EXISTINGRAISEDPLATFORM
TITLE:MASTER PLAN & DETAILS
DWG NO:A-002
DRAWN BY:ABHISHEK
CHECKED
GOPAL
BY:
SCALE: N.T.S
REVISIONS: M S P H C ABM
Architecture Interior Design Engineering RCC.CONSULTANT MComplete MEP Design Solutions MEP CONSULTANT DRAWING
CONSULTANT ARCHITECTS & ENGINEERS CLIENT JUZER A TINWALA CONSULTING STRUCTURAL ENGINEER 1 MASTER PLAN 2 DIVING BOARD DETAIL 3 DETAIL A
PROJECT TITTLE EXISTING DAIS VOLLEY BALL COURT RECREATION AND OUTDOOR EVENTS AREA ROAD PUMP ROOM SUCTION TANK GENTS WASHROOM LOBBY LADIES WASHROOM PORCH ENTRANCE HALL DRESSING ROOM KITCHEN RECEPTION INDOOR GAMES FILTRATION PLANT ELECTRICAL METER TOILET SWIMMING POOL 25.0X14.5 M POOL SIDE VIP PARKING MAIN GATE CHESS BOARD CHESS BOARD TABLE TABLE TENNIS WOODENBENCH WOODENBENCH WADROBE B B' UP UP UP A A' C' C
ARCHITECTS
STATUS:FOR TENDER
ELEVATION PLAN SCOPE OF WORK: AREAS TOTAL AREA OF PLOT = 2694.43 SQ.M TOTAL STRUCTURAL REPAIRS AND RENOVATION = 275.50 SQ.M IN BUILT UP AREA TOTAL INTERNAL RENOVATION IN CARPET AREA = 239.50 SQ.M TOTAL RENOVATION OF SWIMMING POOL = 365.00 SQ.M RENOVATION AND REFURBISHMENT OF POOL DECK = 420.00 SQ.M RENOVATION AND REFURBISHMENT OF PARKING AREA = 353.00 SQ.M RENOVATION AND REFURBISHMENT OF RECREATION AREA = 766.00 SQ.M RENOVATION AND NEW LANDSCAPE AREA = 130.00 SQ.M REPAIRS AND RENOVATION OF COMPOUND WALL (80%) WITH NEW ENTRANCE GATE = 160.00 R.M
REVISIONS:
CONSULTANT ARCHITECTS & ENGINEERS CLIENT JUZER A TINWALA
PROJECT TITTLE
REFURBISHMENT OF POLICE SWIMMING POOL CLUB AT WORLI,MUMBAI
CONSULTING STRUCTURAL ENGINEER
TITLE: ELEVATIONS & COMPOUND WALL DETAILS
DWG NO:A-004
DRAWN BY:ABHISHEK
SCALE:N.T.S
GOPAL
CHECKED BY:
M S P H C
Architecture Interior Design Engineering
M W M@ Complete MEP Design Solutions MEP
ABM ARCHITECTS
RCC.CONSULTANT
CONSULTANT
DRAWING STATUS:FOR TENDER
FRONT ELEVATION SCALE :1:50
ELEVATION
A' A
1
1 POOL SIDE
4 COMPOUND WALL DETAILS 3 NORTH ELEVATION
POOL SIDE
LOBBY
ENTRANCE HALL & RECEPTION
PORCH
FRONT SIDE
1 SECTION C-C'
2 TYPICAL END WALL SECTION
REVISIONS: M
CLIENT
PROJECT TITTLE
REFURBISHMENT OF POLICE SWIMMING POOL CLUB AT WORLI,MUMBAI
3 KITCHEN END WALL SECTION
MEP CONSULTANT
RCC.CONSULTANT
JUZER A TINWALA
CONSULTING STRUCTURAL ENGINEER
CONSULTANT ARCHITECTS & ENGINEERS
ABM ARCHITECTS
TITLE: SECTIONS
DWG NO:A-007
DRAWN BY:ABHISHEK
DRAWING STATUS:FOR TENDER
SCALE:NT.S
CHECKED BY: GOPAL
S P H C
Architecture Interior Design Engineering
MComplete MEP Design Solutions
WALL TYPE LEGEND: 200 MM BLOCK WALL
230 MM BRICK WALL 150 MM BLOCK WALL FIXTURE LEGEND:
CEILING FAN 4' WIDE SURFACE MOUNTED LIGHT 600X600 MM LED TILE LIGHT
WALL MOUNTED
TUBE LIGHT 4' WIDE WALL MOUNTED LIGHT
FULLY RESSCED CEILING SPOT LIGHT
SECTION B-B'
REFURBISHMENT OF POLICE SWIMMING POOL CLUB AT WORLI,MUMBAI
TITLE:REFLECTED CEILING LAYOUT & SECTIONS
DWG NO:A-005
SCALE: N.T.S
CHECKED BY: GOPAL
GENTS WASHROOM LOBBY LADIES WASHROOM PORCH TOILET ENTRANCE HALL DRESSING ROOM KITCHEN RECEPTION INDOOR GAMES ROOM ELECTRICAL METER STORAGE UNIT TILL TOP
M S P H C ABM ARCHITECTS Architecture Interior Design Engineering
MComplete MEP Design Solutions MEP CONSULTANT DRAWING STATUS:FOR TENDER
ARCHITECTS & ENGINEERS CLIENT JUZER A TINWALA CONSULTING STRUCTURAL ENGINEER
DRAWN BY:ABHISHEK REVISIONS:
RCC.CONSULTANT
CONSULTANT
PROJECT TITTLE 1 REFLECTED CEILING LAYOUT 2 SECTION B-B'
EXISTING PUMP ROOM EXISTING SUCTION TANK GENTS WASHROOM LOBBY SHOWER W.C SHOWERSHOWER W.C SHOWER W.C SHOWER W.C LADIES WASHROOM MAIN ENTRANCE PORCH ENTRANCE HALL DRESSING ROOM KITCHEN RECEPTION INDOOR GAMES FILTRATION PLANT ELECTRICAL METER RAMP TOILET POOL SIDE SHOWER SHOE RACK SHOE RACK CHESS BOARD TABLE CHESS BOARD TABLE TABLE TENNIS CAROM BOARD WOODENBENCH WOODENBENCH FULL HEIGHT STORAGE UNIT WADROBE DRESSING TABLE GRANITE BENCH GRANITE BENCH GRANITE BENCH GRANITE BENCH B B' UP UP A A' C' GRANITE BENCH C' WALL TYPE LEGEND: 200 MM BLOCK WALL 230 MM BRICK WALL 150 MM BLOCK WALL CHECKED BY: GOPAL SCALE:N.T.S DWG NO:A-003 TITLE:FLOOR PLAN & SECTIONS DRAWN BY:ABHISHEK REVISIONS: M S P H C REFURBISHMENT OF POLICE SWIMMING POOL CLUB AT WORLI,MUMBAI ABM ARCHITECTS Architecture Interior Design Engineering RCC.CONSULTANT MComplete MEP Design Solutions MEP CONSULTANT DRAWING STATUS:FOR TENDER CONSULTANT ARCHITECTS & ENGINEERS CLIENT PROJECT TITTLE JUZER A TINWALA CONSULTING STRUCTURAL ENGINEER 1 FLOOR PLAN 2 SECTION A-A'
EXISTING OVERHEAD TANK FILTRATION PLANT PUMP ROOM SUCTION TANK CHECKED BY: GOPAL SCALE:N.T.S DWG NO:A-006 TITLE:ROOF PLAN DRAWN BY:ABHISHEK REVISIONS: M S P H C REFURBISHMENT OF POLICE SWIMMING POOL CLUB AT WORLI,MUMBAI ABM ARCHITECTS Architecture Interior Design Engineering RCC.CONSULTANT MComplete MEP Design Solutions MEP CONSULTANT DRAWING STATUS:FOR TENDER CONSULTANT ARCHITECTS & ENGINEERS CLIENT PROJECT TITTLE JUZER A TINWALA CONSULTING STRUCTURAL ENGINEER 1 ROOF PLAN
REVISIONS:
TITLE: WASHROOM DETAILS:WALL ELEVATIONS
DWG NO:A-009
PROJECT TITTLE
REFURBISHMENT OF POLICE SWIMMING POOL CLUB AT WORLI,MUMBAI
DRAWN BY:ABHISHEK
SCALE:N.T.S
CHECKED BY: GOPAL
WALL TYPE LEGEND: 200 MM BLOCK WALL 230 MM BRICK WALL 150 MM BLOCK WALL
M S P H C
Architecture Interior
M W M@ m Complete MEP Design Solutions MEP CONSULTANT
ABM ARCHITECTS
Design Engineering RCC.CONSULTANT
DRAWING STATUS:FOR TENDER CONSULTANT ARCHITECTS & ENGINEERS CLIENT JUZER A TINWALA CONSULTING STRUCTURAL ENGINEER
1
2 ELEVATION:GENTS WASHROOM
ELEVATION:LADIES WASHROOM
3 WASHBASIN DETAIL
PROJECT TITTLE 1 BLOCKWORK LAYOUT
GENTS WASHROOM LOBBY SHOWER W.C SHOWERSHOWER W.C SHOWER W.C SHOWER W.C LADIES WASHROOM POOL SIDE SHOWER GENTS WASHROOM LOBBY SHOWER W.C SHOWERSHOWER W.C SHOWER W.C SHOWER W.C START TILE START TILE LADIES WASHROOM POOL SIDE SHOWER
TYPE LEGEND: 200 MM BLOCK WALL 230 MM BRICK WALL 150 MM BLOCK WALL
BY: GOPAL
BY:ABHISHEK
M S P H C ABM ARCHITECTS Architecture Interior Design Engineering RCC.CONSULTANT MComplete MEP Design Solutions MEP CONSULTANT DRAWING STATUS:FOR TENDER CONSULTANT ARCHITECTS & ENGINEERS CLIENT JUZER A TINWALA CONSULTING STRUCTURAL ENGINEER
WALL
CHECKED
SCALE:N.T.S DWG:A-008 TITLE:WASHROOM DETAILS:LAYOUTS DRAWN
REVISIONS:
REFURBISHMENT OF POLICE SWIMMING POOL CLUB AT WORLI,MUMBAI 2 TILING LAYOUT
REVISIONS:
ARCHITECTS
5 VENTILATOR DETAILS:V3 6 WINDOW DETAILS:W3
TITLE:WINDOW & VENTILATOR DETAILS
DWG:A-010
SCALE:N.T.S
DRAWING STATUS:FOR TENDER
BY:
CHECKED
GOPAL
M S P H C ABM
Architecture Interior Design Engineering RCC.CONSULTANT MComplete MEP Design Solutions MEP CONSULTANT
CONSULTANT
&
DRAWN BY:ABHISHEK CLIENT JUZER A TINWALA CONSULTING STRUCTURAL ENGINEER
ARCHITECTS
ENGINEERS
REFURBISHMENT OF POLICE SWIMMING POOL CLUB AT WORLI,MUMBAI 1 VENTILATOR DETAILS:V1 2 WINDOW DETAILS:W1
PROJECT TITTLE 3 VENTILATOR DETAILS:V2 4 WINDOW DETAILS:W2
REVISIONS:
ARCHITECTS
TITLE:WINDOW,VENTILATOR & DOOR DETAILS
DWG:A-011
SCALE:N.T.S
CHECKED
GOPAL
BY:
M S P H C ABM
Architecture Interior Design Engineering RCC.CONSULTANT MComplete MEP Design Solutions MEP CONSULTANT
STATUS:FOR
DRAWN BY:ABHISHEK CONSULTANT ARCHITECTS & ENGINEERS CLIENT JUZER A TINWALA CONSULTING STRUCTURAL ENGINEER
DRAWING
TENDER
1 VENTILATOR DETAILS:V4 2 WINDOW DETAILS:W4 3 VENTILATOR DETAILS:V5 4 WINDOW DETAILS:W5 5 WINDOW DETAILS:W6 6 DOOR DETAILS:D2 7 DOOR DETAILS:D1
REFURBISHMENT OF POLICE SWIMMING POOL CLUB AT WORLI,MUMBAI PROJECT TITTLE
REVISIONS:
TITLE:GATE & SIGNAGE DETAILS
DWG:A-012
PROJECT TITTLE
REFURBISHMENT OF POLICE SWIMMING POOL CLUB AT WORLI,MUMBAI
DRAWN BY: ABHISHEK
SCALE: N.T.S
CHECKED BY: GOPAL
A' A A' A
B' B
POLICE SWIMMING POOL CLUB
M S P H C
Architecture Interior Design Engineering
MComplete MEP Design Solutions MEP CONSULTANT
A TINWALA CONSULTING STRUCTURAL ENGINEER
ABM ARCHITECTS
RCC.CONSULTANT
DRAWING STATUS:FOR TENDER CONSULTANT ARCHITECTS & ENGINEERS CLIENT JUZER
1 GATE DETAILS
4 DETAIL A
GATE:REFERECE
3 SIGNAGE DETAILS
2
IMAGE
PLAN FRONT ELEVATION 100mm SKIRTING 18 mm THICK PLY WITH LAMINATE FINISH 18MM THICK TABLE TOP LAMINATE FINISH 6 mm PLY 6 mm COMMERCIAL PLY TABLE TOP LAMINATE FINISH 18 mm PLY WITH LAMINATE FINISH 6MM MIRROR ON 18 mm PLY. 18MM THICK TABLE TOP LAMINATE FINISH S.S PULLS CROSS SECTION 18MM PLY SUPPORT DRAWER GAP 18mm LOOSE SHELVES SUPPORT NOTES: 1.ALL EXTERNAL SURFACES TO BE FINISHED IN 1.0 MM SELECTED LAMINATE 2.ALL INTERNAL SURFACES TO BE FINISHED IN 0.6 MM WHITE LAMINATE 3.ALL EXPOSED EDGES TO BE LIPPED IN 6 MM TEAK WOOD 4.ALL IRONMONGERY TO BE S.S AND AS SELECTED 5.ALL LOOSE SHELVES TO BE SUPPORTED AS APPROVED HARDWARE 6.APPROVED LOCKS TO BE PROVIDED WHEREVER SHOWN FRONT ELEVATION SECTION A-A PLAN CEILING 18mm LOOSE SHELVES 100mm SKIRTING FINISHED IN VITRIFIED TILE (SAME AS FLOORING)WITH 18 MM PLY BACKING 18mm FIXED SHELF 18 mm COMMERCIAL PLY 6 mm COMMERCIAL PLY 18 mm COMMERCIAL PLY WITH LAMINATE FINISH 6 mm COMMERCIAL PLY 18 mm SHUTTERS WITH LAMINATE FINISH 6 mm GROOVE BETWEEN TWO SHUTTERS 25 mm PULL GROOVE 18mm GAP FIXED PANEL IN FRONT WITH TEAK WOOD FRAMING BEHIND AND FINISHED IN LAMINATE. 18mm LOOSE SHELVES 18mm LOOSE SHELVES 18mm LOOSE SHELVES CHECKED BY: GOPAL SCALE: N.T.S DWG:A-013 TITLE:FURNITURE & FLUSH DOOR DETAILS-02 REVISIONS: M S P H C ABM ARCHITECTS Architecture Interior Design Engineering RCC.CONSULTANT MComplete MEP Design Solutions MEP CONSULTANT DRAWING STATUS:FOR TENDER CONSULTANT ARCHITECTS & ENGINEERS CLIENT JUZER A TINWALA CONSULTING STRUCTURAL ENGINEER REFURBISHMENT OF POLICE SWIMMING POOL CLUB AT WORLI,MUMBAI PROJECT TITTLE 1 FULL HEIGHT STORAGE DETAILS 2 DRESSING TABLE DETAILS 3 FLUSH DOOR DETAILS:D3 4 FLUSH DOOR DETAILS:D4 DRAWN BY: ABHISHEK
225 mm THICK BRICK WORK 18mm THICK EXTERNAL PLASTER 150 mm THICK BLOCK WALL 6 mm THICK PLASTER 12 mm THICK MORTAR 18 mm GRANITE (BIRD'S MOUTH CORNERS) 30mm THICK KADAPPA 18 mm BULL NOSED GRANITE 30mm THICK KADAPPA BULL NOSED GRANITE FRONT ELEVATION SECTIONAL PLAN AT BOTTOM 150 mm BLOCK WALLS INCLUDING GRANITE FINISH ON ALL SIDES CROSS SECTION TOP PLAN 30mm THICK KADAPPA BELOW 18mm LL NOSED GRANITE TOP 150mm BLOCK WALL BELOW WITH INCLUDING GRANITE FINISH ON ALL SIDES R.C.C COLUMN PLAN FRONT ELEVATION 18mm THICK FIXED SHELF SS HANGER RODS 18 mm PLY SKIRTING WITH LAMINATE FINISH 18mm THICK LOOSE SHELVES 18mm FIXED SHELF 18mm PLY TOP 6 mm COMMERCIAL PLY TABLE TOP LAMINATE FINISH 18 mm COMMERCIAL PLY WITH LAMINATE FINISH 18mm LOOSE SHELVES BOLTS S.S TOWER BOLT CROSS SECTION 18MM PLY SUPPORT SUPPORT NOTES: 1.ALL EXTERNAL SURFACES TO BE FINISHED IN 1.0 MM SELECTED LAMINATE 2.ALL INTERNAL SURFACES TO BE FINISHED IN 0.6 MM WHITE LAMINATE 3.ALL EXPOSED EDGES TO BE LIPPED IN 6 MM TEAK WOOD 4.ALL IRONMONGERY TO BE S.S AND AS SELECTED 5.ALL LOOSE SHELVES TO BE SUPPORTED AS APPROVED HARDWARE 6.APPROVED LOCKS TO BE PROVIDED WHEREVER SHOWN FRONT ELEVATION 24 mm COMMERCIAL PLY TABLE TOP 18 mm COMMERCIAL PLY WITH LAMINATE FINISH 12 mm THICK PLY 100mm SKIRTING IN LAMINATE FINISH 18 mm THICK PLY WITH LAMINATE FINISH TABLE TOP IN 18mm WITH 12mm PLY FRONT AND BACK EDGE WITH POSTFORMED LAMINATE FINISH 24MM THICK TABLE TOP FRONT BACK DRAWERS PLAN REMOVEABLE SHELF REMOVEABLE SHELF LOCK DRAWER LAMINATE FINISH GAP 100mm SKIRTING IN LAMINATE FINISH SECTION A-A A A' NOTES: 1.ALL EXTERNAL SURFACES TO BE FINISHED IN 1.0 MM SELECTED LAMINATE 2.ALL INTERNAL SURFACES TO BE FINISHED IN 0.6 MM WHITE LAMINATE 3.ALL EXPOSED EDGES TO BE LIPPED IN 6 MM TEAK WOOD 4.ALL IRONMONGERY TO BE S.S AND AS SELECTED 5.ALL LOOSE SHELVES TO BE SUPPORTED AS APPROVED HARDWARE 6.APPROVED LOCKS TO BE PROVIDED WHEREVER SHOWN CHECKED BY: GOPAL SCALE: N.T.S DWG:A-014 TITLE:FURNITURE DETAILS-01 REVISIONS: M S P H C ABM ARCHITECTS Architecture Interior Design Engineering RCC.CONSULTANT MComplete MEP Design Solutions MEP CONSULTANT DRAWING STATUS:FOR TENDER CONSULTANT ARCHITECTS & ENGINEERS CLIENT JUZER A TINWALA CONSULTING STRUCTURAL ENGINEER REFURBISHMENT OF POLICE SWIMMING POOL CLUB AT WORLI,MUMBAI PROJECT TITTLE 1 BENCH DETAILS(TYPICAL) 2 WARDROBE DETAILS 3 RECEPTION DESK DETAILS DRAWN BY: ABHISHEK
AREAOFEXISTINGOFFICE :1900 Sq.Ft AREAOFADDITIONALOFFICESPACE : 750Sq.Ft AREAFORFUTUREEXPANSION:1150Sq.Ft
WHITE OAK CAPITAL MANAGEMENT
THIS DRAWING IS NOT TO BE SCALED, REFER DIMENSIONS.
ARCHITECTS
PRIOR TO EXECUTION.
MEMBERS, LIKE COLUMNS, BEAMS AND
OR CHISELED AT
PROPOSED LAYOUT 05/09/2018 MILLERNIUM VEER SAVARKAR MARG DADAR WEST MUMBAI 400028 INDIA abm@abmarchitects.com www.abmarchitects.com
WORKSTATION AREA RECEPTION CONFERENCE ROOM - 1 SERVER ROOM 3696 76 1372 76 76 MASTER CABIN 4952 76 4301 7226 3843 4500 76 4000 4004 13282 2160 7239 76 3917 76
Sr. NoSYMBOLDESCRIPTION 1. EXISTING FURNITURE / PARTITION RETAINED 2. PROPOSED FURNITURE / PARTITION 1500 750 525 4166 TRADER'S CABIN DRY KITCHEN CABIN -1 CABIN - 2 2591 76 2598 MEETING ROOM 1 2 3 6 5 4 7 8 9 13 14 15 16 17 18 19 20 750 3271 511 750 2981 750 750 2231 76 4166 150 1500 525 2000mm WIDE PASSAGE 1770mm WIDE PASSAGE 1480mm WIDE PASSAGE WORKSTATION AREA - 16 NOS. 1480mm WIDE PASSAGE 750 STORAGE CUM BOOK SHELF 12 11 10 76 154 8002 ENTRY 5690 STORAGE 23 24 AREA FOR FUTURE EXPANSION SCALE: NTS DATE: CHECKED BY: DRAWN BY:ABHISHEK SACHIN N O R T H REVISIONDATE 1 2 3 4 5 TITLE : INTERIOR FITOUT DWG :WO/D-01 N PROJECT:
Cnergy, 2/B, 6th Floor, Appasaheb Marathe Marg, Prabhadevi, Mumbai, Maharashtra 400025 ●
●
●
STRUCTURAL
SLABS
TAMPERED
TOTALAREA:3800Sq.Ft SITE. ● LOAD BEARING WALLS AND LINTELS SHALL SIMILARLY NOT BE DEMOLISHED OR CHISELED. ● IF CRACKS, ETC ARE NOTICE , THE SAME SHALL BE BROUGHT TO THE NOTICE OF THE CLIENTS / ARCHITECTS.
INCASE OF ANY DISCREPANCY IN DRAWINGS, INFORM ABM
NO
SHALL BE
4.00 [13'-1"] 5.26 [17'-3"] 3.16 [10'-4"] 16.62 [54'-6"] 8.04 [26'-5"] 14.12 [46'-4"] 5.80 [19'] 8.00 [26'-3"] 21.52 [70'-7"] 21.52 [70'-7"] 8.00 [26'-3"] 2.08 [6'-10"] 5.83 [19'-1"] 5.83 [19'-1"] 9.77 [32'-1"] 5.74 [18'-10"] 4.05 [13'-3"] 2.43 [7'-11"] 12.23 [40'-1"] 6.16 [20'-3"] 4.00 [13'-1"] 11.75 [38'-7"] 2.42 [7'-11"] 2.50 [8'-2"] 2.37 [7'-9"] 12.99 [42'-8"] 6.06 [19'-11"] 2.50 [8'-2"] 4.00 [13'-1"] 4.00 [13'-1"] 4.00 [13'-1"] 4.00 [13'-1"] 4.00 [13'-1"] 1.53 [5'] 4.00 [13'-1"] 3.31 [10'-10"] 5.72 [18'-9"] 2.46 [8'-1"] 8.10 [26'-7"] 2.50 [8'-2"] 3.60 [11'-10"] 3.42 [11'-3"] 2.85 [9'-4"] 1.50 [4'-11"] 1.50 [4'-11"] 1.06 [3'-6"] 1.20 [3'-11"] 4.06 [13'-4"] 3.63 [11'-11"] 4.23 [13'-10"] 3.77 [12'-5"] 4.08 [13'-5"] 3.92 [12'-10"] 3.92 [12'-10"] 2.24 [7'-4"] 2.20 [7'-3"] 4.15 [13'-7"] eq eq eq eq 2.40m WIDE FIRE L6 UP 19 20 21 23 24 25 262728 8 7 6 1 2 3 4 5 9 12 11 10 18 17 16 15 1314 19 20 21 22 23 24 25 262728 12 11 10 18 17 16 15 UP
TOILET TOILET LADIES GENTS CARPET
CARPET
ESCAPE BALCONY WORKSTATION AREA RECEPTION CONFERENCE ROOM - 1 MASTER CABIN TRADER'S CABIN DRY KITCHEN CABIN -1 CABIN - 2 MEETING ROOM 1 2 3 6 5 4 7 8 9 13 14 15 16 17 18 19 20 STORAGE CUM BOOK SHELF 12 11 10 ENTRY STORAGE 23 24 CARPET 172.20 SQ.M 1853 SQ.FT unit 2 unit 3 AREA FOR FUTURE EXPANSION 00.00.201800 01 02 APPROVAL INTERIOR FIT-OUT WITH FLOOR PLAN ABHISHEK SACHIN NTS 07-09-2.18 NORTH ISSUED FOR : DATE : DRAWN BY DRAWING NO: GENERAL NOTES 1. THIS DRAWING IS PROPERTY OF ABM ARCHITECTS IT IS ISSUED SUBJECT TO RETURN UPON DEMAND AND IS NOT TO BE USED EXCEPT IN CONNECTION WITH THE PROJECT FOR WHICH IT IS INTENDED. 2. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. CLIENT CONSULTANTS CHECKED BY DATE REVISION NODESCRIPTION REVISIONS TITLE: SCALE :MILLERNIUM VEER SAVARKAR MARG DADAR WEST MUMBAI 400028 INDIA abm@abmarchitects.com www.abmarchitects.com 00.00.2018 00.00.2018 WHITE OAK CAPITAL MANAGEMENT Cnergy, 2/B, 6th Floor, Appasaheb Marathe Marg, Prabhadevi, Mumbai, Maharashtra 400025 N KEY PLAN: H' I' H I WO/D08 F G' F' G
PASSAGE UNIT C UNIT B
260.69 SQ.M 2806 SQ.FT unit 1
212.98 SQ.M 2293 SQ.FT unit 4
BASE BUILT SPRINKLER PIPING (TYP)
BASE BUILT SPRINKLER HEAD (TYP)
WE HAVE RECEIVED SEPARATE FIRE LAYOUT (PDF COPY OF EXISTING PIPING AND SPRINKLER HEAD IN THIS AREA). THIS IS MISMATCHING WITH BASE BUILT FIRE LAYOUT.PLEASE SHARE CAD DRAWING TO SHOW THE EXTENSION PIECE OF FIRE PIPING
NOTE-BASE BUILT SPRINKLER PIPING AND HEADS ARE NOT MATCHING WITH SITE PHOTOS SHARED. PLEASE HIGHLIGHT EXISTING PIPING IN THIS LAYOUT TO SHOW THE EXTENSION PEACE OF FIRE PIPES.
WHITE OAK CAPITAL MANAGEMENT
FE-1 FE-2 FE-1
FE-1 FE-2 FE-3 FE-4
MILLERNIUM VEER SAVARKAR MARG DADAR WEST MUMBAI 400028 INDIA abm@abmarchitects.com www.abmarchitects.com
FIRE FIGHTING LEGEND:-
FIRE FIGHTING LAYOUT DRAWING:
CLIENT: 05/09/2018 DATE: MEP CONSULTANTS : Complete MEP Design Solutions
ELEVATION B-B'
FFL FALSE CIELING LVL LOWER SLAB LVL DESKS RECEPTION TABLE WORKSTATION WORKSTATION PASSAGE RECEPTION AREA PASSAGE SERVICE SPACE 3025 800 3825 GREY ANODIZED ALLUMINIUM SECTIONS CLEAR GLASS PARTITION CORIAN FINISH TABLE TOP ANODIZED ALLUMINIUM SKIRTING IN GREY OPEN BAFFLE CIELING WORKSTATION AREA TRADERS CABIN PANTRY WORKSTATION AREA SERVER ROOM RECEPTION AREA TV CORIAN FINISH TABLE TOP PU COATED SHUTTERS OF APPROVED COLOUR 3025 800 FFL FALSE CIELING LVL LOWER SLAB LVL SERVICE SPACE 3825 ALUMINUM RAFTERSWHITE POWDER COATED OPEN BAFFLE CIELING ACCENT SEATING ANODIZED ALLUMINIUM SKIRTING IN GREY CORIAN FINISH TABLE TOP PU COATED SHUTTERS OF APPROVED COLOUR 00.00.201800 01 02 APPROVAL SCHEMATIC ELEVATIONS ABHISHEK SACHIN NTS 05-09-2.18 NORTH ISSUED FOR DATE DRAWN BY : DRAWING NO: GENERAL NOTES 1. THIS DRAWING IS PROPERTY OF ABM ARCHITECTS IT IS ISSUED SUBJECT TO RETURN UPON DEMAND AND IS NOT TO BE USED EXCEPT IN CONNECTION WITH THE PROJECT FOR WHICH IT IS INTENDED. 2. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. CLIENT : CONSULTANTS CHECKED BY DATE REVISION NODESCRIPTION REVISIONS TITLE: SCALE :MILLERNIUM VEER SAVARKAR MARG DADAR WEST MUMBAI 400028 INDIA abm@abmarchitects.com www.abmarchitects.com 00.00.2018 00.00.2018 WHITE OAK CAPITAL MANAGEMENT Cnergy, 2/B, 6th Floor, Appasaheb Marathe Marg, Prabhadevi, Mumbai, Maharashtra 400025 N KEY PLAN: A B A' B'
ELEVATION A-A'
WO/D05
TRADERS CABIN PASSAGE MEETING ROOM FFL FALSE CIELING LVL LOWER SLAB LVL BOOKSHELVES STORAGE UNITS SERVICE SPACE 3025 800 3825 ANODIZED ALLUMINIUM SKIRTING IN GREY MEETING ROOM WORKING AREA FFL FALSE CIELING LVL LOWER SLAB LVL STORAGE UNITS WORKSTATIONS SERVICE SPACE 3025 800 3825 CORIAN FINISH TABLE TOP PU COATED SHUTTERS OF APPROVED COLOUR 00.00.201700 01 02 00.00.2017 00.00.2017 APPROVAL SACHIN NTS NORTH KEY PLAN: ISSUED FOR DATE DRAWN BY : DRAWING NO: GENERAL NOTES 1. THIS DRAWING IS PROPERTY OF ABM ARCHITECTS IT IS ISSUED SUBJECT TO RETURN UPON DEMAND AND IS NOT TO BE USED EXCEPT IN CONNECTION WITH THE PROJECT FOR WHICH IT IS INTENDED. 2. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. CONSULTANTS CHECKED BY DATE REVISION NODESCRIPTION REVISIONS TITLE: SCALE :MILLERNIUM VEER SAVARKAR MARG DADAR WEST MUMBAI 400028 INDIA abm@abmarchitects.com www.abmarchitects.com SCHEMATIC ELEVATIONS ABHISHEK 05-09-2.18 CLIENT : WHITE OAK CAPITAL MANAGEMENT Cnergy, 2/B, 6th Floor, Appasaheb Marathe Marg, Prabhadevi, Mumbai, Maharashtra 400025 N D C D' C' ELEVATION C-C'
D-D' WO/D06
ELEVATION
MASTER CABIN MEETING ROOM BOOK SHELVES/ STORAGE CABIN 2 CABIN 1 CONFERENCE ROOM FFL FALSE CIELING LVL LOWER SLAB LVL SERVICE SPACE SERVICE SPACE 3025 800 3825 GREY ANODIZED ALLUMINIUM SECTIONS CLEAR GLASS PARTITION WALLPAPERWALLPAPER 00.00.201700 01 02 00.00.2017 00.00.2017 APPROVAL SACHIN NTS NORTH ISSUED FOR DATE DRAWN BY : DRAWING NO: GENERAL NOTES 1. THIS DRAWING IS PROPERTY OF ABM ARCHITECTS IT IS ISSUED SUBJECT TO RETURN UPON DEMAND AND IS NOT TO BE USED EXCEPT IN CONNECTION WITH THE PROJECT FOR WHICH IT IS INTENDED. 2. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. CONSULTANTS CHECKED BY DATE REVISION NODESCRIPTION REVISIONS TITLE: SCALE :MILLERNIUM VEER SAVARKAR MARG DADAR WEST MUMBAI 400028 INDIA abm@abmarchitects.com www.abmarchitects.com SCHEMATIC ELEVATIONS ABHISHEK 05-09-2.18 CLIENT : WHITE OAK CAPITAL MANAGEMENT Cnergy, 2/B, 6th Floor, Appasaheb Marathe Marg, Prabhadevi, Mumbai, Maharashtra 400025 N E' E
E-E' KEY PLAN: WO/D07
ELEVATION
ELEVATION F-F'
ELEVATION G-G'
ELEVATION H-H'
WO/D05
ELEVATION I-I'
OPEN BAFFLE CIELING OPEN BAFFLE CIELING OPEN BAFFLE CIELINGOPEN BAFFLE CIELING OPEN BAFFLE CIELING OPEN BAFFLE CIELING OPEN BAFFLE CIELING OPEN BAFFLE CIELING FFL FALSE CIELING LVL LOWER SLAB LVL 3150 675 3825 FFL FALSE CIELING LVL LOWER SLAB LVL 3150 675 3825 FFL FALSE CIELING LVL LOWER SLAB LVL 3150 675 3825 FFL FALSE CIELING LVL LOWER SLAB LVL 3150 675 3825 RECEPTION CABIN DRY KITCHEN CABIN CABIN 750 BOOK SHELF ENTRY 23 24 00.00.201800 01 02 APPROVAL SCHEMATIC ELEVATIONS ABHISHEK SACHIN NTS 07-09-2.18 NORTH ISSUED FOR DATE DRAWN BY : DRAWING NO: GENERAL NOTES 1. THIS DRAWING IS PROPERTY OF ABM ARCHITECTS IT IS ISSUED SUBJECT TO RETURN UPON DEMAND AND IS NOT TO BE USED EXCEPT IN CONNECTION WITH THE PROJECT FOR WHICH IT IS INTENDED. 2. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. CLIENT : CONSULTANTS CHECKED BY DATE REVISION NODESCRIPTION REVISIONS TITLE: SCALE :MILLERNIUM VEER SAVARKAR MARG DADAR WEST MUMBAI 400028 INDIA abm@abmarchitects.com www.abmarchitects.com 00.00.2018 00.00.2018 WHITE OAK CAPITAL MANAGEMENT Cnergy, 2/B, 6th Floor, Appasaheb Marathe Marg, Prabhadevi, Mumbai, Maharashtra 400025 N KEY PLAN: H' I' H I
F G' F' G
CEILING LAYOUT
PROJECT: WHITE OAK CAPITAL MANAGEMENT
Cnergy, 2/B, 6th Floor, Appasaheb Marathe Marg, Prabhadevi, Mumbai, Maharashtra 400025
● THIS DRAWING IS NOT TO BE SCALED, REFER DIMENSIONS. ● INCASE OF ANY DISCREPANCY IN DRAWINGS, INFORM ABM ARCHITECTS PRIOR TO EXECUTION.
NO STRUCTURAL MEMBERS, LIKE COLUMNS, BEAMS AND SLABS SHALL BE TAMPERED OR CHISELED AT SITE.
OPEN METAL BAFFLE CEILING WOODEN FINISH CEILING GYPSUM CEILING FINISHED WITH PAINT OPEN METAL BAFFLE CEILING EXISTING CEILING TO BE RETAINED WHITE POWDER COATED AL. RAFTERS
FIXTURE LEGEND NAME OF THE FIXTURE SYMBOL LINEAR PROFILE LIGHT / 50mm / 38W 8W/ 67mm Ø/ 3000K/ 30°Beam DECORATIVE PENDANT LIGHT - 600 MM Ø SURFACE LIGHT / 8W NARROW BEAM PENDANT LIGHT - 300 MM Ø SURFACE MOUNTED NARROW BEAM LIGHT SUSPENDED LINEAR LIGHT FITTING - 6 ft LENGTH NAME OF THE FIXTURE SYMBOL SUSPENDED LINEAR LIGHT FITTING3 ft LENGTH SUSPENDED LINEAR LIGHT FITTING1'-6" LENGTH AC GRILL DIFFUSER SCALE: NTS DATE: CHECKED BY: DRAWN BY:ABHISHEK SACHIN N O R T H REVISIONDATE 1 2 3 4 5 TITLE : CEILING LAYOUT DWG :WO/D-03 N
LIGHT
●
● LOAD
BE
● IF
BROUGHT
05/09/2018 MILLERNIUM VEER SAVARKAR MARG DADAR WEST MUMBAI 400028 INDIA abm@abmarchitects.com www.abmarchitects.com
BEARING WALLS AND LINTELS SHALL SIMILARLY NOT
DEMOLISHED OR CHISELED.
CRACKS, ETC ARE NOTICE , THE SAME SHALL BE
TO THE NOTICE OF THE CLIENTS / ARCHITECTS.
PROJECT: WHITE OAK CAPITAL MANAGEMENT Cnergy, 2/B, 6th Floor, Appasaheb Marathe Marg, Prabhadevi, Mumbai, Maharashtra 400025
● THIS DRAWING IS NOT TO BE SCALED, REFER DIMENSIONS. ● INCASE OF ANY DISCREPANCY IN DRAWINGS, INFORM ABM ARCHITECTS PRIOR TO EXECUTION.
NO STRUCTURAL MEMBERS, LIKE COLUMNS, BEAMS AND SLABS SHALL BE TAMPERED OR CHISELED AT SITE.
LOAD BEARING WALLS AND LINTELS SHALL SIMILARLY NOT BE DEMOLISHED OR CHISELED.
IF CRACKS, ETC ARE NOTICE , THE SAME SHALL BE BROUGHT TO THE NOTICE OF THE CLIENTS / ARCHITECTS.
WORKSTATION AREA RECEPTION CONFERENCE ROOM - 1 SERVER ROOM MASTER CABIN TRADER'S CABIN
KITCHEN CABIN -1 CABIN - 2 MEETING ROOM WORKSTATION AREA - 16 NOS. ENTRY AREA FOR FUTURE EXPANSION SYMBOLDESCRIPTION EXISTING WALL TO BE DEMOLISHED EXISTING PARTITION TO BE RETAINED & REFURBISHED PROPOSED 150MM THK BRICK WALL PROPOSED 75MM THK PARTITION WITH AL. FRAMEWORK & 12mm GYPBOARD FINISHED WITH APP. LAMINATE/ APP. PAINT SYMBOLDESCRIPTION PROPOSED GLAZED PARTITION WITH AL. FRAMEWORK & 12MM TOUGHENED CLEAR GLASS PANELS 4867 592 4063 1067 2591 3310 3483 1455 852 3167 900 3607 76 2610 76 838 76 838 76 2750 76 4242 1258 344 SCALE:
DATE: CHECKED
N O R T H
1 2 3 4 5 TITLE : MEASUREMENT LAYOUT - CIVIL & PARTITION DWG :WO/D-02 N
DRY
NTS
BY: DRAWN BY:ABHISHEK SACHIN
REVISIONDATE
●
●
05/09/2018 MILLERNIUM VEER SAVARKAR MARG DADAR WEST MUMBAI 400028 INDIA abm@abmarchitects.com www.abmarchitects.com
●
BASE BUILT SPRINKLER PIPING (TYP)
BASE BUILT SPRINKLER HEAD (TYP)
WE HAVE RECEIVED SEPARATE FIRE LAYOUT (PDF COPY OF EXISTING PIPING AND SPRINKLER HEAD IN THIS AREA). THIS IS MISMATCHING WITH BASE BUILT FIRE LAYOUT.PLEASE SHARE CAD DRAWING TO SHOW THE EXTENSION PIECE OF FIRE PIPING
NOTE-BASE BUILT SPRINKLER PIPING AND HEADS ARE NOT MATCHING WITH SITE PHOTOS SHARED. PLEASE HIGHLIGHT EXISTING PIPING IN THIS LAYOUT TO SHOW THE EXTENSION PEACE OF FIRE PIPES.
WHITE OAK CAPITAL MANAGEMENT CLIENT:
OPEN METAL BAFFLE CEILING WOODEN FINISH CEILING GYPSUM CEILING FINISHED WITH PAINT OPEN METAL BAFFLE CEILING FE-1 FE-2 FE-1
FE-1 FE-2 FE-3 FE-4 FIRE FIGHTING LEGEND:MILLERNIUM VEER SAVARKAR MARG DADAR WEST MUMBAI 400028 INDIA abm@abmarchitects.com www.abmarchitects.com
FIGHTING LAYOUT
FIRE
DRAWING:
05/09/2018 DATE: MEP CONSULTANTS : Complete MEP Design Solutions
PROJECT: WHITE OAK
WORKSTATION AREA - 16 NOS.
MASTER CABIN
TRADER'S CABIN
DRY KITCHEN
CABIN - 2
WORKSTATION AREA
SERVER ROOM
CABIN -1
AREA FOR FUTURE EXPANSION
MEETING ROOM
RECEPTION
ENTRY
CONFERENCE ROOM - 1
CARPET FLOORING
EXISTING WOODEN FLOORING TO BE RETAINED
DRAWN BY:ABHISHEK SACHIN
CHECKED BY:
DATE:
SR. NOSYMBOLDESCRIPTION
1. 2.
SCALE: NTS
N O R T H REVISIONDATE 1 2 3 4 5 TITLE : FLOORING LAYOUT
:WO/D-04 N
DWG
● NO STRUCTURAL
SLABS
TAMPERED
AT SITE.
LOAD BEARING WALLS
LINTELS SHALL SIMILARLY NOT BE DEMOLISHED
CHISELED. ● IF CRACKS, ETC ARE NOTICE , THE SAME SHALL BE BROUGHT TO THE NOTICE OF THE CLIENTS / ARCHITECTS. 05/09/2018 MILLERNIUM VEER SAVARKAR MARG DADAR WEST MUMBAI 400028 INDIA abm@abmarchitects.com www.abmarchitects.com
CAPITAL MANAGEMENT Cnergy, 2/B, 6th Floor, Appasaheb Marathe Marg, Prabhadevi, Mumbai, Maharashtra 400025 ● THIS DRAWING IS NOT TO BE SCALED, REFER DIMENSIONS. ● INCASE OF ANY DISCREPANCY IN DRAWINGS, INFORM ABM ARCHITECTS PRIOR TO EXECUTION.
MEMBERS, LIKE COLUMNS, BEAMS AND
SHALL BE
OR CHISELED
●
AND
OR
HVAC LAYOUT
WORKSTATION AREA RECEPTION CONFERENCE ROOM - 1 SERVER ROOM MASTER CABIN TRADER'S CABIN DRY KITCHEN CABIN -1 CABIN - 2 MEETING ROOM 1 2 3 6 5 4 7 8 9 13 14 15 16 17 18 19 20 2000mm WIDE PASSAGE 1770mm WIDE PASSAGE 1480mm WIDE PASSAGE WORKSTATION AREA - 18 NOS. 1480mm WIDE PASSAGE STORAGE CUM BOOK SHELF 12 11 10 ENTRY STORAGE 23 24 CABIN 2 3 4 6 5 7 8 10 9 11 12 13 14 16 15 17 18 20 19 21 22 24 23 1
OPEN METAL BAFFLE CEILING WOODEN FINISH CEILING GYPSUM CEILING FINISHED WITH PAINT OPEN METAL BAFFLE CEILING 1000X350 700X350 500X350 T T T 390CFM 200X250 1000X100 SAC 1050X150X250 SAP 390 CFM, 2# Ø200 FLEXIBLE 300CFM 200X250 750X100 SAC 800X150X250 SAP 300CFM, 2# Ø200 FLEXIBLE 4# 550X100 SAC 600X150X250 SAP 210CFM, Ø200 FLEXIBLE T T T 440CFM 300X150 T 440CFM 250X250 T T 440CFM 300X150 210CFM 200X150 210CFM 200X150 85CFM 150X150 120CFM 150X150 440CFM 250X250 EXISTING CSU 9.0 TR 3500 CFM EXISTING CASSETTE UNIT 3.0 TR 5000CFM 1050X350 720CFM 300X300 540CFM 250X300 T T T 180CFM 150X150 320CFM 200X200 180CFM 150X150 180CFM 150X150 4280CFM 900X350 T T 3560CFM 750X350 2840CFM 650X350 T 2360CFM 650X300 100CFM 300X100 100CFM 300X100 T PROPOSED CSU 9.0 TR 3500 CFM 180CFM 150X150 320CFM 200X200 T 180CFM 150X150 320CFM 200X200 T 180CFM 150X150 320CFM 200X200 T 180CFM 150X150 320CFM 200X200 T 480CFM 250X250 T 300CFM 200X200 610CFM 300X250 T T 240CFM 200X2001650CFM 500X300 240CFM 200X200 610CFM 300X250 T T 240CFM 200X200 240CFM 200X200 T 326CFM 250X200 326CFM 250X200 326CFM 250X200 326CFM 250X200 13# 500X100 SAC 180 CFM 200X100 SAC 250X150X250 SAP 85CFM, Ø100 FLEXIBLE 200X100 SAC 250X150X250 SAP 120CFM, Ø100 FLEXIBLE 04# 850X100 SAC 326 CFM 4# 600X100 SAC 240 CFM 750X100 SAC 800X150X250 SAP 305CFM, 2# Ø200 FLEXIBLE 750X100 SAC 800X150X250 SAP 305CFM, 2# Ø200 FLEXIBLE 750X100 SAC 300CFM EXISTING VAV BOX EXISTING VAV BOX EXISTING VAV BOX EXISTING VAV BOX MILLERNIUM VEER SAVARKAR MARG DADAR WEST MUMBAI 400028 INDIA abm@abmarchitects.com www.abmarchitects.com HVAC LAYOUT DRAWING: WHITE OAK CAPITAL MANAGEMENT CLIENT: 05/09/2018 DATE: NO. SYMBOL 01 02 03 04 05 06 SUPPLY AIR DUCT WITH ACOUSTIC INSULATION DESCRIPTION SUPPLY AIR DUCT WITH THERMAL INSULATION VOLUME CONTROL DAMPER LINEAR GRILL TRAPDOOR LEGENDS NO. 01 EXISTING CHILLED WATER CSU DESCRIPTION SCHEDULE FOR AC UNITS CAPACITYQTY 9.0 TR01 02 07 FLEXIBLE DUCT EXISTING CHILLED WATER CASSETTE UNIT 3.0 TR 01 EXISTING SUPPLY AIR DUCT 03 PROPOSED CHILLED WATER CSU 12.0 TR01 Complete MEP Design Solutions MEP CONSULTANT:
AREAOFEXISTINGOFFICE :1900 Sq.Ft AREAOFADDITIONALOFFICESPACE : 750Sq.Ft AREAFORFUTUREEXPANSION:1150Sq.Ft
WHITE OAK CAPITAL MANAGEMENT
THIS DRAWING IS NOT TO BE SCALED, REFER DIMENSIONS.
ARCHITECTS
PRIOR TO EXECUTION.
MEMBERS, LIKE COLUMNS, BEAMS AND
OR CHISELED AT
PROPOSED LAYOUT 05/09/2018 MILLERNIUM VEER SAVARKAR MARG DADAR WEST MUMBAI 400028 INDIA abm@abmarchitects.com www.abmarchitects.com
WORKSTATION AREA RECEPTION CONFERENCE ROOM - 1 SERVER ROOM 3696 76 1372 76 76 MASTER CABIN 4952 76 4301 7226 3843 4500 76 4000 4004 13282 2160 7239 76 3917 76
Sr. NoSYMBOLDESCRIPTION 1. EXISTING FURNITURE / PARTITION RETAINED 2. PROPOSED FURNITURE / PARTITION 1500 750 525 4166 TRADER'S CABIN DRY KITCHEN CABIN -1 CABIN - 2 2591 76 2598 MEETING ROOM 1 2 3 6 5 4 7 8 9 13 14 15 16 17 18 19 20 750 3271 511 750 2981 750 750 2231 76 4166 150 1500 525 2000mm WIDE PASSAGE 1770mm WIDE PASSAGE 1480mm WIDE PASSAGE WORKSTATION AREA - 16 NOS. 1480mm WIDE PASSAGE 750 STORAGE CUM BOOK SHELF 12 11 10 76 154 8002 ENTRY 5690 STORAGE 23 24 AREA FOR FUTURE EXPANSION SCALE: NTS DATE: CHECKED BY: DRAWN BY:ABHISHEK SACHIN N O R T H REVISIONDATE 1 2 3 4 5 TITLE : INTERIOR FITOUT DWG :WO/D-01 N PROJECT:
Cnergy, 2/B, 6th Floor, Appasaheb Marathe Marg, Prabhadevi, Mumbai, Maharashtra 400025 ●
●
●
STRUCTURAL
SLABS
TAMPERED
TOTALAREA:3800Sq.Ft SITE. ● LOAD BEARING WALLS AND LINTELS SHALL SIMILARLY NOT BE DEMOLISHED OR CHISELED. ● IF CRACKS, ETC ARE NOTICE , THE SAME SHALL BE BROUGHT TO THE NOTICE OF THE CLIENTS / ARCHITECTS.
INCASE OF ANY DISCREPANCY IN DRAWINGS, INFORM ABM
NO
SHALL BE
5TH FLOOR LVL- (+21.76MT) 6TH FLOOR LVL- (+25.60MT) 7TH FLOOR LVL- (+28.96MT) 8TH FLOOR LVL- (+32.32MT) 9TH FLOOR LVL- (+35.68MT) 10TH FLOOR LVL- (+39.04MT) 11TH FLOOR LVL- (+42.40MT) 12TH FLOOR LVL- (+45.76MT) 13TH FLOOR LVL- (+49.12MT) 14TH FLOOR LVL- (+52.48MT) 15TH FLOOR LVL- (+55.84MT) 16TH FLOOR LVL- (+59.20MT) 17TH FLOOR LVL- (+62.56MT) 18TH FLOOR LVL- (+65.92MT) 19TH FLOOR LVL- (+69.28MT) 20TH FLOOR LVL- (+71.28MT) 21ST FLOOR LVL- (+74.64MT) 22ND FLOOR LVL- (+78.00MT) 23RD FLOOR LVL- (+81.36MT) 24TH FLOOR LVL- (+84.72MT) 25TH FLOOR LVL- (+88.08MT) 26TH FLOOR LVL- (+91.44MT) 27TH FLOOR LVL- (+94.80MT) 28TH FLOOR LVL- (+98.16MT) 29TH FLOOR LVL- (+101.52MT) 30TH FLOOR LVL- (+104.88MT) 31ST FLOOR LVL- (+108.24MT) 32ND FLOOR LVL- (+111.60MT) 33RD FLOOR LVL- (+114.96MT) 34TH FLOOR LVL- (+118.32MT) 35TH FLOOR LVL- (+121.68MT) 36TH FLOOR LVL- (+125.04MT) 37TH FLOOR LVL- (+128.72MT) TERRACE LVL- (+136.32MT) 136320 3360 3360 3360 5440 3840 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 2000 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3680 3920 3680 38TH FLOOR LVL- (+132.64MT) ISSUED FOR DATE : DRAWN BY : ABHISHEK TITLE: GENERAL NOTES 1. THIS DRAWING IS PROPERTY OF ABM ARCHITECTS IT IS ISSUED SUBJECT TO RETURN UPON DEMAND AND IS NOT TO BE USED EXCEPT IN CONNECTION WITH THE PROJECT FOR WHICH IT IS INTENDED. 2. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. CLIENT : CONSULTANTS CHECKED BY : SP SCALE abm@abmarchitects.com www.abmarchitects.com FINISHING CODE NORTH ABM ARCHITECTS Architecture Interior Design Engineering STRUCTURAL CONSULTANTS: INDRAYANI COMPLEX,J.K.SAWANT MARG,DADAR(W), (022) 24324274,24313943 OFFICE NO.2, 1st FLOOR,ATHARVA HOUSE,`E'WING, MUMBAI-28. WAKDEWADI, PUNE: 411003 SAI CHAMBERS, 16, PUNE-MUMBAI ROAD, PUNE OFFICE reddy.a@jwconsultants.in www.jwconsultants.in Formerly Y Sane Associates ARCHITECT: ENGINEERS,PLANNER & L.SURVEYOR. E-mail vastukhubi@yahoo.co.in ABOVE CENTRAL BANK OF INDIA, PLOT NO. 6 JN. OF BRAHMAKUMARI MARG & JAWAHAR NAGAR RD. NO.6 GOREGAON (WEST), MUMBAI 400 062. 3RD FLOOR, SAXENA HOUSE CLIENT: E-mail duratech@yahoo.co.in ASHA NAGAR, MUMBAI 400 080. O2, B WING, 15TH FLOOR, MULUND (WEST) GFC 1:200 PROPOSED RESIDENTIAL BUILDING, VIKAS PALAZZO AT MULUND (WEST) E1001 / R1 DRAWING TITLE: KASTURBA ROAD (WEST) ELEVATION DRAWING NO: REVISIONS DATEREVISION NODESCRIPTION PODIUM -2 LVL- (+9.60MT) PODIUM -1 LVL- (+6.24MT) PODIUM -3 LVL- (+12.96MT) PODIUM -4 LVL- (+16.32MT) 5TH FLOOR LVL- (+21.76MT) GROUND LVL- (+0.00MT) KASTURBA ROAD ELEVATION SCALE : 1: 175 DRY GRANITE STONE CLADDING ON WALL WITH PARTLY POLISHED PODIUM -1 LVL- (+6.24MT) 3100 GROUND LVL- (±0.00MT) CORNER 5950 5335 4355 R3 R5 R6 R4 CORNER R 2 CORNER PROJECT MANAGEMENT CONSULTANTS: J. J. Realis India Pvt Ltd 9TH FLOOR LVL- (+35.68MT) 3360 LIVING 3360 LIVING LIVING 10TH FLOOR LVL- (+39.04MT) 11TH FLOOR LVL- (+42.40MT) 750 750 200 200 W 2510 1170 75 75 200 750 1170 750 150 1350 2700 750 3680 2915 5440 16/09/17R1HEIGHT OF 18TH FLR. REDUCED TO 3.36M. AND HEIGHT OF 37TH FLR. INCREASED TO 3.92M. HENCE ALL FLR. LEVELS REVISED R1 R1 R1
6TH FLOOR LVL- (+25.60MT) 7TH FLOOR LVL- (+28.96MT) 8TH FLOOR LVL- (+32.32MT) 9TH FLOOR LVL- (+35.68MT) 10TH FLOOR LVL- (+39.04MT) 11TH FLOOR LVL- (+42.40MT) 12TH FLOOR LVL- (+45.76MT) 13TH FLOOR LVL- (+49.12MT) 14TH FLOOR LVL- (+52.48MT) 15TH FLOOR LVL- (+55.84MT) 16TH FLOOR LVL- (+59.20MT) 17TH FLOOR LVL- (+62.56MT) 18TH FLOOR LVL- (+65.92MT) 136320 3360 3360 3360 5440 3840 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3680 3920 3680 2000 PODIUM -2 LVL- (+9.60MT) PODIUM -1 LVL- (+6.24MT) PODIUM -3 LVL- (+12.96MT) FLOOR FINISH PODIUM -4 LVL- (+16.32MT) 5TH FLOOR LVL- (+21.76MT) ISSUED FOR : DATE : TITLE: GENERAL NOTES 1. THIS DRAWING IS PROPERTY OF ABM ARCHITECTS IT IS ISSUED SUBJECT TO RETURN UPON DEMAND AND IS NOT TO BE USED EXCEPT IN CONNECTION WITH THE PROJECT FOR WHICH IT IS INTENDED. 2. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. CLIENT : CONSULTANTS : abm@abmarchitects.com www.abmarchitects.com FINISHING CODE NORTH ABM ARCHITECTS Architecture Interior Design Engineering STRUCTURAL CONSULTANTS: INDRAYANI COMPLEX,J.K.SAWANT MARG,DADAR(W), (022) 24324274,24313943 MUMBAI OFFICE OFFICE NO.2, 1st FLOOR,ATHARVA HOUSE,`E'WING, MUMBAI-28. WAKDEWADI, PUNE: 411003 SAI CHAMBERS, 16, PUNE-MUMBAI ROAD, +91 20 66449100 FAX: +91 20 66449299 PUNE OFFICE Tel. reddy.a@jwconsultants.in www.jwconsultants.in Formerly Y Sane Associates ARCHITECT: ENGINEERS,PLANNER & L.SURVEYOR. E-mail vastukhubi@yahoo.co.in ABOVE CENTRAL BANK OF INDIA, PLOT NO. 6 JN. OF BRAHMAKUMARI MARG & JAWAHAR NAGAR RD. NO.6 GOREGAON (WEST), MUMBAI 400 062. 3RD FLOOR, SAXENA HOUSE CLIENT: E-mail duratech@yahoo.co.in ASHA NAGAR, MUMBAI 400 080. O2, B WING, 15TH FLOOR, MULUND (WEST) GFC PROPOSED RESIDENTIAL BUILDING, VIKAS PALAZZO AT MULUND (WEST) DRAWING TITLE: DRAWING NO: CHECKED BY : SP SCALE : 1:200 E1002 / R1 WALJI LADDHA ROAD (SOUTH) ELEVATION REVISIONS PODIUM -2 LVL- (+9.60MT) PODIUM -1 LVL- (+6.24MT) PODIUM -3 LVL- (+12.96MT) PODIUM -4 LVL- (+16.32MT) 5TH FLOOR LVL- (+21.76MT) GROUND LVL- (+0.00MT) WALJI LADHA ROAD ELEVATION RAMP DN ENT LOBBYENT LOBBY RAMP UP PARKINGPARKING DRIVE WAY RAMP DOWN 3.65 DRY STONE CLADDING DRY GRANITE STONE CLADDING ON WALL WITH PARTLY POLISHED MEMBER FOR CANOPY M.S ADDITIONAL SUPPORT TO R.C.C. CANOPY BMS DOOR WITH VISION PANEL PODIUM -2 LVL- (+9.60MT) PODIUM -1 LVL- (+6.24MT) PODIUM -3 LVL- (+12.96MT) PODIUM -4 LVL- (+16.32MT) 5TH FLOOR LVL- (+21.76MT) GROUND LVL- (+0.00MT) PROJECT MANAGEMENT CONSULTANTS: J. J. Realis India Pvt Ltd W 2590 1330 75 75 200 750 1330 1501350 2700 750 3920 W 2510 1170 75 75 200 750 1170 750 150 1350 2700 750 3680 19TH FLOOR LVL- (+69.28MT) 20TH FLOOR LVL- (+71.28MT) 21ST FLOOR LVL- (+74.64MT) 22ND FLOOR LVL- (+78.00MT) 23RD FLOOR LVL- (+81.36MT) 24TH FLOOR LVL- (+84.72MT) 25TH FLOOR LVL- (+88.08MT) 26TH FLOOR LVL- (+91.44MT) 27TH FLOOR LVL- (+94.80MT) 28TH FLOOR LVL- (+98.16MT) 29TH FLOOR LVL- (+101.52MT) 30TH FLOOR LVL- (+104.88MT) 31ST FLOOR LVL- (+108.24MT) 32ND FLOOR LVL- (+111.60MT) 33RD FLOOR LVL- (+114.96MT) 34TH FLOOR LVL- (+118.32MT) 35TH FLOOR LVL- (+121.68MT) 36TH FLOOR LVL- (+125.04MT) 37TH FLOOR LVL- (+128.72MT) TERRACE LVL- (+136.32MT) 38TH FLOOR LVL- (+132.64MT) DATEREVISION NODESCRIPTION 16/09/17R1HEIGHT OF 18TH FLR. REDUCED TO 3.36M. AND HEIGHT OF 37TH FLR. INCREASED TO 3.92M. HENCE ALL FLR. LEVELS REVISED R1 R1 R1
DRAWN BY ABHISHEK
PROPOSED
6TH FLOOR LVL- (+25.60MT) 7TH FLOOR LVL- (+28.96MT) 8TH FLOOR LVL- (+32.32MT) 9TH FLOOR LVL- (+35.68MT) 10TH FLOOR LVL- (+39.04MT) 11TH FLOOR LVL- (+42.40MT) 12TH FLOOR LVL- (+45.76MT) 13TH FLOOR LVL- (+49.12MT) 14TH FLOOR LVL- (+52.48MT) 15TH FLOOR LVL- (+55.84MT) 16TH FLOOR LVL- (+59.20MT) 17TH FLOOR LVL- (+62.56MT) 18TH FLOOR LVL- (+65.92MT) 136320 6240 3360 3360 3360 5440 3840 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 2000 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3680 3920 3680 EAST SIDE ELEVATION SCALE - 1:200 ISSUED FOR : DATE TITLE: GENERAL NOTES 1. THIS DRAWING IS PROPERTY OF ABM ARCHITECTS IT IS ISSUED SUBJECT TO RETURN UPON DEMAND AND IS NOT TO BE USED EXCEPT IN CONNECTION WITH THE PROJECT FOR WHICH IT IS INTENDED. 2. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. CLIENT : CONSULTANTS : abm@abmarchitects.com www.abmarchitects.com FINISHING CODE NORTH ABM ARCHITECTS Architecture Interior Design Engineering STRUCTURAL CONSULTANTS: INDRAYANI COMPLEX,J.K.SAWANT MARG,DADAR(W), (022) 24324274,24313943 OFFICE NO.2, 1st FLOOR,ATHARVA HOUSE,`E'WING, MUMBAI-28. WAKDEWADI, PUNE: 411003 SAI CHAMBERS, 16, PUNE-MUMBAI ROAD, FAX: +91 20 66449299 PUNE OFFICE reddy.a@jwconsultants.in www.jwconsultants.in Formerly S Sane Associates ARCHITECT: ENGINEERS,PLANNER & L.SURVEYOR. E-mail vastukhubi@yahoo.co.in ABOVE CENTRAL BANK OF INDIA, PLOT NO. 6 JN. OF BRAHMAKUMARI MARG & JAWAHAR NAGAR RD. NO.6 GOREGAON (WEST), MUMBAI 400 062. 3RD FLOOR, SAXENA HOUSE CLIENT: E-mail duratech@yahoo.co.in ASHA NAGAR, MUMBAI 400 080. O2, B WING, 15TH FLOOR, MULUND (WEST)
MULUND (WEST) DRAWING TITLE: DRAWING NO: CHECKED BY : SP SCALE : GFC 1:200 E1003 / R1 JAWAHARLAL NEHRU ROAD (EAST) ELEVATION REVISIONS PODIUM -2 LVL- (+9.60MT) PODIUM -1 LVL- (+6.24MT) PODIUM -3 LVL- (+12.96MT) GROUND LVL- (+0.00MT) JAWAHARLAL NEHRU ROAD ELEVATION ROLLING SHUTTERS ROLLING SHUTTERS ROLLING SHUTTERS PODIUM -4 LVL- (+16.32MT) 5TH FLOOR LVL- (+21.76MT) PROJECT MANAGEMENT CONSULTANTS: J. J. Realis India Pvt Ltd LIVING LIVING LIVING 965 750 200 965 750 200 3360 3360 W 2590 1330 75 75 200 750 730 150 1350 2700 750 3920 19TH FLOOR LVL- (+69.28MT) 20TH FLOOR LVL- (+71.28MT) 21ST FLOOR LVL- (+74.64MT) 22ND FLOOR LVL- (+78.00MT) 23RD FLOOR LVL- (+81.36MT) 24TH FLOOR LVL- (+84.72MT) 25TH FLOOR LVL- (+88.08MT) 26TH FLOOR LVL- (+91.44MT) 27TH FLOOR LVL- (+94.80MT) 28TH FLOOR LVL- (+98.16MT) 29TH FLOOR LVL- (+101.52MT) 30TH FLOOR LVL- (+104.88MT) 31ST FLOOR LVL- (+108.24MT) 32ND FLOOR LVL- (+111.60MT) 33RD FLOOR LVL- (+114.96MT) 34TH FLOOR LVL- (+118.32MT) 35TH FLOOR LVL- (+121.68MT) 36TH FLOOR LVL- (+125.04MT) 37TH FLOOR LVL- (+128.72MT) TERRACE LVL- (+136.32MT) 38TH FLOOR LVL- (+132.64MT) DATEREVISION NODESCRIPTION 16/09/17R1HEIGHT OF 18TH FLR. REDUCED TO 3.36M. AND HEIGHT OF 37TH FLR. INCREASED TO 3.92M. HENCE ALL FLR. LEVELS REVISED R1 R1 R1 DRAWN BY : ABHISHEK
RESIDENTIAL BUILDING, VIKAS PALAZZO AT
(FIRE FIGHTING1) U.G. WATER TANK 125,000 LTRS. 35.96 Sq.M.x3.50m. 3550 (FIRE FIGHTING1) U.G. WATER TANK 125,000 LTRS. 35.96 Sq.M.x3.50m. 3550 6TH FLOOR LVL- (+25.60MT) 7TH FLOOR LVL- (+28.96MT) 8TH FLOOR LVL- (+32.32MT) 9TH FLOOR LVL- (+35.68MT) 10TH FLOOR LVL- (+39.04MT) 11TH FLOOR LVL- (+42.40MT) 12TH FLOOR LVL- (+45.76MT) 13TH FLOOR LVL- (+49.12MT) 14TH FLOOR LVL- (+52.48MT) 15TH FLOOR LVL- (+55.84MT) 16TH FLOOR LVL- (+59.20MT) 17TH FLOOR LVL- (+62.56MT) 18TH FLOOR LVL- (+65.92MT) 136320 6240 3360 3360 3360 5440 3840 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 2000 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3360 3680 3920 3680 NORTH SIDE ELEVATION SCALE - 1:200 ISSUED FOR : DATE : TITLE: GENERAL NOTES 1. THIS DRAWING IS PROPERTY OF ABM ARCHITECTS IT IS ISSUED SUBJECT TO RETURN UPON DEMAND AND IS NOT TO BE USED EXCEPT IN CONNECTION WITH THE PROJECT FOR WHICH IT IS INTENDED. 2. DO NOT SCALE DRAWING. USE FIGURED DIMENSIONS ONLY. CLIENT : CONSULTANTS : abm@abmarchitects.com www.abmarchitects.com FINISHING CODE NORTH ABM ARCHITECTS Architecture Interior Design Engineering STRUCTURAL CONSULTANTS: INDRAYANI COMPLEX,J.K.SAWANT MARG,DADAR(W), (022) 24324274,24313943 MUMBAI OFFICE WAKDEWADI, PUNE: 411003 SAI CHAMBERS, 16, PUNE-MUMBAI ROAD, +91 20 66449100 FAX: +91 20 66449299 Tel. reddy.a@jwconsultants.in www.jwconsultants.in Formerly Y Sane Associates ARCHITECT: ENGINEERS,PLANNER & L.SURVEYOR. E-mail vastukhubi@yahoo.co.in ABOVE CENTRAL BANK OF INDIA, PLOT NO. 6 JN. OF BRAHMAKUMARI MARG & JAWAHAR NAGAR RD. NO.6 GOREGAON (WEST), MUMBAI 400 062. 3RD FLOOR, SAXENA HOUSE CLIENT: E-mail duratech@yahoo.co.in ASHA NAGAR, MUMBAI 400 080. O2, B WING, 15TH FLOOR, MULUND (WEST) PROPOSED RESIDENTIAL BUILDING, VIKAS PALAZZO AT MULUND (WEST) DRAWING TITLE: DRAWING NO: CHECKED BY : SP SCALE : GFC 1:200 E1001 / R1 NORTH ELEVATION REVISIONS PODIUM -2 LVL- (+9.60MT) PODIUM -1 LVL- (+6.24MT) PODIUM -3 LVL- (+12.96MT) PODIUM -4 LVL- (+16.32MT) 5TH FLOOR LVL- (+21.76MT) GROUND LVL- (+0.00MT) NORTH ELEVATION RAMP UP R12 R7 R8 R10 R11 R9 CORNER CORNER RAMP LVL PROFILE AT OUTER SCALE : 1:175 DRY GRANITE STONE CLADDING ON WALL WITH PARTLY POLISHED & PARTLY FLAMED AS PER DESIGN OPENING WITH FINS 50x75MM EXTERIOR PAINT FINISH EXTERIOR PAINT FINISH DRY GRANITE STONE CLADDING ON WALL WITH PARTLY POLISHED & PARTLY FLAMED AS PER DESIGN PROJECT MANAGEMENT CONSULTANTS: J. J. Realis India Pvt Ltd W 2590 1330 75 75 200 1330 150 1350 2700 750 3920 W 2510 1170 75 75 200 750 1170 1501350 2700 750 3680 19TH FLOOR LVL- (+69.28MT) 20TH FLOOR LVL- (+71.28MT) 21ST FLOOR LVL- (+74.64MT) 22ND FLOOR LVL- (+78.00MT) 23RD FLOOR LVL- (+81.36MT) 24TH FLOOR LVL- (+84.72MT) 25TH FLOOR LVL- (+88.08MT) 26TH FLOOR LVL- (+91.44MT) 27TH FLOOR LVL- (+94.80MT) 28TH FLOOR LVL- (+98.16MT) 29TH FLOOR LVL- (+101.52MT) 30TH FLOOR LVL- (+104.88MT) 31ST FLOOR LVL- (+108.24MT) 32ND FLOOR LVL- (+111.60MT) 33RD FLOOR LVL- (+114.96MT) 34TH FLOOR LVL- (+118.32MT) 35TH FLOOR LVL- (+121.68MT) 36TH FLOOR LVL- (+125.04MT) 37TH FLOOR LVL- (+128.72MT) TERRACE LVL- (+136.32MT) 38TH FLOOR LVL- (+132.64MT) DATEREVISION NODESCRIPTION 16/09/17R1HEIGHT OF 18TH FLR. REDUCED TO 3.36M. AND HEIGHT OF 37TH FLR. INCREASED TO 3.92M. HENCE ALL FLR. LEVELS REVISED R1 R1 R1 DRAWN BY : ABHISHEK
GROUND FLOOR