ADCO Contracting Company Profile

Page 1

ADCO Contracting

Company Profile


Contents


Company Profile

3

Welcome

ADCO Contracting set up business in early 2009 with a strong focus on clean room installation, fit-out works and general contracting specifically in the pharmaceutical sector. Since then, we have become well established in the pharmaceutical sector completing shutdowns, upgrades and redevelopment works, and gained a reputation for quality service and deliverability. As well as an emphasis on pharmaceutical works, we also undertake general contracting and commercial fit-out works in many areas, and in the past, have provided project management services for several clients. We are still a relatively young player in our industry, but conduct ourselves as if we were a global leader. Our clients value our dedication to innovation, safety, sustainability and our responsiveness and devotion to customer service. Over the coming years, we will focus strongly on maintaining our status as a quality specialist in the pharmaceutical sector, whilst broadening and strengthening our client base. As well as this, our goal is to innovate and develop in the construction industry whilst branching out into larger commercial fit outs and new builds.


4

Company Profile

To provide our customers nationwide with the highest standards of professionalism and quality, whilst ensuring a harmonious and safe working environment.

Establishing long and lasting relationships with all of our customers both new and existing is paramount to ADCO. At the forefront of our minds during a project is the need to deliver to the customer a project we can all be proud of. To ensure we achieve this, we strive to continuously exceed your expectations and form successful partnerships based on trust and common goals, so once we’ve handed over to you, you’ll bear us in mind for any future work. Companies can come to ADCO knowing that we want to help them, and that we can save them money from the get-go by making thorough, well informed decisions early on. Our project team has been crafted to cover a broad range of expertise with keen eyes, allowing us to see issues before they arise, and change course to keep costs and project duration to a minimum. We work in a sector which requires attention to detail and allows for no margin for error, as a result we keep things simple, down-to-earth and honest with a real approach, to produce a result that we can all be proud of.

Founder and Managing Director of ADCO.


Company Profile

Pleasure in the job puts in the Pleasure perfection job puts in the work.� - Aristotle perfection in the work.�- Aristotle

- Aristotle

5


6

Company Profile

Michael Foran founded ADCO in early 2009, when a lot of people would have considered starting a construction business a sure loss, but due to the work experience and ethic he and his team bring to each project, ADCO has gone from strength to strength and shows no sign of slowing down.

Strive not to be a success, but rather to be of value.� -

Albert Einstein

— Name Surname


Company Profile

7

2009 - 2017

2017 - 2022

HUMBLE BEGINNINGS

THE FIVE-YEAR PLAN

Developing existing contacts

Our key ambition is to increase each year the

as an opportunity to tender for

percentage of business that we win without

works Michael was able to get

competition; that is, clients who consider no

things off the ground during

company but ADCO. Presently, this stands at 30%

an unstable time for Ireland.

of our turnover, which is not bad in an industry

Off the back of our initial

where competitive bids are as routine as coffee

successes with various sized

breaks. It is a credit to our team that 70% of our

pharmaceutical projects, we

business is for repeat clients, providing them and all

have grown and developed,

involved with security and stability.

remain steadfast.

In addition to this, we are determined to further our

We are a small company

and now offer expertise across a range of industrial sectors.

We are building a sustainable business across key sectors, which include pharmaceutical, commercial fit-out and new builds, so that should another economic downturn occur, we will

reach in the pharmaceutical sector, as well as

that takes on big projects

undertake more new-builds and other industrial facilities projects.

expectations. Join us on

and constantly exceeds our journey as we pick up speed.


8

Company Profile


Company Profile

9

Over the last eight years, we have established ourselves as a professional, reliable and experienced contracting firm, capable of delivering on schedule, safely and within budget every time.

Whilst ADCO itself is young, our project team is made up of industry professionals with decades of experience, a wealth of knowledge and expert know-how. We work directly with you, and will provide comprehensive construction

management,

service

that

Our Services

covers

programme, value management, quality control and safety on site.

Each project is unique so we will tailor our approach to your specific needs, and will go above and beyond to

Pharma

Commercial and Fit-Out

Industrial

New Builds

ensure that those needs are recognised and achieved.

We collaborate with a team of specialist subcontractors to optimise quality and performance, all the while keeping you in the loop so that you can trust that your project is being done exactly to your requirements, and ensure to get you the best value and quality on the market. There are no shortcuts taken because perfection takes patience.


10

Company Profile

Or ganis at ional St r uct ur e

With a wealth of knowledge of state-of-the-art manufacturing, distribution and administration facilities, a considerable amount of our work is in the pharmaceutical sector. We fulfil requirements such as upgrades, clean-room installations, extensions, decontamination works, specialist floor finishes and firewall systems for some of the top pharma companies in Ireland, such as MSD, Takeda and Amgen, to name but a few.

For the likes of Analytic Partners, Knight Frank and Belfius Bank we have fit out, renovated, refurbished and extended numerous offices to suit a broad variety of requirements and purposes. Works we’ve undertaken include fitting meeting and comms rooms, directors’ and open plan offices, shower rooms and kitchens and changing the structures of buildings, as well as full M&E installation.

Industrial projects have included food facilities, car showrooms and motor learning centres,

including

demolitions

and

extensions,

office

fit-outs,

car-lifts,

weatherproofing, and successfully working around sensitive products at risk of contamination.

A number of our projects require entirely new constructions, and we are proud to have numerous types in our repertoire. Whatever the intended purpose of the building we have the expertise to construct, extend or reconfigure your project, so you know it will be a sound build and a sight to behold.


Company Profile

As we move forward and expand our operations in the pharmaceutical sector and general contracting such as clean room installation and commercial fit-outs, continuous improvement in management systems remain a core strategy to our company. We are particularly proud of achieving the double ‘A’ rating in our SafeT-Cert audit. This accreditation sets the new benchmark for safety performance within the company and ensures that our sites operate at the highest levels of safety compliance.

11


12

Company Profile

Accident Rate

We have a flawless accident rate with no reportable incidents on site in our history to date. Good health and safety practice is imperative as it prevents potential serious injuries, as well as contributing to reducing project duration

Deliverability

70% 70% of our business is for repeat customers, with projects increasing in scale each time. Our customers know we will deliver, and we know we will have exciting projects that will give us the opportunity to push the envelope.

Opportunity

30% We see new clients as the chance to expand our ever-broadening skill-set, and to put our name to new challenges and innovative projects.

Actual and projected


Company Profile

13

Company Structure Our management and staff are our greatest asset, and provide tremendous support, commitment and dedication to our company. We are what they make us.


14

Company Profile

We all need people who will give us feedback. That’s how we improve.” - Bill Gates, co-founder of Microsoft


Company Profile

We shape our buildings; thereafter they shape us.� - Sir Winston Churchill

15


16

Company Profile

Project Name:

MULTI-STOREY HOTEL PROJECT, CHANCERY LANE, DUBLIN c

SCOPE: ▪

Appointed main contractors for the construction of a seven-storey over basement city-centre hotel, including self-contained suites; reception, lounge and café area; bathrooms; lift installation; basement construction; with feature polished concrete floors and walls; insitu concrete frame, with external lightweight steel construction and brick outerleaf.

KEY INFORMATION

Additional Information This project will delivered in 2018.

be

PROJECT DURATION

16 Months

ARCHITECT

John Fleming Architects

QUANTITY SURVEYORS

O’Byrne Jenkins

CONSULTING ENGINEERS

Lohan and Donnelly

M&E CONSULTANTS

EDP

Project Name:

MSL MOTOR GROUP, POTTERY ROAD, DUN LAOGHAIRE SCOPE: ▪

Demolition of the existing showroom, replaced by an entirely new structure, complete with steel frame structure, glazed curtain walling, new mezzanine floor and all associated M&E.

INNOVATIONS: ▪

Environmental sustainability was at the forefront of this project. The demolished concrete was crushed for re-use to use as fill under roadways to minimize our carbon footprint, as well as incorporating a green roof system.

KEY INFORMATION

Additional Information This will be the largest Mercedes Benz showroom in Europe, and will be delivered later in 2017.

COMPLETION DATE

October 2017

PROJECT DURATION

11 months

PSCS

ADCO

ARCHITECT

EMD Architects

CIVIL CONSULTANTS

DBFL Engineers


Company Profile

Project Name:

MONDELEZ EUROPE, COOLOCK, DUBLIN SCOPE: ▪

Appointed PSCS to oversee the construction of two three-storey over-roof towers within the existing footprint of two live production buildings. This involved excavating over 250m 3 of material, using cranes to erect the steel frame and cladding, and weatherproofing of the towers.

SUCCESSES: ▪

Working in a live and sensitive environment, we delivered this project successfully and on time, much to the client’s satisfaction. There was no disruption to Mondelez’s production activities.

Additional Information For construction and weathering purposes, the towers were constructed in two phases. Phase 1 steel was erected internally. Holes were then made in the existing roof and temporarily weathered. This allowed the erection and cladding of Phase 2 steel tower externally.

KEY INFORMATION COMPLETION DATE

August 2016

PROJECT DURATION

3 months

PSCS

ADCO

PROJECT MANAGERS ARUP Cantrell & ARCHITECT Crowley

Project Name:

MSL SHOWROOM, BALLSBRIDGE, DUBLIN SCOPE: ▪

Completed over two phases, one each in 2016 and 2017, we were contracted to refit the showroom offices, and safely demolish an insitu concrete frame within the showroom footprint. The second phase entailed the installation a curtain wall around the building façade, installation of a canopy around the perimeter of the building; the demolition of internal RC walls and floor slab. Temporary steelwork was installed on a phased basis to stabilize the building as the demolition of the RC frame progressed.

SUCCESSES: ▪

With the showroom remaining open to the public for trade for the duration of the works, we had to be sensitive to noise levels to avoid disruption. The client’s requirements were met satisfactorily and on time. KEY INFORMATION Additional Information Several key scope changes were made during the course of the project including the addition of toilet facilities and a change to the steel design for the existing canopy. All changes were incorporated into the original project programme and successfully delivered on time.

COMPLETION DATE

August 2017

PROJECT DURATION 6 months PM AND ARCHITECT EMD Architects STRUCTURAL ENGINEERS QUANTITY SURVEYORS

DBFL Phelan Doyle Ltd

17


18

Company Profile

Project Name:

MAPLE HOUSE, TEMPLE ROAD, BLACKROCK, DUBLIN SCOPE: ▪

Full renovation of four-storey over basement office building including office floors, a reception area and communal areas. Also, full M&E installation, and reconfiguration of basement from existing storage area to accommodate new shower rooms and changing facilities.

INNOVATIONS: ▪

Delivered to the client’s expectations and on time, we used light fittings as access hatches to reduce the number of ceiling access hatches.

Additional Information This is one of many projects on which we have worked with Knight Frank. We are proud to be associated with them and look forward to working with them in the years ahead.

KEY INFORMATION COMPLETION DATE

December 2016

PROJECT DURATION 15 weeks ADCO

PSCS

PROJECT MANAGERS Knight Frank M&E CONSULTANT

Parkbourne

Project Name:

GLANBIA PLC, DANVILLE, KILKENNY SCOPE: ▪

Refurbishment of Glanbia’s headquarters to provide open plan office areas, including the demolition of loadbearing block walls, installation of steel supports, removal and replacement of floor coverings, suspended ceilings and the redecoration of all ground floor offices.

SUCCESSES: ▪

The offices were in use for the duration, so the work was phased with many night shifts required. With a duration of 14 weeks it was challenging and required maximum attention to detail to ensure quality. Additional Information The week that Phase 1 was due to be handed over a major change to the stairs access to the first floor from reception was introduced, but we took it in our stride and handed over on the date agreed.

KEY INFORMATION COMPLETION DATE AREA

July 2014

PROJECT DURATION

14 weeks

ARCHITECT

Reddy A+U

M&E CONSULTANTS

RMCE

1,300m2


Company Profile

Project Name:

BELFIUS BANK, SHELBOURNE ROAD, BALLSBRIDGE, DUBLIN SCOPE: ▪

Contracted to complete a full internal and IT fit out including Directors’ offices, meeting rooms, comms and printer/store rooms, and a kitchenette area, whilst the premises remained open to commercial tenants.

INNOVATIONS: ▪

High-end Bene glass partitions were sourced from Austria, and installed to create a bright open-plan environment, as per the client’s requirements. KEY INFORMATION

Additional Information Due to the client’s lease agreement, it was required that the contract was completed a week ahead of schedule to allow them to move into the premises on a specific date.

COMPLETION DATE

December 2016

PROJECT DURATION

7 weeks

PSCS

ADCO

PROJECT MANAGERS Derek Hegarty & Associates

M&E CONSULTANTS Colman Reynolds Associates

Project Name:

LINDAB IRELAND, NANGOR ROAD, DUBLIN SCOPE: ▪

Convert old office space to sharp looking public trade counter area for Lindab’s existing distribution facility. Works included demolition of internal ceilings and partitions, installation of underground drainage to facilitate new WCs and coffee dock station, a new resin screed floor, installation of a bespoke counter and dispatch windows, amd two rapid roller doos, which required steel goalposts to be made, and cladding surround.

SUCCESSES: ▪

Loud works were limited to early and late in the day to avoid disruption of the client’s daily activities. The project was completed on schedule, within budget and with no reportable incidents or accidents.

Additional Information The high standard of finish exceeded the client’s expectations and completed works met all objectives.

KEY INFORMATION COMPLETION DATE

March 2017

ARCHITECT AND QUANTITY SURVEYOR

Straightline Architects

M&E CONSULTANTS

Global Labour Facilities

19


20

Company Profile

Project Name:

MERCK SHARP & DHOME, SWORDS, DUBLIN SCOPE: ▪

Upgrade of the bulk tableting cleanroom production facility, including the complete replacement of ceilings and the upgrade of cleanroom facility’s ground and first floor production areas.

SUCCESSES: ▪

This project was completed on time, within budget and there were no reportable accidents. The client’s objectives were met, and the high standard of finish exceeded the client’s expectations. KEY INFORMATION

Additional Information As a result of the successes achieved in this project, we have been working closely with MSD for some time, and have secured a place as one of their preferred framework contractors.

COMPLETION DATE

March 2013

AREA

900m2

PROJECT DURATION

Two months

ARCHITECT AND QS

MSD In-house

CIVIL STRUCTURAL

MSD In-house

M&E CONSULTANTS

MSD In-house

Project Name:

BIOTRIN, SANDYFORD, DUBLIN SCOPE: ▪

To refurbish the manufacturing facilities by installing cleanrooms, upgrading the production warehouse, and completing a full M&E fit-out.

SUCCESSES: ▪

All elements of the cold store fit-out were prefabricated, allowing for quick onsite installation, contributing to the project being completed on-time, within budget, and exceeding the client’s expectations. KEY INFORMATION

Additional Information Biotrin’s General Manager Des O’Leary praised us for our work, particularly on our professionalism and high-quality finish.

COMPLETION DATE

June 2012

AREA

4,000m2

PROJECT DURATION

Three months

ARCHITECT AND QS

Mc Elroy Associates

CIVIL STRUCTURAL

Mc Elroy Associates

M&E CONSULTANTS PROCHEM Engineering


Company Profile

Project Name:

VOLKSWAGEN LEARNING CENTRE, NANGOR ROAD, DUBLIN SCOPE: ▪

Fit-out a large warehouse unit in Volkswagen’s National Learning Centre, involving the demolition of some of the existing office space to make way for a canteen, six state-of-the-art training rooms, a mezzanine level to overlook the workshop floor, four car lifts and three new training rooms.

SUCCESSES: ▪

The project was completed within a tight schedule of elevenweeks and within budget. KEY INFORMATION

Additional Information Whilst fitting car lifts which required excavation to a depth of 5m, work noise levels had to be kept to a minimum between 9am and 5pm as the unit was adjoined by two live premises.

COMPLETION DATE

April 2016

AREA

15,000ft2

PROJECT DURATION

Eleven weeks

ARCHITECT

EMD Architects

QUANTITY SURVEYOR Phelan Doyle M&E CONSULTANTS Baker O’Reilly

Project Name:

ANALYTIC PARTNERS, CHANCERY LANE, DUBLIN SCOPE: ▪

Contracted to fully fit-out Analytic Partners’ new offices in the Chancery Building in Dublin’s City Centre.

SUCCESSES: ▪

We exceeded the client’s expectations by completing the programme within budget, ahead of schedule and with an exemplary finish.

Additional Information A curved finger oak clad wall was required, which provided both visual and acoustic separation but had to maintain a percentage of clear open area to comply with Part B Building Regulations.

KEY INFORMATION COMPLETION DATE

August 2016

PROJECT DURATION

6 weeks

PSCS

ADCO

PROJECT MANAGERS

John Fleming Architects

21


22

Company Profile

Project Name:

CLEARSTREAM TECHNOLOGIES LTD, ENNISCORTHY CO. WEXFORD SCOPE: ▪

Upgrade of existing reception and canteen areas to facilitate ClearStream’s staff of 230, as well as works to the conference room. All demolition works took place during the first weekend as ClearStream operates during two ten-hour shifts, five days a week.

SUCCESSES: ▪

As work progressed it became clear that existing services were inadequate. Changes and decisions were made throughout the contract to further enhance the finishes. Additional Information The upgrade of the conference room was added to the project scope during post-tender negotiations. This was agreed on the understanding that it would be completed within the same programme of two weeks.

KEY INFORMATION COMPLETION DATE

August 2015

PROJECT DURATION

Two weeks

PSCS

ADCO

PROJECT ARCHITECTS OLS Architects

Project Name:

FOREST LABORATORIES, COOLOCK, DUBLIN SCOPE: ▪

Contracted to install a new cleanroom wash plantroom within existing building. The works included underground stainless steel drawing, steel frame, clean room panelled walls and ceilings, rapid roll shutterdoors, anti-static flooring and full M&E installation.

SUCCESSES: ▪

Completed on time to a high-quality finish whilst working in a live production building. KEY INFORMATION

Additional Information Initial heavy civils whilst working within live production building required microprogramming of appropriate plant and resources to achieve the end result.

COMPLETION DATE

October 2014

PROJECT DURATION

Four months

AREA

8500ft2

ARCHITECT AND QS

McElroy and Associates

PROJECT MANAGERS

Malone Engineering


Company Profile

I don’t build in order to have clients. I have clients in order to build.� - Ayn Rand

23


24

Company Profile

Whether they’re repeat clients that we’ve worked with numerous times over the years, or a new client with an exciting project, we pride ourselves on having such a diverse and reputable group of partners:

Merck Sharp & Dohme

ClearStream Technologies Ltd

Leo Pharma

Mondelez International

ARUP

Takeda

Helsinn Birex Pharmaceuticals Ltd

Pfizer

Biotrin

PM Group

Pfizer

Glanbia, Plc

McElroy Associates

Covidien

Amgen

Forest laboratories, Inc

Jacobs Engineering Group


Company Profile

Hedgeserv

Enterprise Ireland

Knight Frank

Waterman Moylan Engineering Consultants

Volkswagen Group Ireland Ltd

Belfius Bank

Football Association of Ireland

Dublin Airport Authority

Dublin City University

Gowan Group Ltd

Analytic Partners

Atkins Ireland

SBA Architects

Department of Defence

Scott Tallon Walker Architects

Aughey O’Flaherty Architects

The Office of Public Works

MSL Motor Group

John Fleming Architects

PAC Studio

25


26

Company Profile

c

We could keep telling you how good we are, but our clients can say it better:

ADCO Contracting are true consummate professionals. My job as architect was no doubt made easier with them delivering the project. The projects came in under budget and on programme much to the client’s Belfius Bank

appreciation.”

February 2017

ADCO completed the project on time and to specification. We found their project team at all times to be professional, accountable and easy to contact ... ” Volkswagen Group Ireland February 2016

The ADCO project team paid great attention to details and worked closely with the appointed design team and our site management to ensure the brief was successfully delivered. Most importantly, ADCO worked with good attention to safety, demonstrated flexibility and were thoroughly professional at all times in what was a challenging working environment. Mondelez Ireland Production Ltd. September 2016


Company Profile

`

On appointment, we were very impressed in the way that [ADCO] set about the task. We found the entire team very pro-active, they always demonstrated a “can-do” approach. , and as a result the project was carried out in a Glanbia Estates Ltd.

smooth, efficient and professional manner.”

February 2017

Part of the Victoria Buildings dates to the 1800 so the design and execution required great attention to detail and micromanagement to ensure a sympathetic connection with the adjoining modern contemporary office building …

Victoria Buildings September 2016

27


28

Company Profile

ADCO Contracting were contracted by Lindab (Irl) Limited to create a new showroom within our existing facility in Dublin 12 ... This work was done to a very high standard in a situation whereby

the existing business continued to run in the background.

Lindab April 2017

I have recently dealt with ADCO, who acted as the main contractor on a construction project for Aerosol Gassing Facility for one of our pharmaceutical clients. The successful completion of this project was largely down to ADCO’s proactive and can-do approach ... PM Group June 2013


Company Profile

s ADCO Contracting were the main contractor for the fit-out of 20,000ft2 of office space at 75 St. Stephen’s Green, Dublin 2, for a client of ours, Hedgeserv Ltd. ...

Most importantly ADCO interacted very positively with our client.� Knight Frank October 2012

ADCO Contracting were the main contractors for the Biotrin International pharmaceutical facility upgrade works in Sandyford, Co. Dublin. ADCO completed all works including full M&E upgrade and new clean-rooms ahead of programme, within budget and to

a high standard of workmanship ... McElroy Associates August 2011

29


30

Company Profile


Company Profile

31


32

Company Profile


Company Profile

33


34

Company Profile

`


Company Profile

35


www.adcocce.ie