Afiq Khan's Architecture Work Portfolio '19-'22

Page 1

MOHAMADAFIQ-KHAN ARCHITECTURE SelectedWorks Acompendiumofworksfrom2019-2022
Acompendiumofworksfrom2019-2022
Tableofcontent:Profile. 01Personal CV. 01.Education 02.WorkingExperiences 03.Participation 04Language 05SoftwareProficientcy 06PersonalStrength/Interest OfficeWorks. 01.PulauMerantiMixedDevelopment 02.SurauJame’Al-Furqan 03.iMedikelPharmafactory 04Ling’sBungalow 05Dato’IrDrFikri’sBungalow 06TTK’sBungalow 07MARABizbox 08Dato’Salleh’sBungalow 09Mardiana’sBungalow 10.CLQJayaGrocer 11.TBTerrace 12.LangkawiInternationalAirport 13.TheDataiResort OtherWorks. 01UiTMStaircases 02CLQHardrivePileSdnBhd 03MrJack’sBungalow 04.CafeMuseumPDRM 05.Khai’sBungalow 06.Izhar’sBungalow 07InteractiveClockTower 08Tower88Gurney 09PSDMCafeteria
Ar.
WorkedasanArchitectforseveralarchitecturalfirms anddesignstudioforthreeyearsPastprojectsscale rangingfromsmalltomediumwithvariousbuilding categoryandtypology.Theseexperienceshas strengthenmyselfinpursuingmorerounded approachtoarchitecture,andmorespecificallyon enhancingthequalityoflife Overseeingandliaisingwithconsultantfromdesign stagetoconstructiondocumentationtocompletion GraduatedfromUniversitiTeknologiMARA,witha MasterofArchitecturequalificationwithmorethan9 years 'experiencelearningaboutarchitectural discourseandtheories,workingwitharchitectural technicaldrawings;designpresentation,3D modellingrenderingandproduction,plusmastering relatedsoftwarewithinthefields,revolvesaround mynotiontowardsfindingabetterarchitecture solutions Therelentlesspursuitinlearningandkeepingupto datewiththecurrenttrendsisduetomypassionin buildingandmakingachangeinmypersonallifeand others.Hence,theinevitablenextstepisworkingup mycareerinarchitecturethatleantowardsproviding abetterdesignundertakingsforeveryoneTherefore, Iamexcitedandlookingforwardtocontributemy personalpointofviewintotheintricaciesand diversityofthiscreativefields

OfficeWorks.

01.PulauMerantiMixedDevelopment 2022-CD,CA

02SurauJame’Al-Furqan 2022-DD,CD

03iMedikelPharmafactory 2021-DD,CD

04Ling’sBungalow 2021-DD,CD,CA

05Dato’IrDrFikri’sBungalow 2021-SD,DD

06.TTK’sBungalow 2021-SD,DD

07.MARABizbox 2021-FC

08Dato’Salleh’sBungalow 2021-FC

09Mardiana’sBungalow 2021-FC

10CLQJayaGrocer 2021-DD

11TBTerrace 2022-SD,DD

12.LangkawiInternationalAirport 2018-SD,DD

13.TheDataiResort 2017-CD,CA

14.TNBQuaters 2016-DD,CD

PulauMerantiMixedDevelopment Sepang,Selangor

Client: SelamanSdnBhd

Phase: CD-ContractDocumentation CA-ContractAdministration.

Status: 2022-present.

Astrataschemedevelopmentona136 acreslandthatconsistof2phaseswhich includeshopoffices,terracehouse& townhouseInvolvementduringthe constructionstage.Preparingthe admendmentbuildingplaninorderto proceedwithscheduleofparcels.Replying RFIsfromthecontractorsandcheckingthe progressbillingaccordancetothesite progress

Aerialviewofthe PulauMeranti Development. SitePlanofPulau MerantiDevelopment Projectinfo:Phase1 1)GuardShoplots(24units) 2)ManagementOffice 3)RetentionPond 4)SewageTreatmentPlant Phase2 1)TerraceHouse(68units) 2)Townhouse(148units) 3)CommunityHall(1unit) 4)ManagementOffice(1unit) 5)GuardHouse(1unit) 6)Playground(1unit)

SurauJame’Al-Furqan Selayang,Selangor

Client: JabatanAgamaIslamSelangor

Phase: SD-SchematicDesign DD-DesignDevelopment. CD-ContractDocumentation. Status: 2022-present

Consistof2storeywithsupporting programsuchasrowsofcommerciallots Theprayerhallconsistof2levelsand doublevolumatricexperience.Mostofthe envelopeareusingventilationblockto maximizepassivedesignandopenness. Responsiblefromthedesigndevelopment phaseandtenderdocumentationphase

Perspectiveviewofthe mainentrance.

Multipleentranceto thebuildingensuring goodcirculation. Naturallightinginto themainprayerhall Doublevolume experienceatprayer hall.

iMedikelPharmafactory

KotaBharu,Kelantan.

Client: iMedikelPharmaceuticalSdn.Bhd.

Phase: CD-ContractDocumentation

Status: 2021-present

iMedikelPharmafactoryisanindustrial developmentprojectlocatedatPengkalan Chepa,KataBharu,Kelantan.Itisablockof 3storeyofficesandanotherblockconsist of4storeywarehousealongwithsupport programmeascanteen,musallahandetc Thelandareais6,831sqmandtheoverall built-upareais5,660sqm

Responsibleforthetenderingphasewhere Iindividuallyworksonthetenderdrawings, bombarequirementsandcoordination meetings.

Frontfacadeimplement islamicpattern‘kuffi’where locatedtheofficesand managementblock

+SitePlan|nts
SitePlan nts

RoofPlan nts

+RoofPlan|nts +FirstFloorPlan|nts

FirstFloorPlan nts GroundFloorPlan nts

+GroundFloorPlan|nts

+SectionX-X|nts +SectionY-Y|nts +SouthElev|nts +WestElev|nts SectionX-X nts SectionY-Y nts SouthElev nts WestElev. nts

Ling’sBungalow Puchong,Selangor

Client: LingHuaHoon&ChongSongHaw

Phase: DD-DesignDevelopment CD-ContractDocumentation. CA-ContractAdministration. Status: 2021-present

TheLing'sBungalowisaprivateresidentialprojectlocatedatBandarKinrara, Puchong,SelangorItisa3storeyresidenceThelocationisstrategicallyat theendcornerofabunglowlotdevelopmentandthetotallandareais 13,393sqfandtheoverallbuilt-upareais7,624sqf.

Extensivelyhandlingtheprojectduringtheconstructionphaseincluding,site meeting,inspections,replyingRFIsandadditionaldesignworksbythe clients.

+SecondFloorPlan|nts

SecondFloorPlan nts

+GroundFloorPlan|nts

+RoofPlan|nts

RoofPlan nts

+FirstFloorPlan|nts

GroundFloorPlan nts FirstFloorPlan nts

+FrontElev|nts +RearElev|nts +SideElev|nts FrontElev nts RearElev. nts SideElev nts

Dato’Ir.Dr.Fikri’sBungalow Bangsar,KualaLumpur

Client: Dato’IrDrFikriHussein

Phase: SD-SchematicDesign DD-DesignDevelopment.

Status: 2022-present.

PantaiBungalowisaprivateresidential projectlocatedatBangsar,KualaLumpur Itisa2storeybungalowStrategically locatedatthepeakofBukitPantaiandthe totallandareais9,854sqfandtheoverall built-upareais11,955sqf. Theconceptofamoderntropicalenhance thesitemulti-levelslopingproperties. Client'sintentiontohaveagoodinteraction withfamilyandusinglowmaintenance materialandsecureconstructionmethod

Theconceptofmodern tropicalsuitthesite contextand complimentthe characteristicofthesite

Theconceptofmodern tropicalsuitthesite contextand complimentthe characteristicofthesite

TTK’sBungalow SubangJaya,Selangor

Client: Dato’SriTingTaiKee

Phase: SD-SchematicDesign DD-DesignDevelopment.

Status: 2022-present.

TheTTK’sBungalowisaprivateresidential projectlocatedatUSJ16,SubangJaya, SelangorItisavolumatic2storey residenceThetotallandareais8,998sqf andtheoverallbuilt-upareais7,838sqf. Clientintentionofamoderncontemporary andensuringgoodinternalvolumatric quality.Oneofthechallengeofthisproject isthatthelandusagethatclientobtainis PublicSpace

FirstFloorPlan nts

nts

GroundFloorPlan

Bangi,Selangor

Client: MajlisAmanahRakyat

Phase: FC-FinalCompletion

Status: 2022-present.

MARABizboxisamediumscalecommercialprojectin PekanBangiWithtotalof7,030sqf,themodular containersystembuildingprovide13unitsofshopsfor thesmallmediumenterprisecompany Involvinginthefinalcompletionphasewhichhandling theCCCinspections.Oneoftheissue(s)isthecompact substationwasbuiltoutsidefromthesiteboundaryby thepreviouscontractor.

MARABizBoxCommercialPlaza

Perspectiveviewof frontfacade.

Salleh’sBungalow Bangi,Selangor

Client: Dato’SallehSaidin

Phase: FC-FinalCompletion

Status: 2021-present.

Theprivateresidentialprojectlocatedat MutiaraBangi,BandarBaruBangi,Selangor Itisa2storeybungalowona15,370sqf landandtheoverallbuilt-upareais7,560 sqf

Assistingonobtainingtheapproveletter fromMPKJonissuerelateddepartment suchasJKKonthereatainingworksand more.

RoofPlan nts FirstFloorPlan nts

nts

GroundFloorPlan
nts
nts
nts
nts
RearElev
FrontElev
SectionX-X
SideElev

Mardiana’sBungalow Bangi,Selangor

Client: MardianaMohamed

Phase: FC-FinalCompletion

Status: 2021-present. Theprivateresidentialprojecttookplace onanemptylotinSeksyen8,BangiThe2 storeyresidenceweredesignedona4,200 sqflandwithbuilt-upareaof1,630sqf InviolvementduringtheCCCinspectionby theMPKJ.

CLQJayaGrocer

PetalingJaya,Selangor

Client: TrendcellSdnBhd

Phase: DD-DesignDevelopment

Status: 2022-present. Arenovationprojectfromanexistingblock of2storeywelfarebuidingconvertingto CentralizedLabourQuatersforJayaGrocer workers

Thetotalareaofthebuildingis7,472sqf andthekeyissuetoconsiderinthisproject istomaximizethenaturalventilationthat promotegoodairquality.

KualaLangat,Selangor

Client: AngKangWei

Phase: SD-SchematicDesign DD-DesignDevelopment. Status: 2022-present.

Theprivateresidentialprojectlocatedataterrace housingdevelopmentwheretheowner’sintention todesignaSuperlinkhousebycombiningan intermidiateunitwithhiscornerunit Itismyfirstprojectentrustedtometohandlefrom thebeginningofappointmentbythecompany. Personallyworkontheschematicdesignuntilthe submissionofbuildingplan.

TBTerrace

LangkawiInternationalAirport Langkawi,Kedah

Client: MalaysiaAirlinesHoldingsBhd

Phase: SD-SchematicDesign DD-DesignDevelopment. FC-FinalCompletion. Status: 2019-2020

Theextensionofthemainairportsonboth kerbsideandairsidetookplaceinPadang MatsiratThemainconsiderationdesigning anairportiscirculation.Itiscrucialand criticalinordertoachievedsuchlevelof efficiency.Extensivelyinvolvedinthe wayfindingaspectofthewholedesign layoutandminordesigningworksof certainarea,hardscaping,landscaping AssistingonGformscompilations

TheDataiResort

Langkawi,Kedah

Client: TheDataiResort

Phase: CD-ContractDocumentation CA-ContractAdministration. Status: 2017-2019.

Theinteriordesignmaincontractorofa6 starresorttookplaceatthetopendof PulauLangkawiWhileworkingwiththe contractorIgotstationedon-siteworking assitesupervisorandalsoextensively producingshopdrawingsofthefurnitures, bathroomequipmentsandalsomain drawingsforsetting-outworks.

Practicingarchitecturehastaughtmetocontinuously learnnewthingsasImovefromoneprojectto anotherIamfullyinvolvedindeveloping architecturaldesignfromresearchtorealisingthem

Recently,Ihavechallengedmyselftobemore experimentalandpushinglimits,focusingonuser experience(s)inamicroscalewithmacroimpactto society

Mymultidisciplinarydesignexperienceshas termendouslyenhancedmycareeraswellasmaking meabettercreativeindividual “

-AfiqKhan,2022

OtherWorks.

01UiTMStaircases 2022-SD,DD,CD,CA

02CLQHardrivePileSdnBhd 2022-DD

03MrJack’sBungalow 2022-FC

04.CafeMuseumPDRM 2022-SD

05.Khai’sBungalow 2022-SD

06Izhar’sBungalow 2022-SD

07InteractiveClockTower 2022-SD

08Tower88Gurney 2022-SD

09PSDMCafeteria 2022-SD

10.ClinWasteFactory 2019-SD MasterStudies.

02MARS:TrainingTransitFacilities 2019-CorporateTowerStudio

03.SuperNature 2019-UrbanDesignStudio

01BlindEntertainmentAcademy 2020-MasterThesis

UiTMStaircases

ShahAlam,Selangor

Client: UiTMShahAlam

Phase: SD-SchematicDesign DD-DesignDevelopment. CD-ContractDocumentation. CA-ContractAdministration.

Status: 2022-present

ThestaircasesworktookplaceattheAnexxebuildingand FSKMfacultybuildingwherethedismantlingofexistingbridge andproposenewstaircases.Oneofthestaircaseislocatedon aslopingsitewithretainingwallwhiletheotherisadjescentto thebuildingwhichwilllandonaslopingpedestrianwalkway. Thedesignintentionistodesignafastconstructionmethodby usinglessmaintenanceandlonglastingmaterials

Mr.Jack’sBungalow Puchong,Selangor

Client: TiewKiaBoon

Phase: FC-FinalCompletion

Status: 2022-present.

ThetasktofinishthecccstageofthehouseTheclientneeds tocomplycomment(s)fromtheMBSJ-tosubmitamendment ofapprovedbuildingplanduetosomediscrepancies

BukitAman,KualaLumpur

Client: PolisDi-RajaMalaysia

Phase: SD-SchematicDesign

Status: 2022-present. Thecontractorappointedanarchitectto designtheoutdoorcafeareaThecafeto accomodate25paxofcustomersand needstofollowtherequirementsandBQ givenbythemanagement

CafeMuseumPDRM

Khai’sBungalow

AdmiralCove,NSembilan

Client: MrKhai

Phase: SD-SchematicDesign

Status: 2022-present. TheclienthasaresidentiallotatAdmiral Covehousingdevelopmentwhichis locatedbythebeachThevistasofthe beachwererequestedbytheownerby havingalargecurtainwallingfromground floortoroofbeamlevelcapturingthe sceneryofthesurrounding.

Izhar’sBungalow

AdmiralCove,NSembilan

Client: IrIzhar

Phase: SD-SchematicDesign

Status: 2022-present. Theclientwanttodesignahousewherehe candohisAirBnBbusinessandalsotreat ashisretreathousewherehecangojetskiingduringtheweekend Theideaofslopingwindowtocreatea dynamic,eye-catchingfacadetothe property.

Georgetown,PPinang

Client: KTCArkzGroupSdnBhd

Phase: SD-SchematicDesign

Status: 2021-present. Thedeveloperappointedmetoproposeanon-typicalclock toweractingasoneofthecatalysttothewhole88Acres development Theideaofinteractiveclocktowerbyproposingtheuseof ledlightingthatcanchangeinaccordancetocertaineventsor alsoasacommercialtoolsthatwillgainR.O.I.tothedeveloper. Programthatarefilledsuchasdininginthesky,viewingdeck andfewoffices.

InteractiveClockTower

Gurney88Tower Georgetown,PPinang

Client: KTCArkzGroupSdnBhd

Phase: SD-SchematicDesign Status: 2021-present. Thedeveloperappointedmetoproposea high-risebuildingwithcommercialusage Theideaofhavingaheritageconceptof shoppingmallatthebottomofthetowerto enliventheUNESCOcitycharacteristicThe globeatthetipofthetowerconceptualize alighthousesincethelocationona reclaimlandandalsoservingasalighting ballthatguidetheships.

ClinWasteFactory TelukPanglimaGarang,Selangor
Client: Medilaund(M)SdnBhd Phase: SD-SchematicDesign Status: 2019-2022. Theclientwanttobuldnewfacilitiesfor linenandlaundryoperationThefactory consistofoffices,cafeteria,loadinghubs, factoriesandincenerator
MohamadAfiq-Khan LAMPart2Architect. Entrepreneur. Address 47820,DamansaraPerdana Selangor,Malaysia Contact +6019.297.2095 afiqkhanstudio@gmail.com

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.