ALEXANDRIA HIGH SCHOOL: MINNIE HOWARD CAMPUS (T.C. WILLIAMS)
BUREAU VERITAS PROJECT: 148303.21R000-015.354
Systems Summary Site Pavement
Asphalt lots with limited areas of concrete pavement and adjacent concrete sidewalks
Fair
Site Development
Property signage
Fair
Landscaping and Topography
Limited landscaping features including lawns, trees, bushes Irrigation not present Low to moderate site slopes throughout
Fair
Utilities
Municipal water and sewer Local utility-provided electric and natural gas
Good
Site Lighting
Building-mounted: LED
Good
Ancillary Structures
None
Accessibility
Presently it does not appear an accessibility study is needed for this property. See Appendix D.
Key Issues and Findings
Exterior wall failures have structural implications and are a safety concern. An engineering study should be performed to understand the deficiencies and remedies. Masonry wall step cracks and separation in various parts of the school, most notably in the mezzanine of the gymnasium addition.
--
Systems Expenditure Forecast