OWNER
Cap
Secondary Mullion 10 cm Filler Box
Glass 6mm
PROJECT
Main Mullion 15 cm
Sealent and Backer
Y-frame Supports the whole mechanism
Rubber
Plaster 2 cm
Brick Wall 25 cm Concrete Slab 20 cm
Sealent and Backer
Main Mullion 15 cm
Cap
Main Mullion 15 cm Support Mullion
Secondary Mullion 10 cm Cap
STRUCTURE CONSULTANT
Fabric Mesh frame (PTFE Coated Fibre Glass): Infill material
Glass 6mm
3
SCALE-1:5
Node pin Pins to star connection
Secondary Mullion 10 cm
Rubber
GROUND.FLOOR.SLAB
MAIN CONSULTANT
Slider Allows tripod to travel along the Y-frame
Filler box
Plaster 2 cm
Glass 6mm
CONSULTANTS
Mobile Tripod (Aluminum) Supports the Fabric frame
Concrete Beam
1
Fabric Mesh Frame Aluminum
PARAPET.SLAB SCALE-1:5
Hollow section Steel frame - Main Structure Strut-Bracket Connects to main structure
5
STAR.CONNECTION SCALE-1:5
Cantilever-Strut Hooks on the selve
MEP CONSULTANT
Star Connection Receives the Y-Frame ends
Steel plate welded to the frame
Rubber
ROADS CONSULTANT
Concrete Slab 20 cm
Brick wall 25 cm
LANDSCAPE CONSULTANT
Cantilever-Strut Hooks on the selve
2
INTERMEDIATE.SLAB
4
SCALE-1:5
LOUVERS.CONNECTION.TO.FRAME SCALE-1:5 KEY PLAN
SCHEDULES
MARK
DATE
DESCRIPTION
ISSUE: PROJECT NO: CAD DWG FILE: DRAWN BY:AHMED EL ATTAR
CHECKED BY:
BUILDING NAME: A-501