adam james lewis
architecture, design, graphics
aptum. cover_boy. .
a collaboration with choreographer tere o’connor for set design. coverboy is a cnc routed routed piece that allowed for interaction between performance and context. The construction and details of the project are a result of the stringent weight and time constraints with the ultimate goal to create something that allowed for an elaborate but simple assembly and transportability. _In Collaboration with Choreographer, Tere O'Connor Danspace Project, St. Marks Church in the Bowery, New York, NY, 2011 Photos by: Julietta Cervantes
adam james ewis
adam james ew adam james ew
ARCH
373
:PROFESSOR
aptum. [aqua]duct. .
[acqua]duct is a steel bridge introducting modular space for program definition and spacial dictation for the amsterdam iconic bridge competition. [aqua]duct bridge is made with horizontal, structural U-shaped ductile concrete girders that twist in the longitudinal section. simultaneously using a porous material as an asset to soak up, cleanse and release water. _AC-CA Bridge Competition, Amsterdam, Netherlands, 2012
practice
A R U
374
ARCH
”POETICS
depourvu wasteland parking alley
practice practice Chicago Ave
A R C H I T E C T U R E U N D E R G R A D A R C H I T E C T U R E ARCH
”POETICS
depourvu
U N :D 374
EPROFESSOR R G R
A D MALNAR
OF VOID ALLOW FOR THE UTILIZATION OF
NATURAL 374 CITY OCCURANCES AND ADVANTAGEMALNAR OF VIEWS.” ARCH : PROFESSOR 0’
”POETICS
depourvu
5’
15’
30’
50’
OF VOID ALLOW FOR THE UTILIZATION OF
NATURAL CITY OCCURANCES AND ADVANTAGE OF VIEWS.” wasteland
Chestnut St
parking
alley
alley
parking
wasteland
Chestnut St
Chicago Ave 0’
5’
15’
30’
30’
50’
50’
Chicago Ave 0’
5’
15’
0’
LARSEN
OF VOID
NATURAL CITY OCCUR
Chestnut St
s s
N
5’
15’
30’
50’
H I T E C T U R E
D
E
R
G
PROFESSOR
R
A
D
MALNAR
W FOR THE UTILIZATION OF
ES AND ADVANTAGE OF VIEWS.”
undergraduate work. earl prize nominee. post-conflict somalia studio project
[omni] phemeral in a post conflict somalia it is time to look at the resources that are available and determine how to use them to the advantage of the existing structure. ultimately creating an opportunity for growth in a failing environment. the ideas of this project provide the begining stages of a possible future. the primary site of this project dealt with dilapidated structures and spaces. in designated areas the market place forms with the start of a simple module. a rebar module can be simply formed and manipulated allowing for density growth and construction production. upon population growth and community build up, the amount of modular rebar increases simultaneously. as modular rebar’s increase in a given space they begin to form walls and columns. from there construction on the site begins and continues to grow all directions. the designated spot of a column or the creation of a wall isn’t necessarily pre-designed, but as time and the people of the space evolve so does the architecture that began with a modular design of rebar.
modular rebar
table
bench
step
column
surface
set down
start
end
undergraduate. selected works. .
a compilation of rendered drawings and physical models completed as a student at the university of illinois.
fade[decay]
ARE DETERMINATE OF ITS DECAY AND
373
ARCH
475 [
ARCH
:PRO
]:
“TERMITES COMPOSE MODULAR F CAPSTONE PROFESS
ARCH 373 :PRO fade[decay] “THE TRUE WONDER LIES BENEA “ fade[decay] CONTRADICTION AND GIVING HEIGHTENE
ARE DETERMINATE OF ITS DE TERMITES COMPOSE MODULAR
[dino]sphere
ARE DETERMINATE OF ITS DE
[dino]sphere [dino]sphere
ARCH
475 [CAPSTONE]:P
“THE
TRUE
ARCH
WONDER
LIES
475 [CAPSTONE]:
CONTRADICTION AND GIVING H “THE TRUE WONDER LIES
CONTRADICTION AND GIVING H
13
13
12 11
12 10
11
8
12
5
9
11 10
4
3
8
5
9
7
6
2
3
13
7
6
10 8 7
6
9
5
1
4
4
4
3
2
2
1
4
A
1
10
4
1
5
B
11
A
C
10 11
7
14
1
5
B
8
A
10
C
1
D
5
B
7
11
8
14
16 D
C
E
8 E
F
14
7
2
12
16
9
2
13 12
6
D
G
14
F
9
I H J
G
K
15
H
2
13
6
16 I
E
J
K
12
9
F
13
13
6
3 12 11 10
G
9 13
8 7
6
I H
12 11
5
10 9
J
K
4
3
8 6
7
5
2 1 3
4
2 1
A 24
B 23
A
13
C B
24
12
23
19
11 10
C
9 D
20 19
8 7
6 5
27
D
20
E
3
4
17
27
E
F
2
17
1 G F
I H G
J
K
14
I H
A
J
K
24
B 23
C 21
19
D
20
27
E 18 17
26
F
25
G
22
FUTURE.”
0’
OR
LARSEN
0’
5’
5’
15’
15’
50’
30’
30’
50’
DEUTSCH
ND THROUGH TIME
OR LARSEN ND ITS FUTURE .”
ANDFORMING THROUGH TIME
AND ITS FUTURE.”
XPERIENCE”
SSOR DEUTSCH
NEATH
FORMING
SSOR DEUTSCH
NED EXPERIENCE” NEATH FORMING
ENED EXPERIENCE”
4
1 exhibition room 1 exhibition room
2 entry
2 entry
3 storage
3 storage 1 exhibition room 4 library
4 library 5
2 entry 5 gift shop
gift shop 63
storage work room
library 74 office
6 work room
gift shop 85 secretary
7 office
96 coordinators work room office
8 secretary107
girls bathroom office
secretary bathroom 11 8 boys
9 coordinators office
9 toilets coordinators office 12
girls bathroom 10 equipment 13 10 girls bathroom boys bathroom 11 janitors closet
14 11 boys bathroom
12 toilets 15 hvac
12 toilets
13 equipment 16 elevator mechanical
14 13 equipment
janitors closet
15 hvac
14 janitors closetelevator mechanical 16
15 hvac 16 elevator mechanical
Cap flashing
Metal Sheating Cap flashing Flashing
Metal Sheating Water drainage
Cant Strip Flashing Firestop
Water drainage Cant Strip Firestop
17
observation room
18
orientation room
19
secretary
17 observation room 20 assistant 18 orientation room 21 directors office 19 secretary 22 accounting office 20 assistant 23 boys bathroom
21 directors office 24 girls bathroom 22 accounting office 25 kitchen 23 boys bathroom 26 storage 24 girls bathroom 27 mechanical 25 kitchen 26 storage
4
27 mechanical
Ceiling Interior dry wall Plywood CeilingThermal insulation
17
observation room
18
orientation room
19
secretary
barrier InteriorAir dry wall Plywood 2’ Kalwal panel
20 assistant
Thermal insulation Air barrier 2’ Kalwal panel Metal Stud
Window flashing
21 directors office 22 accounting office 23 boys bathroom
Kalwal Bracket Metal Stud Window flashing
Window header Kalwal Bracket Weep hole
24 girls bathroom Window header
25 kitchen 26 storage
27 mechanical
Weep hole
Cap flashing
Metal Sheating
Flashing
Water drainage Cant Strip Firestop
Ceiling Interior dry wall Plywood Thermal insulation Air barrier 2’ Kalwal panel
Metal Stud Window flashing Kalwal Bracket
Window header Weep hole
posters. for sale. .
graphic design work to better enhance my skills, knowlege, and thirst for design and design layout.
adam james lewis graphic design
618.910.0198
adam15544@gmail.com
exhibit. it. advertisement. nt. the university of illinois architecture program discovered its first course that would explore the realms of a post conflict environment and the architectural theory that could exist within such a space. the studio in all its uniqueness allowed the chance to show something new to the students and faculty. alloted exhibit space to display the years work the event requested a poster that would respond to the archictural projects to be displayed. this poster design was thought, created, and designed by adam james lewis. The following page is the winning design.
uiuc
first place may 2013
[EXISTING
STRUCTURE]
[DELAPIDATED
[IDP
STRUCTURE]
SETTLEMENTS]
RESURRECTION OF
MOGADISHU
[SOMALIA]
ARCHITECTURE SCHOOL OF
[OPEN HOUSE]]
7 P.M. MAY 8
[LOCATION]
TEMPLE BUELL HALL GALLERY
[DESCRIPTION]
STUDENT INVESTIGATION OF AN EXTREME CONDITION IN
[DATE]
MAY 8
ARCHITECTURE AND URBANISM. ULTIMATELY CREATING AN AUTHENTIC
[CONTACT]
MAY 10
SENSE
OF
EMPATHY
THAT
PROPELS
US
TO
FORM A SOLUTION IN A POST CONFLICT ENVIRONMENT.
PROFESSOR
GREENLEE:
CGREENLE@ILLINOIS.EDU
dance advertiseme the following posters were designed and created to match the progression of a dance performance done by graduate student nico brown at the university of illinois dance program. the posters were designed and built in collaboration with the choreographer nico brown and used as advertisement to gain public awareness for the work and to use along with the piece within the department to show the coordination through dance and graphic.
it. nt.
A 14-HOUR OPEN STUDIO DANCE PERFORMANCE REHEARSAL WHATEVER
WE DO WHAT WE CAN. FRIDAY, OCTOBER 25, 2013 KRANNERT CENTER FOR THE PERFORMING ARTS LOBBY OPEN REHEARSAL 8:00 AM - 10:00 PM PERFORMANCE 10:00 PM IT’S FREE FEATURING NICO BROWN, ALLISON PAULEY HALEY JENSEN, JESSIE YOUNG
WE DO WHATWE CAN
LIN
Arch chite FRIDAY, NOVEMBER 15, 2013 Clie KRANNERT CENTER FOR THE PERFORMING ARTS
LEVEL 2[ALL OVER THE PLACE] OPEN REHEARSAL 8:00 AM - 6:00 PM Proj PERFORMANCE 6:00 PM [MEET AT DANCE REHEARSAL ROOM DRK] Proj FEATURING NICO BROWN, ANDREA CHIM, BRIDGET GRISSOM Loc KRISTIN MCCOY, KATIE WILLIAMS
IT’S FREE
OLN CENTER PENTHOUSE
ect: Studio JS2 ArDeveloper (Private) Size Duration
on: New York, NY
TEXT BOX
studio js2. selected works. project manager and director of design long island townhouse: residential renovation completed the following phases of project as lead project manager schematic design design development construction documents construction administration interior design post occupancy bitcoin company gut renovation: commercial design completed the following phases as lead project manager schematic design design development construction documents: in conjunction with building architect construction administration interior design: including furniture design post occupancy lincoln center penthouse: residential renovation project currently under demolition assisted with the following phases of the project as director of design design development construction documents construction administration interior design: designed interior portfolio
long island townhouse [residential renovation] architect: client: location: status:
studio js2 architect, p.c. cerina family jericho, ny post occupancy
the project required a complete home renovation. primarily focused on a custom staircase and kitchen design. through 3d modeling and analysis the client and i designed a one of a kind staircase for the family that spoke to their material wishes and safety precautions while simultaneously opening up the space. drafting construction documents i was able to design and have the stair built along with a custom kitchen that allowed for optimal seating and functionality.
top right detail
top right image: photo of finished metal staircase top left drawing: exploded view bottom left drawing: isometric top right detail: rod and tread detail bottom left detail: stair detail
left image: photo of finished project from kitchen perspective middle image: presentation floor plan to show client plan, materials, and furniture layout bottom images: elevation drawings of kitchen and milwork
bitcoin company gut renovation [commercial design] architect: client: location: status:
studio js2 architect, p.c. ledger x madison ave, new york, ny post occupancy
as project manager i drafted construction documents for the 21st floor leased by ledger x bitcoin company. i was relied to compose a space that spoke to all the specific programs of the business. during construction i coordinated and resolved all field conditions. simultaneously, i selected and designed interior furniture to be ready for move in. top image: photo of finished ceiling middle drawings: elevation drawings of kitchen/pantry bottom image: photo of finished trading floor area
top drawing: floor plan top left image: before photo of the 21st floor bottom left image: photo of finished conference room barn door entry right image: photo of finished space with pocket door entry
lincoln center penthouse [residential renovation] architect: client: location: status:
studio js2 architect, p.c. private developer new york, ny demolition
the lincoln center is a condominium combination project. taking two existing condos and turning them into one luxurious home for a family of eight. the concept being to keep everything from floor plan to milwork to furniture in linear formation creating a peaceful home environment. as director of design i managed the project fixtures, finshes, details, milwork, and interior furniture. top and bottom images: rendered views of master bathroom and kitchen/dining areas [renderings and drawings were drafted and created with fellow project manager at studio js2]
TEX
BOX
top drawing: floor plan for 25th floor at lincoln center penthouse bottom drawing: reflected ceiling plan of 25th floor at lincoln cetner penthouse
the end