1 minute read
Big Beaver Elementary School
from AE7 Education 2024
by AE7 Design
Big Beaver Falls Area School District, Beaver Falls, PA, USA
The Big Beaver Elementary School is the first improvement project in a Campus Wide Master Plan. The project goal was to transform the school campus into a modern facility that reflects today’s community needs and uses. The design incorporates sustainable environmental, management and maintenance practices, and addresses accessibility and safety. The master plan organized the campus around Tiger Way a new central campus drive and drop off loop. The elements include a new multi-purpose practice field, a competition baseball field, restored natural turf area, backstops, movable bleachers, playground, fencing and campus parking. The baseball and practice field was located within the floodplain. Through design and permitting allowed the project to built on time and within budget.
AE7 partners were involved in this project as the designers, managers and directors of Burt Hill’s offices, and managed the Client and team on a daily basis.
Project Size
56,500 sq.ft / 5,250 sq.m
Services
Architecture
Engineering
Interior Design
Landscape
Architecture