[
[ dAeAs iRgOn Np oYr tAf oNl iGo
[RESUME] P OR TF OLIO
CO NTACT
aar ont ya n g . co m l i nked i n . co m / i n /a a r o n t ya n g
8 6 3 3 Wa l e s Cou r t G a i ne svi l l e , VA 2 0 1 5 5 a t ya n g 9 5 @ g m a i l .com | 7 0 3 .5 8 6 .2 9 3 1
AWARD S
EDUCAT ION
Un iver si ty of Il linois Academi c De a n’s Lis t
U nivers ity of Illinois at Urbana-Champaign
E . B enno Phi l i pps on AIA Trave l Awa rd
Es cu ela Técnica Superior de Arquitectura del Vallés
F al l 20 1 6
2016 - 2 0 1 7
Illin oi s For Il l i nois St udy Abr oa d Sc h ol a r shi p 2016 - 2 0 1 7
L yd ia E. Pa r ke r Bates Sc h ol a rshi p 2013 - 2 0 1 4
B a c h e l o r of S c i e nce i n A r c h i te c t u ra l St u d i e s | G PA : 3 .5 Champaign, IL F a l l 2 0 1 3 - S p r i ng 2 0 1 7 Ove r se a s A r c hi te c t u ra l St u d i e s Exc h a ng e Pr og ra m S a n t C u g a t , B a r ce l ona , Sp a i n F a l l 2 0 1 6 - S p r i ng 2 0 1 7
EXP ER IEN CE AN D INVOLVEMEN T Des ig n Management Group I n te r n I n te r io r A r c h i te c t Summer 2016
- D ra f te d co n s t r u c t i on d rawi ng s for m u l t i p l e i nte r i or office a nd c l i n i ca l b u i l d i n g r e nova t i on p r oj e c t s t h u s ex p e d i t i ng p r oj e c t wor kfl ow
A B I L ITIE S Ad o be S ui te I l l us t ra to r I nD es i g n L i gh t r o o m Photo s h o p
Ar c hi tectura l AutoCA D R ev i t Sketc h U p
Ad di ti ona l D i gi t a l / F i l m P h o to g ra p hy and P o s t-P ro ce s s i n g I nter n e t Ne two rk i n g a n d Tr oub l e s h o o ti n g M i cr os of t O ffice M an da ri n C h i n e s e Span i s h
- E st a b l i sh e d c l e a r com m u ni ca t i on b e t we e n a r c h i te c t s a nd e ng i nee rs to e n su r e e ffic i e nt a nd on- t i m e p r oj e c t d e l i ve r y - G a i n e d fi r s t h a nd ex p e r i e nce i n p r oj e c t si te s t h r ou g h a na l ysi s a nd d o c u m e n t a t i on of ex i st i ng b u i l d i ng cond i t i ons
U nivers ity of Illinois University Housing S p e cia l P r o je c t s N e t Te c h a n d S i te M a n a g e r Fall 2014 - Spring 2016
- P r ov i d e d p e er consu l t i ng a nd d i a g nosi s to u se r s wh o ex p e r i e nce d I n te r n e t co nne c t i vi t y i ssu e s t h r ou g h onl i ne a nd i n- p e r son i nte ra ct i o n - M o n i to r e d t wo l a b s d a i l y to e nsu r e a l l com p one nt s we r e m a i nt a in e d a n d f u n c t i o ni ng p r op e r l y i n or d e r to r e d u ce m a i nte na nce cost s - Co l l a b o ra te d i n a 2 0 - m e m b e r te a m se t t i ng to r e g u l a te wor kl oa d a n d so l ve co m p l ex I T i ssu e s wi t h i n a 4 0 ,0 0 0 st u d e nt ca m p u s - M o d e ra te d onl i ne for u m s a nd g u i d e d t ra i ni ng p r og ra m s for 8 fi r st - ye a r e m p l oye e s a nd su b se q u e nt l y e st a b l i sh e d te a m m ora l e a n d co n fi d e n ce
Advent Taiwan Summer English Program E n gl ish I n s t r u c to r Summer 2014
- P r e p a r e d a n d i m p l e m e nte d t wo u ni q u e we e k- l ong p r og ra m s to te a c h E n g l i sh a t 4 e l e m e nt a r y a nd m i d d l e sc h ool s i n T a i wa n t h r ou g h i n d i v i d u a l a n d g r ou p l e sson p l a nni ng - D eve l o p e d sol u t i ons wi t h 1 0 - m e m b e r te a m s to r e sol ve c h a l l e ng e s e n co u n te r e d d u r i ng c l a sse s
[CONTENTS]
ACADEMIC LESSEPS PUBLISHING COMPANY
03
T E AT R E P U T X E T
11
CABRINI-GREEN LIBRARY
19
PROFESSIONAL DRAFTING AND CONSTRUCTION
25
ADDITIONAL TRAVEL SKETCHES
28
PHOTOGRAPHY
29
[LESSEPS PUBLISHING CO M PA N Y ]
Spring 2017 | Barcelona, Spain
O bjective The Le s s e ps Publi s h i n g Co mp any i s a p r o p o s ed 3 0 0 0 m ² p u b l ish in g co m p a ny wit h additional s tar t-u p o ffi ce s p a ce th a t s i ts i n a n u r b a n st r ip b e t we e n 3 converg ing s tre e ts . Th e s i te i s l o ca ted wi th i n a l ive l y a r e a of c u l t u ra l in tersections frame d by r es i d en ti a l , co mmu n i ty, a n d com m e r c ia l in st it u t io n s. The c halle ng e s te mm ed fr o m b o th th e p hys i ca l a n d so c ia l n e e d s of a pr opos e d new bui ld i n g . How can an i n ter ven ti o n b e m a d e in to a 2 0 m w id e site while exis ting a s a n ew co r n er s to n e fo r r es id e n t s d e m a n d in g r e c l a m a t io n of t h e s pace they once k n ew s o wel l ? Th e p r o p ose d d e sign se e ks to n ot o n l y sat isf y but als o bui ld u p o n th e s o l u ti o n th at this n e igh b o r h oo d in t h e h e a r t of Bar ce lona s o de sp eratel y n eed s . Con cept Al l ow for community i n teg rati o n th r o u g h c i r c u l a t ion b e t we e n t h e gr ou n d l evel whi le conne ctin g th e u p p er l evel s to p r o m ote wor k p l a ce in te gra t ion .
FIGURE GROUND PLAN BARCELONA, SPAIN
03
04
START-UP OFFICES PUBLISHING COMPANY
PUBLIC SPACE
PROGRAM
SITE TO BUILDING
05
VERTICAL CIRCULATION AND EGRESS
EXPLODED AXONOMETRIC
1
Public L obby
2
C afé
3
Tri ple -He i g ht Atr i u m
4
Ope n Studi o
5
Phone Rooms
6
Start-Up Office s
7
Admini s trati ve O ffi ces
8
Te rrace
6
THIRD-FOURTH LEVEL PLAN
By se parating the g r o u n d level into 2 s pace s, g r eater fl ex ib i li ty be twe e n s p a ces i s maintaine d.
7 6 8
Whil e the Eas te rn s i d e of th e buil d i ng is de di cated prim arily for the p r i vate publi s hi ng company , th e Weste rn s ide i s op en to u s e as fl exible s tart-up o ffi ce space and can re m ai n un locke d during of f-wo r k h ours s o as to prom o te th e café as a s tandalone p u b l i c space.
SECOND LEVEL PLAN WITH TERRACE
5 6
4
FIRST LEVEL PLAN
2
1
3 1
GROUND LEVEL PLAN 1:200
06
LONGITUDINAL BUILDING SECTION 1:100
07
+20M
+16M
+12M
+8M
+4M
+0M
-2.8M
08
EAST-WEST ELEVATION
CROSS BUILDING SECTION
09
PRECAST CONCRETE PARAPET TOP DAMP-PROOF COURSE THERMAL INSULATION EXTERIOR FINISH 100MM RIGID INSULATION CAVITY INSULATION GLAZING SYSTEM RETAINER
DOUBLE-LAYER EXTERIOR GLAZING
100MM CENTER MULLION
50MM TRANSLUCENT PANELED GLASS
5MM FLOOR FINISH 80MM SCREED 40MM IMPACT SOUND ISOLATION GROUT BEARING PAD 250MM PRECAST HOLLOW-CORE CONCRETE UNIT 650MM CONCRETE BEAM
100MM CONCRETE SLAB VAPOR RETARDER 150MM REINFORCED CONCRETE RAFT EXTERIOR SEALANT PLATE DAMP PROOF MEMBRANE 50MM BINDING CONCRETE
DETAIL BUILDING SECTION 1:30
10
[ T E AT R E PUTXET]
Fall 2016 | Barcelona, Spain
O bjecti ve R at h e r than v iewi ng th e s i te as s i mp l y a n en ti t y to “ b u il d on ” b u t in ste a d a s a supp le me ntar y e le m en t, th e p r o p o s ed d es i g n t a ke s t h e ste e p S ou t h - N o r t h sl ope to its advanta g e, a l l owi n g fo r mu l ti -l evel c ir c u l a t ion p a t h s a n d l igh t pen et rations from wi th i n th e d o u b l e-l evel th ea te r to t h e e n c l ose d exte r ior court yard. From the ap p r o a c h i n g s tr eet p er s p e c t ive , t h e h e igh t a n d d e p t h layer ing of the facad e an n o u n ces i ts p r es en ce a l b e it q u ie t l y w it h in t h e ot h er wi s e s till re s id en ti a l co mmu n i ty.
CIRCULATION
Collaborati ve proj e ct wi th Peter Wes ter fiel d . Con cept U se t he adj ace nt exi s ti n g b u i l d i n g a n d th e s l o p e of t h e site to c r e a te a n open s pace wi th ab u n d a n t n atu ra l l i g h t an d com m u n it y in te gra t ion . LIGHTING
FIGURE GROUND PLAN BARCELONA, SPAIN
11
12
9 10
SECOND LEVEL PLAN
8
FIRST LEVEL PLAN
GROUND LEVEL PLAN 1:200
13
1
Path to E n tra n ce
6
B a c kst a ge
2
L obby
7
Loa d in g A r e a a n d Wor ksh op
3
C afé
8
Ad m in ist ra t ive Offi ce s
4
Se r vi ces a n d Uti l i ti es
9
Acce ss to B a l cony S e a t in g
5
The a ter
10
Co n t r o l B oo t h
The bui ld i n g ’ s ma i n p r o g ra m a r eas a r e co n ce n t ra te d o n t h e fi r st l eve l con sist in g of both pub l i c l y a cces s i b l e s p ace a n d t h e p e r for m e r s’ sp a ce . B y a l l o ca t in g t h e st a f f s pace s to th e en d s an d u p p er l evel s of t h e t h e a te r , t h e ove ra l l exp e r ie n ce of t h e audi e nce wi l l b e u n i n ter r u p ted by b a c kgr o u n d d ist ra c t io n s w h il e a l l ow in g for s mooth wo r k fl ow th r o u g h o u t th e p e r for m a n ce s.
6
4
5
7
2 1
3
14
NORTH ELEVATION
LONGITUDINAL BUILDING SECTION 1:100
15
BACKSTAGE SECTION
THEATER SECTION
LOBBY SECTION
16
17
18
[CABRINIGREEN LIBRARY]
Spring 2016 | Chicago, Illinois
O bjecti ve Located wi thin the rap i d l y d evel o p i n g C ab r i n i -G r e e n a r e a of Ch ica go , t h is propos e d C TA s tatio n an d l i b ra r y s eeks to h i g hl igh t n ot o n l y t h e conve r gin g geome tri e s of the s i te b u t al s o th e va r y i n g s o c io- e con o m ic st a t u se s of t h e im m edi ate populace. By combini ng the s e two d ras ti ca l l y co n tra s ti n g p r ogra m s in to on e co m m o n gr oun d, the buildi ng s eeks to ex i s t b eyo n d s i m p l y a fa ca d e a n d a s a t u r n in g poin t for the comm u n i ty. Con cept E n gage the buildi ng vo l u me wi th th e trai n l i n e t h r ou gh b ot h ve r t ica l a n d horizo ntal conne ctio n s .
FIGURE GROUND PLAN CHICAGO, ILLINOIS
19
20
EAST WEST SECTION
NORTH ELEVATION
21
NORTH SOUTH SECTION
WEST ELEVATION
N
22
5
4
3
1
2
23 GROUND LEVEL PLAN 1:200
1
Pu b l i c L o b by
7
Com m u n it y S t a ge r o o m
2
C h i l d r en ’ s R o o m
8
Tra in P l a t fo r m s
3
Atr i u m R ead i n g S p a ce
9
Wa it in g Ar e a
4
Pl a tfo r m E n tra n ce
1 0 R e a d in g Cor n e r
5
T i c keti n g A r ea
1 1 M a in S t a c ks
6
Co mmu n i ty R o o m s
1 2 Com p u te r La b
9 12
8
8 11
7
6
10
PLATFORM LEVEL PLAN
LIBRARY LEVEL PLAN
24
[DRAFTING AND CONSTRUCTION] O bjec tive Con st ructi on docum en ts an d d etai l d ra f ti n g for a n in ter ior re de s ig n of a co n s u l ti n g ag en c y i n d ow n tow n Wash i ng ton D.C . S ite vi s i ts and ins pec ti o n s p l ayed c r i ti ca l r o l es in en suri ng prope r dim en s i o n s fo r fitti n g s an d finish e s, part ic ularly i n the k i tc h en a r ea.
ACT AS SCHEDULED
VIF
5/8" GYPSUM WALL BOARD BLOCKING AS REQUIRED RECESSED METAL FRAME
54"
ACOUSTICAL GAULK AT SLAB/WALL JOINT, BOTH SIDES.
G1
TOP TRACK
ACOUSTICAL SEALANT RECESSED METAL FRAME 7'-0"
DOUBLE 5/8"DRYWALL
BLOCKING AS REQUIRED
5/8" GYPSUM WALL BOARD
30"
3 5/8" W/25 GAUGE METAL STUDS AT 24" O.C. 2" SOUND ATTENUATION BLANKET
3 5/8" W / 25 GAUGE METAL STUDS
BASE AS SCHEDULED
B1 FLOOR TRACK
FLOOR TRACK
ACOUSTIC SEALANT
ACOUSTICAL SEALANT
POWER DRIVEN ANCHOR
FLOOR SLAB POWDER DRIVEN ANCHOR
VIF
WALL TYPE D
WALL TYPE G
1"=1'-0"
1"=1'-0"
SCHEDULED PARTITION A3.01 1
A3.01 2
BLOCKING AS NEEDED 2 3/8"
FOAM GASKET 1/2"X1/8"
3'-1 1/4
UPPER TRACK
3/8"
2 13/16"
1/2"
SLIDING DOOR PATCH
UPPER TRACK VALANCE 1/2"
CAP
FIXED GLASS PANEL
42" WIDE SLIDING DOOR
SEE HARDWARE SCHEDULE FOR PULL HANDLE TYPE
1/2"
SLIDING DOOR
BASE TRACK BEYOND DOOR GUIDE BEYOND
SLIDING GLASS DOOR SECTION 3"=1'-0"
25
SLIDING GLASS DOOR AND GLASS PARTITION FLOOR PLAN 3"=1'-0"
7 3'-6"
1'-0"
7
8
2'-3"
1'-8"
6'-8"
1'-3" 1'-3"
21
" 10 4'-TV
CLEAR
3'-0"
20
T3 R1
3'-0"
DW IM
4"
2'-10" MIN. 0"
2'-0"
3'-0"
2'-6"
1'-4"
3'-1"
1'-0"
3'-0"
11
KITCHEN ISLAND ENLARGED PLAN
12
ELEVATION AT LOWER LEVEL KITCHEN
1/4"=1'-0"
1/4"=1'-0"
4" 3 21"
0"
3'-0"
6"
28
3'-6" 3"
SHOWER AND PRINT AREA ENLARGED PLAN 1/4"=1'-0"
26
[ADDITIONAL]
27
[ T R AV E L SKETCHES]
Reichstag | Berlin, Germany
Museu Blau | Barcelona, Spain
La Giralda | Seville, Spain
Jewish Museum | Berlin, Germany
28
[PHOTOGRAPHY]
29
30