Think fast
Think pre-engineered 1. Identify the iconic structure. Completed in 1889 this Pre-engineered building reached an unheard of 1000 ft. Name the two engineers that had the idea for the Tower. 2. Pre-engineered systems are possible for which of the following typologies? a) Commercial buildings. b) Industrial buildings. c) Aviation buildings. d) Storage buildings. e) All of the above. 3. Why pre-engineered? Send us 3 reasons why Pre-engineered buildings are preferred?
For product information, please email us at utpalghosh@everestind.com or visit www.everestind.com CASH PRIZE RS. 10,000/- FOR ONE LUCKY WINNER Send your entries to: iabedt@jasubhai.com, ozoneprints@gmail.com Last date of submission of entries: 31st Dec’ 2010 Disclaimer: Winner will be selected by a lucky draw. The decision of the organisers will be final.
To p a r t i c i p a t e o n l i n e , l o g o n t o w w w. a e c w o r l d x p . c o m