Aquanova Leo Product Guide & Operating Instructions

Page 1

Aquanova Leo

(Manual Traverse) Product Care & User Operating Instructions

Abacus Healthcare Services Ltd, Unit 1 Millennium Way, High Carr Business Park, Newcastle-under-Lyme, ST5 7XE Tel: 01782 569330 Fax: 01782 569349 Sales: 0800 454810 www.abacushealthcare.co.uk e-mail: service@abacushealthcare.co.uk


Technical Product Specification Minimum rim height Lift range (combined) Fill volume Time to fill Total weight (including 80kg patient) Electric/hydraulic motor Electrical Minimum dimensions (w_h_l) Maximum dimensions (w_h_l) Internal dimensions (rim) (w_d_l) Internal dimensions (base) (w_d_l) Safe working load (bath)

605mm 400mm 220 Litres 4.0 min at 2 bar pressure 280kg 300 Watt 24 Volt DC battery/transformer 750_580_1700mm 750_980_1700mm 550_400_1500mm 520_400_1480mm 150kg

Dimensions 600mm

550mm 1500mm

400mm 390mm 580mm

750mm

1700mm

980mm

Fig. 1 750mm

2

1700mm


Abacus Healthcare Service Limited COMMISSIONING CERTIFICATE This is to confirm that the Aquanova Leo Bath Serial No: __________ at ________________________ __________________ __________________ __________________ ____________ has been commissioned on the __/__/____ the Guarantee expires on the __/__/____

Signed by:

Date:

_____________________

________________________ Abacus Healthcare Services Ltd, Unit 1, Millennium Way, High Carr Business Park Newcastle under Lyme, Staffordshire, ST5 7XE Tel: 8693 Fax: Fax:01782 0870 569349 770 8698 Tel: 0870 01782770 569330 email: info@abacushealthcare.co.uk email: info@abacushealthcare.co.uk

3


Warranty Our bath products are guaranteed for a period of twelve months from the date of commissioning. All parts are covered against defects that may arise as the result of faulty materials, inferior workmanship or construction. The baths are not covered for any problems that may arise from the installation or site planning unless carried out by engineers from Abacus Healthcare Services Ltd. Any consequence arising from unskilled or incorrect handling of the product is not covered by this guarantee.

The following items, when supplied by Abacus Healthcare Services Ltd are guaranteed for a period of twelve months from the date of supply for the parts only (labour costs are not covered). • Taps and mixers • Shower hoses, shower heads and shower brackets. • Flexible pipes including waste outlet, hot and cold supply. Hot and cold taps and mixer taps are proprietary fittings and as such carry a standard manufacturer’s warranty. Note: Thermostatic mixing valves must be adjusted for the appropriate discharge temperature by the installer. These require regular maintenance for which Abacus engineers are available.

• Electrical All electrical components fitted to Aquanova baths are CE marked to comply with current European Standards. Electrical items must not be replaced with alternative components without the authorisation of Abacus Healthcare Services Ltd. Failure to obtain such authorisation will exempt the Company from any liability to action for further failure.

4


Safety Instructions Always ensure the equipment is operated by trained staff. Regularly clean the bath using non-abrasive cleaners. Always ensure the mains electricity is switched on. Always have the equipment serviced regularly (see Service Level Agreement). Always keep users hands away from moving parts. Always ensure the shower head is returned to it’s holder when not in use. Never use the bath for any purpose other than that it has been designed. Never leave the bath with the platform in a raised position. Never allow other equipment such as hoists to contact the bath forcibly as this may cause damage. Never allow items such as the shower head to remain beneath platform when raising the bath.

Whirlpool use and safety Ensure you have a minimum of 50mm of water above the highest jet before switching on your whirlpool. Check, especially after the children have used the bath, that they have not pushed small toys or other objects into the jets or suction fitting. Check regularly that all debris is cleared from around the suction fitting. Switch off your whirlpool at the RCCB after use. Ensure that adequate access is left for maintenance and servicing. Do not switch on your whirlpool without any water in the bath since this will damage the whirlpool pump. Do not use large amounts of standard bubble bath in the water since this will fill the room with soap bubbles. Do not run unmixed hot water directly on to the suction fitting. Do not let anything cover the suction fitting during use, especially you. Do not try to put your finger in a jet whilst the whirlpool is working. Do not leave children unattended in the bath with the whirlpool system switched on. Do not wash your hair in a bath fitted with a whirlpool system when the system is working. Do not wash animals in a bath fitted with a whirlpool system. Do not modify your whirlpool in any way. This would result in the guarantee becoming invalid and could result in the system becoming dangerous.

Maintenance After each use:

Dissolve a sterilising tablet into the bath water prior to sending the water to waste. Clean the bath and fittings using a soft cloth and non abrasive cleaner with anti-bacterial agent.

Monthly:

Whirlpool sanitisation using Abacus Healthcare approved cleaner.

Annually:

Servicing by an approved company in accordance with the manufacturer’s instructions. 5


Operating Instructions 1. To close the pop up waste rotate the chrome turn handle clockwise until the waste plug locates in the outlet (fig. 2).

Fig. 2

2. Fill the bath with water to your required level.

3. Check the temperature of the water.

4. Lower the bath rim to the appropriate height for transfer of the bather (fig. 3). There is an option to set the bath on installation to be used with a portable hoist in addition to the ambulant, ceiling track hoist and wheel chair transfer.

Fig. 3

A . A: Ambulant

B B: Ceiling Track Hoist

C

C: Mobile/Portable Hoist

D

D: Wheelchair 6

Fig. 4


Operating Instructions (continued) Using Integral Hoist 5. Allow/assist the bather to access the hoist sling.

6. Raise the sling by pressing and holding the icon on the membrane pad on the bath rim (fig. 5).

7. When the sling is higher than the bath rim, turn the sling onto the line of the bath (you will need to raise the bather’s legs to clear the bath rim. 8. Raise the bath full of water, to the appropriate height by pressing and holding the

icon

on the membrane pad on the bath rim (fig. 6). Fig. 5

9. After bathing, lower the bath (still full of water) by pressing and holding the

icon on

the membrane pad on the bath rim (fig. 7).

Fig. 6

10. When the sling is higher than the bath rim, turn the sling to one of the positions outside the bath (you will need to raise the bather’s legs to clear the bath rim).

11. Lower the sling to the required height to transfer the bather by pressing and holding the icon on the membrane pad on the bath rim (fig. 8).

Fig. 7

12. Assist to towel dry/dress the bather.

13. Empty the bath using the pop up waste turning handle.

14. Make the bath ready for the next bather (clean, disinfect etc). Fig. 8

7


Operating Instructions (continued) Without Hoist 4b. Allow/assist the bather to access the bath. 5b. Raise the bath, full of water to the appropriate height by pressing and holding the icon (fig. 9).

6b. When bathing is completed lower the bath full of water by pressing and holding the icon on the membrane pad on the bath rim (fig. 10).

7b. Assist to towel dry/dress the bather.

Fig. 9

8b. Allow/assist the bather to get out of the bath (see transfers - fig. 4).

9b. Empty the bath using the pop up waste turning handle.

10b. Make the bath ready for the next bather (clean, disinfect etc).

Fig. 10

8


Locking Devices Bath Locking Device 1. All Aquanova baths with a Membrane Keypad have a lock sequence to prevent unauthorised use. Locking Keys

2. To lock the bath, press the two locking keys simultaneously (fig. 9). 3. Check the lock sequence is set by trying to operate the bath. 4. To unlock the bath, press the two locking keys again simultaneously.

Fig. 9

5. Check that the bath is operating by pressing the icon.

9


Service Level Agreement As the manufacturer of your bath we are able to offer a unique range of services, which, due to the modular construction of the bath will extend the working life of the bath and provide a cost effective solution to protect your investment by offering the prospect of upgrading your bath to the latest specification.

Abacus Service Plans There are three foundation plans, which can be added to or modified to personalise service cover to meet the needs of the individual customer. All new equipment may take a four year contract from the warranty expiration date with a reduction in cost of ten percent. Service contracts are established on an evergreen basis, renewed automatically to ensure that maintenance cover is always in place to comply with requirements. You will receive an invoice two months in advance of renewal date, notice to terminate the contract is required three months prior to a renewal date.

Minimum Cover Recommended: Where the usage is relatively low and bathing facilities whilst important are not critical on a daily basis. Comprises: •

One full service visit each year which will include one LOLER weight test if appropriate.

A further LOLER examination if appropriate at a six month interval from the service visit

All labour costs for the pre planned service visit

All consumable parts cost for the pre planned service visit

All travel to and from site for service visit

Discount of 10% on the list price of Engineer Call Out, Labour and Parts

Supply of a Certificate of Maintenance

Supply of LOLER Certificate where appropriate

Priority response to Contract Customers

Cover is available Monday – Friday 09:00 to 17:00 hours

10


Minimum Plus Labour Cover Recommended: Where the usage is regular and may be significant to the daily bathing process. Comprises: •

One full service visit each year which will include one LOLER weight test if appropriate.

A further LOLER examination if appropriate at a six month interval from the service visit

All labour costs for the pre planned service visit

All consumable parts cost for the pre planned service visit

Unlimited breakdown cover for labour for service/repair visits

All travel to and from site for service visit

Discount of 10% on the list price of Engineer Call Out and Parts

Supply of a Certificate of Maintenance

Supply of LOLER Certificate where appropriate

Priority response to Contract Customers

Cover is available Monday – Friday 09:00 to 17:00 hours

Comprehensive Cover Recommended: Where the bath has regular multiple daily usage. Although it may not be the only bathing facility its loss could compromise client or patient care. Comprises: •

One full service visit each year which will include one LOLER weight test if appropriate.

A further LOLER examination if appropriate at a six month interval from the service visit

All labour costs for the pre planned service visit

All consumable parts cost for the pre planned service visit

Unlimited breakdown cover for labour for service/repair visits

Unlimited breakdown cover for parts

Engineer call out

All travel to and from site for service visit

Supply of a Certificate of Maintenance

Supply of LOLER Certificate where appropriate

Priority response to Contract Customers

Cover is available Monday – Friday 09:00 to 17:00 hours

Note: Comprehensive Cover is available initially for new baths and baths in the guarantee period. Comprehensive Cover will be available for baths up to five years old Application for baths more than one year old will be subject to a service inspection prior to acceptance. Application for baths not installed by Abacus will be subject to a service inspection prior to acceptance 11


Ram and Pump Assembly 1 69 58

59 60 61

61

62

Key No. 58 58A 58B 58C 58D 58E 59 60 61 62 63 64 66 67 68 69

67

66

66

61

68

67

62

68

64

Part No. ZAQ303 ZAQ304 ZAQ361 ZAQ362 ZAQ672 ZAQ673 ZAQ328 ZAQ324 ZAQ326 ZAQ332 ZAQ330 ZAQ331 ZAQ325 ZAQ323 ZAQ329 ZAQ307

Description Ram - 180 Degree RH 3 pos Scorpio Plus Ram - 180 Degree LH 3 pos Scorpio Plus Ram - 180 Degree RH 3 position Scorpio Ram - 180 Degree LH 3 position Scorpio Ram 360째 non locking LH (Leo/Leo Plus) Ram 360째 non locking RH (Leo & Leo Plus) Washer - Hydraulic Dowty 3/8 BSP Adaptor - 1/4 x 3/8 Male/Male Elbow - 1/4 x 1/4 BSP Swivel Nut Hose - 800mm Hydraulic Filter - Hydraulic For Ram Hose - 400mm Hydraulic Adaptor - 1/4 x 1/4 BSP Male/Female Adaptor - 1/4 x 1/4 BSP Male/Male Washer - 1/4 In. BSP Dowty Pump Assembly 200 Watt - Seat

64

12

59

60

63 59 60

59


Ram and Pump Assembly 2 69 58

59 61

70

66

60

68 61

68

61 66

62 67 61

66

67

68

62 64

65 Key No. 58 58A 58B 58C 58D 58E 59 60 61 62 63 64 65 66 67 68 69 70 71

Part No. ZAQ303 ZAQ304 ZAQ361 ZAQ362 ZAQ672 ZAQ673 ZAQ328 ZAQ324 ZAQ326 ZAQ332 ZAQ330 ZAQ331 ZAQ331 ZAQ325 ZAQ323 ZAQ329 ZAQ307 ZAQ702 ZAQ327

Description Ram - 180 Degree RH 3 pos Scorpio Plus Ram - 180 Degree LH 3 pos Scorpio Plus Ram - 180 Degree RH 3 position Scorpio Ram - 180 Degree LH 3 position Scorpio Ram 360° non locking LH (Leo/Leo Plus) Ram 360° non locking RH (Leo & Leo Plus) Washer - Hydraulic Dowty 3/8 BSP Adaptor - 1/4 x 3/8 Male/Male Elbow - 1/4 x 1/4 BSP Swivel Nut Hose - 800mm Hydraulic Filter - Hydraulic For Ram Hose - 400mm Hydraulic Hose - 400mm Hydraulic Adaptor - 1/4 x 1/4 BSP Male/Female Adaptor - 1/4 x 1/4 BSP Male/Male Washer - 1/4 In. BSP Dowty Pump Assembly 200 Watt - Seat Pressure Relief Unit Swivel ‘T’ 1/4 BSP Female/Female

65 71

59

59

60

59

60

64

13


Ram and Pump Assembly 3 69 58F

59 61

70

66

60

68 61

68

61 66

62 67 61

66

67

68

64 62

65 Key No. 58F 59 60 61 62 63 64 65 66 67 68 69 70 71

Part No. ZAQ787 ZAQ328 ZAQ324 ZAQ326 ZAQ332 ZAQ330 ZAQ331 ZAQ331 ZAQ325 ZAQ323 ZAQ329 ZAQ307 ZAQ702 ZAQ327

Description Ram - 180 Degree 3 position Universal Washer - Hydraulic Dowty 3/8 BSP Adaptor - 1/4 x 3/8 Male/Male Elbow - 1/4 x 1/4 BSP Swivel Nut Hose - 800mm Hydraulic Filter - Hydraulic For Ram Hose - 400mm Hydraulic Hose - 400mm Hydraulic Adaptor - 1/4 x 1/4 BSP Male/Female Adaptor - 1/4 x 1/4 BSP Male/Male Washer - 1/4 In. BSP Dowty Pump Assembly 200 Watt - Seat Pressure Relief Unit Swivel ‘T’ 1/4 BSP Female/Female

64

14

65 71

59 60

59

60

59


Check that the keypad has not been locked by pressing the two locking keys simultaneously to unlock the bath - see

The control box has failed

Contact Abacus Healthcare Services Ltd*

The keypad/air switch/pendant control has failed

The bathshell may have become detached from the

The bath shell will not go down

Contact Abacus Healthcare Services Ltd*

The lifting mechanism may have overridden the limit

Contact Abacus Healthcare Services Ltd*

The pump motor has failed (burned out/contaminated

Check the supply flow and water temperature using a thermometer Check water temperature by using a thermometer Contact Abacus Healthcare Services Ltd*

The hot/cold supply has been interrupted

The temperature control has failed (required adjusting

/cleaning/replacing)

There is damage on the scissor lift rams

Contact Abacus Healthcare Services Ltd*

Contact Abacus Healthcare Services Ltd*

There is a damaged/broken pipe or connection in the

hydraulic system

Contact Abacus Healthcare Services Ltd*

The oil seals on the seat ram have become damaged

The bathshell is damaged

hose/handset Inspect the bathshell for damage - if the bath has a shower and platform look for signs of trapping

Check the shower divertor on the tap and the connections of the shower hose/shower head

At the shower this may be the divertor or connections

broken pipe or connection)

Check the origin of the water and position relative to the bath

The water supply to the bath has failed (damaged

with oil)

Follow procedure for checking the keypad operation above Contact Abacus Healthcare Services Ltd*

The keypad/air switch/pendant control has failed

The ram/pumpset has failed (seals/loss of hydraulic fluid)

switches

Contact Abacus Healthcare Services Ltd*

The bath is fitted with single acting scissor lift rams

*Telephone 0870 770 8693 - Service Department

Water temperature variable

There is a hydraulic oil leak

There is a water leak

The seat is stuck at the top

Follow procedure for checking the keypad operation above Follow procedure for checking the keypad operation above

The keypad/air switch/pendant control has failed

The control buttons do not work

upper frame

Contact Abacus Healthcare Services Ltd* Contact Abacus Healthcare Services Ltd*

Contact Abacus Healthcare Services Ltd*

Follow procedure for checking the keypad operation above

Check that the battery charger has not been switched off

repeat this procedure once more.

There is a broken mechanical component in the system

Part of the lifting mechanism has failed

Check that the battery charger has not been switched off

The batteries have lost their charge or have failed

Page 5, Fig 4. Try to raise the bath again by pressing the bath raising icon - see Page 7, Point 6 Fig 9. If this fails

Check that the battery charger has not been switched off Check that the battery charger has not been switched off

The supply to the battery charger has been interrupted

Fault Finding Procedure

The battery charger has failed

Possible Cause

There is a broken electrical connection in the system

The bath will not operate

Symptom

Fault Finding

15


Aries 1700

Aries 1800

Pisces

Gemini

Leo

Leo Plus

Scorpio

Scorpio Plus

Scorpio Fixed Height

Diana

Ceiling Hoist

Portable Hoist

Balena

Wash Hand Basin

Changing Bench

Abacus Healthcare Services Ltd, Unit 1 Millennium Way, High Carr Business Park, Newcastle-under-Lyme, ST5 7XE Fax: 01782 569349 Sales: 0800 454810 www.abacushealthcare.co.uk e-mail: service@abacushealthcare.co.uk Tel: 01782 569330 SBAQ08 足 Issue 05 - 28.03.11