1 minute read
THE COMMONS
HEART OF THE COMMUNITY
On October 3, 2022, the School broke ground on a 11,800 square foot dining commons. The project is expected to be completed in the winter of 2024. Derryfield believes one of the most important things we can do as a family, as a community, as friends, is share a meal together.
The total cost of the project is $8.8 million. A generous donation of $2.5 million, the largest single gift in the School’s 58-year history, kick-started the project, a long-held dream for a facility that will be the heart and soul of the School. Thanks to this and many other gifts, the dream will soon be realized.