Adrián Sánchez Sevilla - Structural Engineer

Page 1

Adriรกn Sรกnchez Sevilla - WORKS adsanse@gmail.com


•Drawing skills •Academia •Bridge Technologies (Jan-Dec 2008) •Cesma Ingenieros (Jan 2009-April 2010) •Ideam Consultores de Ingeniería Civil (May 2010-Now)

CONTENTS

•Bio


Adriรกn Sรกnchez Sevilla got his M.Sc. from UPV (ES). In 2007 he received a scholarship from Fundaciรณn Rafael del Pino to complete a Master in Civil Engineering Leadership in UCLM (ES) with an internship period at the Department for International Development of INECO-TIFSA. In 2008 he joined Bridge Technologies, a company dedicated to design bridges and special structures in collaboration with the UPC Bridges Chair. He took part in the design of more than 10 major bridges and special structures. In January 2009 he joined CESMA Engineers, a structural consultancy firm where he worked as a Junior Engineer. After two years of professional experience and having participated in more than 20 bridges and two stations for HST lines he decided to focus his career on international markets and joined IDEAM Civil Engineering Consultants, where he currently works as a Structural Engineer.

BIO

Adriรกn Sรกnchez Sevilla


DRAWING SKILLS Detail Sketching and Model Design


DRAWING SKILLS Detail Sketching and Model Design


ACADEMIA Structural Types II ‒ Bachelor in Architecture at IE University


ACADEMIA Structural Types II ‒ Bachelor in Architecture at IE University


BRIDGE TECHNOLOGIES Girona High Speed Railway Station Cast in place concrete slab. 16 m span. 600 m length and 45m width.


BRIDGE TECHNOLOGIES High Speed Railway Bridge over C-66 Motorway Construction project. Prestressed Concrete Box-Girder Bridge


BRIDGE TECHNOLOGIES Technical advisor for the main contractor Prestressed Concrete Box-Girders Bridges. High Speed Railway line Barcelona-Girona


CESMA INGENIEROS New Atocha High Speed Railway Station Construction project. Steel roof and new foundations


CESMA INGENIEROS La Paloma Footbridge Foundations and construction process


CESMA INGENIEROS Arroyo Butarque Footbridge Foundations, piers and construction process


CESMA INGENIEROS Railway Bridge in Orio Foundations, piers and checking of structure’s safety under construction


CESMA INGENIEROS Bridges over Irueテアa s Reservoir and Bridge in Los テ]geles de San Rafael Supervision of the construction with an underslung moveable scaffolding system. Foundations and construction process


IDEAM Extension of 5 Bridges in AP-7 Highway Construction project for piers and foundations


IDEAM High Speed Railway Bridge over Kinatoi river Construction project


IDEAM High Speed Railway Bridge over Zabaleta river Construction project


IDEAM High Speed Railway Bridge over Ulla river Construction project and Technical Advisory for Spanish Transport Ministry Railway Bureau


IDEAM High Speed Railway Bridge over Ulla river Construction project and Technical Advisory for Spanish Transport Ministry Railway Bureau


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.