INDEX 01. RAVI NK RESIDENCE 02. GANASHYAM RESIDENCE 03. TAPAS SCHOOL 04. MADHUSUDHAN RESIDENCE 05. RAVI NV RESIDENCE 06. GANESH FARMHOUSE 07. BHARATH RESIDENCE 08. RAJARAV RESIDENCE 09. PODAR JUMBO KIDS INTERIORS 10. CHANDANA RESIDENCE
CATALSYT D E S I G N STU D I O
01
RAVI N K
o
o
N
6"
N
TERRACE SLAB-TOP LVL @ 50'-8 9/16"
8'-6"
WOODEN LOUVRES
M
6"
4'-6"
M
BRICK CLADDING
L
3" 9'-1016
L
4'
GLASS RAILING PINEWOOD RAILING
K
6"
K
J
11' 6"
I
COPPER MESH
THIRD FLOOR LVL @ +30'-8 3/8"
EXPOSED CONCRETE
2'-6"
WOODEN LOUVRES H
SECOND FLOOR LVL @ +20'-10 3/8"
10'-8"
J
TERRACE FLOOR LVL @ +39'-2 9/16"
I
H
PINEWOOD RAILING
MARBLE CLADDING
FIRST FLOOR LVL @ +10'-8 3/8"
16'-8"
G
9'
G
6"
GLASS RAILING
WOODEN PANELS
F
1'-6"
F
GL
E
STILT FLOOR LVL @ +1'-6" ROAD @ ±0 GROUND LVL @ ±0
E
NORTH ELEVATION CATALSYT D E S I G N STU D I O D
D
02
RAVI N K
o
o
TERRACE SLAB-TOP LVL @ 50'-8 9/16"
N
4'
6"
N
M
6"
4'-6"
M
TERRACE FLOOR LVL @ +39'-2 9/16"
EXPOSED CONCRETE BAND L
3" 9'-1016
L
K
6"
12'
J
J
SECOND FLOOR LVL @ +20'-10 3/8"
I
COPPER GRILL
H
6'
8'-6"
H
11'
5'
I
THIRD FLOOR LVL @ +30'-8 3/8"
11'
6"
K
FIRST FLOOR LVL @ +10'-8 3/8"
G
4'-6"
G
6'-6"
9'
COPPER GRILL
F
1'-6"
F
GL
STILT FLOOR LVL @ +1'-6"
GROUND LVL @ ±0
E
CATALSYT D E S I G N STU D I O D
SOUTH ELEVATION
E
D
03
TERRACE SLAB-TOP LVL @ 50'-8 9/16"
TERRACE FLOOR LVL @ +39'-2 9/16"
6"
3" 9'-1016
6"
8'-6"
6"
RAVI N K
THIRD FLOOR LVL @ +30'-8 3/8"
6"
27'
11'
EXPOSED CONCRETE
11' 6"
7'-6"
1'
COPPER GRILL
SECOND FLOOR LVL @ +20'-10 3/8"
FIRST FLOOR LVL @ +10'-8 3/8"
BRICK CLADDING
GL
1'-6"
9'
PINEWOOD RAILING
STILT FLOOR LVL @ +1'-6" GROUND LVL @ ±0
EAST ELEVATION
CATALSYT D E S I G N STU D I O
04
TERRACE SLAB-TOP LVL @ 50'-8 9/16"
8'-6"
6"
RAVI N K
TERRACE FLOOR LVL @ +39'-2 9/16"
3" 9'-1016
6"
4'-6"
WOODEN LOUVRES
PINEWOOD RAILING
6"
EXPOSED CONCRETE
THIRD FLOOR LVL @ +30'-8 3/8"
SECOND FLOOR LVL @ +20'-10 3/8"
4'
6"
11'
COPPER MESH
FIRST FLOOR LVL @ +10'-8 3/8"
4'-6"
6"
11'
EXPOSED CONCRETE
1'-6"
9'
COPPER GRILL
GL
GL
STILT FLOOR LVL @ +1'-6" GROUND LVL @ ±0
WEST ELEVATION
CATALSYT D E S I G N STU D I O
05
RAVI N K 22
21
20
19
18
15
16
17
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 13 10 14 12 11
Utility 8'2" x 7'0" 9
8
7
6
5
4
3
2
Kitchen 13'6 x11'6" Parent's Bedroom 19' x14'6"
Shower 5'x3'4"
Dining Area 15'2" x16' Closet 4'8"x9'2"
Bath 7'x5'10"
Pooja 5'0" x 6'4"
Lift 5'0"x5'0"
TERRACE FLOOR LVL @ +43'-6 3/4"
Living 23'x15'0"
CloakRoom 5'6"x4'2"
5'-10-3/16"
C Garden Seating 16'0"x9'0"
C
2'
Entrance 12'x9'0"
KEY PLAN
Guest Bedroom
Bathroom
THIRD FLOOR LVL @ +33'-8 3/8"
6"
1'-6"
6"
4'
Balcony
Powder Room 5'0"x4'6"
SECOND FLOOR LVL @ +22'-2 3/8"
Living Room
Powder Room
8'-6" 6"
3" 3"
FIRST FLOOR LVL @ +10'-8 3/8"
9'
4'-6"
Garage
5'
8'
1'-6"
10'
7'-6"
FW1
1'
1'-6"
6"
FW3
3" 43'-108
10'
13'
FW2
STILT FLOOR LVL @ +1'-6" ROAD @ ±0
CROSS SECTION C-C
TES
COMMENTS
REVISIONS
RESIDENTIAL DEVELOPMENT FOR MR. ANIL KUMA DESHPANDE AND ARCHANA DESHPANDE
PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECTS
CATALSYT D E S I G N STU D I O
Floor plans SCALE
1 22
21
20
19
18
17
06
DRG TITLE
CATALYST DESIGN TEAM PROJECT TYPE
16
DATE
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
P.D.C.
Rev
SOURCE
15
4
NO
DEPARTMENT OF ARCHITECT
3
2
RAVI N K
CATALSYT D E S I G N STU D I O
07
RAVI N K
CATALSYT D E S I G N STU D I O
08
RAVI N K
CATALSYT D E S I G N STU D I O
09
RAVI N K
CATALSYT D E S I G N STU D I O
10
RAVI N K
CATALSYT D E S I G N STU D I O
11
RAVI N K
CATALSYT D E S I G N STU D I O
12
RAVI N K
CATALSYT D E S I G N STU D I O
13
RAVI N K
CATALSYT D E S I G N STU D I O
14
GANAS HYAM R E S I D E N C E 22
21
20
19
18
17
16
15
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10
9
8
7
6
5
4
3
2
1
NOTES 1 2
o
HEADROOM LVL @ +40'6"
3 4
3'-6"
6" 6"
WOODEN LOUVRES N
STEEL FRAME
N
5
PARAPET LVL @ +36' M
6 7
3'
BRICK CLADDING
M
8
TERRACE FLOOR LVL @ +33'
1'-10"
L
o
9 L
10 11
K
K
12
10'
REVISIONS 1
EXPOSED CONCRETE
J
SECOND FLOOR LVL @ +22'6"
3
SECOND FLOOR SUNKEN SLAB LVL @ +10'
I
4
2'-8"
I
J
2
5 6
H
H
7
PLAIN FINISH EXTERNAL PLASTERING
8'-6"
8
G
COPPER FINISH JALLI WORK
G
9 10
FIRST FLOOR LVL @ +12'
F
11
FIRST FLOOR SUNKEN SLAB LVL @ +10'
F
12 COMMENTS
E
E
D
12'
1
PLAIN FINISH EXTERNAL PLASTERING
2 3
D
4 5
PLINTH LVL @ +1'6"
C
GL
C
6
GL
7
RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence
B
WEST ELEVATION
B
PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
DRG TITLE
NORTH PROJECT TYPE
A
SCALE
1 22
21
20
CATALSYT D E S I G N STU D I O
19
18
17
16
A DATE
15
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
P.D.C.
Rev
SOURCE
4
DEPARTMENT OF ARCHITECTURE
3
2
1
15
GANAS HYAM R E S I D E N C E 22
21
20
19
18
17
16
15
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10
9
8
7
6
5
4
3
2
1
NOTES 1 2
o
6" 6"
HEADROOM LVL @ +40'6"
3 4
3'-6"
STEEL FRAME N
WOODEN LOUVRES
o
N
5
PARAPET LVL @ +36'
6 7
3'
M
M
8
TERRACE FLOOR LVL @ +33'
9
L
L
10 11 K
K
11'
12 REVISIONS 1
J
SECOND FLOOR LVL @ +22'6"
3
SECOND FLOOR SUNKEN SLAB LVL @ +10'
I
J
2
I
4 5 6
H
H
12'
7 8
G
G
9 10
FIRST FLOOR LVL @ +12'
F
11
FIRST FLOOR SUNKEN SLAB LVL @ +10'
F
12 COMMENTS
E
E
12'
1
PLAIN FINISH EXTERNAL PLASTERING
D
2 3
D
4 5
PLINTH LVL @ +1'6"
C
C
6
GL
7
RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence
B
SOUTH ELEVATION
B
PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
DRG TITLE
NORTH PROJECT TYPE
A
SCALE
1 22
21
20
19
18
CATALSYT D E S I G N STU D I O
17
16
A DATE
15
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
P.D.C.
Rev
SOURCE
4
DEPARTMENT OF ARCHITECTURE
3
2
1
16
GANAS HYAM R E S I D E N C E 10
11
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 5 8 7 6 4
9
3
2
1
M
M
1'-6"
1'-11"
5'-6"
3'
2'-6"
2'
3'
2'
SHOWER HEAD
5'
1'-6"
NICHE
2'-6"
SLEDGE WALL WALL- MOUNTED EWC FFL CINDER FILLING SUNKEN SLAB
CINDER FILLING SUNKEN SLAB
ELEVATION @ B
ELEVATION @ A
9'-6"
TILES DETAILS
5'-6"
1 8"
1 8" 2'
6"
2'-9"
1" 2'-42
SHOWER HEAD
MIRROR
9" 2' 11" 6" 1'-2" 1'-6"
11"
MIRROR
4'
WASH BASIN
2'-9"
TYPICAL 2 FEET TILE
3'-8"
5'
1 8"
1'-8"
1'-8"
2'
3'
1 8"
5'-6"
SLEDGE WALL WALL- MOUNTED EWC
SLEDGE WALL WALL- MOUNTED EWC FFL
CINDER FILLING SUNKEN SLAB
ELEVATION @ C
6'' X 2' TILES WOODEN FINISH
WASH BASIN
CINDER FILLING SUNKEN SLAB
ELEVATION @ D A
FLOOR TILE LAYOUT
MASTER BEDROOM TOILET DETAILS B
NOTES
REVISIONS
HOLD LIST
6
6
6
5
5
5
4
4
4
3
3
3
B
D
C RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence
PADMAADEV CONSTRUCTIONS DRG TITLE
PROJECT TYPE
A
2
2
CATALSYT D E S I G N STU D I O 11
1 10
9
1 8
7
A
Level Plans
2 SCALE
1
B
DATE Rev
SOURCE
6
5
4
P.D.C.
3
DEPARTMENT OF ARCHITECTURE
2
1
17
GANAS HYAM R E S I D E N C E 10
11
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 5 8 7 6 4
9
3
2
1
M
M
2'-81 4"
1'-6"
2'
2'-9"
2'-6"
1'-8"
2'-6"
1'-11"
SHOWER HEAD 3'
MIRROR
11"
1'-6"
NICHE
1'-6"
WASH BASIN
9"
FFL
6" 1'-2"
2'-6"
2'
SLEDGE WALL WALL- MOUNTED EWC FFL
CINDER FILLING SUNKEN SLAB
CINDER FILLING SUNKEN SLAB
ELEVATION @ B
ELEVATION @ A
2'-81 4"
5'-31 4"
1'-5"
1" 1'-62
TILES DETAILS
2'-6"
1 8"
1 8"
5'-1"
1 8"
1'-8"
2'
TYPICAL 2 FEET TILE
WASH BASIN
9"
2'
3'-11"
11"
1 8"
3'-8"
2'
MIRROR
FFL CINDER FILLING SUNKEN SLAB
CINDER FILLING SUNKEN SLAB
ELEVATION @ C
ELEVATION @ D
FLOOR TILE LAYOUT
CHILDREN'S BEDROOM TOILET DETAILS B
6'' X 2' TILES WOODEN FINISH
NOTES
REVISIONS
HOLD LIST
6
6
6
5
5
5
4
4
4
3
3
3
C
D
B
A RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence
PADMAADEV CONSTRUCTIONS DRG TITLE
PROJECT TYPE
A
2
2
CATALSYT D E S I G N STU D I O 11
1 10
9
1 8
7
A
Level Plans
2 SCALE
1
B
DATE
5
4
P.D.C.
Rev
SOURCE
6
3
DEPARTMENT OF ARCHITECTURE
2
1
18
GANAS HYAM R E S I D E N C E
2'-6"
2'-6"
W3
V1
W3
W3
2'-4" Parent's bedroom 14' x 12'
Bath 8' x 5'6"
Closet 7'6" x 6'2"
D3
Toilet 5' x 4'6"
4' Wooden deck
D1
Internal Courtyard 8'4 x 7'8"
Living 16' x 12'6"
D1 W4
W2 D2
W1
W1
Entrance Foyer 8'2" x 9'10"
DOWN
D4
Pooja 5'6" x 7'
2'-4" W1
W1
W6
Dining 11'8" x 12' W2
FD
Front porch 7' x 4'6"
Kitchen 12'8"' x 10'8" Parking 10' x 25'3"
W2
W5
12'-2"
1'-3"
13'-2"
GROUND FLOOR PLAN
CATALSYT D E S I G N STU D I O
FIRST FLOOR PLAN
19
GANAS HYAM R E S I D E N C E
W3
W2
Bath 8' x 5'6"
D1
Kid's Bedroom 16' x 12' Terrace 24'4" x 11'
W4 W1 D2 D2
W1
W1
Library 7'6" x 10'
W1
W1
D2
D2
Closet cum Bath 11' x 10'6"
Bedroom 14'4" x 12'4"
7'-6"
V2
Terrace
D1
SECOND FLOOR PLAN
CATALSYT D E S I G N STU D I O
FOURTH FLOOR TERRACE PLAN
20
GANAS HYAM R E S I D E N C E 22
21
20
19
18
17
16
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10
15
9
8
7
6
5
4
3
2
1
NOTES 1 2
o
3 4 N
5 6 7
M
8
L
OUT
OUT
2"
K
2'-2"
IN
2"
2"
2'-8"
2"
IN
10 11
OUT
IN
12 REVISIONS
PLAN
PLAN
9
6'
PLAN
J
1 2 3
I
2'-6"
6'
3'
LINTEL LEVEL
4
LINTEL LEVEL
5
LINTEL LEVEL
H
6 7
7'-6"
7'-6"
7'-6"
8 G
9 10 11
F
12
FFL
E
ELEVATION D
D1
BEDROOM WOODEN DOOR
LINTEL-7'6"
D2
LINTEL-7'6"
TOILET / UTILITY WOODEN DOOR
FFL
ELEVATION
ELEVATION
D3
COMMENTS 1 2 3
COURTYARD DOOR IN PARENT'S BEDROOM
LINTEL-7'6"
4 5
C
6 7
DOOR SCHEDULE
B
RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
DRG TITLE
NORTH PROJECT TYPE
A
SCALE
1 22
21
20
CATALSYT D E S I G N STU D I O
19
18
17
16
DATE
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
P.D.C.
Rev
SOURCE
15
4
DEPARTMENT OF ARCHITECTURE
3
2
1
21
22
21
20
19
18
17
16
15
GANAS HYAM R E S I D E N C E
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10
9
8
7
6
5
4
3
2
1
NOTES 1 2
o
o
3 4 N
N
5 6 7
M
M
8 9 L
L
10
OUT
OUT
11
K
K
12
2" J
4'-5"
2"
IN
2"
5'-8"
2"
IN
REVISIONS 1
PLAN
PLAN
J
2 3
I
I
4 5
4'-9"
H
6'
LINTEL LEVEL
6
LINTEL LEVEL
H
7 8
G
G
9
7'-6"
7'-6"
F
10 11
F
12 COMMENTS E
E
1
FFL
FFL
D4
POOJA ROOM DOOR
LINTEL-7'6"
3
ELEVATION
ELEVATION
D
2
FD
LINTEL-7'6"
D
4
FRONT DOOR
5
C
C
6 7
DOOR SCHEDULE
B
RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence
B
PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
DRG TITLE
NORTH PROJECT TYPE
A
SCALE
1 22
21
20
19
CATALSYT D E S I G N STU D I O
18
17
16
A DATE
15
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
P.D.C.
Rev
SOURCE
4
DEPARTMENT OF ARCHITECTURE
3
2
1
22
GANAS HYAM R E S I D E N C E 22
20
21
19
18
17
16
15
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 13 10 14 12 11
9
8
7
6
5
4
3
2
1
NOTES 1 2
o
o
3 4 N
N
2' M
4'
3'
IN
5
OUT
IN
IN
OUT
OUT
6 7
M
8 9 L
L
10
PLAN
PLAN
PLAN
11
K
K
12 REVISIONS 1
J
J
2 3 I
I
4
2' H
4'
3'
LINTEL LEVEL
5
LINTEL LEVEL
LINTEL LEVEL
6
H
4'-6"
G
4'-6"
4'-6"
7 8 G
9 10 11
F
F
3'
3'
3'
12 COMMENTS E
E
FFL
FFL ELEVATION
ELEVATION
1
FFL
2
ELEVATION
3
D
D
4
C
W1
2' UPVC WOODEN WINDOW
LINTEL-7'6" SILL - 3'
W2
LINTEL-7'6" SILL - 3'
3' UPVC WOODEN WINDOW
W3
4' UPVC WOODEN WINDOW
LINTEL-7'6" SILL - 3'
5 C
6 7
WINDOW SCHEDULE
B
RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence
B
PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
DRG TITLE
NORTH PROJECT TYPE
A
SCALE
1 22
21
20
CATALSYT D E S I G N STU D I O
19
18
17
16
A DATE
15
13 10 14 12 11 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
P.D.C.
Rev
SOURCE
4
DEPARTMENT OF ARCHITECTURE
3
2
1
23
GANAS HYAM R E S I D E N C E 22
21
20
19
18
17
16
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10
15
9
8
7
6
5
4
3
2
NOTES 1 2
o
3 4 N
5
5'-2"
M
IN
7'-6"
IN
6
IN
7 8
OUT
OUT
OUT
9
L
10
K
11
PLAN
PLAN
PLAN
12 REVISIONS 1
J
2 3 I
4
5'-2"
3'
7'-6"
LINTEL LEVEL
6
LINTEL LEVEL
7
2'
2'
LINTEL LEVEL
H
5
8
G
6'
9
5'-6"
10
1'-6"
E
11
5'
F
12 COMMENTS
FFL ELEVATION
ELEVATION
FFL
1
FFL
ELEVATION
2 3
D
W4 C
5'-2" UPVC WOODEN WINDOW
LINTEL-7'6" SILL - 1.5''
V1
LINTEL-7'6"
3' UPVC WOODEN WINDOW
V2
4
7'6" UPVC WOODEN WINDOW
LINTEL-7'6"
5 6 7
WINDOW SCHEDULE
B
RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
DRG TITLE
PROJECT TYPE
A
SCALE
1 22
21
20
CATALSYT D E S I G N STU D I O
19
18
17
16
DATE
15
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
P.D.C.
Rev
SOURCE
4
DEPARTMENT OF ARCHITECTURE
3
2
24
GANAS HYAM R E S I D E N C E 11
10
9
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 8 7 6 5 4
3
2
1
o
o
N
N
PLAN
M
M
L
K
K
3"
L
4'-9"
2"
J
4'-9"
2"
J
10' I
I
LINTEL LEVEL
H
2'
H
G
2"
4'-81 4"
G
2"
6'-6"
2"
4'-81 4"
F
F
E
E
WEST ELEVATION
D
W5
C
CATALSYT D E S I G N STU D I O B
D
WOODEN KITCHEN WINDOW
LINTEL-7.5'
NOTES
REVISIONS
HOLD LIST
6
6
6
5
5
5
4
4
4
C
B
RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence
PADMAADEV CONSTRUCTIONS DRG TITLE
25
GANAS HYAM R E S I D E N C E 11
10
9
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 8 7 6 5 4
3
2
1
o
o
N
N
PLAN M
L
L
3"
M
K
2"
5'-10"
2"
5'-10"
K
12'-2"
J
J
LINTEL LEVEL
I
2'
I
H
2"
5'-91 4"
H
2"
6'-6"
2"
5'-91 4"
G
G
F
F
NORTH ELEVATION
E
E
D
D
W5
C
B
NOTES
REVISIONS
HOLD LIST
6
6
6 5
CATALSYT D E S I G N STU D I O A
WOODEN KITCHEN WINDOW
LINTEL-7.5'
5
5
4
4
4
3
3
3
C
B
RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence
PADMAADEV CONSTRUCTIONS DRG TITLE
PROJECT TYPE
NORTH A
26
GANAS HYAM R E S I D E N C E N
N
M
M
SECTION @ W1, V1 & V2 IN
N
L
L
OUT
K
K
J
J
2-1/2" LONG NAIL 3/4" WOODNEN BEADING
I
I
WOODEN FILLING H
H
3/4" THK WOODEN BEADING
1/2" THK TOUGHENED GLASS
G
G
2" x 1" SHUTTER FRAME F
F
DETAIL AT N E
E
TYPICAL WOODEN FRAME DETAIL
D
D
C
C
CATALSYT D E S I G N STU D I O B
NOTES
REVISIONS
HOLD LIST
6
6
6
5
5
5
4
4
4
B
RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence
PADMAADEV CONSTRUCTIONS DRG TITLE
27
o
o
N
N
GANAS HYAM R E S I D E N C E IN OUT
M
DETAIL - M
1-1/4'"
1-1/4" THK GAP B/W GLASS PANELS
3-1/2"
J
OUT
L
0.5" THK TOUGHENED GLASS
1-1/4"
K
M
3-1/2" x 1-1/2" WOODEN UPVC SHUTTER FRAME
IN
L
M
K
1/4" GUIDE RAIL J
3-1/2" x 3" WOODEN UPVC WINDOW FRAME
I
I
3-1/2" x 1-1/2" WOODEN UPVC SHUTTER FRAME H
H
0.5" THK TOUGHENED GLASS
UPVC FRAME DETAIL
3-1/2" x 1-1/2" THK WOODEN UPVC SHUTTER FRAME
G
G
1/4" GUIDE RAIL F
F
3-1/2" x 3" 3-TRACK WOODEN UPVC WINDOW FRAME E
E
TYPICAL UPVC FRAME DETAIL
D
D
C
C
28
CATALSYT D E S I G N STU D I O B
NOTES
REVISIONS
HOLD LIST
B
RESIDENTIAL DEVELOPMENT FOR
GANAS HYAM R E S I D E N C E
GROUND FLOOR
CATALSYT D E S I G N STU D I O
PLAN RENDERS
FIRST FLOOR
27
GANAS HYAM R E S I D E N C E
SECOND FLOOR
CATALSYT D E S I G N STU D I O
PLAN RENDERS
TERRACE FLOOR
28
TAPAS S C H O O L
MODULE-A DEVELOPEMENT
CATALSYT D E S I G N STU D I O
29
TAPAS S C H O O L
MODULE-B DEVELOPEMENT
CATALSYT D E S I G N STU D I O
29
TAPAS S C H O O L
FINAL MODULE DEVELOPEMENT
CATALSYT D E S I G N STU D I O
31
TAPAS S C H O O L
PLAN DEVELOPEMENT
CATALSYT D E S I G N STU D I O
32
TAPAS S C H O O L
PLAN DEVELOPEMENT
CATALSYT D E S I G N STU D I O
33
TAPAS S C H O O L
PLAN DEVELOPEMENT
CATALSYT D E S I G N STU D I O
34
TAPAS S C H O O L
SITE CONTEXT
CATALSYT D E S I G N STU D I O
S U N & WI N D PATH
35
TAPAS S C H O O L
SITE
STRUCTURES ON SITE
CATALSYT D E S I G N STU D I O
R ETAI N
NEW ACCESS ROAD
D E M O L I SH
R ETAI N E D BUILDINGS
PROPOSALS ON SITE
36
TAPAS S C H O O L
COCONUT TREE
TEAK TREE
PEEPAL TREE
S ITE VE G ETATI O N
CATALSYT D E S I G N STU D I O
37
TAPAS S C H O O L LEGEND 1 FOYER 2 PARENTS WAITING LOUNGE 3 ADMIN OFFICE 4 KITCHEN AND DINING CANTEEN 5 COURTYARD
18 CLAY PIT 19 SAND PIT 20 OUTDOOR SEATING (DINING) 21 SEESAW 22 SWING 23 SLIDE
6 LIFT AND STAIRCASE 7 GIRLS AND BOYS TOILET 8 CLASS ROOM – B 9 STAFF ROOM 10 CLASS ROOM – A 11 PLAY AREA 12 AMPHITHEATRE 17 LANDSCAPE
MASTER PLAN CATALSYT D E S I G N STU D I O
38
TAPAS S C H O O L LEGEND 2 CONFERENCE ROOM 6 LIFT AND STAIRCASE 7 GIRLS AND BOYS TOILET 8 CLASS ROOM – B 9 LAB - 1 10 CLASS ROOM – A 11 PLAY AREA
FIRST FLOOR PLAN CATALSYT D E S I G N STU D I O
39
TAPAS S C H O O L LEGEND 6 LIFT AND STAIRCASE 7 GIRLS AND BOYS TOILET 8 CLASS ROOM – B 9 LAB – 2 & 3 10 CLASS ROOM – A 11 PLAY AREA
SECOND FLOOR PLA CATALSYT D E S I G N STU D I O
40
TAPAS S C H O O L LEGEND 6 LIFT AND STAIRCASE 7 GIRLS AND BOYS TOILET 8 CLASS ROOM – B 9 LAB – 4 & 5 10 CLASS ROOM – A 11 PLAY AREA 12 AUDITORIUM 13 GREEN ROOM 14 LIBRARY
THIRD FLOOR PLAN CATALSYT D E S I G N STU D I O
41
TAPAS S C H O O L LEGEND 6 STAIRCASE 14 LIBRARY’S MEZZANINE 15 MACHINE ROOM 16 Art Village
TERRACE PLAN CATALSYT D E S I G N STU D I O
42
22
21
20
19
18
17
16
15
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10
9
8
7
6
5
4
3
2
NOTES
MADHUSUDHAN
1 2
o
3 4 N
2'-9"
5
M
6
HEAD ROOM FLOOR LVL @ +42'6"
7 8 9
10'-6"
7'-9"
L
10
WOODEN RAILINGS
11
K
2'-9"
EXPOSED CONCRETE
12
THIRD FLOOR LVL @ +32'
REVISIONS 1 2
10'-6"
7'-9"
6'
J
3
I
3'-6"
4
2'-9"
TILES CLADDING
H
5
SECOND FLOOR LVL @ +21'6"
6 7 8
10'-6"
6'
G
7'-9"
BRICK CLADDING
9
F
11
FIRST FLOOR LVL @ +11'
6"
1'-3"
10
12 COMMENTS GRANITE/ STONE CLADDING
11'
1 2
5'-6"
E
D
GL
3
GL
PLINTH LVL @ +6"
4 5
C
6 7
RESIDENTIAL DEVELOPMENT F Mr. Madhusudan's Residence
B
EAST ELEVATION
A
PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
SCALE
1 22
21
20
19
CATALSYT D E S I G N STU D I O
18
17
16
DRG TITLE
PROJECT TYPE
DATE
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
P.D.C.
Rev
SOURCE
15
4
DEPARTMENT OF ARCHITEC
3
2
43
NOTES 1 2
MADHUSUDHAN o
3 4
N
5 6
HEAD ROOM FLOOR LVL @ +42'6"
7
M
8
LIFT ROOM
9
10'-6"
L
10 11
K
12
THIRD FLOOR LVL @ +32'
REVISIONS 1
J
10'-6"
2 3
I
4 5
SECOND FLOOR LVL @ +21'6"
6
STEEL GRILL
7 8
10'-6"
H
G
9 10 11
FIRST FLOOR LVL @ +11'
F
12 COMMENTS E
11'
1 GRANITE/ STONE CLADDING
D
2 3
GL
GL
4
PLINTH LVL @ +6"
5
C
6 7
RESIDENTIAL DEVELOPM Mr. Madhusudan's Reside
B
SOUTH ELEVATION
A
PADMAADEV CONSTRUCTIO PRINCIPAL ARCHITECT
SCALE
1 22
21
20
19
CATALSYT D E S I G N STU D I O
18
17
16
DRG TITLE
PROJECT TYPE
DATE Rev
SOURCE
15
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
4
DEP
3
44
MADHUSUDHAN RESIDENCE A
A
5'0"x5'0"
KEY PLAN ROOF SLAB FINISH FLOOR LVL @ +42.5'
4'
10'-6"
Staircase
5'-6"
Family room
SECOND FLOOR FINISH FLOOR LVL @ +21.5'
5'-6"
Living room
FIRST FLOOR FINISH FLOOR LVL @ +11'
Living room
Bedroom
4'
10'-6"
2'
1' 6" 1'-6"
10'-6"
2'
1' 6" 1'-6"
10'-6"
2'
1' 6"
THIRD FLOOR FINISH FLOOR LVL @ +32'
GROUND FLOOR FINISH FLOOR LVL @ +0.5' GROUND FLOOR LVL @ +0.0'
SECTION -AA
CATALSYT D E S I G N STU D I O
45
B
MADHUSUDHAN RESIDENCE
B
5'0"x5'0"
KEY PLAN ROOF SLAB FINISH FLOOR LVL @ +42.5'
4'
10'-6"
Bath room
Bedroom
Family room
Bath room
Bath room
3'-8"
10'
2'
1'
6"
THIRD FLOOR FINISH FLOOR LVL @ +32'
Living room
Dining room
Powder room
Bath room
3'-8"
10'
2'
1'
6"
SECOND FLOOR FINISH FLOOR LVL @ +21.5'
FIRST FLOOR FINISH FLOOR LVL @ +11'
Living room
Bath room
10'-6"
Garage
GROUND FLOOR FINISH FLOOR LVL @ +0.5' GROUND FLOOR LVL @ +0.0'
SECTION -BB
CATALSYT D E S I G N STU D I O
46
MADHUSUDHAN RESIDENCE 22
21
20
19
18
17
16
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10
15
9
8
7
6
5
4
3
2
NOTES 1 2'-6"
1'-3"
2 6"
o
6"
3 4
N
4'
Ventilator
4'
5 6 7
2'
8
2'
10'
10'
M
9
Vitrified tiles
2'
Vitrified tiles
10
2'
L
B
2'
Cinder filling
6" 6" 6"
Cinder filling Sunken slab
6" 6" 6"
20mm flooring
J
Sunken slab
5'
4" 6"
7'-6"
4"
REVISIONS 1
PLAN
4"
2
TOILET ADJACENT TO BEDROOMS @GROUND FLOOR
ELEVATION @ B
ELEVATION @ C
I
12
D
K
20mm flooring
11 C
A
2'
Floor mounted WC
3 4
6"
6"
5 6
H
1 8"
9 10 2'
D2
11 1 8"
10'
SH:0'-0" LH:7'-0"
10' 2'
8
1 8"
5'-11 3/4"
4'
2'
G
F
7
1 8"
1'
Wash Basin and cabinet
2'-3"
Sunken slab
1'
3 4
1'-5"
3' 7'-6"
6"
4"
ELEVATION @ D
5 4"
6 7
1 8"
ELEVATION @ A
5'
2'
1'-2" 4"
Cinder filling
1 8"
1 8"
Sunken slab
1 8"
6" 6" 6"
Cinder filling
2
2'
2'
2'
20mm flooring
1'-6" 6" 6" 6"
20mm flooring
C
COMMENTS 1
Floor mounted WC
D
TYPICAL FLOOR TILE
2'
2'
Wash Basin and cabinet
3'
E
12
7'-4"
Vitrified tiles
TYPICAL WALL TILE
B
PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
DRG TITLE
N
PROJECT TYPE
A
SCALE
CATALSYT D E S I G N STU D I O 22
21
20
1 19
18
17
16
DATE
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
4
47
P.D.C.
Rev
SOURCE
15
DEPARTMENT OF ARCHITEC
3
2
MADHUSUDHAN RESIDENCE 22
21
20
19
18
17
16
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10
15
9
8
7
6
5
4
3
2
1
NOTES 1
o
1 8"
2
1 8"
3
2' 1 8"
4
2'
Ventilator
2'-6"
6
D2
2'
L
10 2'
1 8"
2'- 9"
Sunken slab
2'-9"
2'-4"
5'- 2"
6"
8'
6"
6"
J
2'
2
2'- 9"
8'
3
TYPICAL WALL TILE
6"
I
ELEVATION @ D
1
1 8"
Sunken slab
Cinder filling
K
12
2'
2'
Cinder filling
11
REVISIONS
6" 6" 6"
J
20mm flooring
6" 6" 6"
20mm flooring
1 8"
1'
1 8"
3'
Wash Basin and cabinet Floor mounted EWC
9
7'
Vitrified tiles
2'
7'-4 1/2"
6'-6"
9'
M
8
TYPICAL FLOOR TILE
8'-6"
2'
SH:0'-0" LH:7'-0"
Sliding Glass Door Vitrified tiles
K
7
1 8"
Sliding Glass Partition
Shower head and water spout
L
N
5 3'-11 3/4"
2'
Ventilator
M
1'
1'-6"
N
o
ELEVATION @ B
I
4 5 6
H
H
6"
7
1'
8
G
G
9
2'-4 1/2"
Ventilator
10 11
F
SH:0'-0" LH:7'-0"
C
3'
Health Faucet
D
COMMENTS E
Vitrified tiles
Wash Basin and cabinet
1 2 3
Floor mounted WC
C
20mm flooring
20mm flooring
Cinder filling
Cinder filling
Sunken slab
Sunken slab
5'
4"
ELEVATION @ C
B
PLAN
5
TOILET ADJACENT TO BEDROOMS @GROUND FLOOR
6
C
2'-6" 4"
D
4
1'-5" 4"
F
12
B
D
3"
Vitrified tiles
A
2'-6"
SH:0'-0" LH:7'-0"
8'-6"
D2
2'-9 1/4"
E
D2
5'
4"
7
ELEVATION @ A
B
PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
DRG TITLE
NORTH
PROJECT TYPE
A
SCALE
1 22
21
20
19
18
CATALSYT D E S I G N STU D I O
17
16
A DATE
15
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
P.D.C.
Rev
SOURCE
4
DEPARTMENT OF ARCHITECTURE
3
2
1
48
MADHUSUDHAN RESIDENCE 22
21
20
19
18
17
16
15
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10
9
8
7
6
5
4
3
2
NOTES 1 2
o
6"
3 4
1'
N
5 6
D2
8
A
Vitrified tiles
10
B
D
2'
2'
SH:0'-0" LH:7'-0"
Vitrified tiles
9
8'-6"
10'
SH:0'-0" LH:7'-0" D2
L
7
4'-6"
4'-6"
M
C
11 3'
Wash Basin and cabinet
Sunken slab
6" 6'
4"
Cinder filling Sunken slab
1'-5"
4"
5'
4"
ELEVATION @ B
I
6" 6" 6" 6"
Cinder filling J
REVISIONS
20mm flooring
6" 6" 6" 6"
20mm flooring
12
2'
Wall mounted WC
2'
K
1
PLAN
2
POWDER ROOM @FIRST FLOOR
4"
3
ELEVATION @ C
4 5 6
H
1 8"
1 8"
7
2'
8
1 8"
G
9
SH:0'-0" LH:7'-0"
2'
10 11
D2
12
TYPICAL FLOOR TILE
Vitrified tiles
2'
E
COMMENTS
2'
Vitrified tiles
1 8"
SH:0'-0" LH:7'-0"
10'
F
4'-6"
4'-6"
D2
Wash Basin and cabinet
1 2
Health Faucet
Wall mounted WC
1 8"
2'
2'
Floor mounted WC
D
6" 6'
4"
Sunken slab
2'-6"
4"
4"
ELEVATION @ D
3
1 8"
4 5
5'
6
4"
ELEVATION @ A
7
1 8"
2'-1"
Cinder filling
1'
2'
Sunken slab
6" 6" 6" 6"
Cinder filling
C
20mm flooring
6" 6" 6" 6"
20mm flooring
1 8"
TYPICAL WALL TILE
B
PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
DRG TITLE
PROJECT TYPE
A
CATALSYT D E S I G N STU D I O 22
21
20
19
SCALE
1 18
17
16
DATE
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
4
49 P.D.C.
Rev
SOURCE
15
NORTH
DEPARTMENT OF ARCHITECTURE
3
2
22
21
20
19
18
17
16
15
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10
9
8
7
6
5
MADHUSUDHAN RESIDENCE
4
3
2
NOTES 1 2
o
3 4 6"
N
1'
6"
6 7
2' D2
8
4'-6"
Glass Sliding Partition
4'-6"
9
SH:0'-0" LH:7'-0"
A
8'-6"
L
B
D
8'-6"
M
5
10
C
Vitrified tiles
11
2'
2'
Sliding Glass Partition K
12 3'
2'
Floor mounted EWC
Sunken slab
6" 6" 6"
Cinder filling
1
20mm flooring
6" 6" 6"
20mm flooring
J
Cinder filling Sunken slab
2'-5" 5'-7" I
2 3
1'-5"
3'-1"
6"
REVISIONS
2'
3'
Wash Basin and cabinet
8'-8"
4"
5'
4"
PLAN
4"
WASHROOM @ FIRST FLOOR
ELEVATION @ C
ELEVATION @ B
4 5 6
H
6"
7 1 8"
Ventilator
1 8"
Ventilator
4'-6"
4'-6" Shower head and water spout
10
D2
8'-6"
2'
SH:0'-0" LH:7'-0"
F
11
1 8"
12 2'
Vitrified tiles
2'
Vitrified tiles
Wash Basin and cabinet
3' Cinder filling
Cinder filling
1 8"
Sunken slab
3
1 8"
1'
4
1 8"
Sunken slab
2
6" 6" 6"
20mm flooring
6" 6" 6"
20mm flooring
1
2'
2'
Floor mounted WC
COMMENTS
TYPICAL FLOOR TILE
Health Faucet
Floor mounted EWC
D
9
1 8"
Sliding Glass Partition
E
8
2'
2'
G
8'-8"
4"
C
2'-6"
5'-7" 6"
4"
5 5'
4"
ELEVATION @ A
7 1 8"
ELEVATION @ D
6
2'
3'-1"
B
TYPICAL WALL TILE
PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
CATALSYT D E S I G N STU D I O
SCALE
1 22
21
20
19
50
DRG TITLE
PROJECT TYPE
A
18
17
16
DATE
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
P.D
Rev
SOURCE
15
4
DEPARTMENT
3
2
RAVI N V R E S I D E N C E A 10
11
9
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 5 8 7 6 4
3
2
A
1
M
M
up
3'-6"
PARAPET LVL @ +35'6"
1'-6"
TERRACE FLOOR LVL @ +32'
Master Bedroom
Closet
9'
KEY PLAN
1'-6"
1'-6"
2"
2'-10"
RAILING LVL @ +24.5'
1'-6"
1'-6"
3'
9'
4'
2'
Living Room
Bedroom
SECOND FLOOR LVL @ +21.5'
Bedroom
2'
Wash room
3'
2'-6" 3'
9'
4'
1'-6"
Kitchen
FIRST FLOOR LVL @ +11'
GROUND FLOOR FINISH FLOOR LVL @ +0.5' GROUND FLOOR LVL @ +0.0'
SECTION -AA B
NOTES
REVISIONS
HOLD LIST
6
6
6
5
5
5
4
4
4
CATALSYT D E S I G N STU D I O 3
3
B
RESIDENCIAL DEVELOPMENT FOR MR. Ravi Shankar NV and Mrs. Poornima
PADMAADEV CONSTRUCTIONS DRG TITLE
3
2
2
1 10
9
SCALE
1 8
7
A
Level Plans
2
1 11
NORTH
PROJECT TYPE
A
DATE Rev
SOURCE
6
5
4
P.D.C.
3
DEPARTMENT OF ARCHITECTURE
2
1
51
RAVI N V R E S I D E N C E FRIDGE
B
B
up
KEY PLAN
CATALSYT D E S I G N STU D I O
52
RAVI N V R E S I D E N C E 22
21
20
19
18
17
16
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10
15
9
8
7
6
5
4
3
2
1
NOTES 1 2
o
o
3 4 N
N
5 6 7
M
OUT
OUT L
2"
3'-2"
IN
2"
2"
2'-8"
2"
OUT
IN
2"
2'-2"
M
8 9 L
IN
2"
10 11
PLAN
PLAN
K
PLAN
K
12 REVISIONS 1
J
J
2 3
3'-6"
I
3'
LINTEL LEVEL
2'-6"
LINTEL LEVEL
LINTEL LEVEL
I
4 5 6
H
H
8
7'
7'
7'
7
G
G
9 10 11
F
FFL
FFL
ELEVATION
E
D1
12
ELEVATION ENTRANCE WOODEN DOOR
LINTEL-7'
D2
LINTEL-7'
COMMENTS
ELEVATION BEDROOM WOODEN DOOR
F
D3
E
1
TOILET / UTILITY WOODEN DOOR
LINTEL-7'
2 3
D
D
4 5 C
C
6 7
DOOR SCHEDULE
B
RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence
B
PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
DRG TITLE
NORTH PROJECT TYPE
A
SCALE
1 22
21
20
19
CATALSYT D E S I G N STU D I O
18
17
16
A DATE Rev
SOURCE
15
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
P.D.C.
4
DEPARTMENT OF ARCHITECTURE
3
2
1
53
22
21
20
19
18
17
16
15
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10
9
8
7
6
5
4
3
2
1
NOTES
RAVI N V R E S I D E N C E
1 2
o
o
3 4 N
N
5 6 7
M
M
8
L
2"
K
3'-2"
2"
9
IN
IN
IN
OUT
OUT
OUT
6'
4'
L
10 11 K
12 REVISIONS
PLAN
PLAN
J
PLAN
1
J
2 3 I
3'-6"
6'
LINTEL LEVEL
1" 2'-112
H
4' 1" 1'-112
LINTEL LEVEL
I
4 5
LINTEL LEVEL
6
H
7 8
G
G
7'
7'
7'
9 10 11
F
F
12
FFL
E
ELEVATION
ELEVATION
D4
D
POOJA ROOM WOODEN DOOR
LINTEL-7'
D5
LINTEL-7'
FFL
COMMENTS
FFL
E
1
ELEVATION BALCONY WOODEN DOOR
D6
2
TOILET / UTILITY WOODEN DOOR
LINTEL-7'
3
D
4 5
C
C
6 7
DOOR SCHEDULE
B
RESIDENTIAL DEVELOPMENT FOR Mr. Ghanashyam's residence
B
PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
DRG TITLE
NORTH PROJECT TYPE
A
SCALE
1 22
21
20
19
CATALSYT D E S I G N STU D I O
18
17
16
A DATE
15
14 13 12 11 10 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
8
7
6
5
P.D.C.
Rev
SOURCE
4
DEPARTMENT OF ARCHITECTURE
3
2
1
54
22
20
21
19
18
16
17
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 13 10 14 12 11
15
9
8
7
6
5
4
RAVI N V R E S I D E N C E o
N
M
33 4"
IN
IN
L
5" 2'-118 6'
OUT
OUT
OUT
SECTION @ W1, W2 & W3 DETAIL - M
PLAN
PLAN
3-1/2"
OUT
4'
6'
I
M
OUT
0.5" THK TOUGHENED GLASS
1-1/4" THK GAP B/W GLASS PANELS
1/4" GUIDE RAIL 3-1/2" x 3" WOODEN UPVC WINDOW FRAME
3' LINTEL LEVEL
4'
LINTEL LEVEL
4'
LINTEL LEVEL
4'
1-1/4"
J
IN
3-1/2" x 1-1/2" WOODEN UPVC SHUTTER FRAME
IN
PLAN
K
IN
1-1/4'"
3"
3-1/2" x 1-1/2" WOODEN UPVC SHUTTER FRAME
UPVC FRAME DETAIL
H
0.5" THK TOUGHENED GLASS
G
3'
3'
3'
3-1/2" x 1-1/2" THK WOODEN UPVC SHUTTER FRAME
FFL
FFL
ELEVATION
W1
F
LINTEL-7' SILL - 3'
FFL
ELEVATION 6' UPVC WOODEN WINDOW
1/4" GUIDE RAIL
W2
LINTEL-5'6" SILL - 3'
3-1/2" x 3" 3-TRACK WOODEN UPVC WINDOW FRAME
ELEVATION 4' UPVC WOODEN WINDOW
W3
LINTEL-7' SILL - 3'
3' UPVC WOODEN WINDOW
TYPICAL UPVC FRAME DETAIL
E
D
C
55
CATALSYT D E S I G N STU D I O B
NOTES
REVISIONS
COMMENTS
RESIDENTIAL DEVELOP MRS. Poornima
22
21
20
19
18
17
16
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 14 13 12 11 10
15
9
8
7
6
5
4
RAVI N V R E S I D E N C E o
N
M
L
IN
IN
IN
OUT
OUT
SECTION @ W3 & W4 N
IN
SECTION @ S1 O
IN
OUT K
PLAN
OUT
PLAN
PLAN
OUT
J
2-1/2" LONG NAIL 3/4" WOODNEN BEADING
4'
2'
LINTEL LEVEL
FFL
W4
LINTEL-7' SILL - 3'
2' UPVC WOODEN WINDOW
FFL
ELEVATION
ELEVATION
W5
1/2" THK TOUGHENED GLASS
LINTEL-7' SILL - 3'
4' UPVC WOODEN WINDOW
2-1/2" LONG NAIL
2" x 1" SHUTTER FRAME
5'-6"
FFL
F
LINTEL LEVEL
3'
3'
G
1/2" THK TOUGHENED GLASS
3/4" THK WOODEN BEADING
1/2" THK TOUGHENED GLASS
2'-6"
4'
LINTEL LEVEL
H
WOODEN FILLING
2' 1'-6"
I
3/4" THK WOODEN BEADING
DETAIL AT N
DETAIL AT O
ELEVATION
V1
LINTEL-7'
2' UPVC WOODEN WINDOW
TYPICAL WOODEN FRAME DETAIL
SKYLIGHT FRAME DETAIL
E
D
C
NOTES
CATALSYT D E S I G N STU D I O B
REVISIONS
COMMENTS
56
RESIDENTIAL DEVEL MRS. Poornima
PADMAADEV C PRINCIPAL ARCHITECTS
D
RAVI N V R E S I D E N C E
1'-3"
1'-3"
1'-6"
1'-6"
PLAN
PLAN
1'-3" 6" 9'-6"
9'-6"
6"
1'-6"
FFL
FFL
ELEVATION
S1
CATALSYT D E S I G N STU D I O
LINTEL-7' SKYLIGHT - 10'
2' UPVC WOODEN WINDOW
ELEVATION
S2
LINTEL-7' SKYLIGHT - 10'
2' UPVC WOODEN WINDOW
57
GANESH RESIDENCE
PLAN RENDER
CATALSYT D E S I G N STU D I O
58
GANESH RESIDENCE SKETCH-UP MODEL
CATALSYT D E S I G N STU D I O
59
GANESH RESIDENCE SKETCH-UP MODEL
CATALSYT D E S I G N STU D I O
60
Z
B HARATH R E S I D E N C E
N 11'-7"
Z
PLAN
1 1 2" 1 2'-10 2"
3" 1'-3" 11'-7"
ELEVATION 20mm Thk Rubber Beading 8mm Thk Toughened Glass
50mm Offset from ledge 2.1466
50mm Offset from ledge
Key Plan
Detail - N B
CATALSYT D E S I G N STU D I O
NOTES
REVISIONS
HOLD LIST
6
6
6
5
5
5
4
4
4
3
3
3
2
2
2
NORTH
PROJECT TYPE
1 10
9
1 8
7
A
Level Plans SCALE
11
61
PADMAADEV CONSTRUCTIONS
A
1
B
RESIDENTIAm L DEVELOPMENT FOR MR. DWARAKANATH and Ms. BHARGAVI at Shankarpuram
SOURCE
6
5
4
DATE
P.D.C.
DEPARTMENT OF ARCHITECTURE
1
B HARATH R E S I D E N C E 5
22
4
3
2
1
NOTES 1
8mm Thk Toughened Glass
o
2 3 4
N
5 6
2"
7
75mm Groove with Rubber Beading
3"
1"
25mm Thk Wooden Flooring
1/4"
o
M
8 REVISIONS
3/4"
1/2"
10mm Thk Base plate
3/4"
L
1 2 K
3
2"
4
2.1466
5
Key Plan
J
6
Detail - O
7 I
8 KEY PLAN
H
38mm Wooden Railing
G
10mm Toughened Glass F
3'
75mm Groove with Rubber Beading E
O
Mezzanine 1'-6"
D
C
6" OFFICE INTERIORS FOR BOILED BEANS PRODUCTIONS
SECTION - ZZ
PADMAADEV CONSTRUCTIONS PRINCIPAL ARCHITECT
DRG TITLE
NORTH
PROJECT TYPE
SCALE
1 22
21
CATALSYT D E S I G N STU D I O
20
19
18
17
16
A DATE
14 13 12 DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US.
9
5
P.D.C.
Rev
SOURCE
15
B
4
DEPARTMENT OF ARCHITECTURE
3
2
1
62
B HARATH R E S I D E N C E 20mm Thk Rubber Beading 8mm Thk Toughened Glass
50mm Offset from ledge 2.1466
50mm Offset from ledge
Key Plan Detail - N
38mm Wooden Railing
8mm Toughened Glass
SLIDING SHUTTER
SLIDING SHUTTER
90mm Groove with Rubber Beading
1-1/2" 3'
FIRST FLOOR @ +12'4"LVL
3"
13'-2"
ELEVATION
Balcony 7'1"x13'2"
L
PLAN
CATALSYT D E S I G N STU D I O
B
NOTES
REVISIONS
HOLD LIST
6
6
6
5
5
5
4
4
4
3
3
3
B
RESIDENTIAm L DEVELOPMENT FOR MR. DWARAKANATH and Ms. BHARGAVI at Shankarpuram
PADMAADEV CONSTRUCTIONS NORTH
63
RAJARAV RAO R E S I D E N C E
CATALSYT D E S I G N STU D I O
64
PODAR JUMBO KIDS
PLAN RENDER
CATALSYT D E S I G N STU D I O
65
CHANDANA RESIDENCE
11
10
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 8 7 6 5 4
9
3
2
1
o
o
3345
75 Section- 75x 35 mm
675
N
N
Section- 20 x35 mm
M
20
L
675
L
300
2100
300
M
K
87.5
J
K
87.5
SECTION
J
I
I
100
1547.5
70
G
H
3345
75
100
20
G
Pine wood Section 75x 35 mm
Double Section 1547.5 x 70 mm
Plan at sill level
F
75
1547.5
35
75 H
F
87.5
75
E
35
E
3345 Pine wood Section 20 x 35 mm
D
Plan at floor level
Pine wood Section 75x 35 mm
D
C
C
PLANS B
NOTES
REVISIONS
HOLD LIST
6
6
6
5
5
5
4
4
4
3
3
3
B
RESIDENTIAL DEVELOPMENT FOR MR. Ravi and MR. Kushal at Girinagar
PADMAADEV CONSTRUCTIONS DRG TITLE
A
CATALSYT D E S I G N STU D I O
NORTH
PROJECT TYPE
SCALE
1
1 11
10
9
1 8
7
A
Level Plans
2
2
2
DATE Rev
SOURCE
6
5
4
P.D.C.
3
DEPARTMENT OF ARCHITECTURE
2
1
66
PODAR JUMBO KIDS
CATALSYT D E S I G N STU D I O
65
CHANDANA RESIDENCE
CATALSYT D E S I G N STU D I O
66
PODAR JUMBO KIDS
CATALSYT D E S I G N STU D I O
65
CHANDANA RESIDENCE
11
10
THIS DRAWING MUST NOT WITHOUT OUR CONSENT BE SHOWN TO ANY PERSON OUTSIDE THE RECIPIENT EMPLOY OR BE COPIED OR USED FOR THE PURPOSE OF MANUFACTURING ANY ARTICLE SHOWN IN THE DRAWING AND THE COPYRIGHT IN THE DRAWING SHALL BE AND REMAIN OUR SOLE PROPERTY. THIS DRAWING TOGETHER WITH ANY COPIES MADE BY THE RECIPIENT SHALL BE RETURNED ON DEMAND TO US. 8 7 6 5 4
9
3
2
1
o
o
3345
75 Section- 75x 35 mm
675
N
N
Section- 20 x35 mm
M
20
L
675
L
300
2100
300
M
K
87.5
J
K
87.5
SECTION
J
I
I
100
1547.5
70
G
H
3345
75
100
20
G
Pine wood Section 75x 35 mm
Double Section 1547.5 x 70 mm
Plan at sill level
F
75
1547.5
35
75 H
F
87.5
75
E
35
E
3345 Pine wood Section 20 x 35 mm
D
Plan at floor level
Pine wood Section 75x 35 mm
D
C
C
PLANS B
NOTES
REVISIONS
HOLD LIST
6
6
6
5
5
5
4
4
4
3
3
3
B
RESIDENTIAL DEVELOPMENT FOR MR. Ravi and MR. Kushal at Girinagar
PADMAADEV CONSTRUCTIONS DRG TITLE
A
CATALSYT D E S I G N STU D I O
CATALYST DESIGN STUDIO
NORTH
PROJECT TYPE
SCALE
1
1 11
10
9
1 8
7
A
Level Plans
2
2
2
DATE Rev
SOURCE
6
5
4
P.D.C.
3
DEPARTMENT OF ARCHITECTURE
2
1
66