Adriana Rombaldi 646-853-1109 adrirombaldi@gmail.com
Education
Work Experience
New York University, In Progress
AECOM - New York, NY Architect Designer I
Certificate in Building Information Modeling (BIM) Using Revit
New York Institute of Technology, 2013
Bachelor of Science in Architectural Technology Scholastic Honors - Summa Cum Laude
Parsons, The New School, 2009
Certificate Program in Interior Design
Honors New York Society of Architects - Book Award 2011 Tau Sigma Delta Honor Society Gold Certificate for Achievement in Architectural Technology
Computer Skills Autodesk Revit and AutoCAD Adobe Photoshop, Adobe InDesign, Adobe Illustrator SketchUp, Rhino Microsoft Word, Excel, Power Point
Languages Brazilian Portuguese / fluent in verbal and writing
Leadership AECOM - ACE (Architecture Construction Engineer) Mentor Program CMAA NYIT Student Chapter
Credentials LEED Green Associate, In Progress (Exam pending - April 2014)
Contents
06/2012 - Present
World Trade Center - Vehicular Security Center - Liberty Park Assisted design team on developing Vehicular Security Center facade Produced architectural documents under the direction of Project Architect Developed renderings and presentation boards
World Trade Center Vehicular Security Center Liberty Park
Penn Station Vision Master Plan Study Assisting in design development studies Creation and elaboration of diagrams, renderings, 3D modeling, drafting plans and sections Setting up materials and boards for presentations with clients
RH Consultants & Associates - New York, NY
Intern Preparing NYC Department of Building forms and transmittals Following up with clients Setting up materials for meetings with clients
Jack Sedorowitz R.A. - Merrick, NY Intern Completing invoices and faxing transmittals Management of office maintenance
AECOM
08/2008-04/2009
Penn Vision Master Plan
SCHOOL Wissioming Residence USGBC Headquarters
01/2007-08/2008
Design Headquarters Sandra_Buckland Interior Design Hand Drawings
Education
Work Experience
Adriana Rombaldi
New York University, In Progress
AECOM - New York, NY
646-853-1109
Certificate in Building Information Modeling (BIM) Using Revit
New York Institute of Technology, 2013
Bachelor of Science in Architectural Technology Scholastic Honors - Summa Cum Laude
Parsons, The New School, 2009
Certificate Program in Interior Design
Honors New York Society of Architects - Book Award 2011 Tau Sigma Delta Honor Society Gold Certificate for Achievement in Architectural Technology
Computer Skills Autodesk Revit and AutoCAD Adobe Photoshop, Adobe InDesign, Adobe Illustrator SketchUp, Rhino Microsoft Word, Excel, Power Point
Languages Brazilian Portuguese / fluent in verbal and writing
Leadership AECOM - ACE (Architecture Construction Engineer) Mentor Program CMAA NYIT Student Chapter
Credentials LEED Green Associate, In Progress (Exam pending - April 2014)
Architect Designer I 06/2012 - Present World Trade Center - Vehicular Security Center - Liberty Park Assisted design team on developing Vehicular Security Center facade Produced architectural documents under the direction of Project Architect Developed renderings and presentation boards Penn Station Vision Master Plan Study Assisting in design development studies Creation and elaboration of diagrams, renderings, 3D modeling, drafting plans and sections Setting up materials and boards for presentations with clients
RH Consultants & Associates - New York, NY
Intern Preparing NYC Department of Building forms and transmittals Following up with clients Setting up materials for meetings with clients
Jack Sedorowitz R.A. - Merrick, NY
Intern Completing invoices and faxing transmittals Management of office maintenance
08/2008-04/2009
01/2007-08/2008
adrirombaldi@gmail.com
FLOOR PLAN
WORLD TRADE CENTER VEHICULAR SECURITY CENTER (VSC) LIBERTY PARK The Vehicular Security Center (VSC) is a joint venture among many companies. AECOM is designing the facade and an above grade park for the VSC area which will mask the building as it serves as a background for the south side of the World Trade Center site. Santiago Calatrava is also part of this joint venture as he is designing the rebuilding of St. Nicholas Church, which will be located within Liberty Park, topping the roof of the VSC. One of the key elements in the design of the facade for the VSC was the development of a green wall for Liberty Street, which integrated the raised park above with the street level. The living wall also functions as a background for the World Trade Center Memorial. LIBERTY STREET ELEVATION
DO NOT ENTER
LIBERTY STREET ELEVATION 0
8’
16’
32’
WTC VEHICLE SECURITY CENTER -
OF NY & NJ
AUTHORIZED VEHICLES ONLY - CLEARANCE 14’-0”
Under the supervison of Roger Goodhill and Luciane Maia, I assisted the design team in developing the VSC facade, produced architectural documents, developed 2D renderings and finish boards for presentations with clients.
PARTIAL PARK FLOOR PLAN 0
16’
8’
32’
PARTIAL PARK FLOOR PLAN
Wall sectionS
GUARDRAIL
16’
8’
32’
3’ - 6”
3’ - 6”
EL. 333.38’ T.O. STONE COPING
11” 8 1/2”
8 1/2”
EL. 331.13’ T.O. PARK PAVING
2”
2’ - 2”
2”
11”
EL. 331.33’ (V.I.F.) T.O. EXIST. SLAB
EL. 331.13’ T.O. PARK PAVING
EL. 331.33’ (V.I.F.) T.O. EXIST. SLAB
IRRIGATED GREEN WALL 24” X 24” PLANTER MODULE
VENT A - EAST ELEVATION
SURFACE MTD. SIGN LETTERING
0
EL. 326.29’ T.O. GUTTER FASCIA
EL. 326.29’ T.O. GUTTER FASCIA EL. 325.33’ B.O. BEAM
EL. 325.21’ B.O. GUTTER FASCIA
8’
16’
32’
WEST STREET ELEVATION 0
16’
8’
32’
END PLATE, BEYOND
1’ - 9 3/4” IRRIGATED GREEN WALL 24” X 24” PLANTER MODULE
STAINLESS STEEL JAMB PLATE, BEYOND
METAL WALL PANEL
PARTIAL PARK FLOOR PLAN 0
EL. 313.27’ T.O. SST AND STONE
8’
16’
LIBERTY PARK SCHEMATIC DESIGN
32’
WORLD TRADE CENTER STREETS, UTILITIES+ INFRASTRUCTURE EL. 313.26’ T.O. STONE
STAINLESS STEEL JAMB PLATE, BEYOND
STONE BASE
EL. 310.70’ (+/-) T.O. SIDEWALK
EL. 310.70’ (+/-) T.O. SIDEWALK
WEST STREET ELEVATION 0 WALL SECTIONS
West street elevation
GUARDRAIL
2’ - 2” EL. 333.38’ T.O. STONE COPING
0
14’ - 5”
Y & NJ
Partial floor plan
8’
16’
32’
VENT A study - SOUTH ELEVATION
PARTIAL FLOOR PLAN - AT PARK LEVEL
PARTIAL FLOOR PLAN - AT PARK LEVEL
LIBERTY STREET ELEVATION
CEDAR STREET ELEVATION
Partial LIBERTY STREET ELEVATION
site location UNDERGROUND TRANSIT
PENN VISION MASTER PLAN AECOM’s vision study for Penn Station intends to revitalize the station, reconnecting the station to its urban context and clarifying the station’s circulation. The use of light was an important tool used throughout the development of the master plan in order to create visual connections orienting and directing people in the station. The New York city street grid was incorporated into the station’s circulation in order to provide clear and intuitive wayfinding throughout the station. Also, the circulation layout created a cascade effect across levels allowing pedestrians to have visual connections between the levels, which reinforced the initial idea to connect all levels within the station and the surrounding urban context. During the development of the vision study I was part of the design team under the supervision of Roger Goodhill and Luke Bridle. I assisted in design development studies, created and elaborated upon diagrams, plans, sections, and set up materials and presentation of boards for clients.
1 PENN PLAZA
33RD ST SUBWAY
TICKETS
VENT
OVERLOOK RESTAURANT
PENN STATION
LOADING DOCK
2 PENN PLAZA PEOPLE
OVERLOOK RESTAURANT VENT
MSG VIP
TICKETS
SERVICE
NEW PENN TOWER
8TH AVE
32ND ST
AMTRAK SERVICE BUILDING
MSG THEATER
CHURCH
7 PENN PLAZA
NEW PENN TOWER
7TH AVE
31ST ST
CIRCULATION DIAGRAM
Entrance / light pavilions
Natural Light is used as a tool to orient and direct people throughout the station
The entrance glass pavilions not only establish a civic entrance for penn station but also bring light into the station.
Creating a clear connection from platform level to street level.
The ample vertical height of the pavilions allow for natural light to be introduced along with vertical Circulation elements, which create a direct visual connection throughout the station.
TO 34TH STREET WEST
1 PENN PLAZA PARKING
TO 34TH STREET EAST
1 PENN PLAZA LOADING DOCK
E
3
C
2
A
1
33RD ST
OPEN TO BELOW
RETAIL
RETAIL
OPEN TO TRACKS
MOYNIHAN PENN STATION
TRAIN HALL
WEST
BRIDGE
LEVEL A BELOW
32ND ST 32ND STREET PASSAGE
OPEN TO TRACKS
STATION MASTER TICKETS BAGGAGE
31ST ST
SERVICE SERVICE
AMTRAK OPS.
MEP
BLOCK 780
8TH AVE
CONNECTION FROM STREET TO LEVEL A OPEN TO BELOW
7TH AVE
TO 34TH STREET WEST
TO 34TH STREET EAST
3
E
2
C
1
A
33RD ST
33RD STREET PASSAGE
32ND ST
HILTON CORRIDOR
SERVICE
TRACKS BELOW
AMTRAK OPS.
MEP
31ST ST TRACKS BELOW
CONCOURSE EXTENSION - BELOW
BLOCK 780
8TH AVE
7TH AVE
WISSIOMING RESIDENCE
Architects Robert Gurney Architect Site Location Glen Echo, Maryland, USA Completion September 2007
STUDENT: Adriana Rombaldi CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
5120 Wissioming Road Glen Echo, MD 20816
WISSIOMING RESIDENCE
The Wissioming Residence was used as a reference project for the production of this construction document set. The project began through research of the home and construction details related to it. Through the use of Building Information Modelling (BIM) the goal of this project was to make technically clear drawings, prepare models illustrating and identifying the assembly of materials, systems, and components appropriate for a building design. KEY PLAN
SEAL
REVISION
1
Axonometric
WISSIOMING RESIDENCE ISSUE DATE: 12/19/12
ARCHITECT: ROBERT GURNEY LOCATION: GLEN ECHO, MARYLAND, USA
DESIGN
MM/DD/YY
Project Status
Cover Page Issue Date: 12/19/12
SITE PLAN
BASEMENT FLOOR PLAN
W 99.45’
195
200
205
210
3' - 0"
EXTERIOR
1 1/4" STUCCO 1 1/4" STUCCO
7 5/8" CMU
WIRE MESH 5 7/8" CMU 7/8" FURRING CHANNEL
1 1/4" STUCCO SUSPENDED POOL ABOVE
1
13' - 0"
5/8" GYPSUM
1
TYPE 1
4' - 0"
1
12' - 0"
12' - 0"
1
TYPE12
12' - 0"
8' - 0"
12' - 0"
2
220
INTERIOR
5/8" GYPSUM
INTERIOR
62
27 EXTERIOR
7/8" FURRING CHANNEL
28' - 8"
1 A301
1 1/2" STUCCO
1/2" SHIPLAP RED BALAU SIDING
8" CONCRETE
5/8" PLYWOOD SHEATING
4" WOOD STUD BATT INSULATION
3 5/8" WOOD STUD BATT INSULATION
5/8" GYPSUM
5/8" GYPSUM
BASEMENT
5/8" GYPSUM
101
240
POOL 2
1
TYPE 4
TYPE 5
3' - 2" 6' - 0"
TYPE 3 13' - 0"
14' - 0"
EXTERIOR
EXTERIOR
EXTERIOR
14' - 8"
INTERIOR
EXTERIOR
37' - 4"
1/2" STONE SIDING
1/2" SHIPLAP RED BALAU SIDING
5/8" PLYWOOD SHEATING
5/8" PLYWOOD SHEATING 3 5/8" WOOD STUD BATT INSULATION
1 5/8" GYPSUM A203
29' - 0"
N 28° 43’ 20” W 100.32’
1
Site 1/16" = 1'-0"
28' - 2"
105
WIRE MESH
5/8" PLYWOOD SHEATING
4" CONCRETE
3 5/8" WOOD STUD BATT INSULATION
5/8" GYPSUM
5/8" PLYWOOD SHEATING
5/8" PLYWOOD SHEATING
1/2" SHIPLAP RED BALAU SIDING
1/2" STONE SIDING
REVISION
DESIGN
NOTES 1. WINDOW TAGS: CONVERSATION PL I'M ONLY SHOWING PER LEVEL EVEN T NEED MORE THAN TO TAG ALL WINDO
MM/DD/YY
Project Status
1
22' - 0"
TYPE 7
12' - 0"
BATHROOM
UP
1 1/4" STUCCO 1/2" STONE SIDING
34' - 2"
RETAINING WALL 6'-0"
104
41' - 4"
56' - 0"
3 5/8" WOOD STUD BATT INSULATION
CLOSET
106
SEAL
EXTERIOR
30' - 0"
250
ELEVATOR
TYPE 6
3
102
EXTERIOR
2
MECHANICAL
1
DRIVEWAY
2
KEY PLAN
3
245
INTERIOR
28
A6
5 5/8" CMU
12" CMU FOUNDATION
N 66° 16’ 00” W 352.42’
62 INTERIOR
7/8" FURRING CHANNEL 12" x 24 CONCRETE FOOTING
5/8" GYPSUM
N 66° 16’ 00” E 361.04’
27
EXTERIOR
5/8" GYPSUM
3 5/8" WOOD STUD
230
62
INTERIOR
5120 Wissioming Road Glen Echo, MD 20816
225
INTERIOR
46' - 8"
INTERIOR
11' - 0"
18' - 8"
WIRE MESH
WIRE MESH
215
235
INTERIOR
72' - 4"
190
INTERIOR
8' - 0"
185
1
EXTERIOR
18' - 0"
180
A302
A001 A002 A101 A102 A103 A104 A105 A201 A202 A203 A204 A205 A301 A302 A303 A401 A501 A502 A503 A504 A505 A601 A602 A603 A604 A605 A701 A702 A801
16' - 9"
175
1
1
61' - 4"
A204
Cover Page Sheet List / Site Plan Basement Floor Plan First Floor Plan Second Floor Plan Roof Deck Plan Garage Floor Plans Exterior North House Elevation Exterior East House Elevation Exterior South House Elevation Exterior West House Elevation Exterior Garage Elevations Section House Section House Sections Garage Interior Elevations Basement Floor Finish Plan First Floor Finish Plan Second Floor Finish Plan Roof Deck Floor Finish Plan Garage Floor Finish Plans RCP - Basement Floor RCP - First Floor RCP - Second Floor RCP - Roof Deck Floor RCP - Garage Window Legend Legends and Schedules Perspectives
A201
Sheet Number
STUDENT: Adriana Rombaldi CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
1
WISSIOMING RESIDENCE
Sheet List Sheet Name
170
18' - 0"
S 23° 44’ 00”
1
Basement Floor Plan 1/4" = 1'-0"
TYPE 8
TYPE 9
TYPE 10
Sheet List / Site Plan Issue Date: 12/19/12 SCALE: As indicated
16' - 9"
Partition Wall Legend 1 1/2" = 1'-0"
A002
1 A401
First FLOOR PLAN
A201 1 25' - 4"
1
1
A204
A302
1
12' - 10"
GLASS RAILING
SUSPENDED SWIMMING POOL BELOW
DECK 212 3' - 6" 63' - 1"
8
65
GLASS RAILING
7' - 5"
4' - 0"
11' - 0"
8' - 0"
16
14
LIVING ROOM
204
205
24
1
Sectional Axon
14
KITCHEN
23
203
16
46
2' - 11"
4
3' - 6"
10' - 0"
4' - 0"
12' - 9"
D
I1
BATHROOM
3
4' - 0"
66
210 3
BATHROOM
3
C
206
3 UP
40
208
3
SEAL
ENTRY
5' - 0"
201
3
211
12
40
61
12
33
G2
6
52
3
PANTRY A4
4' - 6"
2' - 11"
3
4' - 7"
ELEVATOR 3
I3
61
DN
39
3 3' - 4"
REVISION
5' - 7"
DESIGN
3' - 7"
10
MM/DD/YY
STORAGE
3
1
Sectional Axon
Interior Perspective 1
3' - 9"
KEY PLAN
7' - 0"
14' - 4"
10' - 11"
14' - 4"
1
First Floor Plan 1/4" = 1'-0"
3' - 0" 41' - 8"
56' - 0"
STUDENT: Adriana Rombaldi CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
Interior Perspective 2
Project Status 6
5120 Wissioming Road Glen Echo, MD 20816
2
WISSIOMING RESIDENCE
1 A203
4
Exterior Perspective 2
3' - 6"
3' - 0"
4' - 0"
4' - 6"
207
3' - 5"
3 6
1
209
MECH.
H1
202
13
3
2' - 0"
PORCH
3' - 0"
8' - 8"
48
2' - 0"
5' - 5"
13
3
46
1' - 6"
4' - 0"
61
KEY PLAN
19' - 6" 17' - 0"
2' - 6"
1
4' - 1"
2' - 11"
28' - 0"
1 A301
A401 15
B
1' - 6"
32' - 8"
25
11' - 11"
Exterior Perspective 1
8
DINING ROOM 44
5
61
4' - 0"
15' - 8"
17
61
4' - 6"
43' - 10"
A2
A1
17
61
4' - 6"
61' - 4"
3' - 10"
34 1
2' - 0"
Perspectives Issue Date: 12/19/12 SCALE:
A801
17' - 6"
4' - 6" 22' - 0"
17' - 6"
4' - 6"
4' - 6"
4' - 6"
13' - 7"
3' - 10"
4' - 0"
4' - 0"
5' - 6"
2' - 11"
10' - 8"
2' - 0"
4' - 3"
3' - 11"
I2
4' - 6"
G1
4' - 6"
11' - 11"
3' - 11"
STUDENT: Adriana Rombaldi CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
1' - 1" 2' - 2"
A3
3' - 3"
5120 Wissioming Road Glen Echo, MD 20816
3' - 8"
4' - 8"
3' - 5"
WISSIOMING RESIDENCE
14' - 1" 2' - 8"
18' - 11"
78' - 0"
NOTES 1. DIMENSIONS: AS PER CONVERSATION YOU A NOT TO DO ANY ADITIO DIMENSIONING FOR BA CLOSETS. THESE AREA REQUIRED ADDITIONAL OUTS.
2. WINDOW TAGS: AS P CONVERSATION PLEAS I'M ONLY SHOWING A F PER LEVEL EVEN THOU NEED MORE THAN THA TAG ALL WINDOWS.
STUDENT: Adriana Rombaldi CLASS: ARCH 327 CLASS TITLE: Construction Docu PROFESSOR: Jason Van Nest, R SEMESTER: FALL 2012
5120 Wissioming Road Glen Ech
WISSIOMIN
1
Sectional Axon
KEY PLAN
NORTH ELEVATION
Issue Date: 12/19/12 SCALE:
A801
21' - 0"
WOOD FASCIA
2
2
2
2
10
1
4
2
61
8
A11
A9
8
9
61
8
61
A8
11
12" CONCRETE WALL STUCCO SIDING
40
13
40
5
2
4
61
2
13
2
2
61
7
8
12 2
A4
1
74
2
14
7
61
2
61 16
12
61
7
65
21
22
2
20
A2
Sectional Axon
C
2
8 39
A1
17
23
24
STUCCO SIDING
34
25
B
26
GLASS RAILING
KEY PLAN GLASS RAILING SUSPENDED SWIMMING POOL
First Floor 12' - 0"
First Floor 12' - 0"
SEAL
KEY PLAN A6 62
5' - 6"
A801
7
28
27
62
27
12" CONCRETE WALL EXTENDS BEYOND SUSPENDED POOL
62
2' - 6"
Issue Date: 12/19/12 SCALE:
2
61
Perspectives
12" x 24 CONCRETE FOOTING
Second Floor 24' - 0"
35
A3
Exterior Perspective 1
Exterior Perspective 2
1
MM/DD/YY
Project Status
4
A7
39
1X6 SHIPLAP WOOD SIDING WOOD FASCIA
DESIGN
Second Floor 24' - 0"
1X6 SHIPLAP WOOD SIDING
31
GLASS RAILING
REVISION
Roof - Garage 36' - 0"
1X6 SHIPLAP WOOD SIDING
2
13' - 6"
SEAL
5
19
20
41
WOOD DECK
18
18' - 0"
2
Roof - Garage 36' - 0"
36 38
5120 Wissioming Road Glen Echo, MD 20816
18
Roof - House 45' - 0"
WISSIOMING RESIDENCE
A13 STONE SIDING
KEY PLAN
3' - 11"
GLASS RAILING
Perspectives
Roof - House 45' - 0"
7' - 0"
Exterior Perspective 2
37
2
STUDENT: Adriana Rombaldi CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
4
42
CANTILEVERED ROOF ZINC ALLOY COATED COPPER FASCIA
5120 Wissioming Road Glen Echo, MD 20816
Interior Perspective 1
Project Status
3' - 0"
3
MM/DD/YY
WISSIOMING RESIDENCE
1X6 SHIPLAP WOOD SIDING
DESIGN
9' - 0"
Sectional Axon
STUDENT: Adriana Rombaldi CLASS: ARCH 327 CLASS TITLE: Construction Documents PROFESSOR: Jason Van Nest, RA SEMESTER: FALL 2012
CANTILEVERED ROOF CANTILEVERED ROOF ZINC ALLOY COATED ZINC ALLOY COATED COPPER FASCIA COPPER FASCIA
REVISION
5120 Wissioming Road Glen Echo, MD 20816
1
WISSIOMING RESIDENCE
SEAL
12" x 24 CONCRETE FOOTING
Basement 2' - 0"
Basement 2' - 0"
Foundation 0' - 0"
Foundation 0' - 0"
REVISION
SEAL
1
Elevation House South 1 1/4" = 1'-0" Elevation House North 1/4" = 1'-0"
Proje REVISION
DESIGN
MM/DD/YY
Exter Hous
Issu SCA
Project Status
Perspectives 2
Interior Perspective 2
3
Interior Perspective 1
4
Exterior Perspective 2
Issue Date: 12/19/12 SCALE:
A801
A2
7
Master Bathroom North 1/4" = 1'-0"
Master Bathroom South 1/4" = 1'-0"
GYPSUM
6' - 8"
5
3
G3
4
1' - 0" 6' - 0" EQ
2
Basement Bathroom Floor Plan 1/4" = 1'-0" Master Bathroom West 8 1/4" = 1'-0"
STONE TILE 6' - 0"
FIBERGLASS ACRYLIC TUB
3 Second Floor Garage Bathroom Plan 1/4" = 1'-0"
2' - 7"
4"
Basement 2' - 0"
Basement Bathroom South 1/4" = 1'-0" Garage Bathroom East 10 1/4" = 1'-0"
59
Second Floor 24' - 0"
4
1' - 3" 1' - 9"
GYPSUM WALL BOARD
2' - 11"
55
4" 2' - 11"
G14
5' - 0"
MAHOGANY VANITY CABINET
2' - 7"
EQ
MIRROR
Foundation 0' - 0"
GYPSUM WALL BOARD
1
9
Basement 2' - 0"
1' - 3" 1' - 9"
7' - 7"
10
55 59
Second Floor 24' - 0"
A401 11
2' - 6"
3' - 1"
2
ENAMELED CAST IRON TUB
12' - 0"
4"
2' - 6"
EQ
4"
105
Basement Bathroom West 1/4" = 1'-0"
GYPSUM WALL BOARD
BATHROOM
3' - 4"
Basement 2' - 0"
2' - 7"
2' - 1"
12
43
2' - 11"
3' - 11"
First Floor 12' - 0"
21' - 9"
4
A401
Basemen 1/4" = 1'-
7' - 0"
6' - 8" 39
6' - 0"
4' - 10" 3
2
7' - 7"
Elevation House South 1/4" = 1'-0"
21' - 9"
2' - 0"
4' - 10" 3 3' - 1"
2
3
GLASS RAILING
G4
3
3' - 9"
C
3
STUCCO SIDING
1' - 0"
4
4 EQ
3
5' - 7"
4" 2' - 11"
12
Second Floor 24' - 0"
3
10' - 8"
1
2' - 7"
1' - 5"
4" 2' - 11"
2' - 7"
Second Floor 24' - 0"
6
3' - 0"
63
Second Floor 24' - 0"
7' - 7" GYPSUM WALL BOARD
3
MAHOGANY VANITY CABINET
MAHOGANY 21 CABINET VANITY
612' - 1"
7
4
GRANITE COUNTER
22
61
Roof - Garage 36' - 0"
GYPSUM WALL BOARD
ENAMELED CAST IRON TUB GYPSUM WALL BOARD
12
7
G4
12" x 24 CONCRETE FOOTING
CLOSET 104
H3 EQ
Roof - Garage 36' - 0"
GRANITE COUNTER
12' - 0"
34
106
A4
2
10' - 3"
GYPSUM WALL BOARD
41
35
Basement Bathroom Floor Plan 1/4" = 1'-0"
1
H2
40
6' - 6"
1' - 10"
3' - 0"
42
Roof - Garage 36' - 0"
2
31
7' - 2"
3 40
18
1X6 SHIPLAP WOOD SIDING
39
Master Bathroom North 1/4" = 1'-0"
GYPSUM WALL BOARD MAHOGANY VANITY CABINET Roof - Garage
2' - 0"
6
Basemen 1/4" = 1'-
36' - 0"
Second Floor 24' - 0"
ELEVATOR
GYPSUM WALL BOARD
1' 3 10' - 8"
21
2' - 1"
1X6 SHIPLAP WOOD SIDING
Second Floor Master Bathroom Plan 5 1/4" = 1'-0"
18
3
9' - 0"
REFRIGERATOR
First Floor 22 12' - 0"
13' - 2"
20
105
38
18' - 0"
3
19
4
21' - 0" 41
MAPLE CABINETS 41
2
BATHROOM
3' - 4"
36
2' - 6"
6
18
I3
2' - 0"
4' - 0"
6
GRANITE COUNTER
ENAMELED CAST IRON TUB
13' - 6"
3' - 8"
7
5' - 7"
2 Roof - House 45' - 0"
3
37
3' - 0"
4
A401
CANTILEVERED ROOF ZINC ALLOY COATED COPPER FASCIA
STONE SIDING
EQ 4' - 0"
3
EQ
2
108
Garage Basement Ba 1/4" = 1'-0"
13
5' - 0"
42
GYPSUM WALL BOARD
3' - 9"
EQ
3
4 6
7 63
2' - 1"
2 CANTILEVERED ROOF ZINC ALLOY COATED COPPER FASCIA
A401
104
G4 H3
Roof - Garage 36' - 0"
20
2' - 6"
8
18
19
10' - 3"
1' - 0"
3
3' - 3"
10' - 0"
17' - 0"
305
12
GYPSUM WALL BOARD
3' - 9"
MAPLE CABINETS
MASTER BATHROOM
3
106
MAPLE CABINETS H2
EQ
2' - 3"
7' - 7"
BRONZE TRACK LIGHTING
Living Room West 1/4" = 1'-0"
OPAQUE ELEVATOR GLASS
GRANITE COUNTER
EQ
5' - 0"
6
16
21
43
HALF BATH
SOUTH ELEVATION
First Floor 12' - 0" CLOSET
4
3' - 3"
1' - 10"
22
6 3' - 0"
4' - 9"
D
First Floor 12' - 0"
4
13
4
2
14' - 0" 6' - 0"
7' - 2"
2' - 1"
13
A3
3
7
EQ EQ
2
6' - 6"
14
G3
2
13' - 2"
MAPLE CABINETS 61
61
4
16
8
4
61
12' - 0"
REFRIGERATOR
1' - 5"
Living Room South 1/4" = 1'-0"
15
3' - 9"
5
GRANITE COUNTER
Basement Bathroom Ea 1/4" = 1'-0" Garage B 11 1/4" = 1'-
TAPERED 2x4 @ 16" O.C.
2X8 @ 16" O.C. SISTERED TO TJI
2X8 @ 16" O.C.
3/8" TERRAZZO FINISHED FLOOR 4" CONCRETE SLAB 2x6 DECKING
8"X48" PRECAST CONCRETE NITTERHOUSE SPANDECK PLANK
2X8 @ 16" O.C.
WALL SECTION
SECTION
WOOD FASCIA 1X4 T&G MAHOGANY 1" FINISH BOARD
WOOD PLATE AS REQUIRED
5/8" PLYWOOD HEATING 2
House Wall Section 1 1" = 1'-0"
JOIST HANGER
JOIST HANGER
(2) ROWS 1/2" EXP. BOLTS @ 16" O.C., STAGGERED
1/2" DRYWALL CEILING FINISH
2X10 LEDGER DB.
2X8 @ 16" O.C. SISTERED TO TJI
4
2X12 LEDGER DB.
House Wall Section 3 1" = 1'-0"
3/8" TERRAZZO FINISHED FLOOR 4" CONCRETE SLAB
60 MIL. EPDM ROOFING 5/8" PLYWOOD HEATING
WOOD PLATE AS REQUIRED
TAPERED 2x4 @ 16" O.C.
2X8 @ 16" O.C. SISTERED TO TJI
2x6 DECKING
2X8 @ 16" O.C.
WOOD PLATE AS REQUIRED
1" FINISH BOARD
1" FINISH BOARD
16" TJI-560 @ 16" O.C. WITH BLOCKING FOR 2X8
2X8 @ 16" O.C. SISTERED TO TJI
2X8 @ 16" SOLID O.C.
1/2" DRYWALL CEILING FINISH @ 16" O.C. WITH SOLID BLOCKING FOR 2X8 WOOD FASCIA
2X10 LEDGER DB.
1X4 T&G MAHOGANY 16" TJI-560
SOLID BLOCKING WITH (2) ROWS OF 1/2" BOLTS @ 16" O.C., STAGGERED
3 A302
1" FINISH BOARD
JOIST HANGER
16" TJI-560 @ 16" O.C. WITH SOLID BLOCKING FOR 2X8
1/2" DRYWALL FINISH
JOIST HANGER
SOLID BLOCKING WITH (2) ROWS OF 1/2" BOLTS @ 16" O.C., STAGGERED
3
4
House Wall Section 3 GLASS RAILING 1" = 1'-0" 4 A302
1/2" DRYWALL CEILING FINISH
4
House Wall Section 2 1" = 1'-0"
2X10 LEDGER DB.
7 3
7
H8
WOOD FASCIA W 8X24, FULL MOMENT WELD AT POSTS 1" FINISH BOARD SOLID BLOCKING WITH (2) ROWS OF 1/2" BOLTS @ 16" O.C., STAGGERED House Wall 2 MOMENT W Section 8X24, FULL 3 1" = 1'-0" WELD AT POSTS
6
KITCHEN 203
5' - 0"
6' - 0"
1
3
PANTRY
First Floor 12' - 0"
3/4" PLYWOOD SUBFLOOR 2X8 @ 16" O.C. SISTERED TO TJI WOOD PLATE AS REQUIRED
2 A302
3
2
SUSPENDED SWIMMING POOL
12
3/4" FINISHED FLOOR
1
BASEMENT
MECHANICAL
101
102
2 A302 1
10
House Section 2 1/4" = 1'-0"
12" x 24 CONCRETE FOOTING
3 A302
16" TJI-560 @ 16" O.C. WITH SOLID BLOCKING FOR 2X8
GLASS RAILING
JOIST HANGER 3 4 A302 A302
1/2" DRYWALL CEILING FINISH 16" TJI-560 @ 16" O.C. WITH SOLID BLOCKING FOR 2X8
H2
Roof - H
H3
Basement 2' - 0"
1/4
Foundation 0' - 0"
36
BEDROOM
DRESSING ROOM
10
301
306
7
BEDROOM
11
H8
7
DRESSING ROOM 306
H8
3' - 0"
5' - 0"
Second F 24
KITCHEN 3 6 PANTRY
BRONZE TRACK LIGHTING
201
KITCHEN 203
8
Second F 24
6 BRONZE TRACK LIGHTING
203
WATER LEVEL
' - 0"
Roof - Ga A302 36
36
301
8 7
1
36
7 3
WATER LEVEL
GLASS RAILING
7
3
1/4
7 4 A302
1/2" DRYWALL CEILING FINISH
1' - 2"
12
Roof - Ga Section Hous Issue Date: 12/19/12 SCALE: As indicated
12" x 24 CONCRETE FOOTING
11
GLASS RAILING
JOIST HANGER
Roof -H DESIGN 45
Project Status 45
3/4" PLYWOOD SUBFLOOR 2X8 @ 16" O.C. SISTERED TO TJI
REVISION
1
1' - 0"
3/4" FINISHED FLOOR
"
House Wall Section 2 1" = 1'-0"
SEAL
BRONZE TRACK LIGHTING
3' - 0"
WOOD PLATE AS REQUIRED
GLASS RAILING
3
Second Floor 24' - 0"
7
House Wall Section 3 1" = 1'-0"
KEY PLAN
306
A4
3' - 11"
SOLID BLOCKING WITH (2) ROWS OF 1X4O.C., T&GSTAGGERED MAHOGANY 1/2" BOLTS @ 16"
DRESSING ROOM
2X12 LEDGER DB.
201
WOOD FASCIA 1" FINISH BOARD
301
8
3' - 11"
2X8 @ 16" O.C. 1X4 T&G MAHOGANY
BEDROOM
36
1' - 2"
2X8 SOLID BLOCKING BETWEEN JOISTS
2x6 DECKING
Roof - Garage 36' - 0"
10
WATER LEVEL
2X8 SOLID 2x6BLOCKING DECKING BETWEEN JOISTS 2X8 @ 16" 1" FINISH O.C. BOARD
1/4
2X12 LEDGER DB.
(2) ROWS 1/2" EXP. 11 BOLTS @ 16" O.C., STAGGERED
GLASS RAILING
1" FINISH BOARD
12
JOIST HANGER
CEILING W 8X24, FULL MOMENT WELD AT POSTS House Wall Section 1 1" = 1'-0"
JOIST HANGER (2) ROWS 1/2" EXP. BOLTS @ 16" O.C., STAGGERED
JOIST HANGER
W1X4 8X24, FULL MOMENT T&G MAHOGANY WELD AT POSTS 1" FINISH BOARD
2
2 A302
Roof - House 45' - 0"
8"X48" PRECAST CONCRETE NITTERHOUSE SPANDECK PLANK
2X8 @ 16" O.C.
3/4" PLYWOOD SUBFLOOR
2x6 DECKING
SOLID BLOCKING WITH (2) ROWS OF 1/2" BOLTS @ 16" O.C., STAGGERED WOOD FASCIA
2x6 DECKING
3/4" FINISHED FLOOR
3' - 11"
1X4 T&G MAHOGANY
House Wall 1 MOMENT W Section 8X24, FULL 1" = 1'-0" WELD AT POSTS
3/8" TERRAZZO FINISHED FLOOR 4" CONCRETE SLAB
2X8 SOLID BLOCKING BETWEEN JOISTS
WOOD FASCIA
2
8"X48" PRECAST CONCRETE NITTERHOUSE SPANDECK PLANK
2X8 @ 16" O.C.
5120 Wissioming Road Glen Echo, MD 20816
W 8X24, FULL MOMENT WELD AT POSTS
60 MIL. EPDM ROOFING
TAPERED 2x4 @ 16" O.C. METAL ROOF 2X8 @ 16" O.C.CAP
16" TJI-560 @ 16" O.C. WITH SOLID BLOCKING FOR 2X8
WISSIOMING RESIDENCE
METAL ROOF CAP
SOLID BLOCKING WITH (2) ROWS OF 1/2" BOLTS @ 16" O.C., STAGGERED
A4
3
PANTRY 201
First F 12
AXONOMETRIC
USGBC HEADQUARTERS Site Location Soho - Manhattan, NY The U.S. Green Council was given a grant to build their headquarters in New York City. The site is located at the intersection of 6th Avenue and Sullivan Street, on the edge of the historic Soho Landmark District. One of the requirements of the client was to provide residential units along with the USGBC Headquarters utilizing the property to its maximum allowable area. Therefore, the first three levels of the building are designed for the headquarters and the upper levels are residential. The small park adjacent to the site served as inspiration for the initial design phase of the project. The intent was to bring the park into the building by using a ramp that wrapped around the perimeter of the site. The wrapping ramp not only allowed the experience of the park to be extended across the street, but it also made the project relate to its context, responding to the need for more public green spaces.
USGBC HEADQUARTERS
NEW YORK INSTITUTE OF TECHNOLOGY PROJECT INTEGRATION FALL 2012 ADRIANA ROMBALDI CHRISTOPHER GOODWIN MARK MIGLIONICO
PROTRUDE MAXIMIZE SUNSHANDING
2
3 30’ RESIDENTIAL STEP BACK
RESIDENTIAL
100’ 8 STORIES
30’ RESIDENTIAL STEP BACK
RESIDENTIAL COMMERCIAL
100’ 8 STORIES
COMMERCIAL
240’
SITE CONTEXT
P
TR EE
T
SUN SHADING DEVICES
SPRING ST
HORIZONTAL RESIDENTIAL WRAPPING SUN SHADING
STEP BACK FOR SUN EXPOSURE TO SULLIVAN STREET
TRUMP SOHO HOTEL NEW JERSEY
WRAPPING RAMP
SUN SHADING
REET
SU
5
HORIZONTAL RESIDENTIAL WRAPPING
LL IVA
NS
5 STEP BACK FOR SUN EXPOSURE TO SULLIVAN STREET
WRAPPING RAMP
DOMINICK
STREET
SITE BOUNDARY
WATTS ST REET
WRAP PUBLIC SPACE
BUILDING FOOTPRINT
WRAP PUBLIC SPACE 30’ RESIDENTIAL STEP BACK RECTILINEAR TO CURVILINEAR
30’ RESIDENTIAL STEP BACK
6TH AVEN UE
+
BUILDING FOOTPRINT
REET
HOLLAND TUNNEL
+
+
SITE BOUNDARY
BROOME ST
W
WRAPPING RAMP DIAGRAM
BR OA DW AY
WRAPPING RAMP DIAGRAM
+
Site context
EMPIRE STATE UPTOWN SKYLNE
SUN SHADING DEVICES
4
3:00 PM
RESIDENTIAL ACCESS COMMERCIAL ACCESS RAMP ACCESS
240’
4
NOON
9:00 AM
ST
2
BUILDING FOOTPRINT
ON
1
3
TH OM PS
MASSING DIAGRAM
1
RE ET
MASSING DIAGRAM MASSING DIAGRAM
WINTER 12.8 °
WINTER 25.8°
WINTER 14.1°
2ND FLOOR TERRACE
2ND FLOOR TERRACE
RECTILINEAR TO CURVILINEAR MAINTAIN SIDEWALK CIRCULATION
MAINTAIN SIDEWALK CIRCULATION
WRAPPING DIAGRAM - ENVIRONMENTAL RESPONSE
SOHO - HISTORIC BUILDINGS ACCESS TO USGBC OFFICES AND LIBRARY
6TH AVE VIEWS
6TH AVE VIEWS VIEW OF FREEDOM TOWER
VIEW OF FREEDOM TOWER
ACCESS TO USGBC OFFICES AND LIBRARY
DOWNTOWN
ELEVATION EAST
floor plans
CAFE
-4' - 0"
0' - 0" CONFERENCE ROOM
CAFE
AG E
CAFE
-4' - 0" KITCHEN
CONFERENCE ROOM
RESIDENTIAL LOBBY OFFICE KITCHEN
GARBAGE DISPOSAL
EXHIBITION SPACE
OFFICE
BIKE COPY CONFERENCE STORAGE ROOM STORAGE
LIBRARY
COPY
CONFERENCE ROOM
STORAGE
LIBRARY MEP
MEP
LAUNDRY ROOM
LAUNDRY ROOM
WEST ELEVATION MEP
MEP
LAUNDRY ROOM
LAUNDRY ROOM
- 3/4" MEP EXHIBITION
FLOOR
IAGRAMS
SECOND FLOOR
THIRD FLOOR
ground floor FIRST FLOOR NORTH
second floor FLOOR SECOND
FOURTH FLOOR
fourth floor
THIRD FLOOR
FOURTH FLOOR
STRUCTURE + MEP + WET WALLS
STRUCTURE + CORE WALLS
STRUCTURE AND CORE WALLS
STRUCTURE + MEP + WET WALLS STRUCTURE AND CORE WALLS
BODY PROSTHETIC
As a requirement for the project the Body Prosthetic, it
DESIGN HEADQUARTERS SANDRA_BUCKLAND
should be usable and wearable and it should enhance the human body. Most importantly, the Body Prosthetic should express the chosen designer’s vision and work. Since Sandra Buckland works with knitting and a variety of materials, I incorporated weaving into the project. The jack-
Site Location Meatpacking District - Manhattan, NY Corner of Washington St. and West 13th St.
et itself, which later becomes the body of the purse, was a machine-made knitting. The hood of the jacket, which later becomes the handle of the purse, was a hand-made piece made of recycled garbage bags. This piece’s volume can be adjusted according the user’s wish. The Body Prosthetic incorporated many of the designer’s ideas, such as weaving, transformation, distortion, and volumetric forms.
1
2
Sandra Buckland is known for her knitting technique. She uses a variety of materials to create clothes that are unique and that express volume and forms. She treats the human body as a sculpture working like a tailor and then going back later to the human body. The designer is fascinated by the way highlighting, distorting, and transforming garments can shape the human body. Emphasizing the human silhouette is a very important part of her designs, and in order to do so she uses the void as important element.
“Fashion is simply art... Trends, seasons, and wearability are not the only measurements for fashion” Sandra Buckland
3
4
CONCEPT
Site Plan
DISTORTION
Interlocking
TRANSFORMATION
Orientation
The design of the Fashion Headquarters embodies the design philosophy of the fashion designer. As in the designer’s clothes, the void is an important element in the headquarters. It separates and emphasizes the upper and lower parts of building. It also separates private and public spaces, public being at the bottom and private at the top. The void is an occupiable area, which is open to the public at all times and is visually in relationship to the High Line Park. Also, distortion, balance and interconnection are important ideals incorporated into the Headquarters’ design in order to best express Sandra Buckland’s philosophy.
Ground Floor Plan
First Floor Plan
Third Floor Plan
Section A-A
North Elevation
West Elevation
INTERIOR DESIGN HAND DRAWINGS
The following drawings were made using watercolor. The drawings on this page were made with watercolor, while I was at Parsons.
Thank you