CV and Part 1 Portfolio

Page 1

ADRIAN CULLEN CV + Portfolio Part 1 BA (Hons) Architecture


EDUCATION

EXPERIENCE

SKILLS

Architecture BA (Hons) University of Kent 2010 - 2013 Awarded a 2(I)

Architecture Open Architecture Sevenoaks - Nov 2013 to present Part 1 Architectural Assistant - My role in the firm covers everything from surveying to the production of CAD drawings for Pre App to Tender stage. My other main task is the production of 3D models and visuals both literal and conceptual images.

Software Capabilities Autocad SketchUp Autodesk 3DS Max Photoshop Indesign Illustrator

Richards Partington Architects - July 2009 Work experience as an Architectural Assistant involving editing and organizing plans, participating in design meetingsand attending site visits.

Other Hand drawn Orthographics Physical Model Making Sketching

A Levels Lingfield Notre Dame Sixth Form 2008 - 2010 Fine Art - B Mathematics - B Theatre Studies - B Acting L.A.M.D.A Grade 8 Acting Gold medal - Merit Acting Guildhall School of Music and Drama 2005 - 2010 Via successful audition I achieved a place in the Youth Acting Class which I attended every weekend during term time.

Other El Matador Restaurant - June 2012 to Dec 2012 Waiter and Barman for 6 months. Self Employed Decorator - June 2011 to Sept 2011 The redecoration of the interior of a house and restoration

ADRIAN CULLEN Mobile 07947 200054 E-mail mail@adriancullen.com

REFERENCES Academic Prof. Marialena Nikolopoulou Email: M.Nikolopoulou@kent.ac.uk Phone: 01227 827779

ABOUT

Dr. David Haney Email: D.Haney@kent.ac.uk Phone: 01227 824339

Outside of Architecture I enjoy a variety of sports and fitness. I have always had a passion for the creative arts and despite no longer being involved with theatre and acting, I regularly enjoy trips to the theatre and concerts. When the oppurtunity presents itself, I am always eager to travel and experience new cultures.

Professional Ian Hudson Email: Ianh@openarc.co.uk Phone: 01732 779580


PROJECT Urban Urban Cultural Centre, Lille Stage 3 - Spring Project

The brief of this project was based on a real competition won by King Kong Architects, to design an urban cultural centre to cater for the movement of Hip Hop in the French city of Lille. My proposal embraces Lille’s industrial past and acknowledges its history of bitter struggles between the forces of its capital and the industrial workers. With the use of familiar architectural forms and materials present in the surrounding vernacular architecture, I’ve created a building with dynamic spaces that glorify these often weathered, harsh industrial architectural forms.

SOUTHERN Perspective


AUDITORIUM Section

-2

1

-1

2

G

3

INTERIOR ARCADE Perspective


PROJECT Modular

Residential Apartments, Margate Stage 3 Autumn Project

This brief ran parallel with a module studying architectural movements during Modernism and required us to draw on inspiration from a particular movement to design a modular residential building. Given the state of Margate’s corroded architecture and economy that once relied on its tourist industry, my design aimed to provide new direction and style. Drawing inspiration from the pure and honest values of the De Stijl movement, my proposal aimed to be totally estranged from the surrounding vernacular architecture much like the Turner Contemporary.

NORTHERN Perspective


1 : 50 Model

SITE Plan

SOUTHERN ENTRANCE Perspective

WEST ELEVATION


PROJECT Roof

Gridshell Roof System Study Stage 2 Minor Spring Project

The task at hand for this project was to investigate a particular type of roofing system and create your own design. I chose to study gridshell roof systems due to their capabilities of spanning huge distances without internal supports. Using my 3D AutoCad capabilities I created a sinusoidal form from scratch and was able to determine the exact dimensions of each structural member which allowed me to create a flawless laser cut file. The final result was a 1:50 model where the members simply slotted together.

CONCEPT AutoCad 3D Image

1 : 50 Model


of

Ro

PROJECT Capital House

Utility ing

n/Din

Kitche

Residential Development , Sevenoaks. Open Architecture 2013 - 14

UNIT

7

ce

rra

Te

it 3

Un

r)

loo

tF

irs

(F

C Cl HW Cloak

The brief for this project involved the addition of 2 residential dwellings to an existing block of apartments. My involvement in this project was the creation of the 3D model and visuals, as well as CAD drawings all of which were used in the feasibility document and Pre Application document which I also aided in putting together. Currently the building is being submitted for BRADBOURNE VALE planning. Bath

Living

Bed

REV

DESCRIPTION

1

For construction purposes do not scale from this drawing Use figured dimensions only If in doubt ask All dimensions to be checked on site Work to be carried out in accordance with by-laws and regulations of local authorities and statutory undertakers

Scale @ A3

notes

it 4

Un

it Un

st

Fir

3(

r

we

(Lo

Created

r)

loo

F 1st

it Un

or)

Flo

f oo

R

er

ow

5 (L

2nd

r) loo

F

it Un

ce

rra

Te

ing

n/Din

Kitche

g Dinin

n/

Kitche

C Cl HW Cloak

Hall

UNIT

REV

Living

G

UNIT

6

of

Ro

F

Drawn by:

R

Checked by: Purpose of Issue

ce

rra

Te

C Cl HW Cloak

7 Bath

Bath

DESCRIPTION

or)

Flo

Gr.

oof

Un Utility

Utility

nd

ou

Gr

( it 1

er

ow

2 (L

r) loo

DATE

Living

Bed

1 Bed CAPITAL HOUSE

BRADBOURNE VALE ROAD, TN13 3QL

1

1

2

SITE PLAN

1:500

Scale @ A3

JAN 2014

Created or)

Flo

it 2

Un

1 nit

nd

rou

(G

(Lo

r we

Gr.

or)

Flo

Drawn by:

SC

Checked by:

FC

it

Un

FEASIBILITY

Purpose of Issue

or)

Flo

of

Ro

nd

r2

we

o 5 (L

or)

Flo

Job Reference

Drawing N

13055

-F-00

ce

rra

Te

U

Utility ing

n/Din

Kitche

C Cl HW Cloak

Hall

UNIT

6 Bath

Living

Job Reference

Drawing Number

Rev

13055

-F-001

-

WESTERN APPROACH Perspective

Bed

1

FRONT ELEVATION Perspective


Back in 2007 Open Architecture designed a high end mansion on an estate in Chislehurst for a client, the client returned and asked if we could construct a small Tudor Lodge on his estate as he wished to divide the land and sell the this lodge. I was asked to produce the entire ELEVATION 1 design under a detailed brief from my superior. The area is under strict conservation policies and therefore the design of the lodge had to be authentic in response to the surrounding architecture. I produced all the drawings as well as the Pre Application document that was submitted.

PROJECT Brook Lodge

Residential / Domestic, Chislehurst2

Eastern Elevation

G

N

1

d Floor Plan

Ground Floor PlanSCALE 1: 100

SCALE 1: 100

2

All dimensions to be checked on site Work to be carried out in accordance with by-laws and regulations of local authorities and statutory undertakers

SCALE 1:100 2

5

0m

3

1

ELEVAT

Southern El

1

For construction purposes do not scale from this drawing Use figured dimensions only If in doubt ask

PLAN

Open Architecture 2013 - 14

SCALE 1: 100

F

PLAN

2

First Floor Plan

PLAN First Floor Plan

SCALE 1: 100

3

SCALE 1: 100

PLAN Roof Plan

3

PLAN Roof Plan

SCALE 1: 100

SCALE 1: 100

r

notes

2

ELEVATION Northern Elevation

10

5

10

NORTHERN Elevation

SCALE 1: 100

1

ELEVATION Eastern Elevation

EASTERN Elevation

SCALE 1: 100

ELEVATION

2

Southern Elevation

4

3

SCALE 1: 100

ELEVATION Western Elevation

SCALE 1: 100

ELEVATION Northern Elevation

WESTERN Elevation SCALE 1: 100

5


vered roof over

Function Room 2

19.48

Disabled WC

Shower

17.67 Balcony / Terrace Lobby

WC's

Storage

Sliding Partition

18.99

Kitchenette

18.89

Shower Disabled WC

Server Boot room

19.29

Winemakers

Office

Lobby Existing Te

Office Terrace

Acoustic Lobby

Shower

21.28

18.66

21.39

Lockers

Balcony / Terrace

19.43

21.39

WC Escape / Entrance

Kitchen

Library WC

Staff Seating Area

1

00

Reception

21.36

Container Store

2

Sales and Marketing

.

Rest Area

corrugated building

2

18.80

18.10

17.95

Cloakroom

Disabled WC

Agricultural Storage

17.02

21.07 21.28

21.34

Staff Parking

21.36

covered Potential for

Vineyard

21.10

roof over Paved Pedestrian Route

corrugated building 1

9

. 0

0

Delivery Yard

Herb Garden

21.44

1

Potential for

21.45

21.47

8.

0 0

Grass

covered roof

Potential for

covered roof

over 21.40

21.41

0 . 0

over

17

0 . 0 20

19.63

Road

19.28

0 . 0 16

storage building

17.57

21.23

19.00

18.67

19.16

Entrance to Herb Garden

15

21.37

Potential for

19.02

19.50

covered roof over

18.99

18.80

18.10

Gravel

Office

Gravel Lobby

Office Shower

19.29

Rear Entrance

Grass Goods Lift

Cleaners C'pd

Restaurant Office

Lockers Mirror Lobby WC Escape / Entrance

Kitchen

Stairwell up

Lobby

Library

WC

WC

WC

8 Person Lift

Function Room Entrance

Rest Area

Car Wine Tasting / Boardroom

Reception

Office Entrance

Potential for shop expansion Sales and Marketing

Controlled Entrance Shop Entrance

Canopy Above

Vineyard

1

9

. 0

Paved Pedestrian Route

Informal Gathering Area

0

Herb Garden

18

0 . 0

Grass

17

. 0

0

Road

1

0 . 0 16

15

0 . 0

3

Formal Courtyard

Entrance to Herb Garden

ELEVATION

Art / Water Feature

Location Plan

SCAL Grass Gravel

Car Park

Road

Controlled Entrance

1

ELEVATION Location Plan

SCALE 1: 1000

For construction purposes do not scale from this drawing Use figured dimensions only If in doubt ask

Key

2

1

. 0 0 21.36

All dimensions to be checked on site

20.66

Work to be carried out in accordance with by-laws and regulations of local authorities and statutory undertakers notes

21.10

3 20.8

21.34

over

Winemakers

Staff Seating Area

78

21.28

Disabled WC

19.43

Line of Existing Building

Schedule of Accommodation

extent of corrugated building

20.96

SECTION

1

08

20.

corrugated building

Main Building:

20.77

21.32

21.45 21.44

Potential for

First Floor

479sqm / 5,156sqft 439sqm / 4,725sqft

Total

918sqm / 9,881sqft

(New Agricultural Building

62sqm / 667sqft)

Ground Floor SCALE 1: 200

Proposed East Section

Delivery Yard

21.47

20.50

over 19.86

covered roof

21.30

covered roof

Potential for

21.40

20.43

21.41

over 3

A - A Section

20.0

20

19.63

20.37

0 . 0

SECTION

1

21.26

storage building

Proposed East Section

portacabin

19.00

21.23

SCALE 1: 200

20.55

Potential for

14

21.

21.35

21.30

21.37

9

covered roof

21.22

20.6 20.49

shed

19.50

20.80

covered roof

over

Potential for

7

20.71 20.62

over

20.53

21.31 19.48

Shower

Lobby

18.31

18.89

Plant

Shower Server Boot room

18.66

52

Disabled WC

21.31

Agricultural Storage

Kitchenette

2

20.

18.80

21.22

Open Architecture was asked by Chapel Down, the winery and brewery, to design a new contemporary barn to house their new restaurant, bar wedding function room above. This is the starting phase of a series of developments that Chapel down wish to undertake. My involvement of this project was primarily the visuals and construction of the 3D model which was used to inform the design. I also aided in the production of CAD drawings. All the work I produced was used on the presentation to the board members of Chapel Down. They were pleased with our work and we are currently awaiting their permission to progress with the planning application. 20.80

19.48

Shower

Lobby

20.

21.07

covered roof

shed

19.07

Disabled WC

17.95

Gravel

corrugated building

Potential for

19.28

17.67

3

21.36

21.35

21.30

20.69 20.49

18.80

17.67

17.02

Open Architecture 2013 -14

Staff Parking

17.52

19.11

16.94

Commercial / Hospitality, Tenterden

Container Store

16.68

21.14

PROJECT Chapel Down

0 . 0

15.30

Agricultural Storage

Server

Boot room

Disabled WC

Winemakers

Office

Lobby

Office Shower

1

Winery

Rear Entrance

Plant

Shower

Kitchenette

2

storage building

Goods Lift

Cleaners C'pd

Restaurant Office

Lockers Mirror WC

Stairwell up

Lobby

Library

WC

WC

Reception

Spots Farm Cottages

Shop

Wine Tasting / Boardroom

glass house

Potential for shop expansion

Office Entrance

Sales and Marketing

WC

8 Person Lift

Function Room Entrance

Rest Area

SOUTHERN Elevation

18.51

Kitchen

20.65

Escape / Entrance

Staff Seating Area

21.08

Lobby

Shop Entrance

20.90

Shop Entrance

20.68

2

Canopy Above

ELEVATION Proposed North Elevation

SCALE 1: 200

Vineyard Paved Pedestrian Route

SCALE 1:200

Paved Pedestrian Route 18.37

0m

0

0

4

10

SMALL HYTHE ROAD (B2082)

.

Herb Garden

Focal Signage Location

Path

Car Park

ELEVATION

2

Path

Car Park

Proposed North Elevation

Car Park

18.01

Path

Drop off / Taxi

Grass

Grass

SCALE 1: 200

Road

SCALE 1:200 B Disabled Spaces

Formal Courtyard

Issued for information

A

Issued for information

REV

DESCRIPTION

05.12.13 12.11.13 DATE

0m

2

18. 00

17.43

Chapel Down Entrance to Herb Garden

Art / Water Feature

Path

Tenterden Vineyard

Path

Proposed Site Layout

18.99

Raised Table

Raised Table

Raised Table

Disabled Spaces

1:200

Scale @ A1

OCT 2013

Created Drawn by :

IH

16.69

Checked by: Path

Car Park

Path

Car Park

Path

PMcP PRELIMINARY

Purpose of Issue

Car Park

Gravel

Drop off / Taxi

18.30

Grass

Grass Gravel

17.87

-by

16

. 0 0

Bus Lay

15.96

Car Park

17. 00

Car Park

Road

2

4

10

20 Spots House

15.36

SITE Plan

SCALE 1:200 0m

Road

16.96

Controlled Entrance

Layout

2

Informal Gathering Area 9

Sliding Gate

1

Job Reference

Drawing Number

Rev

13044

F - 100

B

ISOMETRIC Perspective

4

10


AERIAL Perspective


PROJECT Ragstones

Residential Development, Sevenoaks Open Architecture 2013 - 14

For construction purposes do not scale from this drawing Use figured dimensions only If in doubt ask

For construction purposes do not scale from this drawing Use figured dimensions only If in doubt ask All dimensions to be checked on site Work to be carried out in accordance with by-laws and regulations of local authorities and statutory undertakers

Looking over the cricket Vine in the centre of Sevenoaks, Open Architecture was approached to design a scheme of 5 residential units with parking to replace the existing house on the property. My involvement in this project was the 3D model, visuals and the production of CAD drawings for the feasibility, Pre Application and Planning Application documents. I also attended site visits and meetingS with both the client and planning officer.

1

PLAN PROPOSED FIRST FLOOR LAYOUT

SCALE 1: 100

1

PLAN 3

PLAN

PROPOSED THIRD FLOOR LAYOUT PROPOSED FIRST FLOOR LAYOUT

SCALE 1: 100

3

SCALE 1: 100

PLAN -1

PLAN

PROPOSED BASEMENT LAYOUT PROPOSED THIRD FLOOR LAYOUT

SCALE 1: 100

-1

SCALE 1: 100

All dimensions to be checked on site

Work to be carried out in accordance with by-laws and regulations of local authorities and statutory undertakers

PLAN

PROPOSED BASEMENT LAYOUT

SCALE 1: 100

notes

notes

-

Planning

REV

DESCRIPTION

Schedule of Accommodation

27.02.14 DATE

Ragstones, The Vine

Unit 1 (2 bed Apartment): Unit 2 (2 bed Apartment): Unit 3 (3 bed Apartment): Unit 4 (3 bed Duplex): Unit 5 (3 bed Duplex):

176sqm / 1,895sqft 166sqm / 1,788sqft 226sqm / 2,433sqft 172sqm / 1,851sqft 178sqm / 1,916sqft

TOTAL :

916sqm / 9,860sqft

Proposed Plan Layouts

1:100

Scale @ A1

Feb 2014

Created Drawn by :

-1 -1

G 0

PLAN PROPOSED BASEMENT LAYOUT

PLAN PROPOSED GROUND FLOOR LAYOUT

SCALE 1: 100

1 0

PLAN PLAN PLAN 2

1

PROPOSED SECOND FLOOR LAYOUT PROPOSED LAYOUT PROPOSED GROUND FIRST FLOORFLOOR LAYOUT

SCALE 1: 1001: 100 SCALE 1: SCALE 100

1

SCALE 1: 100 SCALE

PMcP

3

1: 100 100 1: SCALE

0m

-

Planning

REV

DESCRIPTION

Schedule of Accommodation

PLAN

TOTAL :

916sqm / 9,860sqft

-1

DATE

Proposed Plan Layouts

1:100

Scale @ A1

Feb 2014

Drawn by :

IH

Checked by:

PMcP PRELIMINARY

3

For construction purpos

PLAN SCALE 1: 100

PROPOSED THIRD FLOOR LAYOUT PROPOSED BASEMENT LAYOUT

TOTAL :

916sqm / 9,860sqft

2

5

10

Job Reference

Drawing Number

Rev

13058

P 310

-

27.02.14

P

-1

SCALE 1: 100

AllPd

0m

1

2

5

10

Drawing Number

Rev

13058

P 310

-

-

Planning

REV

DESCRIPTION

176sqm / 1,895sqft 166sqm / 1,788sqft 226sqm / 2,433sqft 172sqm / 1,851sqft 178sqm / 1,916sqft

DATE

Proposed Plan Layouts

1:100

Scale @ A1

TOTAL :

IH

916sqm / 9,860sqft

Feb 2014

Drawn by :

IH

Checked by:

PMcP PRELIMINARY

Purpose of Issue

PMcP PRELIMINARY

Purpose of Issue

0

Job Reference

Drawing Number

Rev

13058

P 310

-

PLAN PROPOSED GROUND FLOOR LAYOUT

SCALE 1: 100

0

PLAN

2

PLAN

PROPOSED GROUND FLOORSECOND LAYOUTFLOOR LAYOUT PROPOSED

SCALE 1: 100

SCALE 1: 100

2

PLAN PROPOSED SECOND FLOOR LAYOUT

SCALE 1: 100

SCALE 1:100 0m

1

2

5

10

Job Reference

Drawing Number

Rev

13058

P 310

-

FRONT Elevation 1

27.02.14

Ragstones, The Vine

Created

Feb 2014

Checked by:

Job Reference

Sevenoaks. TN13 3SY

1:100

Drawn by :

10

SCALE 1:100

Unit 1 (2 bed Apartment): Unit 2 (2 bed Apartment): Unit 3 (3 bed Apartment): Unit 4 (3 bed Duplex): Unit 5 (3 bed Duplex):

Proposed Plan Layouts

Scale @ A1

SCALE 1:100

Work to be carried ou regulations of local auth

Schedule of Accommodation

DATE

Created

5

1

Sevenoaks. TN13 3SY

176sqm / 1,895sqft 166sqm / 1,788sqft 226sqm / 2,433sqft 172sqm / 1,851sqft 178sqm / 1,916sqft

2

176sqm / 1,895sqft 166sqm / 1,788sqft 226sqm / 2,433sqft 172sqm / 1,851sqft 178sqm / 1,916sqft

Purpose of Issue

Ragstones, The Vine

Unit 1 (2 bed Apartment): Unit 2 (2 bed Apartment): Unit 3 (3 bed Apartment): Unit 4 (3 bed Duplex): Unit 5 (3 bed Duplex):

1

Unit 1 (2 bed Apartment): Unit 2 (2 bed Apartment): Unit 3 (3 bed Apartment): Unit 4 (3 bed Duplex): Unit 5 (3 bed Duplex):

SCALE 1: 100

SCALE 1:100

0m

27.02.14

Ragstones, The Vine Sevenoaks. TN13 3SY

PRELIMINARY

2

PLAN PLAN PLAN

3 FIRSTPROPOSED 2PROPOSED FLOOR LAYOUT THIRD FLOOR LAYOUT PROPOSED SECOND FLOOR LAYOUT

Planning DESCRIPTION

Created

IH

Checked by: Purpose of Issue

REV

Schedule of Accommodation

Sevenoaks. TN13 3SY

ELEVATION PROPOSED STREET ELEVATION

SCALE 1: 100


200

FRONT ELEVATION Perspective

STREET Perspective

-

Planning

REV

DESCRI

Scale @ A1 Created Drawn by : Checked by: Purpose of Issue

SITE Section


PROJECT Maplecroft

Residential Development, Sevenoaks Open Architecture 2013 - 14

Open Architecture was asked to design a scheme to replace the existing house on the property into 2 mirrored residential dwellings, in turn dividing the site. I was tasked with the creation of the 3D model and renders that informed the design as well as the production of CAD drawings all of which were used in the Planning Application and the Design and Access Statement which I submitted myself.

STREET Perspective


5

ELEVATION Proposed Street Elevation

SCALE 1: 200

FRONT Elevation

5

ELEVATION Proposed Street Elevation

SCALE 1: 200

LINE OF EXISTING LAND BEDROOM 2

FFL 59.07

BEDROOM 4

BATHROOM

MASTER BEDROOM

GARDEN

FFL 56.07

LOUNGE

LOBBY

LIVING

DINNING

TERRACE

FFL 53.07

GARAGE

STUDY

TV ROOM /GAMES ROOM/ GYM

FFL 50.07

SITE Section

6

SECTION Proposed Section A - A

LINE OF EXISTING LAND BEDROOM 2

SCALE 1: 100

FFL 59.07


ADRIAN CULLEN A.17 Uplands Way Sevenoaks Kent TN13 3BN T. 07947200054 E. mail@adriancullen.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.