ARCHITECTURE PORTFOLIO
PORT FOLIO Abdellah El-Soussi
2
A b d e l l a h
E l - S o u s s i
PORTFOLIO
W E L C O M E
A S
American Universty Of Sharjah P.O.Box:70596 Sharjah,United Arab of Emirates b00051422@aus.edu (+971)503868606
SKILLS Digital
Rhino (modelling), Autodesk (Autocad, 3dmax(rendering)),Adobe Photoshop, Indesign ,Illustrator, Microsoft Office, Processing
Fabrication Model Making ,3d Printing, CNC routing , Laser cutting, Wood Shop, Metal Shop
EDUCATION American University Of-Sharjah Bachelor of Architecture 2013-2017
Honors/Awards Deans List (Fall 2013) (Fall 2014+Spring 2015) (Fall 2015)
Languages Arabic
English
EXPERIENCE Adnan Saffarini Architects intern 2015 summer
3
4
T A B L E
O F
C O N T E N T
- Art Building Extension in American University Of Sharjah Fall 2016
- Muwailih Community Centre Spring 2015
- Artist House (Bastakiya) Fall 2015
- Bating Space Fall 2015
- Brick wall project Fall 2015
- Socotra Retreat project Spring 2014
- Digital Fabrication Work - Construction Drawings
5
+
LOW ACTIVE
+
-
CAFETERIA
FLEXIBLE SPACE
HIGH ACTIVE
LOW ACTIVE
+
-
THEATRE
OUTDOOR THEATRE
ART BUILDING EXTENSION HIGH ACTIVE
HIGH ACTIVE
LOW ACTIVE
+
-
CAFETERIA
FLEXIBLE SPACE
2- SPLITTING
PERFORMANCE
LOW ACTIVE SERVICES
LOW ACTIVE SERVICES
1- STACKING
COMMUNITY
LOW ACTIVE
+
-
THEATRE
OUTDOOR THEATRE
-
3- CONNECTING
4- ADDITION
EDUCATION
HIGH ACTIVE
LOW ACTIVE
+
-
LABS
OFFICES
5-MERGING
EDUCATION
HIGH ACTIVE HIGH ACTIVE SERVICES
+ co-educational institution of higher education in the United Arab Emirates (UAE).It is a very diverse university that brings together more than 6,000 students from more than 99 countries and a full-time faculty of more than 370.This project understand the sun path through the use of sustainable technologies and systems as hybrid components of the envelop to create the basis of green design in the building.
HIGH ACTIVE SERVICES
6
LOW ACTIVE SERVICES
PERFORMANCE
HIGH ACTIVE SERVICES
HIGH ACTIVE
LOW ACTIVE SERVICES
-
COMMUNITY
HIGH ACTIVE SERVICES
co-educational institution of higher education in the United Arab Emirates (UAE).It is a very diverse university that brings together more than 6,000 students from more than 99 countries and a full-time faculty of more than 370.This project understand the sun path through the use of sustainable technologies and systems as hybrid components of the envelop to create the basis of green design in the building.
LOW ACTIVE
+
-
LABS
OFFICES
PROGRAM ORGANIZATION
CIRCULATION
1- STACKING
2- SPLITTING
3- CONNECTING
STRUCTURE EXPLODED AXONOMETRIC
4- ADDITION
5-MERGING
GENERATIVE DIAGRAMS
NORTH ELEVATION
SCALE 1:200
1- STACKING
SOUTH ELEVATION
EAST ELEVATION
2- SPLITTING
3- CONNECTING
SCALE 1:200
SCALE 1:200
7
STRUCTURE EXPLODED AXONOMETRIC
GEN
8
9
C
C
B
B
UP
UP
UP
UP
B
B
3.00 M
-4.50 M
UP
UP
1.50 M
UP
UP
-3.00 M
3.00 M
UP
2.00 M
A
A
A
A
1.50 M
-4.50 M
0.00 M
3.00 M
UP
3.00 M
UP
1.50 M
1.50 M
-3.00 M
-4.50 M
UP
UP
UP
-4.50 M
3.00 M
UP
UP
-3.00 M UP
C
C
SCALE 1:200
SECOND FLOOR PLAN
SCALE 1:200
C
C
UP
UP
UP
UP
B
B
B
B 7.50 M
UP
-1.50 M
UP
A
A
A
A
UP
UP
UP
7.50 M
0.00 M
0.00 M
UP
1.50 M
6.00 M
6.00 M
UP
0.00 M
1.50 M
10
UNDERGROUND FLOOR PLAN
UP
C
C
FIRST FLOOR PLAN
SCALE 1:200
THIRD FLOOR PLAN
SCALE 1:200
FELT ROOFING
+12.0 M
INSULATION RCC BARREL VAULT SHEAR CONNECTOR PLASTER FINISH I-BEAM STIFFENING ARCH
NORTH ELEVATION
BEAM
SCALE 1:200
STEEL PLATE BOLTED OFFSET FILLING MEP
EPOXY FINISH INSULATION
SOUTH ELEVATION
SCALE 1:200
+7.50 M
RCC BARREL VAULT FLAT HIDDEN BEAM I-BEAM STIFFENING ARCH STEEL PLATE BOLTED MEP
EAST ELEVATION
SCALE 1:200 EPOXY FINISH FLAT HIDDEN BEAM INSULATION
+3.00 M
FLAT HIDDEN BEAM STEEL HOLLOW TUBE I-BEAM STIFFENING ARCH STEEL MULLION PLUG WELDING DOUBLE GLAZED GLASS
SECTION AA
T-SECTION FLANGE
SCALE 1:200
I-BEAM STIFFENING ARCH
0.00 M
WELDED TO STEEL PLATE MEP TRAVERTINE FLOORING MORTAR BED SHEAR CONNECTOR TONGUE & GROOVE I-BEAM STIFFENING ARCH
SECTION BB
SCALE 1:200
STEEL MULLION T-SECTION FLANGE PLASTER FINISH TRAVERTINE FLOORING STEEL ANGLE EPOXY FINISH
-4.50 M
WATER PROOF MEMBRANE GRAVEL EARTH
SECTION CC
SCALE 1:200
11
COMMUNITY CENTER
CONTINUOUS CIRCULATION
INTEGRATION INTERIOR WITH EXTERIOR FOR AIR VENTALATION AND SOCIAL LIFE VISIBILITY
MATERIALS
MUWAILEH COMMUNITY CENTER CONCRETE
ARC 302 / PROFFESOR IGOR PERAZA
COMMUNITY CENTER
12
CONCEPT DIAGRAMS / COMMUNITY CENTER
ABDELLAH EL-SOUSSI / 51422
COMMUNITY CENTER
CONTINUOUS CIRCULATION
INTEGRATION INTERIOR WITH EXTERIOR FOR AIR VENTALATION AND SOCIAL LIFE VISIBILITY
SUN EXPOSURE
DOUBLE SKIN FOR VENTALATION AND INDIRECTING SUNLIGHT
20%
60%
MATERIALS
80%
INTERLOCKING PATTERN EFFICENT FOR BRINGING INDIRECT SUNLUGHT
CONCRETE
ARC 302 / PROFFESOR IGOR PERAZA
CONCEPT DIAGRAMS / COMMUNITY CENTER
COMMUNITY CENTER
SUN EXPOSURE
DOUBLE SKIN FOR VENTALATION AND INDIRECTING SUNLIGHT
20%
ABDELLAH EL-SOUSSI / 51422
ARC 302 / PROFFESOR IGOR PERAZA
CONCEPT DIAGRAMS/ SKIN STUDY
ABDELLAH EL-SOUSSI / 51422
COMMUNITY CENTER
PREFORMANCE HALL
MULTIFUNCTIONAL ROOM
STUDY ROOMS
LIBRARY
OFFICES AND MEETING ROOM
TOILETS AND FIRE EXIT
GRC SKIN CLADDING
OUTDOOR GATHERING AREA
TEMPRORY OUTDOOR GALLERY
ARC 302 / PROFFESOR IGOR PERAZA
EXPLODED ISOMETRIC
ABDELLAH EL-SOUSSI / 51422
13
14
15
COMMUNITY CENTER
B
COMMUNITY CENTER
A
A
UP STORAGE
UP
TEMPERORY OUTDOOR GALLERY 50 M²
UP
B
GALLERY WALL UP
UP
COMMUNITY CENTER UP
FIRE EXIT
UP
Underground plan
B
SEATING AREA PREFORMANCE HALL 240 M²
LIBRARY 140 M²
A
A UP
B
ARC 302 / PROFFESOR IGOR PERAZA
UNDERGROUND FLOOR PLAN / SCALE 1 : 100
ABDELLAH EL-SOUSSI / 51422 UP
FIRE EXIT
STORAGE
UP
STORAGE
OUTDOOR GATHERING AREA 80 M²
CAFE 35 M²
LOBBY 20 M²
COMMUNITY CENTER
OFFICES 25-35 M²
B
ENTRANCE
A
Third Floor plan
A UP
UP
16
UP
UP TEMPERORY OUTDOOR GALLERY 50 M²
ENTRANCE UP
UP
GALLERY WALL UP
ARC 302 / PROFFESOR IGOR PERAZA
THIRD FLOOR PLAN / SCALE 1 : 100
ABDELLAH EL-SOUSSI / 51422
B
COMMUNITY CENTER B FIRE EXIT
UP
First Floor plan
UP
PREFORMANCE HALL 240 M²
ARC 302 / PROFFESOR IGOR PERAZA
FIRST FLOOR PLAN / SCALE 1 : 100
ABDELLAH EL-SOUSSI / 51422
MULTIFUNCTIONAL ROOM 140 M²
A
A
B
UP
FIRE EXIT
UP
FIRE EXIT
UP
PRESENTATION ROOM 50 M²
UP
STUDY ROOMS 30 M²
B
LIBRARY 140 M²
A
A UP
UP
Fourth Floor plan
UP
ARC 302 / PROFFESOR IGOR PERAZA
B
Second Floor plan
ARC 302 / PROFFESOR IGOR PERAZA
SECOND FLOOR PLAN / SCALE 1 : 100
ABDELLAH EL-SOUSSI / 51422
FOURTH FLOOR PLAN / SCALE 1 : 100
ABDELLAH EL-SOUSSI / 51422
COMMUNITY CENTER
COMMUNITY CENTER
14.5 M
14.5 M
10.95 M
10.95 M
COMMUNITY CENTER 14.5 M
14.5 M
5.55 M 10.95 M
10.95 M 3.75 M
COMMUNITY CENTER
1.95 M
17
5.55 M
Section BB
3.75 M
1.95 M
ARC 302 / PROFFESOR IGOR PERAZA
SOUTH ELEVATION - SECTION BB / SCALE 1 : 100
ARC 302 / PROFFESOR IGOR PERAZA
SOUTH ELEVATION - SECTION BB / SCALE 1 : 100
ABDELLAH EL-SOUSSI / 51422
ABDELLAH EL-SOUSSI / 51422
14.5 M
14.5 M
10.95 M
8.45 M 7.35 M
14.5 M
14.5 M
4.45 M 3.75 M
10.95 M
8.45 M 7.35 M
Section AA 4.45 M
3.75 M
ARC 302 / PROFFESOR IGOR PERAZA
WEST ELEVATION - SECTION AA / SCALE 1 : 100
ABDELLAH EL-SOUSSI / 51422
ARTIST HOUSE (Bastakiya) 18
1
Narrative
2
4
3
5
19
20
21
LIVE / WORK
LIVE / WORK
A
A
LIVE / WORK
B
B
B
B
22 LIVE / WORK
A
A
First Floor plan
Second Floor plan
SECTION AA
D LEVEL PLAN
SCALE 1:100
FIRST LEVEL PLAN
SCALE 1:100
SECTION BB
Section AA
SECTION AA
Section BB
SECTIONS
SCALE 1:100
ABDELLAH EL SOUSSI 51422
WALL SECTION
23
WATERPROOFING MEMBRANE
RIGID INSULATION FINE SAND
THICKINED SLAB
CONCRETE WALL
SLIDING GLASS DOOR
DOUBLE MULLION
MULLION
CONCRETE SLAB STEEL REINFORCEMENT STEEL PLATE BOLTS, WASHER & NUT WELD / PLATE TO STEEL BEAM I-BEAM EXPANSION SHEILDS INSERTS HEAVY TIMBER NAILER NAILER WITH STUD
RIGID INSULATION FLASHING
SCALE 1:20
BATHING SPACE 24
25
26
27
BRICK WALL 28
29
THE WALL
SCALE 1:15
CONCEPT l ABSTRACTION OF FABRIC
TRASITION RESULT IN TEARING THE WALL
A F I R S T N I N E B R I C KS
B SECOND NINE BRICKS
C LAST BRICKS
A
B
C
D
C
D
39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21
30
20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 A
B
FRONT ELEVATION
ROTATE
ROTATE
PLAN VIEW
ABDELLAH EL SOUSSI
l
51422
THE WALL
SCALE 1:40
CONCEPT l ABSTRACTION OF FABRIC
C
B
1 l
U P P E R S H I F TS T O T H E R I G H T T O G E N E R A T E V O I D S
A
60 MM DECREASES DOWNWARDLY BY 5 MM
A
C
B
75 MM
110 MM
DECREASES DOWNWARDLY B Y 6 MM
C
DECREASES DOWNWARDLY BY 7 MM
B
A
2 l
31
L O W E R SH I F TS T O T H E R I G H T T O G E N E R A T E V O I D S
C DECREASES UPWARDLY B Y 7 MM
DECREASES UPWARDLY BY 6 MM
B 110 MM
75 MM
A
3 l
C
B
A
ROTATION
13°
26° DECREASES UPWARDLY B Y 0.5°
33° DECREASES UPWARDLY B Y 1°
13°
13° DECREASES DOWNWARDLY AND UPWARDLY B Y 1°
33°
26° 26° A
B
C ABDELLAH EL SOUSSI
l
51422
THE WALL
CONCEPT l ABSTRACTION OF FABRIC
SECTIONS AND ELEVATIONS S C A L E 1 : 20
EXPLODED AXONOMETRIC l EMPASING ON THE TRANSITION THAT RESULTED IN TEARING THE WALL BY LESSENING THE POINTS OF CONTACT
32
RIGHT ELEVATION
SECTION DD
SECTION CC
SECTION BB
SECTION AA
LEFT ELEVATION ABDELLAH EL SOUSSI
l
51422
THE WALL
CONCEPT l ABSTRACTION OF FABRIC
33
ABDELLAH EL SOUSSI
l
51422
SOCOTRA RETREAT PROJECT 34
PROGGRESSION
PROGGRESSION PROGGRESSION
PROFESSOR HEINTZ S
ABDELLAH PROFESSOR EL SOUSSI
ABDELLAHPR ARC 201 - RETREAT
ARC 201 - R
35
EXTERIOR
PROFESSOR HEINTZ SECTION B ABDELLAH EL SOUSSI 51422 ARC 201 - RETREAT PROJECT
36
EXTERIOR
PROFESSOR HEINTZ SECTION B ABDELLAH EL SOUSSI 51422 ARC 201 - RETREAT PROJECT
37
INTERIOR SPACE
PROFESSOR HEINTZ SECTION B ABDELLAH EL SOUSSI 51422 ARC 201 - RETREAT PROJECT
B
C
Elevations PROFESSOR HEINTZ SECTION B
38
SCALE 1:100 0
1
2
ABDELLAH EL SOUSSI 51422
ELEVATIONS
5
ARC 201 - RETREAT PROJECT
Meters
A
A
BB
C
B
AA
N
SCALE 1:100 0
1
2
PLAN
PROFESSOR HEINTZ SECTION B ABDELLAH EL SOUSSI 51422
5
ARC 201 - RETREAT PROJECT
Meters
CC
Floor plan Sections
PROFESSOR HEINTZ SECTION B SCALE 1:100 0
1
2
SECTION
5
Meters
ABDELLAH EL SOUSSI 51422 ARC 201 - RETREAT PROJECT
39
DIGITAL FABRICATION 40T O P
V I E W TOOFPT EV XI TE W U ROE FCTOENXTT AU IRNEE CR O N T A I N E R
3 D V I E W O F3 D P EVDI EEW S TOAFL PMEODDE ES TL A L M O D E L
3 D V I E W O 3F DT EV XI TE W U ROE FCTOENXTT AU IRNEE CR O N T A I N E R
L OODFE PDEADXEO. 3 D E X P L O D3 EDDE AX XP O. S TOAFL PMEODDE ES TL A L M O D E L
3D VIEW OF SLICED MODEL 3D VIEW OF NURBS MODEL
1
41 3D VIEW OF SLICED MODEL
3D VIEW OF MODEL ASSEMBLY
ABDELLAH EL SOUSSI- 51422-
1
3D VIEW OF MODEL ASSEMBLY
CONSTRUCTION DRAWINGS ARC 382
ARCHITECTURAL DETAILING CORRUGATED METAL SHEET
42
AMERICAN UNIVERSITY OF SHARJAH
WATER BARRIER assignment 2 THERMAL BREAK
RAMMED EARTH
BATT INSULATION project BATTEN SHEET C CHANNEL I BEAM RAFTER
TUCSON MOUNTAIN HOUSE due date
15 FEBRUARY 2016
FURRING CHANNEL persepective DRY WALL
RAMMED EARTH REINFORCEMENT RIGID INSULATION
key plan METAL PLATE ALUMINUM MULLION
DOUBLE GLAZING
CONCRETE
scale
0
0.1
0.3
1:15 DRAINAGE
sheet contents
WALL SECTION EXPANSION JOINT notes
WATER BARRIER FOOTING GRAVEL
EARTH
drawn by
MOHAMMAD ABUALHUDA sheet number
A2.0
43
A b d e l l a h
E l - S o u s s i
PORTFOLIO
B 0 0 0 5 1 4 2 2 @ AUS . E D U