Internship Portfolio : Catalsyt Design Studio

Page 1


INDEX 01. RAVI NK RESIDENCE 02. GANASHYAM RESIDENCE 03. TAPAS SCHOOL 04. MADHUSUDHAN RESIDENCE 05. RAVI NV RESIDENCE 06. GANESH FARMHOUSE 07. BHARATH RESIDENCE 08. RAJARAV RESIDENCE 09. PODAR JUMBO KIDS INTERIORS 10. CHANDANA RESIDENCE

CATALSYT D E S I G N STU D I O

01


RAVI N K

o

o

N

6"

N

TERRACE SLAB-TOP LVL @ 50'-8 9/16"

8'-6"

WOODEN LOUVRES

M

6"

4'-6"

M

BRICK CLADDING

L

3" 9'-1016

L

4'

GLASS RAILING PINEWOOD RAILING

K

6"

K

J

11' 6"

I

COPPER MESH

THIRD FLOOR LVL @ +30'-8 3/8"

EXPOSED CONCRETE

2'-6"

WOODEN LOUVRES H

SECOND FLOOR LVL @ +20'-10 3/8"

10'-8"

J

TERRACE FLOOR LVL @ +39'-2 9/16"

I

H

PINEWOOD RAILING

MARBLE CLADDING

FIRST FLOOR LVL @ +10'-8 3/8"

16'-8"

G

9'

G

6"

GLASS RAILING

WOODEN PANELS

F

1'-6"

F

GL

E

STILT FLOOR LVL @ +1'-6" ROAD @ ±0 GROUND LVL @ ±0

E

NORTH ELEVATION CATALSYT D E S I G N STU D I O D

D

02


RAVI N K

o

o

TERRACE SLAB-TOP LVL @ 50'-8 9/16"

N

4'

6"

N

M

6"

4'-6"

M

TERRACE FLOOR LVL @ +39'-2 9/16"

EXPOSED CONCRETE BAND L

3" 9'-1016

L

K

6"

12'

J

J

SECOND FLOOR LVL @ +20'-10 3/8"

I

COPPER GRILL

H

6'

8'-6"

H

11'

5'

I

THIRD FLOOR LVL @ +30'-8 3/8"

11'

6"

K

FIRST FLOOR LVL @ +10'-8 3/8"

G

4'-6"

G

6'-6"

9'

COPPER GRILL

F

1'-6"

F

GL

STILT FLOOR LVL @ +1'-6"

GROUND LVL @ ±0

E

CATALSYT D E S I G N STU D I O D

SOUTH ELEVATION

E

D

03


TERRACE SLAB-TOP LVL @ 50'-8 9/16"

TERRACE FLOOR LVL @ +39'-2 9/16"

6"

3" 9'-1016

6"

8'-6"

6"

RAVI N K

THIRD FLOOR LVL @ +30'-8 3/8"

6"

27'

11'

EXPOSED CONCRETE

11' 6"

7'-6"

1'

COPPER GRILL

SECOND FLOOR LVL @ +20'-10 3/8"

FIRST FLOOR LVL @ +10'-8 3/8"

BRICK CLADDING

GL

1'-6"

9'

PINEWOOD RAILING

STILT FLOOR LVL @ +1'-6" GROUND LVL @ ±0

EAST ELEVATION

CATALSYT D E S I G N STU D I O

04


TERRACE SLAB-TOP LVL @ 50'-8 9/16"

8'-6"

6"

RAVI N K

TERRACE FLOOR LVL @ +39'-2 9/16"

3" 9'-1016

6"

4'-6"

WOODEN LOUVRES

PINEWOOD RAILING

6"

EXPOSED CONCRETE

THIRD FLOOR LVL @ +30'-8 3/8"

SECOND FLOOR LVL @ +20'-10 3/8"

4'

6"

11'

COPPER MESH

FIRST FLOOR LVL @ +10'-8 3/8"

4'-6"

6"

11'

EXPOSED CONCRETE

1'-6"

9'

COPPER GRILL

GL

GL

STILT FLOOR LVL @ +1'-6" GROUND LVL @ ±0

WEST ELEVATION

CATALSYT D E S I G N STU D I O

05


RAVI N K 22

21

20

19

18

15

16

17

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 13 10 14 12 11

Utility 8'2" x 7'0" 9

8

7

6

5

4

3

2

Kitchen 13'6 x11'6" Parent's Bedroom 19' x14'6"

Shower 5'x3'4"

Dining Area 15'2" x16' Closet 4'8"x9'2"

Bath 7'x5'10"

Pooja 5'0" x 6'4"

Lift 5'0"x5'0"

TERRACE FLOOR LVL @ +43'-6 3/4"

Living 23'x15'0"

CloakRoom 5'6"x4'2"

5'-10-3/16"

C Garden Seating 16'0"x9'0"

C

2'

Entrance 12'x9'0"

KEY PLAN

Guest Bedroom

Bathroom

THIRD FLOOR LVL @ +33'-8 3/8"

6"

1'-6"

6"

4'

Balcony

Powder Room 5'0"x4'6"

SECOND FLOOR LVL @ +22'-2 3/8"

Living Room

Powder Room

8'-6" 6"

3" 3"

FIRST FLOOR LVL @ +10'-8 3/8"

9'

4'-6"

Garage

5'

8'

1'-6"

10'

7'-6"

FW1

1'

1'-6"

6"

FW3

3" 43'-108

10'

13'

FW2

STILT FLOOR LVL @ +1'-6" ROAD @ ±0

CROSS SECTION C-C

TES

COMMENTS

REVISIONS

RESIDENTIAL DEVELOPMENT FOR MR. ANIL KUMA DESHPANDE AND ARCHANA DESHPANDE

PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECTS

CATALSYT D E S I G N STU D I O

Floor plans SCALE

1 22

21

20

19

18

17

06

DRG TITLE

CATALYST DESIGN TEAM PROJECT TYPE

16

DATE

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

P.D.C.

Rev

SOURCE

15

4

NO

DEPARTMENT OF ARCHITECT

3

2


RAVI N K

CATALSYT D E S I G N STU D I O

07


RAVI N K

CATALSYT D E S I G N STU D I O

08


RAVI N K

CATALSYT D E S I G N STU D I O

09


RAVI N K

CATALSYT D E S I G N STU D I O

10


RAVI N K

CATALSYT D E S I G N STU D I O

11


RAVI N K

CATALSYT D E S I G N STU D I O

12


RAVI N K

CATALSYT D E S I G N STU D I O

13


RAVI N K

CATALSYT D E S I G N STU D I O

14


GANAS HYAM R E S I D E N C E 22

21

20

19

18

17

16

15

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10

9

8

7

6

5

4

3

2

1

NOTES 1 2

o

HEADROOM LVL @ +40'6"

3 4

3'-6"

6" 6"

WOODEN LOUVRES N

STEEL FRAME

N

5

PARAPET LVL @ +36' M

6 7

3'

BRICK CLADDING

M

8

TERRACE FLOOR LVL @ +33'

1'-10"

L

o

9 L

10 11

K

K

12

10'

REVISIONS 1

EXPOSED CONCRETE

J

SECOND FLOOR LVL @ +22'6"

3

SECOND FLOOR SUNKEN SLAB LVL @ +10'

I

4

2'-8"

I

J

2

5 6

H

H

7

PLAIN FINISH EXTERNAL PLASTERING

8'-6"

8

G

COPPER FINISH JALLI WORK

G

9 10

FIRST FLOOR LVL @ +12'

F

11

FIRST FLOOR SUNKEN SLAB LVL @ +10'

F

12 COMMENTS

E

E

D

12'

1

PLAIN FINISH EXTERNAL PLASTERING

2 3

D

4 5

PLINTH LVL @ +1'6"

C

GL

C

6

GL

7

RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence

B

WEST ELEVATION

B

PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

DRG TITLE

NORTH PROJECT TYPE

A

SCALE

1 22

21

20

CATALSYT D E S I G N STU D I O

19

18

17

16

A DATE

15

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

P.D.C.

Rev

SOURCE

4

DEPARTMENT OF ARCHITECTURE

3

2

1

15


GANAS HYAM R E S I D E N C E 22

21

20

19

18

17

16

15

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10

9

8

7

6

5

4

3

2

1

NOTES 1 2

o

6" 6"

HEADROOM LVL @ +40'6"

3 4

3'-6"

STEEL FRAME N

WOODEN LOUVRES

o

N

5

PARAPET LVL @ +36'

6 7

3'

M

M

8

TERRACE FLOOR LVL @ +33'

9

L

L

10 11 K

K

11'

12 REVISIONS 1

J

SECOND FLOOR LVL @ +22'6"

3

SECOND FLOOR SUNKEN SLAB LVL @ +10'

I

J

2

I

4 5 6

H

H

12'

7 8

G

G

9 10

FIRST FLOOR LVL @ +12'

F

11

FIRST FLOOR SUNKEN SLAB LVL @ +10'

F

12 COMMENTS

E

E

12'

1

PLAIN FINISH EXTERNAL PLASTERING

D

2 3

D

4 5

PLINTH LVL @ +1'6"

C

C

6

GL

7

RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence

B

SOUTH ELEVATION

B

PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

DRG TITLE

NORTH PROJECT TYPE

A

SCALE

1 22

21

20

19

18

CATALSYT D E S I G N STU D I O

17

16

A DATE

15

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

P.D.C.

Rev

SOURCE

4

DEPARTMENT OF ARCHITECTURE

3

2

1

16


GANAS HYAM R E S I D E N C E 10

11

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 5 8 7 6 4

9

3

2

1

M

M

1'-6"

1'-11"

5'-6"

3'

2'-6"

2'

3'

2'

SHOWER HEAD

5'

1'-6"

NICHE

2'-6"

SLEDGE WALL WALL- MOUNTED EWC FFL CINDER FILLING SUNKEN SLAB

CINDER FILLING SUNKEN SLAB

ELEVATION @ B

ELEVATION @ A

9'-6"

TILES DETAILS

5'-6"

1 8"

1 8" 2'

6"

2'-9"

1" 2'-42

SHOWER HEAD

MIRROR

9" 2' 11" 6" 1'-2" 1'-6"

11"

MIRROR

4'

WASH BASIN

2'-9"

TYPICAL 2 FEET TILE

3'-8"

5'

1 8"

1'-8"

1'-8"

2'

3'

1 8"

5'-6"

SLEDGE WALL WALL- MOUNTED EWC

SLEDGE WALL WALL- MOUNTED EWC FFL

CINDER FILLING SUNKEN SLAB

ELEVATION @ C

6'' X 2' TILES WOODEN FINISH

WASH BASIN

CINDER FILLING SUNKEN SLAB

ELEVATION @ D A

FLOOR TILE LAYOUT

MASTER BEDROOM TOILET DETAILS B

NOTES

REVISIONS

HOLD LIST

6

6

6

5

5

5

4

4

4

3

3

3

B

D

C RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence

PADMAADEV CONSTRUCTIONS DRG TITLE

PROJECT TYPE

A

2

2

CATALSYT D E S I G N STU D I O 11

1 10

9

1 8

7

A

Level Plans

2 SCALE

1

B

DATE Rev

SOURCE

6

5

4

P.D.C.

3

DEPARTMENT OF ARCHITECTURE

2

1

17


GANAS HYAM R E S I D E N C E 10

11

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 5 8 7 6 4

9

3

2

1

M

M

2'-81 4"

1'-6"

2'

2'-9"

2'-6"

1'-8"

2'-6"

1'-11"

SHOWER HEAD 3'

MIRROR

11"

1'-6"

NICHE

1'-6"

WASH BASIN

9"

FFL

6" 1'-2"

2'-6"

2'

SLEDGE WALL WALL- MOUNTED EWC FFL

CINDER FILLING SUNKEN SLAB

CINDER FILLING SUNKEN SLAB

ELEVATION @ B

ELEVATION @ A

2'-81 4"

5'-31 4"

1'-5"

1" 1'-62

TILES DETAILS

2'-6"

1 8"

1 8"

5'-1"

1 8"

1'-8"

2'

TYPICAL 2 FEET TILE

WASH BASIN

9"

2'

3'-11"

11"

1 8"

3'-8"

2'

MIRROR

FFL CINDER FILLING SUNKEN SLAB

CINDER FILLING SUNKEN SLAB

ELEVATION @ C

ELEVATION @ D

FLOOR TILE LAYOUT

CHILDREN'S BEDROOM TOILET DETAILS B

6'' X 2' TILES WOODEN FINISH

NOTES

REVISIONS

HOLD LIST

6

6

6

5

5

5

4

4

4

3

3

3

C

D

B

A RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence

PADMAADEV CONSTRUCTIONS DRG TITLE

PROJECT TYPE

A

2

2

CATALSYT D E S I G N STU D I O 11

1 10

9

1 8

7

A

Level Plans

2 SCALE

1

B

DATE

5

4

P.D.C.

Rev

SOURCE

6

3

DEPARTMENT OF ARCHITECTURE

2

1

18


GANAS HYAM R E S I D E N C E

2'-6"

2'-6"

W3

V1

W3

W3

2'-4" Parent's bedroom 14' x 12'

Bath 8' x 5'6"

Closet 7'6" x 6'2"

D3

Toilet 5' x 4'6"

4' Wooden deck

D1

Internal Courtyard 8'4 x 7'8"

Living 16' x 12'6"

D1 W4

W2 D2

W1

W1

Entrance Foyer 8'2" x 9'10"

DOWN

D4

Pooja 5'6" x 7'

2'-4" W1

W1

W6

Dining 11'8" x 12' W2

FD

Front porch 7' x 4'6"

Kitchen 12'8"' x 10'8" Parking 10' x 25'3"

W2

W5

12'-2"

1'-3"

13'-2"

GROUND FLOOR PLAN

CATALSYT D E S I G N STU D I O

FIRST FLOOR PLAN

19


GANAS HYAM R E S I D E N C E

W3

W2

Bath 8' x 5'6"

D1

Kid's Bedroom 16' x 12' Terrace 24'4" x 11'

W4 W1 D2 D2

W1

W1

Library 7'6" x 10'

W1

W1

D2

D2

Closet cum Bath 11' x 10'6"

Bedroom 14'4" x 12'4"

7'-6"

V2

Terrace

D1

SECOND FLOOR PLAN

CATALSYT D E S I G N STU D I O

FOURTH FLOOR TERRACE PLAN

20


GANAS HYAM R E S I D E N C E 22

21

20

19

18

17

16

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10

15

9

8

7

6

5

4

3

2

1

NOTES 1 2

o

3 4 N

5 6 7

M

8

L

OUT

OUT

2"

K

2'-2"

IN

2"

2"

2'-8"

2"

IN

10 11

OUT

IN

12 REVISIONS

PLAN

PLAN

9

6'

PLAN

J

1 2 3

I

2'-6"

6'

3'

LINTEL LEVEL

4

LINTEL LEVEL

5

LINTEL LEVEL

H

6 7

7'-6"

7'-6"

7'-6"

8 G

9 10 11

F

12

FFL

E

ELEVATION D

D1

BEDROOM WOODEN DOOR

LINTEL-7'6"

D2

LINTEL-7'6"

TOILET / UTILITY WOODEN DOOR

FFL

ELEVATION

ELEVATION

D3

COMMENTS 1 2 3

COURTYARD DOOR IN PARENT'S BEDROOM

LINTEL-7'6"

4 5

C

6 7

DOOR SCHEDULE

B

RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

DRG TITLE

NORTH PROJECT TYPE

A

SCALE

1 22

21

20

CATALSYT D E S I G N STU D I O

19

18

17

16

DATE

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

P.D.C.

Rev

SOURCE

15

4

DEPARTMENT OF ARCHITECTURE

3

2

1

21


22

21

20

19

18

17

16

15

GANAS HYAM R E S I D E N C E

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10

9

8

7

6

5

4

3

2

1

NOTES 1 2

o

o

3 4 N

N

5 6 7

M

M

8 9 L

L

10

OUT

OUT

11

K

K

12

2" J

4'-5"

2"

IN

2"

5'-8"

2"

IN

REVISIONS 1

PLAN

PLAN

J

2 3

I

I

4 5

4'-9"

H

6'

LINTEL LEVEL

6

LINTEL LEVEL

H

7 8

G

G

9

7'-6"

7'-6"

F

10 11

F

12 COMMENTS E

E

1

FFL

FFL

D4

POOJA ROOM DOOR

LINTEL-7'6"

3

ELEVATION

ELEVATION

D

2

FD

LINTEL-7'6"

D

4

FRONT DOOR

5

C

C

6 7

DOOR SCHEDULE

B

RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence

B

PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

DRG TITLE

NORTH PROJECT TYPE

A

SCALE

1 22

21

20

19

CATALSYT D E S I G N STU D I O

18

17

16

A DATE

15

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

P.D.C.

Rev

SOURCE

4

DEPARTMENT OF ARCHITECTURE

3

2

1

22


GANAS HYAM R E S I D E N C E 22

20

21

19

18

17

16

15

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 13 10 14 12 11

9

8

7

6

5

4

3

2

1

NOTES 1 2

o

o

3 4 N

N

2' M

4'

3'

IN

5

OUT

IN

IN

OUT

OUT

6 7

M

8 9 L

L

10

PLAN

PLAN

PLAN

11

K

K

12 REVISIONS 1

J

J

2 3 I

I

4

2' H

4'

3'

LINTEL LEVEL

5

LINTEL LEVEL

LINTEL LEVEL

6

H

4'-6"

G

4'-6"

4'-6"

7 8 G

9 10 11

F

F

3'

3'

3'

12 COMMENTS E

E

FFL

FFL ELEVATION

ELEVATION

1

FFL

2

ELEVATION

3

D

D

4

C

W1

2' UPVC WOODEN WINDOW

LINTEL-7'6" SILL - 3'

W2

LINTEL-7'6" SILL - 3'

3' UPVC WOODEN WINDOW

W3

4' UPVC WOODEN WINDOW

LINTEL-7'6" SILL - 3'

5 C

6 7

WINDOW SCHEDULE

B

RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence

B

PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

DRG TITLE

NORTH PROJECT TYPE

A

SCALE

1 22

21

20

CATALSYT D E S I G N STU D I O

19

18

17

16

A DATE

15

13 10 14 12 11 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

P.D.C.

Rev

SOURCE

4

DEPARTMENT OF ARCHITECTURE

3

2

1

23


GANAS HYAM R E S I D E N C E 22

21

20

19

18

17

16

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10

15

9

8

7

6

5

4

3

2

NOTES 1 2

o

3 4 N

5

5'-2"

M

IN

7'-6"

IN

6

IN

7 8

OUT

OUT

OUT

9

L

10

K

11

PLAN

PLAN

PLAN

12 REVISIONS 1

J

2 3 I

4

5'-2"

3'

7'-6"

LINTEL LEVEL

6

LINTEL LEVEL

7

2'

2'

LINTEL LEVEL

H

5

8

G

6'

9

5'-6"

10

1'-6"

E

11

5'

F

12 COMMENTS

FFL ELEVATION

ELEVATION

FFL

1

FFL

ELEVATION

2 3

D

W4 C

5'-2" UPVC WOODEN WINDOW

LINTEL-7'6" SILL - 1.5''

V1

LINTEL-7'6"

3' UPVC WOODEN WINDOW

V2

4

7'6" UPVC WOODEN WINDOW

LINTEL-7'6"

5 6 7

WINDOW SCHEDULE

B

RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

DRG TITLE

PROJECT TYPE

A

SCALE

1 22

21

20

CATALSYT D E S I G N STU D I O

19

18

17

16

DATE

15

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

P.D.C.

Rev

SOURCE

4

DEPARTMENT OF ARCHITECTURE

3

2

24


GANAS HYAM R E S I D E N C E 11

10

9

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 8 7 6 5 4

3

2

1

o

o

N

N

PLAN

M

M

L

K

K

3"

L

4'-9"

2"

J

4'-9"

2"

J

10' I

I

LINTEL LEVEL

H

2'

H

G

2"

4'-81 4"

G

2"

6'-6"

2"

4'-81 4"

F

F

E

E

WEST ELEVATION

D

W5

C

CATALSYT D E S I G N STU D I O B

D

WOODEN KITCHEN WINDOW

LINTEL-7.5'

NOTES

REVISIONS

HOLD LIST

6

6

6

5

5

5

4

4

4

C

B

RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence

PADMAADEV CONSTRUCTIONS DRG TITLE

25


GANAS HYAM R E S I D E N C E 11

10

9

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 8 7 6 5 4

3

2

1

o

o

N

N

PLAN M

L

L

3"

M

K

2"

5'-10"

2"

5'-10"

K

12'-2"

J

J

LINTEL LEVEL

I

2'

I

H

2"

5'-91 4"

H

2"

6'-6"

2"

5'-91 4"

G

G

F

F

NORTH ELEVATION

E

E

D

D

W5

C

B

NOTES

REVISIONS

HOLD LIST

6

6

6 5

CATALSYT D E S I G N STU D I O A

WOODEN KITCHEN WINDOW

LINTEL-7.5'

5

5

4

4

4

3

3

3

C

B

RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence

PADMAADEV CONSTRUCTIONS DRG TITLE

PROJECT TYPE

NORTH A

26


GANAS HYAM R E S I D E N C E N

N

M

M

SECTION @ W1, V1 & V2 IN

N

L

L

OUT

K

K

J

J

2-1/2" LONG NAIL 3/4" WOODNEN BEADING

I

I

WOODEN FILLING H

H

3/4" THK WOODEN BEADING

1/2" THK TOUGHENED GLASS

G

G

2" x 1" SHUTTER FRAME F

F

DETAIL AT N E

E

TYPICAL WOODEN FRAME DETAIL

D

D

C

C

CATALSYT D E S I G N STU D I O B

NOTES

REVISIONS

HOLD LIST

6

6

6

5

5

5

4

4

4

B

RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence

PADMAADEV CONSTRUCTIONS DRG TITLE

27


o

o

N

N

GANAS HYAM R E S I D E N C E IN OUT

M

DETAIL - M

1-1/4'"

1-1/4" THK GAP B/W GLASS PANELS

3-1/2"

J

OUT

L

0.5" THK TOUGHENED GLASS

1-1/4"

K

M

3-1/2" x 1-1/2" WOODEN UPVC SHUTTER FRAME

IN

L

M

K

1/4" GUIDE RAIL J

3-1/2" x 3" WOODEN UPVC WINDOW FRAME

I

I

3-1/2" x 1-1/2" WOODEN UPVC SHUTTER FRAME H

H

0.5" THK TOUGHENED GLASS

UPVC FRAME DETAIL

3-1/2" x 1-1/2" THK WOODEN UPVC SHUTTER FRAME

G

G

1/4" GUIDE RAIL F

F

3-1/2" x 3" 3-TRACK WOODEN UPVC WINDOW FRAME E

E

TYPICAL UPVC FRAME DETAIL

D

D

C

C

28

CATALSYT D E S I G N STU D I O B

NOTES

REVISIONS

HOLD LIST

B

RESIDENTIAL DEVELOPMENT FOR


GANAS HYAM R E S I D E N C E

GROUND FLOOR

CATALSYT D E S I G N STU D I O

PLAN RENDERS

FIRST FLOOR

27


GANAS HYAM R E S I D E N C E

SECOND FLOOR

CATALSYT D E S I G N STU D I O

PLAN RENDERS

TERRACE FLOOR

28


TAPAS S C H O O L

MODULE-A DEVELOPEMENT

CATALSYT D E S I G N STU D I O

29


TAPAS S C H O O L

MODULE-B DEVELOPEMENT

CATALSYT D E S I G N STU D I O

29


TAPAS S C H O O L

FINAL MODULE DEVELOPEMENT

CATALSYT D E S I G N STU D I O

31


TAPAS S C H O O L

PLAN DEVELOPEMENT

CATALSYT D E S I G N STU D I O

32


TAPAS S C H O O L

PLAN DEVELOPEMENT

CATALSYT D E S I G N STU D I O

33


TAPAS S C H O O L

PLAN DEVELOPEMENT

CATALSYT D E S I G N STU D I O

34


TAPAS S C H O O L

SITE CONTEXT

CATALSYT D E S I G N STU D I O

S U N & WI N D PATH

35


TAPAS S C H O O L

SITE

STRUCTURES ON SITE

CATALSYT D E S I G N STU D I O

R ETAI N

NEW ACCESS ROAD

D E M O L I SH

R ETAI N E D BUILDINGS

PROPOSALS ON SITE

36


TAPAS S C H O O L

COCONUT TREE

TEAK TREE

PEEPAL TREE

S ITE VE G ETATI O N

CATALSYT D E S I G N STU D I O

37


TAPAS S C H O O L LEGEND 1 FOYER 2 PARENTS WAITING LOUNGE 3 ADMIN OFFICE 4 KITCHEN AND DINING CANTEEN 5 COURTYARD

18 CLAY PIT 19 SAND PIT 20 OUTDOOR SEATING (DINING) 21 SEESAW 22 SWING 23 SLIDE

6 LIFT AND STAIRCASE 7 GIRLS AND BOYS TOILET 8 CLASS ROOM – B 9 STAFF ROOM 10 CLASS ROOM – A 11 PLAY AREA 12 AMPHITHEATRE 17 LANDSCAPE

MASTER PLAN CATALSYT D E S I G N STU D I O

38


TAPAS S C H O O L LEGEND 2 CONFERENCE ROOM 6 LIFT AND STAIRCASE 7 GIRLS AND BOYS TOILET 8 CLASS ROOM – B 9 LAB - 1 10 CLASS ROOM – A 11 PLAY AREA

FIRST FLOOR PLAN CATALSYT D E S I G N STU D I O

39


TAPAS S C H O O L LEGEND 6 LIFT AND STAIRCASE 7 GIRLS AND BOYS TOILET 8 CLASS ROOM – B 9 LAB – 2 & 3 10 CLASS ROOM – A 11 PLAY AREA

SECOND FLOOR PLA CATALSYT D E S I G N STU D I O

40


TAPAS S C H O O L LEGEND 6 LIFT AND STAIRCASE 7 GIRLS AND BOYS TOILET 8 CLASS ROOM – B 9 LAB – 4 & 5 10 CLASS ROOM – A 11 PLAY AREA 12 AUDITORIUM 13 GREEN ROOM 14 LIBRARY

THIRD FLOOR PLAN CATALSYT D E S I G N STU D I O

41


TAPAS S C H O O L LEGEND 6 STAIRCASE 14 LIBRARY’S MEZZANINE 15 MACHINE ROOM 16 Art Village

TERRACE PLAN CATALSYT D E S I G N STU D I O

42


22

21

20

19

18

17

16

15

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10

9

8

7

6

5

4

3

2

NOTES

MADHUSUDHAN

1 2

o

3 4 N

2'-9"

5

M

6

HEAD ROOM FLOOR LVL @ +42'6"

7 8 9

10'-6"

7'-9"

L

10

WOODEN RAILINGS

11

K

2'-9"

EXPOSED CONCRETE

12

THIRD FLOOR LVL @ +32'

REVISIONS 1 2

10'-6"

7'-9"

6'

J

3

I

3'-6"

4

2'-9"

TILES CLADDING

H

5

SECOND FLOOR LVL @ +21'6"

6 7 8

10'-6"

6'

G

7'-9"

BRICK CLADDING

9

F

11

FIRST FLOOR LVL @ +11'

6"

1'-3"

10

12 COMMENTS GRANITE/ STONE CLADDING

11'

1 2

5'-6"

E

D

GL

3

GL

PLINTH LVL @ +6"

4 5

C

6 7

RESIDENTIAL DEVELOPMENT F Mr. Madhusudan's Residence

B

EAST ELEVATION

A

PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

SCALE

1 22

21

20

19

CATALSYT D E S I G N STU D I O

18

17

16

DRG TITLE

PROJECT TYPE

DATE

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

P.D.C.

Rev

SOURCE

15

4

DEPARTMENT OF ARCHITEC

3

2

43


NOTES 1 2

MADHUSUDHAN o

3 4

N

5 6

HEAD ROOM FLOOR LVL @ +42'6"

7

M

8

LIFT ROOM

9

10'-6"

L

10 11

K

12

THIRD FLOOR LVL @ +32'

REVISIONS 1

J

10'-6"

2 3

I

4 5

SECOND FLOOR LVL @ +21'6"

6

STEEL GRILL

7 8

10'-6"

H

G

9 10 11

FIRST FLOOR LVL @ +11'

F

12 COMMENTS E

11'

1 GRANITE/ STONE CLADDING

D

2 3

GL

GL

4

PLINTH LVL @ +6"

5

C

6 7

RESIDENTIAL DEVELOPM Mr. Madhusudan's Reside

B

SOUTH ELEVATION

A

PADMAADEV CONSTRUCTIO PRINCIPAL ARCHITECT

SCALE

1 22

21

20

19

CATALSYT D E S I G N STU D I O

18

17

16

DRG TITLE

PROJECT TYPE

DATE Rev

SOURCE

15

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

4

DEP

3

44


MADHUSUDHAN RESIDENCE A

A

5'0"x5'0"

KEY PLAN ROOF SLAB FINISH FLOOR LVL @ +42.5'

4'

10'-6"

Staircase

5'-6"

Family room

SECOND FLOOR FINISH FLOOR LVL @ +21.5'

5'-6"

Living room

FIRST FLOOR FINISH FLOOR LVL @ +11'

Living room

Bedroom

4'

10'-6"

2'

1' 6" 1'-6"

10'-6"

2'

1' 6" 1'-6"

10'-6"

2'

1' 6"

THIRD FLOOR FINISH FLOOR LVL @ +32'

GROUND FLOOR FINISH FLOOR LVL @ +0.5' GROUND FLOOR LVL @ +0.0'

SECTION -AA

CATALSYT D E S I G N STU D I O

45


B

MADHUSUDHAN RESIDENCE

B

5'0"x5'0"

KEY PLAN ROOF SLAB FINISH FLOOR LVL @ +42.5'

4'

10'-6"

Bath room

Bedroom

Family room

Bath room

Bath room

3'-8"

10'

2'

1'

6"

THIRD FLOOR FINISH FLOOR LVL @ +32'

Living room

Dining room

Powder room

Bath room

3'-8"

10'

2'

1'

6"

SECOND FLOOR FINISH FLOOR LVL @ +21.5'

FIRST FLOOR FINISH FLOOR LVL @ +11'

Living room

Bath room

10'-6"

Garage

GROUND FLOOR FINISH FLOOR LVL @ +0.5' GROUND FLOOR LVL @ +0.0'

SECTION -BB

CATALSYT D E S I G N STU D I O

46


MADHUSUDHAN RESIDENCE 22

21

20

19

18

17

16

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10

15

9

8

7

6

5

4

3

2

NOTES 1 2'-6"

1'-3"

2 6"

o

6"

3 4

N

4'

Ventilator

4'

5 6 7

2'

8

2'

10'

10'

M

9

Vitrified tiles

2'

Vitrified tiles

10

2'

L

B

2'

Cinder filling

6" 6" 6"

Cinder filling Sunken slab

6" 6" 6"

20mm flooring

J

Sunken slab

5'

4" 6"

7'-6"

4"

REVISIONS 1

PLAN

4"

2

TOILET ADJACENT TO BEDROOMS @GROUND FLOOR

ELEVATION @ B

ELEVATION @ C

I

12

D

K

20mm flooring

11 C

A

2'

Floor mounted WC

3 4

6"

6"

5 6

H

1 8"

9 10 2'

D2

11 1 8"

10'

SH:0'-0" LH:7'-0"

10' 2'

8

1 8"

5'-11 3/4"

4'

2'

G

F

7

1 8"

1'

Wash Basin and cabinet

2'-3"

Sunken slab

1'

3 4

1'-5"

3' 7'-6"

6"

4"

ELEVATION @ D

5 4"

6 7

1 8"

ELEVATION @ A

5'

2'

1'-2" 4"

Cinder filling

1 8"

1 8"

Sunken slab

1 8"

6" 6" 6"

Cinder filling

2

2'

2'

2'

20mm flooring

1'-6" 6" 6" 6"

20mm flooring

C

COMMENTS 1

Floor mounted WC

D

TYPICAL FLOOR TILE

2'

2'

Wash Basin and cabinet

3'

E

12

7'-4"

Vitrified tiles

TYPICAL WALL TILE

B

PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

DRG TITLE

N

PROJECT TYPE

A

SCALE

CATALSYT D E S I G N STU D I O 22

21

20

1 19

18

17

16

DATE

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

4

47

P.D.C.

Rev

SOURCE

15

DEPARTMENT OF ARCHITEC

3

2


MADHUSUDHAN RESIDENCE 22

21

20

19

18

17

16

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10

15

9

8

7

6

5

4

3

2

1

NOTES 1

o

1 8"

2

1 8"

3

2' 1 8"

4

2'

Ventilator

2'-6"

6

D2

2'

L

10 2'

1 8"

2'- 9"

Sunken slab

2'-9"

2'-4"

5'- 2"

6"

8'

6"

6"

J

2'

2

2'- 9"

8'

3

TYPICAL WALL TILE

6"

I

ELEVATION @ D

1

1 8"

Sunken slab

Cinder filling

K

12

2'

2'

Cinder filling

11

REVISIONS

6" 6" 6"

J

20mm flooring

6" 6" 6"

20mm flooring

1 8"

1'

1 8"

3'

Wash Basin and cabinet Floor mounted EWC

9

7'

Vitrified tiles

2'

7'-4 1/2"

6'-6"

9'

M

8

TYPICAL FLOOR TILE

8'-6"

2'

SH:0'-0" LH:7'-0"

Sliding Glass Door Vitrified tiles

K

7

1 8"

Sliding Glass Partition

Shower head and water spout

L

N

5 3'-11 3/4"

2'

Ventilator

M

1'

1'-6"

N

o

ELEVATION @ B

I

4 5 6

H

H

6"

7

1'

8

G

G

9

2'-4 1/2"

Ventilator

10 11

F

SH:0'-0" LH:7'-0"

C

3'

Health Faucet

D

COMMENTS E

Vitrified tiles

Wash Basin and cabinet

1 2 3

Floor mounted WC

C

20mm flooring

20mm flooring

Cinder filling

Cinder filling

Sunken slab

Sunken slab

5'

4"

ELEVATION @ C

B

PLAN

5

TOILET ADJACENT TO BEDROOMS @GROUND FLOOR

6

C

2'-6" 4"

D

4

1'-5" 4"

F

12

B

D

3"

Vitrified tiles

A

2'-6"

SH:0'-0" LH:7'-0"

8'-6"

D2

2'-9 1/4"

E

D2

5'

4"

7

ELEVATION @ A

B

PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

DRG TITLE

NORTH

PROJECT TYPE

A

SCALE

1 22

21

20

19

18

CATALSYT D E S I G N STU D I O

17

16

A DATE

15

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

P.D.C.

Rev

SOURCE

4

DEPARTMENT OF ARCHITECTURE

3

2

1

48


MADHUSUDHAN RESIDENCE 22

21

20

19

18

17

16

15

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10

9

8

7

6

5

4

3

2

NOTES 1 2

o

6"

3 4

1'

N

5 6

D2

8

A

Vitrified tiles

10

B

D

2'

2'

SH:0'-0" LH:7'-0"

Vitrified tiles

9

8'-6"

10'

SH:0'-0" LH:7'-0" D2

L

7

4'-6"

4'-6"

M

C

11 3'

Wash Basin and cabinet

Sunken slab

6" 6'

4"

Cinder filling Sunken slab

1'-5"

4"

5'

4"

ELEVATION @ B

I

6" 6" 6" 6"

Cinder filling J

REVISIONS

20mm flooring

6" 6" 6" 6"

20mm flooring

12

2'

Wall mounted WC

2'

K

1

PLAN

2

POWDER ROOM @FIRST FLOOR

4"

3

ELEVATION @ C

4 5 6

H

1 8"

1 8"

7

2'

8

1 8"

G

9

SH:0'-0" LH:7'-0"

2'

10 11

D2

12

TYPICAL FLOOR TILE

Vitrified tiles

2'

E

COMMENTS

2'

Vitrified tiles

1 8"

SH:0'-0" LH:7'-0"

10'

F

4'-6"

4'-6"

D2

Wash Basin and cabinet

1 2

Health Faucet

Wall mounted WC

1 8"

2'

2'

Floor mounted WC

D

6" 6'

4"

Sunken slab

2'-6"

4"

4"

ELEVATION @ D

3

1 8"

4 5

5'

6

4"

ELEVATION @ A

7

1 8"

2'-1"

Cinder filling

1'

2'

Sunken slab

6" 6" 6" 6"

Cinder filling

C

20mm flooring

6" 6" 6" 6"

20mm flooring

1 8"

TYPICAL WALL TILE

B

PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

DRG TITLE

PROJECT TYPE

A

CATALSYT D E S I G N STU D I O 22

21

20

19

SCALE

1 18

17

16

DATE

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

4

49 P.D.C.

Rev

SOURCE

15

NORTH

DEPARTMENT OF ARCHITECTURE

3

2


22

21

20

19

18

17

16

15

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10

9

8

7

6

5

MADHUSUDHAN RESIDENCE

4

3

2

NOTES 1 2

o

3 4 6"

N

1'

6"

6 7

2' D2

8

4'-6"

Glass Sliding Partition

4'-6"

9

SH:0'-0" LH:7'-0"

A

8'-6"

L

B

D

8'-6"

M

5

10

C

Vitrified tiles

11

2'

2'

Sliding Glass Partition K

12 3'

2'

Floor mounted EWC

Sunken slab

6" 6" 6"

Cinder filling

1

20mm flooring

6" 6" 6"

20mm flooring

J

Cinder filling Sunken slab

2'-5" 5'-7" I

2 3

1'-5"

3'-1"

6"

REVISIONS

2'

3'

Wash Basin and cabinet

8'-8"

4"

5'

4"

PLAN

4"

WASHROOM @ FIRST FLOOR

ELEVATION @ C

ELEVATION @ B

4 5 6

H

6"

7 1 8"

Ventilator

1 8"

Ventilator

4'-6"

4'-6" Shower head and water spout

10

D2

8'-6"

2'

SH:0'-0" LH:7'-0"

F

11

1 8"

12 2'

Vitrified tiles

2'

Vitrified tiles

Wash Basin and cabinet

3' Cinder filling

Cinder filling

1 8"

Sunken slab

3

1 8"

1'

4

1 8"

Sunken slab

2

6" 6" 6"

20mm flooring

6" 6" 6"

20mm flooring

1

2'

2'

Floor mounted WC

COMMENTS

TYPICAL FLOOR TILE

Health Faucet

Floor mounted EWC

D

9

1 8"

Sliding Glass Partition

E

8

2'

2'

G

8'-8"

4"

C

2'-6"

5'-7" 6"

4"

5 5'

4"

ELEVATION @ A

7 1 8"

ELEVATION @ D

6

2'

3'-1"

B

TYPICAL WALL TILE

PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

CATALSYT D E S I G N STU D I O

SCALE

1 22

21

20

19

50

DRG TITLE

PROJECT TYPE

A

18

17

16

DATE

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

P.D

Rev

SOURCE

15

4

DEPARTMENT

3

2


RAVI N V R E S I D E N C E A 10

11

9

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 5 8 7 6 4

3

2

A

1

M

M

up

3'-6"

PARAPET LVL @ +35'6"

1'-6"

TERRACE FLOOR LVL @ +32'

Master Bedroom

Closet

9'

KEY PLAN

1'-6"

1'-6"

2"

2'-10"

RAILING LVL @ +24.5'

1'-6"

1'-6"

3'

9'

4'

2'

Living Room

Bedroom

SECOND FLOOR LVL @ +21.5'

Bedroom

2'

Wash room

3'

2'-6" 3'

9'

4'

1'-6"

Kitchen

FIRST FLOOR LVL @ +11'

GROUND FLOOR FINISH FLOOR LVL @ +0.5' GROUND FLOOR LVL @ +0.0'

SECTION -AA B

NOTES

REVISIONS

HOLD LIST

6

6

6

5

5

5

4

4

4

CATALSYT D E S I G N STU D I O 3

3

B

RESIDENCIAL DEVELOPMENT FOR MR. Ravi Shankar NV and Mrs. Poornima

PADMAADEV CONSTRUCTIONS DRG TITLE

3

2

2

1 10

9

SCALE

1 8

7

A

Level Plans

2

1 11

NORTH

PROJECT TYPE

A

DATE Rev

SOURCE

6

5

4

P.D.C.

3

DEPARTMENT OF ARCHITECTURE

2

1

51


RAVI N V R E S I D E N C E FRIDGE

B

B

up

KEY PLAN

CATALSYT D E S I G N STU D I O

52


RAVI N V R E S I D E N C E 22

21

20

19

18

17

16

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10

15

9

8

7

6

5

4

3

2

1

NOTES 1 2

o

o

3 4 N

N

5 6 7

M

OUT

OUT L

2"

3'-2"

IN

2"

2"

2'-8"

2"

OUT

IN

2"

2'-2"

M

8 9 L

IN

2"

10 11

PLAN

PLAN

K

PLAN

K

12 REVISIONS 1

J

J

2 3

3'-6"

I

3'

LINTEL LEVEL

2'-6"

LINTEL LEVEL

LINTEL LEVEL

I

4 5 6

H

H

8

7'

7'

7'

7

G

G

9 10 11

F

FFL

FFL

ELEVATION

E

D1

12

ELEVATION ENTRANCE WOODEN DOOR

LINTEL-7'

D2

LINTEL-7'

COMMENTS

ELEVATION BEDROOM WOODEN DOOR

F

D3

E

1

TOILET / UTILITY WOODEN DOOR

LINTEL-7'

2 3

D

D

4 5 C

C

6 7

DOOR SCHEDULE

B

RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence

B

PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

DRG TITLE

NORTH PROJECT TYPE

A

SCALE

1 22

21

20

19

CATALSYT D E S I G N STU D I O

18

17

16

A DATE Rev

SOURCE

15

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

P.D.C.

4

DEPARTMENT OF ARCHITECTURE

3

2

1

53


22

21

20

19

18

17

16

15

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10

9

8

7

6

5

4

3

2

1

NOTES

RAVI N V R E S I D E N C E

1 2

o

o

3 4 N

N

5 6 7

M

M

8

L

2"

K

3'-2"

2"

9

IN

IN

IN

OUT

OUT

OUT

6'

4'

L

10 11 K

12 REVISIONS

PLAN

PLAN

J

PLAN

1

J

2 3 I

3'-6"

6'

LINTEL LEVEL

1" 2'-112

H

4' 1" 1'-112

LINTEL LEVEL

I

4 5

LINTEL LEVEL

6

H

7 8

G

G

7'

7'

7'

9 10 11

F

F

12

FFL

E

ELEVATION

ELEVATION

D4

D

POOJA ROOM WOODEN DOOR

LINTEL-7'

D5

LINTEL-7'

FFL

COMMENTS

FFL

E

1

ELEVATION BALCONY WOODEN DOOR

D6

2

TOILET / UTILITY WOODEN DOOR

LINTEL-7'

3

D

4 5

C

C

6 7

DOOR SCHEDULE

B

RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence

B

PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

DRG TITLE

NORTH PROJECT TYPE

A

SCALE

1 22

21

20

19

CATALSYT D E S I G N STU D I O

18

17

16

A DATE

15

14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

8

7

6

5

P.D.C.

Rev

SOURCE

4

DEPARTMENT OF ARCHITECTURE

3

2

1

54


22

20

21

19

18

16

17

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 13 10 14 12 11

15

9

8

7

6

5

4

RAVI N V R E S I D E N C E o

N

M

33 4"

IN

IN

L

5" 2'-118 6'

OUT

OUT

OUT

SECTION @ W1, W2 & W3 DETAIL - M

PLAN

PLAN

3-1/2"

OUT

4'

6'

I

M

OUT

0.5" THK TOUGHENED GLASS

1-1/4" THK GAP B/W GLASS PANELS

1/4" GUIDE RAIL 3-1/2" x 3" WOODEN UPVC WINDOW FRAME

3' LINTEL LEVEL

4'

LINTEL LEVEL

4'

LINTEL LEVEL

4'

1-1/4"

J

IN

3-1/2" x 1-1/2" WOODEN UPVC SHUTTER FRAME

IN

PLAN

K

IN

1-1/4'"

3"

3-1/2" x 1-1/2" WOODEN UPVC SHUTTER FRAME

UPVC FRAME DETAIL

H

0.5" THK TOUGHENED GLASS

G

3'

3'

3'

3-1/2" x 1-1/2" THK WOODEN UPVC SHUTTER FRAME

FFL

FFL

ELEVATION

W1

F

LINTEL-7' SILL - 3'

FFL

ELEVATION 6' UPVC WOODEN WINDOW

1/4" GUIDE RAIL

W2

LINTEL-5'6" SILL - 3'

3-1/2" x 3" 3-TRACK WOODEN UPVC WINDOW FRAME

ELEVATION 4' UPVC WOODEN WINDOW

W3

LINTEL-7' SILL - 3'

3' UPVC WOODEN WINDOW

TYPICAL UPVC FRAME DETAIL

E

D

C

55

CATALSYT D E S I G N STU D I O B

NOTES

REVISIONS

COMMENTS

RESIDENTIAL DEVELOP MRS. Poornima


22

21

20

19

18

17

16

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10

15

9

8

7

6

5

4

RAVI N V R E S I D E N C E o

N

M

L

IN

IN

IN

OUT

OUT

SECTION @ W3 & W4 N

IN

SECTION @ S1 O

IN

OUT K

PLAN

OUT

PLAN

PLAN

OUT

J

2-1/2" LONG NAIL 3/4" WOODNEN BEADING

4'

2'

LINTEL LEVEL

FFL

W4

LINTEL-7' SILL - 3'

2' UPVC WOODEN WINDOW

FFL

ELEVATION

ELEVATION

W5

1/2" THK TOUGHENED GLASS

LINTEL-7' SILL - 3'

4' UPVC WOODEN WINDOW

2-1/2" LONG NAIL

2" x 1" SHUTTER FRAME

5'-6"

FFL

F

LINTEL LEVEL

3'

3'

G

1/2" THK TOUGHENED GLASS

3/4" THK WOODEN BEADING

1/2" THK TOUGHENED GLASS

2'-6"

4'

LINTEL LEVEL

H

WOODEN FILLING

2' 1'-6"

I

3/4" THK WOODEN BEADING

DETAIL AT N

DETAIL AT O

ELEVATION

V1

LINTEL-7'

2' UPVC WOODEN WINDOW

TYPICAL WOODEN FRAME DETAIL

SKYLIGHT FRAME DETAIL

E

D

C

NOTES

CATALSYT D E S I G N STU D I O B

REVISIONS

COMMENTS

56

RESIDENTIAL DEVEL MRS. Poornima

PADMAADEV C PRINCIPAL ARCHITECTS

D


RAVI N V R E S I D E N C E

1'-3"

1'-3"

1'-6"

1'-6"

PLAN

PLAN

1'-3" 6" 9'-6"

9'-6"

6"

1'-6"

FFL

FFL

ELEVATION

S1

CATALSYT D E S I G N STU D I O

LINTEL-7' SKYLIGHT - 10'

2' UPVC WOODEN WINDOW

ELEVATION

S2

LINTEL-7' SKYLIGHT - 10'

2' UPVC WOODEN WINDOW

57


GANESH RESIDENCE

PLAN RENDER

CATALSYT D E S I G N STU D I O

58


GANESH RESIDENCE SKETCH-UP MODEL

CATALSYT D E S I G N STU D I O

59


GANESH RESIDENCE SKETCH-UP MODEL

CATALSYT D E S I G N STU D I O

60


Z

B HARATH R E S I D E N C E

N 11'-7"

Z

PLAN

1 1 2" 1 2'-10 2"

3" 1'-3" 11'-7"

ELEVATION 20mm Thk Rubber Beading 8mm Thk Toughened Glass

50mm Offset from ledge 2.1466

50mm Offset from ledge

Key Plan

Detail - N B

CATALSYT D E S I G N STU D I O

NOTES

REVISIONS

HOLD LIST

6

6

6

5

5

5

4

4

4

3

3

3

2

2

2

NORTH

PROJECT TYPE

1 10

9

1 8

7

A

Level Plans SCALE

11

61

PADMAADEV CONSTRUCTIONS

A

1

B

RESIDENTIAm L DEVELOPMENT FOR MR. DWARAKANATH and Ms. BHARGAVI at Shankarpuram

SOURCE

6

5

4

DATE

P.D.C.

DEPARTMENT OF ARCHITECTURE

1


B HARATH R E S I D E N C E 5

22

4

3

2

1

NOTES 1

8mm Thk Toughened Glass

o

2 3 4

N

5 6

2"

7

75mm Groove with Rubber Beading

3"

1"

25mm Thk Wooden Flooring

1/4"

o

M

8 REVISIONS

3/4"

1/2"

10mm Thk Base plate

3/4"

L

1 2 K

3

2"

4

2.1466

5

Key Plan

J

6

Detail - O

7 I

8 KEY PLAN

H

38mm Wooden Railing

G

10mm Toughened Glass F

3'

75mm Groove with Rubber Beading E

O

Mezzanine 1'-6"

D

C

6" OFFICE INTERIORS FOR BOILED BEANS PRODUCTIONS

SECTION - ZZ

PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT

DRG TITLE

NORTH

PROJECT TYPE

SCALE

1 22

21

CATALSYT D E S I G N STU D I O

20

19

18

17

16

A DATE

14 13 12 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.

9

5

P.D.C.

Rev

SOURCE

15

B

4

DEPARTMENT OF ARCHITECTURE

3

2

1

62


B HARATH R E S I D E N C E 20mm Thk Rubber Beading 8mm Thk Toughened Glass

50mm Offset from ledge 2.1466

50mm Offset from ledge

Key Plan Detail - N

38mm Wooden Railing

8mm Toughened Glass

SLIDING SHUTTER

SLIDING SHUTTER

90mm Groove with Rubber Beading

1-1/2" 3'

FIRST FLOOR @ +12'4"LVL

3"

13'-2"

ELEVATION

Balcony 7'1"x13'2"

L

PLAN

CATALSYT D E S I G N STU D I O

B

NOTES

REVISIONS

HOLD LIST

6

6

6

5

5

5

4

4

4

3

3

3

B

RESIDENTIAm L DEVELOPMENT FOR MR. DWARAKANATH and Ms. BHARGAVI at Shankarpuram

PADMAADEV CONSTRUCTIONS NORTH

63


RAJARAV RAO R E S I D E N C E

CATALSYT D E S I G N STU D I O

64


PODAR JUMBO KIDS

PLAN RENDER

CATALSYT D E S I G N STU D I O

65


CHANDANA RESIDENCE

11

10

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 8 7 6 5 4

9

3

2

1

o

o

3345

75 Section- 75x 35 mm

675

N

N

Section- 20 x35 mm

M

20

L

675

L

300

2100

300

M

K

87.5

J

K

87.5

SECTION

J

I

I

100

1547.5

70

G

H

3345

75

100

20

G

Pine wood Section 75x 35 mm

Double Section 1547.5 x 70 mm

Plan at sill level

F

75

1547.5

35

75 H

F

87.5

75

E

35

E

3345 Pine wood Section 20 x 35 mm

D

Plan at floor level

Pine wood Section 75x 35 mm

D

C

C

PLANS B

NOTES

REVISIONS

HOLD LIST

6

6

6

5

5

5

4

4

4

3

3

3

B

RESIDENTIAL DEVELOPMENT FOR MR. Ravi and MR. Kushal at Girinagar

PADMAADEV CONSTRUCTIONS DRG TITLE

A

CATALSYT D E S I G N STU D I O

NORTH

PROJECT TYPE

SCALE

1

1 11

10

9

1 8

7

A

Level Plans

2

2

2

DATE Rev

SOURCE

6

5

4

P.D.C.

3

DEPARTMENT OF ARCHITECTURE

2

1

66


PODAR JUMBO KIDS

CATALSYT D E S I G N STU D I O

65


CHANDANA RESIDENCE

CATALSYT D E S I G N STU D I O

66


PODAR JUMBO KIDS

CATALSYT D E S I G N STU D I O

65


CHANDANA RESIDENCE

11

10

THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 8 7 6 5 4

9

3

2

1

o

o

3345

75 Section- 75x 35 mm

675

N

N

Section- 20 x35 mm

M

20

L

675

L

300

2100

300

M

K

87.5

J

K

87.5

SECTION

J

I

I

100

1547.5

70

G

H

3345

75

100

20

G

Pine wood Section 75x 35 mm

Double Section 1547.5 x 70 mm

Plan at sill level

F

75

1547.5

35

75 H

F

87.5

75

E

35

E

3345 Pine wood Section 20 x 35 mm

D

Plan at floor level

Pine wood Section 75x 35 mm

D

C

C

PLANS B

NOTES

REVISIONS

HOLD LIST

6

6

6

5

5

5

4

4

4

3

3

3

B

RESIDENTIAL DEVELOPMENT FOR MR. Ravi and MR. Kushal at Girinagar

PADMAADEV CONSTRUCTIONS DRG TITLE

A

CATALSYT D E S I G N STU D I O

CATALYST DESIGN STUDIO

NORTH

PROJECT TYPE

SCALE

1

1 11

10

9

1 8

7

A

Level Plans

2

2

2

DATE Rev

SOURCE

6

5

4

P.D.C.

3

DEPARTMENT OF ARCHITECTURE

2

1

66


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.