Adam T Thesing Architectural Portfolio 2015

Page 1

Adam T Thesing architectural portfolio


Experience

ADAM T THESING

Architectural Intern, LKA Partners, Inc Architect January 2010 - Present

Architectural Intern, LKA Partners, Inc Architectural Intern September 2005 - January 2010

Personal Statement

A rchitecture has many sides, and for me, outreach and community play an important role. I believe architects can have a strong community voice and AIA helps provide this positive impact and I enjoy the challenges that come with it. I engage in the AIA because by working together we can better ourselves, our communities and our architecture.

Objective

erge into a team environment where I can M advance the entire team through collaboration while building upon my skill set. Contribute to diverse projects while gaining new experiences that push and expand the limits of my current abilities. Earn respect and advancement within the firm through hard work and determination. Quickly master Revit and become a productive part of the design team.

L ed production drawings and engagement in all phases of design. Coordinated owner and consultant progress and design meetings. Actively participated in job interviews, community and school board presentations and creating digital graphics. Performed construction administration tasks, including multiple projects at once. Submitted code review plans to several jurisdictions and numerous code editions. Ran the office resource library and handled product rep requests. Developed animations and 3D renderings for both presentations and working study models.

D rawing production in all phases of design. Developed construction details to meet the design. Coordination of consultant drawings with ongoing architectural updates. Attended owner progress meetings and produced interview graphics. Developed animations and 3D renderings.

Skills & Abilities

D etailed oriented hard worker with a determined mindset and ability to adapt to changes during design and construction. Self-motivated quick learner with outgoing personality that is dependable. Advanced understanding of building assemblies and construction detailing while creatively solving problems. Ability to think beyond the last request and foresee future possibilities and requirements to complete the project. - Adobe Creative Suite, AutoCAD Architecture, Trimble SketchUp, Microsoft Office Suite

Education

B.A. Architecture, B.A. Environmental Design and Minor in Archaeology - 2004 North Dakota State University, Fargo, ND

Leadership L ead internal project team on a daily basis, providing guidance and knowledge with job experience and technological issues. Offering ongoing guidance to future architects through mentorship within the office as well as involvement in the NDSU alumni mentorship program. Continued volunteer leadership within the AIA on many levels and committees including president of the Colorado South chapter in 2012, developed AIA National Convention Continuing Education Course in 2013 and partnered on AIA National Community Grant SDAT project.


CONTENTS Project Photos Ellicott Middle School Black Forest Hills Elementary Mountain View Electric Association, Inc. Garfield County Middle School Sanford PK-12 Graphics Working and Presentation Model Images Project Interview Images Digital Renderings Presentation Boards Daylighting Analysis Study Models and Sections Production Drawings Plans Elevations Sections Details Volunteer Work American Institute of Architects Engagement Acknowledgements


PROJECT PHOTOS Project Photos Ellicott Middle School Black Forest Hills Elementary Mountain View Electric Association, Inc. Garfield County Middle School Sanford PK-12


Ellicott School District Ellicott Middle School 2013-15


Ellicott School District Ellicott Middle School 2013-2015


Ellicott School District Ellicott Middle School 2013-15


Cherry Creek School District Black Forest Hills Elementary 2012-13


Cherry Creek School District Black Forest Hills Elementary 2012-13


Mountain View Electric Association, Inc. Falcon, CO Facility Renovation & Expansion 2008-09


garfield County School District New Middle School 2007-08


Sanford School District 6J New Sanford PK-12 School 2012-13


Sanford School District 6J New Sanford PK-12 School 2012-13


GRAPHICS Graphics Working and Presentation Model Images Project Interview Images Digital Renderings Presentation Boards


Roaring Fork School District

Roaring Fork High School 2005-06 Material, Color and Presentation Model - CD Phase


Roaring Fork School District Roaring Fork High School 2005-06 Material, Color and Presentation Model - CD Phase


Douglas County School District Re-1 Rock Canyon High School Addition 2010 Material, Color and Presentation Model - CD Phase


Pueblo County School District 70

3 Mesa School Remodels 2013 Form and Material Study Model - Early DD Phase


Garfield County School District

New Middle School 2008 Progression from Study Model (Top Left) to Finished Model (Bottom Left) to Constructed Building (Right) - All Phases


Colorado Springs School District 11

Doherty High School Remodel and Additions 2006 Study Model For Building Signage (Top) - CD Phase Form and Scale Model (Bottom) - SD Phase


Salida School District

Project Interview Images 2013 3 Day Deadline to Create Design Schemes for Interview. Created Model Images, Animations, PowerPoint Slides and Handouts for the Interview.


Aurora Public Schools

Lansing Elementary School Additions and Renovations 2011 Two of Many Tile Color Selection Options for Owner - CD Phase


Sanford School District 6J

New PK-12 School Additions and Alterations 2012 Presentation and Color Selection - CD Phase


Thompson School District R2J

New Transportation Facility 2008 Presentation Elevations - DD Phase


Aurora Public Schools Lansing Elementary School Additions and Renovations 2011 Presentation Site Plan - CD Phase


Thompson School District R2J

New Transportation Facility 2008 Presentation Floor Plan - DD Phase


Mountain View Electric Association, Inc. Falcon, CO Facility Renovation and Expansion 2010 Presentation Board Layout (Left) and Building Image (Bottom) - CD Phase


Thompson School District R2J

New Transportation Facility 2008 Presentation Board Layout - Post Construction Phase


Aurora Public Schools Lansing Elementary School Additions and Renovations 2011 Presentation Board Layouts - CD Phase


Saint Vrain Valley School District 3 New Elementary Schools 2007 Presentation Board Layout - SD Phase


Douglas County School District Rock Canyon High School Addition 2010 Presentation Board Layout - CD Phase


DAYLIGHTING ANALYSIS Daylighting Analysis Study Models and Sections


Daylighting Analysis Mountain View Electric Association, Inc. Falcon, CO Facility Renovation & Expansion 2010 In-depth analysis of daylighting of the office space to help design the custom freestanding sun control shade and interior and exterior light shelf. AutoCAD and 3D Modeling were used.


Daylighting Analysis New Roaring Fork High School(Top) and New Garfield County Middle School (Bottom) 2005-06 and 2008 Using 3D modeling to analyze the proposed sun shade and light shelf assemblies.


Daylighting Analysis

Rock Canyon High School Addition 2010 Using 3D modeling to analyze the clerestory popup and overhang length for daylighting in the classrooms and main hallway.


PRODUCTION DRAWINGS Production Drawings Plans Elevations Sections Details


Production Drawings

ADAM THESING Pueblo County School District 70 Three Mesa School Additions and Renovations 2014 Floor Plan (Right) and Window Sill Detail (Bottom)


Production Drawings Boulder Valley School District Broomfield Heights Middle School Improvements 2011 Elevations


Production Drawings Mountain View Electric Association, Inc. Falcon, CO Facility Renovation and Expansion 2010 Elevations


Production Drawings

ADAM THESING Ellicott School District New Ellicott Middle School 2012-13 Interior Elevation (Right) and Window Sill Detail (Bottom)


Production Drawings Mountain View Electric Association, Inc. Falcon, CO Facility Renovation and Expansion 2010 Building Sections


Production Drawings

Pueblo County School District 70 Three Mesa School Additions and Renovations 2014 Wall Sections (Left) and Window Details (Right)


VOLUNTEER WORK Volunteer Work American Institute of Architects Engagement


Volunteer Work

American Institute of Architects (AIA) With my engagement within the AIA I have had the opportunity to be involved with several programs and initiatives. I have helped develop, organize, produce promotional flyers and volunteer during these events. Disaster Assistance Training Flyer, 2014 (Left), Local AIA Colorado South Associates Event Flyer, 2009 (Right) and AIA Western Mountain Region Conference Logo Design Competition Entry, 2010 (Below)


1.1

Volunteer Work

American Institute of Architects (AIA) Sustainable Design Assessment Team (SDAT) Community Development Grant 2011 Helped develop the grant application and documentation (Right) as well as the event poser boards (Left and Middle).


Volunteer Work

American Institute of Architects (AIA) 2010 DreamCity 2020 Community Visioning Event


ACKNOWLEDGEMENTS Projects displayed in this portfolio are the product of projects developed through and with LKA Partners, Inc. Not all images are the sole product of Adam Thesing. Some AIA volunteer work is also developed as a committee and not solely my work. Thank you


Adam T Thesing


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.