OWNER

Cap

Secondary Mullion 10 cm Filler Box

Glass 6mm

PROJECT

Main Mullion 15 cm

Sealent and Backer

Y-frame Supports the whole mechanism

Rubber

Plaster 2 cm

Brick Wall 25 cm Concrete Slab 20 cm

Sealent and Backer

Main Mullion 15 cm

Cap

Main Mullion 15 cm Support Mullion

Secondary Mullion 10 cm Cap

STRUCTURE CONSULTANT

Fabric Mesh frame (PTFE Coated Fibre Glass): Infill material

Glass 6mm

3

SCALE-1:5

Node pin Pins to star connection

Secondary Mullion 10 cm

Rubber

GROUND.FLOOR.SLAB

MAIN CONSULTANT

Slider Allows tripod to travel along the Y-frame

Filler box

Plaster 2 cm

Glass 6mm

CONSULTANTS

Mobile Tripod (Aluminum) Supports the Fabric frame

Concrete Beam

1

Fabric Mesh Frame Aluminum

PARAPET.SLAB SCALE-1:5

Hollow section Steel frame - Main Structure Strut-Bracket Connects to main structure

5

STAR.CONNECTION SCALE-1:5

Cantilever-Strut Hooks on the selve

MEP CONSULTANT

Star Connection Receives the Y-Frame ends

Steel plate welded to the frame

Rubber

ROADS CONSULTANT

Concrete Slab 20 cm

Brick wall 25 cm

LANDSCAPE CONSULTANT

Cantilever-Strut Hooks on the selve

2

INTERMEDIATE.SLAB

4

SCALE-1:5

LOUVERS.CONNECTION.TO.FRAME SCALE-1:5 KEY PLAN

SCHEDULES

MARK

DATE

DESCRIPTION

ISSUE: PROJECT NO: CAD DWG FILE: DRAWN BY:AHMED EL ATTAR

CHECKED BY:

BUILDING NAME: A-501