord 1 (Am aria 31 no 1 elan no. of ifolia) .o amp T2 (Os 6 no. o c lexic f H6 p f man lanti hier lam tree auli thus He2 pla n s arkii g 'Fire burk nting ) tail') woo 1 dii) (Os 5 no. o f man 23 thus He2 pla (Os no. o burk nting f He man woo 2p thus dii) burk lanting He2 woo dii) H2

He2

H2

3 He H5

3

S2

')

He

He3 H4

)

son

s 'E o. o ve P f H3 rice plan plan ') ting ting (Ge (Vib raniu urnu m 'J mb ohn odn son ante 's B nse lue') 21 n 'Daw o. n') (Ma of S2 plan hon 23 n ia japo ting nica o (Iris ) 'Len . of H5 t A W plan illiam ting son He3 ') H5

50 n (Pru o. of S 3 nus lauro plantin 'Ott cerasu g o Lu yke s n)

olia

illiam

tinu

)

ordif

2, The contractor is to chec dimensions before constru to be brought to the attenti writing before commencing

Proposed trees. Refer planting schedule for tree species.

3 He

f S5

ting

ting

15 n

ee (B

plan

plan

T1-T6

T3 tr

3 He

300

. of

. of

H3

4 no

9 no

Entra En trance Lob nce Lob by

0.29 by 0.29 AA

88

99

1010

RK RK

ck

S1

Block Blo ck 33 Main Ma in En Entra trance nce

Entra En tra nce Lob nce Lob by

2

Unitit Un 0.29 0. 29 /1 /1.2 .299

0.31 by 0.31 AA

Unitit Un 0.19 0. 19 /1 /1.1 .199 Entran En tra ce Lob nce Lob by

Enttra En rance Lob nce Lob by

0.19 by 0.19 AA

0.30 by 0.30 AA

Lob Lob by 2 by 2

Unitit Un 0.30 0. 30

Unit Un it 0.1 0. 177 /1.1 /1 .177

Unit Un it

Entra 0. Ent 0.18 ce 18 /1 Lob rannce /1.1 Lob by .18

0.18 by 0.18 AA

Sub

sta

G1 S3

70 n (Sa o. of S4 rcoc occ plantin aC onfu g sa)

11 n

o. o

L

1100

L

140

1100

L 1100

L

L

Ref u Sto se rag e3 140

S4

1100

L

1100

L 1100

1100

L

S4

L 1100

L 1100

L

L 1100

o. o

11 n

1100

S4

L

110

f G1

f G1

plan

ting

53 n (Sa o. of S4 rcoc occ plantin aC onfu g sa)

(Jara plan va ic ting hu) (Jara va ic 45 n hu) o . o (Sa rcoc f S4 pla occ a C nting onfu sa)

S4

3

He

3

S1

60 n (Sa o. of S4 rcoc occ plantin aC onfu g sa)

3

He

S1

He3

3

He

S3

yth

rs

Fo

ad

Ro

3

S1

He

S1

S1

tion

He

0L

emone hybrida genia cordifolia ranium 'Johnson's Blue' ranium macrorrhizum 'Lent A Williamson' sicaria amplexicaulis 'Firetail' via nemorosa

1 (Ca no. of T rpin us b 4 tree etulu s)

S3

65 n (Pru o. of S 3 nus lauro plantin 'Ott cerasu g o Lu yke s n)

S1

S4

me

3

He

S4

G1

Enttra En rance Lob nce Lob by

me ava ichu

S4

S1

8

0.17 by 0.17 AA

He3

37 n (Sa o. of S4 rcoc occ plantin aC onfu g sa) 54 n (Sa o. of S4 rcoc occ plantin aC onfu g sa)

3

Blo ASSUMED ASSUMED BEARING LOAD BEARING LOAD BLOCKWO BLOCKWO

Lob Lob by 3 by 3

He

Unit Un it 0. 0.31 /1.3 /1 .322 31

77

7 (Lon 50 no. of icera nitid S1 plan a 'M ti 5 8 aigru ng 2 (Vib n') urnu no. of H m ti nus e3 plan ting 'Eve Pric e')

132 n (Pru o. of S 3 nus lauro plantin 'Ott cerasu g 2 o Lu (Ca no. of yke s T rpin n) us b 4 tree etulu s)

Sta Rev

Description

S4

He3

S1

S1 He3

th

sy

r Fo

ad

Ro

Davis

Landscap

15 Iliffe Yard, London, SE1 020 7277 1035 mail@davisla.com I w Client

Shall do Wells Cour

Rt Cdn C

Rt Cdn

Cont size 1L

Cont size

C

1L

C C C C C C

1L 1L 1L 1L 1L 0.5 L

Spacing

Quantity

5/m2

98

Spacing

Quantity

5/ m2 5/ m2 5/ m2 5/ m2 5/ m2 5/ m2 7/ m2

36 44 24 48 41 60 35

Job Title

Wells Court, Wokin

Drawing Title

Planting Plan

Scale :

1:200@A1

Date :

14.10.2020

Drawing No. : L0711L06


(0.00)*

Existing tree retained

NOTES:

(0.00)

Proposed Planting. Existing levels to be retained.

0.00

Proposed levels.

(0.00)*

Assumed existing levels. Contractor to verify and confirm the levels prior to any construction.

See Planting Plan.

SITE BOUNDARY

1. This drawing is to be read in conjunction with all relevant contract documentation from theK4design team, Existing concrete with any conflicting information to be brought to be theretained and kerb to attention of Davis Landscape Ltd in writing before make good where commencing on site. necessary. Engineer's to assess stability of 2, The contractor is to check and verify allstructural levels and the kerb for its dimensions before construction. Any discrepancies areintended use. to be brought to the attention of Davis Landscape Ltd in writing before commencing on site.

+(27.50)*

Building finished floor levels.

Building finished floor levels. Assumed existing FFL. Contractor to verify and confirm the levels prior to any construction. Existing Public Footpath +(26.70)

Existing Ground Profile.

01

7. All proprietary products shall be installed in accordance with manufacturers written instructions.

1100

L

F

1100

L 1100

L 1100

L 1100

1100

L

140

REFUSE STORE 1

L 1100

L

140

L

L

1100

L 1100

L 1100

L 1100

8. Submit Shop drawings for Davis Landscape Ltd approval before constructing any bespoke landscape item.

02

F

L

E

E

B

Entrance Entrance Lobby Lobby

0.6A 0.6A

Entrance Entrance Lobby Lobby

Unit Unit

Unit Unit 0.8 0.8 /1.8 /1.8

// 1.6 1.6

B

Unit Unit 0.7 0.7 / 1.7 / 1.7

0.5 0.5

Entrance Entrance

0.5A 0.5A

0.7A 0.7A

0.6 0.6

Entrance Entrance Lobby Lobby

0.8A 0.8A

Lobby Lobby

Unit Unit Lobby Lobby

33

0.9 0.9 /1.9 /1.9

D

Entrance Entrance Lobby Lobby

0.9A 0.9A

L

1100

L

1100

L 1100

L 1100

L

Unit Unit

0.12/ 0.12/

Entrance Entrance Lobby Lobby

Unit Unit 0.25 0.25 /1.25 /1.25 Entrance Entrance Lobby Lobby

0.25A 0.25A

Lobby Lobby

/1.23 /1.23

Unit Unit 0.26 0.26 /1.26 /1.26 Unit Unit

Entrance Entrance Lobby Lobby

44

0.26A 0.26A

1.12 1.12

Unit Unit Unit Unit

Unit Unit 0.20 /1.20 0.20 /1.20

L 1100

L

L

1100

1100

J

Lobby

1100

L

GF GF BLOCK BLOCK

0.13A 0.13A

Unit Unit

/1.22 /1.22 18

L 1100

1100

Stair Stair

22

19 19

1

Unit Unit 0.21 /1.210.21 /1.21

18 18

0.32 0.32

GF BLOCK GF BLOCK

0.32A 0.32A

Entrance Entrance Lobby Lobby

Unit Unit Entrance Entrance

Unit /1.320.31 /1.32

7

9

1010

L

L

Bloc

1100

Lobby Lobby

11

L

L

/1.27 /1.27

33

1717

1100

1100

L

L

1100

1100

22 Main Main

L 1100

140

H

0.27 0.27

Entrance Entrance Lobby Lobby

0.28A 0.28A

8

/1.33 /1.33

0.29A 0.29A

Block Block

9

L

/1.28 /1.28

k3

77 9

88

140

0.28 0.28

Bloc

6

10

Unit Unit Entrance Entrance Lobby

L

L

11

0.22A 0.22A

Entrance Lobby Lobby

0.21A 0.21A

1100

REFUSE STORE 2

19 19

Entrance Entrance Lobby Lobby

Entrance Entrance Lobby Lobby

0.20A 0.20A

2

0.13 0.13

L

1100

0.22 0.22

1717

3

Entrance Entrance Lobby Lobby

L

(48) 1100

CYCLE STORE 2

L

H

ASSUMED ASSUMED BEARING LOAD BEARING LOAD BLOCKWORK BLOCKWORK

k2 Unit Unit

Entrance Entrance Lobby Lobby

Unit Unit

0.14A 0.14A

I

Lobby Lobby

Block Block

Entrance Entrance Lobby Lobby

0.31A 0.31A

0.19 0.19

33 Main Main

Lobby Lobby

Unit Unit 0.16 0.16 /1.16 /1.16 Unit Unit

Entrance Entrance Lobby Lobby

1.15 1.15

Entrance Entrance Lobby

0.30A 0.30A

22

Entrance Entrance Lobby Lobby

1.15A 1.15A

Unit Unit

Unit Unit 0.17 0.17 /1.17 /1.17

0.16A 0.16A

/0.15 /0.15

/1.29 /1.29

/1.19 /1.19

0.19A 0.19A

/1.14 /1.14

0.29 0.29

33

Entrance Entrance

Entrance Entrance Lobby Lobby

0.14 0.14

0.30 0.30

Unit Unit

Entrance 0.18 Entrance 0.18 Lobby /1.18 Lobby /1.18

0.18A 0.18A

K Entrance Entrance Lobby Lobby

Sub

0.17A 0.17A

stat

ion th

ad Ro

rsy

Fo

K

I th Road

Forsy

140

Refu Stor se age 140

Alber t Drive

1100

L

1100

L

1100

L

1100

L

1100

L

L 1100

L 1100

L

3

L

1100

L 1100

L 1100

E

0.23 0.23

Entrance Entrance Lobby Lobby

0.11 0.11

0.12A 0.12A

140

E

All works in Root Protection Areas to comply with BS5837.

/1.24 /1.24

Entrance Lobby Lobby

0.23A 0.23A

0.27A 0.27A

Unit Unit

Unit Unit

L

L

0.24 0.24

Entrance Entrance Lobby Lobby

0.24A 0.24A

C Entrance Entrance Lobby Lobby

0.11A 0.11A

1100

140

Unit Unit 0.1/1.1 0.1/1.1

L

1100

L

/1.10 /1.10

Entrance Entrance Lobby Lobby

0.1A 0.1A

Unit Unit

0.2 0.2

1100

140

Entrance Entrance Lobby Lobby

8

L

0.10 0.10

11

0.2A 0.2A

Unit Unit

9

1100

GF GF BLOCK BLOCK

J

10

L

22

0.3 0.3

6

1100

Entrance Entrance Lobby Lobby

Lobby Lobby

Entrance Entrance Lobby Lobby

0.3A 0.3A

Unit Unit

18

L

C

1010

0.10A 0.10A

Entrance Entrance Lobby Lobby

0.4A 0.4A 826 826

7

1100

9

Unit Unit

0.4 0.4

G

1

L

D

6

8

9

1100

REFUSE STORE 1

k1

7

11

8

F

17 17

7

L

L

18 18

6

1100

1100

1919

Lobby Lobby

Unit Unit

G

8. Submit Shop drawings for Davis Landscape Ltd approval before constructing any bespoke landscape Proposed footing to item. Engineer's detail. Footing to suit root protection area of existing tree to be retained and comply with BS5837 requirements.

02

F

Bloc

1

50 mm topsoil (Q28/335A) for cultivation. 01 Cultivation in root protection areas of existing trees to comply with BS5837.

11 1

Entrance Entrance

A

7. All proprietary products shall be installed in accordance with manufacturers written instructions.

Note: Levels shown on this drawings are spot levels to have DDA compliant access to and from building and to minimize damage to roots of existing trees to be retained . For drainage levels and gradients to avoid rain water ponding refer drainage Engineer's drawing.

Stair Stair

11 Main Main

A

Unit Unit

Block Block

Alber t Drive

c to be retained and y. Engineer's to assess e surfacing for its

6. We are not liable for the detailed design of above ground drainage, ground drainage, sub-bases, foundations, retaining structures, fall from height barriers and building waterproofing details.

Alber t Drive

Existing Ground Profile.

4. Do not scale from this drawing. 5. All sub base and concrete specification, fixings, brackets & the like to Engineers' details & specification.

Note: Levels shown on this drawings are spot levels to have DDA compliant access to and from building and to minimize damage to roots of existing trees to be retained . For drainage levels and gradients to avoid rain water ponding refer drainage Engineer's drawing.

+(26.49)* 6. We are not liable for the detailed design of above ground drainage, ground drainage, sub-bases, foundations, retaining structures, fall from height barriers and building waterproofing details.

Proposed level: to be flush with the building FFL

3. All dimensions in mm, unless otherwise stated.

Proposed level: to be flush with the building FFL

0.0*

brackets & the like to Engineers' details & specification. +(26.59)

0.0 TOW Top of wall level. 0.0*

Building finished floor levels. Assumed existing FFL. Contractor to verify and confirm the levels prior to any construction.

L

+(26.55)

Building finished floor levels.

0.0 FFL*

0.0 TOW Top of wall level.

3. All dimensions in mm, unless otherwise stated. P2-Existing black tarmac to be retained and make good if necessary. Engineer's to assess 4. Do not scale from this drawing. structural stability of the surfacing for its intended use. 5. All sub base and concrete specification, fixings,

0.0 FFL*

ure to Architect's detail.

0.0 FFL

1100

0.0 FFL

2, The contractor is to check and verify all levels and dimensions before construction. Any discrepancies are to be brought to the attention of Davis Landscape Ltd in writing before commencing on site.

Proposed gradients.

826 826

B1-Existing 0.8m high brick boundary wall to be retained and make good if necessary. Engineer's1:40 to assess structural stability ect's detail. Proposed gradients. of all the walls and provide structural support including underpinning if necessary.

CS2- Refuse Store enclosure to Architect's detail.

commencing on site.

confirm the levels prior to any construction.

1:40

Refuse store post to Architect's detail.

L

B

Entrance Entrance Lobby Lobby

0.6A 0.6A

Entrance Entrance Lobby Lobby

Unit Unit

// 1.6 1.6

B

Unit Unit 0.7 0.7 / 1.7 / 1.7 Entrance Entrance Lobby Lobby

0.8A 0.8A

Lobby Lobby

Unit Unit Lobby Lobby

33

0.9 0.9 /1.9 /1.9

D

Entrance Entrance Lobby Lobby

0.9A 0.9A

Stair Stair

11

1919

18 18

17 17

k1

Ro

rsy

Fo

D

6

6 7

8 8

9 9

1010

Unit Unit Entrance Entrance Lobby Lobby

0.10 0.10

A

C

7

11

/1.10 /1.10

0.10A 0.10A

Entrance Entrance Lobby Lobby

0.4A 0.4A

G

ad

th

Bloc

1

Entrance Entrance

1

11 Main Main

Lobby Lobby

0.4 0.4

Forsy th Road

Unit Unit 0.8 0.8 /1.8 /1.8

0.7A 0.7A

0.6 0.6

0.5 0.5

Entrance Entrance

0.5A 0.5A

Block Block

Unit Unit

A

Unit Unit

Scale 1:20@A1

Lobby Lobby

826 826

22

GF GF BLOCK BLOCK

11

826 826

Entrance Entrance Lobby Lobby

0.3A 0.3A

Unit Unit

0.3 0.3

Entrance Entrance Lobby Lobby

0.2A 0.2A

G

Unit Unit

J

Entrance Entrance Lobby Lobby

Unit Unit

0.1A 0.1A

Unit Unit

0.2 0.2

0.24 0.24

/1.24 /1.24

Unit Unit 0.25 0.25 /1.25 /1.25

0.1/1.1 0.1/1.1

Entrance Entrance Lobby Lobby

Entrance Entrance Lobby Lobby

0.25A 0.25A

0.24A 0.24A

C

Unit Unit 0.26 0.26 /1.26 /1.26

Entrance Lobby Lobby

0.23A 0.23A

Unit Unit

0.23 0.23

Lobby Lobby

/1.23 /1.23

Unit Unit

Entrance Entrance Lobby Lobby

44

0.26A 0.26A

Entrance Entrance Lobby Lobby

0.27A 0.27A

Alber t Drive

Unit Unit

Unit Unit

0.11 0.11

0.12/ 0.12/

Entrance Entrance Lobby Lobby

1.12 1.12

Unit Unit Unit Unit

Unit Unit 0.20 /1.20 0.20 /1.20

L

L

1100

1100

J

Lobby

/1.22 /1.22 18

L

1100

Entrance Entrance Lobby Lobby

Entrance Entrance Lobby Lobby

0.20A 0.20A

Entrance Lobby Lobby

L

L

1100

1100

1100

Unit Unit 0.21 /1.210.21 /1.21

18 18

0.32 0.32

/1.33 /1.33

GF BLOCK GF BLOCK

Entrance Entrance Lobby

L

19 19

0.32A 0.32A

Entrance Entrance Lobby Lobby

L

1100

1100

L

L

1717

0.29A 0.29A

Unit Unit Entrance Entrance

Unit /1.320.31 /1.32

7

7

1100

L

N.T.S

33

1

1100

Section Location Plan

Entrance Entrance Lobby Lobby

0.28A 0.28A

8

8

22

1

22 Main Main

9

1100

Lobby Lobby

9

1010

Bloc

L

L

11

1100

L

L

ASSUMED ASSUMED BEARING LOAD BEARING LOAD BLOCKWORK BLOCKWORK

1100

Unit Unit

I

Lobby Lobby

0.31A 0.31A

Unit Unit

Entrance Entrance Lobby Lobby

0.14A 0.14A

Block Block

Entrance Entrance Lobby Lobby

k2

L

L

/1.28 /1.28

k3

77 9

Unit Unit

Stair Stair

Block Block

88

140

140

140

0.28 0.28

Bloc

6

10

0.21A 0.21A

9

L

11

0.22A 0.22A

2

0.13 0.13

10

1100

GF GF BLOCK BLOCK

0.13A 0.13A

Unit Unit

6

REFUSE STORE 2

19 19

1717

3

Entrance Entrance Lobby Lobby

L

(48)

1100

0.22 0.22

18

1100

L

0.12A 0.12A

CYCLE STORE 2

H

/1.27 /1.27

Entrance Entrance Lobby Lobby

0.11A 0.11A

H

oting to rea of tained 5837

0.27 0.27

0.19 0.19

33 Main Main

Lobby Lobby

Unit Unit 0.16 0.16 /1.16 /1.16 Unit Unit

Entrance Entrance Lobby Lobby

1.15 1.15

0.30A 0.30A

22

Entrance Entrance Lobby Lobby

1.15A 1.15A

Unit Unit

Unit Unit 0.17 0.17 /1.17 /1.17

0.16A 0.16A

/0.15 /0.15

/1.29 /1.29

Entrance Entrance Lobby

0.19A 0.19A

/1.14 /1.14

0.29 0.29

33

Entrance Entrance

/1.19 /1.19

Entrance Entrance Lobby Lobby

0.14 0.14

0.30 0.30

Unit Unit

Entrance 0.18 Entrance 0.18 Lobby /1.18 Lobby /1.18

0.18A 0.18A

K Entrance Entrance Lobby Lobby

Sub

0.17A 0.17A

stat

ion th

Ro

ad

(0.00)

Exis

0.00

Prop

(0.00)*

Ass con

rsy

Fo

K

I th Road

1100

L

Forsy

1100

L

140

Refu Stor se age 140

1100

L

1100

L

1100

L

1100

L

1100

L

L 1100

L 1100

L

3

L

1100

L 1100

L 1100

L

Forsy

th Road

ad

th

Ro

rsy

Fo

1:40

Refuse store post to Architect's detail.

Section Location Plan

Existing tree retained

N.T.S

CS2- Refuse Store enclosure to Architect's detail.

P3-400x400mm PC concrete flag paving for private patios/gardens. Colour: Silver Grey. Bond: Stack. Q25/315A.

British Standard Colour:Natural. ching to Engineer's .

SITE BOUNDARY

Proposed Planting. See Planting Plan. Unit 0.7/1.7

B1-Existing 0.8m high brick boundary wall to be retained and make good if necessary. Engineer's to assess structural stability of all the walls and provide structural support including underpinning if necessary.

K4- Existing concrete kerb to be retained and make good where necessary. Engineer's to assess structural stability of the kerb for its intended use.

+(27.50)*

Rev

+ 27.22* F.F.L.

+ 27.22*

Existing Public Footpath

1:40 slope

P2-Existing black tarmac to be retained and structural stability of the surfacing for its intended use.

+(26.59)

Albert Drive -

Stage 4 Rev

xisting ground profile dashed magenta line)

Description

Date

50 mm topsoil (Q28/335A) for cultivation. Cultivation in root protection areas of existing trees to comply with BS5837. All works in Root Protection Areas to comply with BS5837.

01

L0711D01

Section

-

-

Davis

-

Landscape Architecture

15 Iliffe Yard, London, SE17 3QA 020 7277 1035 ProposedI footing to mail@davisla.com www.davisla.com Engineer's detail. Footing to Client suit root protection area of existing tree to be retained Shall do Wells Court Limited and comply with BS5837 requirements.

By

DPC to Architect's detail.

-

-

Davis

Job Title

Wells Court, Woking

-

Scale 1:20@A1 Landscape Architecture

Drawing Title

15 Iliffe Yard, London, SE17 3QA 020 7277 1035 mail@davisla.com I www.davisla.com

Detail 01

Client

Shall do Wells Court Limited

Scale 1:20@A1

Job Title SITE BOUNDARY

1:20@A1 26.11.2020

Drawing No. : L0711D01

Wells Court, Woking

F1-Existing 2.3m high chain link fencing to be retained and make good where necessary. Engineer's to assess structural stability of the fence for its intended use.

Scale : Date :

Drawing Title

Detail 01

Scale :

1:20@A1

Drawn : PK

Date : planting.See 26.11.2020 Checked : SJ Proposed Planting plan. Drawing No. : L0711D01 Rev. : K2- 50X150mm British Standard channel edging. Colour:Natural. Laid flush. Haunching to Engineer's detail.Q10/110C.

Unit 0.7/1.7

P3-400x400mm PC concrete flag paving for private patios/gardens. Colour: Silver Grey. Bond: Stack. Q25/315A.

Rear patio/ Garden + 27.22*

F4-100mm treated timber posts touching each other or treated railway sleeper to be introduced locally as necessary to achieve maximum 1:3 slope in the planting.

+ 27.11

+ 27.22* F.F.L.

1:40 slope

Topographical information not available +(26.42)

Geotextile Linear

Bedding and Subbase to Engineer's detail.

Existing ground profile (dashed magenta line) DPC to Architect's detail.

50 mm bark mulch (Q28/155). 300mm topsoil (Q28/335A) for hedge and shrubs on top of 300mm subsoil (Q28/335C). Total 600mm to meet BS3882:2015 requirement. Break existing subsoil as necessary to ensure free draining.

02

L0711D01

Section

Scale 1:20@A1

Prop

Exis

+(26.49)*

Bedding and Subbase to Engineer's detail.

Buil Ass con

0.0*

to assess make good if necessary. Engineer's Description Date By

+(26.70)

+(26.55)

Buil

0.0 FFL*

0.0 TOW Top

Stage 4

Rear patio/ Garden

Prop

0.0 FFL

Drawn : PK Checked : SJ Rev. : -

-

Note: Levels show compliant access roots of existing t and gradients to a drawing.


P4-Resin bound gravel for communal path. Colour: Buff.Q23/225.

1:40

Aeration/Irrigation perforated pipe. Q31/512.

Proposed planting. Refer to planting plan.

K2- 50x150mm British standard channel edging . Colour: Natural. to Engineer's Existing levels to be retained. flush.Haunching Laid (0.00) detail.Q10/110C.

0.00

Proposed levels.

(0.00)*

Assumed existing levels. Contractor to verify and confirm the levels prior to any construction.

0.0 FFL*

Building finished floor levels. Assumed existing FFL. Contractor to verify and confirm the levels prior to any construction.

8. Submit Shop drawings for Davis Landscape Ltd approval before constructing any bespoke landscape item.

F 1100

L

F

1100

L 1100

L 1100

L 1100

1100

L

140

REFUSE STORE 1

L 1100

L

140

L

L

1100

L 1100

L 1100

L 1100

L

E

E

B

Entrance Entrance Lobby Lobby

0.6A 0.6A

Entrance Entrance

0.5A 0.5A

Unit Unit 0.8 0.8 /1.8 /1.8

0.7A 0.7A

0.6 0.6

// 1.6 1.6

B

Unit Unit 0.7 0.7 / 1.7 / 1.7

0.5 0.5

Entrance Entrance Lobby Lobby

0.8A 0.8A

Lobby Lobby

Unit Unit Lobby Lobby

33

0.9 0.9 /1.9 /1.9

D

Entrance Entrance Lobby Lobby

0.9A 0.9A

Stair Stair

Block Block

11 Main Main

11

Bloc 1919

1

Entrance Entrance

18 18

1

17 17

k1

8 8

9 9

1010

0.4 0.4

Entrance Entrance Lobby Lobby

0.10 0.10

/1.10 /1.10

0.10A 0.10A

Entrance Entrance Lobby Lobby

0.4A 0.4A

Lobby Lobby

826 826

22

GF GF BLOCK BLOCK

11

Entrance Entrance Lobby Lobby

0.3A 0.3A

Unit Unit

0.3 0.3

Entrance Entrance Lobby Lobby

0.2A 0.2A

G

Unit Unit

J

Entrance Entrance Lobby Lobby

0.1A 0.1A

Unit Unit

0.2 0.2

D C

01

A

Unit Unit

Unit Unit

G

02

6 7

11

7

Lobby Lobby

6

Existing Ground Profile.

Entrance Entrance Lobby Lobby

Unit Unit

Unit Unit

A

6. We are not liable for the detailed design of above ground drainage, ground drainage, sub-bases, foundations, retaining structures, fall from height barriers and building waterproofing details.

Subbase

Unit Unit

0.24 0.24

/1.24 /1.24

Unit Unit 0.25 0.25 /1.25 /1.25

0.1/1.1 0.1/1.1

Entrance Entrance Lobby Lobby

Entrance Entrance Lobby Lobby

0.25A 0.25A

0.24A 0.24A

C

Unit Unit

0.23 0.23

Lobby Lobby

/1.23 /1.23

Unit Unit

Entrance Entrance Lobby Lobby

44

0.26A 0.26A

0.11 0.11

0.12/ 0.12/

Entrance Entrance Lobby Lobby

1.12 1.12

Unit Unit Unit Unit

Unit Unit 0.20 /1.20 0.20 /1.20

L

L

1100

1100

J

Lobby

/1.22 /1.22 18

L

L

1100

Entrance Entrance Lobby Lobby

Entrance Entrance Lobby Lobby

0.20A 0.20A

Entrance Lobby Lobby

L

1100

19 19

1100

Unit Unit 0.21 /1.210.21 /1.21

18 18

0.32 0.32

/1.33 /1.33

GF BLOCK GF BLOCK

Entrance Entrance Lobby

L

1100

Entrance Entrance Lobby Lobby

0.28A 0.28A

8

8

22

0.32A 0.32A

33

1

1

Entrance Entrance Lobby Lobby

Block Block

1100

22 Main Main

Unit Unit Entrance Entrance

9

1100

Lobby Lobby

9

1010

Bloc

L

L

Unit /1.320.31 /1.32

7

7

1100

L

L

1100

1100

L

L

1717

0.29A 0.29A

11

8. Submit Shop drawings for Davis Landscape Ltd approval before constructing any bespoke landscape item.

1100

L

L

L

H

/1.28 /1.28

k3

77 9

Unit Unit

Stair Stair

88

140

140

140

0.28 0.28

Bloc

6

10

0.21A 0.21A

9

L

11

0.22A 0.22A

2

0.13 0.13

L

1100

GF GF BLOCK BLOCK

0.13A 0.13A

Unit Unit

10

REFUSE STORE 2

19 19

1717

3

Entrance Entrance Lobby Lobby

6

1100

0.22 0.22

18

1100

L

0.12A 0.12A

H

(48)

ASSUMED ASSUMED BEARING LOAD BEARING LOAD BLOCKWORK BLOCKWORK

Entrance Entrance Lobby Lobby

Unit Unit

0.14A 0.14A

I

Lobby Lobby

Block Block

Entrance Entrance Lobby Lobby

k2

0.31A 0.31A

Unit Unit

0.19 0.19

33 Main Main

Entrance Entrance Lobby Lobby

0.14 0.14

Lobby Lobby

Unit Unit 0.16 0.16 /1.16 /1.16 Unit Unit

Entrance Entrance Lobby Lobby

1.15 1.15

0.30A 0.30A

22

Entrance Entrance Lobby Lobby

1.15A 1.15A

Unit Unit

Unit Unit 0.17 0.17 /1.17 /1.17

0.16A 0.16A

/0.15 /0.15

/1.29 /1.29

Entrance Entrance Lobby

0.19A 0.19A

/1.14 /1.14

0.29 0.29

33

Entrance Entrance

/1.19 /1.19

0.30 0.30

Unit Unit

Entrance 0.18 Entrance 0.18 Lobby /1.18 Lobby /1.18

0.18A 0.18A

K Entrance Entrance Lobby Lobby

Sub

0.17A 0.17A

stat

ion th

ad Ro

rsy

Fo

K

I th Road

1100

L

Forsy

1100

L

140

Refu Stor se age 140

1100

L

1100

L

1100

L

1100

L

1100

L

L 1100

L 1100

L

3

L

1100

L 1100

L 1100

300mm topsoil (Q28/335A) for trees on top of 600mm subsoil (Q28/335C). 02 Total 900mm to meet BS3882:2015 requirement.

L

F

1100

L

F

1100

L

1100

L

1100

L

1100

1100

L

140

REFUSE STORE 1

L

1100

L

140

L

L

1100

Forsy th Road

L

1100

L

1100

L

1100

L

E

Alber t Drive

aining.

/1.27 /1.27

0.27A 0.27A

Unit Unit

Unit Unit

CYCLE STORE 2

0.27 0.27

Entrance Entrance Lobby Lobby

0.11A 0.11A

Alber t Drive

01

Unit Unit 0.26 0.26 /1.26 /1.26

Entrance Lobby Lobby

0.23A 0.23A

Entrance Entrance Lobby Lobby

7. All proprietary products shall be installed in accordance with manufacturers written instructions.

Note: Levels shown on this drawings are spot levels to have DDA compliant access to and from building and to minimize damage to roots of existing trees to be retained . For drainage levels and gradients to avoid rain water ponding refer Engineer's (Q28/155). mm bark mulch 50 drainage drawing.

op of 35C). ment.

7. All proprietary products shall be installed in accordance with manufacturers written instructions.

Existing Ground Profile. Note: Levels shown on this drawings are spot levels to have DDA compliant access to and from building and to minimize damage to roots of existing trees to be retained . For drainage levels and gradients to avoid rain water ponding refer drainage Engineer's drawing.

4. Do not scale from this drawing.

Bedding and Proposed level: to be flush with the building FFL 0.0* to Engineer's details.

ac to be retained and y. Engineer's to assess /155). e surfacing for its

6. We are not liable for the detailed design of above ground drainage, ground drainage, sub-bases, foundations, retaining structures, fall from height barriers and building waterproofing details.

Proposed level: to be flushed with the building FFL

0.0*

5. All sub base and concrete specification, fixings, brackets & the like to Engineers' details & specification.

0.0 TOW Top of wall level.

4. Do not scale from this drawing. 5. All sub base and concrete specification, fixings, brackets & the like to Engineers' details & specification.

Alber t Drive

Building finished floor levels. + 27.11

3. All dimensions in mm, unless otherwise stated.

L

ure to Architect's detail.

0.0 FFL

Building finished floor levels. Assumed existing FFL. Contractor to verify and confirm the levels prior to any construction.

1100

max

Building finished floor levels.

0.0 FFL*

0.0 TOW Top of wall level.

2, The contractor is to check and verify all levels and dimensions before construction. Any discrepancies are Timber stakes to support to be brought to the attention of Davis Landscape in installed proposed trees Ltd to be writing before commencing on site. parallel with the building/path. Q31/550A. 3. All dimensions in mm, unless otherwise stated.

Proposed gradients.

0.0 FFL

826 826

1:40

tect's detail.

NOTES: Proposed tree Refer to Planting plan. 1. This drawing is to be read in conjunction with all planting. Proposed relevant contract documentation from the design team, plan. Refer to planting with any conflicting information to be brought to the attention of Davis Landscape Ltd in writing before commencing on site.

dimensions before construction. Any discrepancies are to be brought to the attention of Davis Landscape Ltd in writing before commencing on site.

Proposed gradients.

ad

th

Ro

rsy

Fo

E

B

Break existing subsoil as necessary to ensure free draining. Entrance Entrance Lobby Lobby

0.6A 0.6A

Entrance Entrance Lobby Lobby

Unit Unit

0.6 0.6

// 1.6 1.6

B

Unit Unit 0.7 0.7 / 1.7 / 1.7

0.5 0.5

Entrance Entrance

0.5A 0.5A

Entrance Entrance Lobby Lobby

0.8A 0.8A

Lobby Lobby

Unit Unit Lobby Lobby

33

0.9 0.9 /1.9 /1.9

D

Entrance Entrance Lobby Lobby

0.9A 0.9A

Stair Stair

Block Block

11

Bloc 1919

1

Entrance Entrance

18 18

1

11 Main Main

17 17

k1

7

8 8

9 9

1010

Entrance Entrance Lobby Lobby

0.10 0.10

A

C

7

11

Unit Unit

0.4 0.4

Section Location Plan

D

6

6

Lobby Lobby

Unit Unit

/1.10 /1.10

0.10A 0.10A

Entrance Entrance Lobby Lobby

0.4A 0.4A

G

A

Unit Unit

Unit Unit 0.8 0.8 /1.8 /1.8

0.7A 0.7A

Lobby Lobby

826 826

22

GF GF BLOCK BLOCK

11

826 826

Entrance Entrance Lobby Lobby

0.3A 0.3A

Unit Unit

0.3 0.3

Entrance Entrance Lobby Lobby

0.2A 0.2A

G

Unit Unit

J

Entrance Entrance Lobby Lobby

Unit Unit

0.1A 0.1A

Unit Unit

0.2 0.2

0.24 0.24

/1.24 /1.24

Entrance Entrance Lobby Lobby

Entrance Entrance Lobby Lobby

0.25A 0.25A

0.24A 0.24A

C

Unit Unit 0.26 0.26 /1.26 /1.26

Entrance Lobby Lobby

0.23A 0.23A

Unit Unit

0.23 0.23

Lobby Lobby

/1.23 /1.23

Unit Unit

Entrance Entrance Lobby Lobby

44

Alber t Drive

1.12 1.12

Unit Unit Unit Unit

Unit Unit 0.20 /1.20 0.20 /1.20

L 1100

L

L

1100

1100

J

Lobby

/1.22 /1.22 18

L

L

1100 L

L 1100

1100

22

19 19

1

Unit Unit 0.21 /1.210.21 /1.21

18 18

0.32 0.32

Entrance Entrance Lobby Lobby

0.28A 0.28A

8

/1.33 /1.33

GF BLOCK GF BLOCK

Entrance Entrance Lobby

L 1100

Stair Stair

0.32A 0.32A

33 Entrance Entrance Lobby Lobby

1100

22 Main Main

Unit Unit Entrance Entrance

Unit /1.320.31 /1.32

7

7

1100

L

L

1100

1100

L

L

1717

0.29A 0.29A

Block Block

9

9

1010

Bloc

1100

L

L

Lobby Lobby

11

1100

L

L

ASSUMED ASSUMED BEARING LOAD BEARING LOAD BLOCKWORK BLOCKWORK

1100

Unit Unit

Lobby Lobby

0.31A 0.31A

Unit Unit

Entrance Entrance Lobby Lobby

0.14A 0.14A

I

Block Block

Entrance Entrance Lobby Lobby

k2

L

L

/1.28 /1.28

k3

77 9

Unit Unit

88

140

140

140

H

0.28 0.28

Bloc

6

10

8

L

11

0.22A 0.22A

Entrance Lobby Lobby

0.21A 0.21A

9

REFUSE STORE 2

19 19

Entrance Entrance Lobby Lobby

Entrance Entrance Lobby Lobby

0.20A 0.20A

2

10

1100

GF GF BLOCK BLOCK

0.13 0.13

6

1100

0.22 0.22

1717

3

Entrance Entrance Lobby Lobby

0.13A 0.13A

Unit Unit

1

0.19 0.19

33 Main Main

Lobby Lobby

Unit Unit 0.16 0.16 /1.16 /1.16 Unit Unit

Entrance Entrance Lobby Lobby

1.15 1.15

0.30A 0.30A

22

Entrance Entrance Lobby Lobby

1.15A 1.15A

Unit Unit

Unit Unit 0.17 0.17 /1.17 /1.17

0.16A 0.16A

/0.15 /0.15

/1.29 /1.29

Entrance Entrance Lobby

0.19A 0.19A

/1.14 /1.14

0.29 0.29

33

Entrance Entrance

/1.19 /1.19

Entrance Entrance Lobby Lobby

0.14 0.14

0.30 0.30

Unit Unit

Entrance 0.18 Entrance 0.18 Lobby /1.18 Lobby /1.18

0.18A 0.18A

K

P3-400x400mm PC concrete flag paving for private patios/gardens. Colour: Silver Grey. Bond: Stack.Q25/315A.

Entrance Entrance Lobby Lobby

Sub

0.17A 0.17A

stat

ion th

Ro

K2- 50x150mm British standard channel edging . Colour: Natural. Laid flush.Haunching to Engineer's detail.Q10/110C.

ad

rsy

Fo

K

I th Road

1100

L

Forsy

L

140

1100

oting to rea of tained 5837

0.12/ 0.12/

Entrance Entrance Lobby Lobby

18

cale 1:20@A1

0.11 0.11

0.12A 0.12A

(48)

/1.27 /1.27

Entrance Entrance Lobby Lobby

0.27A 0.27A

Unit Unit

Unit Unit

CYCLE STORE 2

0.27 0.27

0.26A 0.26A

Entrance Entrance Lobby Lobby

0.11A 0.11A

H

N.T.S

Unit Unit 0.25 0.25 /1.25 /1.25

0.1/1.1 0.1/1.1

Refu Stor se age 140

1100

L

1100

L

1100

L

1100

L

1100

L

L 1100

L 1100

L

3

L

1100

L 1100

L 1100

L

Forsy

th Road

Fp1-Proposed 1200mm timber close board fence to private patios/gardens. Q40/310A. ad

th

Ro

(0.00)

Exis

0.00

Pro

(0.00)*

Ass con

rsy

Fo

Fp1-Proposed 1200mm timber close board fence to private patios/gardens.Q40/310A.

K2- 50x150mm British standard channel edging . Colour: Natural. Laid flush.Haunching to Engineer's detail.Q10/110C.

Section Location Plan

K2- 50x150mm British standard channel edging . Colour: Natural. Laid flush. Haunching to Engineer's detail. Q10/110C.

Proposed planting. Refer to planting plan.

P4-Resin bound gravel for communal path. Colour: Buff.Q23/225.

N.T.S

P3-400x400mm PC concrete flag paving for private patios/gardens. Colour: Silver Grey. Bond: Stack.Q25/315A.

Unit 0.9/1.9

1:40

Aeration/Irrigation perforated pipe. Q31/512.

Proposed planting. Refer to planting plan.

Unit 0.12/1.12

K2- 50x150mm British standard channel edging . Colour: Natural. Laid flush.Haunching to Engineer's detail.Q10/110C.

Proposed tree Refer to Planting plan.

Pro

0.0 FFL

Bui

0.0 FFL*

Bui Ass con

0.0 TOW Top

Proposed planting. Refer to planting plan.

0.0*

Stage 4

Pro

Exis Rev

+ 27.22* F.F.L.

+ 27.22 *

+ 27.22* F.F.L.

+ 27.22*

1:3

Fall

slop

em

+ 27.11

ax

Description

-

-

-

Davis

Footing to Engineer's detail

Client

Footing to Engineer's Rev Description detail

Date

8/335A) 8/335C). irement.

300mm topsoil (Q28/335A) for hedge and shrubs on top of 300mm subsoil (Q28/335C). Total 600mm to meet BS3882:2015 requirement.

e draining.

Break existing subsoil as necessary to ensure free draining.

cale 1:20@A1

Shall do Wells Court Limited

By

DPC to architect's detail. 50 mm bark mulch (Q28/155).

28/155).

-

-

Davis

-

Job Title

50 mm bark mulch (Q28/155).

Wells Court, Woking

300mm topsoil (Q28/335A) for trees on top of 600mm subsoil (Q28/335C). Total 900mm to meet BS3882:2015 requirement.

-

Drawing Title

Detail 02

Break existing subsoil as necessary to ensure free draining.

Landscape Architecture

15 Iliffe Yard, London, SE17 3QA 020 7277 1035 mail@davisla.com I www.davisla.com

01

L0711D02

Client

Shall do Wells Court Limited Scale 1:20@A1

Section

Landscape Architecture

15 Iliffe Yard, London, SE17 3QA 020 7277 1035 mail@davisla.com I www.davisla.com

Bedding and Subbase to Engineer's details.

Stage 4 DPC to architect's detail.

Date

Job Title K2- 50x150mm British standard Wells. Colour: Court,Natural. Woking channel edging Laid flush.Haunching to Engineer's detail.Q10/110C.

Scale :

1:20@A1

Date :

26.11.2020

Drawing No. : L0711D02

P3-400x400mm PC concrete flag paving for private patios/gardens. Colour: Silver Grey. Bond: Stack.Q25/315A.

Drawing Title

P4-Resin bound gravel for communal path. Colour: Buff. Q23/225. K2- 50x150mm British standard channel edging . Colour: Natural. Laid flush. Haunching to Engineer's detail. Q10/110C.

Detail 01

Fp1-Proposed 1200mm timber close board fence to private patios/gardens.Q40/310A.

Scale :

1:20@A1

Date :

26.11.2020

Drawing No. : L0711D01

Drawn : PK planting. Checked :Proposed SJ Refer to planting plan. Rev. : -

K2- 50x150mm British standard channel edging . Colour: Natural. Laid flush. Haunching to Engineer's detail. Q10/110C.

Unit 0.12/1.12

Se1-Timber top warm to touch bench. Install to manufacturer's written recommendations.Q50/220A.

Proposed turf.Q30/405.

+ 27.22*

+ 27.19

300mm topsoil (Q28/335A) for Grass/Turf on top of 150mm subsoil (Q28/335C). Total 450mm to meet BS3882:2015 requirement.

+ 27.22* F.F.L.

Fall

Bedding and Subbase to Engineer's detail. Footing to Engineer's detail.

Footing to Engineer's detail

50 mm bark mulch (Q28/155).

300mm topsoil (Q28/335A) for hedge and shrubs on top of 300mm subsoil (Q28/335C). Total 600mm to meet BS3882:2015 requirement. Break existing subsoil as necessary to ensure free draining.

02

L0711D02

Section

Scale 1:20@A1

By

Timber stakes to support proposed trees to be installed parallel with the building/path. Q31/550A.

DPC to architect's detail.

Drawn : PK Checked : SJ Rev. : -

-

Note: Levels sho compliant access roots of existing t and gradients to drawing.


Gillian Court, London Office work

The design was prepared for the London Borough of Lewisham to support a planning application for the Gillan Court site,located at the corner between Baring Road and Dilhorne Close. The landscape proposals included general improvement of areas lo-cated between Baring Road and the existing building as well as new amenity spaces that will be shared with the proposed new building. Whilst the main aim of the project was to provide additional resi-dential units in the borough (thereby helping to tackle the shortage of accommodation) it was also a significant opportunity to improve the quality of the existing landscape facilities for both the existing and future residents of the site.

Design Strategy





visualization | holbeck viaduct project office work |urban wilderness|2018


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.