Acording to the syllabus of IV/I prescribed by Tribhuwan University, students of architecture are required to work in an arcitectural firm for atleast 90 days (14 weeks). This period is termed as Practicum.

Its is a specialized field of study, that is designed to provide supervised practical application of a previously studied theory. One should learn under the supervision of practicing architects as an apprentice architect regarding the office management, project handling, bye laws, client dealings, site works etc.

ABSTRACT

A practicum report is an explanation of what one has done during practicum and their outcome. As per the requirement of the course, I Yojana Acharya engaged myself as an trainee architect under an architectural firm ArchSolar Designs.

During this period, I was involved in various projects as well as site visits. This report contains all the works assigned and completed by me during the practicum.

Creative ideas and design works are only fulfilled when it goes for construction and is completed on the given site. so the course is designed in a view to develop the overall ability of a student and experience the realistic side of the profession.

2

3

“Architecture is like writing. You have to edit it over and over so it looks effortless.”

-Zaha Hadid

ACKNOWLEDGEMENT

I am greatly indebted to Ar. Subash Phuyal, under whose supervision I was able to complete my training.

For this, the whole credit goes to Ar. Shreejay Tuladhar and Ar.Arunima dev, principal architects who have let me to work in this office. My special thanks goes to Ar. Lunibha Manandhar and Ar. Aakritie Karki who throughout my practicum period gave me invaluable suggestions and helped me learn a lot. They have been a really wonderful guide who have always tried their best in every possible way to help me to be more competent and practical.

I heartily express my sincere gratitude to the Department of Architecture of KEC for the inception of practicum which has exposed many going-to-be architects like me to the professional field and thus, boosted our confidence. and be aware about our responsibilty as an architect in days ahead.

I am sure the experience, knowledge, vision and vitality that I gained in this office will always remain with me and will serve as a milestone in the development of my career as an architect.

ACKNOWLEDGEMENTThereportsummarizesthepracticalknowledgeIgained,experiencedandtheprojectsIgotinvolvedduringmyinternshipperiodatArchSolarDesign,Kathmanduforover90dayswiththecontinuousguidanceandsupport of the individuals and the firm. Its privilege for me that I got an opportunity to work in ArchSolar Design as a trainee architect.

4

Designingpriate.

Architecture being a distinct academic discipline, extends beyond the bound of theoretical knowledge. One involved in any field can only attain a better understanding of the field, once they have completely gone through it practically. It is easier for one to attain a better grasp of the knowledge through prac tice than through the use of books. Similarly, in architecture, though thetheoretical knowledge goes into the in depth analysis, it cannot be completely fulfilled until and unless the theoretical knowledge is practiced in the practical field. Hence, practicum is a platform where we get an opportunity to be involved in the practical world of architecture, where the designs and drawings that we prepare on paper comes to be concretized on the ground of reality.

This practicum course in B.Arch. IV/I curriculum is intended to endow the students of architecture with a base for using their theoretical knowledge that they gained during their class hours which helps them to work more efficiently with self confidence in the future, with their own ability when they put their step in the actual pro fessional architectural world. During the design projects in class, we just put our imaginative ideas into the design consideration regardless of any constructional restrains, economy and many other things. But in practicality, they might be infeasible. In the class projects, we, ourselves being the virtual clients, design according to our wish. But when we design in the real life,the design is for the client, meaning his decision proves to be the most, which we have to trail up. So, most of the times, we have to compromis in our ideas. This practicum teaches us how to interact with the clients and how to convince them if their stipulate isn’t feasible and appro -

on paper is an easy task, but during the process of concretizing them, many problems maybe raised which we aren’t conscious of until it is confronted in the real practice. Hence, practicum proves to be beneficial in the exposure of those factual problems and helps us to experience the design by ourselves. In architectural field, along with the architects, many other allied professionals are involved in the creation of any built spaces. Practicum teaches us the team spirit to work in coordination with those personals. Moreover, the ethical norms like the essence of endeavor, commitment and enthusiasm in our work, are all learnt during the internship period.

Introduction

5 INTRODUCTION

Objective of practicum

To understand the range of field up to which and architectural firm should deal with the project.

07060504030201

To adapt to the corporate world and learning the rules and regulations of the business.

6 OBJECTIVE

To further develop research skill, personal skill and communication skill.

To gain an opportunity to be familiar with the professional field while utilizing the academic knowledge gained in previous semesters and consolidate their knowledge.

The objective of this practicum is to acquaint us with the various architectural and other issues. The institute provide us ac quaintance with the theoretical aspect of architecture. But this does not build the architect to cope with the practical circumstances. It is necessary for every architect to gain knowledge of professional life, which is gained through practicum. The practicum session has been planned with the following objectives:

To work under the supervisiom of senior architects and learn from their experience and design idealogies.

To compare and contrast between academic teachings and professional life.

To know the general concept of working method of an architectural firm.

ECIFFO ELIFORP

In this context, the essence of every project, be functionality, aesthetics, society, heritage or economy, identified and served accordingy.The projects at ARCHSOLAR range from scale luxury hotels to small interior spaces, each with it’s own personality. The variation in design requirements renders each project with its own unique spirit.There is no hierarchal inequality in the offce although I was a trainee in the office. This made the communication and team work better. I felt like I had equal participation in every project as my senior architects.

7 OFFICE PROFILE

Architectural / Sustainability/ Green Building Consultant/ Renovation/ Interior Design JORPATI, KATHMANDU

ARCHSOLAR?WHY

I have been updated with ARCHSOLAR since a year. Their type of project and quality of work had been captivating me since then. Also my keen interest has always been towards hospi tality because of their rich and luxury architecture whether exterior or interior. Similarly, the qualification of principal architects are praiseworthy.

design is established by Ar. Shreejay Tuladhar and Ar. Arunima Dev with the years of independent practice. Ar. Shreejay Tuladhar is a Havard Graduate who has worked in Page WSoutherland, USA that comes under top 22 architecture firm of the world. Ar. Arunima Dev has been In-house architect of Hyatt Regency, Nepal for 4 years. Their accomplished experience in architecture field has given emphasis to research and design.

At archsolar, every project is treated as a creative variance of functionality and beauty, where multiple possiblities are taken into consideration to create a per fect harmony between two. Every project is treated not only as another mass, but as an opportunity to explore the effective transformation and aesthetic aspects of the environment and as a potential benefactor of the society. Although clients tend to approach designers for primarily spatial purposes, th project at ARCHSOLAR strive to provide an enrchment in the user’s experience of not only the space but also al the aspects related to it.

ARCHSOLAR DESIGN

When I was called for the trainee interview, I was asked alot of architecture related and detailed question. They explained me about their projects and working environment which I thought would be suitable for me to work. I joined the office on 6th of Baisakh. I completed 97 days working days as a trainee architect. Ever since then, my experience in practical field of architecture has been knowledgeable and fruitful.

Archsolar

8 ArchSolar Designs tants*And-Er.Civil-Ar.-Ar.Architects-Ar.-Ar.FounderEstd:Jorpati,Location:Kathmandu2020membersShreejayTuladharArunimaDevLunibhaManandharAakritiKarkiEngineerSwornimaDevvarioussubconsulinIndiaandNepal07060504030201 REQUIREMENTSCONCEPTUALPLANNING & CONCEPTUAL 3D OFFICE SOURCESCLIENTPROPOSALMEETING&INITIAL CLIENT MEETING CHANGES, OPTION & FINALIZATION SITE ANALYSIS 14131211100908 STRUCTURAL ANALYSIS BOQ AND SPECIFICATION WORKING DETAILEDIMPLEMENTATIONDRAWINGPLANAND DETAILED 3D SITE SUPERVISION AND SITE VISIT MUNICIPAL SETWOLFKROWECIFFO OFFICE PROFILE

9 TABlE OF CONTENT CONTENTS11HYATTINCUBATIONYATRIRADISSONREGENCYNIWASTVSSHOWROOMBACKPACKERHOSTELCENTER4743335561

10 TABLE OF CONTENT 65 JORPATI APARTMENT 103 BASBARI RESIDENCE 75 BIHAR FARMHOUSE 83 BALWATAR RESIDENCE 89 GAIRIDHARA RESIDENCE 93 NAXAL RESIDENCE 93 NAKHIPOT RESIDENCE

1. HYATT REGENCY HOTELS 2. RADISSON 3. YATRI NIWAS

-planPlanning of offices - 3D development

Client: Hyatt Regency

- Design

Project Requirement of existing offices gym block banquet

Project type: Hotel

My Involvement: drafted of gym block of banquet

- Rennovation

Project status: Conceptual

du near Boudhanath Stupa. It is situated in a city with a plethora of ancient sites and fascinating architecture. It is set on 37 acres of landscape grounds. The building style is a traditional style of newari architecture. It came to operation on 31 August, 2000.

- New

-officesDesign of

is the biggest luxury 5 star hotel in the country. It is located in Taragaon,Kathman

and 3D development -Site Modeling for presentation INVOLVED PROJECTS FIG: SITE PLAN

- New HbakeryyattRegency

- New

HYATT REGENCY

Location: Taragon, Kathmandu

- Site measurement of existing office and

11 HYATT REGENCY

The need of squezing office spaces was felt as new studio meeting room would lead to profit for the

The objective for renovation is to create an open planned offices and to provide space for studio meeting room.

FIG: PROVIDED EXISTING PLAN

1. Offices

Concept for planning

EXECUTIVE OFFICE

Forhotel.this new planning was done such that there is minimum partition and all the partition used were glass to avoid narrow corridor.

LEGENDS

The first option was presented to the client where around 50% of the space was separat ed for studio meeting room and rest of the spaces were divided as office space. The planning is done according to their major function. The corporate is separated from executive section. STUDIO

FIG: OPTION 1 PLAN

12 HYATT REGENCY

CIRCULATIONW/CHCAVELECTRICALCORPORATEMEETINGMEETINGSECTIONANDFAFROOM

Software used

NOTE: REFER TO ANNEX

The existing office layout was planned when hotel was first built and hasnot been updated since then. Hyatt offices is divided into two parts corpo rate and executive. All the office member are provided with separate rooms parted with gypsum partition which makes the space conjusted and dark since there is no window and only vetilation is provided by central hvac system.

13 HYATT REGENCY

After the first option was presented to the client, he wanted some changes. He demanded separate meeting rooms for corporate and executive sec tion. Also, separate pantry w/c was provided for Owner and VP in option 2.

LEGENDS

NOTE: REFER TO ANNEX

EXECUTIVE OFFICE STUDIO CIRCULATIONW/CHCAVELECTRICALCORPORATEMEETINGMEETINGSECANDFAFROOM

Then, the client felt like the entrace space which was used as waiting lobby was kept wasted. So, he demanded a separate meeting room there and the previous meeting room was changed to account section. Hence, more staff were able to adjust.

For the final plan, the client demanded a phone booth in the entrance section with some cabin seating space.

FIG: OPTION 2 PLAN

The UPS room was made small and accountant section was added facing towards corridor.

FIG: FINAL OPTION

FIG: OPTION 3 PLAN

14 HYATT REGENCY officevpofficeowner officedof officefinAnce recepTion wMALe/c wfeMALe/c rooeLecTricALM eXecUTive officeS cooperATe officeS MeeTinG rooM MeeTinG rooM officeGM pAnTrY w/cenTrY enTrY Final office plan

FABRIC PRIVACYPROVIDEDPANELFOR

OPTION 4 OPTION 5

OPTION 2

OPTION 1

PARTITION USED AS WITH STORAGE UNIT

SEATING WITH DOUBLE STORAGE

OPTION 3

15 HYATT REGENCY Conceptual Furniture Design

CLOTH TO BE USED AS PIN BOARD STORAGE UNIT WITH WHEEL FOR EASY MOVE MENT WITH CUSHION ON TOP THAT CAN BE USED AS SEATING

SEATING WITH SINGLE STORAGE

STORAGE FORVELVETFILE

EXISTING OFFICE FURNITURE USED AS REFRENCE FOR DIMENSION AND DESIGN

The device takes air from the outdoors, cleans and conditions it, and heats or cools it as needed. Once properly conditioned, the air is forced through ductwork inside the rooms of the building.

VICECHANGES

Air handling unit (AHU) is used to condition and distribute fresh air throughout the building. An AHU is part of the larg er HVAC system (heating, ventilating, and air conditioning).

Units (FAHU) which regulate and circulate fresh air as part of a heating, ventilating, and air-conditioning (HVAC) system.

SITE MEASURED USING LASOR DE

FAHU gives an output of a constant volume of fresh & cleaned air.

DONE DURING CLIENT MEETING

During site visit to hyatt I got chance to see dif ferent hvac system machines and its function. I also got chance to see earth air tunnel system, FAHU (Fresh Air Handeling Unit) and AHU (Air Handeling FreshUnit).AirHandling

16 HYATT REGENCY Site Visit

EXPOSED DUCTS RUNNING THROUGH OFFICE CORRIDOR

2.layoutHorizontal wooden baffle ceiling 75*100mm running through corridor with light running through

Ceiling Plan 1.

3.themFloating

Reflected 600*600 BAFFLE CEILING

Hyatt Offices have very low and varring height due to ducts of hotel running through the office ceilling. I was assigned to design reflected ceiling plan under the guidance of Principal Architect Ar. Arunima Dev maam. The false ceiling was kept as simple as possible with three major design element:

3. FLOATING

PANEL 2. 75*100 WOODEN

17 HYATT REGENCY

1. 600*600 prefab panel for open planned office

FIG: FINAL REFLECTED CEILING PLAN

Ceilling in head officers offices and meet ing room

I was also assigned to include sprinkler and fire detector in the plan. For this I researched and found the radius of them as:

DETAIL REFLECTED CEILING PLAN

2. Smoke detector= 7.5m

18 HYATT REGENCY

1. Sprinkler= 2.4m

NOTE: REFER TO ANNEX

Research Done

SPRINKLERSMOKEDETECTOR

FIG: SECTION AT A-A

DETAIL DRAWING IN ANNEX

FIG: OWNER OFFICE

FIG: VP OFFICE WITH HIDDEN CABINET ROOM

19 HYATT REGENCY Office 3D

- 3D visualization of overall office area was done using sketchup and enscape which helped me to improve my 3d skills.

FIG: EXISTING OFFICES

FIG: TOP VIEW OF OVER ALL 3D MODEL OF OFFICE

GYPSUMdesign).PARTITION

- Glass partition was used instead of gypsum partition like in exist ing offices.

- Ceilling designed such that it guides visitor to different part of office(wooden baffle

FIG: EXECUTIVE MEETING ROOM

FIG: FINANCE OFFICE

FIG: OPEN SEATING SPACE IN CORPORATE PART OF OFFICE

FIG: CORPORATE MEETING ROOM

20 HYATT REGENCY

When I joined office phase1 of gym planning was going on, the building foot print and site selection was already done.

of hotels should be upto date with current demand of the users for better hospitality experience. Existing gym of hyatt is small and client wanted to upgrade it with minimum investment.

The planning of gym was done in different phases as per change in client requirements.

FIG: OPTION 1 FIG: OPTION 2 GYM BLOCK 3D BY AR. SHREEJAY TULADHAR

21 HYATT REGENCY 2. GYM

Phase 1

I was involved in designing plan in the finalized building foot print.

Gym

CONCEPTUAL DEVELOPMENT

EXISTING GYM

22 HYATT REGENCY

The planning of gym was done by aligning it’s shape with the contour line of existing site. It had to be placed in such a way that it would create a visual connection with the existing gym and is easy accessible form existing staircase.

During phase 2 I was involved in over all design development of the gym block. With guidance of Ar.Lunibha Manandhar I was able to complete the conceptual development of gym block.

Conceptual Planning

Development of Building foot

In second option dogleg staircase was provided which created separationtheof entry way for male and female unlike in option 1.

Phase 2

In first option straight flight staircase was provided so as to go to gym from ground floor which had sau na, steam and jacuzi.

After presentation there was changes in client -Relocationrequirementsof gym block

OPTIONOPTION12

EXISTING STAIRCASE

Updated Requirement

-Addition of sauna, steam and kids recreation space.

Rectangular block with zen garden as per the shape of contour

Block with curve fornt facade

EXISTING ZEN GARDEN

GARDEN?ZEN

Zen Gardens may contain elements of water, trees, stone, sand, plants, moss, gravel, grass, and bushes – although a Zen Garden can be as simple as one stone in a square of sand.

23 HYATT REGENCY

Zen Gardens are miniature landscapes composed of natural elements and arranged in such a way that reflects the essence of the natural world.

Phase 3

After consultation with principal architect gym footprint was further changed and two option were designed.

24 HYATT REGENCY

3. Difference between wet zone and dry zone; dry zone includes steam, sauna, jacuzzi while wet zone includes washroom, shower, urinal and basin.

FIG: OPTION 1 GROUND FLOOR

FIG:

FIG: OPTION 2 FIRST FLOOR

Designing

drop to be provided; for people to dispose towel after use.

CONCEPTUAL PLANNING

4. Store should be in close proximity to the recep 5.tion.Towel

FIG: OPTION 1 FIRST FLOOR OPTION 2 GROUND FLOOR

for hotel gym there were few point to be considered :

of vestiblue and double door sys tem. If two doors are provided it ensures privacy for the people inside.

1.Entrance for male and female must be clear and apart from each other so that no one gets con2.fused.Importance

Acess from hotel building(indoor)

Acess from existing staircase landing (outdoor)

NOTE: REFER TO ANNEX

25 HYATT REGENCY OFRACK DUMBELL13 44444 TRADE MILL TRADE MILL TRADE MILL TRADE MILL TRADE MILL PEAK RECUTING BIKE2 33 CROSS TRAINER CROSS TRAINER 5 CYCLE CROSSCABLE7 MACHINESMITH8 CHEST PRESS109 11 LEG CURL EXTENSION LEG PRESS LAT PULLDOWN612 MULTI BENCH12 MULTI BENCH PLAN DEVELOPMENT FIG: OPTION 1 GROUND FLOOR FIG: OPTION 1 FIRST FLOOR

26 HYATT REGENCY

When the design was presented client liked both the options, but after long discussion option 2 was finalized.

West facing?

The finalized plan is west facing, front facade of the building is fully glazed on addition to being west facing. This was one of the biggest problem faced during the designing of gym block.

PLAN DEVELOPMENT

27 HYATT REGENCY

To encounter this problem large overhang roof was proposed which compli mented the built structure.

Calculation of the overhang length was done by Ar. Shreejay Tuladhar by doing glare analysis.

FIG: OPTION 2 GROUND FLOOR

Option 2 since was simple to construct it would cost much less than the option 1 i.e, it is easier to find straight glass for facade treatment at low cost than for the curved facade i.e, customized curved glass.

NOTE: REFER TO ANNEX

Approved Design

28 HYATT REGENCY

CONCEPTUAL PLANNING COURTTENNISKITCHENFUNCTIONPRE DOCKLOADING STORAGE303.45m2 47.87m2GROUND567m2FLOOR PLANSERVICESTATION37.39m2 BANQUET525.47m21 525.47m2BANQUET237.83m2FEMALETOILETMALETOILETVANITY37.18m2HCTOILET 28462.71 10661.62 46500.00 51927.82 40000.00 13500.00 20000.00 26273.82 20000.00 26273.82 3000.00 4500.00 10037.03 4647.7412161.62 6013.89 7997.54 1500.00 2000.00 4500.00 1500.00 1500.00 1200.00 1300.00 3000.00 10661.62 8263.46 12612.93 2397.43 4500.00 13500.00 6500.00 10000 3500 3500.00 3000 FIG: GROUND FLOOR PLAN LAwn

When I joined office phase2 of banquet plan ning was going on, the building foot print and site selection was already done. I was involved in designing plan which encountered the changes concluded form phase1.

Prefunction area is where people first gather and food is served. Here there is lawn at the en trace of banquet which can be used as outdoor prefunction area.

1. PRE FUNCTION AREA 2. CIRCULATION 3. TOILET 4. SATELLITE KITCHEN 5. BANQUET HALL 6. ROAD NOTE: REFER TO ANNEX

29 HYATT REGENCY 3. BANQUET Concept for the banquet design was to create a hall with long span structure made of prefabricated material with modern look.

1. void 2. circULATion 3. ToiLeT 4. Green rooM 5. SpAce for HvAc MAcHineS

30 HYATT REGENCY BANQUET1 BANQUET2 COURTTENNIS555.47m2FUNCTIONPRE 555.47m2FIRST567m2FLOOR PLAN VOID 1500.00 1000.00 FEMALEGREENMALEROOMGREEN60m2ROOM50m210000.00 10000.00 4508.74 6000.00 3500.00 3500.00 Kitchen?Satellite

Satellite kitchen is a food service establishment where food is stored, prepared, portioned or packaged for service else where. It is different from the central kitchen as it is created to specifically cater to 1 outlet when the central kitchen cannot do so due to geographical disadvantages. While a central kitchen is created to cater to all the outlets of the restaurant within the serviceable region.

Front facade was designed to be of glass so there is space left between facade and staircase so as not to distrub the clean modern look.

BANQUET 3D

FIG: FRONT FACADE

REGENCY

HYATT

FIG: VIEW FROM ROAD

FIG: BIRD EYE VIEW OF OVER ALL SITE

31

SITE MODELING

FIG: VIEW FROM SWIMMING POOL

DIFFERENT TYPES OF HVAC AND FAHU SYSTEM

32 HYATT REGENCY

IDEA ABOUT LUXURY HOTELS

060504030201

Hyatt was the first project I did when I joined the firm. I learnt a alot of things while working on the project. Many site visits were done where I learnt about different architectural things of a hotel. It’s space planning, function, materials, etc.

MORE UNDERSTANDING TOWARDS CLIENT’S OPINION

SPACE PLANING OF OFFICE, BANQUET AND GYM

LEARNINGS

I also learnt about spaces planning of a gym, banquet and office.

LEARNED ABOUT ZEN GARDEN

During site visit, I visit the service room and learnt about its working process and necessaity in a pub lic Interiorbuilding.3Ds

IMPROVEMENT IN USE OF SOFTWARE

also helped me to explore more of my software skills.

Project status: Construction

- Terrace Bar, Garden renovation to create modern minimalistic asthetic - Outdoor Seating Design - Addition Of Washroom Project

Radisson

is the biggest luxury 5 star hotel in the country. It is located in Lazimpat, Kathmandu. Radisson Hotel Kathmandu provides upscale accommodations and places guests near corporate offices, embassies, and popular attractions like the lively and buzzing entertainment district-Thamel, Narayanhiti Palace Museum, and historical Kathmandu Durbar Square. It came to operation in the year 1998.Radisson Hotels is an international hotel-chain headquartered in the United States.

RADISSON

Project type: Hotel

My Involvement: - Design of Seating Hall - Pergola Detailing - Bar Detailing - Washroom Detailing and updated 3d -Site Supervision and Cordination

TERRACE Requirement:

1. TOILET 2. TERRACE GARDEN INVOLVED PROJECTS

RADISSON33

Client: Location:RadissonLazimpat, Kathmandu

RADISSON

SECTION

RD-BAR B RD-BAR B RD-BARA AA 4525 450 4975 4295 100 450 50 700 50 700 50 700 50 700 50 700 50 700 50 700 50 700 50 700 50100 75 505 P2 CEILING PLAN 7350 CEILING PLAN NOTE: REFER TO ANNEX

Roofing material CGI sheet with tile sel. finish. 19 mm Cement Board Ceiling 50X100 mm Rafters 45050700507005070050700507005070050700507005070050 100 7350 40 220 40 300 34

1. Pergola Detailing

Software used AT B-B

Outddor Seating with toughen glass used as covering was the approved design. The tough ened glass would cost much high and time to be imported would be more because of recent changes in government policy.

So, CGI sheets was used instead of the toughened glass. Ceraboard was used to cover the purlin and CGI sheet for clean look.

When I joined the firm this project was on construction phase and I was given task to solve the site problem and give proper solutions to site Mostchanges.ofthe changes was because of government stopping import of material which caused price hike of materials and the estimated cost happened to be more than periviously published BOQ. So, alternate options were done with out compromising the final output of the project.

Site Changes

RADISSON35

36

4’x8’CeraboardDrainageMetalChanelRADISSON

Skeleton Details Of Pergola

Cera board??

Post and strut connection

form (EPE) roll

ExpandedPurlinPolyethylene

Cera board is used because it can resist the heat produced by CGI sheet and is a rigid, self supporting and insulating product and it also has good resistance to physical damage.

I learned about the use of back splash on the counter top of basin. A backsplash is a section of material added onto the wall behind a sink or a counter, usually in a kitchen. Tiles are one of the most common types of backsplash materials. The main purpose backsplashes is to provide an easy-to-clean surface so that messes or splashes.

RADISSON37

An angle bracket or angle brace or angle cleat is an L-shaped fastener used to join two parts generally at a 90 degree angle. The metallic angle brackets feature holes in them for screws. Its typical use is to join a wooden shelf to a wall or to join two furniture parts together.

ELEVATION OF MALE TOILET

2.

Washroom Construction Detailing

Radisson washroom was addition to the existing site condition. There was voild before which was covered and hence bought to existing entrance floor level. Previously provided plan was not com patible because of many reason mainly due to space specified for drainage pipe to pass. So, there was change in plan and I was assigned to do detailing of new plan .

RADISSON38 Render Elevation Of Male Toilet

IN

RADISSON39 2. Washroom Construction Detailing HOT WATER PIPE FOR COLD WATER PIPE OR SINK COLD WATER PIPE FOR FLUSH WASTE PIPE SOIL DifferentPIPE phases of constructionCOLDWATER PIPE FOR HANDHELD

SOIL PIPE

Option 3

For third option I designed 4 niche on the longer side of wall and single niche on shoter side with downlight. Niches wouldnt create the visual obstruction and the construction cost wouldnot be affected.

For second option I replaced the painting from option 1 and used wall paper instead as client wanted cheaper option.

Coffer was given through out the seating area hall to avoid visual obstruction.

Previously approved design had to be changed because client now wanted to use the bar seating area to be also rented out as event hall.

Option 2

Problem Identification

RADISSON40

In this design coffer was given as per seating arrangements, since seating arrangement was changed the coffer now created visual divisions.

Option 1

3.Seating Area Design

RADISSON41 DIFFERENT PHASES OF CONSTRUCTION 200 Wall niches to be sel.finish 165 50 3352 200 200mm false ceiling level. 125 mm brick wall to be added 125 mm brick wall 200 mmx275 mm cornice 200 275 75 165 mmx75 mm board to be sel.finish led lights 1560 125 mm brick wall to be added 125 mm brick wall Skirting to be sel. stone finish. 3152 125 875 75 1560 75 442 165 mmx 75 mm board to be sel.finish F.L.

RADISSON420504030201 SiteImportanceCoordinationofdetail drawing Material Constructioncode procedure Different materials used LEARNINGS CONSTRUCTION OF PERGOLA

Project type: Hotel Project status: Construction Phase

YATRI NIWAS

- Detail of bar

Yatri

- Rennovation of old wing - New wing addition - Banquet design

Project Requirement:

My Involvement:

43 YATRI NIWAS

- Drafted elevation from given plan

SITE PLAN INVOLVED PROJECTS

Client: Yatri Niwas Location: Janakpur

Niwas is the brand franchise of The Soltee, Kthmandu. Design of a new four-star hotel. It includes renovation of existing block of 30 rooms along with addition of a new wing with 30 rooms. It is located in Janakpur, Nepal. It is designed in traditional mithila architecture to blend with the site. Dome structure on the roof is designed with traditional arches on the wall. The color choosen for the building is also similar to the mithila style architecture. Yet, it is simple and less ornamentation is used on the facade designing.

are chamfered at 45 degree usually There6mm. are different effect of different types of lighting.

NOTE: REFER TO ANNEX

44 YATRI NIWAS

Bar counter workspace should be hidden from front Marblecounter.edges

45 YATRI NIWASNOTE: REFER TO ANNEX

46 YATRI NIWAS LEARNINGS 030201 LEARNT ABOUT Bar Details LEARNT ABOUT MATERIAL CODE FIG: FRONT ELEVATION OF NEW WING FIG: BACK ELEVATION OF NEW WING DIFFERENT TYPES OF LIGHTING 04 MATERIALS USED IN ELEVATION TREATMENT I was assigned to draft elevation from given plan by the firm for municipal set.

1. INCUBATION CENTER 2. TVS SHOWROOM 3. BACK PAKER HOSTEL COMMERCIAL

-Uselanguageofcustom made and multiuse furniture

centre is a workspace created to offer startups and new ventures access to the resourc es they need, all under one roof. In addition to a desk or office, incubators often provide resident companies with access to expert advisors, men tors, administrative support, office equipment, training, and/or potential investors. These are centres where transitory and facilitative assistance is given to small enterprises or start-ups.

Incubation

Project type: Commercial Project status: Construction My Involvement:

-To create three classroom for teaching Japanese

-Site measurement and measured drawing

-Create a co-working space

-BOQ-Client-PlanningMeeting

Project Requirement:

Location: Anamnagar, Kathmandu

47 INCUBATION CENTRE

FIG: AFTER CONSTRUCTION

FIG: EXISTING SPACE

-Case study at KMC Idea Studio

incubation centre

Client: Dr. Tshering Lama

Studio provides encouragement, resources, space, exposure, learning, networking, and investment opportunities for socially conscious business ideas. It acts as a platform to turn promising ideas into business igniting social change and unlocking young potentials. A team of experienced profes sionals helps startups bootstrap during its early stages and often provides mentoring, guidance, co-working space and also at times some funding.

THAT ACT AS RECEPTION AND CAN BE USED AS WORKING DESK

ENTRYDESK

HEXAGONAL SEATING AREA AT LOUNGE

FURNITURE DESIGNED WITH INTRESTING STORAGE UNITS AND PLANTER AREA

Incubation centre is the project that was given to me from conceptual phase. As this project was new for me principal architects of the firm encouraged me to study about if before starting planning. Since I new Idea Studio existed in KMC I went there for case study to boarden the knowledge about the project.

CABINET IN LOGO DESIGN

FIG: LOGO OF KMC

-Interestingfurniturelounge area

48 INCUBATION CENTRE

-Multi use

-Multi purpose meeting hall and coworking spaces

-Open planning

1. Case Study at Kathmandu

Model College Idea studio

FIG: ENTRY AREA OF IDEA STUDIO KMC

Concept for planning

Software used

DIFFERENT MATERIALS

FIG: BAR LIKE SEATING SPACE

FIG: STORAGE UNDER SEATING

FIG: SEATING SPACE ON ONE SIDE OF PARTION WALL

FIG: DOWN LIGHT CREATING INTERESTING SHADOW

INCUBATION49 CENTRE

FOR WRITING NOTES FIG:

ON SEATING

FIG: USE OF ON WALL CHARGING PORT

FIG: COWORKING SPACE

FIG: CABINET

50 INCUBATION CENTRE

FIG: DEATTACHABLE TABLE

After visit to Idea studio my vision about the project became clear. From material to be used to different multi use spaces and furniture I learned many things that I have encoporated while planing the new incubation center.

D

The final plan was chosen after various changes

THIRD FLOOR PLAN

-Oppostitesustainable.toIcafethere

-Open lobby is provided after entry in fourth floor, this space will act as break-out-zone when students leave class.

LEGENDSCOWORKINGSITTINGCLASROOMBARPODAREAPRIVATECABINMEETINGROOM

-Private cabin are provided for finance team of the incubation

-Twocentre.pods spaces are created as a private cabin for private meeting. -It can also be used as smoking zone.

INCUBATIONNOTE:CENTREREFERTO ANNEX

-Two classrooms and one meeting room are provided as per the requirement. ICAFEWAITING

Fourth Floor

FOURTH FLOOR PLAN

Third Floor

- Near the entrace, there is Icafe which also serves the purpose of reception. This space contains bakery items, microwave, freeze for storage, coffee ma chine, etc which van be used by visitors and people using coworking space hence can be rented to make the centre self

A B C C C D D G ECABD F GF

is two step seating space like amphithreater where visitor can wait or people can work seating there also this space can be used as meeting area too. The two step seating shall include storage self within them.

51

52 INCUBATION CENTRE 1236 mm X 100 mm X 125 mm Furniture Design 1. Light box 2. Workstation 1050 mm X 600 mm X 750 mm 3. Classroom Table Type A: 1200 mm X 450 mm X 750 mm Type B : 600 mm X 450 mm X 750 mm

FIG: TWO STEP STEATING SPACE WITH CABINET

FIG:CABINS MADE OF GYPSUM PARTITION FIG: CLASSROOM

FIG: VIEW FROM ENTRANCE (ICAFE ON RIGHT)

FIG: CLASS ROOM

INCUBATION53 CENTRE 3D VIEWS

FIG: COWORKING AREA

FOURTH

FLOOR -ONGOING CONSTRUCTION

FIG: FOURTH FLOOR VIEW FROM EN

3D BY AR. SHREEJAY TULADHAR

4'-2" X 2" X 4" Hanging vase above the work stations Nos. 4.00

Ottoman chair Nos. 2.00

5 Bakery Overhead Cabinet Sqft 10.00

6 Amphitheatre Seating Sqft 80.75

Total= NPR

NOTE: REFER TO ANNEX

5 Wall Putty on the Walls

Sqft 3,256.54

7 Painting Work(Premium emulsion) Sqft 6,333.54

54 INCUBATION CENTRE

Sqft 3,156.00

2 Table

3 Chair

Café area bar chair Nos. Sofa for Pod Nos. 4.00

LEARNINGS

-Knowledge about rate of different materials. -Importance of BOQ for startup of a project

Sqft 678.27

Total Cost - NPR

ESTIMATION OF QUANTITIES

B Carpentary and Furniture Works

Knowledge about multi use furniture

Knowledge about estimation procedure

Learned about concept of incubation centre

Classroom Chair Nos. 94.00

Use of color pop technique

-Estimation of different quatities of materials through plan and internal elevation. -Learnt about BOQ format.

04020103

1 Terrazo flooring

Sqft 432.52

7 Locker Sqft 36.00

8 Ply Boaxing and Cladding with Sunmica(Seating Pod) Sqft 96.03

Map of Nepal Table Nos. 1.00

A. Civil Work

Workstation Table Sqft 208.00

C AC Work as Per Thumb Rule Ton - - NPR

9 Plywood box for Tube light Nos. 50.00

Workstation Chair Nos. 21.00 bar/ high seating chair Nos. 11.00

4 POP on the Ceiling Sqft 4,077.00

1 Sliding Folding Partition

D Electrical System(10% of Civil Cost(3600*3000)) Sqft 3,600.00 NPR

2 Dry wall Partition with Double Layer Cement and Gypsum Board

Yet to be decided

4 Bakery Display Counter Sqft 40.33

3 12mm Toughen Glass Partition Sqft 441.72

Pod table Sqft 10.00

Raised bar area Table Sqft 22.88

Classroom Table Sqft 292.00

S.N Description Unit Quantity Rate Amount Remarks

Project status: Conceptual

TVS

Location: Lazimpat, Kathmandu

Project Requirement:

TVS55SHOWROOM

My Involvement:

-3D of -SignageshowroomDesign

TVS SHOWROOM

Client: Mr. Sirohiya

Project type: Commercial

-Study of TVS facade and signage

ZSpAceoninG

-Rennovation Of Existing building ground floor into a showroom

Brand is a well-established in brand Two-Wheeler industry in Nepal. Both motorcycles and scooter of these brand are widely popular among public of Nepal with TVS RTR being the flag ship model. The brand has gained popularity in terms of good power and pick up motorcycle with sporty looks appealing to youths and middle aged alike. The company occupies 5th largest market share in Nepal.

-White ACP with Stalin to be place in the center and Blue & Red band on either side

-Width of the main road which influence the view ing

10. Plinth, steps and ramp cladded with Granite

1. Dealer name :

8. Entrance portal: Printed Vinyl on WhiteACP

6. Horizontal“I” section painted in DarkGrey

1. Learnt Guideline:

9. Toughened glass: 12mm thick

“I” section painted in Dark Grey

-Cleardistancevisibility of signage from a distance

White acrylic backlit letter inserted from 3.2.backsideBlueACPRedacrylic strip, backlit LED lights

2. Materials Used on the frontage of showroom.

3. Installation of toughened glass(12 mm) as fra meless glass.

56 TVS SHOWROOM

Study from TVS showroomguide lines

4. White ACP clip-on board housing TVS & Horse

7. Entrance canopy in WhiteACP

5.logoVertical

TO LEDGE

Facade Design

After studing the guidelines I did the 3d according to it. Glass facade is used as elevation treatment. For the glass facade I studied about different types of glass facade and did the 3D and wall section with guidance of principal architects.

FRAMLESS GLASS MOUNTED

57 TVS SHOWROOM

NOTE: REFER TO ANNEX

58 TVS SHOWROOM 150 450 230 3140 230 1200 600 3600 1200 5400 1000 230 130 300 90 652 90 FIG: WALL SECTION FIG: SPIDER CLAMP

FIG: FITTING OF SPIDER CLAMP

59 TVS SHOWROOM

3D VIEWS

Learnt about how glass facades are built

60 TVS SHOWROOM

FIG: OPTION 1 SIGNAGE RESTING ON GROUND

LEARNINGS

Signage is the design or use of signs and symbols to communicate a message.

FIG: OPTION 2 SIGNAGE MOUNTED ON FAA CIA AND GLASS (FLAG SIGNAGE)

04030201

FIG: OPTION 3 SIGNAGE MOUNTED ON WALL

Knowledge about showroom spaces, its zoning

SIGNAGE?

Study about showroom guidelines in Nepal

Learned about signage

61 Fig: Site Visit

-Site measurement and measured drawing

Project Requirement:

-Change in upper floor hotel to back packer hostels

-Mirror Design

BACKPACKER HOSTEL

Hostels and Guesthouses are the first choice as an accommodation for real travel ers. Unlike tourists, real travelers (“backpacker”) depend on cheap, affordable accommodation when traveling the world on a small budget, having no income for several months or even years. Especially young people aged 20-30 traveling alone or in groups often share accommodation with others in dormitory rooms.

My Involvement:

-Case-study of existing hostel

Client: Mr. Tashi

Backpacker

11 BACKPACKER HOSTEL

Location: Boudaha, Kathmandu

Project type: Commercial Project status: Construction

Software used visit

PRIVATE CABINETS PROVIDED TO USERS CURTAINS PROVID ED FOR PRIVACY

COMMON STORAGEUNITS

These rooms had already been constructed on one floor and now client wanted the same for upper floors.

62 BACKPACKER HOSTEL Site

12

I was assigned to measure site for calculation of carpet area and design instagramable mirror for existing hostel.

ATTACHED

WASHROOM FOR EACH ROOM

First option was designed such that the mirror had irregular shape and led strip light along its perim eter behid mirror giving it some depth and nice look.

BACKPACKER HOSTEL 63

Second optiom was designed being inspired from trending mirror designs which looks like semi-cir cle or half moon shape. This mirror would enhance the asthetic look of the hostel.

Third option was designed such that it had small bulbs with hidden wire along the perimeter of the mirror. The border around the mirror would hide the wiring of bulb.

Fourth option was also done inspired from trending mirror that looks like leaf and is hung to the wall.

This is the one line meaured drawing done after site measurement for the calculation of carpet area. This was first site measurement and measured drawing I did after joining the firm. During this process I learned the different ways of site measurement.

64 BACKPACKER HOSTEL

1. JORPATI APARTMENT 2. BIHAR FARMHOUSE 3. BALWATAR RESIDENCE 4. GAIRIDHARA RESIDENCE 5. NAXAL RESIDENCE 6. NAKHIPOT RESIDENCE 7. BASBARI RESIDENCE RESIDENCE

-

-

Project status: Conceptual EXISTING SPACE

- Rennovation of ground floor to create a suite room Bathroom with steam and sauna Sliding door connecting different

Project Requirement:

JORPATI APARTMENT

65 FIG:

-

spacesJorpati

apartment is at the ground floor of existing three storey residence located at Jorpati, Kathmandu. Client wanted to renovate existing space into suite room. Clients idea of the new space guided the reqirement for new planning. I was involved in this project from conceptual phase.

-

-

--planningdevelopment

Location: Jorpati, Kathmandu

11 JORPATI APARTMENT

My Involvement: Site measurement and drafting of interior 3d Quantity estimate Preparing client presentation

Project type: Residence

sheetClient: Dr. Tshering Lama

ENTRYCLOSET PRIVATEBATHROOMW/C PANTRY

CIRCULATION

66

12 JORPATI APARTMENT Design Development Software used

Suite refers to a set of rooms with luxurious facilities. A general suite includes a separate bedroom, private bathroom and a living area. Much grander suites can consist of a kitchen, balcony, and even offices. A suite gives the ambiance of an apartment.

BED ROOM

FIG: EXISTING PLAN WITH CIRCULATION

Room?Suite NOTE: REFER TO ANNEX

LIVING ROOM

FIG: CIRCUALATION DIAGRAM

such that there was mini mum changes in existing wall so as to reduce cost of -Circulationconstruction.waslimited upto the existing toilet.

-Sliding door was given from porch to provide easy acess of living room for guest.

-Luxury toilet that includes sauna, steam, jacuzi and shower was provided for guest suite.

FIG: OPTION1

JORPATI67

Design Development

- For first option existing wall was not altered at all, planning was done ac cording to existing condition.

-PlanningAPARTMENTwasdone

-Along with existing door another sliding door was given for providing connection between living room and guest bedroom which served the purpose of guest suite.

-Seperate luxury toilet was designed which included all the requirement of client sauna, steam, jacuzzi and shower.

68 JORPATI APARTMENT

-Access to washroom was changed and only provided through closet.

FIG: OPTION2

- In third option entry was only provided through living room comletly blocking access from existing main entry.

-Small walking closet was also added.

FIG: OPTION3

-Access to washroom was provided from main entry and closet.

- For second option pantry was placed along the entry in an enclosed room other remaining same as option1.

-Final plan was the updated option 4 after client meeting.

JORPATI69 APARTMENT

- For option 4 access to luxury toilet was given such that both the owner and guest can use it.

-Sliding door connecting living room and bedroom was placed off-center to entry for living room for privacy of guest bedroom.

-Further private washroom was also provided to guest room.

-Space For closet was increased, console was added.

FIG: FINAL PLAN

FIG: OPTION4

FIG: RENDER OF FINAL PLAN

70 JORPATI APARTMENT

JORPATI71 APARTMENT

FIG: PANTRY INBUILT MICROWAVE

FABRIC PANEL

FINISHSTAINLESSBRONZE

FIG: BED ROOM WITH STUDY TABLE

MATERIAL

The design of the living had to be designed in a sophiscated manner yet in a homely way. For that, the choice of color and material has made a great impact. Light wood has been choosen for furniture and warm color for wall while the flooring is wooden parquet not allowing to pass cold even in the ground floor.

Japnese door is used while connecting living room with bedroom as per the client choice.

I FIG:

FIG: LIVING ROOM

WOOD SAMPLE

FIG: JAPNESE SLIDING DOOR

INTERIOR 3D

DARK

MATT STATUARIOWHITEMARBLE

FIG: SHOWER NICHE EMPERADORGREY MARBLE

72 JORPATI APARTMENT

INTERIOR 3D

FIG: CLOSET WITH CONSOLE

FIG: TOILET INCLUDING SHOWER, BATHTUB OF GUEST ROOM

Shower niches are suitable for utilizing space in a small area.

FIG: TOILET INCLUDING SHOWER, SAUNA OF COMMON AREA

Quantity estimate NOTE: REFER TO ANNEX

JORPATI73 APARTMENT Length Breadth Height m m m 2.11.61.51.41.31.21.112 16.212 1 -2.1 1 -0.9 Total- 13.212 0.15 2.2 14.718 1 -1.5 1 -0.75 Total- 12.468 0.15 2.3 4.36 0.15 2.4 8.62 0.15 2.5 7.08 0.15 3.13 14.665 0.115 2.79 3.2 0.9 0.15 2.79 3.3 4.665 0.23 2.79 3.4 1.7 0.23 2.79 3.5 -0.9 0.115 2.1 -0.75 0.115 2.1 Total4.14 16.1 2.79 -2.1 2.1 -0.9 2.1 -1.8 1.5 Total4.2 14.7 2.79 1.5 -2.1 0.75 -2.1 1.8 -1.5 Door DeductionDoorDoorDeductionPrivateW/CPantryDeductionLiving3RoomW/C34 Brickwall Door 2,3,4 & 5 Door 1 Door Window2 1 Painting in Bed room Window 2 Wall Finish Door 4 S.N Description Of Items No Parquetting in Living Room Flooring Parquetting in Bedroom Parquetting in Closet Internal wall 115 Internal wall 230 Internal wall 150 Tile in WoodenW/CTileTilePrivatePantryW/cinBathroominShowerFlooring in Sauna Tile in Shower Tile in Toilet Tile in Bathroom Skirting Door 1 Door External2 wall 230 Door PaintingDeductionBedDeduction1Roomin Living room Area Quantity Rate Unit sqm 8.7678612.9935314.7052651.87021.981813.05816.2126.9087.3954.9221.1622.4941.6031.3869.9880.6541.2931.0620.376651.09089-0.21735-0.1811344.919-4.41-1.89-2.735.91941.013-3.15-1.575-2.7WallBrickwallFinishFlooringSkirting

Remarks

74 JORPATI APARTMENT 060504030201

KNOWLEDGE

USE

ROOM ENHANCED

BOQ LEARNINGS

LEARNED ABOUT RENOVATION ON EXISTING BUILDING OF NICHES IN TOILET ABOUT

KNOWLEDGE ABOUT SUITE 3D DEVELOPMENT SKILLS UNDERSTANDING TOWARDS MATERIAL USE

MORE

My Involvement:

11 BIHAR FARMHOUSE

Project status: Construction

Bihar

Farmhouse is a renovation project. There was existing building which construction was going on without proper planning. I was assigned to design new plan retaining the external walls under the guidance of principal architect Ar. Arunima Dev maam.

Location: Bihar, India

-Incoperation of Newari and Bihar architecture style

-Renovation of existing building into a farmhouse for client

Bihar Farmhouse

Project type: Residence renovation

75 EXISTING SITE

Project Requirement:

-Preparation-Planning of render for client meeting

Client: Mr. Aditya Jha

-Measured drawing

GROUND FLOOR PLAN

BEDROOM 1 BOOKFILECABINETCABINETBOOKLIBRARY BOOK CONSOLELIBRARY W/C KITCHEN STORE DRESSER DRESSER WADROBE WADROBEBEDROOM 2 KITCHEN DINING STAIRCASE

Plan Development

DININGW/COFFICEBEDROOMKITCHENCIRCULATION

Kitchen having island counter is planned along with dining enough for upto 8 people along with basin near dining area for easy access.

W/C

W/C

OFFICE

EXISTING WASHROOM

Phase 1

ENTRY PORCH

LEGENDS

Planning is done such that there is minimum changes in exterior walls for cost cutting. Since the location is Bihar we know that it has very hot climate. So for bedroom seatings are provided near window and beds are placed further away from window so that there is no direct heat while having sufficient natural light. Individual wardrobe is provided for each bedroom along with attached washroom and dresser .

Office is provided in ground floor which includes disuccion table for 6 and also sofa is provided. File cabinet is planned such that it is hidden from entry. Book library/cabinets are provided as client has book collection and wants it on display.

12 Software used 76 BIHAR FARMHOUSE

DRESSER

LEGEND

WADROBE WADROBEBEDROOM 2 KITCHEN

CLOSET W/C KITCHEN STORE DRESSER

-Kitchenwish. size was increased compromising the size of store.

W/C OFFICE BEDROOM 1 FILE CABINET BOOK LIBRARYCONSOLE W/C

GROUND FLOOR PLAN

Phase 2 BIHAR FARMHOUSE NOTE: REFER TO ANNEX

77

ENTRY PORCH

-Seperate seating area was added behind sofa and cabinate for privacy also bed was added as per client

BOOK LIBRARYLIBRARYBOOK SHOWERSHOWER SHOWER FRIDGE

After client meeting few changes were done in the presented plan.

DINING

CIRCULATIONDININGW/COFFICEBEDROOMKITCHEN EXISTING WASHROOM

STAIRCASE

BIHAR FARMHOUSE Final

After second client meeting minor changes were done:

78

-Also the position of staircase was changed because client wanted store room behind the staircase.

-Washroom were placed side by side unlike in previous plan for easy sanitary works and ventilation.

GROUND FLOOR PLAN

-This was the final updated plan until I worked on the firm. Plan

Phase 1

Few minor changes were done after first client -meeting:Clientwanted smaller living room so that the guard room also has wardrobe which could be ocassonaly used by his family members too. -Position of toilets were also re-arranged.

W/C

FIRST FLOOR PLAN

W/CW/CW/C

BALCONY

LIVING

LIVINGCONSOLEBOOK BEDROOMW/CWADROBE3

LIVINGBEDROOMW/C 4

BALCONY CLOSET CLOSETTVWALL

W/CCLOSETBEDROOMLIVINGCIRCULATION

Phase 2

STAIRCASE

BIHAR FARMHOUSE Plan Development

WADROBE WADROBE WADROBE

LIVING BOOK CONSOLE BEDROOM 3 STAIRCASE

FIRST FLOOR PLAN

79 CONSOLE

MASTER BEDROOM BEDROOM 4 CLOSET CLOSET CLOSET TVWALL TVWALL

LEGEND

WADROBE WADROBE MASTER BEDROOM

In first floor 3 bedrooms were designed. Master bedroom was deigned for the client which guard room next to it. Guard room has access to the master bed room while main entry to the room is from the corridor.

- Bed position of master bedroom was changed and double vanity basin was added to the toilet. -Pantry was added in the living room and ward robe size was increased as per clients interest. -Guard room was placed near staircase . -This was the final updated plan until I worked on the Phasefirm.3

Final Plan

FIRST FLOOR PLAN

80 BIHAR FARMHOUSE

BY: ARCHSOLAR DESIGNS

81 BIHAR FARMHOUSEDESIGNED

Knowledge about planning farmhouse

learnt about sanitary layout

82 04030201

LEARNINGS

BIHAR FARMHOUSE

Importance of shades and its incoporation in design

Relation of spaces according the individual needs

11 BALWATAR RESIDENCE

Balwatar

Project Requirement:

Project status: Municipal

-Sanitary And Electrical Drawings

-Site Draft, elevation and section for municipal set

- Duplex apartment in ground and first floor as per client demand

residence project was at municipal phase when I joined the firm. As all the planning was done I was involved in drafting the elevation from provided plan, electrical drawing and to do sanitary drawing. The basic plannning concept is based on duplex style with a central courtyard. For the facade, mediterrean style of architecture is chosen. It has features like arch windows, brick and stucco painted white, textured white walls combine with natural woods for a warm, inviting atmosphere. Also natural lights and views is maximized.

Project type: Residence

My Involvement:

83 FIG: CONCEPTUAL DEVELOPMENT DESIGNED BY: ARCHSOLAR DESIGNS

Location: Balwatar, Kathmandu

-Mediterranean Style Elevation treat -Coutyardment Planning

Client: Mr. Sanjay Sirohiya

Balwatar Residence

-Spaciouswallsoutdoor living areas

12

-Stucco

What is a duplex?

Each unit has a separate entrance and there is no interior connection between the two units. If there is outdoor space on the lot, the residents of the two units must share it, or it will be partitioned.

A duplex is a multi-family home that has two units in the same building. These two units always share a common wall, but the floor plan can vary. Units can be arranged either side by side or stacked on top of one anoth er, each occupying an entire floor or two of the building.

-Wrought-iron details

Mediterranean style

-Arched windows and doors

Mediterranean style varies depending on the specific architectural influences, but many of these homes showcase similar exterior elements. Typical characteristics include:

-Clay roof tiles

Software used

84 BALWATAR RESIDENCE

Several of these distinctive exterior Mediterranean features, including the stucco and roof materials, are intended to help keep these homes cool in hot, sunny climates.

WEST ELEVATION

NO DATEAMENDMENT JOB NO : JOB DRAWNDESIGNERDATETITLESCALEBY : CLIENT SANJAY SIROHIYA SHEET DRAWINGNO TITLE : JORPATI, CONTACTKATHMANDUNO9843587935, archsolardesigns@gmail.com9841552155ArchSolarDesignsLOCATIONBALUWATAR,KATHMANDUPLOTAREA:SQ.FT.PLINTHAREASQ.FT.BUILDINGTYPE:RESIDENCEPLOTNO. NOTE: REFER TO ANNEX

All designs are the property of ArchSolar Designs and cannot be used without their written permission. All prints specification and copyrights are the property of ArchSolar Design and shall be returned at the completion of the work. Measurement must be checked at the site contractor.

11 BALWATAR RESIDENCE 85 Drafted Elevation EAST ELEVATIONNORTHSOUTHELEVATIONELEVATION

12 86 BALWATAR RESIDENCE

11 BALWATAR RESIDENCE 87

Steel tubes for structural purpose:

Available: 1/2” to 8”

LEARNINGS

ISNB Hulas65MSteel Pipe

learnt about sanitary layout

Drafting skill development

ISNB 50M

Knowledge about duplex style

Knowledge about Mediterranean style

knowledge of municipal set

12 88 BALWATAR RESIDENCE 060504030201

knowledge about electrical layout

residence project was an on-going project when I joined the firm. Since I was involved in furniture design on previous project I was assigned to do furniture detail of few remaining furniture of this project so as to enhance my knowledge about the importance of detail, how its constructed and what material is to be used. I completed these details under the guidance of Ar.Lunibha Manandhar.

FIG: AFTER CONSTRUCTION DESIGNED BY: ARCHSOLAR DESIGNS

My Involvement: Furniture Detail

Project Requirement: -Interior Location:Client:-RenovationDesignMr.SatyalGairidhara,

GAIRIDHARA RESIDENCE

89 GAIRIDHARA RESIDENCE

Kathmandu

Project type: Residence

Project status: Construction

Gairidhara

90 GAIRIDHARA RESIDENCE NOTE: REFER TO ANNEX

91 GAIRIDHARA RESIDENCE

LEARNINGS

LEARNT ABOUT FURNITURE CONSTRUCTION

LEARNT ABOUT MATERIAL CODE

DESIGNED BY: ARCHSOLAR DESIGNS GAIRIDHARA RESIDENCE

INFORMATION ABOUT TYPES OF WOOD USED IN FURNITURE

030201

92

Client: Mrs. Rani Banji

Project type: Residence

Project status: Construction

My Involvement:

Project Requirement:

93 NAXAL RESIDENCE

DESIGNED BY: ARCHSOLAR DESIGNS FIG: ON-GOING CONSTRUCTION

alwatar residence project was at construction phase when I joined the firm. I was assigned to cordinate with site engineer and counter site problem along with doing door window sched ule, detail and electrical layout drawings. The basic concept of the residence utilizing maximum space since the plot area is very less. For proper lightning and view, ribbon windows. Voild is left for ribbon window and ventilation on toilet.. The facade design is modern and minimalist.

Location: Naxal, Kathmandu

Requirement was to create a modern building and use maximize space. Various elevation options were presented to the client. After the approval from

Naxal Residence

Nclient.axal

-Site -Options-Door-OpeningCo-ordinationscheduledetailforelevation treatment

1

Ventilation

- -

33 -1 1 Window

FIRST FLOOR PLAN

- -

WINDOW SCHEDULE 1ST 2ND 3RD - - 11 Ventilation V1.0 - - - - 1 Ventilation V2.0 1 2 2 2 2 V4.0 V3.0 2 D2.6 D3.0 D4.0 1 1 1 1 4 1 2 Window DW2.6 Door SD5.0 2 2 1 1 3 4.6 2 2.6 1 2.7 1 Window CW8.0 1 1 3 3.0 111- - 3 6.0 2 -1 4 --Window DW2.11 --1 1

94 Software used NAXAL RESIDENCE

Window

1 Corner

2111

1 Sliding

3 3 Door

Door

TOP TOTAL - -

329 Door

1

Descriptions

16.15. 25 Window

Window

- -

-Door

Door

Ventilation V38.8

Window

There was addition of opening on east side for ventilation, so I was assigned to upgate the existing plans along with new opening schedule.

S.No1.2.3.5.6.7.8.9.12.13.11.10.4.14.

121321 -

17. 65

- -

NO. OF OPENINGS G.F

Ventilation

The wall enclosing study didnot feel right so, I re moved the wall and door to create free space for circulation. Also I rearranged the study table such that when being used chair we could still face north side and when closet is being used chair can be kept underneath the study

There was need to change in plan of box room because of insuffi cient space for circulation as during wall layout the space seemed to be smaller than in plan.

Storagetable.

95 NAXAL RESIDENCE

Closet Design (site change)

unit was also provide above and next to study table for enough storage while having clear circulation space of 3’-6”.

SOIL PIPE

Site Visit 96 NAXAL RESIDENCE

REINFORCEMENT ON SLAB

DOWN SLAB FOR W/C

POINTS LEFT FOR ELECTRICAL WIRES ON THE SLAB

MANHOLE WITH IN THE BUILDING DUE LESS SITE AREA PLY USED ON FRAMEWORK FOR PROPER FINISHED CONCRETE SLAB

OPTION 1 OPTION 2

So, other possible elevation treatment were designed which looked similar to one first designed. Also different methods of used of material was explored while trying to achile the previous design.

97RESIDENCE

NAXAL

Elevation Treatment (site change)

As per elevation treatment approved by client there was need to give cantilever space of 4’ on front facade only on second and fourth floor but the contractor made mistake and same cantilever was repeated on every floor.

USE OF DOWN SLAB

IMPORTANCE OF USE OF ARCHITRAVES IN DOOR

CONSTRUCTION DETAILING OF DOORS

LAYOUT OF WINDOW IN SITE 2'-4" 1'-2" 3'-3" 3'-9" 2'-4" 1'-2" 9'-4" +3'6"SILL LVL +0'0"PLINTH LVL

LEARNINGS

98 NAXAL RESIDENCE

1'-4" 3'-2" 4" 3'-6" 4" 2'-0" 1'-2" 3'-3" 3'-9"

04030201

1'-2" 9'-4" 1'-2" 3'-3" 46'-7"

3'-3" 3'-9" 2'-4" 1'-2" 3'-3" 1'-4" 10'-8" 1'-2" 9'-4" 1'-2"

+24'6"SILL +10'6"FIRST+7'0"LINTELLVLLVLFLOOR LVL +14'0"SILL+17'6"LINTELLVL LVL +21'0" SECOND FLOOR LVL +28'LINTEL LVL +31'6" THIRD FLOOR LVL +35'0"SILL +42'0"FOURTH+38'6"LINTELLVLLVLFLOOR LVL +45'3"PARAPET LVL

-1'4"GROUNDLVL

Project status: Municipal Phase

DESIGNED BY: ARCHSOLAR DESIGNS CommercialResidential

Project Requirement

Nakhipot

NAKHIPOT99 RESIDENCE

residence project was at municipal phase when I joined the firm. I was assigned to do opening schedule, overlap plan, sabiatry drawing and electrical drawing at first. Then due to change ni municipality rules I was assigned to update the drawings as per new rules. The basic concept of the residence is mixed used type of building. Two lower floors are used for commercial purpose where as upper floors are used as residential purpose.

Nakhipot Residence

-Mixed used type of building i.e. residential cum -commercialElevationtreatment

only on front facade

My Involvement: - Municipal - Electrical drawings - Sanitary drawings

-3D development according to provided drawings

Client: Mr. Pramode

Project type: Residence

Location: Nakhipot, Lalitpur

100 NAKHIPOT RESIDENCE

i.DrawingsLightswitches and power socket were provided using simple Thumb rule. ii. The position of power socket and light fixture were taken in account.

Electrical Layout

NAKHIPOT101 RESIDENCE

ix. Concrete of grade M25 is mostly used. Readily Mixed Concrete (RMC) is used for high rise

LEARNINGS

v. The stirrup near the pillar is placed more closely in the beam(4” c/c) because it needs to tolerate more shear force at the connection of beam and column. While at the central of the beam due to less shear force, stirrups are provided are more distance (6” c/c)

Mild steel- low carbon steel Tor Steel-Fe415

iii. Extra bars are added on the upper side of the rebar mesh to prevent the hogging moment and also flexing of the salb.

vii. The sizes of stirrups are 4mm, 6mm, 8mm, 10mm but most commonly 8mm is used.

iv. The rebars are larger in diameter on the lower floors of the building because more load are beared by the lower floors.

SANITARY ELECTRICALDRAWINGSDRAWINGSREQUIREMENTOFMUNICIPAL SET OF LALITPUR

The structural municipal set of this building was taken as reference and studied. The following things were learned:

vi.The rebar are mainly of 3 types: TMT- Fe500

102 NAKHIPOT RESIDENCE

buildings.NOTE:REFER TO ANNEX

viii. The cranking is done in stairs at L/4 length where, L is the length of stairs.

04030201

i. Knowledge about lower tie and upper tie beam.

ii. The slab tends to sag most at the central area where supports are not present, hence to prevent the slab from sagging and to support the load, bars are cranked on the lower part of the slab.

MIXED USE BUILDING TYPE

- Landscape

My Involvement: -Site -Landscape-Ceilling-Detailingco-ordinationofgymblockDetailDetailing

Basbari Residence

- Interior

VAASTU PURUSH MANDALA

Client: Mr. Sirohiya Residence Location: Basbari, Kathmandu

BASBARI103 RESIDENCE

residence is developed from basic concept of planning of this residence is Vaastu Purush Mandala. It is a sinuous volume with no sharp edges. The building is constructed in a luxury neo-clasical style. It has features of neo-classical design like grand scale, extensive use of doric col umn, vaulted and groin ceiling in different rooms, dome in the design. The building has been designed by Ar. Bibuti Man Sigh. It took around five years for the building block to be built. Now, the interior and exterior finishing design is being done by Archsolar Design since 6 months. . The detailing is done very precisely both of interior and exterior .

BUILDING FOOTPRINT 3D BY AR. SHREEJAY TULADHAR ADG E' 5'3' H ADG E'H 5'3' FIG: CONCEPTUAL DEVELOPMENT

- Exterior

Project Requirement: Addition of gym block Design Design Design

Project type: Residence Project status: Construction

-

Basbari

Pedestrian Entry Lotus -DetailingPondof Pond -Elevation pedestrianofblock

-Design of closet ceiling and its detailing -Detailing of other -Corniceceillingroomdetails

-DesignedBedOptions for flower -Layoutbedon site -Detailing of flower bed

-Designed back of garage -Draftedwall elevation andsectionFlower

Garage/ Gym Block

BANSBARI RESIDENCE

Main Block

Pond and Deck Details

I designed first option such that -The curves of deck and pond ended on same line.

This was the previously approved design for pond and deck. Changes had to be done as -Client prefere’s symmetry and hence wanted deck and pond to end at same line. -The shape of pond was not fully circular because of pizza stand area so that also had to be updated.

POND UP UP DECK

While the option 1 already encountered all the problem, option 2 was de signed because addition of another curve at end also it being steps would be complicated. Also it only differed in 300mm for having same ending line.

-The problem of sharp edges was encountered by addition of curved ending. -The pond outline was also extended for it to have undisturbed semicircular outline.

PIZZA BARBEQUEOVEN/ UP UP

PIZZA BARBEQUEOVEN/ POND 304UP UP DECK

DECK

PIZZA BARBEQUEOVEN/

OPTION 1 OPTION 2

BASBARI105 RESIDENCE

After client meeting option 1 was selected, its detailling was done and I was assigned for its on so, I prepared layout diagram needed.

site

Client wanted both lotus pond and fountain on specified area which was not possible because lotus plant needed stagnant water and as for fountain the water need to be running. So, for this problem another partation was added for lotus water to be not affected by the fountain water.

FINAL UPDATED POND PLAN NOTE: REFER TO ANNEX

106 BANSBARI RESIDENCE 50150 50 SILL LVL "A" = 1575MM SILL LVL "B" = 1850MM SILL LVL "C" = 2125MM LINTEL LVL = 2600MM 2726 150 R2730 734PONDLOTUSBATHROOM1311 925 2075 2149 BC A LN-DPS3 LN-DPS3 100MM THK RCC M20 COMPACTED EARTH ONE LAYER FLAT BRICK SOLING WATER PROOF LAYER 20 MM THICK SCREEDING 12 MM THK STONE/TILE FINISH 600 SILL LVL "A" +1350MM 2550 LINTEL LVL +2550 MM SILL LVL "A" +1150MM 200 500 1150 700 1850 700 150 759 125 774 125 GROUND LEVEL HT +000M LN-DP S3 SECTION SCALE = 1: 25 Wall WallstaircaseAnnexnicheblockopeningPetalfountain600mmhighpond ledge Freshwater pond Lotus pond 200MM BRICK BATS FILLING Pond division 1250 75 525 700 437 1250 700 437

layout

BASBARI107 RESIDENCE Different phases of construction Brick layout for flowerbedConstructed curve flower bed First flower bed was straight but client had change in his mind and wanted it to be curve. -So I designed a flower bed with the width of -Layout600mm.was done and client thought its width was more. Again flower bed width was reduced to 350mm and was finally approved after again doing layout on the site. 110 350 25 725 125 2150 125 725 TYPICAL FLOWER BED PLAN 600 250 819 350 125 2150 125 874 TYPICAL FLOWER BED PLAN C Brick wall ledge Floor MetallightmeshNiches Boundary wall Planter Ledge Plaster to be sel. finish on existing wall 115 mm Brick wall with 12mm plaster finish35010007506002700 6002100600 75 mm lintel band G.L. Foundation brick wall 2100 MM HT -600 MM HT 750 MM HT 1750 MM HT 75 mm sill band 2700 MM HT 125 75 mm THK COMPACTEDPCC[1:3:6]EARTHONELAYERFLATBRICK SOLING GL 5075 225350125 Flower bed Details FINAL PLAN

108 BANSBARI RESIDENCE Cornice design facia, casted using formwork. Gym/Garage Block Details BALCONY GYM300 mm down main building first floor lvl GROUND FLOOR(LIV.) +101.95 PLINTH LEVEL +101.5 FIRST FLOOR +104.95 SECOND FLOOR +111.45+108.25 THIRD FLOOR BRIDGE 300 mm down main building plinth floor lvl ROAD LEVEL 7501200 450 3450 3300 300 1000 150 300 150 230 125 3297 2400 1325 PLINTHGL +150 3448 MM HT 5887 MM HT 7223 MM HT 75 MM gutter 230 mm brick wall 125 mm concrete roof 125 mm brick wall water proofing layer 50mm thk. cement screeding 3219 1200 160 125 375 150 100 50 50 10075 50 50 100 100 450

272 345 1738 707 1738 345 351 5496 700 50 100 25 695 1131 175 570 3448 345 1738 707 1738 345 4873 R870R870 1738 1306 869 175BASBARI109 RESIDENCE

I was assigned to design garage backwall, science the client always choosed curve I designed archs for it which would be costructed over wall using plaster and there will be darker shade of paint used within it.

FACIA BEAM

NORTH ELEVATION

110 BANSBARI RESIDENCE

VOID DN DAD'S ROOM DRESSING ROOM DN UP SUITE ROOM RMPUJA TERRACE FIRST FLOOR PLAN LIVING ROOM FAMILY GUEST BEDROOMBASBARI111 RESIDENCE Curtain Architecturalpelmetdownlight 150F.L.MM HT 3200 MM HT 150mm high skirting SF-B RM S1 SECTION X-X SCALE = 1:25 19mm thk. gypsum board ceiling to be sel. finish 01 R-04 LED strip light 200 200 02 R-04 19mm thk. gypsum board ceiling to be sel. finish LED strip Architecturallight downlight2550 MM HT 3200 2790 32003162 2690 3200 12mm thk. plaster cross pattern 450 1015 920 2040 1501100X100 mm cornice 100X100mm cornice 26902790 350 100 25037 576 152 100 410 300 200 563 37 700 37 563 100100 300 300 1525 1650 26002600 Ceiling cassette BRM-SF Y SF-B RM P1 REFLECTED CEILING PLAN SCALE = 1: 25 SF - BRM X SF -BRM X BRM-SF Y 100 200 37 600 1700 700 1700 100 300 300 37 700 600 663 663 200 37 663 100 300 200 100 12.5mm thk. cement sand plaster (1:4),2mm thk. 2 coats of wall putty with 2 coats of emulsion paint gypsum board ceiling with exterior surface duly taped at all joints, frames with suspension hangers less than 400m spacing CEILING AT +2700mm LVL CEILING AT +2800mm LVL CEILING AT +3200mm LVL Curve ceiling end cornice 200 450 250 37 662 350 300 300 100 663 37 700 350 2100 200 1037710 152 100 100 200500 1525900cassetteCeilingx900 coffer 900 900 coffer 400 900 350 900 350 900 450 212900312 312 312 50 25 750 2550 100 100 CEILING DETAIL DRAWING

37

For curtain pelmet, 200mm is left. The material used in the false ceiling as well as cornice is Plaster of Paris. Various lights like architectural down light and strip light is also used for the lighting as well as aesthetic purpose. They are hidden in the false ceiling.

LED strip thk. cement sand

DETAIL AT = 1:20

CORNICE DETAIL SCALE: 1:2

DETAIL =

Architecturallight downlight 12mm

DESIGNED BY: ARCHSOLAR DESIGNS

CORNICE DETAIL 12 25 25 12 37 SCALE= 1:2 20 15 75 15 10 60 15 100

Gap to be leveled upto beam bottom level

19mm thk. gypsum board ceiling to be sel. finish 12mm thk. cross pattern 10 60 15 100

AT 01 SCALE

plaster100x125mm cornice 60 200 210 140 100 250 37 260 350 100 287 610 350 37 37 338 125 110500 140 100 250 2512 540 37 727 20 15 75 15 125 15

37

CORNICE DETAIL SCALE: 1:2 CORNICE DETAIL 12 25 37 25 12 SCALE= 1:2

The designing and detailing of ceiling is a long and tedeous process. The oval shape ceiling vault was demanded by the client. So, equal offset from the wall and beam was taken i.e 300mm. Again offset of 700mm was taken from the inner oval making it look like a vault like structure. For the passage, coffer ceiling is chosen where as ceiling above the sofa follows the shape of the ceiling.

112 BANSBARI RESIDENCE 19mm thk. gypsum board ceiling to be sel. finish 01 R-04 LED strip light Curtain Architecturalpelmetdownlight 200 350 12mm thk. cement sand plaster

plasterCurtain pelmet

03 SCALE

125 15

1:20 550 12mm thk. cross pattern plaster 100 250 37 100 286 144 191 140 100 825 2512 862 25 12 37 338 125 463 727500 R-05 03

BASBARI113 RESIDENCE In similar ways other ceiling details were also done which is included in annex. VOID DN DAD'S ROOM DN SUITE ROOM RMPUJA TERRACE FIRST FLOOR PLAN DRESSING ROOM LIVING ROOM FAMILY GUEST BEDROOM MASTER SUITE LIVING SPACE SF -BRM X' SF - B RM X' BRM-SF Y' RMB-SF Y' SF-B RM P2-A REFLECTED CEILING SEATING PLAN SCALE = 1: 30 CEILING AT +2800 mm LVL gypsum board ceiling with exterior surface duly taped at all joints, frames with suspension hangers less than 400m spacing CEILING AT +3200mm LVL CEILING AT +2700 mm LVL Curve ceiling starting point 150 150 1650300 1501501501650 150 Groin CEILINGvaultAT +2600mm LVL Groin vault Arch bottom-2700mm LVL Arch top-3200mm LVL 350 150 1200 350 1950 600 1950 1200 6050 200 Groin vault Arch bottom-2700mm LVL Arch top-3200mm LVL 838 150 2068 150 1339 200 1540 2368 838 4746 Curtain Pelmet 2299 F.L. 3200 MM HT 02 R-04 19mm thk. gypsum board ceiling to be sel. finish LED strip Architecturallight downlight SF-B RM S1 SECTION X'-X' SCALE = 1:25 150mm high skirting 01 R-03 350 150 1650 150150 300 150150 1650 150 1200 350 1950 600 1950 1200 1650 481 19 2700 3200 500 2700 2700 MM HT 2600 MM HT 500 2700 500 2700 2299

114 BANSBARI RESIDENCE DESIGNED BY: ARCHSOLAR DESIGNS

Fig: Cornice negative

BASBARI115 RESIDENCE SITE VISIT

Fig: Cornice sample

Atcornicefirstthe

Cornice design process

CorniceCornice

Fig: Cornice nega

Space for

cornice is designed and it’s negative as well postive is printed in the scale 1:1. Then it is drafted on the site and hand brace is made according to cornice negative. Different samples are showed to the client. The chosen sample are made into long pieces using Plaster Of Paris. They are laid hanging to be dried on the sun. Finally, they are cut into required length and used on the required surface area.

Fig: Cornice sample

Fig: Drying of cornice

Fig: Cornice sample

Fig: Hand brace for running

walls.Fig:Step 1 Fig: Step 2 Fig: Step 3 Fig: Step 4

116 BANSBARI RESIDENCE SITE VISIT

Fitting of window frame in curve wall

Fig: Construction of building

At first, the frame size required is measured on wall then it is traced and cut on thin sheet of wood. Then, it is further traced on wooden frame and cut accordingly. Finally, they are ready to be fitted on the wall. The frames are made very small and large ribbon windows are avoided in curve

Fig: POP on wall

Fig: Wooden detailing for dome

FIG: FRAMING OF FALSE CEILING

BASBARI117 RESIDENCE SITE VISIT

Ceiling hanger is used whose one end is on ceiling and another end is on perimeter chanel. They are not kept more than 600mm spacing. There after, the perimeter chanel is connected to each other by C section. The metal wire mesh is bolted on C section. Finally POP is applied and let to dry. The holes for electrical wires are also covered by POP.

FIG: BOLTING OF METAL WIRE MESH

False Ceiling framing and laying POP

C-SECTERPERIMEINGCEIL

FIG: APPLYING POP ON ELECTRICAL WIRE HOLES

FIG: CEMENT BLOCK

FIG: ANNEX BUILDING REINFORCEMENT

SITE VISIT

CIRCULAR COLUMNFORMWORK OF CIRCULAR

FIG: FINAL RESULT OF POP ON VAULTED CEILING

SPACE REINFORCEMENTFORREINFORCEMENTINBETWEENCEMENT

118 BANSBARI RESIDENCE

FIG: CEMENT BLOCK

BY: ARCHSOLAR DESIGNS

BASBARI119 RESIDENCEDESIGNED

STRUCTURE OF CURVE BUILDINGS

METHODVASTU

Since the building is designed in neoclassical style, I gained more knowledge about its style, characteristics, construction process, etc.

c.Use of POP on wall instead of wall putty to make the building more iii.stronger.Different styles of vault on ceiling

OF CONSTRUCTION of POP ON CEILING

Since I was involved in ceiling detailing, I learnt about different ceil ing styles like coffer ceiling, groin vault, oval vault, etc.

120 BANSBARI RESIDENCE LEARNINGS 07060504030201

SITE DIFFERENTSUPERVISIONSTYLES

INSTALLATION OF WINDOW FRAME ON CURVE WALLS

OF VAULT ON CEILING

A curve building is generally not built. Even if it is built, it is very im portant for it’s structure to be durable especially in case of Nepal as it lies in earthquake zone. Inorder to make the curve building stronger, following things were considered:

iv. Method of construction of POP on false ceiling

Through site visit, I had gained knowledge about the construction of POP and false ceiling.

v. Vastu

It played a vital role in planning. According to it, furniture layout was vi.done.Installation of windows on curve wall

vii. Site supervision

Every Tuesday, detail drawings were presented to the client, site engineer and layman.

a. Use of cement blocks with vertical space left for reinforcement in regular b.Maximuminterval.use of secondary beam to make the structure strong.

Through site visit, I had gained knowledge about the construction of curve window frames and it’s installation

ii. Structure of curve building

KNOWLEDGE ABOUT NEO-CLASSICAL STYLE

i. Knowledge about Neo-classical style

-Zaha Hadid

121

Conclusion

“Architecture is like writing. You have to edit it over and over so it looks effortless.”

In this period of over 90 days, I’ve been involved projects having design, conceptualization, architectural visualizations, walkthrough, working drawings, preparation of municipal set, etc. with a large array of variety of works involving, residences, commercial complexes, hotels, etc. that have been a companion in this journey of internship I have learned that designing in college used to be about employing out of the world designs while in professional life, it is much different to stick to simple but effective and functional design. All these could have never been possible without the regular supervision and consultation of the supervisors, teachers, seniors and collegues.

122

Architect, it has made me realise how much I’ve grown as a person and the level of confidence I have endured as a student to a Trainee Architect. This period of time has brought a great change in my mindset as a student and learned what it feels like to work professionally.

ConclusionLookingbackatallthesemonthsworkingasaTrainee

“Architecture is the learned game, correct and magnificent, of forms assembled in the light.” – Le

ForABOUTCorbusierCOVERPAGE:coverpagedesign

Ive choosen the render image of project I was involved during my internship. I have tried to create balance by leaving some white space and using colorpop technique.

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.