TRANSPORTATION SYSTEM PLAN
DEVELOPMENT OF ALTERNATIVE 'STRATEGIES SEPTEMBER,1981 REVISED MARCH 31, 1982
@tionlon
TRANSPORTATION SYSTEMS DESIGN
TSR/04/81: TRANSPORTATION SYSTEM PLAN DEVELOPMENT OF ALTERNATIVE STRATEGIES
The Transportation System Plan consists of the following six reports:
TSR/02/81 Transportation System Plan:
Summary
TSR/03/81 Transportation System Plan:
Assessment of Future Demand
TSR/04/81 Transportation System Plan:
Development of Alternative Strategies
TSR/05/81 Transportation System Plan:
Assessment of Alternative Strategies
TSR/06/81 Transportation System Plan:
The Recommended Strategy
TSR/07/81 Transportation System Plan:
The Transportation Planning and Implementation Process in Edmonton
These reports were prepared in order to meet the requirements of the City Transportation Act 1970 and constitute the "comprehensive transportation study report" required by the Act.
This series of reports was received as information by City Council as the "comprehensive transportation study report(s)" required by the City Transportation Act, 11 May 1982.
These documents were used as the basis for the development of the "Transportation System Bylaw 6707", as required by the Act.
Finally, the Recommended Strategy was used as the basis for amendments to the "General Municipal Plan Bylaw 6000".
June, 1982
R.A. Heise, P. Eng. General Manager TRANSPORTATION SYSTEMS DESIGN
TABLE OF CONTENTS
PAGE
1.0
SUMMARY
2.0
INTRODUCTION
10
2.1
PURPOSE OF REPORT
10
2.2
APPROACH
10
2.3
SCOPE AND LIMITATIONS
10
2.4
REPORT ORGANIZATION
11
3.0
4.0
TRANSPORTATION MEASURES
12
3.1
AVAILABLE MEASURES
12
3.2
DEFINITION OF DISTINCT STRATEGIES
14
IDENTIFICATION OF ALTERNATIVE STRATEGIES
17
4.1
ALTERNATIVE STRATEGIES SELECTED
17
4.2
FINANCIAL CONSTRAINTS
22
4.3 PHYSICAL CONSTRAINTS 4.4
5.0
1
PHYSICAL DESCRIPTORS OF ALTERNATIVE STRATEGTFS
DEVELOPMENT OF ALTERNATIVE STRATEGIES
28 28
35
5.1
THE DEFAULT STRATEGY
35
5.2
THE AUTO-ORIENTED STRATEGY
39
5.3
THE TRANSIT-ORIENTED STRATEGY
43
5.4
THE BALANCED STRATEGY
48
5.5
ACTUAL CAPITAL INVESTMENT BY STRATEGY
59
PAGE 6.0 PRELIMINARY TESTING OF ALTERNATIVE NETWORKS
61
6.1 METHODOLOGY
61
6.2 BALANCED STRATEGY, ROADWAY NETWORK ALTERNATIVES
61
6.3 TRANSIT-ORIENTED STRATEGY, TRANSIT NETWORK ALTERNATIVES 65
LIST OF EXHIBITS PAGE 1.1 Default Strategy - Roadway Network
2
1.2 Default Strategy - Transit Network
3
1.3 Auto-Oriented Strategy - Roadway Network
4
1.4 Auto-Oriented Strategy - Transit Network
5
1.5 Transit-Oriented Strategy - Roadway Network
6
1.6 Transit-Oriented Strategy - Transit Network
7
1.7 Balanced Strategy - Roadway Network
8
1.8 Balanced Strategy - Transit Network
9-
3.1 Definition of Strategies by Measures
15
4.1 Capital Expenditures per Capita, 1967 to 1982 (1977 Dollars) 24 5.1 Default Strategy - Roadway Network
32 37
5.2 Default Strategy - Transit Network
38
5.3 Auto-Oriented Strategy - Roadway Network
40
5.4 Auto-Oriented Strategy - Transit Network
42
5.5 Transit-Oriented Strategy - Roadway Network
44
5.6 Transit-Oriented Strategy - Transit Network Alternative I
46
5.7 Transit-Oriented Strategy - Transit Network Alternative II
47
4.2 Jurisdictions
5.8 Transit-Oriented Strategy - Transit Network Alternative III 49 5.9 Balanced Strategy - Roadway Network Alternative I
51
5.10 Balanced Strategy - Downtown Network Alternative I
52
5.11 Balanced Strategy - Downtown Network Alternative II 5.12 Balanced Strategy - Downtown Network Alternative III
55 56
5.13 Balanced Strategy - Transit Network
58
6.1 Balanced Strategy - Roadway Network Alternatives -
62
Preliminary Testing 6.2 Transit-Oriented Strategy - Transit Network Alternatives Preliminary Testing
66
LIST OF TABLES
PAGE
4.1
Projected Annual Transportation Capital Expenditures
25
(1977 Dollars) Per Capita, 1983 - 2001 4.2 Investment Split by Strategy and by Network 4.3
Total Capital Expenditure by Strategy and by Network
26 27
(1979 Dollars) 1981 - 2001 4.4
Networks Built by Strategy and by Type
29
5.1
Estimated Capital Costs by Strategy and Network Type
59
(Billions of 1979 Dollars)
LIST OF APPENDICES
A
Default Strategy - Network Listings Auto-Oriented Strategy - Network Listings Transit-Oriented Strategy - Network Listings Balanced Strategy - Network Listings Basic Roadway Network Listing
NOTES:
1.
The roadway network component of each strategy consists of the Basic Roadway Network (Appendix E) which is common to all strategies, plus those facilities specifically listed under each strategy.
2.
These appendices are merely summaries of the full, detailed listings of the various networks. The physical bulk of the detailed listings precludes their transmission. They are however available for examination upon request, by contacting Transportation Systems Design Department.
1
1.0 SUMMARY
Four alternative long-range transportation improvement strategies have been identified for comparative assessment. These strategies are:
- Default Strategy - Auto-Oriented Strategy - Transit-Oriented Strategy - Balanced Strategy
Transportation Plan Part 3, Volume 1, received as infoLmation by City Council on 1977 09 08, described the basic philosophy behind each strategy.
Each alternative strategy has been described by a complementary pair of networks - a roadway network and a transit network. Each network pair is technically and financially feasible within defined constraints. In the case of the Transit-Oriented Strategy transit network and the Balanced Strategy roadway network, alternative networks were developed. Some preliminary testing of these alternatives was carried out to define the preferred network in each case.
The four strategies, as described by roadway and transit networks, are shown on Exhibits 1.1 to 1.8 inclusive. A detailed listing of each network is contained in Appendices A to D.
These networks were later used in the comparative assessment of alternative strategies. Strategy-specific demand forecasts for the auto mode and the transit mode were generated by each pair of networks. A range of system wide parameters, resulting from the assignment of these forecasts to the alternative strategies, formed the basis of the comparative assessment. This work is documented in a subsequent report.
trans • ortation s stem plan
trans ortation s stem plan
e d wel sA's uoll epo. suw
transportation system plan transportation system plan
Mb uo. 111 ity.! avvratoirp Ldr,,_,_ 4..4. map ofatitairg* Etivaiir
_La d we)
dr•MirW rli kgri2
ii
N
1111,1 ,,, g Wellest7-- liworalamitasilD 00 14
eof
4A
e dW9) SINdone) Jo • suw
-.111mom, NEM14.111MILIPe
,
Nwevoikatas
MITIMMIDICEIZEEL
"rri_watori'VE ,x imi,w mu
FACILITIES AS EXISTING
=ansportationSystem Pia
mi
THE CI, OF
@monton trans • ortation system plan
DEFAULT STRATEGY - ROADWAY NETWORK
trans • ortation system plan
transportation system plan
EXHIBIT 1.1
trans • ortation s stem plan
e d wei sAsuoi ej Jo. suei
NEW CONSTRUCTION, UPGRADING , AND TRAFFIC MANAGEMENT
trans ortation s stem plan
trans • ortation s stem plan
M7Wri7L.7i1N7577iCEM
ortation system plan trans • ortation system plan
••••
IIiu El
PN tii` 119 MOP' 1 I'101 • I 111: 1111P1 6
'47 j•
%big 111. _
„gm
•g, 4 r
air F
.17M
BUS ROUTING LRT FACILITY
ransportationSystem millimm
@Manton dation system Plan
Plan
DEFAULT STRATEGY - TRANSIT NETWORK
trans • ortation system plan
trans ortation system plan
EXHIBIT 1.2
trans • ortation s
trans • ortation s stem plan
trans • ortation s stem plan
16
adiZm21412NM=aEITM ,
16
=EM:IliZ;kL1
.
ue Luai s s uoi e JO. suei
trans ortation system plan trans • ortation system plan
NEW CONSTRUCTION, UPGRADING , AND TRAFFIC MANAGEMENT FACILITIES AS EXISTING
77-ansportationSystem
wmiffi
@Wanton trans • ortation system plan
AUTO-ORIENTED STRATEGY ROADWAY NETWORK
trans • ortation system plan
trans • ortation system p an
EXHIBIT 1.3
trans • ortation s stem plan
trans ortation s stem plan
5
trans ortation s stem plan
me rai
I .)°a* '''..
.
d
renI 11,.•
pi . I!"
n Fil lea ii.1 At el nu:
el
i, 13 WA 1111-
t-i,
A
v---Idiran3 I llit. \11 OLLA 00 ..E, 6741(IN "'Mu
_tte40.4.01; ...ianimulm.
e d wal sAs u ontl io st iei
•
rot
4111 . ,!..
1a
tual eifs u onepo suei
e
Ire
e l • J00 171177
ueid wai sAs u onepo. suer
portation system plan transportation system plan
.
gralp2 ..ie.
BUS ROUTING LRT FACOLOTY NIT
0
77-ansportationbystem
mml1
T.E Cr Of
i nr on
s.ortatiofl system plan
AUTO-ORIENTED STRATEGY TRANSIT NETWORK
trans • ortation system plan
transportation system p an
EXHIBIT 1.4
trans • ortation s S:
trans ortation s stem plan
trans ortation s stem plan
-
u.. • J Osu
e 11 tuoisks uoil es id. sue.,
e
d we.
.
o. u e
ue d tuai sits uon ej J O . sue.i
ansportation system plan transportation system plan
FACILITIES AS EXISTING
=ansportationSystem Pla @Manton vans • ortation system plan
TRANSIT-ORIENTED STRATEGY ROADWAY NETWORK
trans • ortation system pla
vans • ortation .syst
EXHIBIT 1.5
trans ortation s stem pla
e d woi sits uo, e Jo. sue,
NEW CONSTRUCTION, UPGRADING , AND TRAFFIC MANAGEMENT
trans ortation $ stem plan
alarm s los=s, 1$1111tresal
r
. , ,,rgo, _. , . . ..
e d we' s s u oil el l u• s El
T. a. -11 BILLut 711 1 s. --4 1111NONSII I§ 211.s- tt , '7,11E- EMI ia1111 11111-70 IL. — ym• , -i, . it-Balm__ I LIM' V iligrft.l95-1 1IMPIFID91 i V"r411.-'471 4-4111N I K -.4116-4 dirgeNimiij1 1111101 real lialk MCP I li Frailidifil&Mr .-71.12- ,31 .04111,7 A L. -.iii imulai i.--kirem-u- mummy n .. . 1 • 1.. ...I ..IIIi
A eidwe)S 'S uoilepo, suei
I.
ik
111 opk, 161:siri —
iluir : g,-;:fArirtnezg1 114 , 1 0 4.--at.
BUS ROUTING LRT FACILITY
Immil77.ansportationSystem
Plan
@T. Cr, OF e on
S ortation system plan
AUTO-ORIENTED STRATEGY TRANSIT NETWORK
trans • ortation system plan
transportation system plan
5
trans ortation s stem plan
ueld wei s s uon eoodsuei
sportation system plan transportation system plan
EXHIBIT 1.4 trans ortation s stem plan
II
e d wag s u oi)evo. sue.,
trans ortation s stem plan
trans • ortation s stem plan
a
Ae41 110 4• 111100yM .CATERKIIIM 1==1.17"
RIF*
Fi.
MNLC
iize.-dEste pm
...... ovum
T
-Id air-ZEIXIMMILLEZZ
colvr,to
EZI,ECILEMIGIEBLZkak2
I transportation system plan transportation system plan
e d aims s u oli epo. SUM!
Pro,
NEW CONSTRUCTION, UPGRADING , AND TRAFFIC MANAGEMENT FACILITIES AS EXISTING
wiffmNamransportation
eiM- anton trans • ortation system plan
Systeiii TRANSIT-ORIENTED STRATEGY ROADWAY NETWORK
trans • ortation system plan
transportation s stem plan
EXHIBIT 1.5 trans • ortation s stem plan
z
7
trans ortation s stem plan
trans ortation s stem plan
JO • sue" e d tud) sAs u one
anniThrirkaiNZL j ja lifiejrr
e d wej sA
.
• p o isue'
e d Luaj sifs uon es i o • sue.,
$ 'ortation system plan transportation system plan
BUS ROUTING
Parimmlwr--
a
millimiTansportationSystem
s s u o tj el io • suei
LRT FACILITY
Eji T. Tr,C•
TRANSIT-ORIENTATED STRATEGY TRANSIT NETWORK
e
on i
s • ortation system plan
t s
an
EXHIBIT 1.6
trans • ortation s stem Plan
trans ortation s stem plan
trans ortation s stem plan
e d wei sA's don e' JO . suei
transportation system plan transportation system plan
NEW CONSTRUCTION, UPGRADING , AND TRAFFIC MANAGEMENT FACILITIES AS EXISTING
=ansportationSystem jaharka
@Manton trans • ortation system plan
BALANCED STRATEGY ROADWAY NETWORK
trans • ortation system plan
transportation system plan
EXHIBIT 1.7 transportation s stem plan
trans ortation s stem plan
9
trans ortation s stem plan
d- we' s.% uonsw o • sue,
e d it rai sifs uon es io • sue.,
e d wai sifs u o! j ej J O • Su e.,
e d wapAs uon e) J 0. sue.,
s• ortation system plan transportation system plan
BUS ROUTING
COT,* 01, CS
Ilion
ortation s stem plan
BALANCED STRATEGY TRANSIT NETWORK
trans • ortation system plan
transportation system plan
S
PlankEXHIBIT 1.8 trans • ortation s stem ,
e d LUDI S
wa-gmmi7LnsportationSysiern
uonej i o • sue.,
LRT FACILITY
10
2.0 INTRODUCTION
2.1 PURPOSE OF REPORT
This report is the third in a series of reports produced by the Transportation Systems Design Department relating to the City of Edmonton's Transportation System Plan. The first report, entitled "Transportation System Plan Summary", highlighted all the findings and recommendations that evolved from the Transportation System Plan project. The second report, "Assessment of Future Demand", dealt with the estimation of future transportation demand in a preliminary manner, suitable for the development of alternative strategies. The purpose of this report is to document the work carried out in developing alternative strategies for dealing with the City of Edmonton's transportation problems over a 20 year planning horizon.
2.2 APPROACH
Following the methodology described in Transportation Plan Part 3, Volume I (received as information by City Council on 1977 09 08), four alternative strategies were developed for managing the city's future transportation requirements. These alternative strategies reflected different methods of dealing with future travel demand, and in addition to being as distinct as possible, were developed within a framework of technical and financial feasibility.
2.3 SCOPE AND LIMITATIONS
In developing alternative strategies, City of Edmonton boundaries as of 1979 01 01, were used as the basic study area. However, in order to account for trip interchanges outside of and across this boundary it was necessary to take into consideration some transportation facilities outside the city, even though the City would have no control over the actual implementation of any such facilities.
11
No consideration was given to development of strategies for any land use scenario which departed from the range of scenarios described in the previous report, "Assessment of Future Demand".
No consideration was given to time frames beyond 2001.
The alternative strategies were developed within a fixed financial framework which resulted from the extrapolation of past transportation capital spending trends. Operating cost was not used as a constraint on strategy development. It was however used, along with capital cost, in the evaluation process.
2.4 REPORT ORGANIZATION
This section deals with the purpose, the approach, and the scope and limitations of the report.
The first section is a summary of the development of alternative strategies.
Section 3 is a brief discussion of the full range of transportation measures that form the basis for the strategy alternatives.
The four alternative strategies, the financial framework for strategy development, and the physical descriptors of these strategies are discussed in Section 4.
Section 5 provides descriptions of all roadway and transit networks generated for each strategy. Also included in this section are the financial limitations and Investment priorities for each strategy.
The preliminary testing of alternative networks is presented in Section 6.
The appendices to this report list the components of the roadway and transit networks defining each strategy.
12
3.0 TRANSPORTATION MEASURES
The four alternative strategies to be considered were described in Transportation Plan Part 3, Volume 1, in terms of the broad philosophy within each strategy. Each strategy can be defined by a set of transportation measures which reflect the direction of the philosophy. The following section describes the full range of transportation measures which could be used to effect any given philosophy.
3.1 AVAILABLE MEASURES
3.1.1 Traffic Engineering
A wide range of construction techniques used to improve roadway and intersection capacity fall under this heading. Amongst the more common methods are: construction of grade separations where warranted; restriction of access to major arterial routes; channelization and provision of turn bays at intersections.
3.1.2 Transit Improvements
The full range of improvements to transit operating efficiency, for example:
bus priority systems (exclusive bus lanes, busways, signal
pre-emption); light rail transit; higher frequency of service; larger buses.
3.1.3 Transit Incentives
Transit incentives are measures designed to make transit more attractive. The most common types of transit incentives include: a high level of service in terms of frequency and coverage; a timed transfer system to facilitate longer journeys; the provision of park and ride facilities in conjunction with light rail transit and busways, where appropriate.
13
3.1.4 Major New Roads
The construction of major new roadway facilities to accommodate projected future traffic volumes could also include the major upgrading of an existing facility. Minor widenings or realignments to allow for the implementation of lane controls (see 3.1.5 below) are excluded.
3.1.5 Lane Control
This technique refers to utilization of spare capacity in the off-peak direction on a roadway facility. This is performed by the reversal of off-peak direction lanes in peak hours.
3.1.6 Roadway Pricing
Roadway pricing is the application of a tariff or toll charge on use of designated roadway facilities or on circulation within a particular area, to limit the use of those roadway facilities.
3.1.7 Parking Controls
Parking controls are normally set for purposes of modifying automobile use or circulation. Typically, these controls include: restrictions on the locations of parking lots or parkades; restrictions on the capacity of parking facilities; control of on-street parking through metering or restrictions; increased parking costs for "all day" parking.
3.1.8 Traffic Management
A number of more refined traffic engineering techniques fall under the heading of traffic management. These techniques may include: one way couplet systems; restricted access areas; bus only areas; provision of pedestrian malls; optimization and coordination of traffic signal settings.
14
3.1.9 Staggered Work Hours
This broad heading includes a number of methods used to reduce peak hour transportation demand by spreading work start and finish times over longer time periods. Such methods require considerable cooperation between employers and are easier to implement where there are only a few large employers.
3.1.10 Decentralization
The concept of decentralization is aimed at redistributing demand on the transportation network as a means of alleviating pressure on high-demand facilities. Decentralization is commonly implemented through the use of zoning controls to influence redevelopment, and development of subcentres.
3.1.11 Car Pooling
This measure attempts to maximize the use of existing roadway facilities by increasing the car occupancy. rate. Common means of initiating car pooling schemes include advertising and computer matching programs. Further encouragements, such as the sharing of bus-only facilities, priority in road pricing schemes, and parking pricing schemes are also used.
3.2 DEFINITION OF DISTINCT STRATEGIES
The first step in the process of defining the four distinct transportation strategies, was the correlation of the broad measures described above with the four strategies. Exhibit 3.1 shows this correlation. No correlation between measure and strategy is shown when the implementation of that particular measure would not be supportive of the strategy.
STRATEGY
0
ueld umsifs uoneiJodsuen
TRANSIT AUTO ORIENTED ORIENTED
BALANCED
TRAFFIC ENGINEERING
P
P
TRANSIT IMPROVEMENTS
P
P
P
TRANSIT INCENTIVES
P
P
s
MAJOR NEW ROADS
P
P
LANE CONTROLS
P
p
ROAD PRICING
P
s
P
PARKING CONTROLS
P
6
P
TRAFFIC MANAGEMENT
P
s
s
STAGGERED WORK HOURS
P
s
s
s
DECENTRALIZATION
P
s
s
s
CAR POOLING
P
s
s
03
0
P
TT,C_M rrirErW iri • .E1114]
0
VS ilEHHX3
Cl)
D E FIN iTiO N SO F STRAT E G!E S BYME A SU RE S
0
DEFAULT
MEASURES
•••••
P - Primary Measure s - Secondary Measure ue d um's/Cs uoliejiodsuen
ueid weisifs uonesiodsueil ue d uiaisAs uonepo • sum
ueld wapifs uoneliodsuen
16
As a further refinement to the correlation, the support of the measures for each of the four strategies has been identified as being either primary (P), or secondary (s) in Exhibit 3.1.
While the full range of available measures were considered to be of primary importance in the Default Strategy (which has no particular strategic direction or philosophy), the other three alternative strategies were defined by a small group of primary measures, with some secondary supportive measures.
Thus, the Transit-Oriented Strategy was primarily concerned with providing improved transit service and incentives; the Auto-Oriented Strategy was primarily concerned with providing more roadway capacity by building facilities; the Balanced Strategy was primarily concerned with providing improved transit facilities whilst also restraining the demand for major roadway facilities in conjunction with a series of "soft" measures aimed at reducing the demand for major roadway facilities.
17
4.0 IDENTIFICATION OF ALTERNATIVE STRATEGIES
This section describes the more detailed definition of the alternative strategies, in terms of priorized investment priorities. These investment priorities largely follow the policies and concepts laid down in Transportation Plan Part 1, approved by City Council on 1974 07 15. Priorities were changed, and some rather extreme interpretations were necessary, in order to develop four distinct alternative strategies.
The financial and physical constraints within which each strategy was developed are also described. Again, the requirement for future transportation plans to be both financially and physically feasible is clearly specified in Transportation Plan Part 1.
4.1 ALTERNATIVE STRATEGIES SELECTED
4.1.1 Default Strategy
The Default Strategy was described by a series of investment policies that were a continuation of past and current policies, lacking any clearly defined long-term strategic goals. These policies were not implemented as part of an overall transportation plan in co-ordinated steps.
The advantages of this strategy were:
1.
Maximization of resources allocated to the solution of short-term transportation problems.
2.
Minimization of resources spent on planning and protection of options for future transportation facilities.
The fundamental disadvantage of this strategy was that it provided no framework for dealing with long-term problems on a city-wide basis.
18
The Default Strategy assigned the highest investment priority to the extension of the arterial roadway system into newly developing residential and industrial area. The second priority was the completion of the truck route loop. Third was the extension of the LRT system south to Millwoods. Fourth in importance was the upgrading of radial routes such as Calgary Trail and 97 Street. Fifth was the implementation of a major north-south roadway corridor connecting Calgary Trail to Castledowns via Downtown. The last investment priority was to allocate the remaining funds to roadway improvements in other areas of capacity deficiency.
4.1.2 Auto-Oriented Strategy
The Auto-Oriented Strategy allocated the majority of transportation investments to the provision of the highest possible level of service for the private automobile, whilst maintaining the minimum reasonable level of investment in transit facilities and service.
The advantages of the Auto-Oriented Strategy were as follows:
1.
The continued investment in major roadway facilities would maximize past investments in roadway construction, and continued usage thereof.
2.
Whereas accidents are caused in part by congestion and sub-standard road design, improvements in road design and capacity would diminish the incidence of accidents caused by these conditions.
3.
Increased roadway capacity could be shared by transit vehicles as well.
The disadvantages of this strategy were:
1.
The initial stages of the roadway construction would inevitably require property acquisitions, with obvious social and economic impacts.
2.
Construction of new roadways would reinforce the use of the private automobile, encouraging non-essential trips and attracting choice trip makers to the automobile mode.
19
3.
The road construction program would likely initiate a costly series of secondary expenditures, such as parking facilities and environmental protection measures.
The highest priority in the development of the Auto-Oriented Strategy was the provision of a free flow, limited access Inner Ring Road around the central business district. Second in priority was the upgrading of radial roadways connecting this Inner Ring Road to suburban areas. Third was the completion of the truck route loop. Fourth in importance was the extension of the arterial network into newly developing areas. Finally, the remaining funds were invested in an LRT extension to the University of Alberta, being the second most important trip generator in the City.
4.1.3 Transit-Oriented Strategy
The Transit-Oriented Strategy attempted to accommodate future demand by providing a high level of public transit service, while deliberately ignoring the demand for roadways in the inner city, i.e., inside the truck route loop (170 Street - Yellowhead Trail - Highway 16A/14 Whitemud Freeway). A high proportion of transportation expenditures were therefore allocated to high capacity transit facilities and high operating standards, eg. frequency of service, route coverage, off-peak services etc.
The advantages of this strategy were:
1.
Provision of an extensive integrated LRT and bus network would allow for deep penetration of bus routes into residential and commercial areas, and also allow for transfers from bus lines to higher capacity LRT lines.
2.
The use of buses in conjunction with LRT would ensure future route flexibility.
3.
Transit systems cause a minimum of environmental and social intrusion, especially where facilities are located in existing rights-of-way.
20
The disadvantages of the Transit-Oriented Strategy were:
1.
Bus systems are labour intensive and therefore have high operating costs.
7.
In the inner city (as defined above), buses would have to compete for scarce roadway capacity with private vehicles, to the detriment of the operation of both.
3.
LRT systems are inflexible in that once corridors and stations are built, it becomes difficult to move them. During periods of low demand, these systems become cost-inefficient.
The first priority of the Transit-Oriented Strategy was to develop a full LRT system as recommended in the 1977 Rapid Transit Extension Study. The second priority was to extend the arterial roadway system into newly developing areas. Third in importance was the completion of the truck route loop. Fourth was the upgrading of radial roadways such as 97 Street and Fort Road. Finally, remaining funds were allocated to roadway improvements in areas of capacity deficiency.
4.1.4 Balanced Strategy
The Balanced Strategy attempted to accommodate the future travel demand by making coordinated investments in transportation facilities. The intent of this strategy was to encourage people destined to the central area to use public transit, and to discourage trips through the CBD for non-CBD destinations, while maintaining proper levels of accessibility for industrial areas.
The advantages of the Balanced Strategy were:
1.
The extensive transit network would provide good access into the central business district.
2.
The imposition of long-term employee parking restrictions in the downtown area along with the good transit service would discourage auto usage in the central area.
21
3.
The provision of a hierarchy of ring roads would serve to segregate cross town trips from radial CBD-bound trips and divert them to the ring routes, thereby alleviating congestion problems on radial facilities.
4.
The Balanced Strategy forms a logical "stepping stone" from the autooriented philosophy of the past to the inevitable transit-orientation of the future as Edmonton grows beyond the foreseeable population levels. It affords the opportunity for travel habits and behaviour to be modified in an orderly manner over time. It avoids the social strains and likely adverse impacts on the growth strategy of the G.M.P. that would otherwise be experienced.
The disadvantages of the Balanced Strategy were:
1.
Bus systems are labour intensive and therefore have high operating costs.
2.
LRT systems are inflexible in that once corridors and stations are built, it becomes difficult to move them. During periods of low demand, these systems become cost-inefficient.
3.
In practice it may be difficult to apply effective long-term employee parking restrictions in the downtown.
The first investment priority of the Blanaced Strategy was to develop a high capacity LRT and busway system focused on the downtown. The second priority was to implement traffic management measures in the downtown area, including an inner distribution facility for bypassing and accessing the downtown. Third in importance was the upgrading of radial roadways, making extensive use of lane controls. The completion of the truck route loop and upgrading of other secondary ring routes was the fourth priority. Fifth was the extension of the arterial roadway network into developing areas, and finally long-term employee parking restrictions were imposed on the downtown area.
22
4.2 FINANCIAL CONSTRAINTS
4.2.1 Financial Resources for Transportation Facilities
An upper limit to the total capital expenditure on transportation facilities in Edmonton to the year 2001 was estimated, and used as an upper limit to the capital that could be used by any one of the four strategies.
The annual maintenance and operating cost of the alternative strategies, as defined by the specific networks, was calculated and used as part of the comparative analysis documented in the subsequent report "Assessment of Alternative Strategies", in addition to the comparative capital cost of the alternatives.
In order to evaluate and compare the various strategic alternatives, it was necessary to formulate a specific set of transportation network improvements for each strategy. Without the financial framework for implementation of these improvements, i.e., capital expenditure on construction, it would have been extremely difficult to select and justify specific facilities.
4.2.2 Estimation of Future Capital Expenditures
The estimates of capital expenditures on transportation projects in Edmonton up to the year 2001 were prepared in 1977. The initial step was to formulate projections of total municipal capital expenditures. By examining cost trends, three levels of total municipal capital expenditure were identified. These three levels represented low, medium and high capital expenditure rates that were observed in the years 1967 to 1977. Therefore, for each level of total municipal capital expenditure a corresponding transportation capital expenditure was determined. However, since transportation services might assume various degrees of priority in the total municipal budget, three levels of transportation capital expenditure were identified for each level of total municipal capital expenditure.
23
The specific levels of municipal capital expenditure and transportation capital expenditure that were identified are discussed in the following sections.
4.2.3 Total Municipal Capital Expenditure
As shown in Exhibit 4.1 capital expenditure on all municipal services excluding utilities was relatively modest in the period prior to 1974. From 1974 to 1977, capital expenditure rose sharply to a high of $412.00 per capita as expressed in 1977 dollars. Estimates of municipal capital expenditure for the period 1978 - 1982 were prepared by Corporate Policy Planning Office in 1977. These estimates anticipated a decrease in the per capita capital expenditure on municipal services from a high of 8412.00 in 1977 to just under $200.00 per capita in 1982.
Three levels of total capital municipal expenditure were anticipated for the period 1983 to 2001. The high level of capital expenditure experienced in the mid 70's could prevail and would amount to a per capita expenditure of $250.00 in constant 1977 dollars. On the other hand, capital expenditure could assume very modest levels, as was experienced prior to 1974. The corresponding per capita figure would be $150.00. These two figures represented the extreme ends of the spending spectrum. A more likely level of expenditure would be $200.00 per capita for the period 1983 to 2001, in constant 1977 dollars.
4.2.4 Total Transportation Capital Expenditure
The priority assigned to Transportation Services in municipal budgets has varied considerably since 1967. In the late 60's, transportation expenditure had a high priority and accounted for 60% of the total municipal budget. During the mid 70's, transportation related expenditures decreased sharply in importance and accounted for only 30% of municipal capital budget. The same wide range in the priority assigned to transportation services can be expected to occur in future years, with an average medium priority of 45% of the municipal budget.
!
4 5 0
a)
z
(I)
$412. 4 0 0
0 r t) 3 5 0
z
CO) ‘C
3 0 0
(/)
(7. 2 5 0 ALL MUNICIPAL SERVICE
VIEMEENLEMILIEXhaklatL
13
1
2 0 0
1 5 0
10 0
Vu1. 181HX3
50
1967 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982
uel
waisifs uone,Jodsueij
ue d cuaistfs uoileiJO sueij
ueld wajsAS uoneliodsuen
ue d waisifs uoilepo suen
ueld weisits uonepodsuen
. a
,C11/77/3/47101iPMA
ALL TRANSPORTATION RELATED SERVICES
25
As was mentioned earlier, three levels of municipal capital spending were identified. For each level of municipal expenditure, three levels of transportation capital expenditure were identified to reflect the different priorities that transportation services might assume. This is illustrated in Table 4.1.
Table 4.1
PROJECTED ANNUAL TRANSPORTATION CAPITAL EXPENDITURE (1977 DOLLARS) PER CAPITA, 1983 - 2001 Transportation Priority
Total Municipal Spending High
Medium
Low
112.50
75
High
250
150
Medium
200
120
Low
150
90
90
60
67.50
45
In light of past expenditure trends, it was anticipated that transportation capital expenditures for the years 1983 to 2001 would be a function of a medium level of municipal capital spending, and be based on a mediuth level of priority for transportation services.
The estimates of municipal capital expenditure provided by the Corporate Policy Planning Office were based on 1977 dollars. The costing of alternative transportation networks was conducted in 1979 and hence in 1979 dollars. Therefore, the projections of transportation capital expenditure were normalized to 1979 base dollars, assuming 8% per annum cost inflation between 1977 and 1979, as per CPPO guidelines in 1977. Total transportation capital expenditure for the period 1981 - 2001 was then estimated at $1.4 billion in 1979 dollars, based upon a 2001 city population of 666,000 as projected in 1977.
26
4.2.5 Investment Splits by Strategy and by Network
The Default Strategy used an average apportioning of funds as experienced in recent years between roadway and transit facilities. The year 1974 was an example for such an average expenditure. In an average year such as this, 40% of the annual capital transportation expenditure was on transit related items while the remaining 60% was spent on roadway facilities.
In the Auto-Oriented Strategy, expenditure allocated to roadway facilities was determined by the average level of expenditure on roadways prior to the implementation of the Northeast LRT line in 1974. The roadway system capital allocation therefore amounted to 85% of total transportation capital expenditure; the transit system was allocated 15%.
In the Transit-Oriented Strategy, 65% of total transportation capital expenditure was allocated to transit while 35% was allocated to roadway construction. This allocation of funds between transit and roadways was determined by examining relative levels of investment during construction of the Northeast LRT in the mid 1970's.
The financial allocations of the Balanced Strategy were not specified at this stage, as there was no historical data upon which to base such an estimate. Table 4.2 illustrates the investment splits for the alternative strategies by type of network.
Table 4.2
INVESTMENT SPLIT BY STRATEGY AND BY NETWORK
TRANSIT
ROADWAY
Default
40
60
Auto-Oriented
15
85
Transit-Oriented
65
35
Balanced
Not specified
27
4.2.6 Projections of Likely Transportation Capital Expenditure
The projections of likely transportation capital expenditures between 1981 and 2001 in 1979 dollars, broken down by type of network, are shown for each alternative strategy in Table 4.3.
Table 4.3
TOTAL CAPITAL EXPENDITURE BY STRATEGY AND BY NETWORK .(l979 DOLLARS, BILLIONS) 1981 - 2001
Expenditure ($ Billion) Strategy
Transit
Default
0.56
0.84
1.4
Auto-Oriented
0.21
1.19
1.4
Transit-Oriented
0.91
0.49
1.4
Balanced
Not specified
Roadway
Total
1.4
The average annual capital cost of $70 million (1979 dollars) is considered reasonable as a commitment to the upgrading of the roadway and transit networks though further capital investments will be devoted to major maintenance items.
It is assumed that changes in funding levels (from taxes and grants) will keep pace with the cost escalation of land acquisition, construction and operation of roadway and transit projects.
Some allowance is built in to accommodate financing of projects during construction, prior to opening to traffic or revenue service. Care must be taken to avoid comparing "future" dollars on a project by project basis with these forecasts of capital needs using constant 1979 dollars.
28
4.3 PHYSICAL CONSTRAINTS
4.3.1 Requirement for Physical Feasibility
The development and evaluation of alternative strategies required accurate simulation of the physical components and configurations of the networks that were proposed. In order to arrive at any meaningful conclusions about network performance it was necessary to ensure that all the facilities included in the various strategies were in fact technically and physically feasible. The feasibility of the various network components was determined through various preliminary functional planning studies carried out at 1:5000 scale. These initial studies also provided rough capital cost estimates and land acquisition cost estimates for the various facilities.
4.3.2 Preliminary Testing of Alternatives
When cost estimates and physical and technical feasibility were finalized, various roadway and transit networks were built for each of the four strategies. Where alternative networks within a strategy were developed, preliminary testing of these alternatives was carried out, to identify the preferred alternative.
The procedure for testing the alternative networks involved the loading of a trip table on to the networks and the review of system-wide performance parameters. The performance parameters used to evaluate the various networks included items such as the number of vehicle miles, the number of vehicle hours, and average vehicle speed.
4.4 PHYSICAL DESCRIPTORS OF ALTERNATIVE STRATEGIES
In order to simulate any existing or proposed roadway or transit network, it was necessary to develop models to represent the various transportation strategies. The most common types of models used to describe transportation networks are both graphical and mathematical in form. The graphic component of the model consists simply of a schematic
29
representation of all the components of the transportation network, i.e., location, configuration and distribution of land use concentrations, roadways and transit routes. On the other hand, the mathematical component of a transportation model describes in more rigorous algebraic terms the various interrelationships between the above network components. The following sections describe the input parameters required for the graphical and mathematical representations of the various networks that were built.
4.4.1 Networks
At least one roadway network and one transit network were built for each of the four alternative transportation strategies. Table 4.4 indicates the number of network alternatives that were generated by strategy and by type of network.
Table 4.4
NETWORKS BUILT BY STRATEGY AND BY TYPE
Network
Transit
Roadway
Default
1
1
Auto-Oriented
1
1
Transit-Oriented
3
I
Balanced
1
3
Strategy
4.4.2 Roadway Network Components
The fundamental components of any roadway network are:
a)
traffic zones
b)
zone centroids
c)
nodes
d)
connector links
e)
arterial links
30
The initial step in the definition of roadway and transit networks was to assign a zone centroid to each one of the traffic zones used to define the land use scenario (see "Assessment of Future Demand", Section 2.0). The zone centroid acted as a point source for all land use activity occuring in any given zone. Each arterial intersection in the roadway network was represented by a node. The zone centroids were connected to the roadway network nodes by line segments known as a connector links. A connector link is simply a linear representation of the local and collector system that ties into the arterial system. In order to ensure that each zone was tied into the roadway network, at least one connector link was provided from each zone. This standard, if adhered to strictly, would simulate only one access orientation for a zone. It was therefore better wherever possible, to provide more than one connector link to represent the multitude of access orientations which actually exist in a roadway network. Lastly, the nodes were then joined by line segments known as arterial links, representing segments of the actual arterial roadway network. The above described elements provide a full graphic representation of a roadway network.
The mathematical formulation of a roadway network requires that each element of the network be assigned a unique code to identify it. Consequently, each zone centroid and each node in the system were assigned a unique number. Thus a one-to-one correspondence was established between each zone number and a location and specific land use configuration. Similarly, each node number was synonymous with a specific network location.
The above named variables only describe the locational characteristics of a roadway network. In order to describe the operational characteristics of a network it was necessary to assign level of service variables to each link in the network. Thus, the roadway network was described by a complete link description for every link in the network. A complete link file would contain the following information:
31
- Link location given by:
- street name - named of cross streets fotming link end points - nodes forming link end points
- Link characteristics given by:
- link length in miles - link speed in miles per hour - level of Service "E" capacity in vehicles per hour
- Traffic control information:
- percent right turns, percent left turns, percent through traffic, signal cycle length in seconds
- Geometrics of link at the downstream intersection:
- left turn bay, exclusive left, left turn option, through only, right turn option, exclusive right, right turn bay, right turn cut-off, right/left/through option or left/right option
- Miscellaneous link information:
- link direction - jurisdiction; ie. location by area of City (Exhibit 4.2) - number of bus lanes - parking code: no parking, parking on one side or both - truck route designation; ie. 24 hour truck route, day time truck route or non truck route - year of implementation of link if not already in existence
4.4.3 Transit Network Components As with roadway networks, transit networks consist of traffic zones, zone centroids, connector links, nodes and transit links. The nodes of the transit network do not represent street intersections but rather,
32 trans • ortation s stem plan
ue d wej sAs uon el i o • sue.:
trans ortation s stem plan
ransportation system plan transportation system plan
12 ST. ALBERT
v, -
dirsympai_ is a 16mirria, .11,12' a r ll ealealrl=a '94 %, 411411
rag rtalluf f:
y kfir grtarl aU llilltia jn16 11111RZFAIWZIFILT imeamiimernire ErklEfir Fas' 11111 mom I I Nis mregralii211 "14/ se INNA 4„ mokiworm lEbtltil I NE m —1 4111 11 § 11111n lirtirk """ . , MP% -Amon
um. witteximrani-
.1
RSV CrOaDilltan gEggrair w
1 11 6 -2.52 :62 antalfr
#1.41
I•
'Iv--... EEO wrar•A'aj TilMiVE 4 life' Oro. Rigllid: h. o
11 SHERWOOD PARK
NIEKETELENT2
-. 110
—
.
9 -;1110511, :sonsi nage, 2,1 iFtS4,L1 63 r, . _Ana, ,.... Bram gem*. - 'co - r-onzoswo - '
v 4.4 Ake-
-
p
gh
e d waj elfs uon epo. sue.,
1tjolt
rTRAMILIP,0610 62041M[0,1 4: atugagsligew 011 4,It '14 4,
sXs ti c): es Jo. suei
13 - PROVINCIAL HIGHWAYS
TansportationSystem Plan
limilimi
fsitrionton trans • ortation system plan
JURISDICTIONS
trans • ortation system plan
transportation system plan
EXHIBIT 4.2
transportation s stem plan
33
they indicate transit stops and transit terminals. In contrast to roadway links, transit links define all rights-of-way in which transit vehicles are able to operate. They Include most arterial roadways, collector roads within subdivisions and those rail rights-of-way that are relevant to the operation of light rail transit. The traffic zones and centroid numbering system used in the transit networks were identical to the ones used in the roadway networks. Since transit nodes did not coincide with roadway network nodes, they were assigned a different numbering system.
Another feature of transit networks which was not
common to the roadway networks was the fact that transit vehicles operate on specific routes only. For that reason, the simple link file to describe a transit network was not sufficient. It was necessary to provide route descriptions for each bus line or LRT line that operated in the transit network. Route descriptions were recorded in a line file listing the sequence of transit nodes which occurred on a given transit route.
Together, the link and line files provided a complete mathematical description of a transit network. The line file defined the paths or routes which transit vehicles followed, whereas the link file provided information on the operating characteristics on these routes.
A complete transit link file would contain the following information:
- Link characteristics in both directions for three time periods:
- link length in miles - link speed in miles per hour - link travel time in minutes
- Miscellaneous link information:
- transit mode, bus, 1, 2 or 3 car train - link direction - link identification - node number at both ends of link
34
A complete transit line file would contain the following information:
- Line characteristics:
- vehicle headway in minutes for four time periods - maximum allowable headway in minutes to provide minimum service - line description, based on links, from start node to end node
- Miscellaneous line information:
- transit mode - transit line number - line direction
35
5.0 DEVELOPMENT OF ALTERNATIVE STRATEGIES
This section describes the philosophies, investment priorities and major facilities in each of the transportation strategies that were developed. It should be stressed that each alternative strategy was conceived and developed as a fully-integrated transportation system, comprized of the two major components - a roadway and a transit network. Networks are not interchangeable between strategies.
5.1 THE DEFAULT STRATEGY
5.1.1 The Default Roadway Network
The Default Strategy was merely a continuation of past and current plans and policies, lacking clearly defined long-term strategic goals. Therefore it did not provide any strategic constraints on network configuration and performance. As was previously shown, about 840 million dollars (1979 dollars) was available for capital roadway expendi- ture in the Default Strategy.
In the absence of overall strategic guidelines the investment priorities of the Default roadway network were determined by an assessment of current investment priorities and perceived future roadway deficiencies. The roadway priorities, in descending order of importance were:
1.
Extension of the arterial roadway system into developing areas.
2.
Completion of the truck route loop.
3.
Extension and upgrading of existing radial routes.
4.
Construction of a major continuous north/south corridor.
5.
Local improvements.
36
The above investment priorities led to the development of a roadway network which contained the following major features:
- extension of Capilano Freeway to the Yellowhead Trail - extension of Whitemud Drive to 34th Street - completion of Yellowhead Trail from 178 Street to Beverly Bridge - extension of Manning Freeway to Yellowhead Trail - a six lane MacKinnon Ravine Roadway - widening of Quesnell Bridge - downtown couplet system on existing streets - upgraded 97th Street radial route - a major north/south crosstown route, Calgary Trail to Castle Downs - 112 Avenue widening from 101 Street to Capilano Freeway
A complete list of all the Default roadway network components along with corresponding capital costs is given in Appendix A. Exhibit 5.1 shows the network configuration. The total cost of the built Default roadway network was estimated at $803 million.
5.1.2 The Default Transit Network
The ceiling on Default capital transit expenditure was set at 560 million dollars (1979 dollars). The Default transit network was a passive option in which improvements were only developed to overcome identified local deficiencies. In terms of overall priority within the Default Strategy, the transit network was only third in importance.
The transit network included the northeast LRT line extended to Clareview, and supported by a network of bus routes and transit centres. South of the River, an LRT line to Millwoods via the CPR right-of-way was included. Again the supporting bus network was a function of LRT alignment.
This transit network had a vehicle fleet of 750 surface buses and 70 LRT vehicles, along with 17 major and minor transit centres. A detailed list of specific bus and LRT routings is provided in Appendix A. Exhibit 5.2 illustrates the network features. The total capital cost of this network including vehicles, was estimated at $403 million.
trans • ortation s stem plan
37
trans ortation s stem plan
skigityreit ;AV LW
*Et
gd1,14 °RN wreirtiVi . 6i PP1 irig-,1-akffir P°1 i.-Ar&ZI,,,T14,1.,, =1a L
whEgairtamm. a•amarvihmmrovamivaPJLIV limpli9-mairongs, rpr earizrau ' Irobin NE- ramer
16. %Sr .e 4 1 001111 IIM' imL 1=41.111 LIMB! ;4 t
e d uiej sirs u onep o. sue;
vl
e d we' s s uoi e
J Osuer
S • ortation system plan transportation system plan
ralEllaiLIZEZ
itrivr#
a'
el, R.• Er•rkitorizq t:AINIreVous
4:-/-1 /1 , 3
I IEMILVsjvps
-wpm, poi III tex 4 IF 52.1664gat; TfiallitV2 goetAraiV lb alabrp „Awe BAIL= DWI riv v.+741
ad
4'n
.s .;l ey °.SUal
j
NEW CONSTRUCTION, UPGRADING , AND TRAFFIC MANAGEMENT FACILITIES AS EXISTING
wieNlimmransportationSystem
ellifortion S • ortation system plan
Pa
DEFAULT STRATEGY - ROADWAY NETWORK EXHIBIT 5.1
trans ortation system plan
transportation system plan
trans ortation s stem plan
38 trans • ortation s stem plan
trans ortation s stem plan
e d ulapifs uon epo , sue.,
nsportation s stem plan trans • ortation system plan
Amt._ 717-730. p„,
ir d
e d =asks uonev o , sue.,
I ea - - 1.1 1.0.....1! IMO UMW 11,11.11 al alr .772 I I HI m i a W i
sr; Tr.•
MI
Oritnrial
uei e d wa s s u oil epo ,
pi
e d wej sks u oi3ep o sue.,
111161111111r/Adi
W -417/1.164,1i t° '
LRT FACILITY
=ansportationSystem
elitiOnton ans • ortation system plan
Piar=
—
DEFAULT STRATEGY - TRANSIT NETWORK
ott •
t
t t
t
EXHIBIT 5.2
trans orta son s stem pla
e d ulas sits u o! i es i o , sue,
BUS ROUTING
39
5.2 THE AUTO-ORIENTED STRATEGY
5.2.1 The Auto-Oriented Roadway Network
The limit of capital expenditure on the roadway component of the AutoOriented Strategy was estimated at 1.19 billion dollars. This represented 85% of the total transportation capital budget. The philosophy of the Auto-Oriented Strategy dictated the design of a roadway network which encouraged the use the private automobile, providing the highest possible level of service on the arterial roadway network, particularly for access to the downtown area.
Therefore, the roadway investment priorities were:
1.
Construction of a free-flow grade-separated Inner Ring Road in the downtown area
2.
Upgrading radial routes
3.
Completion of ring routes
4.
Extension of the arterial roadway system into developing areas
The Auto-Oriented roadway network evolved as a direct product of the above-noted strategic goals and investment priorities. The total cost of the network was estimated at $1.17 billion. A complete list of all network elements is given in Appendix B, while Exhibit 5.3 shows the network configuration. Following is a list of the most important features of the Auto-Oriented roadway network:
- a 4 lane Inner Ring Road - complete Parkway Ring Road - Fort Road Radial upgraded
40
trans ortation s stem plan
trans ortation s stem plan
e d aims s u oil ei Joe suell
Y 16
ID
wia •••••
1* 4 r lli (.431 +1 ."A :4" :011P44: 760111 I mak
e d wal stie uonej i e • sue)
$''1 Jo 4 1 1 % 1
&MI plon 1114044#.4 itivatEkt] j, Vs 1J
NEW CONSTRUCTION, UPGRADING , AND TRAFFIC MANAGEMENT FACILITIES AS EXISTING
mmimiransportationSystem
e,
T. T
i fr on
trans • ortation system plan
Plan
AUTO-ORIENTED STRATEGY ROADWAY NETWORK trans • ortation system plan
e d we' s s u o! i ew
•1
e d we' s s uoti el i o• suel
transportation system plan transportation system plan
transportation system plan
EXHIBIT 5.3
trans • ortation s stem plan
41
- 98 Avenue Radial upgraded - 107/106/105 Street Radial - Calgary Trail Radial - a six lane MacKinnon Ravine Roadway - extension of 122 Street from Fox Drive to University Avenue - 119 Street Radial - upgrading the truck route loop - extension of arterial roadways into developing area - Capilano extension to Yellowhead Trail - 112 Avenue widening from 101 Street to Capilano
5.2.2 The Auto-Oriented Transit Network
It was estimated that approximately 210 million dollars would be allocated to transit capital in the Auto-Oriented Strategy. This represented about 15% of the total transportation capital budget.
The transit network consisted•of a northeast LRT line to Clareview with a southerly extension to the University of Alberta. In the northeast corridor, the surface bus routes would be complementary to the LRT line. In non-LRT corridors, extensive express bus service would be provided to the CBD, making use of the expanded roadway capacity that would be available. In off-peak hours, only the minimum level of service would be provided in all areas of the City. The fleet requirements for this transit system were 833 surface buses and 36 LRT vehicles, with 12 transit centres being required. A complete description of all network components and route descriptions is given in Apppendix B. Exhibit 5.4 illustrates the major routes.
The cost of the above-described network was estimated at $282 million.
42 trans ortation s stem •lan
trans ortation s stem plan
e d wai sifs u oi. j epo • u ei
e d Illai S s uo!l ev o. sue.,
transportation s stem plan transportation system plan
1 . .., . 4,"... It
e d wai sAs uonepo. sue,
r
„,,,L.
"ipti. 1a . 10 I .
:ONO 4
OW 41111
e dtuals.fs uoimp o.suei
410
LRT FACILITY
ransportationSystern Pian
ffilim
@ THE Cnr
i
n on
trans • ortation s stem plan
AUTO-ORIENTED STRATEGY TRANSIT NETWORK
trans • ortation s stem plan
transportation system p an
EXHIBIT 5.4
trans • ortation 5 stem plan
e dLual sifs uonepo. sue,
BUS ROUTING
43
5.3 THE TRANSIT-ORIENTED STRATEGY
5.3.1 The Transit-Oriented Roadway Network
The Transit-Oriented roadway network was merely a down-graded Default roadway network. Only the most basic roadway requirements were provided under the Transit-Oriented Strategy. The $490 million capital expenditure allocation was a minimum amount which set an upper limit on transit capital expenditures.
The major features of the Transit-Oriented roadway network were:
- a completed truck route loop - upgrading of 97th Street Corridor - construction of 107/106/105 Street Radial from Yellowhead Trail - extension of arterials into developing areas - project UNI - upgrading of Fort Rpad from Yellowhead Trail - 153 Avenue - extension of Capilano Freeway from 118 Avenue to Yellowhead Trail - 112 Avenue widening from 101 Street to Capilano
A complete listing of roadway network components in the Transit-Oriented Strategy is given in Appendix C, while Exhibit 5.5 shows network configuration. The total cost of the Transit-Oriented roadway network was estimated at $515 million.
5.3.2 The Transit-Oriented Transit Networks
In this strategy the emphasis was placed on the transit system, with major expansion of LRT and bus facilities. Three possible networks were developed, with different LRT/busway alignments for the western half of the City.
44
trans ortation s stem plan
trans ortation s stem plan
e d ulai sofs uoi l ei Jo. sue.,
e d ulei sifs uon ez io. sue,
R d uiej sifs uon es i o. sueJ
e d uiej sAs uon el i o. sue.,
transportation system plan transportation system plan
=MIZE
NEW CONSTRUCTION, UPGRADING , AND TRAFFIC MANAGEMENT FACILITIES AS EXISTING
=r1-ansportationSystem Plana,
einionton rans ortatio sy t
TRANSIT-ORIENTED STRATEGY ROADWAY NETWORK
trans or a
5'
O
•stem pan
EXHIBIT 5.5 trans ortation s stem plan
45
5.3.2.1 Alternative I: Full LRT
The first transit network alternative was characterized by a City-wide LRT system consisting of the northeast line to Clareview, a northwest line into Castle Downs teLminating at 153 Avenue and 113A Street, a west LRT line along 107 Avenue to Jasper Place, and south lines to Millwoods, University Farm, and the Kaskitayo Town Centre. The bus system was expanded and re-oriented to serve newly developed areas as well as to complement the LRT network. This alternative required ten transit centres and a fleet of 562 surface buses and 114 LRT vehicles. Exhibit 5.6 shows the major elements of this transit network alternative while Appendix C provides full network description. The total cost of this network was estimated at $596 million.
5.3.2.2. Alternative II: Minimum LRT
The second network alternative consisted of an LRT system which was a scaled-down version of the one described in Alternative I. The northeast line to Clareview, the south line to Millwoods and the south LRT line to the University Farm remained unchanged in this alternative. However, the south LRT extension to the Kaskitayo Town Centre was omitted, while the northwest line to Castle Downs was shortened, as it was terminated at 153 Avenue and 127 Street.
As an alternative to an LRT line to the west end, this alternative provided for a busway to be built in the MacKinnon Ravine Corridor. To the south, the Kaskitayo Town Centre would be serviced by surface buses operating in conjunction with the south LRT line to Millwoods. Exhibit 5.7 illustrates this network alternative and Appendix C provides a complete list of all routes.
The fleet requirements for this alternative were 629 surface buses and 90 LRT vehicles with a requirement for 7 transit centres. The total cost of this network was estimated at $536 million.
46 trans ortation s stem plan
trans ortation s stem plan
rnm,;r-m
-MUT71EtVir.r E7777T
transportation system plan transportation system plan
gmr= grip- usil ...±..%iui 9 ,., . ; .... .1 • 111 J,kriiii :iel....m.*Ht.111'
..,„„... 111 1 IluelphiT.1.12.11" ,„,,,.. ,qati.... i.!;:i Nap.,---1.........-_.: 1, 11 a
r gi
-
killi unite ii:
..P .1
tit Ilik. 37, , Amm 1. ., *lei_ 4 anst
is lig I &-
fri. .16 odt
NM
1 li: i,:"1111 li k aiiii I
: rli 21.211 1
,...1
A,
11111
'5/1 i
.1--
:11111N;1,7 - -,
. mws:
, „IP ...--,.,, Hirer 401-41-..-! limb 1L-41 11.11-1 , - i
i'
''' ll 1.1 IMP
\T"'
111
1;fr I
..."
II 1 "
1==. -..a . .ks ,11
regiliVifi Pr..J1Vii0
41111 .7,PAW tri 11111111111j101 Mill 14 le Firr) A MOW Eli r;. ) la .1111.4 t. m ail , ,t7,41 ..agjo ,g -,41 Mho te• '111 I MI —111 kifaltilSbai 5.0 iltitifliPte I Et! I-1 '07-11W 6 4149 'rcli:Otarr 41 4,1 44 01 a
i.bJ In
ialt i ;
'afai el A111:46 [mom
..621nrit, oriatalyal .1. (r7:64:1! TV
BUS ROUTING LRT FACILITY in
mammiransportationSystem 611 T. CSI, Of
:
nion
trans • ortation system plan
Plan
TRANSIT-ORIENTATED STRATEGY TRANSIT NETWORK - ALT. I (FULL LRT) transportation system plan
transportation system plan
EXHIBIT 5.6
trans ortation s stem plan
trans ortation s stem plan
trans ortation s stem plan
47
e d way sifs u oll ej io• suey
e d way s s uoyl epoi suey
0I
.I.gaLealSKILIMILL=111
yi eld way s s d one
J O. SIM
sportation system plan transportation system plan
LRT FACILITY
=-ansportationSystem Filatummv
11
monton
Ed
s • ortation system plan
TRANSIT-ORIENTATED STRATEGY TRANSIT NETWORK - ALT. II (NINSIUM LRT) trans • ortation system plan
trans ortation system p an
t s
EXHIBIT 5.7
yiel d tuai sifs uon es io• sue.t
BUS ROUTING
48
5.3.2.3 Alternative III
The third transit network built was very similar to the second alternative. It included the northeast LRT line to Clareview, the south LRT line to Millwoods, and the northwest LRT line to Castle Downs terminating at 153 Avenue and 127 Street. Service to the west end differed in this alternative from all the previous ones. The University LRT line of Alternative II was truncated at 87 Avenue and extended westward along 87 Avenue, across the River and terminated at the West Edmonton Mall. The MacKinnon Corridor busway was eliminated from this alternative, as it would be in competition with the west end LRT line. The surface bus system in this network was very similar to all others, but differed in west end route configurations due to the presence of the LRT line.
The fleet requirements for this network were 569 surface buses and 102 LRT vehicles. The number of transit centres required for this alternative was estimated to be nine. Exhibit 5.8 illustrates the major components of this alternative while Appendix C provides a complete description of all bus and LRT routes. The total capital cost of this network was estimated at $560 million.
5.4 THE BALANCED STRATEGY
5.4.1 The Balanced Roadway Networks The primary aim of the Balanced roadway network was to provide appropriate roadway facilities to manage future travel demand on the arterial roadway system, whilst encouraging the effectiveness of transit as a preferred mode for CBD - oriented trips. Three roadway network alternatives were generated, incorporating a number of mechanisms for reducing vehicular movements into the downtown area, to complement the encouragement of transit usage into the central area.
r1zrzu.—...iff am Igo ii...r
_L. ,i...,ff ,iiremitti
49
k,4/ Ellat*A irprimilw ;..s
gr,
e d wei sA"s uonei • • SU•.1
gi
trans • ortation s stem plan
ue d Wei s s uonel io • sue.,
trans ortation s stem plan
S • ortation system plan transportation system plan
Namtrittil r Kos 1
11. ni .1111111111p112 101 1 L'il" NI Ilia 11 1111% RI
, ,
,.1.1. WW1 ......,-,_ s • rff-411BRIIIIii Mid 93:4kmmisseAp. e" FtIipi,Vm: II Ismovi ,....... 1 np_-1 ,,-; gam mpg NI
I
.
bli191 Nr. WI i 019 aill•-•• 1 ilk Op s Wr illr 1
-.ealliaRigibe I IlliapAttart alLnftnigie 1.1 ;04. t. Amo' qsgo-:•.,•
-rWMTUF ITZIka _Ljat iff-41-1.
lagfiErasaiwiRral; i ,.:4110V ilo''
wimigumsum ne. r a relark Miglipro a1 7-rxv d. Ikg liatualayid
Z. . an 1-4. 2 Ufa!
:,..
,,htlegrarlig4 .
LRT FACILITY
Ta nspor tat io,1System Piar
wagimIN
@ I" kit 0.1 OF
t
n
oni
s ortation system plan
TRANSIT-ORIENTATED STRATEGY TRANSIT NETWORK - ALT. III
trans ortation system plan
trans ortation system pan
EXHIBIT 5.8 trans ortation s stem plan
e d weisifs uonesio , sue.,
BUS ROUTING
50
A capital expenditure ceiling for the Balanced roadway network was not identified. However, the financial limitations on both transit and roadway capital expenditure were set at a maximum of $1.4 billion from 1981 to 2001.
5.4.1.1 Alternative I - Passive Management of Auto Demands
The first version of the Balanced roadway network included few features directly managing auto demand, and relied more heavily on transit incentives built into the transit network.
The major features of this alternative were:
- a six lane tidal flow (4 + 2) MacKinnon Ravine Roadway and Busway - a downtown distribution system consisting of one way couplets on existing streets and a new river crossing at 95 Street - completion of the truck route loop - construction of radial routes such as 119 Street and 107/106/105 Street - Project UNI Stage II - upgrading of Fort Road from the Yellowhead Trail to 153 Avenue - extension of Capilano Freeway from 118 Avenue to Yellowhead Trail - extension of the arterial network into newly developed areas
The city-wide network is illustrated in Exhibit 5.9, and listed in Appendix D. The complete network was estimated to cost $762 millions of 1979 dollars. The details of the downtown network are shown on Exhibit 5.10.
There are strong similarities between this network and the Transit-Oriented Roadway network. The major differences between these two alternatives lie in the designation of the Downtown distribution system and in the upgrading of roads feeding this facility.
51 trans ortation s stem plan
trans ortation s stem plan
01 elJOsue)
ue d we' s s uolle).10. sue,
sportation system plan transportation system plan
NEW CONSTRUCTION, UPGRADING , AND TRAFFIC MANAGEMENT FACILITIES AS EXISTING
611i. Or
nik
ori 1:
s ortation
BALANCED STRATEGY ROADWAY NETWORK - ALT. I
EXHIBIT 5.S
transportation system plan
trans • ortation system pan
transportation system plan
transportation system p an
trans • ortation system plan
AVM ]NO MOld 1Vall smilmosmo
transpor tation sy s tem plan
1VIE13.1.1:1V AVM OMJ.
IMO
1111:11 11111111111 WI o'‘O Iliu .1111 HMI %a
tea
transpor tat ion sy s tem plan
ilf11111111, -: iii I VIII I HIM ii !.III1II I irinu i ilhili Ingumin LP urilMi '--•11.‘". T1
ranspor tation sy s tem plan
anspor tation sy s tem plan
transpor tation sy s tem plan
transpor tation sy s tem plan
transpor tation sy s tem p lan
E LE
transportation sy s tem p lan
_
53
5.4.1.2 Alternative II - Management of Auto Demands By Traffic Management
This alternative was identical to the first in all areas except the downtown, where stronger mechanisms were introduced. Whereas the first alternative relied on a downtown distribution system to divert through trips, this second alternative made extensive use of lane management techniques to achieve modifications to the choice of route patterns accessing and crossing the downtown area. The following features were used:
1.
Stony Plain Road/104 Avenue Lane Management:
From 142 Street to 122 Street, 3 + 1 tidal flow. From 122 Street to 109 Street, widening to five lanes to allow for 3 + 2 tidal flow with dual right turns on to 109 Street southbound.
2.
101 Street Lane Management:
From 118 Avenue to 104 Avenue, widening to five lanes to allow for 3 + 2 tidal flow.
3.
Connors Road Traffic Management:
From 85 Street to 95 Street: peak direction bus lane plus a 2 + 1 tidal operation; intersection modifications at 90 Avenue and Connors Road.
4.
105 Street/River Road Grade Separation; no turning movements allowed.
5
Rossdale Road/97 Avenue Grade Separation; no turning movements allowed.
6.
109 Street at the CN tracks: complete reversible tidal operation.
7.
Dawson Bridge: complete reversible tidal operation.
54
8.
South Approach Ramps at Capilano Freeway and 106 Avenue.
9.
114 Street/University Avenue diamond interchange.
10. 111 Avenue/Groat Road diamond interchange.
11. Bellamy Hill Lane Management: 3 + 1 tidal operation.
12. Project UNI.
The details of the downtown network are shown in Exhibit 5.11. In all other areas, the network was identical to Alternative I. A detailed listing was therefore not prepared. It was estimated that the capital cost of this alternative would not be significantly different from the cost of Alternative I - $762 millions of 1979 dollars.
5.4.1.3 Alternative III - Auto Demand Management by Physical Road Closure
The third alternative incorporated a number of specific roadway link deletions as a means of managing vehicular traffic through and within the downtown. The following roadway links were removed from the network:
1.
All north-south roadways east of 109 Street and west of McDougall Hill, between Jasper and 100 Avenues. (It was assumed that 105 Street south would have access to parking for downtown zones immediately north of this division).
2.
All east-west arterials south of the CNR tracks and north of the top-of-bank, between 101 Street and 100 Street.
These roadway deletions created three distinct downtown cells which only had a limited number of access points as shown in Exhibit 5.12. Note that this network alternative was identical to the two previous ones in all the areas outside the downtown, and therefore a detailed listing
ueld usaisXs uonesio sueJj
ueid wag s uonerio • wen
sss,
I. VS 1181HX3
ufild
LUGJS
s uoisepo • wen ueld
(11•1311130VNVIAI OldAVEll) II •11V - NEIOMJAN Avmavou AD31VELLS G33NV1VEI
LOWS S
uonepo • s
UIC" 1-10 .11 ^
ueid waisiSuonepodsuelmmffs.a_ ••••
Lu
mon-1111,11 / 1
• a &I
=1&‘. 111MkirMBL.... 44,
[z]
:PLUJIAIAM
e
SS
JO
suei
1141* =UP)
I
Elir
tiT774177:1Tr37174777r1rMairTFITTrourriTrIIMM
trans • ortation system p an
trans • ortation system plan
1
.1 1V11
=ION Allit=. I
system p an
trans • ortation system plan
31:111S013 1V3ISAHd AVM 3NO
E
MOld -wall mum= 1V11:1311:IV AVM 0M1
Ispor ta t ion sy s tem plan
WA
transpor tation sy s tem p lan
transpor tation sy s tem plan
Qat
trans • or
transpor tation sy s tem plan
transportation system plan
NY__N
L V I. SIN
IPLIlI gni
al!
-
II
L9
57
was not prepared. It was estimated that the capital cost of this alternative would not be significantly different from the cost of Alternative I - $762 millions of 1979 dollars.
5.4.2 Other Auto Demand Management Measures
The above three roadway network alternatives relied on network modifications as a means of managing central area traffic. This is the most direct method of altering the operational characteristics of a roadway network. Other management measures include roadway pricing, by means of toll charges or supplementary licenses for the use of specific facilities or entry into a restricted area, and increased parking prices. Both these techniques are intended to discourage the use of automobiles to access the restricted area. Roadway pricing is considered to be impractical in Edmonton in the short or mid-term. However, increased parking prices in the downtown area were built into the Balanced Strategy, in addition to the physical network design, in an effort to reduce the demand for longterm employee parking and hence the demand for auto access into the downtown. This was effected by increasing the parking cost component of the modal split calculations for the downtown zones by about 50%.
5.4.3 The Balanced Transit Network
The Balanced transit network reflected the strategic goals of providing a high level of transit service to all areas of the City, with a particular emphasis on downtown-oriented routes.
The transit network was centered around an extensive LRT system serving the northeast, the north and northwest as well as the south. Specifically, the LRT lines extended to Clareview in the northeast, to Castle Downs in the north, as well as to Millwoods and to Malmo in the south. In conjunction with this LRT system, a MacKinnon Ravine busway was provided to serve the west end. The remaining surface bus routes provided feeder service from outlying areas to LRT terminals or transit centres. Ten transit centres were required. The major features of the Balanced transit network are illustrated in Exhibit 5.13 while a detailed listing of network components is given in Appendix D.
58
trans ortation s stem plan
trans • ortation s stem plan
c= 4.71 •11/uas s.CINITPTIT471141 id7im
e d ulm sifs u onej.i o. Wei
ue d wai sAs uon ej i ct • sue.,
transportation system plan transportation system plan
R?Nie Air I il
-et; 4t„. IIpiovai Irae.4.... Aram
if
a;,.
•0
LRT FACILITY
wilimm7ransportationSystem
ernionton trans • ortation system plan
Plan. BALANCED STRATEGY TRANSIT NETWORK
trans • ortation system plan
trans • ortation system plan
EXHIBIT 5.13 trans • ortation s stem plan
e d tual s s u onej.w.sue.'
BUS ROUTING
59
The transit networks of the transit-oriented (Alternative I) and the balanced strategies are very similar. The major difference lies in the treatment of the West End Corridor. In the former network an LRT line is assumed where in the latter a busway is provided.
The fleet requirements of this transit network were 588 surface buses and 90 LRT vehicles. The total cost of this network was estimated at $533 million.
5.5 ACTUAL CAPITAL INVESTMENT BY STRATEGY
The financial resources likely to be available for capital investment in transportation facilities between 1981 and 2001 are shown in Table 4.3 broken down by alternative strategy and by type of network. The total amount of $1.40 billions of 1979 dollars was obtained from an average projection of total municipal capital expenditures, and an average level of investment in transportation capital.
The estimated capital costs of the networks developed to represent the alternative strategies are shown in Table 5.1 along with the split of costs between roadway and transit networks.
TABLE 5.1 ESTIMATED CAPITAL COSTS BY STRATEGY AND NETWORK TYPE (BILLIONS OF 1979 DOLLARS)
NETWORK TYPE
TOTAL
STRAlEGY
ROADWAY
Default
0.803
66.6
0.403
33.4
1.206
Auto-Oriented
1.170
80.6
0.282
19.4
1.452
Alternative I
0.515
46.4
0.595
53.6
1.111
Alternative II
0.515
49.0
0.536
51.0
1.051
Alternative III
0.515
47.9
0.560
52.1
1.075
0.762
58.8
0.533
41.2
1.295
TRANSIT
ESTIMATE
Transit-Oriented
Balanced
60
The total estimated cost of the Default Strategy was some 14% below the upset constraint of $1.4 billion. This represents, an annual investment per capita of approximately $78 millions in 1977 dollars, which would place the Default Strategy in the low to medium priority range for transportation investments, as shown in Table 4.1. This was interpreted as being consistent with the general default philosophy.
The Auto-Oriented Strategy was estimated to cost approximately 4% more than the upset constraint. This was considered to be well within the noLmal limits of estimating error, and was therefore considered to be acceptable.
The estimated capital costs of the three transit network alternatives in the Transit-Oriented Strategy were consistently well within the upset constraint. The range of values of the annual investment per capita for this strategy was $68 to $71 in 1977 dollars. This would place the strategy in the low to medium priority range shown on Table 4.1, but still- well within the total possible range of capital investmentConsideration was given to adding further facilities to the transit networks, so as to raise the level of capital investment to the upset limit. However, the networks were considered to represent a reasonable level of physical development for the planning horizon. Furthermore, the provision of extra transit facilities merely to expend "available" funds was considered to be in conflict with the strategic philosophy: in the early 1970's one of the arguments presented in favour of the initial Northeast LRT line was that it was considerably less expensive to construct than roadway alternatives.
The Balanced Strategy was estimated to cost 7% less than the upset constraint. This was considered to be within the normal limits of estimating error and was therefore considered to be acceptable.
61
6.0 PRELIMINARY TESTING OF ALTERNATIVE NETWORKS
Only one roadway and one transit network were developed for the Default and the Auto-Oriented Strategies. However, three alternative transit networks had been developed for the Transit-Oriented Strategy, and three alternative roadway networks had been developed for the Balanced Strategy. In order to identify the most appropriate network to use in each case, preliminary testing of these alternative networks was carried out.
6.1 METHODOLOGY
The preliminary testing was carried out on a system-wide basis, rather than a local basis. Auto and transit trip tables derived from the application of land use Scenario A for 2001 to the 1981 existing and committed networks (see "Assessment of Future Demand") were assigned to the alternative networks, and system-wide parameters obtained. Thus this testing did not reflect the variations in modal split that would be generated in the full testing of alternative strategies. This was a perfectly valid procedure, as only alternative networks within strategies were being compared. The full assessment of alternative strategies was carried out later, using individually generated trip tables which were therefore fully reflective of the likely modal split generated by each alternative strategy.
6.2 BALANCED STRATEGY, ROADWAY NETWORK ALTERNATIVES
System-wide parameters for the perfolmance of the three alternative roadway networks developed for the Balanced Strategy are shown on Exhibit 6.1. As the only differences between the three alternatives were in the downtown area, more detailed parameters for jurisdiction 1 (the downtown, see Exhibit 4.2) are also shown.
62 trans • ortation s stem plan transportation system plan
trans ortation s stem pia"
trans ortation s stem plan
ROUNDED AVERAGE TRAVEL SPEEDS BY JURISDICTION* SPEED mph.
12 17
11
6 7
21 23 19 19
8
28
9 10 11 12 13
24 21
20
22 22 43
28 23 22 44
23 19 20 28 22 22 43
18 41
18 41
19 42
22
22
22
21
21
21
5.84
5.86
30,220
30,301
JURISDICTION 1 PARAMETERS VEHICLE MILES 19,910 20,490 VEHICLE HOURS 1,790 1,690 AVERAGE SPEED 11.45 11.78
18,870 1,710 11.04
SYSTEM AVERAGE INTERNAL AVERAGE
23 19 20
OTHER SYSTEM PARAMETERS MEAN TRIP 5.83 LENGTH (MILES) TOTAL VEHICLE HOURS
30,454
*SEE EXHIBIT 4.2
** JURISDICTIONS
rif:RE1317CW17713TWIT.I11414
3 4 5
16 27
1 to 10 ONLY
=7ansportat1onSystem
eirnonton trans • ortation system plan
BALANCED STRATEGY ROADWAY NETWORK - ALTERNATIVES PRELIMINARY TESTING trans • ortation system plan
trans • ortation system plan
EXHIBIT 6.1
trans ortation 5 stem plan
e d urai sAs uon e110 • sue)
2
0
ugp ilerip:wcP
PHYSICAL CLOSURE
11 17 24
1
**
TRAFFIC MANAGEMENT
e d wai sifs u ones i o • sue.,
PASSIVE RESTRAINT
JURISDICTION
63
6.2.1 System Performance
The system-wide parameters showed virtually no discernible difference between the three alternative networks. A very slight tendency to increased trip length, as the method of implementing restraint became more severe, was detected. This would be a reflection of vehicles being forced to make more circuitous trips so as to overcome the restraint mechanism.
6.2.2 Downtown Performance
The performance parameters for jurisdiction 1 (the downtown) did show some differentiation between the three networks. The vehicle miles travelled within the downtown decreased as the restraint mechanism became more severe while the system-wide mean trip length increased. This indicated clearly that the restraint mechanisms were affecting trip patterns outside the downtown area, in proportion to their severity. The traffic management alternative, which used extensive tidal flow measures to provide increased capacity in the peak direction at the expense of capacity in the off-peak direction (see Exhibit 5.11) resulted in the best level of service in the downtown, having the highest average speed and the lowest number of vehicle hours. The most extreme network which utilized physical roadway closures to create three limited access cells in the downtown (see Exhibit 5.12), achieved the lowest number of vehicle miles at the expense of level of service, having the lowest average speed of the three networks.
6.2.3 Other Considerations
The system-wide performance differences between the three networks were insignificant; the differences in the downtown area were not entirely conclusive. Practical considerations relating to the achievability and
64
implications of the alternatives were therefore introduced. The most extreme alternative was restraint by physical closure of roadways. To be effective this network would require adequate parking facilities in each cell to meet future demand; this may be difficult or undesirable to achieve in practice. Difficulties would also be experienced in enforcing restricted access across the cell boundaries, as emergency vehicles and buses would require that facility. Local movements, access and deliveries would also become more difficult, lengthy and expensive. Extreme pressure would be placed upon key intersections accessing the cells. There could also be a requirement for some major changes to access arrangements and circulation in the immediate vicinity of the cell boundaries. The physical closures alternative was therefore discarded, as being too extreme, having too many potential implementation problems, and as being perhaps inappropriate for a downtown area as physically large as Edmonton's. The traffic management alternative, which used extensive tidal flow measures, was also discarded. It was considered that the wholesale application of the tidal flow technique on downtown approaches would be impractical, as the downtown area experiences a wide range of diverse trip making patterns throughout the day, and the tithes at which there is a clearly defined peak direction are rather limited. The operation of such a system would therefore be rather difficult. Furthermore, changing traffic patterns during the day would likely cause some difficulty in local trips and deliveries within the downtown, and could make the provision of transit priority measures more difficult. However, it is expected that the tidal flow technique will be applied, in specific and carefully designed locations, as part of the on-going maximization of usage of existing roadways.
6.2.4 The Preferred Balanced Roadway Network
The passive auto demand management alternative (see Exhibit 5.10) was therefore carried forward as being the most appropriate roadway network for the Balanced Strategy. In the downtown area, this alternative relied
65
upon the provision and the attractiveness of a system of preferentially signalled at-grade couplets around the downtown, to provide an effective bypass for non-Central Business District bound trips. This was considered to be acceptable, as the preliminary test results were not significantly different from the more extreme alternatives, and this concept was fully consistent with the policies contained in Transportation Plan Part 1.
6.3 TRANSIT-ORIENTED STRATEGY, TRANSIT NETWORK ALTERNATIVES
System-wide parameters for the performance of the three alternative transit networks developed for the Transit-Oriented Strategy are shown in Exhibit 6.2.
6.3.1 Average Travel Time and Total Person-Hours of Travel
Alternative I (Exhibit 5.6) had the lowest average travel time, followed by Alternative III (Exhibit 5.7). These two performed better than Alternative II (Exhibit 5.8) because of their extensive LRT systems. Alternative II, with a reduced LRT system, had to rely heavily on the bus system for transit trips originating from the west, which contributed to the higher average travel time.
The total person-hours of travel was a direct reflection of the average travel time under the constant ridership assumptions. Again, both Alternatives I and III exhibited similar total person-hours of travel. The reliance on the bus system in Alternative II resulted a higher total person-hours of travel due to longer travel time.
6.3.2 Operating Cost Per Ride and Annual Operating Cost
The operating cost per ride and annual operating cost for the three transit alternatives were all within 77 of each other. Alternative II had the highest cost, largely attributed to its greater emphasis on the bus system, which required a larger bus fleet. The operating cost for Alternative III was marginally lower than Alternative I because of the combined west/southwest LRT line.
66
SYSTEM PERFORMANCE PARAMETERS
e d wag s s u oneg io. suei
trans ortation s stem •lan
trans ortation s stem plan
ALTERNATIVE 1
2
3
Average Travel Time (Mins. Per / Trip)
35.7
36.5
36.0
Total Person-Hours of Travel*
22,500
22,900
22,600
0.76
0.79
0.74
73-8
69.1
Operating Cost / Ride (1979$) Annual Operating Cost (1979 $ x 106 )**
70.6
e d wags/ Cs uogi eg i o. suei
trans ortation s stem plan transportation system plan
* Based on 37,692 peak hour transit trips. ( All destinations )
e d wagsits u oneg Jo. suei
**LRT track & station operating costs included.
gransportationSystem Pia rthonton trans • ortation system plan
TRANSIT-ORIENTED STRATEGY TRANSIT NETWORK - ALTERNATIVES PRELIMINARY TESTING trans ortation s stem plan
trans ortation system plan
EXHIBIT 6.2 trans ortation s stem plan
67
6.3.3 The Preferred Transit-Oriented Transit Network
Alternative II, the minimum LRT alternative, was rejected on the basis of network performance. Although Alternative I provided a lower travel time, Alternative III had a lower operating cost. The 87 Avenue LRT corridor in Alternative III would have an undesireable impact on the river valley, as well as on all the stable low-density neighbourhoods along the corridor. Furthermore, the use of the 87 Avenue LRT corridor to extend LRT out to the west end would concentrate all LRT movements from south of the North Saskatchewan River, plus the movements from the west end, on to the High Level Bridge. This would likely create future capacity and operating problems on this extremely critical link. In addition it was considered to be poor strategic planning to predicate the downtown accessibility of a substantial portion of the City population upon one river bridge.
Therefore Alternative I (Exhibit 5.6) was carried forwarded as being the most appropriate transit network for the Transit-Oriented Strategy. It should be noted that this alternative includes the long range LRT network previously approved in principle by City Council in both 1977 and 1980.
APPENDIX A DEFAULT STRATEGY NETWORK LISTINGS
A2
DEFAULT STRATEGY - ROADWAY NETWORK
Loc. From To
Construction Activity
Project Cost Included in (1979$ X103 ) Strategy* D
B
11500
D A
B
80000
DA
B
Implement Tran Manage Plan
1000
86-87 AVE 112 STREET 107 STREET
Construct One Way Couplet
3500
98 AVENUE 96ASTREET 80 STREET
Construct Lanes 3 & 4 / 4 Construct Lanes 5 & 6 / 6
4860
99-100 AVE 117 STREET 109 STREET
Construct One Way Couplet
MACKINNON 191 STREET 105 STREET
Construct 6 Lane Roadway Construct Interchange
106-107 AV 117 STREET 95 STREET
'Construct One Way Couplet
1000
106-107 AV 117 STREET STADIUM RD
Construct One Way Couplet
4305
107 AVENUE 117 STREET STADIUM RD
Construct One Way Couplet
0
132 AVENUE FORT ROAD 50 STREET
Construct 4 Lane Roadway Construct Rlwy Grade Sep.
4000
MANNING FR 66 STREET 153 AVENUE
Construct Rlwy Grade Sep.
5000
82 AVENUE 112 STREET 99 STREET
D
Page-total = 115165 Sub-total = 115165 * D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
A3
DEFAULT STRATEGY - ROADWAY NETWORK Project Cost Included in (1979$ X103 ) Strategy*
Loc. From To
Construction Activity
MANNING FR 66 STREET 153 AVENUE
Construct 4 Lane Roadway Construct Grade Separation Construct Interchange
30000
D
109 STREET 103 AVENUE 105 AVENUE
Construct Rlwy Grade Sep.
10000
D
105 STREET BRIDGE 63 AVENUE 137 AVENUE
Construct Bridge Construct Brid Approaches Construct Rlwy Grade Sep.
160000
D
116-117 ST 99 AVENUE 108 AVENUE
Construct One Way Couplet Construct Rlwy Grade Sep.
9000
D A
B
119 STREET 108 AVENUE KINGAVENUE
Construct Lanes 3 & 4 / 4
3000
D
B
B
Sub-total for Default Strategy = 327165 TOTAL COST = 327165 + 475710 (BASIC NETWORK COST) = 802875 * D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
A4
DEFAULT STRATEGY - TRANSIT NETWORK NO
CITY BUS ROUTINGS
1 BEVERLY - 112 AVE - STADIUM LRT - JASPER AVE - CBD - 102 AVE - STONY PLAIN ROAD - JASPER PLACE TRANSIT CENTRE 2 OLIVER - JASPER AVE - CBD - JASPER AVE - STADIUM LRT 3 DOVERCOURT - 124 ST - 107 AVE - 101 ST - CBD - 97 ST NOR WOOD 4 WESTMOUNT - 124 ST - 107 AVE - 101 ST - CBD 5 WESTMOUNT - 124 ST - JASPER AVE - CBD - 95 ST - COLISEUM LRT 6 DOVERCOURT - 124 ST - JASPER AVE - CBD - 95 ST - COLISEUM LRT 7 JASPER PLACE TRANSIT CENTRE - 156 ST - 107 AVE - CBD 8 BONNIE DOON - 82 AVE - SCONA LRT - U OF A 9 SOUTHGATE - 109 ST - CBD - 101 ST - KINGSWAY - NAIT 10 SCONA LRT - U OF A/HOSPITAL LOOP' 11 JASPER PLACE TRANSIT CENTRE - WESTMOUNT - STADIUM LRT COLISEUM LRT - BELEVDERE LRT 12 MEADOWLARK - 87 AVE - 142 ST - STONY PLAIN ROAD - CBD 13 JASPER PLACE - MEADOWLARK - CBD 14 MEADOWLARK - JASPER PLACE - CBD 15 MEADOWLARK - PATRICIA HTS. - STONY PLAIN ROAD - JASPER PLACE TRANSIT CENTRE - CBD 16 RIO TERRACE - MEADOWLARK - JASPER PLACE TRANSIT CENTRE CBD 17 JASPER PLACE TRANSIT CENTRE - WESTMOUNT - 111 AVE - CBD 18 BEVERLY - 118 AVE - COLISEUM LRT - NAIT - KINGSWAY 19 NORTHGATE - 97 ST - KINGSWAY - 116 ST - U OF A - SCONA LRT 20 BEVERLY (NORTH) - 118 AVE - COLISEUM LRT 21 WESTMOUNT - 111 AVE - CBD
A5
DEFAULT STRATEGY - TRANSIT NETWORK NO
CITY BUS ROUTINGS
22 WESTMOUNT - DOVERCOURT - KINGSWAY - 101 ST - CBD 23 KINGSWAY - NAIT - 122 AVE - COLISEUM LRT - NORTH BEVERLY ABBOTTSFIELD 24 CALDER - 129 AVE - 97 ST - CBD 25 CALDER - 134 AVE - NORTHGATE - 97 ST - CBD 27 CALDER - 127 ST - KINGSWAY - CBD 28 BEVERLY (SOUTH) - 118 AVE - COLISEUM LRT 30 NORTHGATE - 135 AVE - BELVEDERE LRT - 129 AVE - 130 AVE NORTHGATE 32 CLAREVIEW LRT - STEELE HEIGHTS - 144 AVE - 82 ST - COLISEUM LRT 33 CLAREVIEW LRT - STEELE HEIGHTS - 140 AVE - NORTHGATE 34 BELVEDERE LRT - 149 AVE - NORTHGATE 35 CASTLEDOWNS I - NORTHGATE - 97 ST - CBD 36 SOUTHGATE - 40 AVE - 122 ST - U OF A - SCONA LRT 37 CALDER - DOVERCOURT - WESTMOUNT - GROAT RD - U OF A - SCONA LRT 38 JASPER PLACE TRANSIT CENTRE - 156 ST - MEADOWLARK QUESNELL - U OF A - SCONA LRT 39 WEST JASPER PLACE - WESTGATE - 87 AVE - 156 ST - JASPER PLACE TRANSIT CENTRE - CBD 40 51 AVE LRT - SOUTHGATE - LENDRUM - 109 ST - 72 AVE - 114 ST - U OF A - SCONA LRT 41 BELGRAVIA - 76 AVE - 109 ST - CBD - 101 ST - KINGSWAY NAIT 42 PARKALLEN - 109 ST - 76 AVE - SCONA LRT 43 SOUTHGATE - 106 ST - 104 ST - SASKATCHEWAN DR - SCONA LRT U OF A - WINDSOR PARK 44 S. OTTEWELL - 98 AVE - CBD
A6
DEFAULT STRATEGY - TRANSIT NETWORK NO
CITY BUS ROUTINGS
45 S. OTTEWELL - 82 AVE - 92 ST - CONNORS RD - CBD 46 CBD - 99 ST - 82 AVE - U OF A - SCONA LRT (TWO - WAY) 47 51 AVE LRT - SE INDUSTRIAL - HAZELDEAN - 99 ST - SCONA LRT 48 51 AVE LRT - SE INDUSTRIAL - KING EDWARD - 85 ST - 98 AVE CBD 49 34 AVE LRT - DUGGAN - SOUTHGATE - 51 AVE LRT 50 CAPILANO - GOLD BAR - 106 AVE - RIVERDALE - CBD 51 CAPILANO - HARDISTY - 101 AVE - 98 AVE - CBD 52 PETROLIA - SOUTHGATE - 51 AVE LRT 53 W. MILLWOODS - GRANT McEWAN LRT - 51 AVE LRT 54 RIVERBEND - 23 AVE - 34 AVE LRT 55 CAPILANO - 90 AVE - CONNORS RD - CBD 56 RIVERBEND - WHITEMUD - SOUTHGATE - 51 AVE LRT 57 RIVERBEND - FOX DR - 114 ST - U OF A - SCONA LRT 58 KING EDWARD - AVONMORE - 92 ST - CONNORS RD - CBD 59 CAPILANO - 98 AVE - GOV'T CENTRE 61 KASKITAYO - DUGGAN - SOUTHGATE - 51 AVE LRT 62 WESTBROOK - PETROLIA - SOUTHGATE - 51 AVE LRT 63 CBD - 106 AVE - 79 ST - 82 AVE - U OF A 65 NAIT - KINGSWAY - CALDER 7 132 AVE - NORTHGATE - BELVEDERE LRT - COLISEUM LRT 68 WESTGATE - WEST JASPER PLACE - 100 AVE - JASPER PLACE TRANSIT CENTRE - CBD 69 W. MILLWOODS - GRANT McEWAN LRT - 51 AVE LRT - U OF A 70 HERMITAGE - 132 AVE - BELEVEDERE LRT 71 SOUTHGATE - PETROLIA - 122 ST - U OF A
A7
DEFAULT STRATEGY - TRANSIT NETWORK NO
CITY BUS ROUTINGS
72 SOUTHGATE - PETROLIA - 122 ST - U OF A 74 CLAREVIEW - CLAREVIEW LRT 75 SOUTHGATE - ARGYLL RD - BONNIE DOON - CAPILANO - COLISEUM LRT 77 CAPILANO - 94 AVE - HOLYROOD - CBD 79 CLAREVIEW - CLAREVIEW LRT 78 WEST JASPER PLACE - WESTGATE - 163 ST - 95 AVE - 156 ST _ JASPER PLACE TRANSIT CENTRE 81 W. MILLWOODS - GRANT McEWAN LRT - 51 AVE LRT 83 SOUTHGATE - 103 ST - SCONA LRT 88 WEST JASPER PLACE - WESTGATE - JASPER PLACE TRANSIT CENTRE - CBD 89 WESTGATE - WEST JASPER PLACE - JASPER PLACE TRANSIT CENTRE - CBD 90 JASPER PLACE TRANSIT CENTRE - 149 ST - BONAVENTURE INDUSTRIAL 91 WESTGATE - WEST JASPER PLACE - 95 AVE - 142 ST - STONY PLAIN ROAD - CBD 92 82 AVE LRT - 99 ST - 51 AVE LRT .- PARSONS INDUSTRIAL LRT MILLWOODS LRT 93 JASPER PLACE TRANSIT CENTRE - STONY PLAIN ROAD - 170 ST _ MILLWOODS INDUSTRIAL 94 WESTMOUNT TRANSIT CENTRE - 111 AVE - 149 ST - 125 AVE CALDER TRANSIT CENTRE 95 WESTMOUNT TRANSIT CENTRE - 112 AVE - 170 ST - 107 AVE JASPER PLACE TRANSIT CENTRE 96 WESTMOUNT TRANSIT CENTRE - 142 ST - BONAVENTURE INDUSTRIAL 97 WESTMOUNT TRANSIT CENTRE - 118 AVE - 178 ST - JASPER PLACE TRANSIT CENTRE 98 KASKITAYO - SOUTHGATE - 51 AVE LRT
A8
DEFAULT STRATEGY - TRANSIT NETWORK NO CITY BUS ROUTINGS 99 KASKITAYO - KASKITAYO TRANSIT CENTRE - 34 AVE LRT 102 KASKITAYO TRANSIT CENTRE - 34 AVE LRT 103 E. MILLWOODS - MILLWOODS LRT - 66 ST - 51 AVE LRT 104 E. MILLWOODS - MILLWOODS LRT - GRANT MCEWAN LRT 105 MILLWOODS - MILLWOODS LRT - 66 ST - 51 AVE LRT 106 MILLWOODS LRT - MILLWOODS - 50 ST - CAPILANO TRANSIT CENTRE 108 CASTLEDOWNS - CALDER - 127 ST - KINGSWAY - CBD 109 CASTLEDOWNS - NORTHGATE - 97 ST - CBD 112 ZOO - 142 ST - STONY PLAIN ROAD - CBD 114 CLAREVIEW - CLAREVIEW LRT 116 LAKE DISTRICT - NORTHGATE - 97 ST
CBD
117 LAKE DISTRICT - 66 ST - BELVEDERE LRT 118 LAKE DISTRICT - 66 ST - CLAREVIEW LRT 120 KASKITAYO - S. INDUSTRIAL - PARSONS INDUSTRIAL LRT - 51 AVE LRT 122 CAPILANO - SE INDUSTRIAL - 51 AVE LRT 123 BONNIE DOON - SE INDUSTRIAL - 51 AVE LRT NO CITY LRT ROUTINGS 10 CLAREVIEW - CBD - GOV'T. CENTRE - CP CORRIDOR - MILLWOODS TRANSIT CENTRE
A9
DEFAULT STRATEGY - TRANSIT NETWORK NO EXTERNAL BUS ROUTINGS 1 ST. ALBERT - ST. ALBERT TRAIL - KINGSWAY - CBD - GOV'T CENTRE 2 ST. ALBERT - ST. ALBERT TRAIL - GROAT RD - U OF A 41 SHERWOOD PARK - CONNORS RD - CBD 42 SHERWOOD PARK - CAPILANO TRANSIT CENTRE - CBD 43 SHERWOOD PARK - MILLWOODS LRT
Al 0
DEFAULT STRATEGY TRANSIT NETWORK CAPITAL COST SUMMARY
COST COST COMPONENT
(in Millions of 1979 $)
LRT Construction
178.1
Vehicles (LRT & Bus)
148.2
Transit Centres
8.4
Others (Plant Facilities & Miscellaneous)
68.3
TOTAL TRANSIT NETWORK CAPITAL COST
403.0
APPENDIX B AUTO-ORIENTED STRATEGY NETWORK LISTINGS
B9
AUTO-ORIENTED STRATEGY - ROADWAY NETWORK Loc. From To
Construction Activity
Project Cost Included in (1979$ X103 ) Strategy*
98 AVENUE 96ASTREET 50 STREET
Construct Lanes 5 & 6 / 6 Construct Interchange
24000
A
99-100 AVE 117 STREET 109 STREET
Construct One Way Couplet
11500
D A
B
MACKINNON 191 STREET 105 STREET
Construct 6 Lane Roadway Construct Interchange
80000
D A
B
104 AVENUE 116 STREET 110 STREET
Construct Lanes 5 & 6 / 6 Construct Interchange
3400
A
129 AVENUE FORT ROAD 50 STREET
Construct 4 Lane Roadway
167 AVENUE 97 STREET 50 STREET
Construct Lanes 3 & 4 / 4
2250
A
50 STREET 153 AVENUE 167 AVENUE
Construct Lanes 3 & 4 / 4
750
A
66 STREET 153 AVENUE 167 AVENUE
Construct Lanes 3 & 4 / 4
750
A
2500
A
37040
A
CAPILANO 106 AVENUE
Construct Interchange
FORT ROAD 107 AVENUE YELLOWHEAD
Construct Lanes 5 & 6 / 6 Construct Interchange
680
A T B
B
Page-total = 162870 Sub-total = 162870 * D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
B3
AUTO-ORIENTED STRATEGY - ROADWAY NETWORK Loc. From To
Construction Activity
Project Cost Included in (1979$ X103 ) Strategy*
FORT ROAD Widen Road to 6 Lane Roadway YELLOWHEAD Construct Interchange 137 AVENUE
14330
ATE
MANNING FR Widen Road to 6 Lane Roadway 137 AVENUE Construct Interchange 153 AVENUE
14330
AT B
82 STREET Widen Road to 5 Lane Roadway 95 STREET Construct Bridge 115 AVENUE Construct Interchange
20000
A
750
A
82 STREET 153 AVENUE 167 AVENUE
Construct Lanes 3 & 4 / 4
106 AVENUE 110 STREET 95 STREET
Construct Downtown Loop Construct Interchange
68750
A
110 STREET 97 AVENUE 106 AVENUE
Construct Downtown Loop Construct Grade Separation Construct Interchange
68750
A
97 AVENUE 110 STREET 95 STREET
Construct Downtown Loop Construct Grade Separation Construct Interchange
68750
A
95 STREET 97 AVENUE 106 AVENUE
Construct Downtown Loop Construct Grade Separation Construct Interchange
68750
A
9000
A
83000
A
CALGARY TR 34 AVENUE
Construct Interchange
105 STREET 63 AVENUE YELLOWHEAD
Construct Bridge Construct Brid Approaches
Page-total = 416410 Sub-total = 579280 * D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
B4
AUTO-ORIENTED STRATEGY - ROADWAY NETWORK Project Cost Included in (1979$ X103 ) Strategy*
Loc. From To
Construction Activity
109 STR BR 88 AVENUE 97 AVENUE
Construct Bridge Construct Brid Approaches
37305
A
111 STREET BLACKMUD
Construct Bridge Construct Brid Approaches
4964
A
111 STREET 18 AVENUE 23 AVENUE
Construct Lanes 3 & 4 / 4
260
A
111 STREET 61 AVENUE
Construct Interchange
6000
A
113ASTREET 127 AVENUE 132 AVENUE
Construct 4 Lane Roadway
1000
A
114 STREET 72 AVENUE
Construct Interchange
3000
A
114 STREET UNIV AVE
Construct Grade Separation
4500
A
B
116-117 ST 99 AVENUE 108 AVENUE
Construct One Way Couplet Construct Rlwy Grade Sep.
9000
DA
B
119 STREET 108 AVENUE ST. ALBTR
Construct Lanes 3 & 4 / 4 Construct 4 Lane Roadway Construct interchange
31500
A
119 STREET 108 AVENUE ST. ALBTR
Construct Rlwy Grade Sep.
0
A
Page-total =
97529
Sub-total = 676809 * D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
B5
AUTO-ORIENTED STRATEGY - ROADWAY NETWORK Loc. From To
Construction Activity
122 STREET 63 AVENUE UNIV AVE
Construct 4 Lane Roadway
127 STREET 153 AVENUE 167 AVENUE 127 STREET 153 AVENUE 167 AVENUE
Project Cost Included in (1979$ X103 ) Strategy* 15000
A
Construct Lanes 1 & 2 / 4
1000
A
Construct Lanes 3 & 4 / 4
750
A
Sub-total for Auto-Oriented Strategy = 693559 TOTAL COST = 693559 + 475710 (BASIC NETWORK COST) =1169269 * D=Default 'A=Auto-oriented T=Transit-oriented
B = Balanced
B6
AUTO-ORIENTED STRATEGY - TRANSIT NETWORK
NO
CITY BUS ROUTINGS
1 JASPER PLACE TRANSIT CENTRE - STONY PLAIN ROAD - 102 AVE JASPER - 112 AVE - 50 ST LOOP 3 118 AVE - 124 ST - 107 AVE - CBD - 97 ST - 95 ST - 115 AVE 5 WESTMOUNT - 124 ST - JASPER - CBD - 95 ST - 118 AVE COLISEUM LRT 7 JASPER PLACE TRANSIT CENTRE - MAYFIELD - 156 ST - 107 AVE 101 ST - CBD 9 SOUTHGATE - 109 ST - CBD - 101 ST - KINGSWAY - NAIT 12 LAURIER HEIGHTS - 142 ST - STONY PLAIN ROAD - CBD 13 WESTGATE - 87 AVE - 149 ST - Mack EXPY - CBD 14 WESTGATE - 87 AVE - 163 ST - JASPER PLACE TRANSIT CENTRE MacK EXPY - CBD 15 MEADOWLARK - 163 ST - JASPER PLACE TRANSIT CENTRE MacKINNON BUSWAY - CBD 16 QUESNELL - MEADOWLARK - 156 ST - JASPER PLACE TRANSIT CENTRE - MacKINNON BUSWAY - CBD 17 McQUEEN - GLENORA - 107 AVE - 101 ST - CBD 19 NAIT - 106 ST - 109 ST - 107 AVE - 116 ST - GROAT RD - 87 AVE - U OF A LRT 20 BEVERLY LOOP - 118 AVE - COLISEUM LRT - 118 AVE - NAIT 21 WESTMOUNT - DOVERCOURT - 118 AVE - KINGSWAY - CBD 22 WESTMOUNT - 111 AVE - KINGSWAY - 101 ST - CBD 23 NAIT - 106 ST - 122 AVE - 82 ST - COLISEUM LRT - 120 AVE MONT ROSE 24
CALDER - 129 AVE - 97 ST - CBD
25
CALDER - 135 AVE - NORTHGATE - 97 ST - CBD
28
BEVERLY - RUNDLE - 114 AVE - 118 AVE - COLISEUM LRT
30
NORTHGATE - 135 AVE - FORT RD - BELVEDERE LRT
31 NORTHGATE - 130 AVE - 129 AVE - BELVEDERE LRT - 66 ST SANTA ROSA - FORT RD - COLISEUM LRT
B7
AUTO-ORIENTED STRATEGY - TRANSIT NETWORK NO
CITY BUS ROUTINGS
32 CLAREVIEW LRT - STEELE HEIGHTS - 144 AVE - 82 ST - COLISEUM LRT 33 NORTHGATE - DICKINSFIELD - LONDONDERRY - STEELE HEIGHTS CLAREVIEW LRT 34 NORTHGATE - DICKINSFIELD - LONDONDERRY - 66 ST - BELVEDERE LRT 35 CASTLEDOWNS - NORTHGATE - 97 ST - CBD 36 ASPEN - LANSDOWNE - GRAND VIEW - 114 ST - U OF A 38 JASPER PLACE TRANSIT CENTRE - 156 ST - 95 AVE - WEST JASPER PLACE - WESTGATE - 87 AVE - 149 ST - QUESNELL - 114 ST - U OF A 39 WEST JASPER PLACE - WESTGATE - 170 ST - 100 AVE - JASPER PLACE TRANSIT CENTRE - MacKINNON BUSWAY - CBD 40 SOUTHGATE - MALMO - LENDRUM - 109 ST - 72 AVE - 114 ST - U OF A - WINDSOR PARK 41 BELGRAVIA - 76 AVE - 109 ST - CBD 43 SOUTHGATE - 106 ST - WHYTE AVE - U OF A LRT 44 CAPILANO - OTTEWELL - 98 AVE - 95 ST BRIDGE - CBD 45 IDYLWYLDE - 90 AVE - 85 ST - 95 AVE - CONNORS RD - CBD 46 U OF A - WHYTE AVE - 99 ST - CBD 47 SE INDUSTRIAL - ARGYLL - RITCHIE - 99 ST - CBD 48 SE INDUSTRIAL - AVONMORE - 83 ST - CONNORS RD - CBD 49 DUGGAN - SOUTHGATE - 111 ST - 114 ST - U OF A LRT 50 CAPILANO - GOLD BAR - 106 AVE - CBD 51 CAPILANO - HARDISTY - 101 AVE - 98 AVE - 95 ST BRIDGE - CBD 52 PETROLIA - SOUTHGATE - 111 ST - 114 ST - U OF A LRT 53 MILLWOODS TRANSIT CENTRE - SW - 23 AVE - 103 ST - CBD 54 RIVERBEND - FOX DR - 114 ST - U OF A LRT
B8
AUTO-ORIENTED STRATEGY - TRANSIT NETWORK NO
CITY BUS ROUTINGS
56 RIVERBEND - WHITEMUD - 122 ST - 114 ST - U OF A LRT 57 RIVERBEND - FOX DR - 114 ST - U OF A LRT 58 BONNIE DOON - KING EDWARD - 76 AVE - 89 ST - 92 ST - CBD 61 KASKITAYO - 111 ST - 114 ST - U OF A LRT 63 U OF A - WHYTE AVE - BONNIE DOON - 79 ST - 106 AVE - CBD 68 WESTGATE - WEST JASPER PLACE - 95 AVE - 163 ST - JASPER PLACE TRANSIT CENTRE - MacKINNON BUSWAY - CBD 70 HERMITAGE - BELVEDERE LRT 74 CLAREVIEW - CLAREVIEW LRT 78 WEST JASPER PLACE - QUESNELL FREEWAY - FOX DR - 114 ST - U OF A LRT 79 CLAREVIEW - CLAREVIEW LRT 81 MILLWOODS TRANSIT CENTRE T NW - 51 AVE - SOUTHGATE - 111 ST 114 ST - U OF A LRT 88 WEST JASPER PLACE - QUESNELL - FOX DR - 114 ST - U OF A LRT 89 WESTGATE - WEST JASPER PLACE - 178 ST - 100 AVE - JASPER PLACE TRANSIT CENTRE - MacKINNON BUSWAY - CBD 92 CBD - 99 ST - S. INDUSTRIAL - 28 AVE - MILL WOODS TRANSIT CENTRE 94 CALDER - 127 ST - 125 AVE - 142 ST - 118 AVE - 178 ST STONY PLAIN ROAD - JASPER PLACE TRANSIT CENTRE 95 WESTMOUNT TRANSIT CENTRE - NW INDUSTRIAL - 107 AVE - 159 ST - JASPER PLACE TRANSIT CENTRE 96 WESTMOUNT TRANSIT CENTRE - 115 AVE - 149 ST - BONAVENTURE INDUSTRIAL 98 KASKITAYO - SOUTHGATE - 111 ST - 114 ST - U OF A LRT 99 KASKITAYO - 103 ST - CBD 102 KASKITAYO - 103 ST - CBD 103 MILLWOODS - NORTH CENTRAL - 51 AVE - 103 ST - CBD
139
AUTO-ORIENTED STRATEGY - TRANSIT NETWORK NO CITY BUS ROUTINGS 104 MILLWOODS TRANSIT CENTRE - CENTRAL WEST - 23 AVE - 103 ST CBD 105 MILLWOODS TRANSIT CENTRE - S CENTRAL - 23 AVE - 103 ST CBD 106 MILLWOODS TRANSIT CENTRE - E. MILLWOODS - 50 ST - SHERWOOD PARK FREEWAY - CONNORS RD - CBD 107 MILLWOODS (SE) - MILLWOODS TRANSIT CENTRE - 66 ST - 75 ST CONNORS RD - CBD 108 CASTLEDOWNS - NORTHGATE - 97 ST - CBD 109 CASTLEDOWNS - NORTHGATE - 97 ST - CBD 114 CLAREVIEW - CLAREVIEW LRT 116 NORTHGATE - LAKE DISTRICT - BELVEDERE LRT 117 NORTHGATE - LAKE DISTRICT - 66 ST - BELVEDERE LRT 118 LAKE DISTRICT - 66 ST - CLAREVIEW LRT 120 SOUTHGATE TRANSIT CENTRE - 111 ST - KASKITAYO TRANSIT CENTRE - 23 AVE - S. INDUSTRIAL - MILLWOODS TRANSIT CENTRE 122 SOUTHGATE TRANSIT CENTRE - 51 AVE - SE INDUSTRIAL - 50 ST CAPILANO TRANSIT CENTRE NO CITY LRT ROUTINGS 10 CLAREVIEW - CBD - GOV'T. CENTRE - UNIVERSITY OF ALBERTA
B10
AUTO-ORIENTED STRATEGY - TRANSIT NETWORK NO EXTERNAL BUS ROUTINGS 1 ST. ALBERT - ST. ALBERT TRAIL - KINGSWAY - CBD - GOV'T CENTRE 2 ST. ALBERT - ST. ALBERT TRAIL - GROAT RD - U OF A 41 SHERWOOD PARK - CONNORS RD - CBD 42 SHERWOOD PARK - CAPILANO TRANSIT CENTRE - CBD
Bl 1
AUTO-ORIENTED STRATEGY TRANSIT NETWORK CAPITAL COST SUMMARY
COST COMPONENT
LRT Construction Vehicles (LRT & Bus) Transit Centres
COST (in Millions of 1979 $) 92.5 119.9 9.4
Others (Plant Facilities & Miscellaneous)
60.2
TOTAL TRANSIT NETWORK CAPITAL COST
282.0
APPENDIX C TRANSIT-ORIENTED STRATEGY NETWORK LISTINGS
C2 TRANSIT-ORIENTED STRATEGY - ROADWAY NETWORK Loc. From To 98 AVENUE 96ASTREET 80 STREET
Construction Activity
Project Cost Included in (1979$ X103 ) Strategy*
Implement Tran Manage Plan Construct Lanes 5 & 6 / 6
5505
T
Construct 4 Lane Roadway
680
A T B
FORT ROAD Widen Road to 6 Lane Roadway YELLOWHEAD Construct Interchange 137 AVENUE
14330
A T B
MANNING FR Widen Road to 6 Lane Roadway 137 AVENUE Construct Interchange 153 AVENUE
14330
A T B
4650
T B
129 AVENUE FORT ROAD 50 STREET
107 STREET 107 AVENUE YELLOWHEAD
Construct Lanes 3 & 4 / 4
Sub-total for Transit Oriented Strategy = TOTAL COST =
39495
39495 + 475710 (BASIC NETWORK COST) = 515205
* D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
C3
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 1 - FULL LRT NO
CITY BUS ROUTINGS
1 JASPER LRT - SP. RD - 102 AVE - CBD 2 BEVERLY - 112 AVE - JASPER - CBD - 124 ST - 107 AVE LRT 3 DOVERCOURT - 124 ST - 107 AVE - CBD - 97 ST - 95 ST - 115 AVE 5 WESTMOUNT - 124 ST - CBD - 95 ST - COLISEUM LRT - 118 AVE 72 ST LOOP 7 JASPER LRT - 156 ST - 107 AVE - CBD 8 BONNIE DOON - SCONA LRT - U OF A 9 SOUTHGATE - 109 ST - CBD - 101 ST - KINGSWAY - NAIT 11 ZOO - 142 ST - STONY PLAIN ROAD - CBD 12 WESTGATE - 87 AVE '- 142 ST - 107 AVE LRT 14 WESTGATE - 87 AVE - 149 ST - 107 AVE LRT - NW INDUSTRIAL 118 AVE LRT 15 PATRICIA HEIGHTS - 156 ST - STONY PLAIN ROAD - JASPER PLACE LRT 16 RIO TERRACE - 156 ST - STONY PLAIN ROAD - JASPER PLACE LRT 17 JASPER LRT - MAYFIELD - WESTMOUNT - 111 AVE - STADIUM LRT 18 BEVERLY - 118 AVE - 121 ST LRT 19 NAIT - GROAT BRIDGE - U OF A 20 BEVERLY - 118 AVE - COLISEUM LRT 22 118 AVE LRT - DOVERCOURT - WESTMOUNT TRANSIT CENTRE - 111 AVE - 111 AVE LRT - KINGSWAY - 101 ST - CBD 23 KINGSWAY - COLISEUM LRT - BEVERLY 24 CALDER LRT - 129 AVE - 97 ST - CBD 25 CALDER - 135 AVE - 97 ST - CBD 28 BEVERLY - 118 AVE - COLISEUM LRT 30 NORTHGATE - 135 AVE - BELVEDERE LRT
C4
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 1 - FULL LRT NO
CITY BUS ROUTINGS
31 NORTHGATE - 130 AVE - BELVEDERE LRT 32 CLAREVIEW LRT - STEELE HEIGHTS - 82 ST - COLISEUM LRT STADIUM LRT 33 NORTHGATE - 140 AVE - CLAREVIEW LRT 34 NORTHGATE - 150 AVE - BELVEDERE LRT 35 CASTLEDOWNS - CASTLEDOWNS LRT - NORTHGATE - 97 ST - CBD 36 SOUTHGATE - MALMO - LANSDOWNE - GRAND VIEW - BELGRAVIA LRT 38 JASPER- LRT - 156 ST - QUESNELL - BELGRAVIA LRT 39 WEST JASPER PLACE - QUESNELL - BELGRAVIA LRT 40 51 AVE LRT - SOUTHGATE - BELGRAVIA LRT - WINDSOR PARK - U OF A 41 BELGRAVIA - 76 AVE - 109 ST - CBD - KINGSWAY - NAIT 42 BELGRAVIA LRT - PARKALLEN - SCONA LRT 43 SOUTHGATE - 106 ST - SCONA LRT 44 S. OTTEWELL - 98 AVE - CBD 45 S. OTTEWELL - 92 ST - CBD 46 U OF A - 82 AVE - 99 ST - CBD 47 SCONA LRT - ARGYLL - 51 AVE LRT 48 51 AVE LRT - DAVIES INDUSTRIAL - AVONMORE - 85 ST - CBD 49 KASKITAYO LRT - DUGGAN - SOUTHGATE - BELGRAVIA LRT 50 CAPILANO - GOLD BAR - RIVERDALE - CBD 51 CAPILANO - HARDISTY - CBD 52 PETROLIA - SOUTHGATE - 51 AVE LRT 53 W. MILLWOODS - GRANT McEWAN. LRT - MILLWOODS RD - 51 AVE LRT 54 TERWILLEGER - 23 AVE - KASKITAYO LRT
C.5
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 1 - FULL LRT NO
CITY BUS ROUTINGS
55 CAPILANO - 90 AVE - CBD 56 RIVERBEND - SOUTHGATE - 51 AVE LRT 57 RIVERBEND - FOX DR - BELGRAVIA LRT 58 KING EDWARD PARK - 92 ST - CBD 61 34 AVE LRT - DUGGAN - SOUTHGATE - 51 AVE LRT 62 PETROLIA - SOUTHGATE - 51 AVE LRT 63 CBD - HOLYROOD - 82 AVE - U OF A 65 CALDER - NORTHGATE - BELVEDERE LRT - COLISEUM LRT 68 JASPER LRT - STONY PLAIN ROAD - WEST JASPER PLACE WESTGATE 70 HERMITAGE - BELVEDERE LRT 74 CLAREVIEW
CLAREVIEW LRT
75 COLISEUM LRT - CAPILANO - BONNIE DOON - 51 AVE LRT 77 CAPILANO - HOLYROOD - 95 AVE - CBD 78 WEST JASPER PLACE - WESTGATE - 163 ST - STONY PLAIN ROAD JASPER PLACE LRT 79 CLAREVIEW - CLAREVIEW LRT 81 W. MILLWOODS - GRANT McEWAN LRT - MILLWOODS RD - 51 AVE LRT 88 WEST JASPER PLACE - STONY PLAIN ROAD - JASPER LRT 89 WEST JASPER PLACE - STONY PLAIN ROAD - JASPER LRT 91 WESTGATE - WEST JASPER PLACE - 95 AVE - 142 ST - CBD 92 SCONA LRT - 99 ST - 51 AVE LRT - PARSONS INDUSTRIAL LRT 93 JASPER LRT - NW INDUSTRIAL 94 JASPER LRT - 156 ST - 125 AVE - CALDER LRT 95 JASPER LRT - NW INDUSTRIAL - 111 AVE LRT
C6
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 1 - FULL LRT NO CITY BUS ROUTINGS 96 111 AVE LRT - WESTMOUNT - 142 ST - BONAVENTURE INDUSTRIAL 97 118 AVE LRT - 118 AVE - NW INDUSTRIAL - 178 ST - WESTGATE TRANSIT CENTRE 98 KASKITAYO LRT - SOUTHGATE - BELGRAVIA LRT 99 KASKITAYO - KASKITAYO LRT 102 KASKITAYO LRT - 34 AVE LRT 103 E. MILLWOODS - MILLWOODS LRT - 66 ST - 51 AVE LRT 104 E. MILLWOODS - MILLWOODS LRT - GRANT McEWAN LRT 105 CENTRAL MILLWOODS - MILLWOODS LRT - 66 ST - 51 AVE LRT 106 MILLWOODS LRT - MILLWOODS - 50 ST - CAPILANO 108 CASTLEDOWNS - CALDER LRT 109 CASTLEDOWNS - NORTHGATE 114 CLAREVIEW - CLAREVIEW LRT 116 LAKE DISTRICT - 153 AVE - CASTLEDOWNS LRT 117 CASTLEDOWNS LRT - LAKE DISTRICT - 66 ST - BELVEDERE LRT 118 LAKE DISTRICT - 56 ST - CLAREVIEW LRT 120 51 AVE LRT - S. INDUSTRIAL - PARSONS INDUSTRIAL LRT KASKITAYO LRT 122 CAPILANO - SE INDUSTRIAL - 51 AVE LRT 123 BONNIE DOON - SE INDUSTRIAL - 51 AVE LRT NO CITY LRT ROUTINGS 10 CLAREVIEW - CBD - GOV'T. CENTRE - CP CORRIDOR RIDGEWOOD 11 CASTLEDOWNS TRANSIT CENTRE - CALDER - CBD - GOV'T CENTRE -U OF A FARM 13 KASKITAYO TRANSIT CENTRE - CP CORRIDOR - GOV'T CENTRE - CBD - 107 AVE - JASPER PLACE
C7
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 1 - FULL LRT NO
EXTERNAL BUS ROUTINGS
2 ST. ALBERT - ST. ALBERT TRAIL - GROAT RD - U OF A 3 ST. ALBERT - ST. ALBERT TRAIL - 137 AVE LRT 41 SHERWOOD PARK - CONNORS RD - CBD 42 SHERWOOD PARK - CAPILANO TRANSIT CENTRE - CBD 43 SHERWOOD PARK - RIDGEWOOD LRT
C8
TRANSIT-ORIENTED STRATEGY Alternative 1 - Full LRT TRANSIT NETWORK CAPITAL COST SUMMARY
COST COMPONENT
COST (in Millions of 1979 $)
LRT Construction
308.8
Vehicles (LRT & Bus)
185.5
Transit Centres
9.7
Others (Plant Facilities & Miscellaneous)
92.0
TOTAL TRANSIT NETWORK CAPITAL COST
596.0
C9
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 2 - MINIMUM LRT NO
CITY BUS ROUTINGS
1 JASPER PLACE TRANSIT CENTRE - STONY PLAIN ROAD - JASPER CBD 2 BEVERLY - STADIUM LRT - JASPER - CBD - OLIVER - 107 AVE LRT 3 WESTMOUNT - 114 AVE - 124 ST - 107 AVE - CBD 4 EX. GROUNDS - 115 AVE - 95 ST - CBD 7 JASPER PLACE TRANSIT CENTRE - 156 ST - 107 AVE - 101 ST CBD 8 BONNIE DOON - 82 AVE - SCONA LRT - U OF A LOOP 9 SOUTHGATE - 109 ST - WALTERDALE BRIDGE - CBD - 101 ST KINGSWAY - NAIT 11 ZOO - 142 ST - STONY PLAIN ROAD - 104 AVE - CBD 12 WESTGATE - 87 AVE - LAURIER HEIGHTS - 142 ST - 95 AVE - 149 ST - MacKINNON BUSWAY - CBD 13 WESTGATE - 87 AVE - 149 ST - MacKINNON BUSWAY - CBD 14 WESTGATE - 163 ST - STONY PLAIN ROAD - JASPER PLACE TRANSIT CENTRE - MacK BUSWAY - CBD 15 MEADOWLARK - PATRICIA HEIGHTS - 165 ST - STONY PLAIN ROAD JASPER PLACE TRANSIT CENTRE - MacKINNON BUSWAY - CBD 16 RIO TERRACE - 156 ST - JASPER PLACE TRANSIT CENTRE MacKINNON BUSWAY - CBD 17 JASPER PLACE TRANSIT CENTRE - MAYFIELD - 110 AVE WESTMOUNT - 111 AVE - STADIUM LRT 18 BEVERLY - 118 AVE - COLISEUM LRT - NAIT - KINGSWAY AIRPORT - NW LRT - WESTMOUNT 19 NAIT - KINGSWAY - 109 ST - 107 AVE - 116 ST - GROAT RD - U OF A 20 BEVERLY - 121 AVE - 54 ST - 118 AVE - COLISEUM LRT 22 1.11 AVE LRT - 111 AVE - WESTMOUNT - DOVERCUORT 23 BEVERLY - 123 AVE - COLISEUM LRT - 82 ST - 122 AVE - NAIT KINGSWAY
C10
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 2 - MINIMUM LRT NO
CITY BUS ROUTINGS
24 CALDER - 132 AVE LRT - 129 AVE - 97 ST - CBD 25 132 AVE LRT - CALDER - 134 AVE - NORTHGATE - 97 ST - CBD 28 BEVERLY - 114 AVE - 118 AVE - COLISEUM LRT 30 NORTHGATE - 135 AVE - BELVEDERE LRT - 129 AVE - NORTHGATE 32 CLAREVIEW LRT - STEELE HEIGHTS - 144 AVE - 82 ST - STADIUM LRT 33 CLAREVIEW LRT - STEELE HEIGHTS - LONDONDERRY - DICKINSFIELD - NORTHGATE 34 BELVEDERE LRT - 66 ST - LONDONDERRY - DICKINSFIELD NORTHGATE 35 CASTLEDOWNS TRANSIT CENTRE - NORTHGATE 36 SOUTHGATE TRANSIT CENTRE - MALMO - LANSDOWNE - GRAND VIEW BELGRAVIA LRT 38 JASPER PLACE TRANSIT CENTRE -.156 ST - 87 AVE - 149 ST QUESNELL - FOX DR - BELGRAVIA LRT 39 WEST JASPER PLACE - QUESNELL FREEWAY - FOX DR - BELGRAVIA LRT 40 51 AVE LRT - SOUTHGATE - LENDRUM - BELGRAVIA - WINDSOR PARK - U OF A 41 BELGRAVIA - 76 AVE - 109 ST - CBD - 101 ST - KINGSWAX NAIT 42 BELGRAVIA LRT - PARKALLEN - 109 ST - 76 AVE - SCONA LRT 43 SOUTHGATE - 106 ST - 76 AVE - SCONA LRT 44 S. OTTEWELL - OTTEWELL RD - 98 AVE - CBD 45 S. OTTEWELL - 82 AVE - 92 ST - CONNORS RD - CBD 46 U OF A - 82 AVE - 99 ST - CBD 47 WHYTE AVE LRT - 96 ST - ARGYLL - 91 ST - 51 AVE LRT 48 51 AVE LRT - SE INDUSTRIAL - 85 ST - 95 AVE - CONNORS RD CBD
C11
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 2 - MINIMUM LRT NO
CITY BUS ROUTINGS
49 KASKITAYO - DUGGAN - SOUTHGATE - 111 ST - 113 ST BELGRAVIA LRT 50 CAPILANO - GOLD BAR - 106 AVE - RIVERDALE - CBD 51 CAPILANO - HARDISTY - 101 AVE - 84 ST - 106 AVE - CBD 52 ASPEN - ROYAL GARDENS - 40 AVE - 111 ST - 51 AVE - 51 AVE LRT 53 W. MILLWOODS - GRANT McEWAN LRT - MILLWOODS RD - 51 AVE LRT 54 TERWILLEGAR - 23 AVE - HIGHWAY 2 - 34 AVE LRT 55 CAPILANO - 58 ST - 90 AVE - CONNORS RD - CBD 56 TERWILLEGAR - RIVERBEND - WHITEMUD - SOUTHGATE - 51 AVE 51 AVE LRT 57 TERWILLEGAR - RIVERBEND - FOX DR - BELGRAVIA LRT 58 KING .EDWARD PARK - 76 AVE - 92 ST - CONNORS RD - CBD 59 CAPILANO - 98 AVE - GOV'T CENTRE 61 SOUTHGATE - DUGGAN - 34 AVE LRT 61 WESTBROOK - GREENFIELD - 111 ST - 51 AVE - 51 AVE LRT 63 U OF A - 82 AVE - 79 ST - 106 AVE - CBD 65 COLISEUM LRT - BELVEDERE LRT - 132 AVE - NORTHGATE - 132 AVE - CALDER LRT - 127 ST - 118 AVE LRT 68 WEST JASPER PLACE - STONY PLAIN ROAD - JASPER PLACE TRANSIT CENTRE - MacKINNON BUSWAY - CBD 69 KASKITAYO TRANSIT CENTRE - 23 AVE - 119 ST - BELGRAVIA LRT 70 HERMITAGE - CLAREVIEW LRT 74 CLAREVIEW - CLAREVIEW LRT 75 51 AVE LRT - ARGYLL RD - BONNIE DOON - CAPILANO - COLISEUM LRT 77 CAPILANO - 95 AVE - CONNORS RD - CBD
C12
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 2 - MINIMUM LRT NO
CITY BUS ROUTINGS
78 WEST JASPER PLACE - WESTGATE - 163 ST - STONY PLAIN ROAD JASPER PLACE TRANSIT CENTRE - MacK BUSWAY - CBD 79 CLAREVIEW - CLAREVIEW LRT 81 W. MILLWOODS - GRANT McEWAN LRT - MILLWOODS RD - 51 AVE LRT 88 WEST JASPER PLACE - WESTGATE - WEST JASPER PLACE - 100 AVE - STONY PLAIN ROAD - JASPER PLACE TRANSIT CENTRE MacKINNON BUSWAY - CBD 89 WESTGATE - WEST JASPER PLACE - STONY PLAIN ROAD - JASPER PLACE TRANSIT CENTRE 91 WESTGATE - WEST JASPER PLACE - 95 AVE - 149 ST - MacKINNON BUSWAY - CBD 92 SCONA LRT - 99 ST - 51 AVE LRT - S. INDUSTRIAL - PARSONS INDUSTRIAL LRT 93 NW INDUSTRIAL - 170 ST - STONY PLAIN ROAD - JASPER PLACE TRANSIT CENTRE - 149 ST - 115 AVE - WESTMOUNT - 111 AVE .LRT 94 JASPER PLACE TRANSIT CENTRE - 156 ST - 125 AVE - 127 ST CALDER LRT 95 JASPER PLACE TRANSIT CENTRE - 156 ST - 107 AVE - 170 ST 112 AVE - 111 AVE LRT 96 BONAVENTURE - 125 AVE - 142 ST - WESTM0UNT - 111 AVE - 111 AVE LRT 97 WESTGATE TRANSIT CENTRE - 178 ST - NW INDUSTRIAL - 178 ST 118 AVE - 118 AVE LRT 98 KASKITAYO - 111 ST - 51 AVE - 51 AVE LRT 99 KASKITAYO - 23 AVE - HIGHWAY 2 - 34 AVE LRT 102 KASKITAYO - 34 AVE LRT 103 E. MILLWOODS - MILLWOODS LRT - 66 ST - 51 AVE LRT 104 RIDGEWOOD LRT - MILLWOODS LRT - GRANT McEWAN LRT 105 CENTRAL MILLWOODS - MILLWOODS LRT - 66 ST - 51 AVE LRT 106 MILLWOODS LRT - MILLWOODS - 50 ST CAPILANO
C13
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 2 - MINIMUM LRT NO
CITY BUS ROUTINGS
107 CASTLEDOWNS TRANSIT CENTRE - 132 AVE LRT 108 CASTLEDOWNS TRANSIT CENTRE - NORTHGATE - 97 ST - CBD 109 CASTLEDOWNS - 132 AVE LRT 114 CLAREVIEW - CLAREVIEW LRT 116 LAKE DISTRICT - 97 ST - CBD 117 LAKE DISTRICT - 66 ST BELVEDERE LRT 118 LAKE DISTRICT - 66 ST - CLAREVIEW LRT 120 51 AVE LRT - S. INDUSTRIAL - PARSONS INDUSTRIAL LRT _ KASKITAYO TRANSIT CENTRE 122 CAPILANO - SE INDUSTRIAL - 51 AVE LRT 123 BONNIE DOON - SE INDUSTRIAL - 51 AVE LRT NO
CITY LRT ROUTINGS
10 CLAREVIEW - CBD - GOV'T. CENTRE - CP CORRIDOR RIDGEWOOD 11 CASTLEDOWNS TRANSIT CENTRE - CALDER - CBD - GOV'T CENTRE -U OF A FARM
C14
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 2 - MINIMUM LRT NO EXTERNAL BUS ROUTINGS 1 ST. ALBERT - ST. ALBERT TRAIL - 137 AVE LRT 2 ST. ALBERT - ST. ALBERT TRAIL - GROAT RD - U OF A 41 SHERWOOD PARK - CONNORS RD - CBD 42 SHERWOOD PARK - CAPILANO TRANSIT CENTRE 43 SHERWOOD PARK - RIDGEWOOD LRT
C15
TRANSIT-ORIENTED STRATEGY Alternative 2 - Minimum LRT TRANSIT NETWORK CAPITAL COST SUMMARY
COST COMPONENT
COST (in Millions of 1979 $)
LRT Construction
282.1
Vehicles (LRT & Bus)
170.7
Transit Centres
10.4
Others (Plant Facilities & Miscellaneous)
72.8
TOTAL TRANSIT NETWORK CAPITAL COST
536.0
C16
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 3 NO
CITY BUS ROUTINGS
1 JASPER PLACE TRANSIT CENTRE - STONY PLAIN ROAD - 102 AVE JASPER - CBD 2 BEVERLY - STADIUM LRT - JASPER - CBD - 107 AVE LRT 3 WESTMOUNT - 124 ST - 107 AVE - 101 ST - CBD 4 EX.GROUNDS - 115 AVE - 95 ST - CBD 7 JASPER PLACE TRANSIT CENTRE - 156 ST - 107 AVE - 107 AVE LRT - 101 ST - CBD 8 BONNIE DOON - 82 AVE - SCONA LRT - U OF A 9 SOUTHGATE - 109 ST - CBD - 101 ST - KINGSWAY - NAIT 11 ZOO - 142 ST - STONY PLAIN ROAD - CBD 12 LAURIER HEIGHTS - 142 ST - 102 AVE - JASPER - CBD 13 JASPER PLACE TRANSIT CENTRE - STONY PLAIN ROAD - 163 ST - 87 AVE - MEADOWLARK LRT 14 JASPER PLACE TRANSIT CENTRE - STONY PLAIN ROAD - 149 ST 87 AVE - MEADOWLARK LRT 15 JASPER PLACE TRANSIT CENTRE - 167 ST - ELMWOOD - 156 ST MEADOWLARK LRT 16 QUESNELL HEIGHTS - 156 ST - MEADOWLARK LRT - 156 ST JASPER PLACE TRANSIT CENTRE - STONY PLAIN ROAD - CBD 17 JASPER PLACE TRANSIT CENTRE - MAYFIELD - WESTMOUNT - 111 AVE - STADIUM LRT 18 WESTMOUNT - 118 AVE - KINGSWAY - PRINCESS ELIZABETH DR NAIT - 118 AVE - ABBOTTSFIELD 19 NAIT - KINGSWAY - 109 ST - 107 AVE - 116 ST - GROAT RD SASKATCHEWAN DR - 116 ST - U OF A LRT 20 BEVERLY - 121 AVE - 54 ST - 118 AVE - COLISEUM LRT 21
111 AVE LRT - WESTMOUNT - DOVERCOURT - 127 ST - 118 AVE 124 ST - 111 AVE LRT
23 KINGSWAY TRANSIT CENTRE - NAIT - 122 AVE - 82 ST - COLISEUM LRT - 120 AVE - 123 AVE - BEVERLY
C17
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 3 NO
CITY BUS ROUTINGS
24 CALDER - 129 AVE - 97 ST - CBD 25 CALDER - 134 AVE - NORTHGATE - 97 ST - CBD 28 BEVERLY - 114 AVE - 50 ST - 118 AVE - COLISEUM LRT 30 NORTHGATE - 134 AVE - BELVEDERE LRT - 130 AVE - NORTHGATE 32 CLAREVIEW LRT - STEELE HEIGHTS - 144 AVE - 82 AVE COLISEUM LRT 33 CLAREVIEW LRT - STEELE HEIGHTS - LONDONDERRY - DICKINSFIELD - NORTHGATE TRANSIT CENTRE 34 NORTHGATE TRANSIT CENTRE - DICKINSFIELD - LONDONDERRY - 66 ST - BELVEDERE LRT 35 CASTLEDOWNS - NORTHGATE TRANSIT CENTRE - 97 ST - CBD 36 51 AVE LRT - SOUTHGATE - MALMO - LANSDOWNE - GRAND VIEW 114 ST - U OF A LRT 39 WEST JASPER PLACE - WESTGATE LRT 40 51 AVE LRT - SOUTHGATE - LENDRUM - 109 ST - 72 AVE - 114 ST - U OF A AVE - 116 ST - U OF A LRT 41 BELGRAVIA - 76 AVE - 109 ST - CBD - 101 ST - KINGSWAY NAIT 42 PARKALLEN - 109 ST - 76 AVE - 103 ST - 82 AVE LRT 43 SOUTHGATE - 106 ST - 76 AVE - 103 ST - 82 AVE LRT 44 S. OTTEWELL - OTTEWELL RD - 98 AVE - CBD 45 S. OTTEWELL - 86 AVE - 82 AVE - 92 ST - CONNORS RD - CBD 46 U OF A - 82 AVE - 99 ST - CBD 47 51 AVE LRT - SE INDUSTRIAL - ARGYLL - 96 ST - 82 AVE SCONA LRT
-
48 51 AVE LRT - SE INDUSTRIAL - AVONMORE - 85 ST - 95 AVE CONNORS RD - CBD 49 KASKITAYO - DUGGAN - SOUTHGATE - 51 AVE - 51 AVE LRT
C18
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 3 NO
CITY BUS ROUTINGS
50 CAPILANO - GOLD BAR - 106 AVE - CBD 51 CAPILANO - HARDISTY - 101 AVE - 84 ST - 106 AVE - CBD 52 ASPEN - PETROLIA - SOUTHGATE - 51 AVE LRT 53 W. MILLWOODS - GRANT McEWAN LRT - MILLWOODS RD - 51 AVE 54 TERWILLEGAR - 23 AVE - HIGHWAY 2 - 34 AVE LRT 55 CAPILANO - OTTEWELL - 90 AVE - CONNORS RD - CBD 56 RIVERBEND - WHITEMUD - QUESNELL - 149 ST - 149 ST LRT 57 RIVERBEND - WHITEMUD - QUESNELL - 149 ST - 149 ST LRT 58 KING EDWARD PARK - 76 AVE - 92 ST - CONNORS RD - CBD 59 CAPILANO - 101 AVE - 98 AVE - GOV'T CENTRE 61 34 AVE LRT - DUGGAN - SOUTHGATE - 111 ST - 114 ST - U OF A LRT 62 PETROLIA - 111 ST - SOUTHGATE - 51 AVE LRT 63 CBD - DAWSON BRIDGE - 79 ST - 82 AVE - U OF A 65 118 AVE LRT - 127 ST - 132 AVE - NORTHGATE - 132 AVE BELVEDERE LRT - COLISEUM LRT 68 WEST JASPER PLACE - WESTGATE LRT - 178 ST - 95 AVE LOOP 69 KASKITAYO - 119 ST - 122 ST - U OF A LRT 70 HERMITAGE - BELVEDERE LRT 74 CLAREVIEW - CLAREVIEW LRT 75 51 AVE LRT - 104 ST - 63 AVE - BONNIE DOON - CAPILANO COLISEUM LRT 77 CAPILANO - 95 AVE - CONNORS RD - CBD 78 WEST JASPER PLACE - WESTGATE LRT 79 CLAREVIEW - CLAREVIEW LRT 81 W. MILLWOODS - GRANT McEWAN LRT - MILLWOODS RD - 51 AVE LRT
C19
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 3 NO CITY BUS ROUTINGS 88 WEST JASPER PLACE - WESTGATE LRT 89 WESTGATE LRT - WEST JASPER PLACE - STONY PLAIN ROAD JASPER PLACE TRANSIT CENTRE 90 WESTGATE LRT - 170 ST - NW INDUSTRIAL 91 WESTGATE LRT - WEST JASPER PLACE - 95 AVE - 142 ST LAURIER HEIGHTS 92 SCONA LRT - 99 ST - 51 AVE LRT - S. INDUSTRIAL - PARSONS INDUSTRIAL LRT 93 MEADOWLARK LRT - 156 ST - JASPER PLACE TRANSIT CENTRE STONY PLAIN ROAD - 149 ST - 115 AVE - WESTMOUNT - 111 AVE LRT 94 JASPER PLACE TRANSIT CENTRE - 156 ST - NW INDUSTRIAL - 125 AVE - 127 ST - CALDER LRT 95 JASPER PLACE TRANSIT CENTRE - 156 ST - 107 AVE - NW INDUSTRIAL - WESTMOUNT TRANSIT CENTRE - 111 AVE LRT 96 BONAVENTURE INDUSTRIAL - 149 ST - WESTMOUNT TRANSIT CENTRE - 111 AVE LRT 97 WESTGATE LRT - 170 ST - 156 ST - 107 AVE - 178 ST - 118 AVE - 118 AVE LRT 98 KASKITAYO - 34 AVE LRT 99 KASKITAYO - KASKITAYO TRANSIT CENTRE - 34 AVE LRT 102 KASKITAYO - 34 AVE LRT 103 E. MILLWOODS - MILLWOODS LRT - 66 ST - 51 AVE LRT 104 E. MILLWOODS - MILLWOODS LRT - GRANT McEWAN LRT 105 MILLWOODS - MILLWOODS LRT - 66 ST - 51 AVE LRT 106 MILLWOODS LRT - MILLWOODS - 50 ST - CAPILANO TRANSIT CENTRE 107 153 AVE LRT - CASTLEDOWNS - CASTLEDOWNS TRANSIT CENTRE 132 AVE LRT 108 CASTLEDOWNS TRANSIT CENTRE - 97 ST - NORTHGATE - 97 ST CBD
C20
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 3 NO CITY BUS ROUTINGS 109 CASTLEDOWNS - CASTLEDOWNS TRANSIT CENTRE - 132 AVE LRT 114 CLAREVIEW - CLAREVIEW LRT 116 LAKE DISTRICT - 97 ST - NORTHGATE - 97 ST - CBD 117 NORTHGATE - 97 ST - LAKE DISTRICT - 66 ST - BELVEDERE LRT 118 LAKE DISTRICT - 66 ST - CLAREVIEW LRT 120 51 AVE LRT - S. INDUSTRIAL - PARSONS INDUSTRIAL LRT - S. INDUSTRIAL - KASKITAYO TRANSIT CENTRE 122 CAPILANO - SE INDUSTRIAL - 51 AVE LRT 123 BONNIE DOON - SE INDUSTRIAL - 51 AVE LRT NO CITY LRT ROUTINGS 10 CLAREVIEW - CBD - GOV'T. CENTRE - CP CORRIDOR RIDGEWOOD 11 CASTLEDOWNS TRANSIT CENTRE - CALDER - CBD - GOV'T CENTRE -U OF A - 87 AVE - WEST JASPER PLACE TRANSIT CENTRE
C21
TRANSIT-ORIENTED STRATEGY - TRANSIT NETWORK ALTERNATIVE 3 NO
EXTERNAL BUS ROUTINGS
1 ST. ALBERT - ST. ALBERT TRAIL - 137 AVE LRT 2 ST. ALBERT - ST. ALBERT TRAIL - GROAT RD - U OF A LRT 41 SHERWOOD PARK - CONNORS RD - CBD 42 SHERWOOD PARK - CAPILANO TRANSIT CENTRE 43 SHERWOOD PARK - RIDGEWOOD LRT
C22
TRANSIT-ORIENTED STRATEGY Alternative 3 TRANSIT NETWORK CAPITAL COST SUMMARY
COST COMPONENT
COST (in Millions of 1979 $)
LRT Construction
290.1
Vehicles (LRT & Bus)
174.3
Transit Centres
9.1
Others (Plant Facilities & Miscellaneous)
86.5
TOTAL TRANSIT NETWORK CAPITAL COST
560.0
APPENDIX D BALANCED STRATEGY NETWORK LISTINGS
D2
BALANCED Loc. From To
STRATEGY - ROADWAY NETWORK
Construction Activity
Project Cost Included in (1979$ X103 ) Strategy*
82 AVENUE 112 STREET 99 STREET
Implement Tran Manage Plan
1000
98 AVENUE 96ASTREET 80 STREET
Construct Lanes 3 & 4 / 4 Construct Lanes 5 & 6 / 6
4860
99-100 AVE 117 STREET 109 STREET
Construct One Way Couplet
11500
D A
B
MACKINNON 191 STREET 105 STREET
Construct 6 Lane Roadway Construct Interchange
80000
D A
B
106-107 AV 117 STREET 95 STREET
Construct One Way Couplet
1000
106-107 AV 117 STREET STADIUM RD
Construct One Way Couplet
4305
129 AVENUE FORT ROAD 50 STREET
Construct 4 Lane Roadway
CAPILANO 106 AVENUE
Construct Interchange
2500
FORT ROAD 112 AVENUE YELLOWHEAD
Construct Minor Improvemnt
2250
FORT ROAD Widen Road to 6 Lane Roadway YELLOWHEAD Construct Interchange 137 AVENUE
680
14330
A T B
A
B
A T B
Page-total = 122425 Sub-total = 122425 * D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
BALANCED Loc. From To
STRATEGY - ROADWAY NETWORK
Construction Activity
Project Cost Included in (1979$ X103) Strategy*
MANNING FR Widen Road to 6 Lane Roadway 137 AVENUE Construct Interchange 153 AVENUE
14330
A T B
95 STREET 82 AVENUE 112 AVENUE
Construct Bridge Construct Brid Approaches
86370
B
PROJ UNI 2 82 AVENUE 99 AVENUE
Implement Tran Manage Plan Construct Grade Separation Construct Bridge
28500
B
107 STREET 107 AVENUE YELLOWHEAD
Construct Lanes 3 & 4 / 4
4650
T B
109 STREET 103 AVENUE 105 AVENUE
Construct Rlwy Grade Sep.
10000
114 STREET 72 AVENUE UNIV AVE
Construct Lanes 5 & 6 / 6
3000
114 STREET UNIV AVE
Construct Grade Separation
4500
A
B
116-117 ST 99 AVENUE 108 AVENUE
Construct One Way Couplet Construct Rlwy Grade Sep.
9000
D A
B
119 STREET 108 AVENUE KINGAVENUE
Construct Lanes 3 & 4 / 4
3000
D
B
B
D
B
Sub-total for Auto-Restraint Strategy = 285775 TOTAL COST = 285775 + 475710 (BASIC NETWORK COST) = 761485 * D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
D4
BALANCED STRATEGY - TRANSIT NETWORK NO
CITY BUS ROUTINGS
1 JASPER PLACE TRANSIT CENTRE - STONY PLAIN ROAD - 102 AVE JASPER - CBD 2 BEVERLY - 112 AVE - JASPER - CBD - JASPER - 124 ST - 107 AVE LRT 3 WESTMOUNT TRANSIT CENTRE - 114 AVE - 124 ST - 107 AVE - 101 ST - CBD 4 EX. GROUNDS - 115 AVE - 95 ST - CBD 7 JASPER PLACE TRANSIT CENTRE - 156 ST - 107 AVE - 107 AVE LRT - 107 ST - CBD 8 BONNIE DOON - 82 AVE - SCONA LRT - U OF A LOOP 9 SOUTHGATE - 109 ST - CBD - 101 ST - KINGSWAY - NAIT 11 ZOO - 142 ST - STONY PLAIN ROAD - 104 AVE - CBD 12 WEST JASPER PLACE TRANSIT CENTRE - 87 AVE - 142 ST - 95 AVE - MacK BUSWAY - CBD 13 WEST JASPER PLACE TRANSIT CENTRE - 87 AVE - 149 ST MacKINNON BUSWAY - CBD 14 WEST JASPER PLACE - 87 AVE - 163 ST - STONY PLAIN ROAD JASPER PLACE TRANSIT CENTRE - MacKINNON BUSWAY - CBD 15 MEADOWLARK - ELMWOOD - 165 ST - STONY PLAIN ROAD - JASPER PLACE TRANSIT CENTRE - MacKINNON BUSWAY - CBD 16 RIO TERRACE - 156 ST - JASPER PLACE TRANSIT CENTRE MacKINNON BUSWAY - CBD 17 JASPER PLACE TRANSIT CENTRE - MAYFIELD - 110 AVE - 135 ST 111 AVE LRT - 111 AVE - STADIUM LRT 18 WESTMOUNT - 118 AVE LRT - NAIT - 118 AVE - COLISEUM LRT BEVERLY 19 NAIT - 109 ST - 107 AVE - 116 ST - GROAT BRIDGE - U OF A LRT 20 BEVERLY - 121 AVE - 54 ST - 118 AVE - COLISEUM LRT 22 111 AVE LRT - WESTMOUNT - DOVERCOURT - 118 AVE LRT 23 KINGSWAY - NAIT - 122 AVE - COLISEUM LRT - 120 AVE BEVERLY
D5
BALANCED STRATEGY - TRANSIT NETWORK NO
CITY BUS ROUTINGS
24 CALDER - 129 AVE - NW LRT - 97 ST - CBD 25 WELLINGTON - 135 AVE - 132 AVE LRT - NORTHGATE - DELWOOD BELVEDERE LRT 28 BEVERLY - 114 AVE - 50 ST - 118 AVE - COLISEUM LRT 30 BELVEDERE LRT - 130 AVE - 97 ST - CBD 32 CLAREVIEW LRT - STEELE HEIGHTS - 82 ST - STADIUM LRT 33 CLAREVIEW LRT - STEELE HEIGHTS - LONDONDERRY - NORTHGATE - 132 AVE LRT
DICKINSFIELD
34 BELVEDERE LRT - STEELE HEIGHTS - LONDONDERRY - DICKINSFIELD - NORTHGATE - 132 AVE LRT 35 CASTLEDOWNS - CASTLEDOWNS LRT - NORTHGATE 36 SOUTHGATE - GRAND VIEW - 114 ST - WINDSOR PARK - U OF A LRT 38 JASPER PLACE TRANSIT CENTRE - MEADOWLARK - QUESNELL - FOX DR - PARKALLEN LRT 39 WEST JASPER PLACE - QUESNELL - FOX DR - PARKALLEN LRT 40 SOUTHGATE TRANSIT CENTRE 7 LENDRUM - PARKALLEN - U OF A LRT 41 BELGRAVIA - 76 AVE LRT - 76 AVE - 109 ST - CBD - 101 ST KINGSWAY - NAIT 42 PARKALLEN LRT - 109 ST - 76 AVE - 82 AVE LRT 43 SOUTHGATE - 106 ST - 76 AVE - SCONA LRT 44 CAPILANO - OTTEWELL - 98 AVE - 95 ST BRIDGE - CBD 45 OTTEWELL - BONNIE DOON - CONNORS RD - CBD 46 U OF A LRT - SCONA LRT - 99 ST - 98 AVE - 95 ST BRIDGE CBD 47 51 AVE LRT - SE INDUSTRIAL - RITCHIE - 82 AVE LRT 48 51 AVE LRT - AVONMORE - BONNIE DOON - 95 AVE - CONNORS RD CBD 49 34 AVE LRT - DUGGAN - SOUTHGATE - 51 AVE LRT
D6 BALANCED STRATEGY - TRANSIT NETWORK NO CITY BUS ROUTINGS 50 CAPILANO - GOLD BAR - 106 AVE - CBD 51 CAPILANO - HARDISTY - 101 AVE - 84 ST - 106 AVE - CBD 52 SOUTHGATE - ROYAL GARDENS - MALMO LRT 53 W. MILLWOODS - MILLWOODS RD - 51 AVE LRT 54 RIVERBEND - 23 AVE - 119 ST - MALMO LRT 56 RIVERBEND - WHITEMUD - 119 ST - MALMO LRT 57 RIVERBEND - WHITEMUD - 119 ST - MALMO LRT 58 BONNIE DOON - KING EDWARD - 91 ST - CONNORS RD - CBD 59 CAPILANO - 98 AVE - GOV'T CENTRE LRT 61 KASKITAYO TRANSIT CENTRE - DUGGAN - SOUTHGATE - 51 AVE LRT 62 SOUTHGATE - GREENFIELD - MALMO LRT 65 118 AVE LRT - DOVERCOURT - 127 ST - 132 AVE LRT - NORTHGATE - 132 AVE - BELVEDERE LRT - COLISEUM LRT 68 WEST JASPER PLACE TRANSIT CENTRE - WEST JASPER PLACE JASPER PLACE TRANSIT CENTRE - MacKINNON BUSWAY - CBD 69 KASKITAYO TRANSIT CENTRE - KASKITAYO - ASPEN - 119 ST MALMO LRT 70 HERMITAGE - BELVEDERE LRT 74 CLAREVIEW - CLAREVIEW LRT 77 CAPILANO - 95 AVE - CONNORS RD - CBD 78 WEST JASPER PLACE - QUESNELL - FOX DR - PARKALLEN LRT 79 CLAREVIEW - CLAREVIEW LRT 81 W. MILLWOODS - GRANT McEWAN LRT - 51 AVE LRT 88 WEST JASPER PLACE - 100 AVE - JASPER PLACE TRANSIT CENTRE MacKINNON BUSWAY - CBD 89 WEST JASPER PLACE TRANSIT CENTRE - WEST JASPER PLACE - 100 AVE - JASPER PLACE TRANSIT CENTRE - MacKINNON BUSWAY - CBD
BALANCED
NO
STRATEGY - TRANSIT NETWORK
CITY BUS ROUTINGS
91 WEST JASPER PLACE TRANSIT CENTRE - WEST JASPER PLACE - 95 AVE - 149 ST - MacKINNON BUSWAY - CBD 92 SCONA LRT - 99 ST - S. INDUSTRIAL - PARSONS INDUSTRIAL LRT 93 NW INDUSTRIAL - 170 ST - STONY PLAIN ROAD - JASPER PLACE TRANSIT CENTRE 94 132 AVE LRT - 132 AVE - 127 ST - 125 AVE - 156 ST - JASPER PLACE TRANSIT CENTRE 95 JASPER PLACE TRANSIT CENTRE - NW INDUSTRIAL - 111 AVE LRT 96 BONAVENTURE INDUSTRIAL - 142 ST - 111 AVE LRT 97 118 AVE LRT - 118 AVE - 178 AVE - WESTGATE TRANSIT CENTRE 98 KASKITAYO TRANSIT CENTRE - KASKITAYO - 34 AVE LRT 99 KASKITAYO - KASKITAYO TRANSIT CENTRE - 34 AVE LRT 102 KASKITAYO TRANSIT CENTRE - KASKITAYO - 34 AVE LRT 103 E. MILLWOODS - MILLWOODS LRT - 66 ST - 51 AVE LRT 104 RIDGEWOOD LRT - MILLWOODS LRT
- GRANT McEWAN. LRT
105 CENTRAL MILLWOODS - MILLWOODS LRT - 66 ST - 51 AVE LRT 106 MILLWOODS LRT - MILLWOODS - 50 ST - CAPILANO TRANSIT CENTRE 107 CASTLEDOWNS - 132 AVE LRT 108 CASTLEDOWNS - 132 AVE LRT 114 CLAREVIEW - CLAREVIEW LRT 116 LAKE .DISTRICT - 153 ST - CASTLEDOWNS LRT 117 CASTLEDOWNS LRT - 153 AVE - LAKE DISTRICT - 66 ST BELVEDERE LRT 118 LAKE DISTRICT - 66 ST - CLAREVIEW LRT 120 51 AVE LRT - S. INDUSTRIAL - PARSONS INDUSTRIAL LRT KASKITAYO TRANSIT CENTRE 122 CAPILANO TRANSIT CENTRE - SE INDUSTRIAL - 51 AVE LRT
D8 BALANCED NO
STRATEGY - TRANSIT NETWORK
CITY BUS ROUTINGS
123 BONNIE DOON - SE INDUSTRIAL - 51 AVE LRT NO
CITY LRT ROUTINGS
10 CLAREVIEW - CBD - GOV'T CENTRE - OP CORRIDOR - MILLWOODS TRANSIT CENTRE 11 CASTLEDOWNS TRANSIT CENTRE - ROSSLYN - CBD - GOV'T CENTRE U OF A - MALMO
D9 BALANCED STRATEGY - TRANSIT NETWORK NO EXTERNAL BUS ROUTINGS
2 ST. ALBERT - ST. ALBERT TRAIL - GROAT RD - U OF A LRT 3 ST. ALBERT - ST. ALBERT TRAIL - 118 AVE LRT 41 SHERWOOD PARK - CONNORS RD - CBD 42 SHERWOOD PARK - CAPILANO TRANSIT CENTRE - CBD 43 SHERWOOD PARK - MILLWOODS LRT
D10
BALANCED
STRATEGY
TRANSIT NETWORK CAPITAL COST SUMMARY
COST COMPONENT
COST (in Millions of 1979 $)
LRT Construction
271.4
Vehicles (LRT & Bus)
188.6
Transit Centres
4.3
Others (Plant Facilities & Miscallaneous)
68.7
TOTAL TRANSIT NETWORK CAPITAL COST
533.0
APPENDIX E BASIC ROADWAY NETWORK LISTING
E')
BASIC ROADWAY NETWORK Loc. From To
Construction Activity
Project Cost Included in (1979$ X103 ) Strategy*
23 AVENUE TERW DRIVE 142 STREET
Construct Lanes 1 & 2 / 4
890
DATE
23 AVENUE TERW DRIVE 142 STREET
Construct Lanes 3 & 4 / 4
670
DATE
23 AVENUE 142 STREET 119 STREET
Construct Bridge
6000
DATB
23 AVENUE 142 STREET 119 STREET
Construct Lanes 3 & 4 / 4
1500
DATE
23 AVENUE 119 STREET 91 STREET
Construct Lanes 1 & 2 / 4
2720
DATB
23 AVENUE 119 STREET 91 STREET
Construct Lanes 3 & 4 / 4
1640
DATE
23 AVENUE 91 STREET 34 STREET
Construct Lanes 3 & 4 / 4
2650
DATB
23 AVENUE 50 STREET 34 STREET
Construct Lanes 1 & 2 / 4
1000
DATB
34 AVENUE 119 STREET 111 STREET
Construct Lanes 3 & 4 / 4
750
DATB
34 AVENUE 111 STREET CALGARY TR
Construct Lanes 3 & 4 / 4
700
DATB
Page-total = 18520 Sub-total = 18520 * D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
E3
BASIC ROADWAY NETWORK Loc. From To
Construction Activity
Project Cost Included in (1979$ X103 ) Strategy*
34 AVENUE 111 STREET CALGARY TR
Construct Lanes 1 & 2 / 4
1000
DATE
34 AVENUE CALGARY TR 99 STREET
Construct Lanes 3 & 4 / 4
230
DATE
34 AVENUE 99 STREET 91 STREET
Construct Lanes 3 & 4 / 4
570
DATE
34 AVENUE 91 STREET 34 STREET
Construct Lanes 3 & 4 / 4
2250
DATE
34 AVENUE 66 STREET 34 STREET
Construct Lanes 1 & 2 / 4
1800
DATE
WHITEMUD TERW DRIVE
Construct Interchange
7000
DATE
WHITEMUD RAINBOWVAL
Construct Bridge
3270
DATB
WHITEMUD 60 AVENUE
Construct Grade Separation
1000
DATE
WHITEMUD 60 AVENUE 122 STREET
Construct Lanes 5 & 6 / 6
1500
DATE
WHITEMUD 122 STREET
Construct Interchange
10000
DATB
Page-total = 28620 Sub-total = 47140 * D=Default A=Auto-oriented T=Transit-oriented B = Balanced
E4 BASIC ROADWAY NETWORK Project Cost Included in (1979$ X103 ) Strategy*
Loc. From To
Construction Activity
WHITEMUD 122 STREET 34 STREET
Construct Lanes 5 & 6 / 6
10000
DATE
WHITEMUD 111 STREET
Construct Interchange
10000
DATE
WHITEMUD 106 STREET
Construct Grade Separation
5000
DATB
WHITEMUD CALGARY TR
Construct Interchange
10000
DATE
WHITEMUD SELRT
Construct Rlwy Grade Sep.
5000
DATB
WHITEMUD 99 STREET
Construct Grade Separation
5000
DATB
WHITEMUD 91 STREET
Construct Interchange
10000
DATB
WHITEMUD 76 STREET
Construct Grade Separation
5000
DATE
WHITEMUD 66 STREET
Construct Interchange
10000
DATE
WHITEMUD 50 STREET
Construct Interchange
10000
DATB
Page-total = 80000 Sub-total = 127140 * D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
E5 BASIC ROADWAY NETWORK Loc. From To
Construction Activity
WHITEMUD 34 STREET
Construct Interchange
WHITEMUD 99 STREET 91 STREET
Project Cost Included in (1979$ X103 ) Strategy* 10000
DATB
Construct Div 4 Lane Road
1450
DATB
WHITEMUD 91 STREET 75 STREET
Construct Div 4 Lane Road
2400
DATB
WHITEMUD 75 STREET 50 STREET
Construct Div 4 Lane Road
1650
DATB
WHITEMUD 50 STREET 34 STREET
Construct Div 4 Lane Road
1650
DATB
ROPER ROAD - 34 STREET 50 STREET
Construct Lanes 1 & 2 / 4
1000
DATB
ROPER ROAD 75 STREET 50 STREET
Construct Lanes 1 & 2 / 4
1000
DATB
ROPER ROAD 75 STREET 34 STREET
Construct Lanes 3 & 4 / 4
1510
DATB
62 AVENUE 191 STREET 184 STREET
Construct Lanes 1 & 2 / 4
500
DATB
62 AVENUE 191 STREET 178 STREET
Construct Lanes 3 & 4 / 4
620
DATB
Page-total =
21780
Sub-total = 148920 * D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
E6 BASIC ROADWAY NETWORK Loc. From To
Construction Activity
Project Cost Included in (1979$ X103 ) Strategy*
62 AVENUE 184 STREET 178 STREET
Construct Lanes 1 & 2 / 4
915
DATE
62 AVENUE 178 STREET 170 STREET
Construct Div 4 Lane Road
625
DATB
107 AVENUE 184 STREET 178 STREET
Construct 4 Lane Roadway
400
DATE
111 AVENUE 184 STREET 170 STREET
Construct Lanes 1 & 2 / 4
1000
DATE
111 AVENUE 184 STREET 170 STREET
Construct Lanes 3 & 4 / 4
750
DATE
111 AVENUE 170 STREET MAYFIELD
Construct Lanes 3 & 4 / 4
380
DATE
112 AVENUE 97 STREET CAPILANO
Construct Lanes 5 & 6 / 6 Construct Rlwy Grade Sep.
16020
118 AVENUE 184 STREET 170 STREET
Construct 4 Lane Roadway
YELLOWHEAD 178 STREET FORT ROAD YELLOWHEAD 178 STREET FORT ROAD
D A T
830
DATE
Construct Lanes 3 & 4 / 4 Construct Lanes 5 & 6 / 6 Construct Interchange
86400
DATE
Construct Lanes 5 & 6 / 6 Construct Interchange
35000
DATE
Page-total = 142320 Sub- total = 291240 * D=Default A=Auto-oriented T=Transit-oriented B = Balanced
E7 BASIC ROADWAY NETWORK Loc. From To
Construction Activity
YELLOWHEAD 66 STREET BEVERLY BR
Construct Lanes 5 & 6 / 6
2950
DATE
YELLOWHEAD CLOVE REAR
Construct 3 Lane Roadway
2500
DATE
137 AVENUE 58 STREET 50 STREET
Construct 4 Lane Roadway
1900
DATB
137 AVENUE 50 STREET VICT TRAIL
Construct Lanes 3 & 4 / 4
880
DATE
153 AVENUE 127 STREET 121 STREET
Construct Lanes 1 & 2 / 4
440
DATE
153 AVENUE 127 STREET 121 STREET
Construct Lanes 3 & 4 / 4
330
DATE
153 AVENUE 121 STREET 113ASTREET
Construct Lanes 3 & 4 / 4
450
DATE
153 AVENUE 113ASTREET VICT TRAIL
Construct Lanes 1 & 2 / 4
6000
DATB
153 AVENUE 113ASTREET VICT TRAIL
Construct Lanes 3 & 4 / 4
4500
DATE
CAST ROAD 153 AVENUE 97 STREET
Construct Lanes 3 & 4 / 4
1350
DATE
Project Cost Included in (1979$ X103 ) Strategy*
Page-total = 21300 Sub-total = 212540 * D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
E8 BASIC ROADWAY NETWORK Loc. From To
Construction Activity
167 AVENUE 97 STREET 50 STREET
Construct Lanes 1 & 2 / 4
3000
DATE
VICT TRAIL 125 AVENUE 153 AVENUE
Construct Bridge Construct Rlwy Grade Sep. Construct 4 Lane Roadway
10375
DATE
34 STREET 06 AVENUE 92 AVENUE
Construct Lanes 1 & 2 / 4
6500
DATE
34 STREET 06 AVENUE 92 AVENUE
Construct Lanes 3 & 4 / 4
4875
DATB
50 STREET 06 AVENUE 12 AVENUE
Construct Lanes 1 & 2 / 4
570
DATE
50 STREET 06 AVENUE 12 AVENUE
Construct Lanes 3 & 4 / 4
430
DATB
50 STREET 12 AVENUE 23 AVENUE
Construct Lanes 3 & 4 / 4
710
DATE
50 STREET 23 AVENUE 76 AVENUE
Construct Lanes 1 & 2 / 4
4000
DATE
50 STREET 23 AVENUE 34 AVENUE
Construct Lanes 3 & 4 / 4
600
DATE
50 STREET 34 AVENUE WHITEMUD
Construct Lanes 3 & 4 / 4
1025
DATD
Project Cost Included in (1979$ X103 ) Strategy*
Page-total = 32085 Sub-total = 344625 * D=Default A=Auto-oriented T=Transit-oriented B = Balanced
E9 BASIC ROADWAY NETWORK Loc. From To
Construction Activity
Project Cost Included in (1979$ X103 ) Strategy*
50 STREET WHITEMUD 76 AVENUE
Construct Lanes 3 & 4 / 4
3115
DATB
50 STREET YELLOWHEAD
Construct Rlwy Grade Sep. Construct Interchange
5000
DATB
50 STREET 125 AVENUE 137 AVENUE
Construct Lanes 3 & 4 / 4
920
DATB
50 STREET 137 AVENUE 144 AVENUE
Construct Lanes 1 & 2 / 4
570
DATB
50 STREET MANNING FR 144 AVENUE
Construct Lanes 3 & 4 / 4
430
DATB
50 STREET 144 AVENUE 153 AVENUE
Construct Lanes 3 & 4 / 4
430
D A T. B
50 STREET 153 AVENUE 167 AVENUE
Construct Lanes 1 & 2 / 4
1000
DATB
66 STREET 06 AVENUE 12 AVENUE
Construct Lanes 1 & 2 / 4
570
DATE
66 STREET 12 AVENUE 16 AVENUE
Construct Lanes 1 & 2 / 4
340
DATB
66 STREET 12 AVENUE 34 AVENUE
Construct Lanes 3 & 4 / 4
1000
DATB
Page-total = 13375 Sub-total = 358000 * D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
El0
BASIC ROADWAY NETWORK Loc. From To
Construction Activity
Project Cost Included in (1979$ X103 ) Strategy*
66 STREET 34 AVENUE 38 AVENUE
Construct Lanes 3 & 4 / 4
645
DATB
66 STREET 38 AVENUE WHITEMUD
Construct Lanes 3 & 4 / 4
615
DATB
66 STREET 120 AVENUE FORT ROAD
Construct Lanes 5 & 6 / 6 Construct Rlwy Grade Sep.
15900
DATB
66 STREET 149 AVENUE 153 AVENUE
Construct Lanes 1 & 2 / 4
280
DATB
66 STREET 149 AVENUE 153 AVENUE
Construct Lanes 3 & 4 / 4
210
DATB
66 STREET 153 AVENUE 167 AVENUE
Construct Lanes 1 & 2 / 4
1000
DATB
75 STREET WHITEMUD ROPER ROAD
Construct Lanes 3 & 4 / 4
440
DATB
CAPILANO 118 AVENUE YELLOWHEAD
Construct 6 Lane Roadway Construct Rlwy Grade Sep. Construct Interchange
15750
DATB
82 STREET 149 AVENUE 153 AVENUE
Construct Lanes 1 & 2 / 4
280
DATB
82 STREET 149 AVENUE 153 AVENUE
Construct Lanes 3 & 4 / 4
210
DATB
Page-total = 35330 Sub-total = 393330 * D=Default A=Auto-oriented T=Transit-oriented B = Balanced
Eli BASIC ROADWAY NETWORK Loc. From To
Construction Activity
Project Cost Included in (1979$ X103 ) Strategy*
82 STREET 153 AVENUE 167 AVENUE
Construct Lanes 1 & 2 / 4
1000
DATB
91 STREET 06 AVENUE 23 AVENUE
Construct Lanes 1 & 2 / 4
1160
DATB
91 STREET 06 AVENUE 23 AVENUE
Construct Lanes 3 & 4 / 4
900
DATB
91 STREET 23 AVENUE MILL ROAD
Construct Lanes 3 & 4 / 4
1315
DATB
91 STREET MILL ROAD 63 AVENUE
Construct Lanes 3 & 4 / 4
1175
DATB
97 STREET Construct One Way Couplet JASPER AVEWiden Road to 6 Lane Roadway YELLOWHEAD
9020
DATB
97 STREET 127 AVENUE 135 AVENUE
Construct Lanes 5 & 6 / 6
2700
DATB
97 STREET 137 AVENUE
Construct Square About
2500
DATB
CALGTRA 23 AVENUE 34 AVENUE
Construct One Way Couplet
4090
DATB
CALGARY TR 23 AVENUE
Construct Interchange
12000
D A T 3
Page-total = 35860 Sub-total
429190
* D=Default A=Auto-oriented T.Transit-oriented
B = Balanced
E12 BASIC ROADWAY NETWORK Project Cost Included in (1979$ X103 ) Strategy*
Loc. From To
Construction Activity
CALGTRA 34 AVENUE 51 AVENUE
Construct One Way Couplet
4090
DATE
PROJ UNI 1 82 AVENUE 99 AVENUE
Implement Tran Manage Plan Improve Intersection Implement One Way System
3200
DATE
111 STREET 18 AVENUE SADDLEBACK
Construct Lanes 1 & 2 / 4
870
DATE
111 STREET 23 AVENUE SADDLEBACK
Construct Lanes 3 & 4 / 4
540
DATE
111 STREET SADDLEBACK 36 AVENUE
Construct Lanes 3 & 4 / 4
410
DATB
113ASTREET 137 AVENUE 153 AVENUE
Construct Lanes 3 & 4 / 4
750
DATE
119 STREET 23 AVENUE 34 AVENUE
Construct Lanes 3 & 4 / 4
810
DATE
127 STREET 137 AVENUE 153 AVENUE
Construct Lanes 1 & 2 / 4
1000
DATE
127 STREET 137 AVENUE 153 AVENUE
Construct Lanes 3 & 4 / 4
750
DATE
142 STREET 23 AVENUE TERW DRIVE
Construct Lanes 1 & 2 / 4
1330
DATB
Page-total = 13750 Sub-total = 442940 * D=Default A=Auto-oriented T=Transit-oriented
B = Balanced
E13 BASIC ROADWAY NETWORK Loc. From To
Construction Activity
142 STREET 23 AVENUE TERW DRIVE
Construct Lanes 3 & 4 / 4
142 STREET WHITEMUD WHITEMUD QUESNELL
Project Cost Included in (1979$ X103 ) Strategy* 990
DATB
Construct Interchange
4200
DATB
Widen Road to 6 Lane Roadway
3000
DATB
TERW DRIVE 23 AVENUE 45 AVENUE
Construct Lanes 1 & 2 / 4
1890
DATB
TERW DRIVE 23 AVENUE 45 AVENUE
Construct Lanes 3 & 4 / 4
1420
DATB
149 STREET 118 AVENUE 125 AVENUE
Construct Lanes 3 & 4 / 4
570
DATB
149 STREET 125 AVENUE 137 AVENUE
Construct 4 Lane Roadway
2250
DATB
170 STREET 62 AVENUE 69 AVENUE
Construct Lanes 1 & 2 / 4
490
DATB
170 STREET 62 AVENUE 79 AVENUE
Construct Lanes 3 & 4 / 4
750
DATB
170 STREET 79 AVENUE 98 AVENUE
Construct Lanes 5 & 6 / 6
890
DATB
Page-total = 16450 Sub-total = 459390 * D=Default A=Auto-oriented T=Transit-oriented B = Balanced
E14
BASIC ROADWAY NETWORK Loc. From To
Construction Activity
170 STREET 98 AVENUE 107 AVENUE
Construct Lanes 5 & 6 / 6
1100
DATE
170 STREET 79 AVENUE
Construct interchange
6000
DATE
170 STREET 92 AVENUE 118 AVENUE
Construct Div 4 Lane Road
4230
DATE
170 STREET 107 AVENUE 118 AVENUE
Construct Lanes 5 & 6 / 6
1000
DATE
178 STREET 100 AVENUE 101 AVENUE
Construct 4 Lane Roadway
490
DATE
184 STREET 101 AVENUE 118 AVENUE
Construct Lanes 1 & 2! 4
2000
DATE
184 STREET 101 AVENUE 118 AVENUE
Construct Lanes 3 & 4 / 4
1500
DATE
Project Cost Included in (1979$ X103 ) Strategy*
Page-total =
16320
TOTAL COST FOR BASIC NETWORK = 475710 * D=Default A=Auto-oriented T=Transit-oriented
B
= Balanced