portfolio Abhidev Thankappan
Selected Works 2019-2022
“
Hi, I am Abhidev Thankappan, an Architect graduated
from L.T.I.A.D.S. Mumbai and I am looking for new ways of learning Architecture. The following is a curated collection of my architectural projects that reflects my passion for creating meaningful designs.
”
professional skills
languages
Conceptualizing Detailing Rendering Sketching Model Making
English Hindi Malayalam Marathi Tamil
interests
abhidevt01@gmail.com +91 9324581390 24/3, Ashok Vihar, Shanti Nagar, Wagle Estate, Thane (W) – 400604
education BACHELOR OF ARCHITECTURE
workshops 2019
UNDERSTANDING STREETSCAPE -Urbanity, By Prof. Shilpa Vivekanand
Lokmanya Tilak Institute of Architecture & Design Studies, Kopar Khairane, Mumbai - 400 709 2021 2020 2019 2018
4TH Year 3RD Year 2ND Year 1ST Year
9.5 9.1 8.2 8.4
2018
ARCHITECTURE NARRATIVE -Storytelling in Architecture, By Prof. Neeladuwati C.
competitions
HIGHER SECONDARY CERTIFICATE IN SCIENCE Vani Vidyalaya, Mulund West, Mumbai, 400 080 2017
82.45%
2021
PLAY: INTERACTIVE FURNITURE -Furniture Design Competition, Winning Entry
2021
HOUSE 2.0 - Architecture Design Competition
2020
ARCHITECTURE AND PEOPLE INTERNATIONAL CONFERENCE -Students Design Competition
2020
HAMMOCK OF CONTEMPLATION - An installation at LTIADS
2019
EDGE DESIGNING COMPETITION - Furniture design
SECONDARY SCHOOL CERTIFICATE Vani Vidyalaya, Mulund West, Mumbai, 400 080 2015
90.6%
professional experience 2021
STAND DESIGN STUDIO, Mumbai Practiced as an Architect intern for 6 Months; worked on Commercial, Residential Interior Designing and Furniture Designing under Ar Nikita D’Silva and Ar Siddhant Tikoo.
2021
accomplishments
LUCKY OFFICE CUM WORKSHOP, Mulund Designed interiors for a Furniture workshop and
2021
First In Architectural Design 4th Year B. Arch
2019
First In Architectural Design 2nd Year B. Arch
2018
First In Architectural Design 1st Year. Arch
2017
Principal’s Award Of Excellence
2015
State Level Winner At National Children Science Congress
office (Freelance) 2020
NAALKETTU HOUSE At Thrissur Designed Plans for a two storeyed Bunglow
2019
FREELANCE RESIDENTIAL PROJECT 3000 Sqft House -Redesigned and prepared renders for Facade Redevelopment
tools advanced
intermediate
basic
AUTOCAD PHOTOSHOP ILLUSTRATOR RHINO INDESIGN SKETCHUP PRIEMIER PRO REVIT MS OFFICE
CONTENTS
p. 3
01
Staging Transience- Consolidating Eventspaces For Kalolsavam Design Dissertation 2021-22 | Academics | p.5
02 Puneri Mehfil- Rethinking the Mall
Architectural Design Semester 9 | Academics | p.21
03 Subko Craftry
STaND Design Studio| Professional Practice | p.33
04 Solitude in Kinship
House 2.0 | Competition | p.45
05 Technical Drawings
Professional Practice | Academics | p.48
p. 4
STAGING TRANSIENCE Consolidating Eventspaces for Kalolsavam Design Dissertation 2021-22 | Academics Guide: Niladwuti Chattopadhyay WHY
Kerala School Kalolsavam is a humongous annual school arts festival which brings in an influx of population into a district making it a melting pot of culture. To stimulate larger participation and promote continuity of cultural heritage of the state, Kalolsavam has to be reanimated through spatial architectural configurations.
HOW
The design proposal aims to provide a permanent solution to this problem by incorporating temporary modular event units that can be arranged in an open site. The same modules could be dismantled and used to solve various urban issues for the rest of the year until it is shifted to another district for the next edition of the Kalolsavam.
WHAT
Staging Transience is an attempt at exploring temporality in architecture through Kalolsavam. An array of modules having varied functions come together on a site to facilitate the event. The modules can be dismantled with no substantial site damage and can be individually used in different context to respond to different design requirements.
p. 5
p. 6
Kerala School Kalolsavam is an annual event conducted by the Government of Kerala, featuring several art competitions for high school and higher secondary school students of Kerala. The weeklong event is usually conducted in December–January months of a year and is considered to be the biggest cultural event of Asia. Every year, about 12000 contestants from all around the state, flock to around 20 competition venues in a district to participate in 232 events of performing arts and showcase their talent. Each year the venue of the Kalolsavam is changed from one District to another to ensure the participation of the people throughout the state.
Types of Events in Kalolsavam
Ty p e A Combination of visual and auditory experience
Ty p e B Primarily Auditory experience
Ty p e C Musical Instrument
Ty p e D Outdoor events
Ty p e E Spectator less Events
Eg. Bharatnatyam, Kathakali
Eg. Kathaprasangam, Sasthreeya Sangeetham
Eg. Mrudamgam, Veena
Eg. Chendamelam, Panchavadyam
Eg. Chitra Rachana, Quiz
p. 7_ Staging Transience | Kollam
NAME
KEYWORDS
MATERIALITY
CONCEPTION
CONFIGURATIONS
Entryway Registration
Portable
Small Shops
PRELUDE
MODULES
Lightweight
Portable Lightweight Closable
Materiality Threshold
Interactive Iconic
INTERLUDE
MODULES
Exhibition Pavillion
Informal Stage
Media Centre
Materiality Discoverability Easy Assembly
Appealing Movement Accessbility
Frame Easy Assembly Backdrop
Expandable Toilet
Portable Self Sufficient
p. 8
Typical Circulation Diagram XL Venue 5000 Capacity
Firemans Cabin
Ootupura (Kitchen)
L Venue 1000 Capacity
Committee Room
Dining Hall
M Venue 500 Capacity
Parking
Small Shops
S venue 250 Capacity
Central Gathering
Judges Room
Modules incorporated for Kalolsavam
Kollam city in Kerala was selected as the site for the proposal. 23 Sites were identified which included open public grounds, school playgrounds and existing eventspaces in the city.
p. 9_ Staging Transience | Kollam
MODULE
KEYWORDS
MATERIALITY
CONCEPTION
CONFIGURATIONS
Acoustics S Venue
Focal Point Backdrop
Periphery M Venue
Focal Point
POSTLUDE
MODULES
Backdrop
Periphery L Venue
Focal Point Backdrop
Arena XL Venue
Focal Point Backdrop
Elemental Kitchen
Modular Circulation
Modular Dining Hall
Zoning Structural
3” Dia Bamboo (Bambusa Balcooa) PTFE Membrane
Prefabricated Steel Joints Steel Cable
Steel Mast Container
p. 10
+21000mm
+9200mm
+4500mm
+1500mm
Section Through XL Venue
Configuration For Site 1, Asramam Maidan- Isometric View
XL Venue Physical Model p. 11_ Staging Transience | Kollam
20mm 20mm Steel Steel Cables Cables PTFE PTFE Membrane Membrane Roof Roof
Ring Ring Beam Beam Module Module with with Prefab Prefab Steel Steel Joints Joints Lattice Lattice Bamboo Bamboo Arch Arch Module Module
Stretched PTFE Membrane
Quadrapole Quadrapole Ring Ring Beams Beams
Lattice Lattice Bamboo Bamboo Arch Arch
Stretched PTFE Membrane
A Detatchable Detatchable Railing Railing Coconut Coconut Leaves Leaves Partition Partition wall wall
Modular Structural Truss System
Bamboo Bamboo FLooring FLooring Finished Finished in Plywood in Plywood Wooden Wooden Ramp Ramp
0 0 500500
Beaten Beaten Bamboo Bamboo Flooring Flooring Bamboo Truss and Ring Beam Metal Metal Ramp Ramp Structural Framework Charupadi Charupadi Type Type Edge Edge Seating Seating
Gallery Seating
Beaten Beaten Bamboo Bamboo Roofing Roofing 25MM 25MM Bamboo Bamboo splits splits 6" C/C 6" C/C 2" Dia 2" Dia Bamboo Bamboo Threaded Threaded Bolt Bolt
B Seating Arrangement for ‘Sadhya’
A A
Separated Entry Exit Points
B Dining HallB Exploded View
Backstage Stage
PTFE PTFE Membrane Membrane
3" Dia Bamboo 3" Dia Bamboo
3" Dia 3" Dia Bamboo Bamboo
25mm Steel 25mm Steel RodRod Internode Filled with Internode Filled with Grout Grout
Threaded Bolt Threaded Bolt Vertical Vertical Bamboo Bamboo Supports Supports
6mm6mm Thick Jute rope Thick Jute rope Bamboo Bamboo Connector Connector 2 2 direction direction rotation rotation
3" Dia 3" Dia Bamboo Bamboo
Detail Detail AtAt D D
Concrete Pedestral Concrete Pedestral
XL Venue Exploded View
Detail Detail AtAt Detail at AAA
oo
Detail Detail Detail atAtBAtB B
2" Dia 2" Dia Bamboo Bamboo 4" Dia 4" Dia Bamboo Bamboo
dRod
olt Threaded Threaded Bolt Bolt
Threaded Threaded Bolt Bolt
oo
ed illed
2" Dia 2" Dia Bamboo Bamboo 2" Dia 2" Dia Bamboo Bamboo
ate
Detail Detail AtAt B B
XL Venue View From Gallery
Detail Detail AtAt C C
ROOF ROOF LEVEL LEVEL Media Centre +3000 +3000 MM MM View Ceiling Ceiling Level Level +2700 +2700 MM MM
35mm 35mm Thick Thick Recycled Recycled Plastic Plastic Board Board Foldable Foldable Steel Steel Legs Legs
p. 12
Backstage Roof Level
Hollow Steel Wheel Foundation
+3800 MM
20MM Steel Cable point of intersection
20MM Steel Cable Steel Roof Caping
300 DIA Steel MAin Mast
e
Stretched PTFE Roof Level +8200 MM Membrane
+600 lvl
D
Cable Anchored to top
Threaded Bolt
Detail At B
Stage Level +600 MM
Floor Level +150 MM
Quadrapole Ring Beams
Prefab Bamboo Steel Connector
Lattice Bamboo Arch
Detail at A
Lattice Bamboo Arch Module
Internode Filled with Grout
Vertical Flaps to recieve Cables
+5800 lvl
Stretched PTFE Membrane
Threaded Bolt
+150 lvl
Prefab Cable TO Beam Steel Connector
on
Ring Beam Module with Prefab Steel Joints
Main RIng Beam
A
Main RIng Beam
B
Steel Roof Caping
Lattice Bamboo Arch
Lattice Bamboo Arch
3D veiw at Stretched PTFE Memdetail B brane
Sectional Detail At B
Backstage Roof Level +3800 MM
20MM Steel Cable
Steel Roof Caping
Steel Roof Caping
Coconut Leaves Partition wall
Stretched PTFE Membrane
Stretched PTFE Membrane
Main RIng Beam
Main RIng Beam Threaded Bolt
Floor Level Internode +150 MM
Prefab Cable TO Beam Steel Connector
Filled with Grout
6mm Thick Jute rope
Threaded Beaten Bamboo Bolt C Flooring
Prefab Bamboo SteelMembrane Connector PTFE Roof
Lattice Bamboo Arch
25mm Steel Rod Internode Filled with Grout
Bamboo FLooring Steel Cap Finished in Plywood PTFE Membrane Stretched Under Steel Cable Wooden Ramp
B
Stage Level Threaded Bolt
+600 MM
+150 lvl
3" Dia Bamboo
Detatchable Railing
20MM Steel Cable
Bamboo Connector 2 direction rotation
3" Dia Bamboo Metal Ramp Bamboo Truss and Ring Beam Structural Framework
Lattice Bamboo Arch
Concrete Pedestral
Charupadi Type Edge Seating
Sectional Detail at B
3D veiw at detail B
Detail At B
Detail At A
A
Detail At C
3" Dia Bamboo
Beaten Bamboo Roofing 25mm Steel Rod Internode Filled with Grout
Steel Cap
Bamboo Composite Frame
Threaded Bolt 3" Dia Bamboo
Threaded Bolt
Detail At B 3" Dia Bamboo
Threaded Bolt
Bamboo Connector 2 direction rotation
2" Dia Bamboo
25MM Bamboo splits 6" C/C 2" Dia Bamboo
PTFE Membrane Stretched Under Steel Cable
6mm Thick Jute rope
PTFE Membrane Roof
25MM Bamboo splits 6" C/C
Beaten Bamboo Roofing
4" Dia Bamboo
3" Dia Bamboo
25mm Steel Rod
Concrete Pedestral
Vertical Bamboo Supports
Concrete Pedestral
Detail at C Detail At C
w at lB
Threaded Bolt
3" Dia Bamboo 2" Dia Bamboo
M Detail Venue Isometric View At Exploded D
Detail At A
Internode Filled With Grout
A
Internode Filled with Grout 6MM MS Plate Roof Level
Detail At
Threaded Bolt Beaten Bamboo Roofing
Beaten Bamboo Flooring
Curved Bamboo to receive Detail At members
25MM Bamboo splits 6" C/C
+18000 MM
A
Detail At C
2" Dia Bamboo Threaded Bolt
3" Dia Bamboo
3" Dia Bamboo
Bamboo Composite Frame
Detail At B
Internode Filled with Grout
4" Dia Bamboo 4" Dia Bamboo
Steel Mast Joint
Concrete Pedestral
Threaded Bolt
3" Dia Bamboo
Threaded Bolt A
2" Dia Bamboo
Internode Filled With Grout
Internode Filled with Grout
Curved Bamboo to receive members
A
+3000 lvl
+8200 MM
2" Dia Bamboo
Detail At D
Threaded Bolt
Detail At A
Threaded
Roof Level
3" Dia Bamboo B
Fabric Covering
6MM MS Plate
2" Dia Bam
Threaded Bolt
25mm Steel Rod
Beaten Bamboo Flooring
c
B
2" Dia Bam
+5800 lvl
Detail At B
Detail At C
Backstage Roof Level +3800 MM
ROOF LEVEL
Detail At C
+4300 MM
Backstage stage
3" Dia Bamboo D
c
Stage Level
+600 lvl
C
B
+150 lvl
+2700 MM
Internode Filled with Grout
C D
Ceiling Level
M Venue Detailed Section Threaded Bolt
+150 MM
ROO
+300
Ceil
+270
2500
Steel Mast Anchored to Foundation
+600 MM
Floor Level
Hollow Steel Wheel Foundation
A
p. 13_ Staging Transience | Kollam
3" Dia Bamboo
point of intersection
Fabric Covering
300 DIA Steel MAin Mast
20MM Steel Cable Steel Roof Caping
Detail At D
Stretched PTFE Membrane
FF LEVEL 20MM Steel Cable Steel Roof Caping Stretched PTFE Membrane Main RIng Beam
+150 MM
FF L
3" Dia Bamboo
+150
25mm Steel Rod
Internode Filled w Grout
+18000mm
+7500mm +3500mm
Section Through Site 6
M Venue Configuration For Site 6, Craven LMS- Isometric View
M Venue Physical Model p. 14
Convergence of M Venues at Site 8- Cantonment Ground p. 15_ Staging Transience | Kollam
p. 16
S Venue Site View
Exhibition Pavillion View
Trailer Toilet Assembly Mechanism p. 17_ Staging Transience | Kollam
Dining Hall View
3" Dia B
Detail At C
Detail At D
Detail At A
4" Dia Bamboo
2" Dia Bamboo 4" Dia Bamboo
25mm Steel Rod Threaded Bolt Threaded Bolt 4" Dia Bamboo 2" Dia Bamboo
Threaded Bolt 2" Dia Bamboo
4" Dia Bamboo 2" Dia Bamboo
Internode Filled 25mm Steel Rod with Grout Threaded Bolt
2" Dia Bamboo Threaded Bolt
Threaded Bolt
6MM MS Plate 2" Dia Bamboo Internode Filled with Grout
Detail Detail at A At A
2" Dia Bamboo
Detail at B At B Detail
6MM MS Plate
Detail At A
Detail atDetail C At C
Detail At B
2" Dia Bamboo
Detail At C
ROOF LEVEL +3000 MM
c B
Ceiling Level +2700 MM
ROOF LEVEL +3000 MM
c B
Ceiling Level +2700 MM
A
FF LEVEL +150 MM
A
FF LEVEL +150 MM
Exhibition Pavillion Detailed Section
C
Wooden Backrest Stretched Pivoted 3" PTFE Bamboo Membrane Member
Recycled Plastic Seating Wooden Support Wooden Backrest
2500
2500
Stretched PTFE Membrane
Pivoted Bamboo Bamboo 3" Flooring Member
Recycled Plastic Seating Wooden Support
Bamboo Flooring
A
B PTFE Membrane Main ring
3800
PTFE Membrane Splice Cables
Hinged Bamboo Members
Main ring Edge Mast
3800
2500
Stretched PTFE Roof
Splice Cables
Hinged Bamboo Members Faric Covered Wall
Stay Cables Edge Mast Outer Caterneries
2500
Stretched PTFE Roof Bamboo Splits Wall
25
00
Hydraulic Hinge Faric Covered Wall
StayBamboo CablesFlooring
Bamboo Flooring Bamboo Splits Wall
Outer Caterneries
Hydraulic Hinge
Bamboo Flooring
00
25
Exhibition Pavillion Isometric View 25
00
Wa S
Bamboo Flooring
00
25
Registration Module Mechanism
Small Shop Module Mechanism p. 18
21 Days Before the Festival- Setting out and Digging of foundations Begin.
19 Days Before the Festival- Installation Electrical Lines are laid.
7 Days Before the Festival- M Venue is Roofed and Floored. Installation of Interlude structures begins
4 Days Before the Festival- Installation of
Days 1 of the Festival- The venue is ready to host events and supporting logistics.
Day 2 of the Festival- Water filling and scheduled.
Timeline of Site 6, Craven LMS
p. 19_ Staging Transience | Kollam
of the M Venue Begins, Plumbing and
12 Days Before the Festival- Ring Beams are anchored to main Mast using Steel Cables
Interlude Structures are finished
2 Days Before the Festival- Furnitures, Prelude Structures and toilets are brought on to the site
Delivery of meals happen regularly as
p. 20
PUNERI MEHFIL Semester 9 Architecture Design | Academics Location: Pune, Maharashtra Guide: Shilpa Vivekanand WHY
In recent years, emerging malls showcase similar character, functioning on artificial ventilation, closed building with many boxes of same sizes as tenants, with no local identity. Hence there is a need to Rethink and question the malls as they have to be transformed into thriving 3rd space with seamless shopping experiences.
HOW
Programmatic aspect of rethinking comprises addition of ephemeral eventspaces which amalgamates well with the cultural fabric of Pune. The architectural form of the mall is inspired from tradional wadas of Maharashtra that showcases great potential in adaptabilty and programmatic flexibility.
WHAT
Puneri Mehfil is a meticulously crafted third space for the city wherein retail spaces are woven around ephemeral eventspaces. Both the programs foster each other and contibute to the longetivity of the centre. These eventspaces are not only vital functions in the building but also acts as microclimate and temperature regulators.
p. 21
p. 22
Fragments inspired Maharashtra
Conceptual Sketch
p. 23_ Puneri Mehfil | Pune
by
wadas
of
Interconnected Fragments creating pockets in between
Ground Floor Plan
p. 24
Entrance View p. 25_ Puneri Mehfil | Pune
p. 26
Single Shopping Block
Eventspaces at the Core
Clusters of fragments
Section AA’ through different courts
p. 27_ Puneri Mehfil | Pune
Clusters Step down towards the River
Joining Eventspaces to form an undisrupted loop
Raising Eventspaces to different levels for better user experience
p. 28
Ephemeral Core when the mall is dormant
Ephemeral Core during an event p. 29_ Puneri Mehfil | Pune
Third Floor
Second Floor
First Floor
Ground Floor
Basement Floor
A.H.U. Vertical Circulation Core Storage Electrical Rooms
p. 30
Warm Air Escapes from the coutyard
Secondary Facade protects the glazing from direct Sunrays Existing Vegetation Screens Western Facade
Courtyard protected from harsh Sunrays and rainfall
Solar Panels on Flat roof
Cool Air gets trapped inside the courtyard
Design Responses to climate and site context
p. 31_ Puneri Mehfil | Pune
Mall as reflection of Pune’s Culture
p. 32
SUBKO CRAFTERY Professional Practice 2021 Location: Byculla, Mumbai Team: STaND Design Studio WHY
Subko at Mary Lodge in Bandra needed to expand to a space where it could process coffee at a larger scale as well as create a engaging interactive experience with the customers. Amalgamation of two different process- Coffee roasting with Baking also had to be explored
HOW
Nestled in a leafy Byculla lane the 2,200sqft space has been inspired by microbreweries and wineries from around the world. By introducing industrial chic elements into the warehouse space a fresh perspective into the rich essence of coffee houses in the Indian Subcontinent is established.
WHAT
Subko Craftery is a ‘facility’ in Byculla that is a bakehouse, a roastery and coffee shop, all rolled into one.The Craftery allows Subko to make their production process visible to the public—coffee beans are ground, dough is prepped in an all-glass cold room.
p. 33
p. 34
brand identity
tri-script, indigenous, kerala green
copper, brick, metal, indian spotted marble, concrete, textured glass, mesh, charcoal grey
materiality contextualism
warehouse - structured and functional, process driven
chic
industrial, raw, textured
4
3
staff lockers
ss storage rack
ss storage rack
ss table with tool drawer proofer
proofer
ss table with tool drawer
2 burner range
pot rack
trolley rack
ss storage rack
2
dough sheeter
deck oven
wash pit
1
convection oven
Kitchen
tall fridge
tall fridge
ss table with tool drawer
Cold Room
10
p. 35_ Subko Craftry | Mumbai
wood-top table
trash pit
chiller room
Floor Plan
ss table with uc bins storage
ss table with tool drawer
5
slotted angle storage
panel
6
sensory lab
7
bloom bar
bake display
coffee bar electrical panel
panel
packaging tables
slotted angle storage
Roastry
Coffee Bar
8
9
p. 36
sensory lab coffee + bake
guest zones shelving bake roastery
packaging
pastry
sensory lab
guest zone
coffee + bake bar
roastery
guest zone
Concept Ideation 1
roastery
guest zones sensory lab
shelving bake
coffee + bake packaging
pastry
Concept Ideation 2 p. 37_ Subko Craftry | Mumbai
moments
moments
roastery
coffee + bake bar
moments
Rendered view of Experience Zone
Rendered view of Coffee Bar and Roastery
Photograph of finished Cold Room
p. 38
Rendered ‘Alcove’ view of Experience zone p. 39_ Subko Craftry | Mumbai
Rendered ‘Community’ view of Experience zone p. 40
FLOORING IPS - Concrete finish Depicting seamlessness and solidity
ACCENTS Slotted angles For functionality and industrial appeal •
Storage shelving
Cane Brings a hint of craft and regionalism •
High stool seats
Jute fabric Brings a hint of craft and regionalism •
Diwaan cushions
Reinforced glass Creates transparency with a hint of texture •
Sliding doors
Black Metal Frame Frames and defines the cold room cube •
p. 41_ Subko Craftry | Mumbai
Cold room framework
S U R FA C E S Teak A regional wood lending warmth •
High chairs + diwaan seating frame
Washed Teak A contrasting tone of wood maintaining the rawness •
Table tops + shelving
Black Stainless Steel To boldly define and ground the cold room cube •
Exterior walls of the cold room
PA I N T S H A D E S Kerala Green Gives definition and retains the brand identity •
South and west walls
Textured Beige Paint Breaks monotony and adds warmth •
North and east walls
Black Gives a defined backdrop for lighting •
Ceiling
p. 42
Rendered view of Subko Craftery, March 2021
p. 43_ Subko Craftry | Mumbai
Photograph of Completed Subko Craftery, August 2021
p. 44
HOUSE 2.0 Archdias Design competition 2021 Location: Kochi, Kerala Project Type: Residential Colonial streets along the water’s edge, festive and colourful Fort Kochi Operates at its own pace Sandwiched between one such street and the majestic beach lives a resident of the city, The House. The writer and the teacher start another day in The House Forced setting of working from home Is the idea of home the same as before? The House is now where there are no rooms stripped down to bare necessities A dwelling governed by activities. Activities dignified by interposing voids The House now has no sharp edges to rip the walls one continuous curved envelope. Punctuated orderly by windows; dwellers meander through spaces that flows The House has space for every accounted and unaccounted emotions to dissipate The House that celebrates aloneness, not loneliness. With private spaces in a shared volume, There’s Solitude in kinship. - Author
p. 45
The
Activity Mapping of the Writer
Str
eet
and the Teacher
Ground Floor Plan Activity zones (12ft X 12ft) are spread out by interposing voids. Hence each activity space opens up to voids on all sides.
Relax
Socialize
View
Utility
Gather
Write
Genkan
Park
Hobby
Sleep
Stairs
Pet’s Sleep
Cook
Sleep’
Meditate
Teach
Rejuvenate
Meditate
Aromatize
Chat First Floor Plan
p. 46
p. 47_ Solitude in Kinship | Kochi
p. 48
255
LVL +450 MM
COLUMN ALL TREADS 300MM ALL RISERS 150MM
4700
17 18 19 20 21 22 23 24
WALL BUILDING PROFILE
12 MM THICK PLASTER
SHEAR WALL
07 06 05 04 03 02 01
4400
UP
CENTRE LINE
R.C.C. WAIST SLAB 150MM THK
TYPICAL RAILING DETAIL SCALE-1:20
GROUND FLOOR PLAN
SCALE- 1:50
18 MM THK GRANITE POLISHED TREAD
2650
ANTI-SKIDE GROOVE
STAIRCASE-1
2550
150 MM THK WAIST SLAB
LVL +450 MM
12 MM THICK PLASTER 22 MM THK SCREED
4700
17 18 19 20 21 22 23 24
KEY PLAN:
2200
07 06 05 04 03 02 01
TYPICAL TREAD AND RISER DETAIL SCALE-1:20
TECHNICAL DRAWINGS
TERRACE FLOOR PLAN
SCALE- 1:50
Semester 6 | Working Drawings REVISION NUMBER: Professional Practice | Working Drawings REVISION DATE: SCALE: 1:100 Municipal Drawings DRAWN BY:
SHEET NUMBER:
13/15 N
CHECKED BY:
TITLE: STAIRCASE DETAILS PROJECT:PROPOSED PRIMARY SCHOOL AT PANVEL 1
2
3
4
5
6
7
8
OWNER: 9
10
11
12
C
A
NAME: ABHIDEV THANKAPPAN
950
680
W1
LVL +2250 MM
F.D. 1000X 1000
E.D. 1150X 1000
120
480 200
MS BOLT
INDOOR SPORTS AREA 9920 X 7300
7140
1120
D1
HANDRAIL DETAIL CONFERENCE ROOM 9920 X 6850 FOR FIRE STAIRCASE 2900
1120
710
D2
3430
LVL +300 MM
LVL +300 MM
W1
1350
MEN'S TOILET WF1 SF1 FF1 CF2
D3
V1
D3
V1
3. SF3
FINISHES: CEILING 1. CF1
03
W1
02 01
450W1
LVL +0.00 MM
E
WOMEN'S TOILET WF1 SF1 FF1 CF2
D3
V1
D3
V1
DN
2000 2400
V1
D
D2
S SIZE OF OPENING HE
W1 W2
750
1
SIZE OF LI OPENING HE
D1
2000
2
D2
1125
2
D3
750
2
FD
1125
2
REVISION NU
LOCKER ROOM 2900 X 4920
STAIRCASE-3
3270
UP
450
LVL +450 MM
2. CF2
B
7000 450 1020
W1
500
REVISION DA
3420
LVL +450 MM
WF1 SF1 FF1 CF2
3270
9920
D2
ENTRY LOBBY 6400 X 3070 WF1 SF1 FF1 CF2
WF1 SF1 FF1 CF2
1340
1500
D2
1760
1020
1760
UP
24
2460
23
01
22
02
21
03
20
04
19
05
18 16
2280
LIFT LOBBY WF1 SF1 FF1 CF2
06
2820
07 08
2280
6550
WF1 SF1 FF1 CF2
02
1770
TITLE: GR OWNER:
03
11
LIFT WELL 2600X2600
01
LVL +0.00 MM
DRAWN BY:
CHECKED BY
PROJECT:PRO
LVL +450 MM
09 10
13
W1
C
WF1 SF1 FF1 CF2
EXIT LOBBY 6550 X 3150
15
12
900
D1
14
LVL +2250 MM
B
SCALE: 1:100
KINDERGARTEN 9770 X 7140
LVL +450 MM
W1
9770
6400
2200
17
UP
950
900
W1
7140 500
NAME: AB W1
950
B
A
ROLL NO: 71
SUBJECT : A
A C
A
1
2
Ground Floor Plan of a Primary School p. 49
G
NO.
D2
3150
STAFF ROOM 9920 X 7000
3150
3070
D1
4920
4920
EXAM SECTION 2900 X 4920
450
4960
3. FF3
FINISHES:
NO.
D2
3430
3420 9920
2200
D2
950
FLOOR
SKIR M
W1
LVL +450 MM
LVL +300 MM
W1
WALL
WF1 WF2 WF3 FINISHES:
1. FF1
H
DN
D2
1
3420 500
J
FINISHES: W
1350
LVL +450 MM
DN
ADMIN 9920 X 7220
W1
K LVL +0.00 MM
1. SF1
WF1 SF1 FF1 CF2
7220
7220 950
C
UP
LOKMANYA TILAK INSTITUTE OFF ARCHITECTURE AND DESIGN STUDIES, KOPARKHAIRANE, NAVI MUMBAI
3150
4700
2200
CANTEEN 7220 X 13270
D1
1500
WF1 SF1 FF1 CF2
03 02 01
2. FF2
D2
D2
D2
D
D2 1720
2530
1
2350
670
W2
5120
WF1 SF1 FF1 CF2
FD
UP
KITCHEN LVL +450 MM 6400 X 3590 WF1 SF1 FF1 CF2
1820
SCALE-1:5
4700
12 11 10 09 08 07 06 05 04 03 02 01
2200
23
W1
2550
2200
13 14 15 16 17 18 19 20 21 22 23 24
1420
2460
E
LVL +450 MM
D2
7300
2650
STAIRCASE-1
LVL +2250 MM
21 22 24
6850
F
W1
01
2600 1480
D2
STAIRCASE-2
FD
D2
B
03 02
UP
1820
3650 2520
6400
LVL +450 MM
7220
1420
25
G
WF1 SF1 FF1 CF2
950
10350
VISITORS ROOM WF1 SF1 10350 X 3190 FF1 CF2
WF1 SF1 FF1 CF2
W1
20
3950
D2
BOARD MEMBERS AREA 9920 X 7220
500
TOILET
3420
9920
H
W1
18 19
2460
380 650 380 2900
950
V1
D3 6100
17
WF1 SF1 FF1 CF2
1350
J
F.D.
1250 X1580
16
05
L
300 W1300
WASHING AREA 2600 X 2610
640
1500X1580
15
08
1350
E.D.
950
14
09 07 06 04
750
STORAGE 3650 X 2610 WF1 SF1 FF1 CF2
13270
W1
10
420 W1
2300
1350
500
3190
W1
9920
950
610
K
DETAIL
PLATE 100MM DIA
WF1 SF1 FF1 CF2
13
3590
PRINCIPALS CABIN CONNECTING 7140 X 6580
11
1920
4960
9920
6580
12
2610
980
1200
W1
500
SUBJECT : ARD- WORKING DRAWING
640
W1
950
SEM VI
ROLL NO: 71
4960
1350
W1
230MM THICK BRICK WALL
50MM THICK STAINLESS STEEL 950 W1 HANDRAIL
1350
500
2610
4960
950
1820
1/3 OF ENTIRE OHT TANK WATER FOR L FIRE FIGHTING
ALL DIMENSI ALL DIMENSI MEASURED ALL LEVELS S BEFORE STAR ALL THE DRA ALL DIMENSI SPECIFIED OT ALL EXTERNA OTHERWISE M ALL INTERNA PLASTERS AR FOR DOOR, W TILE DROP IS
3
4
5
6
7
8
9
10
11
12
LOKM ARCHITE KOPAR
PB-
300 300
1950 1650 1050
PB-132
PB-133
2010
1200
300 300
PB-103
A'
300 300
PB-84
150
SECTION AA'
PB-63
PB
C27 F27
PB-62 1340
1340
450)
4.
300 300
C26 F26
300 300
COLUMN
SHEAR WAL
SECTION AA' 2100 1800 1200
9
+31150
+32400
1820 1500 900
PB-21
300 300
300 300
FOOTING SCHEDULE A' 150
A'
10
A
11
NO.
SIZE
2250 1950 1350
12
FOOTING NAME A
+42300
(COLUMN SIZE 750 X 300)
PB-20
C
PB
GENERAL NOTES C27 F27
E
PLINTH BEAM 4. 1650 X 1650 F33, F34, F39, F40
HATCH KEY PLAN:
COLUMN
G
PB-20
ABBREVIATIONSNO. +42300
C
COLUMN
F
FOOTING
C
1950
300 300
SIZE +49300
A'
REVISION DATE:
SCALE: 1:100
2. 1800 X 1500 F1, F2, F3, F4, F5, F6, F7, F11, F12, F13, F14, F15, F16,
3. 1950 X 1500 F8, F10
4. 1650 X 1650 F33, F34, F39, F40
PB-5 SIZE
SHEAR WALL
B
PLINTH BEAM NAME
KEY PLAN:
(PB-111), PB-115, (PB-117)-(PB-130), (PB-133)-(PB-138)
SECTION AA'
A
PROJECT:PROPOSED PRIMARY SCHOO OWNER:
COLUMN
300 X 600 PB-1, PB-2, (PB-4) - (PB-13), (PB-15)-(PB-42), (PB-45)7000
FOOTING NAME
REVISION NUMBER:
1. 1650 X 1500 F9, F22, F23, F24, F29, F30, F43, F44, F57, F69.
CENTRE LINE C5 F5 300 300 PLINTH SCHEDULE 300 300 300 BEAM 300
PB-4
SECTION AA'
12 FOOTING SCHEDULE A' A
F17, F18, F19, F20, F21, F25,DRAWN F26, F27, F28, F32, BY:F31, 3 ISOLATED F35, F36, F37, F38, F41, F42, F45, F46,TYPE F47, F48, F49, TYPE 2 ISOLATED SHEAR WALL FOOTING PLAN F50, F51,PLAN F52, F53, F54, F55,CHECKED F56,STEPPED F58, F59,BY: F60, F61, STEPPED FOOTING F63, F71, F72, F73. (COLUMN SIZE 750 X 300) STEPPED FOOTING PLAN (COLUMN SIZEF62, 600 X 300)F64, F65, F66, F67, F68, F70, AR PLINTH BEAM PB (COLUMN SIZE 450) TITLE: PLINTH BEAM AND FOUND
300 300
450 mm SUNK
SUB
150
300 300 150
A
HATCH
C27 F27 300 300 C4 E F4
ROL
PB-135'.
A'
C6 F6 SW 4 ISOLATED TYPE
150
3
13402820
PB-42
300 300
2240
+39475
OWN
1800 1500 900
C46 F46
A
A
TIT
PROJ
NA
SHEAR WALL
C5 F5 PLINTH BEAM B SCHEDULE
NAME: ABHIDEV THANKAPPAN ROLL NO: 71
300 300
300 300
+35300
D
11
REV
+49300 REVF ABBREVIATIONS 1. 1650 X 1500 F9, F22, F23, F24, F29, F30, F43, +39475
+35300
TYPE ISOLATED F5, 3F6, F7, F11, F12 2. 1800 X 1500 F1, F2, F3, F4, STEPPED FOOTING PLAN SCA F17, F18, F19, F20, F21, F25, F26,A C COLUMN F35, F36, F37, F38, F41, F42,DRA F45, C6 TYPE TYPE 2 ISOLATED F50, F51, F52, F53, F54, F55, F56, F 4 ISOLATED FOOTING F6 F62, F63,PLAN F64, F65, F66, F67,CHE F68, STEPPED FOOTING PLAN STEPPED FOOTING (COLUMN SW SIZE 450) (COLUMN SIZE 600F10 X 300) SHEAR WALL 3. 1950 X 1500 F8,
C26 F26
10
A'
A'
1800 1500 900
+28300
8
PB-5
300 300
1820 1500 900
+21300
PLINTH BEAM SCHEDU
150
PB-6
2620
PB-7
3130
C26 F26
7
PB-21
1950 1650 1050
6
PB-41
300 300
PB-22
PB-23
PB-24
PB-25
PB-42
PB-8
150
PB-40
(COLUMN SIZE 600 X 300)
RE-BARS FOR WAIST SLAB
2240 PB-9
2240
PB-39
PB-38
PB-43
PB-44 A
A'
1820 1500 900
9
PB-43150
C56 F56 C25H F25
3
HATCH 300 300
2240 2240
PB-44
4600
C25 F25
E
3. 4 PLINTH BEA
(COLUMN SIZE
450 mm SUNK
600
PB-41'
450)
150
C28 F28
F24
NO
C46 F F46 FOOTING 12 TYPE 4 ISOLATED F TYPE 4 ISOLATED STEPPED FOOTING PLAN SW SHEAR WAL STEPPED FOOTING PLAN
(COLUMN SIZE
PB-45
PB-46
E
C23 F23
A'
PB-42
C29 F29
G
30
COLUMN 2.
A
PB-83
C27 GENERAL NOTES F27 C24
ALL DIMENSIONS ARE IN MM UNLESS AND OTHERWISE SPECIFIED
2240
J
30
1950 1650 1050
C45 F45
PB-43
C44 F44 PB-82
D
F
C4 F4
NO.
ABBREVIATIONS H 1.
C
PB-61
C22 F22
300 300
C56 F56
PB-102
2240
F
C30 F30
PB-47
PB-48
C21 F21
150
300 300 150
PB-131
PB-116
1200
1950 1650 1050
PB-104
C55 F55
J
1950 1650 1050
PB-65
PB-63 PB-66
PB-67
A
PB-101
PB-81
C43 F43
(COLUMN SIZE 300 X 450)
2240
PB-87
PB-88
F47
2460
930
PB-130
C57 F57
A'
PB-85
PB-105
C54 F54
1800 1500 900
PB-64
PB-128 1470
PB-84
PB-129
PB-103
300 300 150 PB-127 PB-106 PB-89
RE-BARS FOR WAIST SLAB
PB-86
2010 1200
PB-116
2240
PB-16
PB-63
PB-6
PB-118
G
PB-80
PB-37
7000
G5
+17800
PB-135'
PB-115'
300 300
ALL DIMENSIONS ARE MM UNLESS AND OTHERWISE SPECIFIED D 300 300 300IN 300 CENTREA' LIN 1340 A ALL DIMENSIONS IN THE DRAWING ARE TO BE READ AND NOT 300 300 300 300 RE MEASURED RE 600 450 mm SUNK ALL LEVELS SHALL BE CROSS CHECKED WITH THE ARCHITECT SC C9 BEFORE C10STARTING DR F9 ON SITE. C8 C7 C6 TYPE 2 ISOLATED F10 NAME F8TOPB-19 F7 SIZE F6PLINTH BEAM ALL THE BE VERIFIED PRIOR TO THE EXECUTION. STEPPED FOOTING PLAN PB-18 HAVE CH PB-17DRAWINGS PB-20 C SECTION AA' T ALL DIMENSIONS ARE FROM UNFINISHED LEVELS/SURFACES UNLESS PB-1, PB-2, AA' (PB-4) - (PB-13), (PB-15)-(PBPR 1340 300 X 600 SECTION SPECIFIED OTHERWISE 1960 OW (PB-111), PB-115, (PB-117)-(PB-130), (PBALL EXTERNAL1950 WALLS ARE 230 MM THICK BRICK WALLS UNLESS PB-3 2100 OTHERWISE MENTIONED. N SHEAR WALL STOPS AT PLINTH 1650 PB-3, PB-14, PB-41', PB-43, PB-44, PB-71',RO C3 C4 C5 1800 XEXTERNAL 450 PB-113, 1050 ALL INTERNAL PLASTERS RCC ARE 15FOOTING MM THICK 300 AND F3 F4 F5 RAFT PB-114, PB-115', PB-116, PB-117',SU PB-4 1200 PB-2 B PLASTERS ARE 20 MM THICK. PB-135'. 3200 FOR DOOR, WINDOWS AND OTHER FINISHES REFER SCHEDULE. SECTION AA' 2850 1250 2900 4180 2820 7000 A TILE DROP IS 15 MM UNLESS OTHERWISE MENTIONED.
PB-36
2240
PB-50
PB-28
PB-10
3500
C46 F46
C64 F64
1900
(COLUMN SIZE 300 X 450)
PB-26
PB-90
PB-69
PB-68
PB-133
PB-64
PB-103
PB-45
PB-84
1950 1650 1050
PB-107
PB-108
PB-91
PB-92
2620
PB-7
7000
PB-135
H
C46 F46 C47
PB-100
PB-60
PB-41
1500 900
C53 F53
C31 F31
150
PB-63 PB-6
150
600
PB-42
300 300
1340 RCC RAFT FOOTING 2240
PB-1
PB-21
PB-22
PB-23
PB-62 HEAR WALL STOPS AT PLINTH 300 300
4
PB-15
C7 F7 TYPE 1 ISOLATED
PB-3 PB-62
(COLUMN SIZE 300 X 450)
PB-3
2240
C12
C56F12 PB-41'C11 F11 F56 4600
C13 F13
PB-22
150
2770
PB-29
300 300 PB-11
1950 1650 1050 +10800
RCC Column footing
PB-41'
J
PB-136
TYPE 1 ISOLATED STEPPED FOOTING PLAN
PB-59
C20 PB-62 F20
4600
300 300
PB-14
C69 F69
C70 F70
PB-115
PB-79
(COLUMN SIZE 300 X 450)
C7F TYPE 1 ISOLATED STEPPED FOOTINGF7 PLAN
J
300 300
4
1950 1650 1050
PB-84
+32400
PB-19
PB-35
11
4600
STEPPED FOOTING PLAN
2240
PB-103 PB-45
C24 F24
8
+31150
F19
PB-119
1800 1500 900
ALL DIMENSIONS ARE IN MM UNLESS AND OTHER ALL DIMENSIONS IN300 THE300 DRAWING ARE TO BE RE 300 300 MEASURED 12 SECTION AA' WITH TH ALL LEVELS SHALL BE CROSS CHECKED BEFORE STARTING ON SITE. ALL THE DRAWINGS HAVE TO BE VERIFIED PRIOR C68 C67 SI UNFINISHED LEVELS F67ARE FROM F68 ALL DIMENSIONS A' A PB-134 SPECIFIEDSECTION OTHERWISE L AA' 300 X ALL EXTERNAL WALLS ARE 230 MM THICK BRICK 3500 OTHERWISE MENTIONED. 2440 1950 PB-117' TYPE 1 ISOLATED ALL INTERNAL1650 PLASTERS ARE 15 MM THICK STEPPED FOOTING PLAN AND 600 C65 PLASTERS ARE C66MM THICK. 300 X 1050 20 F65 F66 PB-117 FOR DOOR, WINDOWS K AND OTHER FINISHES REFE 4750 TILE DROP IS 15 MM UNLESS OTHERWISE MENTION PB-102' 300 300
10
ALL DIMENSIONS IN THE DRAWING ARE TO BE READ AND NOT SHEAR WALL STOPS AT PLINTH MEASURED 1340 300 300 300 300 300 300 300 300 CENTRE LINE 300 300 300 300 ALL LEVELS SHALL BE CROSS CHECKED WITH THE ARCHITECT 4600 RCC RAFT FOOTING 300 300 300 300 600 450 SUNK PB-4 BEFORE STARTING ONmm SITE. ALL THE DRAWINGS HAVE TO BE VERIFIED PRIOR TO THE EXECUTION. ALL DIMENSIONS ARE FROM UNFINISHED LEVELS/SURFACES UNLESS PB-41' SPECIFIED OTHERWISE SIZE PLINTH BEAM NAME 3200 ALL EXTERNAL WALLS ARE 230 MM THICK BRICK WALLS UNLESS AA' SECTION AA' SECTION AA' 4600 1340 SECTION OTHERWISE MENTIONED. SECTION AA' 300 X 600 PB-1, PB-2, (PB-4) - (PB-13), (PB-15)-(PB-42), (PB-45)2900 4180 2820 7000 (PB-111), ALL INTERNAL PLASTERS ARE 15 MM THICK AND EXTERNAL 1800 2100PB-115, (PB-117)-(PB-130), (PB-133)-(PB-138) 2250 1500 PLASTERS ARE 1950 20 MM THICK. 1800 900 1650 PB-3, PB-14, PB-41', PB-43, PB-44, PB-71', PB-102', PB-112, 1950 FOR DOOR, WINDOWS AND OTHER FINISHES 300 REFER SCHEDULE.1200 X 450 1050 PB-41 PB-40 1350 PB-113, PB-114, PB-115', PB-116, PB-117', PB-131, PB-132, TILE DROP IS 15 MM UNLESS OTHERWISE MENTIONED.
1950 1650 1050
7A
K
C28 F28 C19
PB-34
3
PB-19
PB-44
PB-39
C32 F32
300 300
C56 F56
GENERAL NOTES
J
9
PB-137
C42 F42
PB-78
PB-58
1200 PB-51
PB-116
PB-46
PB-30
2A
2240
1250
PB-83 C41 F41
C66C33 F66F33
K
SECTION AA' C63 F63
PB-99
PB-77
PB-57
C71 F71
PB-5
PB-61
C66 F66 C28K F28
C52 F52
8
300 300
PB-120
A
C24 SECTION AA' H C25 F24C1 C2 F25 1800 F2 F1
3500
+7300
C45L F45 C40 F40
PB-40
7000
C8 F8
PB-85
PB-109
PB-132
2010 PB-70
PB-65
PB-71
PB-71'
2350
PB-52
1200
1430
1430
PB-86
PB-110 PB-93
2460
PB-131
PB-87 PB-111 PB-94
5000
C29 F29
1200
PB-46
PB-102 2850 23 23
H004180
PB-13
PB-102
+300
PB-24
PB-132
600
300 300
PB-2
00
PB-12
C14 F14
C51 F51
(COLUMN SIZE 300 X 450)
C66 F66
7
PB-114
PB-76
C18 PB-61 F18
C17 F17
PB-33
PB-32
C67 F671 C45L F45
PB-18
150
C3 F3
K
PB-133 PB-64
960PB-117
PB-102'
PB-102'
C29 F29
PB-39
F9
2010
PB-65 3130PB-116 PB-8
RE-BARS FOR WAIST SLAB
PB-83
PB-85
PB-86
PB-131 PB-25
2440
B-117' PB-17
L
C44 F44
PB-56
C62 F62
PB-98
PB-97
600 C34 F34
PB-83 PB-82 Column Layout of School Building C9
C10 F10
750
+150
PB-134
4750 C16 F16
C35 F35
PB-117
PB-55
C23 F23
B A
RE-BARS FOR WAIST SLAB
PB-23
PB-47
+300
PB-81
2200
C67 F67
C39 F39
C38
PB-102
PB-121
PB-113
C44C50 F50 F44
F38 2440 PB-75
6
C61 F61 PB-122
PB-82
PB-74
C15 C55 F15 F55
+5300
C22 F22
PB-38
PB-37 47 47
C65 C36 F65 F36
12C
PB-101
C49 F49
PB-96
PB-117'
D
PB-104
+10300
54 54 C21 F21
2150 5000
WAIST SLAB
PB-60 PB-115
PB-112
PB-95
CPB-54
5000
C30 F30 C57 F57
E
5000
PB-118
+15300
PB-66
F
PB-138
C60 F60
PB-123
PB-134
C37 3500 F37
1080
CPB-73
CPB-72
PB-129
+20300
64 64 31 PB-115' 31 RE-BARS FOR
8 8
G
PB-130
+22450
PB-135'
PB-124
C48 F48
PB-53
PB-79
C59 F59
C47 C68 F47 F68 PB-81
H 2850
930
+25300
C43 F43
2880
PB-80 PB-135
C58 F58
2120
J
C72 C55 F72 F55
PB-101
PB-31
PB-88
+28175
C69 F69
+30300
70 70 B-136 C42 F42
K
5
300 300
C73 F73
PB-125
L
4
12
C54 F54
PB-102'
PB-49
11
3
5000
PB-100
2
C57 F57
150
+35300
10
C53 F53
1
4750
PB-126
PB-105
PB-115
PB-117
PB-27
1470
RE-BARS FOR WAIST SLAB
1200
PB-118
PB-115'
TYPE 1 ISOLATED STEPPED FOOTING PLAN
600
1430
1900
C65 F65
PB-104
C64 F64
PB-119
PB-
PB-129
PB-
C63 F63
2440
PB-117'
SECTION AA'
SEM VI
SUBJECT : ARD- WORKING DRAWING
p. 50
K
L
H
J
F
G
WI
450
WI
750
WF1 SF1 FF1 CF2
460
460 1100
WI
1ST FLOOR LVL. + 4050 mm NO.
KINDERGARTEN 9770 X 7140
V1
2ND FLOOR LVL. + 7650mm
750
WF1 SF1 FF1 CF2
1100
V1
WI
3RD FLOOR LVL. + 11250 mm
750
WF1 SF1 FF1 CF2
EVS LAB 9770 X 7140
V1
460
1100
1100
460
460
V1
3450 1350 750
MATHS LAB 9770 X 7140
WI
V1
WI
3450 1350
1100
WF1 SF1 FF1 CF2
450
1100
460
1100
460
BIOLOGY LAB 9770 X 7140
450
1100
1100
460
460
460
V1
V1
1100
700
WF1 SF1 FF1 CF2
WI
V1
V1
460 1100
WI
1100
V1
3450
WI
CANTEEN 7220 X 13270
V1
460
1100 WI
1100
WF1 SF1 FF1 CF2
V1
WI
3450
LIBRARY 7220 X 14700
WI
V1
460
WI
WF1 SF1 FF1 CF2
V1
WI
3450
3450
WI
V1
3450 1350
V1
1100
1100
WI
450
1100
460
1100
460
1100
ART ROOM 7220 X 9700
V1
2250
1100
WF1 SF1 FF1 CF2
WF1 SF1 FF1 CF2
WI
460
MULTIPURPOSE HALL 7220 X 14700
450
1100
460
V1
WI
MUSICWIROOM 7220 X 4850 450
1100
1100
V1
V1
460
1100
V1
V1
460
1100
V1
460
1100
V1
460
460
1100
WI
3450
V1
ALL DIMENSIO ALL DIMENSIO MEASURED ALL LEVELS S BEFORE STAR ALL THE DRA ALL DIMENSIO SPECIFIED OT ALL EXTERNA OTHERWISE M ALL INTERNA PLASTERS AR FOR DOOR, W TILE DROP IS 1
TERRACE FLOOR LVL. + 14850 mm
GIRLS TOILET LOFT SLAB
V1
1100
V1
B
C
3450 1350
BOYS TOILET LOFT SLAB
V1
D
E
PLINTH LVL.+ 450 mm GROUND LVL. ± 0.00 mm
450 THK RANDOM RUBBLE PACKING COMPACTED EARTH
K
L 2
OVER HEAD TANK
3
4
F
G
D
E
5
6
7
8
B
C 9
10
11
2400
7
V1
750
1
D1 D2
7
SIZE OF LIN OPENING HE
2000
2
1125
2
D3
750
2
FD
1125
2
12
640
5250
STAIRCASE HEADROOM
3450
900
2500
1
H
J
2000
W2
NO.
50 THK FLOOR FINISH 150 THK PCC BED
SECTION CC
S SIZE OF OPENING HE
W1
REVISION NU
REVISION DA
LIBRARY 7220 X 14700
3450
WF1 SF1 FF1 CF2
3450 1350
TITLE: SEC
750
NAME: ABH
ROLL NO: 71
SUBJECT : AR
2
3
Section Through School
p. 51_ Working Drawings | Academics
4
5
1ST FLOOR LVL. + 4050 mm
PLINTH LVL.+ 450 mm GROUND LVL. ± 0.00 mm
50 THK FLOOR FINISH 150 THK PCC BED
SECTION BB
1
OWNER:
3450 1350
WF1 SF1 FF1 CF2
DRAWN BY:
PROJECT:PRO 2ND FLOOR LVL. + 7650mm
750
CANTEEN 7220 X 13270 WI
3450
3450
750
2250 3450
WI
SCALE: 1:100
CHECKED BY
750
3450
750
2250 3450
WF1 SF1 FF1 CF2
3RD FLOOR LVL. + 11250 mm
3450 1350
ART ROOM 7220 X 9700
3450
3450
750
2250 3450
750
WF1 SF1 FF1 CF2
3450 1350
MULTIPURPOSE HALL 7220 X 14700
3450
3450
750
2250
TERRACE FLOOR LVL. + 14850 mm
450 THK RANDOM RUBBLE PACKING COMPACTED EARTH
6
7
8
9
10
11
12
LOKM ARCHITE KOPAR
BOYS TOILET 6400 X 4900
CHEMISTRY LAB 9920 X 7300 WF1 SF1 FF1 CF2
WF1 SF1 FF1 CF2
600
3 PANEL SLIDING WINDOW SHUTTER 4MM THICK GLASS
480
750
POWER COATED ALUMINIUM SLIDING WINDOW FRAME
1100
2100
RCC SILL
3RD FLOOR LVL. + 11250 mm
BOYS TOILET 6400 X 4900
230THICK EXTERIOR WALL
WF1 SF1 FF1 CF2
SKIRTING 12MM THICK AND 100MM HIGH
COMPUTER LAB 9920 X 7300 WF1 SF1 FF1 CF2
12MM THICK VETRIFIED TILES AS FLOOR FINISH 1ST FLOOR LVL. + 4050 mm
18MM THICK PLASTER ON EXTERIOR SIDE 900
BOYS TOILET 6400 X 4900
12MM THICK PLASTER ON INTERIOR SIDE
2990
INDOOR SPORTS AREA 9920 X 7300
480
750
1100
2100
WF1 SF1 FF1 CF2
600
2990
3450
WF1 SF1 FF1 CF2
PLINTH LVL. + 450 mm
150 THICK PCC BED 400 MM THICK RANDOM RUBBLE
PB-12
PB-43
GROUND LVL. ± 0.00 mm
COMPACTED EARTH
C15 F15
C2 F2
RCC FOOTING
L WALL SECTION THROUGH WINDOW Wall Section Through Window SCALE 1:25
WALL SECTI
p. 52
1. 2. 3.
break thebreak existing the existing dado on the walls dado on the walls
do not scale this written dimensions notify architect in c if additional informa all written mate original and unpublis duplicated, used or written consent of t
datum point datum point vitrified floor vitrified floor tiles tiles 600x600mm 600x600mm 1 2" tile drop in shower area
1 2"
tile drop in shower area
datum point datum point
break thebreak existing the existing flooring and brick and brick flooring bat coba bat coba
4"
4"
4"x 4" mosaic 4"x 4" tiles mosaic tiles
3'-1"
3'-1"
construction construction of 4" thk of 4" thk brickwork brickwork in cement in + cement + sand mortar sand finished mortar finished with plaster with plaster
1'-3"
1'-3"
construction construction of 4" of 4" high otla high in brickwork otla in brickwork finished with finished mosaic with mosaic tiles tiles
4"
11" 4"
11"
geyser
geyser
supply for supply for wash basin wash basin tap + health tap faucet + health faucet geyser geyser hot and cold hot water andsupply cold water from geyser supply to from geyser to shower shower wc flushing separate wc flushing separate
Civil Layouts for a Residence Interior project (Practice)
052_501 || R0 || 052_501 || R0 S ||CIVIL LAYOUTS
p. 53_ Working Drawings | Professional Practice
shraddha & eamonn's shraddha residence & eamonn's || shraddha residence & eamonn || shraddha || nts ||& on eamonn site |||| 24.03.2 nts || o
1. 2.
Notes do not scale this drawing - follow only written dimensions notify architect in case of any discrepancy or if additional information is requiered all written material herein constitutes original and unpublished work and may not be duplicated, used or disclosed without the written consent of the architect
b'
3.
1'-9" 7" counter carcass in 43" marine ply with dark wood laminate
41 2"
1'-11"
1'-7"
drawers in 21 " marine ply with dust pink pu coat
6"
1'-5"
41 2"
1"thk black granite counter top
offset to conceal bottle trap fitting
drawer profile handle counter carcass in 43" marine ply with dark wood laminate
11"
b
Plan at 2'
10"
drawer
1'-11"
1'
concealed bottle trap fitting 1 2" dia ms grill shelf with black powder coating
1 2"
dia ms grill shelf with black powder coating
Plan at 8"
1'-11"
1'-5"
Front Elevation
Section AA'
a
Details For a Wash Basin Unit
TOILET DETAILS_sections || 052_506 D || R0
shraddha & eamonn's residence || shraddha & eamonn || nts || on site || 24.03.2021
1. 2. 3.
4"
4" thk false ceiling
1'-3"
4" thk false ceiling
4' x 6' dust pink tiles overhead shower fitting
cove light behind mirror
4'-01 2"
6mm thk mirror
6mm thk mirror with ply backing
4" x 4" white mosaic tiles
mirror
towel rod
6" 5'
vitrified floor tiles in requred slope
section aa'
cove light behind mirror 1 2" thk black granite
2'-7"
2'-7"
3'
6" 2'-11"
3'-51 2"
3'-1"
1 2" thk black granite slab under basin counter with drawers SS wash basin counter unit wall hung wc
2'-111 2"
8' 7'-6"
4' x 6' dust pink tiles
6'-101 2"
12mm toughened glass door hand shower + tap fitting
Notes do not scale this drawing - follow only written dimensions notify architect in case of any discrepancy or if additional information is requiered all written material herein constitutes original and unpublished work and may not be duplicated, used or disclosed without the written consent of the architect
vitrified floor tiles in requred slope
section bb' a
Section through Toilets TOILET DETAILS_sections || 052_506 B || R0
shraddha & eamonn's residence || shraddha & eamonn || nts || on site || 24.03.2021
p. 54
Siddhant Tikkoo and Nikita D'Silva || 478 Pierreville, 13th road, Chembur, Mumbai - 400071, India || info@standdesign.in || (+91)9920035691, (+91)9920475565
1'-8"
counter in 1" dia ms frame with black powder coating
8"
1'-5"
counter in 1" dia ms frame with black powder coating
Siddhant Tikkoo and Nikita D'Silva || 478 Pierreville, 13th road, Chembur, Mumbai - 400071, India || info@standdesign.in || (+91)9920035691, (+91)9920475565
drawers in 21 " marine ply with dust pink pu coat
1'-11"
A
1200 5900
TIOS
D2
TOILET
1.57M X 2.7M
D1 D1
BEDROOM 1
LIVING
4.2M X 2.6M
3.5M X 3.3M
4.2M X 2.6M
W1
W1
W3
REFUGE AREA
5900
(b)
3400 (a)
(a)
5400
2180
W2
DINING
DINING
3.35M X 2.7M
3.35M X 2.7M
19900 5400 KITCHEN
W1
3.2M X 2.5M
2
W2
12 13 14 15 16 17 18 19 20
09
04
16
03
17
02
18
01
19
DN W2
20
DINING
3700
V
2.85M X 1.5M
MASTER BEDROOM 4.6M X 3.6M
W3
2100
D1
3.5M X 3.3M
W1
W
4.6M X 3.6M
DINING
W
(f)
740 370 KITCHEN
32003.2M X 2.5M
BALCON
REF 1.8M X 4.7
DINING
W
10200
SCALE
370
3200
W1
4.2M X 2.6M
B
4.2M X 2.6M
REF 3.5M XA
BEDRO
TYPICAL FLOOR PLAN AREA DIAGRAM 3.5M X 3.3M STANDARD DEDUCTIONS :4.03 SQ.M. 7.03 SQ.M. V V 63.8 SQ.M. TOILET c. 3.20 X 19.9 X 2 = TOILET 92.25 SQ.M.1.7M X 2.4M D1 = d. 10.2 X 9.10 1.7M X 2.4M BUILT-UP AREA e. 2.10 X 2.40 = STATEMENT : TYPICAL 5.04 SQ.M.FLOOR D2 D2 f. 3.20 X 3.70 X 2 = V11.77 VSQ.M. BEDROOM 2 W3AREA OF BLOCK [ABCD] = 16.56 X 38.25 = 633.42 SQ.M. 3.5M X 3.3M D1 TOILET 266.52 TOILET SQ.M. TOTAL DEDUCTIONS = 2.85M X 1.5M STANDARD DEDUCTIONSD2:- 2.85M X 1.5M D2
B
W3
W1
W2
W2
a. 1.20 X = 3.40 X 2=- 266.52 = NET AREA 633.42 b. 2.40 X 3.40 = c. 3.20 X 19.9 X 2 = d. 10.2 X 9.10 = BALCONY e. 2.10 X 2.40W= MASTER BEDROOM 1.8M XX3.6M3.70 X 2 = f. 3.20 4.6M X 3.6M
BALCONY 1.8M X 3.6M
A
W1
KITCHEN
SCALE
266.52 SQ.M.
S
a b c d
D1
BEDRO B
D1
63.8 SQ.M. 92.25 SQ.M. 5.04 SQ.M. MASTER BEDROOM 11.77 SQ.M. 4.6M X 3.6M
3.5M X
W1
W
A
SN
a b
BALCONc
1.8M X 3.6d
W3
D
N
366.9 SQ.M.
REFUGE FLOOR PLAN
3.2M X 2.5M
D1
4.03 SQ.M. 366.9 SQ.M. 7.03 SQ.M.
4
TOTAL DEDUCTIONS = W3
3200
24
W1
D1
(f)3.35M X 2.7M
3.35M X 2.7M
BEDROOM 1
W3
1-6, 8-10 BUILT UP AREA- 368SQMT Scale 1:100
A
7TH FLOOR
Built up Area Statement Scale 1:100 D1
BALCONY
4
1.8M X 4.7M
W1
5800 W2
W1 BALCONY 1.8M X 4.7M
BEDROOM 1
D
DINING
3.35M X 2.7M
KITCHEN
3.2M X 2.5M
1ST FLOOR
2ND FLOOR 3RD FLOOR
D1 LIVING
4TH FLOOR
5TH FLOOR 4.2M X 2.6M
BALCONY AREA STATEMENT PERMISSIBLE BALC.
FLOORS
ENTRY LOBBY
W
5700
p.3200 55_ Municipal Drawings | Academics
(f)
1.35M X 3.35M
H
F.D.
ENTRY LOBBY
Typical Floor Plan
D
1.35M X 3.35M
3.2M X 2.5M
NET AREA = 633.42 - 266.52 =
TYPICAL FLOOR PLAN
3
D
SCALE 1 a. : 200 1.20 X 3.40 X 2= D1 = b. 2.40 X 3.40 B
BEDROOM 2
D2
MASTER BEDROOM
W3
W3
D1
D1
TOILET
2.85M X 1.5M
4
(e) 10200
KITCHEN
W1
3200
D1
D2
740
24 540
PASSAGE
PASSAGE
1.2M X 2.55M
TOILET
V
DN W2
20
BUILT-UP AREA STATEMENT : TYPICAL FLOOR W2 W1
W2
BEDROOM 1
1.7M X 2.4M
TOILET
D2
W
V
1.7M X 2.4M
D1
W1
1.8M X 3.6M
PASSAGE
20 M WIDE ROAD
3.5M X 3.3M
BALCONY
TOILET
D2
BEDROOM 2
W2
SCALE 1 : 200
3.5M X 3.3M
D1
B W3
4.2M X 2.6M
V
18 19
2100 LIVING AREA OF BLOCK [ABCD] = 16.56 X 38.25 = 633.42LIVING SQ.M.
3.5M X 3.3M
D1
17
01
TYPICAL PLAN AREA DIAGRAM Typical FloorFLOOR Area Diagram
LIVING
4.2M X 2.6M
3800
16
02
1.8M X 4.7M
W
W1
BEDROOM 1
3200 BALCONY
BALCONY
540
2.4M X 1.5M
ENTRY LOBBY
D1
W1
1.2M X 2.55M
W3
15
LIFT WELL
(f)
2400
W1
3.35M X 2.7M
LIVING
14
05
(e)
E.D.
KITCHEN
DINING
06
FIRE STAIRCASE
LIFT WELL
7400 3700
3.2M X 2.5M
3.35M X 2.7M
12 13
PASSAGE
W2
FD
11
08 07
UP
3M X 9M
1.8M X 1.5M
1.8M X 4.7M
W
LOBBY
7400 2400 5400
1.8M X 4.7M
Y
09
03
F.D.
1.35M X 3.35M
1.35M X 3.35M
ENTRY LOBBY
D
ENTRY LOBBY
3
D
(c)
04
2.4M X 1.5M
4
(d)
10
38200
LIFT WELL
E.D.
D1
15
10 09 08 07 06 05 04 03 02 01
FIRE STAIRCASE
1.8M X 1.5M
BALCONY
14
05
W2
12 13 14 15 16 17 18 19 20
1.35M X 3.35M
FD
LIFT WELL
KITCHEN
06
UP
3M X 9M
3.2M X 2.5M
12 13
(c) W3
19900 5400
11
08 07
STAIRCASE 11
1.2M X 2.55M
LOBBY
W1
9100
10
1.2M X 2.55M
10 09 08 07 06 05 04 03 02 01
2180 3800
38200
DN
DN
1
UP
20 M WIDE ROAD
W3
(c)
D
D
STAIRCASE 11
(d)
UP
3.2M X 2.5M
(c)
ENTRY LOBBY
KITCHEN
REFUGE AREA
9100
1.8M X 4.7M
D1
1.35M X 3.35M
W1
BALCONY
1.35M X 3.35M
D1
ENTRY LOBBY
1.35M X 3.35M
1.8M X 4.7M
ENTRY LOBBY
BALCONY
W
H
H
1200 16600 2400
3800 W
. MT.
H
(a)
1200 3800 REFUGE AREA 5900
D1
D2
(b)
3400 (a)
D1
TOILET
2.85M X 1.5M
LIVING
3.5M X 3.3M
W2
1.57M X 2.7M
TOILET D2 2.85M X 1.5M
BEDROOM 1
W
3.7M X 3.3M
TOILET
V
V
MASTER BEDROOM
1.2M X 3.2M
3.7M X 3.3M
CAR NG
W3
V
V D2
MASTER BEDROOM
BALCONY
1.2M X 3.2M
BALCONY
W
5900
W2
W2
-----
A
1200 16600 2400
55.03 sq.mt.
PROPOSED BALC. 54 sq.mt.
55.03 sq.mt.
54 sq.mt.
55.03 sq.mt.
54 sq.mt.
55.03 sq.mt.
54 sq.mt.
55.03 sq.mt.
54 sq.mt.
EXCE
1.2M X 3.2M
BALCONY
VENTILATION STATEMENT LIVING sq.mt.AND 17.95 LIGHT 18.20 sq.mt. DINING 4.2M X 2.6M W AREA OF BLOCK [ABCD] = 16.56 X 38.25 633.42OPENING SQ.M. SIZE(in m) CARPET BEDROOM 1 C.A/6 AREA= PROV ROOM 3.35M X 2.7M W3 18.20 sq.mt. 17.95 sq.mt. 3.9
W
2.3
W1
22.2
PASSAGE
1.2M X 2.55M
BEDROOM sq.mt. 17.95 BEDROOM 1
W3
266.52 SQ.M.
5TH FLOOR
3.5M X 3.3M TOTAL
1.9 4.2M X 2.6M sq.mt. 18.20 11.5
3.5 X 3.3
DEDUCTIONS =
BEDROOM 2 sq.mt. 17.95 3.5M X 3.3M
W3
7.1
D2
N E
LI
EY
E1 :10 0
3.7 X 3.3 18.2012.21 2.0 sq.mt. LIGHT AND VENTILATION ST 1.57 X 2.7 4.23 0.7 MASTER TOILET sq.mt. 6TH FLOOR 17.95B sq.mt. SIZE(in m)18.20 CARPET C.A/6 ROOM 13
14
COMMON TOILET
LI EY16
2.85 X 1.5
LL
A
V
17 4.27
0.7
V ROOM 22.2 3.7 sq.mt. 7TH FLOOR LIVING 19 3.5XX5.8 3.3 18.20 11.5 1.9 17.95 sq.mt. 4.2 BEDROOM D2
MASTER BEDROOM
LOBBY
KITCHEN
8TH FLOOR TOILET
3.7M X 3.3M
X 9M 17.953Msq.mt.
MASTER V BEDROOM
1.57M X 2.7M
:10 0
18
DN
20
3.2 X 2.5 8 1.3 SLOPE 1:100 W FD 3.7 X 3.3FIRE STAIRCASE 12.21 2.03
18.20 sq.mt.
sq.mt.0.7 9TH FLOOR MASTER 17.95 TOILETsq.mt. 1.57 X 2.718.204.23 D1 TOILET
D1
2.85M X 1.5M
D2 COMMON TOILET 4.27 sq.mt.0.7 10TH FLOOR LIFT WELL 17.95 sq.mt. 2.85 X 1.518.20 LIFT WELL FLOOR PLAN
1.8MBEDROOM X 1.5M
1 SCALE 1 :W3 200 BEDROOMTOTAL
W1, W2, W3
W2
4.2M X 2.6M
1.9
397.65 sq.mt.
200MM DIA RAIN WATER PIPE
E.D.
W1
2.4M X11.5 1.5M
3.5 X 3.3
LIVING
3.5M X 3.3M
V424.16 SQ.M.
18.20 sq.mt.
W
3BHK UNIT
5.7 SQ.M. 12.21 2.03 360.84 W, W2 BEDROOM W2MASTER V17.37 SQ.M. b. W1 3.20 X 5.40 1.57 X 2X 2.7 = 4.23 0.7 0.8 V MASTER TOILET TOILET sq.mt. 17.95 5.04 SQ.M. c. 2.10 X 2.40 = 18.20 sq.mt. D1 2.85 4.27X 2.4M 0.7 0.8 SQ.M. V COMMON TOILET 11.77 d. 3.20 X 3.70 X 2X=1.5 1.7M LIVING
4TH FLOOR
12
MASTER17.95 BEDROOM sq.mt.
5TH FLOOR
E1 :10 0
3.7
1.3 sq.mt. = X18.20 3.7 3.3
4.2 X 5.8
STANDARD DEDUCTIONS :-8 3.2 X 2.5
KITCHEN sq.mt. 17.95 a. 16.6 X 21.8 D1
3.7
100MM TH W/P TREATMENT OPEN TO SKY
OP
4.03 SQ.M. 7.03 SQ.M. 2ND FLOOR 63.8 SQ.M. 92.25 SQ.M. 3RD FLOOR 5.04 SQ.M. 11.77 SQ.M.
22.2
18.208sq.mt. 11 1.3
SLOPE 1:100
3.5M X 3.3M LIVING ROOM
3.2 X 2.5
CARPET C.A/ sq.mt.W2 18.20
SL
1ST FLOOR
V A LL
SLOPE 1:100
W2
1.8M X 4.7M BUILT-UP AREA STATEMENT : REFUGE FLOOR
GROUND FLOOR
sq.mt.
KITCHEN17.95
SIZE(in m) 4.2 X 5.8
15 NE
D1 ST FIRE STAIRCASE STAIRCASE W2 BALCONY W1
X 38.25 = 633.42 SQ.M.
4TH FLOOR
SLOPE 1:100
AREA
W3
1.35M X 3.35M
STATEMENT
ENTRY LOBBY
DINING W KITCHEN 3.35M X 2.7M 3.2M X 2.5M FOR W1 STAIRCASE
LIVING ROOM
STAIRCASE
D
REFUGE FLOOR PLAN AREA DIAGRAM SCALE 1 : 200
SL OP
3RD FLOOR ROOM 17.95 sq.mt.
SL OP E1
209.26 SQ.M.
DN
NET AREA = 633.42 424.16 = 1.8M X- 4.7M
18.20 sq.mt. 17.95 sq.mt. SLOPE 1:100 D VENTILATION LIGHT AND ST 17.95 sq.mt. 18.20 sq.mt. RID
SLOPE 1:100
397.65 sq.mt. 2ND FLOOR
3200
4
2100
BALCONY
366.9 SQ.M.
sq.mt.
10200 424.16 SQ.M. D1
TOTAL
1.35M X 3.35M
W1
FLOOR 18.20 sq.mt.
1ST 17.95 sq.mt.
(d) FLOOR 10TH
ENTRY LOBBY
3909 sq.mt.
TOTAL DEDUCTIONS3200 =
4 D NT : TYPICAL FLOOR FLOOR
SLOPE 1:10
F.D.
LIGHT AND VENTILATION STATEMENT
COMMON TOILET
3.2 X 2.5
8
3.7 X 3.3
12.21
3. 5.7 2.03 BEDROOM
1.57 X 2.7
4.23
0.7
2.85 X 1.5
4.27
3.5 X 3.3 BEDROOM 3BHK UNIT FLOOR PLAN
B 11.5
4.2 X 5.8
W23.2 X 2.5W1
LIVING
CARPET C.A/6 AREA PROV 4.2M X 2.6M 22.2 3.7 3.9
0
LL EY V A
OPENING
W
8
1.3
2.3
W1
MASTER BEDROOM
4.6 X 3.6
16.56
2.76
5.7
W, W2
MASTER TOILET
2.85 X 1.5
4.27
0.7
0.8
V
COMMON TOILET
1.7 X 2.4
4.08 W
DINING
3.35M 0.7 X 2.7M 0.8
V
BEDROOM 1
3.5BALCONY X 3.3 1.8M X 4.7M 3.5 X 3.3
11.5
1.9
7.1
11.5
1.9
D1
KITCHEN
3.2M X 2.5M
1.35M X 3.35M
W1
7.1
W1, W2, W3
ENTRY LOBBY
BEDROOM 2
W1, W2, W3
D
2BHK 2BHK Unit Floor Plan UNIT FLOOR PLAN SCALE 1 : 100
CARPET AREA STATEMENT
200MM DIA RAIN WATER PIPE
(INCLUDING BALCONY & CUPBOARD) FLAT NO. CARPET AREA (SQ.MT.)
EY
0
W1
KITCHEN
3.2M X 2.5M
SLOPE 1:100
SLOPE 1:100
2BHK UNIT FLOOR SCALE 1 : 100
CHAJJA BELOW
CARPET AREA STATEMENT A
(INCLUDING BALCONY & CUPBO REFUGE FLOOR PLAN FLAT NO. CARPET AREA (SQ.M
2BHK Unit Carpet Area diagram
CARPET AREA SCALE 1 : 200
Scale 1:100
1.
80.77 SQ.M.
2.
80.77 SQ.M.
3.
2500
SIZE(in m) 3.5M X 3.3M
D1
SLOPE 1:100
D2 2.85M X 1.5M
BALCONY 1.8M X 4.7M
TOILET
SLOPE 1:100
1.2M X 3.2M
SLOPE 1:100
V
DINING
0
LIVING ROOM W1, W2, W3 KITCHEN
BEDROOM 1
L
3.35M X 2.7M
W
:10
V
W3
LL
EY
W1
E1
0.8
A
LIGHT AND VENTILATION STATEMENT ROOM
A
LL
OP
V
V
W2
SL
0.8
4.2M X 2.
E
N LI
E
W, W2
CA
SCA LIVING
3.5M X 3.3M
W1, W2,EYW3 V
BEDROOM 1
N
5.7
D1
7.1
W3
LI
W1
106.35 SQ.M.
EY
2.3
W1, W2, W3
3.5 X 3.3
LL
W
7.1 7.1
OPEN TO SKY
A
3.9
1.57M X 2.7M
D1
1.9 1.9
W, W2
SLOPE 1:100
TOILET
3BHK UNIT FLOOR PLAN
OPENING SCALE 1 : 200
AREA PROV
7.1
3.7M X 3.3M
1.9
V
11.5
W1 100MM TH W/P 3.5TREATMENT X 3.3
2
V
0.8
V
TEMENT
V D2
MASTER BEDROOM
4. 0.8
0.8
0.7
106.35 SQ.M. 11.5
1
0.7 0.8 V Carpet Area Statement
SCALE 1 :W2 100
W
1.3 BEDROOM
0.7
D1 TOIL V X D1 D2 2.85M 100MM TH W/P W1, W2, W3 OPEN TO
80.77 SQ.M.
4.08
N E
MASTER BEDROOM W3 MASTER TOILET
2. 2.3
1.7 X 2.4
LI
SCALE 1 : 100 KITCHEN
80.77 SQ.M.
1.
3.7 3.9 TOILET W COMMON
RIDGE
4.6M X 3.6M 3BHK UNIT FLOOR PLAN SCALE 1 : 200
CARPET AREA (SQ.MT.) FLAT NO. C.A/6 AREA PROV 2.85 X 1.5 4.27 MASTER TOILET OPENING
1000
V
:10
0.8
SIZE(in m) CARPET ROOM W7.1 W1, W2, W3 MASTER BEDROOM Floor Plan 4.2 X 5.8 AREA 22.2 LIVING ROOM 1.8M 11.5 X 3.6M 1.9 7.1 CARPET W1, W2, W3
E1
3BHK Unit 3.5 X 3.3
0.7
OP
BEDROOM 2
4.08
11.5 1.9 BALCONY
SL
3.5 X 3.3
00
1.7 X 2.4
1:1
COMMON TOILET
BEDROOM 1
SL OP E
1.35M X 3.35M
E
V
N
A
LI
LL
1.2M X 3.2M
BALCONY
EY
LL
LI
A
D
N
V
E 2500
SL
RIDGE
OP
E1
:10
1.35M X 3.35M
PASSAGE
ENTRY LOBBY
0
:10
E1
OP
SLOPE 1:100
4
SL
V
1.2M X 2.55M
D1 DINING D SLOPE 1:100 SLOPE 1:100 3.35MPLAN X 2.7M 3BHK W SIZE(in NET AREA D1 - 424.16sq.mt. = TOILET 209.26 SQ.M.3BHK REFU UnitUNIT CarpetFLOOR Area diagram m) CARPET C.A/6 AREA PROV OPENING 366.9 6TH SQ.M. FLOOR ROOM sq.mt. = 633.4218.20 17.95 2.85M X 1.5M V D2 BALCONY SCALE 1 : 200 200MM DIA RAIN WATER PIPE 3BHK UNIT FLOOR PLAN TOILET W1 4.2 X 5.8 22.2 3.7 3.9 W LIVING ROOM W2 1.8M X 4.7M SCALE 1 : 200 1.7M X 2.4M sq.mt. 18.20 D1 7TH FLOOR 17.95 sq.mt.D1 3.2 X 2.5 8 1.3 2.3 W1 KITCHEN D2 KITCHEN 5.7 4.6 X 3.6 16.56 2.76 8TH FLOOR W, W2 MASTER BEDROOM 17.95 sq.mt. 18.20 sq.mt. V 3.2M X 2.5M 2 LIGHT ANDW1VENTILATION STATEMENT LIGHT AND VENTILATION 150MM TH W3 BEDROOMSTATEMENT 2.85 X 1.5 4.27 0.7 0.8 V MASTER TOILET 3.5M X 3.3M W D1 18.20 sq.mt. BALCONY WATER P FLOOR 9TH W2 sq.mt. 17.95 MASTER BEDROOM SIZE(in m) OPENING CARPET C.A/6 AREA PROV ROOM TOILET SIZE(in PROV VOPENING 1.8M X 3.6M ROOM 1.7 X 2.4m) CARPET 4.08 D C.A/6 0.7 AREA0.8 COMMON TOILET 3.6M X 1.5M 4.2 X 5.8 22.2 3.7 3.9 W 4.6M LIVING ROOM 2/3 OF E D2 X 2.85M 2BHK UNIT FLOOR22.2 PLAN3.7 18.20 sq.mt. FLOOR 3.2 X 2.5 W2 10TH W11.3 4.2 3.9 W LIVING ROOM sq.mt. 17.95 3.5XX5.8 3.3 11.5 1.9W 7.1 W1, W2, W3 BEDROOM 1 8 2.3 W1 KITCHEN WATER SCALE 1 : 100 D2 MASTER BEDROOM 5.7 16.56 2.76 3.2 811.5 1.3 2.3 W, W2 MASTER BEDROOM 4.6 X 3.6 W1 KITCHEN 3.5XX2.5 3.3 1.9 7.1 CA W1, W2, W3 BEDROOM 2 3.7M X 3.3M W3 AND TOTAL sq.mt.VENTILATION STATEMENT 397.65 LIGHT CARPET AREA STATEMENT TOILET 2.85 X 1.5 4.27 0.7 0.8 V MASTER TOILET RIDGE SCA 5.7 4.6 X 3.6 16.56 2.76 (INCLUDING BALCONY & CUPBOARD) W, W2 MASTER BEDROOM 1.57M X 2.7M
BALCONY
1.35M X 3.35M
360.84 SQ.M. KITCHEN 17.37 SQ.M. 5.04XSQ.M. 3.2M 2.5M 11.77 SQ.M. 3511.36
209.26 SQ.M. sq.mt. 18.20
SLOPE 1:100
3200
(d)
00 1:1
266.52 SQ.M.
3700
a. 16.6 X 21.8 = X2 = c. 2.10 X 2.40 = d. 3.20 X 3.70 X 2 = NET B.U.A.
TOTAL b. 3.20 X 5.40
8TH FLOOR 17.95 sq.mt. 18.20 sq.mt. NET AREA = 633.42 17.95 - 424.16sq.mt. = 366.9 SQ.M. FLOOR GROUND 18.20 sq.mt. FLOOR 9TH 200MM DIA RAIN WATER PIPE 17.95 sq.mt.
D
397.65 sq.mt.
STAIRCASE AREA STANDARD DEDUCTIONS :-
(f)
4
=
00 1:1 PE LO
4.03 SQ.M. 7.03 SQ.M. 63.8 SQ.M. 92.25 SQ.M. 5.04 SQ.M. 11.77 SQ.M.
AREA DIAGRAM
V
0 sq.mt.
NET AREA = 633.42 266.52 AREA OF BLOCK [ABCD] = 16.56 X 38.25 = 633.42 -SQ.M.
200MM DIA RAIN WATER PIPE
E OP
00
00
EXCESS BALCONY
sq.mt. 18.20 DEDUCTIONS 424.16 STAIRCA SQ.M. TOTAL = ST FIRE STAIRCASE FLOOR
SLOPE 1:100S
BUILT-UP AREA STATEMENT : REFUGE FLOOR
X 38.25 = 633.42 SQ.M.
17.95 sq.mt.
SL
7TH FLOOR 266.52 SQ.M.
E N
366.9 sq.mt. 9TH FLOOR TOTAL DEDUCTIONS =
17.95 sq.mt.
LI
NT : TYPICAL FLOOR
17.95 sq.mt.
a.NET 16.6 X 21.8 = - 424.16 = 360.84 SQ.M. AREA = 633.42 209.26 SQ.M. sq.mt. 18.20 17.37 SQ.M. b. 3.20 X 5.40 X 2 = 5.04 SQ.M. c. 18.20 2.10 X 2.40 = sq.mt. STATEMENT FOR STAIRCASE 11.77 SQ.M. AREA SLOPE 1:1 d. 3.20 X 3.70 X 2 = 18.20 sq.mt.
17.95 sq.mt.
EY
f. 3.20 X 3.70366.9 X 2 = sq.mt. 9TH FLOOR (c) 2400
AREA DIAGRAM
LL A V
)
7.03 SQ.M. 63.8 SQ.M. FLOOR 4TH 366.9 SQ.M. 92.25 SQ.M. FLOOR 5TH 5.04 SQ.M. 11.77 SQ.M. 6TH FLOOR
2.40 = 209.26 sq.mt. 2100X 3.40 7TH FLOOR b. c.NET 3.20 X 19.9 X 2 =- 266.52 = AREA = 633.42 REFUGE 7400 FLOORd.PLAN 10.2 XAREA 9.10 =DIAGRAM 366.9 sq.mt. 8TH FLOOR e. 2.10 X 2.40 = SCALE 1 : 200
00
150MM THICK ROOF 4. WATER PROOFING
106.35 SQ.M
106.35 SQ.M
2/3 OF ENTIRE OHT TANK WATER p. 56
thank you abhidevt01@gmail.com