Technical Architecture Portfolio

Page 1

AHMED ZAKI

Architecture WORKING DRAWINGS


PROFINAL PROJECTS BIN GHANNAM ECO-LOGE RESORT ( QATAR) BAB EL NJOOM HYDRAT RESORT ( UAE ) MARSANA RESORT ( UAE ) ALEXANDRIA METRO ( EGY) HEGRA BOUTIQUE HOTEL (KSA)

AHMED ZAKI PROJECT ARCHITECT | MSA University | Class 2021

GPA CUMULATIVE : 3.77 Honor List From genral “Excellent With Honors “

Graduation Project : Project (Grade = A )

A

PROGRAMS Autocad, 3dmax, Corona render, Revit,Lumion, Rhino, Grasshoper, indesign, Shetchup, Twinmotion, Photoshop, illustrator,Office

ACHIEVEMENTS MSA Star By Dr Nawal (2019) Student Training Committee Architecture Coordinator

CONTACT

Grand Egyptian Museum Trip Organizer

Tel : 0021025580944 E-mail : ahmed.mohamedzaki@dar.com E-mail : amadozaki77@gmail IG : amadozakiii

Barjeel Museum Competition

Honorable Mention( International Competition)

The Social Housing In Saint-Denis For Different Cultures Saint-Gobain 3rd Winner (National)


T Tower Project

V Villa Project


ARCHITECTURE

ARCHITECTURAL SYMBOLS & ABBREVIATIONS

D101 Drawings Table and Symbols D102 D103

D200 D201 D202 D203 D300

D400 D500 A100 A101 A110 A120 A130 A140 A150 A160 A170 A200 A300

Door & Window Schedules Finish Schedule

Typical Details Canopy Details Flooring Details Curtain Wall Details

Stair Details Bathroom Details Wall Section Site Plan Landscape Basement Floor Plan Ground Floor Plan First Floor Plan Roof Of podium Floor Plan Typical Floor Plan Roof plan Reflected Ceiling Plan, Ground Floor Section A North Elevation

GRAPHIC SYMBOLS BEDROOM

NORTH OR MAKKAH DIRECTION INDICATOR

1

GRID

A

GRID (PERPENDICULAR)

Working Drawings IV (ASE552)

MATERIAL INDICATION 1

ROOM 0-0000

ROOM NUMBERING SYSTEM ROOM NAME ROOM NUMBER

NAME :

EARTH

WOOD

AHMED ZAKI

175057

ID :

PROJECT NAME:

DRAWING NUMBERING SYSTEM DISCIPLINE BUILDING NUMBER

SAND OR PLASTER

CARPET

REINFORCED CONCRETE

GLASS

TOWER PROJECT

ELEVATION NUMBER

B

A

RAMP NOTATION

0

ASTART OF SLOPE BEND OF SLOPE & DIRECTION UP.

DRAWING NAME : Drawings Table and Symbols

ELEVATION SCALE 1:100 SCALE OF ELEVATION

STAIR NOTATION

SECTION NUMBER

START OF STAIR

00.000 F.F.L.

10 A2-004

B.S.S.

00.000 T.S.S.

DRAWING NUMBER

FINISHED FLOOR LEVEL

T.O.P.

10 A2-004

P.F.L.

00.000 W.F.L.

00.000 T.S.L.

00.000 S.C.L.

ARTIFICIAL STONE MORTER

WATERPROOFING MEMBRANE

BRICK WALL 25 CM OR 12 CM

RIGID THERMAL INSULATION

TERRACE FLOOR

CERAMIC TILES

COLORED ROOF CLAY TILES

WALL SECTION REFERENCE DRAWING NUMBER

TOP OF STRUCTURAL SLAB

TOP OF PARAPET 10 A4-000

00.000

GRANITE OR MARBLE

BOTTOM OF STRUCTURAL SLAB

ELEVATION NUMBER 00.000

D101

CROSS SECTION REFERENCE ELEVATION REFERENCE IN ELEVATION

WALL SECTION NUMBER 00.000

DRAWING NUMBER : DRAWING SCALE :

END OF STAIR & DIRECTION UP.

PAVEMENT FINISH LEVEL

WALKWAY FINISH LEVEL

ELEVATION REFERENCE IN PLAN DRAWING NUMBER

DO

DOOR TYPE NUMBER

W20

WINDOW TYPE NUMBER

TOP SOIL LEVEL

SUSPENDED CEILING LEVEL

PLUMBING

P100 Site Plan Public Toilets Plan Plumbing ( Drainage) Public Toilets Plan Plumbing ( Water Supply)

ELECTRICAL E100 Typical Floor Plan

NORTH

DOCTORES

Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants

Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021


Out

Out

Out

In

In

In

0.91

0.6

0.76

2.20

2.20

2.20

Working Drawings IV (ASE552) NAME :

AHMED ZAKI

175057

ID :

PROJECT NAME:

TOWER PROJECT 0.90

0.6

0.76

Elevation

Section

Elevation

Section

Elevation

DOORS DETAILS

DRAWING NAME :

Section

Number of door leafs: 1

Number of door leafs: 1

Number of door leafs: 1

Door Leaf: Artificial oak wood laminate on mdf

Door Leaf: Artificial oak wood laminate on mdf

Door Leaf: Artificial oak wood laminate on mdf

External accesories: Stainless steel handle, lock set beige acrylic signage

External accesories: Stainless steel handle, lock set beige acrylic signage

External accesories: Stainless steel handle, lock set beige acrylic signage

Door frame: hollow 1.5 mm metal frame with electrostatic grey coating (ral 7001)

Door frame: hollow 1.5 mm metal frame with electrostatic grey coating (ral 7001)

Door frame: hollow 1.5 mm metal frame with electrostatic grey coating (ral 7001)

Notes: door components to be fire rated to comply with Egyptian fire code requirements

Notes: door components to be fire rated to comply with Egyptian fire code requirements

Notes: door components to be fire rated to comply with Egyptian fire code requirements

Door opening direction as indicated in floor plan

Door opening direction as indicated in floor plan

Door opening direction as indicated in floor plan

DRAWING NUMBER :

D102

DRAWING SCALE :

1:20

1.4 1.4

NORTH

DOCTORES

Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Number of door leafs: 1 Door Leaf: GLASS PANEL DOOR External accesories: Stainless steel handle, lock set beige acrylic signage Door frame: hollow 1.5 mm metal frame with electrostatic grey coating (ral 7001) Door opening direction as indicated in floor plan

Number of door leafs: 1 Door Leaf: GLASS PANEL DOOR External accesories: Stainless steel handle, lock set beige acrylic signage Door frame: hollow 1.5 mm metal frame with electrostatic grey coating (ral 7001) Door opening direction as indicated in floor plan

Dr. lamia shehata Teaching assistants

Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021


Working Drawings IV (ASE552) NAME :

AHMED ZAKI

175057

ID :

PROJECT NAME:

TOWER PROJECT Typical Details

DRAWING NAME :

D1 A200

joint top connection 1:20

D4 A200

parapet detail 1:20

D7 A200

D8 A200 D2 A200

joint top connection 1:20

D5 A200

DRAWING NUMBER :

A200

DRAWING SCALE :

1:20

basement wall and flooring layers 1:20

false ceiling details 1:20

curtain wall connection with slab 1:20

NORTH

DOCTORES

Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants

Rana Adel

D3 A200

joint bottom connection 1:20

D6 A200

Taher Mahmoud

basement wall detail 1:20

Alshimaa Galal Yousra Mohamed

D9 A200

ramp detail 1:20

Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021


3

2

4

9

D1

5

Working Drawings IV (ASE552)

D1

AHMED ZAKI

NAME :

175057

ID : D1

Orsa type 1 from 9 cells cell = 60*60

Orsa type 2 from 81 cells cell = 60*60

Orsa type 3 from 289 cells cell = 60*60 D1

8 15

D1

Marble 60*60 Outline Gray marble White marble central 6 orsa type 1 from 9 cells

Marble 60*60 Outline Gray marble White marble central

Marble 60*60 Outline Gray marble White marble central

2

9

3

4

Marble 60*60 Outline Gray marble White marble central

5

12

Marble 60*60 Outline Gray marble White marble central

13 8

Marble 60*60 White marble central 3 orsa type 1 from 9 cells

D1

11

D1 D1

10

6

D1

D2

18

D2

D2

FLOORING

DRAWING NAME :

D6

DRAWING NUMBER :

D202

DRAWING SCALE :

1:100

D1 D6

D2

16

TOWER PROJECT

D3 D12 D3 D2

17 D2

D2

D2 D1 D6 1

2

3

4

5

6

7

8

Level 12 45.45

Level 12 45.45

roof 40.45

14

Marble 60*60 White marble central 5 orsa type 1 from 9 cells

7

7

PROJECT NAME:

roof 40.45

Level 9 35.45

Level 9 35.45

Level 8 30.45

Level 8 30.45

Level 7 25.45

Level 7 25.45

Level 6 20.45

Level 6 20.45

Level 5 15.45

Level 5 15.45

roof of bodum 10.45

19

D3

roof of bodum 10.45

first floor 5.45

first floor 5.45

ground floor 0.45

ground floor 0.45

basment -5.00

basment -5.00

A

SEC

D3

21

D5 N

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

3 W19

4

W20 W21

2

W22

+40.45

1

W8

W23W24

W9

W10

124.06 7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

6.99

0.25

W14

7.00

7.00

0.14

7.00

0.14

0.24

W11

6.55

6.55

14.48

W11

W26 0.45

0.45

W26

A

15.40

8.80

A

15.40

+40.45 +10.45

B 0.45

B C 2.98

C W25

0.45

W25

D

D +45.45

6.10

20

W7

W14

0.45

22

Marble 60*60 White marble central

Marble 60*60 White marble central

+45.45

E

E

+10.45

+40.45

+40.45

+0.45

Marble 60*60 White marble central

14

Marble 60*60

Marble 30*30 White marble central

16.53

100.60

100.55

16.53

4.02

+0.00

0.45

F 0.45

F G

G

28.46

+10.45

14.91

+10.45

14.91

White marble central 13 orsa type 1 from 9 cells 2 orsa type 2 from 81 cells

8.80

14.55

K

14.55

K

W27 L

W12

0.18

7.00

W13

7.00

W12

White marble central 11 orsa type 1 from 9 cells 1 orsa type 2 from 81 cells

7.00

L

0.45

W27 0.45

21

7.00

17

Marble 60*60

0.24

7.00

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

7.00

0.24

124.06

W7

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3

W19

W20 W21

2

W22

1

W23 W24

W8

W9

W10

A

SEC

Marble 60*60

6

15.06

11

Marble 30*30 White marble central

2.98

13

18

0.45

16

Marble 60*60 White marble central

20.98

Marble 60*60 White marble central

15

6.10

Marble 60*60 White marble central

0.18

10

ELE

Marble 60*60 White marble central

12

D5

23

White marble central 6 orsa type 1 from 9 cells 1 orsa type 2 from 81 cells

22

19 Marble 60*60

20

White marble central 12 orsa type 1 from 9 cells 2 orsa type 2 from 81 cells

24

23

Marble 60*60

Marble 60*60 White marble central 2 orsa type 1 from 9 cells

D5

Marble 60*60 White marble central 2 orsa type 1 from 9 cells

D5

24

Marble 60*60 White marble central 2 orsa type 1 from 9 cells

25

29

NORTH

White marble central 24 orsa type 1 from 9 cells 1 orsa type 3 from 289 cells

DOCTORES

29

25

D5

Marble 60*60 White marble central 3 orsa type 1 from 9 cells

Dr. Ahmed Abdelsalam

28 28

Marble 60*60 White marble central 4 orsa type 1 from 9 cells

27

Marble 60*60 White marble central 4 orsa type 1 from 9 cells

26

Marble 60*60 White marble central 3 orsa type 1 from 9 cells

Prof. Tarek Galal

D5

Dr. salwa el gendy D5

27

26

Dr. lamia shehata Teaching assistants

Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021

W13


Parapet Detail roof insulation layers

F

F

F

F

F

F

F

1

2

2

1

1

1

2

F

F

F

2

1

Aluminum cladding

R.C

ANCHOR BOLT

CURTAIN WALL TRANSOM 120mm * 60mm

Curtain wall top detail

1

F

F

F

F

F

F

F

F

F

F

2

1

1

2

2

2

1

2

1

2

F

F

F

F

F

F

F

F

F

F

ALUMINUM COVER 4mm

Working Drawings IV (ASE552) NAME :

GLASS PANEL

D4 D203

parapet detail 1:10

D4 D203

AHMED ZAKI

175057

ID :

PROJECT NAME:

CURTAIN WALL MULLION 200mm *100 mm

parapet detail 1:5

1

2

2

1

1

1

2

F

F

F

F

F

F

F

2

1

1

2

2

2

1

D4 D203

1

2

1

F

F

F

2

1

2

TOWER PROJECT CURTAIN WALLS

DRAWING NAME : DRAWING NUMBER :

D203

DRAWING SCALE :

1:20

CURTAIN WALL ELEVATION 1:10

Curtain wall bottom detail

ANCHOR BOLT false ceiling

1.5

CURTAIN WALL MULLION 200mm *100 mm

CURTAIN WALL TRANSOM 120mm * 60mm

F R.C

2.3

1

GLASS PANEL

D5 D203

curtain wall connection with slab 1:10

D4 D203

Middle connection detail curtain wall 1:5

F 2.3

2 Parapet Detail Aluminum cladding

Curtain wall top detail

roof insulation layers

false ceiling

D4 D203

Curtain wall middle detail

GLASS PANEL

CURTAIN WALL UNIT 1:5

CURTAIN WALL MULLION 200mm *100 mm

NORTH

DOCTORES ANCHOR BOLT CURTAIN WALL TRANSOM 200mm * 100mm

Curtain wall bottom detail

marble flooring for typical floor

TYPE

1

L*W

1.5*2.3

DESECRATION OPERATION COLOR FIXED

GREEN

Prof. Tarek Galal

U-VALUE TRANSPARENCY REFLECTION 3

Dr. Ahmed Abdelsalam Dr. salwa el gendy

100%

30%

Dr. lamia shehata Teaching assistants

D4 D203

BOTTOM DETAIL CURTAIN WALL 1:5

D4 D203

BOTTOM DETAIL CURTAIN WALL 1:50

2

1.5*2.3

FIXED

GREEN

3

100%

70%

Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021


9.39 9.39

7.71

0.87

4

5

7

6

8

2.00

5.78

0.18

7.96

225 226 227 228229 230 231232 233 234235 236 237 238 239

30

5.78

Elevator Lobby ROOF FLOOR

1.34

0.64

0.63

1.34

roof 40.45 m

0.64

MARBLE 3 CM

240

239

237

243

236

244

235

1.70

245

234

247

233 232

231

0.40

211

212

214

213

209

0.40

210

0.87

8.52

251

215

208

216

207

217

206

218

205

204

220

203

202

228

222

MARBLE 3 CM 30

183

184

185

182

186

181

187

180

188

179

189

178

190

191

177 176

192

175

+25.45 m

201

30

155

156

158

157

154

153

159

152

160

151

161

150

162

149

163

174

148

164

147

173

30

127

128

129

126

130

125

131

124

132

123

133

122

134

121

135

120

136

119

+15.45 m

145

137

118

MARBLE 3 CM 30

1.68

7.71

0.93

0.50

1.34

0.92

99

100

102 101

0.87

98

1.39

117

0.77

93

92

91

73

72

0.50

70

74

69

68

76

67

77

66

65

64

63

0.17

first floor 5.45 m

2.49

2.70

3.70

43

44

45

42

0.13

2.30

0.03 46

41

47

40

48

39

49

38

51

50

37

36

52

35

+0.45 m

0.45

1.34

1.34

1.34

1.33

1.34

0.64

34

0.85

15

2.17

0.21

0.03

0.24

0.21

0.40

0.50

0.50

2.30

2.63

2.30

2.63

2.30

2.63

3.29

17

NO (F.F.L) BECAUSE OF SLOP

0.50 8.52

0.31

1.75 2.20

0.14

18

13

MARBLE 3 CM 30

PLAIN CONCRET 300 MM MARBLE 3 CM

0.50 0.87

16

14

1.70

0.50

1.70

22

30

( F.F.L )

141

Level 6 20.45 m

115

+15.45 m

30

114

( F.F.L )

113

Level 5 15.45 m

+10.45 m

30

87

86

( F.F.L )

85

84

83

10.45 m

+5.45 m

MARBLE 3 CM

60

54

33

59

30

58

56

55

( F.F.L )

57

first floor 5.45 m

19

12

20

21

23

24

25

26

+0.45 m

MARBLE 3 CM

32

31

30

30

NORTH

( F.F.L )

29

27

0.45 m

DOCTORES

Prof. Tarek Galal 11

10

9

8

7

6

NO (F.F.L) BECAUSE OF SLOP 5

4

3

2

( T.O.S ) -4.55 m

Dr. Ahmed Abdelsalam Dr. salwa el gendy

1

basment -4.55 m

0.50

2.17 1.70

30

142

28

ground floor 0.45 m MARBLE 3 CM

2.17

143

MARBLE 3 CM

88

( F.F.L ) 0.63

( F.F.L ) Level 7 25.45 m

MARBLE 3 CM

82

61

53

+25.45 m

30

169

111

( F.F.L )

2.70

2.46

2.70

3.70

9.87

Elevator Lobby GROUND FLOOR

1.70

89

Level 8 30.45 m

139

116

110

81

62

+5.45 m

30

0.02

90

80

79

78

MARBLE 3 CM

3.00

2.00

71

75

0.20

1.70

5.78

+0.45

0.50

0.50 0.40 2.20

7.96

10.40

30

1.32

2.00

94

roof of bodum 10.45 m

0.16

0.16 0.50

9 10 11 12 13 14 15

0.33 0.18

95

106

+10.45 m

0.50 0.03

2.72

0.08 29 30 31 32 33 34 35 8

103

96

105

109

( F.F.L )

197

MARBLE 3 CM

144

138

( F.F.L )

0.13

+0.45

2.64

97

104

108 107

MARBLE 3 CM

1.20

2.73 3.40

0.50

+2.49

+5.45

28 27 26 25 24 23 22 21 20 19 18 17 16

0.21

1.20

1.34

171 170

112

Level 5 15.45 m

+30.45 m

30

198

167

( F.F.L )

2.20

199

140

MARBLE 3 CM

Level 9 35.45 m

MARBLE 3 CM

172

166

165

146

Level 6 20.45 m

0.50

1:20

( F.F.L )

225

195

( F.F.L )

9.39

D300

DRAWING SCALE :

+35.45 m

30

226

168

MARBLE 3 CM

3.20

227

MARBLE 3 CM

200

194

193

( F.F.L ) Level 7 25.45 m

roof 40.45 m

223

196

Level 8 30.45 m

Staircase Roof Plan 1:50

252

MARBLE 3 CM

229

221

( F.F.L )

9.39

D2 D300

250

224

219

+30.45 m

Staircase Basement plan 1:50

STAIR DETAILS

DRAWING NUMBER :

( T.O.S ) +40.45 m

230

Level 9 35.45 m

8.52 9.39

249

( F.F.L )

30

D2 D300

248

+35.45 m 2.30

2.63

3.29

2.30

1.70

242 241

238

1.70

246

30

2.17

MARBLE 3 CM

0.87

TOWER PROJECT

30

( T.O.S ) +40.45 m

2.17 2.63

2.30

1.33

2.17

1.70

2.63

2.30

2.63

1.34

2.17

1.70

1.70 3.29

1.34

2.63

2.17 2.17

1.34

MARBLE 3 CM

2.63

1.33

2.30

1.34

2.30

1.34

175057

DRAWING NAME : +40.75

+40.75

+40.45

D4 1.34

( T.O.S ) +45.45 m

( T.O.S ) +45.45 m

7.96

0.45

0.45

0.63

Level 12 45.45 m

Level 12 45.45 m

2.00

2

D4 10.40

9.87

2.00

Elevator Lobby Basement

-0.45

3.00

10.40

2.00

1

2.72

2.64

2

0.18

+37.33

+40.45

1

9 10 11 12 13 14 15

9.87

3

PROJECT NAME:

3.00

2

AHMED ZAKI

ID :

1.20

1

NAME :

1.39

0.21

2.73

2.72

3.40

-0.45

2.64

Working Drawings IV (ASE552)

252 251 250 249 248 247 246 245244 243 242 241 240

1.39

1.20

2.73 3.40

7.71

-2.04

+0.45

28 27 26 25 24 23 22 21 20 19 18 17 16

0.21

1.20

0.87

1.68

1.20

1.68

basment -4.55 m

( T.O.S ) -4.55 m

Dr. lamia shehata Teaching assistants

0.50 0.50

Rana Adel

3.20

9.39

Taher Mahmoud Alshimaa Galal

D2 D300

Staircase Ground Floor Plan 1:50

D2 D400

ELEVATOR PLAN 1:20

D2 D400

Sections Of Main Staircase 1:100

Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021


0.46

30*30 Marble Tiles

0.81

2.64

1.81

0.12

1.19

1.59

4.35

1.40

D2 1.22

DT402

0.37

0.76

D2

D2

1.01

1.01

DT401

0.31

0.76

1.08

D1

0.91

DT403

0.76

1.03

3.95

21 0.48

D6

2.09

wcw gf

Working Drawings IV (ASE552)

D6

D2 1.01

D2

0.47

4.08

0.76

0.76

0.31 DT403

0.37

4.35

DRAWING NAME :

Bathroom Details

DRAWING NUMBER :

D400

DRAWING SCALE :

1:100

1.02

0.76

DT402

wcm gf

TOWER PROJECT

1.01 D2

0.76

PROJECT NAME:

1.02 DT401

D1

0.91

1.01

D2

1.15

1.01

D2

1.40

1.22

DT401

3.72

D12

4.49

4.08

1.40 0.19

175057

ID :

0.82

30*30 Marble Tiles

AHMED ZAKI

NAME :

0.67

1

2

3

4

5

6

7

8

Level 12 45.45

Level 12 45.45

roof 40.45

roof 40.45

Level 9 35.45

Level 9 35.45

2.22

20

Level 6 20.45

Level 5 15.45

roof of bodum 10.45

D6

roof of bodum 10.45

first floor 5.45

first floor 5.45

ground floor 0.45

ground floor 0.45

1.21 0.46

0.79

DT402

N

W7

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3 W19

W20 W21

2

W22

+40.45

1

W23W24

W8

W9

W10

124.06

0.24

7.00

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

6.99

0.25

7.00

0.14

W14

W11

6.55

6.55

14.48

W11

W14

0.14

2.74

7.00

0.52

A

SEC

0.80

basment -5.00

1.85

basment -5.00

2.72

2.11

Level 7 25.45

Level 6 20.45

Level 5 15.45

4.37 1.65

Toilets Flooring Detail 1:20

Level 8 30.45

Level 7 25.45

ELE

2.18

Level 8 30.45

W26 0.45

0.45

W26 A

A

15.40

15.40

8.80

Public Toilets Plan 1:20

B 0.45

0.45

B

2.98

C 2.98

C W25

0.45 20.98

0.45

W25

D

D

6.10

6.10

+45.45

+45.45

E

E

+10.45

+40.45

+40.45

+0.45

16.53

100.60

100.55

16.53

4.02

+0.00

0.45

F 0.45

F G

G

28.46

+10.45

14.91

+10.45

14.91

D1 D400

+40.45 +10.45

8.80

14.55

K

14.55

K

0.82

7.00

7.00

15.06

7.00 0.18

0.18

7.00

0.38

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

7.00

0.24

124.06

W6

W5

W4

W15 W3

W2

W1

8

7 W16

6

5

W18

4

3 W19

W20 W21

2

W22

1

W23 W24

W8

W9

W10

0.80

0.24

0.12

0.48

0.36

2.40

1.94

0.39

0.39

0.25 NORTH

0.76

0.31

0.79

0.19

0.53

0.39 0.11

0.39 0.25

0.82

3.72

0.82

0.46

0.46

1.31

2.13 0.74

2.31

7.00

0.80 3.72

1.26

2.99

1.41

1.41 2.31

W12

0.24

W7

0.97

0.97

0.97 2.99 3.72

W13

A

1.59

L

W12

SEC

2.13

0.45

L

3.89

0.74

W27 0.45

W27

DT403

DOCTORES

Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants

Rana Adel Taher Mahmoud

D3 D400

Public Toilets ( Section ) 1:20

D2 D400

Public Toilets (Elevation of Mirror/sink) 1:20

Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021

W13


Parapet Detail Aluminum cladding

Working Drawings IV (ASE552)

roof insulation layers

NAME :

AHMED ZAKI

175057

ID :

PROJECT NAME:

TOWER PROJECT

1.05

roof

roof ( T.O.S ) +40.45 m

WALL SECTION

DRAWING NAME :

false ceiling

4.57 3.58

Curtain wall top detail

5.00

( T.O.S ) +40.45 m

+35.45 m

D500

DRAWING SCALE :

1:20

4.57 3.58

Level 9

5.00

( F.F.L )

DRAWING NUMBER :

+30.45 m

Level 8

5.00

( F.F.L )

4.57 3.58

Curtain wall middle detail

+25.45 m

( F.F.L )

Level 7

+20.45 m

Level 6

5.00

( F.F.L )

4.57 3.58

Level 9

41.50

+35.45 m

( F.F.L )

4.57 3.58

marble flooring for typical floor 5.00

Curtain wall bottom detail

+15.45 m

4.57 3.58

Level 5

5.00

( F.F.L )

+10.45 m

Curtain wall bottom detail

( F.F.L )

roof of bodum

ground floor

4.57 3.58

( F.F.L )

5.00

+0.45 m

+5.45 m

5.00

4.57 3.58 4.57 3.58

first floor

5.00

( F.F.L )

+0.45 m

ground floor

4.15

( F.F.L )

NORTH

NO (F.F.L) BECAUSE OF SLOP

basment ( T.O.S ) -4.55 m

DOCTORES

Prof. Tarek Galal Dr. Ahmed Abdelsalam

polish concert by helicopter

NO (F.F.L) BECAUSE OF SLOP

Dr. salwa el gendy Dr. lamia shehata

basment

Teaching assistants

( T.O.S ) -4.55 m

Rana Adel Taher Mahmoud Alshimaa Galal

D2 D500

joint bottom connection 1:20

D1 D500

joint bottom connection 1:100

Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021


N

ELE

W7

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3W19 W20 W21 2

W22

1

W23W24 W8

W9

Working Drawings IV (ASE552)

W10

124.06 7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45 1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32 2.77

7.00

6.99

W14

7.00

7.00

W11

PROJECT NAME:

TOWER PROJECT

W26

LANDSCAPE

A

DRAWING NUMBER :

A101

DRAWING SCALE :

1:200

15.40

15.40

8.80

A

175057

ID :

DRAWING NAME :

6.55

0.45

W26

0.45

6.55

14.48

W11

AHMED ZAKI

NAME :

0.25

0.14

7.00

0.14

0.24

W14

+40.45 T.O.S

1

B

B

+10.45 T.O.S

2

3

4

5

6

7

8

Level 12 45.45

Level 12 45.45

roof 40.45

roof 40.45

6.10

0.45 2.98 0.45

0.45 2.98 0.45

D

W25 D

Level 9 35.45

Level 8 30.45

C

6.10

W25

20.98

Level 9 35.45

C

Level 8 30.45

Level 7 25.45

Level 7 25.45

Level 6 20.45

Level 6 20.45

Level 5 15.45

Level 5 15.45

roof of bodum 10.45

roof of bodum 10.45

first floor 5.45

first floor 5.45

ground floor 0.45

ground floor 0.45

basment -5.00

+45.45 T.O.S

+40.45 T.O.S

+10.45 T.O.S

E

A

SEC

E

basment -5.00

+0.45

N

4.02

ELE

+0.00

16.53

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3 W19

W20 W21

2

W22

+40.45

1

W23W24

W8

W9

W10

124.06 7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

7.00

2.77

6.99

0.25

W11

6.55

W26 0.45

0.45

W26

100.60

A

15.40

15.40

8.80

A

+40.45 +10.45

B 0.45

0.45

B C

W25

2.98

C 2.98

20.98

0.45

W25 0.45

100.55

W14

14.48

W11

7.00

7.00

0.14

7.00

0.14

0.24

W14

6.55

16.53

W7

+40.45 T.O.S

D

D

6.10

6.10

+45.45

+45.45

E

E

+10.45

+40.45

+40.45

+0.45

16.53

100.60

100.55

0.45

F 0.45

F G

G

28.46

+10.45

14.91

+10.45

14.91

F

8.80

14.55

K

14.55

K

W27 L

15.06

7.00

L

0.45

W27 0.45

G

7.00

0.45

F G

0.45

16.53

4.02

+0.00

0.18

0.18

7.00

W12

7.00

W12

W13

0.24

7.00

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

7.00

0.24

124.06

W6

W5

W4

W15 W3

W2

W1

8

7 W16

6

5

W18

4

3 W19

W20 W21

2

W22

1

W23 W24

W8

W9

W10

14.91

28.46

14.91

W7

+10.45 T.O.S

A

SEC

+10.45 T.O.S

0.45 15.06

W12

NORTH

DOCTORES

7.00 0.18

W13

0.18

7.00

W12

T1

W27 L

7.00

L

7.00

W27

0.45

8.80

14.55

K

14.55

K

W13

Prof. Tarek Galal Dr. Ahmed Abdelsalam

0.24

7.00

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45 1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32 2.77

7.00

7.00

0.24

124.06

T2

Dr. salwa el gendy Dr. lamia shehata

W7

W6

W5

W4

W15 W3

W2

W1

8

7 W16

6

5

W18

4

3 W19W20W21 2

W22

1 W23 W24 W8

W9

W10

Teaching assistants

Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021

W13


7

6

N

5

3

4

ELE

8

2

1

54.38 0.39

5.32

9.36

0.45

10.94

1.22

10.92

1.24

10.16

15.38 0.78

0.40

14.60

0.79 0.59

A

13.90

11.69

0.70

0.31

0.78

0.45

A

6.99

6.77

6.66

53.41

-5.00

1.10

31.05

0.79

7.00

AHMED ZAKI

14.82

NAME :

5.72

5.48

5.75

Working Drawings IV (ASE552)

15.40

6.27

0.70

15.40

6.76

175057

ID :

D1 D400

23.84

0.85 D1 D2

D6

3.00 1.34

1.33

DRAWING NUMBER :

A110

DRAWING SCALE :

1:100

1.34 D2

D2

D2

1.70

D1

2.30

2.63

BASEMENT FLOOR

DRAWING NAME :

6.10

1.34

D

TOWER PROJECT

D6

0.66

1.34

2.19

0.80

D2

12.02

0.55 3.92

D2

7.96

2.00

1.50

D6

D3

E

0.84

0.80

2.53

D3

3.94

5.93

5.30

0.45

16.90 6.10

D400

D2

8.63

D6

D2

3.43

0.21

3.69

2.73

3.22

2.82 23.06

D1

D2 0.80

23.28

3.43

C

4.46

D1

1.33

E

0.45

B

0.86

C

3.75

D

PROJECT NAME:

1.49

2.76

D1 D300

D3

0.45

7.00

D400

B

31.85

2.52

1.10

1.25

6.27

2.35

6.76

1

2

3

4

5

6

7

8

Level 12 45.45

Level 12 45.45

25.65

4.02

5.32

roof 40.45

roof 40.45

Level 9 35.45

Level 9 35.45

Level 8 30.45

Level 8 30.45

Level 7 25.45

Level 7 25.45

Level 6 20.45

Level 6 20.45

Level 5 15.45

Level 5 15.45

roof of bodum 10.45

roof of bodum 10.45

0.63

0.63

first floor 5.45

first floor 5.45

ground floor 0.45

ground floor 0.45

basment -5.00

5.59

4.36

0.58

21.63

0.79

7.00

0.73

7.03

basment -5.00

7.04

16.53

6.27

16.53

6.76

-5.00

6.91

73.46

0.80

73.46

11.28

73.17

56.60

A

SEC

10.33

0.87

11.28

0.79

6.63

0.61

N

ELE W7

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3 W19

W20 W21

2

W22

+40.45

1

W23W24

W8

W9

W10

124.06

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

6.99

0.25

W14

W11

6.55

6.55

14.48

W11

7.00

7.00

0.14

7.00

0.14

0.24

W14

W26 0.45

0.45

W26

A

15.40

15.40

8.80

A

+40.45 +10.45

B 0.45

0.45

B

2.98

C 2.98

C W25

0.45 20.98

0.45

W25

D

D

6.10

6.10

+45.45

+45.45

E

E

+10.45

+40.45

+40.45

+0.45

0.45

16.53

100.60 0.45

F 0.45

F G

G

28.46

+10.45

14.91

14.91

+10.45

8.80

14.55

K

14.55

K

0.45

W27 0.45

W27 L

7.00

L

7.00

W12

0.18

0.18

7.00

W12

W13

7.00

G

15.06

0.85

10.63

10.61

0.85

F 0.45

F G

100.55

16.53

4.02

+0.00

0.24

7.00

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

7.00

0.24

124.06

W7

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3

W19

W20 W21

2

W22

1

W23 W24

W8

W9

W10

12.50

A

SEC

7.00

0.75

37.61

-5.00

13.69

0.40

0.85

11.74

10.54

0.40

7.25

7.00

29.30

0.49

7.03

6.97

14.91

7.00

14.91

0.62

K

K

9.97

NORTH

DOCTORES

Prof. Tarek Galal

15.00

0.70

15.00

Dr. Ahmed Abdelsalam 4.92

40.46

0.61

Dr. salwa el gendy

7.00

Dr. lamia shehata Teaching assistants

6.81

6.82

6.81

-5.00

Rana Adel

53.41

0.60

0.59

0.300.70

Taher Mahmoud

L

L

Alshimaa Galal Yousra Mohamed

0.77 0.38

13.90

5.32

0.79 0.45

9.36

11.38 11.69

1.23 0.45

10.16 10.94

0.76

14.62 15.38

0.79 0.40

54.37

8

7

6

5

4

3

2

1

Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021

W13


6

5

9.36 14.28

53.99 0.45

10.94

11.29

0.85

10.54

C1

0.20

14.98

0.40

C1

0.38

14.28

1 15.38

0.40

C1

0.38

0.39

0.32

0.40

0.80

2

11.69

0.85

C1

A

3

4

0.45

0.14

8.46

6.48

0.40

7 5.32

0.40

0.80

8 0.20

A

0.14

14.74

SHOP 2 +0.45

9.42

8.62

2.13

0.06 1.53

8.46

6.53

0.28

D1

C1

7.11

175057

ID :

0.37

6.85

7.13

D1

AHMED ZAKI

NAME :

0.16

32.25

4.90

Working Drawings IV (ASE552)

15.40

0.93 0.51 0.91 0.65

6 +0.45

14.81

0.28

2.20

0.54

6.53

0.91

18.53

+0.45

SHOP 4

8.46 0.65

D1

D1

2 18.56

0.93

7.13

14.80

15.40

14.80

BANK

0.91

12.27

9.42 9.86

C1

5

+0.45

0.10

0.16 0.28

SHOP 3

8.18

+0.45

8.18

8.18

3 8.25

1

7.87

8.27

7.85

8.24

SHOP 1

PROJECT NAME:

2.43

1.67

20

2.11

D6 1.85

0.80

2.74

0.80

2.62

0.45

0.85

3.43

1.46

GROUND FLOOR

DRAWING NAME : DRAWING NUMBER :

A120

DRAWING SCALE :

1:100

6.10

7.57

1.46

7.70

D3

3.28

D1

2.14 3.01

D2

wcm gf

TOWER PROJECT

+0.45

1.49 D2

D

1.49

D2

0.85

0.19 0.39 9.64

D3

1.49

D2

7.72

1.49 1.49

6.14

0.66

1.70

C

1.49

5.60 4.35

D12

B

0.28

1.34

1.64

1.81 0.91

D6

D2

0.91

1.33

2.30

2.63

1.34

+0.45

7

0.91

0.20

D1

0.40

0.54

D1

D2

3.00

47 1.34

0.45

0.14

D1

CLEANING ROOM

9.60

0.21

2.73

5.85

0.55

elevator lobby gf

2.00 0.24

D2

7.96

2.17 3.29

7.16

0.00

0.87

1.77

0.41

4

D1 D400

D6

21

D400

D2

5.30

0.91

wcw gf D2

1.08 0.76

0.86

0.76 0.80 6.76

5.30

0.50

Administration

5.60 8.26

17

2.85

0.80

0.80

0.80

1.49 0.80

19

D1

SERVICE

ATM

10.47

12.09

D1 6.61

0.76

1.46

6.22

0.88

18

0.81

D1

2.65

9.92

2.27

3.15

ATM C1

6.10

2.15

1.68

0.80

D1 D200

2.72

0.26 0.91 0.49

2.57

D1 2.83 6.52

E

9.56 14.75

2.34

D

0.76

1.77

2.82

0.87

0.45

0.87

3.43

4.31

6.32 1 2 3

D1

9.92

D3

C

0.81 0.06 0.82

D1 D300

D400

B

10.48

2.61

6.44 0.81

E 1

2

3

4

5

6

7

8

4.34

10.89

1.67

5.85

SHOP 5

3.88

9.83

25.65

0.240.91 0.99

0.23 0.91

first floor 5.45

first floor 5.45

ground floor 0.45

ground floor 0.45

basment -5.00

basment -5.00

0.28

D5

16.53

D5 0.28 1.16

16.56

16.36

Level 5 15.45

roof of bodum 10.45

A

4.38

Level 6 20.45

Level 5 15.45

roof of bodum 10.45

SEC

0.47

19.90

0.91

0.06

12.14

Level 7 25.45

Level 6 20.45

+0.45

14.90

Level 8 30.45

Level 7 25.45

10

0.85

10.34

0.80

N

W7

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3 W19

W20 W21

2

W22

+40.45

1

W23W24

W8

W9

W10

124.06

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

6.99

0.25

7.00

0.14

7.00

W11

W14

0.14

0.24

W14

+0.45

7.00

11

8.38

W11

6.55

11.29

14.48

0.85

6.55

13.87

7.00

7.00 0.63

8.45

SHOP 6

8.69

8.69

73.07

D1 D200

73.07

roof 40.45

Level 9 35.45

Level 8 30.45

7.16

15.53

1.45

1.45 1.45

1.45

1.45 1.45

D3

16.53

D3

Level 12 45.45

roof 40.45

Level 9 35.45

6.04

C1

26.59

4.34

18.39

15.35

ELE

4.34

Level 12 45.45

+0.0

+0.45

W26 0.45

0.45

W26 A

A

15.40

15.40

8.80

6.20

+40.45 +10.45

B 0.45

0.45

B

2.98

C 2.98

C W25

0.45 20.98

0.45

W25

D

D

6.10

6.10

+45.45

100.60

16.53

4.02 16.53 100.55

0.45

0.45

0.45

28.46

14.91

14.91

14.55

14.55

8.80

0.85

0.45

0.45

7.00

7.00

L

0.18

0.18

W13

7.00

W12

7.00

7.00

10.34

0.80

7.00

8.38

W6

7.00

W5

6.67

W4

0.45

W15 W3

6.88

7.00

W2

7.00

W1

5.32

8

0.45

8.91

0.45

7 W16

6

6.55

5.14

5

W18

0.45

4

1.41

3

5.32

W19

0.32

W20 W21

3.89

6.97

2

8.41

W22

3.91

1

0.32

2.77

W23 W24

7.00

W8

7.00

W9

0.24

W10

SHOP 7 12 +0.45

14.31

14.91

0.240.910.24

0.24

C1

0.75 0.91

D5

SHOP 8 13

+0.45

K

0.80

8.10

8.10

0.80

0.80

15.01

0.80

23.57

10.64

23.11

0.48

D5

0.75 0.91

11.21

11.21

0.24 0.91

14.31

4.72

23.57

28.86

K

W27

7.00

0.40

3.50

7.63

8.85

7.00

6.94 15.01

0.80

29.31

+10.45

15.06

0.50

6.67

14.31

14.31

L

A

14.91

F G

+10.45

K

W12

SEC

12.68 1.49

26.42

0.80

F G

G

124.06

C1

K

+0.45

0.24

27.02 7.63

+40.45

+40.45

+0.00

W7

14.34 5.55

0.35

0.04 0.80

+0.45

E

+10.45

W27

1.23

14.35

F 0.67

2.61

2.65

1.23

G

0.40

10.34

11.29

0.85

0.45

13.87

0.50

F

0.20 0.40

+45.45

E

6.67

NORTH 1.20

8.46

0.380.910.46 1.35

6.70

0.40

D5

D5

3.91

1.26

1.38

6.94

8.46

0.38 1.17

16

1.60

6.70

0.40

SHOP 10 15 8.65

+0.45

+0.45

0.43 0.91

SHOP 11

14

Rana Adel

+0.45

Taher Mahmoud

+0.45

C1 14.28

5.32

0.40 9.36

C1

11.74

0.45

11.69

0.85

10.54

0.45

10.94

C1 0.40

14.98 15.38

0.40 0.20

53.99

8

7

6

5

4

3

2

1

0.40

0.80

C1 0.40

Dr. lamia shehata Teaching assistants

SHOP 9

+0.45

0.20

Dr. salwa el gendy

C1

1.23

3.04

0.80

L

0.40

14.28

0.20

11.21

8.11

12.67

5.06

26.82 14.15

Dr. Ahmed Abdelsalam 6.67

15.00

4.72

14.20

7.63

7.31

1.49

Prof. Tarek Galal

10.48

7.63

6.94

5.55

0.37

C1

14.60

14.20

14.20

15.00

2.11

D5

0.63

0.51 0.910.14

0.91 0.77

7.66

7.66

DOCTORES

L

Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021

W13


8

7

6

5

3

4

2

1

53.99 0.20

5.32

9.36

0.45

11.69

0.45

10.94

15.38

0.20

0.40

0.40

53.99

25

8.82

1.41

0.91

8.82

1.41

0.91

3.54

SHOP 14 26

6.30

0.91

0.91 0.68

D1

D1

SHOP 15 27

6.53

14.84

2.20

0.45 D2

D2

0.05

12.09

9.83

0.80

0.04

2.73

3.43

1:100

0.80

E

1.07

6.60

5.74

19.93

46.99

26.45

1

SHOP 17

2

3

4

5

6

7

8

Level 12 45.45

Level 12 45.45

roof 40.45

60

10.01

9.81

9.63

D5

0.91 1.67

A130

DRAWING SCALE :

39

D6

1.44

10.89

DRAWING NUMBER :

1.68

wcm ff

MEZZANINE FLOOR

DRAWING NAME :

C1

SHOP 16

D1

2.30

2.63

D2

5.28

1.10

0.48

0.480.40 D2

7.72

7.30

6.60

D6

1.34

1.70

2.17

D 4.00

1.33

4.00

1.34

0.65

26.92

1.34

29

8.93

D6

C

STOREGE

TOWER PROJECT

D1

6.15

43

3.74

0.910.34

4.41

B

6.10

D2

5.28

0.300.91

2.74 2.95

D1

D2

0.40

D1

28

6.66

D6

44

3.00

3.00

elevator lobby ff 1.34

7.30

0.80

D1

PROJECT NAME:

CLEANING ROOM

D1

2.55 D2

0.91

2.73

2.73

3.40

wcw ff D2

45

E

1.42

2.21 0.91 0.91

5.49

175057

ID :

0.87

2.06 6.41

6.61

6.86

22 1.51

2.64

7.96

Room

3.91

0.80

D400

9.20

36

6.10

9.92

D2

Room 36

1.19

7.11

6.71

7.11

1.01 2.47 0.39

1.68

2.00

5.11

10.48

AHMED ZAKI

NAME :

6.56

D1 D400

0.91

1.60 0.91

D

D1

D1

D1 D300

0.81

0.86

5.75

0.45 3.43

C

37

6.53

0.68

31.82

D3

Room 37

0.39

D400

B

2.08

14.55

3.10

0.14

3.10 0.91

0.09

0.14

D1

Working Drawings IV (ASE552)

0.91

1.02 6.20

4.24

0.25 0.25 2.20

D1

16.45

15.40

23

0.54

A

6.60

15.40

SHOP 13

24

0.28

8.34

8.67

SHOP 12

8.16

8.57 12.81

Room 23

10.83

12.28

11.57

8.16

14.55

8.16

A

roof 40.45

Level 9 35.45

Level 9 35.45

Level 8 30.45

Level 8 30.45

Level 7 25.45

Level 7 25.45

Level 6 20.45

Level 6 20.45

Level 5 15.45

Level 5 15.45

roof of bodum 10.45

roof of bodum 10.45

first floor 5.45

0.26

1.42

D5

D5

D5

1.36

1.54

D5

basment -5.00

C1

6.60

73.07 1.58

D5

73.07

D5

ground floor 0.45

basment -5.00

A

D5

first floor 5.45

ground floor 0.45

D5

8.78

16.53

3.40

2.90

15.94

4.20

1.37

0.62

1.43

4.38

2.90

1.14 4.30

0.60

0.47

6.10

1.19

16.53

3.00

SEC

3.66

CAFE 4

CAFE 5

68

67

8.84

4.20

73

7.00

5.89

CAFE 3

72

7.00

1.49

CAFE 3

6.30

4.30

6.64

71

6.64

6.14

CAFE 2

6.64

70

6.64

CAFE 1

6.64

5.30

6.64

0.20

SHOP 18 62 N

ELE

73.07

5.30

0.20

W7

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

3 W19

4

W20 W21

2

W22

+40.45

1

W8

W23W24

W9

W10

124.06 6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

6.99

0.25

W14

7.00

7.00

0.14

7.00

6.55

6.55

14.48

W11

W26 0.45

0.45

15.40

15.40

8.80

A

+40.45 +10.45

B

2.98

2.98

C

0.45 20.98

0.45

W25

D

D

6.10

6.10

+45.45

+45.45

E

E

+10.45

+40.45

+40.45

+0.45

100.60

16.53

4.02

+0.00

16.53

F 0.45

F 0.45

G

6.60

0.45

0.45

B

W25

100.55

0.50

8.38

0.80

G

G

28.46

14.91

+10.45

14.91

4.77

K

8.80

14.55

K

14.55

4.81

19.88

0.45

0.45

7.00

7.00

15.06

7.00 0.18

7.00 0.18

7.00

8.89

7.00

7.00

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

7.00

2.77

7.00

0.24

124.06

W6

W5

W4

W15 W3

W2

W1

8

7 W16

6

5

W18

4

3 W19

W20 W21

2

W22

1

W23 W24

W8

W9

W10

15.15 1.39 1.91

14.91

1.15 0.48

D5

6.85

2.80

6.60

0.75

75

W12

0.24

W7

6.17

10.64

8.10

8.10

30.05

21.00

0.91 0.89

K

64

NORTH

0.77

Prof. Tarek Galal 6.60

Dr. Ahmed Abdelsalam

11.69

15.80

Dr. lamia shehata SHOP 21 Teaching assistants

65

Rana Adel

8.78 4.28

19.88

0.40

0.46

0.40

Taher Mahmoud

0.35 0.45

10.42

8.45

6.17

8.45

1.91

D4

0.85

9.36

10.94

15.38

0.20

53.99

8

7

6

5

4

3

2

L

Alshimaa Galal Yousra Mohamed

26.32

0.45

Dr. salwa el gendy

D4

2.22

0.15 1.23

0.42

0.40

26.82 5.32

4.93 4.28

1.23

1.72

1.31

8.10

0.20

12.47

4.93

0.24

14.35

77

15.00

D5

1.57

0.91

1.38

D5

7.09

1.56

D5

DOCTORES

0.63

69

3.56

4.78

5.14

7.62

5.14

1.49

5.06

15.00

14.20

7.62

27.11

0.40

SHOP 20

CAFE 9 5.55

0.20

D4

FOOD COURT

76

L

D4

0.51

CAFE 8

3.66

5.52

5.52

4.93

0.91

0.30

21.00

15.02

4.93 23.57

15.02

23.57

15.02

15.02

0.80

K

30.22

3.74

5.12

CAFE 7 5.12

D5

0.91

1.95 D5

D5

W13

D4

CAFE 6 74

7.62

L

W12

63

D4

0.24

0.30 3.50

4.93

SHOP 19

A

14.31

8.78

W27

SEC

7.62

6.17

1.26

4.82 5.23

7.62

5.23

1.49

3.49

1.26

4.93 12.77

7.62

7.00

C

0.45

1.10

0.90 1.23

0.15

7.10

F

L

27.11 5.55

7.00

A

W27

14.34

14.91

W11

W26

+10.45

2.61

1.00

10.34

0.41

1.23

G

5.20

0.40

5.88

63.71

5.93

0.40

6.05

0.45

0.45

F

7.70

0.14

0.24

W14

7.08

1

Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021

W13


Working Drawings IV (ASE552)

N

ELE hotel

$200,000.00

hotel

hotel

$200,000.00

$200,000.00

presupuesto hotel

presupuesto hotel

presupuesto hotel

5

3

4

2

1

11.29

0.40 0.40 0.05

10.54

0.85

10.54

11.69 11.89

0.40

0.20

14.98

0.40

PROJECT NAME:

0.40

0.04

A

TYPICAL FLOOR

DRAWING NAME : DRAWING NUMBER :

A150

DRAWING SCALE :

1:100

15.40

14.81

15.21

15.62

15.21

15.62

15.40

15.20

15.62

15.22

15.62

TOWER PROJECT

15.18 26.53

38.46

14.82

175057

ID : 15.38

0.40

10.94

0.80

A

0.45

0.80

0.40

11.69

AHMED ZAKI

NAME :

38.86 0.20

38.46

0.40

1

2

3

4

5

6

7

8

Level 12 45.45

Level 12 45.45

roof 40.45

roof 40.45

Level 9 35.45

Level 9 35.45

Level 8 30.45

Level 8 30.45

Level 7 25.45

C

Level 7 25.45

Level 6 20.45

Level 6 20.45

Level 5 15.45

Level 5 15.45

3.43

roof of bodum 10.45

0.91

3.43

3.40

D2

B

0.45

0.390.05

0.03

0.47

12.34

0.03

D1 D400

0.84

2.64

1.81

0.87

0.03

0.03

0.85

0.04

0.80

D3

0.40 0.40

26.53 9.92

D400

roof of bodum 10.45

first floor 5.45

first floor 5.45

ground floor 0.45

ground floor 0.45

basment -5.00

basment -5.00

D400

8.93 6.10

42.51

8.93

41.91

4.35

41.91

W7

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3 W19

W20 W21

2

W22

+40.45

1

W23 W24

W8

W9

W10

124.06

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

6.99

0.25

W11

W14

7.00

7.00

0.14

7.00

0.14

0.24

W14

W11

6.55

6.55

14.48

E

0.80

0.80

0.40

0.80

N

ELE

E

1.85

3.69

0.91

A

SEC

6.10

41.91

41.91

2.04

D 8.92

D 42.51

furniture plan (type 1) 1:200

C

0.04 1.68

D1 D300

0.45

11.89 11.08

B

W26

A

A

15.40

8.80

12.46

15.40

14.91

0.45

0.45

W26

11.09

+40.45 +10.45

26.53

B 0.45

0.45

B C

W25

2.98

C 2.98

W25 20.98

D

38.46

0.45

0.04

0.45

11.89

D

6.10

6.10

+45.45

+45.45

E

E

+10.45

+40.45

+40.45

+0.45

16.53

100.60

100.55

26.26

0.45

0.45

F

G

G

+10.45

28.46

26.26

26.26

26.26

14.91

+10.45

14.91

25.85

16.53

4.02

+0.00

F

8.80

14.55

K

14.55

K

0.45

W27 0.45

W27

typical floor

L

7.00 15.06

7.00

L

0.18

W13

0.18

38

7.00

W12

7.00

W12

0.24

7.00

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

7.00

W13

0.24

124.06

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3

W19

W20 W21

2

W22

1

W23 W24

W8

W9

W10

16.53

15.93

16.13

16.39

16.53

16.31

15.53

W7

A

SEC

38.46 0.04

26.53

0.85

10.34

0.80

11.29

0.40 0.05 0.40

10.34

0.80

11.69

0.45

10.94

14.98

0.40

F 0.40 0.20

14.38 15.38

0.20

11.89 11.49

F

0.80 0.20

NORTH

38.86

DOCTORES

5

4

3

2

1

Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata

furniture plan (type 2) 1:200

Teaching assistants

Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021


0.77

2.51 0.370.93

1.37

1.71

0.75 2.52

0.82

1.37

3.43

5

6

7

8

Level 12 45.45

roof 40.45

Level 9 35.45

Level 8 30.45

Level 7 25.45

Level 6 20.45

Level 6 20.45

Level 5 15.45

1.64

3.48

Level 5 15.45

first floor 5.45

first floor 5.45

ground floor 0.45

0.74

ground floor 0.45

basment -5.00

basment -5.00

1.03

+4.03

roof of bodum 10.45

0.84

1.03 0.73

0.73 D5

7.03

7.05

3.65

+4.03

D5

3.57

N

W7

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3 W19

W20 W21

2

W22

+40.45

1

W23 W24

W8

W9

W10

124.06

3.48

0.84

W11

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

6.99

0.25

W14

W11

W26

W26 0.45

0.82

7.00

0.14

0.24

W14

7.00

1.37

6.55

3.63

0.38

+4.13

0.45

+4.03

1.80

4

Level 7 25.45

roof of bodum 10.45

2.13

1.08

1.08

2.52

3.40

3

Level 8 30.45

1.46

3.99

3.65

7.03

6.93

3.65

3.65

6.93

3.65

8.01

4.26

2.66

2

roof 40.45

Level 9 35.45

A

3.40

1

Level 12 45.45

E

0.14

4.30

4.50

1:100

SEC

1.40

1.37

A170

DRAWING SCALE :

D3

1.36 0.85

D1

DRAWING NUMBER :

1.13

D2

+4.13

D3

+4.13

3.32

0.67 1.35 1.35

2.96

REFLECTED CEILING

DRAWING NAME :

7.00

3.80

4.85

D

TOWER PROJECT

14.48

3.60

0.74 0.84

2.42

1.37

175057

6.55

3.92

+4.03

B C

1.88

D2

2.68

2.65 1.08 3.99

2.56

1.94

D2

1.84

+4.03

4.26

3.13

1.08 0.92

1.94

1.87

2.34

3.48

D3

+4.03

+4.03

+4.13

3.95

D6

1.08

1.08 4.15

1.37

1.58

D3

1.80

3.08

2.42

0.56

3.99

3.48

PROJECT NAME:

1.08

1.59

4.48

3.99

3.11

0.33

1.43

5.89

D6

D2

+4.03

4.26

+4.03

D1

1.52

1.37

1.08

2.42

D6

3.89

2.87

D2

3.89

3.43

1.40

0.27

D1

D12

1.37

1.28

3.16

1.08

3.89

0.95 0.79

5.92

D2

2.52

1.63 1.37

3.89

3.43

1.49

0.60 0.95 C1

1.37

2.01

+4.03

1.20

D2

2.65

0.85 1.42

3.89

+4.03

E

0.59 1.02

1.02

+4.03

2.45

2.45

+4.13

0.95

1.60

1.16 1.08

D1

1.72

1.37 3.99

0.60

0.77

1.87

1.98

1.87

2.42

D1

3.72

+4.03

D2

3.60

2.43

0.92 0.69 0.27

1.55

3.38

3.38

1.03

1.50

3.78

1.61

1.61

1.61

2.65

+4.03

0.70

C1

1.48

1.61

D

0.95

1.37

1.08 0.89

1.55

D1

1.72

2.66

3.32

1.80

+4.03

D1

1.90

ID :

+4.03

0.74 1.08

3.99

1.37

6.87

10.59

10.59 0.36

0.73

1.34

2.68

4.26

5.92

0.28

1.40

1.37

2.10

2.31

3.14

0.78

3.99

1.11

C

2.87

1.37

AHMED ZAKI

NAME :

3.40 +4.13

1.12

1.71

0.71 1.08 0.91

1.69

0.68 0.72

0.70

0.620.77

D1

3.43

1.11

1.72

+4.13

1.18

1.88

0.69

B

5.92

3.38

0.46 1.37

+4.13

3.38

+4.13

0.77

1.60

1.11

4.79

1.08

3.38

11.61

Working Drawings IV (ASE552)

C1

3.07

0.90

+4.13

1.09

3.47

3.80

6.45

D1

1.05

0.59

2.56

3.60

+4.03

5.18

6.96

0.57

1.11 2.51

3.40

D1

1.69

0.50

0.68

0.59

1.08 1.01

1.08 1.17 3.15

0.91

3.13

0.52 0.50

9.20

2.37

1.31

A

1.54

3.48

3.89

0.64

+4.13

3.15 1.26 +4.03

0.50 3.99

5.78

0.85

D1

2.37

0.50 1.49

4.26

+4.03

0.59

0.44

0.361.08

0.66

1.40

3.80

1.28

2.28

2.35

1.37

1.21

3.60

1.37

2.04

5.92

9.55

2.13

9.10 +4.13

0.85

+4.03

+4.03

0.99

4.08

0.66 1.06

1.37

2.96 0.82

1.37

0.58 1.41

9.79

0.64

4.69

1.06 2.00

+4.03

1.83

1.55

0.99

+4.13

0.80

0.92

0.68 3.13

3.99

3.65

2.51

1.30

1.63

2.51 3.32

C1

4.26

0.54

1.30

4.31

0.74

0.50 1.08

1.00

1.37

C1

9.10

6.98

3.99

11.90

0.77

2.51

2.87

2.05

3.43

6.77

+4.13

1.72

1.11

4.11

1.75

3.15

1.37

1.08 1.10

0.85 5.92

1

C1

0.59

C1

3.98

1.08 0.85

0.60 2.96

1.37

2

0.64 1.08

C1

A 1.49

3

4

3.89

5

6.98

6

0.56 1.44

7

ELE

8

A

15.40

15.40

1.08

0.45

0.45

B

2.98

2.98

C

W25

0.45

0.45

W25 20.98

4.32

1.08

1.06

4.32

2.40

D

D +45.45

0.55

1.96

1.37

1.81

6.10

1.37

+40.45 +10.45

C

6.10

7.68

4.32

1.08

1.08

4.32

4.32

4.32

1.08

8.80

A

B

+45.45

0.74

E

E

+10.45

+40.45

+40.45

+0.45

16.53

100.60 0.45

0.45

F G

14.91

+10.45

14.91

0.67

28.46

4.20

K

8.80

14.55

K

14.55

4.20

0.45

W27

7.00

L

7.00

L

0.45

W27

W12

0.18

0.18

W13

7.00

W12

7.00

+4.03

15.06

F

1.86

2.33

F G

+10.45

2.33

4.20

4.03 2.33

2.33

0.96

4.21

+4.13

F

100.55

2.25

2.84

16.53

4.02

+0.00

2.21

1.61

3.48

1.37

4.30

7.00

W1

5.32

8

0.45

7

8.91

W16

0.45

6

6.55

5.14

5

W18

0.45

4

1.41

3

5.32

W19

0.32

W20 W21

3.89

6.97

2

8.41

W22

3.91

1

0.32

2.77

W23 W24

7.00

W8

7.00

W9

0.24

W10

3.40

1.96

1.37

1.81

D5

2.50

0.74

C1

2.05

3.80

7.00

W2

0.82

2.02

0.40

3.60

0.55 D5

5.91

1.08

1.08

5.91

5.91

9.04

9.04

1.68

6.88

3.57 +4.03

C1

0.45

W15 W3

2.10

0.98 8.13

1.37

6.67

W4

1.08

3.70

+4.13

4.85

7.00

W5

0.84

3.70

0.82

3.70

3.99

7.00

W6

2.19

0.69

1.43

1.43

1.43 1.37

4.26

2.48

4.15

7.42

3.99

3.70

9.88 1.08

2.87

7.42

1.37

1.08

9.14

3.43

W7

A

1.58

7.00

124.06

G

SEC

0.56 1.37

2.45

2.45

+4.03

0.74

0.24

G

3.48

0.84

4.45

+4.03

1.08

3.57

9.13

9.13

4.45

3.57

+4.13

+4.03

4.85

1.37

8.13

1.37

NORTH

L C1

C1

3.01 1.08 0.55 1.45

0.49 3.13

1.16

1.96

1.37

1.72

0.96 1.48

C1

1.37

1.81

Dr. Ahmed Abdelsalam Dr. salwa el gendy

0.74

C1

Dr. lamia shehata

3.59 2.04

1.56

0.82

+4.13

1.99

1.37

2.63

3.48

+4.13

1.01

Teaching assistants

0.84

Rana Adel

1.08

3.40

3.57

1.02

0.74

3.06

1.00

1.37

+4.03

0.68

3.57

3.80 3.57

3.60

3.57

1.11 1.12

1.20

1.08 2.10

2.10

+4.03

0.56

DOCTORES

0.74

Prof. Tarek Galal

0.45 +4.13

0.56 +4.03

1.98

2.40

1.08

1.37

1.43

9.88

1.81

1.45 D5

0.39 1.37

0.53

9.14

0.56 1.37

1.37

+4.03

3.75 D5

1.08

1.80

1.69

3.99

0.74

4.26

0.80

4.15

1.21

3.99

+4.03

1.08

6.40

1.08

1.08

5.52

3.75 2.87

1.53

3.43

1.96

D5

3.13

1.58

0.55

12.09

12.09

6.40

+4.03

C1

K

3.65

Taher Mahmoud

1.63

+4.03

0.51

+4.03

2.27

K

0.79

1.08

1.08

+4.03

L

C1

Alshimaa Galal Yousra Mohamed Nermine Ibrahim

8

7

6

5

4

3

2

1

PAPER SIZE : A0

DATE: 16- 2 - 2021

W13


1

2

3

4

5

6

7

Working Drawings IV (ASE552)

8

AHMED ZAKI

NAME :

175057

ID :

PROJECT NAME:

Level 12

TOWER PROJECT

12 Level

( T.O.S ) +45.45 m

( T.O.S ) +45.45 m

NORTH ELEVATION

DRAWING NAME :

5.00

5.00

roof

DRAWING NUMBER :

A300

DRAWING SCALE :

1:100

roof

( T.O.S ) +40.45 m

( T.O.S ) +40.45 m

5.00 +35.45 m

( F.F.L )

F

F

F

F

F

F

F

1

2

2

1

1

1

2

F 1

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

2

1

2

1

2

2

1

2

1

1

2

2

2

1

1

2

1

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

2

1

1

2

2

2

1

2

1

2

1

2

1

1

2

1

2

2

1

1

1

2

2

1

2

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F 1

5.00 +35.45 m

( F.F.L )

Level 9

9 Level

5.00

2

2

1

1

1

2

2

1

2

1

2

2

1

2

1

1

2

2

2

1

1

2

F

F

F

F

F

F

F

1

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

2

1

1

2

2

2

1

2

1

2

1

2

1

1

2

1

2

2

1

1

1

2

2

1

2

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

5.00 +30.45 m

A

1

SEC

+30.45 m

( F.F.L )

( F.F.L )

Level 8

8 Level

N

1

1

1

2

F

F

F

F

F

1

2

1

2

1

2

2

1

2

1

1

2

2

2

1

1

2

1

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

5.00

W7

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3 W19

W20 W21

2

W22

+40.45

1

W23 W24

W8

W9

W10

124.06

0.24

W14

7.00

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

6.99

0.25

W11

6.55

6.55

14.48

W11

W26

W26 0.45

+25.45 m

0.45

F

W14

0.14

2

F

A

A

1

2

2

2

1

2

1

2

1

2

1

1

2

1

2

2

1

1

1

2

2

1

( F.F.L )

2

+40.45 +10.45

B

B 0.45

1

0.45

2

15.40

( F.F.L )

15.40

8.80

+25.45 m

7.00

2

F

0.14

1

7.00

5.00

ELE

D1 D203

W25

20.98

0.45

W25 0.45

7 Level

2.98

C 2.98

C

D

D

6.10

+45.45

6.10

Level 7

+45.45

E

E

+10.45

+40.45

+40.45

+0.45

F

F

F

F

2

1

1

1

2

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

2

1

2

1

2

2

1

2

1

1

2

2

2

1

1

2

1

16.53

100.60

F

2

F

F 0.45

F

0.45

F 1

100.55

16.53

4.02

+0.00

G

G

28.46

+10.45

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

2

1

2

1

2

1

2

1

1

2

1

2

2

1

1

1

2

2

1

2

14.55

14.55

0.45

F

2

+20.45 m

( F.F.L )

L

7.00

F

2

W12

W13

W12

7.00

F

1

0.18

F

1

K

W27 0.45

F

L

7.00

F 2

14.91

14.91

+10.45

K

W27

15.06

+20.45 m

( F.F.L )

45.00

8.80

5.00

7.00

1

5.00

0.18

45.00

0.24

7.00

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

7.00

0.24

124.06

W7

Level 6

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3

W19

W20 W21

2

W22

1

W23 W24

W8

W9

W10

6 Level

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

2

2

1

1

1

2

2

1

2

1

2

2

1

2

1

1

2

2

2

1

1

2

1

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

2

1

1

2

2

2

1

2

1

2

1

2

1

1

2

1

2

2

1

1

1

2

2

1

2

1

F

F

F

F

A

F

SEC

F

1

5.00

5.00

+15.45 m

( F.F.L )

+15.45 m

( F.F.L )

Level 5

5 Level

5.00

5.00

+10.45 m

+10.45 m

( F.F.L )

( F.F.L ) roof of bodum

roof of bodum

F

5.00 D2 D201

+5.45 m

( F.F.L )

F

F

F

F

F

F

F 1

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F 1

1

2

2

1

1

1

2

2

1

2

1

2

2

1

2

1

1

2

2

2

1

1

2

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

2

1

1

2

2

2

1

2

1

2

1

2

1

1

2

1

2

2

1

1

1

2

2

1

2

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

5.00 D2 D201

+5.45 m

( F.F.L )

first floor

first floor

F

F

F

F

F

F 1

F

F

F

F

F 1

F

F

F

F

F

F 1

F

F

F

F

F

1

1

F

F

2

1

1

2

2

1

1

2

1

2

2

2

1

2

1

2

2

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

2

1

1

2

2

2

1

2

1

2

1

2

1

1

2

1

2

2

1

1

1

2

2

1

2

2

1

F

2

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

5.00 +0.45 m

( F.F.L )

5.00 NORTH

+0.45 m

( F.F.L )

ground floor

ground floor

DOCTORES

0.45

Prof. Tarek Galal NO (F.F.L) BECAUSE OF SLOP

NO (F.F.L) BECAUSE OF SLOP

basment

( T.O.S ) -5.00 m

Dr. Ahmed Abdelsalam Dr. salwa el gendy

basment

( T.O.S ) -5.00 m

Dr. lamia shehata Teaching assistants

Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021

W13


A

B

C

E

D

F

G

K

L

Working Drawings IV (ASE552)

AHMED ZAKI

NAME :

175057

ID : Level 12

12 Level

D1 D501

D1 D500

5.00

TOWER PROJECT

0.51

0.81

roof

PROJECT NAME:

( T.O.S ) +45.45 m

5.00

( T.O.S ) +45.45 m

5.00

4.57

3.58

4.57

3.58

4.57 3.58

4.57

3.58

5.00

( T.O.S ) +40.45 m

+35.45 m

SECTION

DRAWING NAME : roof

( T.O.S ) +40.45 m

DRAWING NUMBER :

A200

DRAWING SCALE :

1:100

+35.45 m

( F.F.L )

( F.F.L ) 9 Level

5.00

4.57

3.58

4.57

3.58

+30.45 m

4.57 3.58

4.57

3.58

5.00

Level 9

+30.45 m

( F.F.L )

( F.F.L ) 8 Level

5.00 29.79

4.57

3.58

4.57

3.58

4.57

4.57 3.58

A

+25.45 m

SEC

3.58

5.00

Level 8

( F.F.L )

+25.45 m

( F.F.L ) 7 Level

Level 7

N

ELE

5.00

W5

W4

W15 W3

6.67

0.45

W2

6.88

W1

8

7.00

7.00

7

5.32

W16

0.45

6

8.91

5

0.45

W18

6.55

4

5.14

3 W19

0.45

1.41

W20 W21

5.32

0.32

2

W22

+40.45

3.89

6.97

1

8.41

W23W24

3.91

0.32

W8

2.77

W9

7.00

W10

6.99

0.25

W14

7.00

7.00

0.14

7.00

0.14

7.00

6.55

6.55

14.48

W11

W26 0.45

0.45

A

15.40

8.80 15.40

+40.45 +10.45

B 0.45

0.45

B C

W25

2.98

C 2.98 0.45

W25 0.45

( F.F.L )

20.98

D

D

6.10

+45.45

6 Level

6.10

4.57

3.58

4.57

3.58

7.00

A

+20.45 m

41.50

Level 6

W6

124.06

0.24

W11

W26

41.50

4.57 3.58

+20.45 m

( F.F.L )

4.57

3.58

5.00

W7

W14

+45.45

E

E

+10.45

+40.45

+40.45

+0.45

16.53

100.60

100.55

16.53

4.02

+0.00

0.45

F 0.45

F G

G

28.46

+10.45

14.91

14.91

+10.45

8.80

14.55

K

14.55

5.00

0.45

0.45

W27

( F.F.L )

15.06

0.18

W13

7.00

W12

7.00

+15.45 m

( F.F.L )

7.00

L

7.00

L

W12

0.18

4.57

3.58

4.57

3.58

4.57 3.58

4.57

3.57

+15.45 m

3.58

5.00

K

W27

0.24

7.00

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

7.00

W13

0.24

124.06

W7

W6

W5

W4

W15 W3

W2

W1

8

7 W16

6

5

W18

4

3 W19

W20 W21

2

W22

1

W23 W24

W8

W9

W10

5 Level

Level 5

1.02

1.50

( F.F.L )

5.00

1.23 0.97

+5.45 m

( F.F.L )

11.69

first floor

5.00

9.58

3.63

9.58

2.50

4.57

+10.45 m roof of bodum

2.50

( F.F.L )

3.58

4.57

3.58

4.57

4.57 3.58

+0.45 m

3.58

5.00

first floor

1.25 0.91 1.61

( F.F.L )

3.63

4.57

3.58

4.57

3.58

4.57 3.58

4.57

3.58

5.00

roof of bodum

+5.45 m

5.00

1.48

4.57

3.58

4.57

3.58

4.57 3.58

4.57

3.58

5.00

A

SEC

+10.45 m

( F.F.L )

+0.45 m

( F.F.L )

ground floor

ground floor

5.00

4.57 3.58

4.57 3.58

4.57 3.58

4.57 3.58

4.57 3.58

5.00

NORTH

DOCTORES

NO (F.F.L) BECAUSE OF SLOP

NO (F.F.L) BECAUSE OF SLOP

basment

( T.O.S ) -4.55 m

Prof. Tarek Galal

basment

( T.O.S ) -4.55 m

Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants

Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021


0.46

0.81

2.64

1.81

0.12

1.19

1.59

4.35

D2

1.40

1.22

0.37

0.76

0.31

D2

D2

1.01

1.01

0.76

1.08

WATER HEATER

0.91

0.76

1.03

3.95

21 0.48

D6

2.09

wcw gf

D1

WATER SUPPLY 2''

Working Drawings IV (ASE552)

D6

D2 1.01

PVC 4'' FOR TOILET DRAING

wcw gf

D6

4.35

3.72

0.82

4.49

D2

D2

D2

PROJECT NAME:

D1 D2

D6

D2

D2

175057

ID :

D1 D12

AHMED ZAKI

NAME :

D6

21

PVC 3'' FOR BASIN DRAINAGE

0.67

D2

TOWER PROJECT

D6

D2

DRAWING NAME :

GULLY TRAP 30*30

PLUMBING

DRAWING NUMBER :

P100

DRAWING SCALE :

1:100

1.40

D2 0.31

0.76

0.37

wcm gf

1.02 1.02

PVC 2'' FOR VENTILATION

D1

INSPECTION ROOM 60*90

D12

D12

PVC 4'' FOR TOILET DRAING

1

2

3

4

5

6

7

8

Level 12 45.45

GULLY TRAP 30*30

Level 12 45.45

roof 40.45

roof 40.45

Level 9 35.45

Level 9 35.45

Level 8 30.45

Level 8 30.45

Level 7 25.45

20

Level 6 20.45

Level 5 15.45

roof of bodum 10.45

D6

4.37 1.65

Level 7 25.45

Level 6 20.45

Level 5 15.45

roof of bodum 10.45

first floor 5.45

first floor 5.45

ground floor 0.45

ground floor 0.45

basment -5.00

D2

D2

D2

D2

D2

D2

D2

basment -5.00

D2

0.46

0.52

A

SEC

1.21

2.72

1.85

2.18

D2 0.76

1.15

0.76

4.08

0.47

0.91

D2

0.76

1.01

4.08

D2

0.19

1.01

2.22

1.40

PVC 4'' FOR TOILET DRAING

1.01

1.22

0.79

D1

D1

wcm gf 20

N

D6

W7

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3 W19

W20 W21

2

W22

+40.45

1

W23W24

W8

W9

W10

124.06

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

6.99

0.25

W11

W14

7.00

7.00

0.14

7.00

0.14

0.24

W14

W11

6.55

6.55

D6

14.48

2.74

ELE

0.80

2.11

W26 0.45

0.45

W26 A

A

15.40

15.40

8.80

public toilets (Plan) 1:20

+40.45 +10.45

B 0.45

0.45

B

0.45 20.98

0.45

W25

D

D

6.10

6.10

+45.45

+45.45

E

E

+10.45

+40.45

+40.45

+0.45

100.60

100.55

16.53

4.02

+0.00

16.53

WATER SUPPLY 2''

2.98

C 2.98

C W25

0.45

F 0.45

F G

G

28.46

+10.45

14.91

+10.45

14.91

K

8.80

14.55

K

14.55

WATER HEATER

INSPECTION ROOM 60*90 EVERY 25m

0.45

W27 0.45

W27 L

7.00 15.06

7.00

L

0.18

0.18

W13

7.00

W12

7.00

W12

MAIN LINE

0.24

7.00

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

7.00

0.24

124.06

W7

6

5

9.36

53.99

11.69

0.45

11.29

0.85

1 15.38

0.40

0.20

14.98

0.40

C1

0.38

0.39

0.38

0.32

0.40

2 10.94 10.54

C1 0.14

8.46

0.14

14.74

6.48

A

SHOP 2

18.53

18.56

0.54

9.42

2.13

0.06 1.53

8.46

8.62

8.18

D1

6

5

W18

4

3 W19

W20 W21

2

W22

1

W23 W24

W8

W9

W10

Public Toilets (Water Supply) 1:20

C1

0.93 0.51 0.91 0.65

6.53

0.28

0.16

D1

7.13

7.11

4.90

6.85

7 W16

12.27

6

0.28

14.81

6.53

32.25

7.13

8

0.91

D1

0.65

0.37

14.80

15.40

14.80

BANK

SHOP 4

8.46

0.91

0.93

2

C1

Public Toilets (DRAING ) 1:20

W1

15.40

9.42 9.86

W2

0.10

0.16 0.28

5

W15 W3

2.20

1

SHOP 3

8.18

8.25

8.18

3

7.87

8.27

7.85

8.24

SHOP 1

W4

A

0.80

3

4

0.45 0.85

C1

14.28

W5

SEC

14.28

C1

0.40

7 5.32

0.40

0.80

8 0.20

A

W6

2.43

D1

0.45

0.85

0.85

0.19 0.39

1.49

3.43

3.01 1.49

7.57

6.10

1.49

5.85

SHOP 5

3.88

9.83

NORTH

73.07 13.87

0.85

11.29

0.85

10.34

0.80

8.38

0.80

8.38

7.00

7.00 0.63

11

DOCTORES

8.45

SHOP 6

8.69

8.69

73.07

0.28

D5

16.53

D5 0.28 1.16

16.56

4.38

16.36

0.23 0.91

19.90

0.47

0.06

12.14

10

0.91

14.90

25.65

1.67

26.59

10.89

15.53

1.45

1.45 1.45

1.45

1.45 1.45 16.53

D3

1.46

15.35 6.04

C1

D3

E

2.72

2.62

1.46

9.64

D6

2.74

0.80

1.49 1.49

D2

0.80

D

3.28

D2

20

2.11

D3

1.49

D2

wcm gf

7.72

B C

D3

7.70

6.14

0.28

D2

1.70

2.14

1.64

1.81 0.91

5.60 4.35

D12

0.66

1.85

2.00

0.91

0.20 0.55

D6

D2

3.00 1.34

0.91

1.33

9.60

2.73

0.21

1.34

7

0.40

0.80

0.54

D1

D2

17

4.34

4.34

18.39

D2

7.96

1.67

4.34

D1

D6

21

47 1.34

2.17

0.14

wcw gf

elevator lobby gf

2.63

0.240.91 0.99

3.29

0.24

7.16

0.00

8.26

D2

0.45

0.91

4 7.16

5.60

CLEANING ROOM

0.80

5.30

5.30

0.50

Administration

2.65

0.87 10.47

5.85

0.80

D1

0.80

9.92

2.30

0.26 0.91

0.41

0.49 0.86

1.77

0.81

0.76

9.92

1.68

12.09

SERVICE

2.85

0.80

D1

0.81 0.06 0.82

2.27 0.88

6.22

D1

2.34

6.10

1.46 1.49

19

D1

0.76

3.15

18

ATM

0.80

E

2.15

ATM C1

6.61

6.52

10.48

D1

1.77

2.57

14.75

6.32 2.83

D

9.56

1.08 0.76

0.87

0.76

6.76

0.45

0.87 2.82

3.43

4.31

2.61

6.44 0.81

B C

8.85

0.45

0.85

12

Dr. salwa el gendy

14.31

14.91

0.24

C1

SMOKE AND HEAT EXHAUST VENTILATION SYSTEM

0.75 0.91

0.75 0.91

0.48

0.240.910.24

0.24 0.91

14.31 11.21

D5

D5

SHOP 8 13

K

0.80

8.10

8.10

0.80

0.80

10.64

23.11

11.21 15.01

0.80

23.57

28.86

23.57

15.01

0.80

26.42

29.31

Dr. Ahmed Abdelsalam

SHOP 7

4.72

C1

0.80

7.00

7.00 7.63

Prof. Tarek Galal

G

0.50

0.50 2.61 1.49

10.34

14.31

14.31

14.91

7.63

0.40

3.50

27.02 5.55

0.35

0.04 0.80

1.23 2.65

12.68

F 0.67

6.67

1.23

6.94

14.34

K

0.40

10.34

11.29

0.85

0.45

13.87

14.35

0.20 0.40

6.20

F G

WATER HEATER

Dr. lamia shehata Teaching assistants

6.67 0.40

D5

6.94

0.91

SHOP 11 16

SHOP 10 15

14.20

1.60 0.40

PVC 3'' FOR BASIN DRAINAGE

SHOP 9 14

PVC 2'' FOR VENTILATION

1.38

8.65

C1 14.28

5.32

0.40 9.36

C1 0.85

11.74

0.45

11.69

10.54

0.45

0.40

0.80 C1 0.40 0.20

STEEL FIRE PROOFED WATER SUPPLY 5'' FOR FIRE SYSTEM

C1

1.23

3.04

6.70

0.80

L

0.40

14.28

0.43

WATER SUPPLY 2''

6.67

0.20 0.38 1.17

10.48

5.06

3.91

8.11

8.46

7.31

D5

11.21 1.26

6.94

4.72

12.67

15.00

0.91 0.77

D5

2.11 7.63

1.49 26.82

14.15

0.37

7.63

5.55

14.60

14.20

14.20

15.00

C1

0.63

6.70

0.51 0.910.14

0.380.910.46 1.35

7.66

8.46

7.66

1.20

7

6

5

4

3

14.98 15.38

2

Taher Mahmoud Alshimaa Galal

PVC 4'' FOR TOILET DRAING

Yousra Mohamed

GULLY TRAP 30*30

Nermine Ibrahim

L

C1 0.40

10.94

0.40 0.20

53.99

8

Rana Adel

1

public toilets GROUND FLOOR 1:200

INSPECTION ROOM 60*90

PAPER SIZE : A0

DATE: 16- 2 - 2021

W13


Working Drawings IV (ASE552)

hotel

$200,000.00 $200,000.00

hotel

$200,000.00

hotel

presupuesto hotel

presupuesto hotel

AHMED ZAKI

presupuesto hotel

NAME :

175057

ID :

PROJECT NAME:

TOWER PROJECT TYPICAL ELECTRICAL

DRAWING NAME :

DRAWING NUMBER :

E100

DRAWING SCALE :

1:100

1

2

3

4

5

6

7

8

Level 12 45.45

Level 12 45.45

roof 40.45

roof 40.45

Level 9 35.45

Level 9 35.45

Level 8 30.45

Level 8 30.45

Level 7 25.45

Level 7 25.45

Level 6 20.45

Level 6 20.45

Level 5 15.45

Level 5 15.45

roof of bodum 10.45

roof of bodum 10.45

first floor 5.45

first floor 5.45

ground floor 0.45

ground floor 0.45

basment -5.00

furniture plan (type 1) 1:200

basment -5.00

TYPICAL ELECTRICAL LOOKING UP A

SEC

N

ELE W7

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

3 W19

4

W20 W21

2

W22

+40.45

1

W8

W23W24

W9

W10

124.06 7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

6.99

0.25

W14

W11

6.55

6.55

14.48

W11

7.00

7.00

0.14

7.00

0.14

0.24

W14

W26 0.45

0.45

W26

A

15.40

15.40

8.80

A

+40.45 +10.45

B 0.45

0.45

B

W25

2.98

C 2.98

C

0.45 20.98

0.45

W25

D

D

6.10

6.10

+45.45

+45.45

E

E

+10.45

+40.45

+40.45

+0.45

16.53

100.60

100.55

16.53

4.02

+0.00

0.45

F 0.45

F G

G

28.46

+10.45

14.91

14.91

+10.45

8.80

14.55

K

14.55

K

L

0.45

W27 0.45

W27

7.00 15.06

7.00

L

0.18

0.18

7.00

W12

7.00

W12

W13

0.24

7.00

7.00

7.00

6.67

0.45

6.88

7.00

7.00

5.32

0.45

8.91

0.45

6.55

5.14

0.45

1.41

5.32

0.32

3.89

6.97

8.41

3.91

0.32

2.77

7.00

7.00

0.24

124.06

W7

W6

W5

W4

W15 W3

W2

W1

8

7

W16

6

5

W18

4

3

W19

W20 W21

2

W22

1

W23 W24

W8

W9

W10

A

SEC

NORTH

DOCTORES

Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata

furniture plan (type 2) 1:200

Teaching assistants

TYPICAL ELECTRICAL LOOKING DOWN

Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0

DATE: 16- 2 - 2021

W13


NOTE: ALL DRAWINGS ARE IN A1 SIZE

ARCHITECTURE Symbols

Door & Window Schedules Finish Schedules

Typical Details Canopy Details Typical Details Flooring

Site Plan Plans Ground Floor Plan First Floor Plan Roof Floor Plan Sections Section 1 Section B Elevations North Elevation Southe Elevation East Elevation West Elevation Reflected Plans Reflected Ceiling Plan, Ground Floor Reflected Ceiling Plan, First Floor Wall Section Stair Details Bathroom Details Kitchen Details Wardrobe Detailing

LANDSCAPE site plan hardscape softscape landscape details

Working Drawings IV (ASE552) NAME :

AHMED ZAKI ID :

PLUMBING First Floor Plan Plumbing ( Drainage) Site Plan And Ground Floor Plan Plumbing ( Drainage) First Floor Plan Plumbing ( Water Supply) Site Plan And Ground Floor Plan Plumbing ( Water Supply)

175057 PROJECT NAME:

VILLA PROJECT

NORTH

ELECTRICAL

DOCTORES

Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy

First Floor Plan Ground Floor Plan lighting details

Dr. lamia shehata Teaching assistants

Rana Adel Taher Mahmoud Alshimaa Galal

HVAC

Yousra Mohamed Nermine Ibrahim

First Floor Plan Ground Floor Plan Details PAPER SIZE : A1

DATE: 13 - 11 - 2020


WINDOW STIL 3.09

BOLT FOR FIXING

Working Drawings IV (ASE552)

2.20

1.20

NAME :

AHMED ZAKI ID :

Detail

6

175057

ROOF PROOFING DETAIL 1:25

PROJECT NAME:

WINDOW SETING

Detail

3

VILLA PROJECT

DETAIL FOR LIGHTING AND POWER SUPPLY 1:25

BOLT FOR FIXING

MORTAR

BRICK WALL

MORTAR STEEL NET ( SHABAKA) Detail

4

WASTE OF AC

FREON GAS

DETAIL FOR AC PIPES IN WALL 1:5

Detail

7

Detail

TYPICAL FLOORING DETAIL 1:25

Prof. Tarek Galal

WINDOW DETAIL

1

NORTH DOCTORES

Dr. Ahmed Abdelsalam

1:5

Dr. salwa el gendy Dr. lamia shehata Teaching assistants

Rana Adel Taher Mahmoud

15 cm

3.08

3.91

Alshimaa Galal

2.20

Yousra Mohamed Nermine Ibrahim

25 cm

AC FAN

drawing

3.0 m

typical details 20 cm

scale

Detail

2

LIGHT DETAIL

1:5

Detail

9

1:50

LIGHT DETAIL

1:20

Detail

5

SECTION DETAIL FOR AC UNIT 1:25

Detail

8

GROUND PROOFING DETAIL 1:25 PAPER SIZE : A1

DATE: 13 - 11 - 2020


TILES 10*10

TILES 10*10

TILES 10*10

TILES 30*30 MARBLE 40*40

MARBLE 40*40

MARBLE 40*40 MARBLE 40*40

MARBLE 40*40

Working Drawings IV (ASE552)

MARBLE 40*40

NAME : W1

W1

W1

W2

W1

D3

W2

9 10111213 8 7 6 5 4

W1

W3

W1

W3

AHMED ZAKI 14 15 16 17 18 19 20 UP

W1

ID :

W1

D3

175057

D3 D2

D2

D2 D2

1

D2

2

UP

UP

D1

PROJECT NAME:

VILLA PROJECT

W1

11 W1 W1

W1

W1

W1 W1

FIRST FLOOR PLAN FLOORING 1:50

W1

GROUND FLOOR PLAN FLOORING 1:50

NORTH DOCTORES

Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata TILES

Teaching assistants

MORTAR

Rana Adel

SAND WATER INSULATION CONCERT SLAB

CONCERT SLAB

Taher Mahmoud

SAND

Alshimaa Galal Yousra Mohamed

S10 MORTAR + 7.45 T.O.S

Nermine Ibrahim drawing

MARBLE TILES

typical details flooring scale

ROOF FLOOR PLAN FLOORING 1:50

FLOORING DETAIL 1:10

1:50

PAPER SIZE : A1

DATE: 13 - 11 - 2020


1

2

3

4

5

6

Working Drawings IV (ASE552) NAME :

AHMED ZAKI E

E ID :

175057 D

D

C

C

B

B

A

A

PROJECT NAME:

VILLA PROJECT

NORTH DOCTORES

Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants

1

2

3

4

5

Rana Adel

6

Taher Mahmoud Alshimaa Galal

T1 T2

Yousra Mohamed Nermine Ibrahim drawing

T3

site plan

T4 scale

T5

1:100

PAPER SIZE : A1

DATE: 13 - 11 - 2020


N

2

ELE

1

3

4

5

6

B

SEC 17.06

4.00

3.60 0.71

1.18

0.48

2.92 2.13

1.19

W1

0.13 0.93 0.48 1.06

4.90

1.00

D2

11

0.13

175057

1.09

0.84

1.03

3.06

2.62

ID :

2.00

2.00

3.85

3.84

3.98

3.92

A

0.13

3.06

0.51

E

B + 3.95

+ 3.95

1.77

AHMED ZAKI

C

S5 S4

2.78

NAME :

D 8.26

0.19

0.97

D2

1.24 D2

3.34

Working Drawings IV (ASE552)

0.48 3.30

3.92

1.19

2.79

E

+ 3.95

1.07

1.02

0.11 0.81

1.37

1.43

0.60 8.26

0.48 0.43 3.06

W1

D3

S10

1.19

0.73

S6 + 3.95

4.44

W1

0.54

+ 3.95

0.97

1.05

2.39

2.85

S7

2.27

4.88

0.48 0.48

0.12

1.79

1.00

0.48

+ 3.95

D2

2.18

+ 3.95

A

0.55

0.81

S8

14 15 16 17 18 19 20 UP

2.60

2.73

2.02

+ 3.95

1.05

+ 2.83

9 10111213 8 7 6 5 1.12 4

+ 1.98

0.71 0.33

0.93

2.82

1.77

S9

3.74

A

SEC ELE

B

1.00

1.04

W1

1.43

0.61

0.12

0.67 0.48 1.19

3.30

W1

0.05 0.12

0.82

1.77

D3

C

0.55

W2

1.10

3.49

0.91

D

W

1.87

W1 W2

E

3.50

0.71

ELE

1.74

0.13

0.48

0.60

1.19

1.05

0.48

A

1.89 0.97

SEC

0.13

PROJECT NAME: W1

W1

W1

1 0.90

0.98

0.13

0.48

1.12

1.89

1.19

0.48

1.76

0.48

1.19

3.94

0.48

3.60

4.00

0.48

1.19

0.48

0.54 0.37

3.50

2.92

2

3

4

5

VILLA PROJECT

6

1.00 17.06

1.00

0.12

1.89

4.00

3.60

2.92

3.50

1.01

3

4

S

5

6

E

E

0.13

2

0.13

1

0.13

17.06

ELE

B

SEC

3.30 8.25

S10

B

6

B

B

SEC A

0.44

1.89

4.00

0.76

1.43

0.76

3.60

2.92

0.76

1.41

3.50

7.51

0.48

1.19

0.13 0.48

0.97

0.12 0.00

0.12 0.48 3.30

0.48 0.97

0.45 0.12

0.76

0.67

1.14

1.89

0.48

1.19

W1

0.48

7.84

0.48

3.60

4.00

1.19 3.50

2.92

0.48

2

3

ELE

S

4

5

E

Yousra Mohamed

Drawing A

plans

1.03 0.13

16.18

1

Dr. salwa el gendy

Nermine Ibrahim

0.12

13.80

Dr. Ahmed Abdelsalam

Alshimaa Galal ELE

1.19 0.48

1.77

Prof. Tarek Galal

Taher Mahmoud

C

1.35

8.21

1.29

0.12

1.77

1.01

6

3.06

1.77

4.48

W1

2.80 1.08

3.50

5

Rana Adel

D

B

5.16

0.68 0.48

W1

W1

B

SEC

GROUND FLOOR PLAN 1:50

1.19 0.48

+ 0.45

+ 0.15

1.19

3.06

0.76

S1

+ 0.45

0.48 0.48

0.12

1.77

+ 0.45

1.10

D1

W1

+ 0.45

0.60

0.62 0.60 8.26

0.91 0.40

UP

2

2.92

4

Dr. lamia shehata

1.05

SEC 1.05

0.32

D2 1

UP

ELE

B

A

0.76

1.79

1.41

3.60

3

Teaching assistants

8.25

0.76

14 15 16 17 18 19 D3 20

2.16

A

+ 0.45

C W

9 10111213 8 7 1.08 6 5 4 3 2 1

7.75

REF.

3.02

+ 0.45

4.35

D

E

0.82

0.50 2.53

3.30

S2

6.29

S3

ROOF FLOOR PLAN 1:50

A

0.12

W3

+ 0.45

1.10

4.00

2

W1

SEC

E

1.89

17.06

1

W3

A

DOCTORES

16.18 0.13

NORTH

3.06

5

0.12

4

T.O.S 3.06

3

C

+ 7.45

0.12

2

ELE

1

N

D

1.05

8.12 1.05

C

0.60

D

8.00

FIRST FLOOR PLAN 1:50

0.60

3.30

16.81

6

Scale

1:50 PAPER SIZE : A1

DATE: 13 - 11 - 2020


E

D

C

B

A

Detail

6

2.76

1.50

1.31

1.50

roof floor 7.45 m

T.O.S

WHITE PAINTING

2.76

+7.45

+7.45 roof floor 7.45 m

Detail

Working Drawings IV (ASE552)

T.O.S

1

0.13

1

0.13 1.20

WHITE PAINTING

B

F.F.L

landscape level 0.15 m

PROJECT NAME:

VILLA PROJECT

zero level

zero level

SEC

175057

+0.58

ground floor 0.45 m

0.91

Detail

8

landscape level 0.15 m

AHMED ZAKI

F.F.L ID :

3.07 0.78

3.50

0.74 0.18

ground floor 0.45 m

F.F.L

8.50

0.24

Detail

+4.08

first floor 3.95 m

2.00

Detail

1.20

+0.45

NAME : 3.50

1.14

3.07

1.20

WHITE PAINTING

0.13

2.00

first floor 3.95 m

F.F.L

7

3.50

8.50

+3.95

Detail

WHITE PAINTING

0.18

3.50

0.13

1

SECTION B 1:50

NORTH DOCTORES

Prof. Tarek Galal 6

5

Detail

6

4

3

2

1

Dr. Ahmed Abdelsalam

Detail

6

1.50

1.31

1.50

roof floor 7.45 m

+7.45 roof floor 7.45 m

2.89

T.O.S

2.77

+7.45

WHITE PAINTING

Detail

T.O.S

Rana Adel

3.50

1.14

3.07

3.07

3.07

7

Detail 0.24

8.50

1.04

10

+4.08 first floor 3.95 m

F.F.L

0.54

WHITE PAINTING

Detail

3.50 2.58

3.07

ground floor 0.45 m

WHITE PAINTING 0.08

Detail

8

Taher Mahmoud Alshimaa Galal Yousra Mohamed

1

3.07

0.13 3.50

zero level

0.30

landscape level 0.15 m

0.74 0.24

ground floor 0.45 m

1.14

+0.45 F.F.L

WHITE PAINTING

0.24

8.50

first floor 3.95 m

0.96

F.F.L

1.04

+3.95

Dr. lamia shehata Teaching assistants

Detail 3.07

3.50

1.14

0.13

1

Dr. salwa el gendy

+0.58 F.F.L

Nermine Ibrahim Drawing

landscape level 0.15 m

zero level

sections Scale

SEC

A

SECTION A 1:50

1:50 PAPER SIZE : A1

DATE: 13 - 11 - 2020


6

1.50 2.77 1.50 2.58

ground floor 0.45 m

0.08

ground floor 0.45 m

ID :

3.50

WHITE PAINTING

zero level

ELE

N

2

3

4

5

175057 PROJECT NAME:

SOUTH ELEVATION

1

AHMED ZAKI

0.96 3.50

zero level

E

first floor 3.95 m

0.74

3.50

1.50 0.74

3.50

1.50 0.74

ground floor 0.45 m landscape level 0.15 m

landscape level 0.15 m

ELE

Working Drawings IV (ASE552) NAME :

1.57

first floor 3.95 m

WHITE PAINTING

ground floor 0.45 m

roof floor 7.45 m

8.50

3.50

1.04

first floor 3.95 m

2.00

2.00

first floor 3.95 m

WHITE PAINTING

3.50

1.50 2.77 3.50

roof floor 7.45 m

8.50

3.50

roof floor 7.45 m

8.50

1.50

2.77

1.50

WHITE PAINTING

1.50

E

1.50

roof floor 7.45 m

1

2.77

D

2

1.50

C

3

8.50

B

4

1.50

A

5

VILLA PROJECT

SOUTH ELEVATION

NORTH

6 DOCTORES

E

D

C

B

A

Prof. Tarek Galal

roof floor 7.45 m

1.50

Dr. salwa el gendy roof floor 7.45 m

1.39

roof floor 7.45 m

2.77

1.50

roof floor 7.45 m 1.27

WHITE PAINTING 2.77

1.50

WHITE PAINTING

1.50

1.50

1.50

Dr. Ahmed Abdelsalam WHITE PAINTING

Dr. lamia shehata

S

1.50

3.50

ground floor 0.45 m landscape level 0.15 m

landscape level 0.15 m

zero level

ELE

W

SOUTH ELEVATION

Taher Mahmoud Alshimaa Galal Yousra Mohamed

3.50

1.50 0.74

3.50

ground floor 0.45 m

WHITE PAINTING

0.74

ground floor 0.45 m

1.50

1.09

WHITE PAINTING 3.50

1.20 0.91

SOUTH ELEVATION

first floor 3.95 m

2.00

2.00

first floor 3.95 m

zero level

ELE

Rana Adel 8.50

3.50

1.50

8.50

3.50

0.13

first floor 3.95 m

0.30

3.50

1.33 0.30

0.91

WHITE PAINTING

0.30

8.80

1.04

8.80 1.04 0.97

first floor 3.95 m

ground floor 0.45 m

1.25

WHITE PAINTING

1.50

3.50

Teaching assistants

Nermine Ibrahim Drawing

elevations Scale

1:50 PAPER SIZE : A1

DATE: 13 - 11 - 2020


W1

W3

0.42

0.42

0.50 1.52

+ 7.15

AHMED ZAKI

0.77

+ 3.55

+ 3.65

0.80

0.59

D2

+ 3.55

5.52

0.65

D1

W1

0.74

D3

0.60

+ 3.55

2.80

0.61

0.63 0.87

+ 3.65

0.25

0.76 2.16

2.70

1.07 1.46

0.41

NAME :

5.23

0.48

0.68 0.61 1.52

0.48

0.60 0.74

0.95

2.47 1.07

0.34

+ 3.65

+ 3.55

2.47

3.14

0.56

0.93

1.05

+ 3.55

1.56

3.03

0.51

1.01

1.17

1.47

+ 3.651.56

1.05 + 3.55

Working Drawings IV (ASE552)

W1

W3

0.31

1.15

6.30

ID :

1.15

7.11

4.64

0.52

0.60

0.69 0.41

1.69

1.64

1.69

1.64

0.92

0.37 3.66

1.55

3.07 3.66

0.94

2.99

2.16

2.02

1.69

W1

+ 3.55

0.48

0.94 + 3.55

W1

+ 3.55 1.69

1.64

PROJECT NAME:

0.51

0.81

0.69 0.19

0.25

3.16

0.48

+ 3.65

0.43

175057

1.30

0.92

+ 3.55

3.16

1.48

VILLA PROJECT

+ 3.55

0.43

W1

W1

GROUND Reflected FLOOR PLAN 1:50

NORTH DOCTORES

Prof. Tarek Galal W1

W1

W1

W2

0.29

0.37

0.66

+ 7.15

0.63

0.63

W1

+ 7.15

0.40

+ 7.15

1.21

1.23

0.68

1.27

0.58

0.32

0.61

0.37

0.24

0.59

1.31

+ 7.05

0.76

+ 7.15

0.58

0.26

+ 7.15

1.60 0.99

0.59 0.34

1.04

0.62 1.02

0.19

W1

FRIST Reflected FLOOR PLAN 1:50

W1

+ 7.15

11

2.04

0.62

0.19

W1

Yousra Mohamed

0.49

Nermine Ibrahim

0.21

1.80 + 7.15

0.62

+ 7.15

0.62

0.31

0.60

Alshimaa Galal

0.20

0.62

1.12

0.991.60

0.62

0.25 0.46

2.02

0.15 0.83 0.53

+ 7.0

0.99

+ 705

1.98

0.62

1.11

+ 7.05

2.18

0.62 3.04 1.94

0.39

+ 7.15

Teaching assistants

Taher Mahmoud

0.39

1.00

0.62

1.11

+ 7.00

2.23 1.87 1.27

1.21

1.23

4.52 1.07 0.62

0.50 3.11 + 7.15

W1

0.22 0.59

W1

Rana Adel

+ 7.15

D2 0.33

+ 7.15

1.27

1.26

+ 7.05

D2

0.96

1.35

0.69

1.27

0.63

0.39

3.18

3.20

0.59

+ 7.15

0.39

0.41 1.01

0.64 3.17 + 7.05

1.33

0.58

D2

Dr. lamia shehata

1.31

0.40 3.20

D3 0.58

0.78 0.54

+ 7.15

1.32

0.54

D3 D2

0.69

+ 7.15

0.95

+ 7.15

0.41

0.49

1.04

0.59

0.56

0.57 0.44

0.24 0.27

1.31

1.48

0.50

3.11 + 7.15

+ 7.15

+ 7.15

1.00

0.50

3.18 2.55

Dr. salwa el gendy

0.74

1.23

0.49

0.50 0.42

+ 7.15

1.31

+ 7.05

0.74

0.58

0.54 0.88

0.58 1.35

Dr. Ahmed Abdelsalam

W2

0.13 0.97

Drawing

reflected plans Scale

1:50 PAPER SIZE : A1

DATE: 13 - 11 - 2020


+ 2.83

C

B

AHMED ZAKI

Detail

WHITE PAINTING

roof floor 7.45 m

2.76

1.50

ID :

2.76

1.50

1.31

6

175057

roof floor 7.45 m

Detail

PROJECT NAME:

1

Detail

landscape level 0.15 m

VILLA PROJECT

3.50

0.13

Detail

1

8.50

first floor 3.95 m

1

Detail

8

WHITE PAINTING

DOCTORES

3.50

1.20

3.07

0.13

NORTH

0.91

ground floor 0.45 m

0.24

WHITE PAINTING

0.78

3.50

W1

1.14

7

0.13

2.00

first floor 3.95 m

Detail

2.00

WHITE PAINTING

0.18

3.50

+ 0.45

3.07

+ 3.95

+ 2.83

Working Drawings IV (ASE552)

A

NAME :

8.50

UP

D

1.20

1.10

E

0.13

1.12

14 15 16 17 18 19 D3 20

1.20

9 10111213 8 7 6 5 4 3 2 1

0.74 0.18

+ 1.98

Prof. Tarek Galal ground floor 0.45 m

landscape level 0.15 m

Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants

Rana Adel + 1.98

9 10111213 8 7 6 5 4 1.12

1.43

0.3

14 15 16 17 18 19 20

zero level

zero level

Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim Drawing

stair details UP

Scale

1.10

1:50 PAPER SIZE : A1

DATE: 13 - 11 - 2020


UPPER CABINET Working Drawings IV (ASE552) NAME :

HOB (as per slection) TENDOM BOX TENDOM BOX TENDOM BOX

SHELF TO KEEP INGREDIENTS

TRY TRY

SHELF

TRY

SINGLE PULL OUT DRAWER TO KEEP VESSELS

AHMED ZAKI ID :

175057 PROJECT NAME:

4" SKIRTING KT

SECTIONAL ELEVATION 1

VILLA PROJECT

SEC 1

NORTH DOCTORES

Prof. Tarek Galal

UPPER CABINET

UPPER CABINET

Dr. Ahmed Abdelsalam Dr. salwa el gendy

19mm THICK PLYWOOD

Dr. lamia shehata Teaching assistants

20mm GRANITE COUNTER TOP 20mm GRANITE ADDITON

Rana Adel Taher Mahmoud

19mm THICK PLYWOOD SHUTTER WITH 1mm LAMINATE OF APPROVED COLOUR

Alshimaa Galal Yousra Mohamed

20mm THICK GRANITE TOP

Nermine Ibrahim Drawing

KITCHEN DETAILS

19mm THICK PLYWOOD SHUTTER WITH 1mm LAMINATE OF APPROVED COLOUR 19mm THICK PLYWOOD PARTION

SS KITCHEN BASKET (as per selection)

4" SKIRTING

KT

SECTIONAL ELEVATION 2

Scale

SEC2

1:50 PAPER SIZE : A1

DATE: 13 - 11 - 2020


4 4 0.04 0.04

1.64

0.05

0.04

0.04

2.24

0.04

0.04 0.15

0.15

0.05

1.64

0.05

2.23

1.64

0.15

2.23

0.47

0.47

0.47

LED

LED

LED

LED

i 1.20 x 1.60m mirror

1.2

h 1st plywood pine frame door with double wheelbarrow

1.67

1st plywood pine frame door with double wheelbarrow

0.05

0.05

Working Drawings IV (ASE552)

0.7

1.5

2.46

0.03

0.36

2.27

NAME :

0.35

0.35

1.20 x 1.60m mirror

1.2 2.46

0.62

LED

i

1.17

h

1.67

LED

AHMED ZAKI

0.38

0.1

0.01 0.2

1.65

l

0.03 0.23

0.03 0.03 0.16 0.23

1st plywood pine plywood sheet 1 "brushed

0.16

0.2

0.23

0.23

0.23

0.23

Round stick made of pine wood from 1st. 1 "brushed

0.57

0.57

PROJECT NAME:

0.36

k

0.05 0.99

0.65

0.05

1.04

1.2

0.04

0.04

0.99

0.65

ELEVATION 1:10

0.19 0.45

c

0.59

D2 c

a

c

1st grade pine wood slat 1 "brushed

d

6 x 75 x 20mm plywood sheet, 1st pine wood, brushed

e

1st grade pine wood slat 1 1/2 "brushed

f

1/2 "Plywood Sheet 1a. Pine Wood, brushed

g

1st grade pine wood slat 3/4 "thick, brushed

h

1st plywood pine frame door with double wheelbarrow

i

1.20 x 1.60m mirror

j

Round stick made of pine wood from 1st. 1 "x 12 cm

k

Round stick made of pine wood from 1st. 1 "brushed

l

1st plywood pine plywood sheet 1 "brushed

0.04 0.05

1.5

0.03 0.02 0.02 0.04

VILLA PROJECT

0.6

0.82 0.59

0.15

b

0.19

NORTH

b

D2

DOCTORES

0.66

0.6

1a. 1/2 "Plywood Sheet Pine Wood, brushed

0.03

0.05

a

LED

b

0.7

0.82 0.15

c 0.5

1mm pinewood 6mm plywood plywood, brushed

0.05

ELEVATIONAL SECTION 1:10 0.65 0.57

a

175057

0.2

1

0.03

ID :

h h 2.46

2.35

0.35

a

1.2

a

Dr. Ahmed Abdelsalam Dr. salwa el gendy

0.3

Dr. lamia shehata 2.46

a 0.17

a

0.3

Prof. Tarek Galal a

a 0.36

2.27

D6

a

a

a

2.35 2.27

a 2.46

h

h

Rana Adel Taher Mahmoud Alshimaa Galal

0.17

0.25

Teaching assistants

Yousra Mohamed

0.17

0.23

Nermine Ibrahim 0.31

0.23

0.52

0.55

CS1

D3

0.05

0.63

D3 0.09

k

Drawing

k

0.6 0.05

CS2 CROSS SECTIONS

CS3

WARDROBE DETAILING Scale

1:50 PAPER SIZE : A1

DATE: 13 - 11 - 2020


4 1.68

0.04

0.7

0.04

1.5

a a

D5 0.79

0.65

D7

l

0.03

a h

0.63

0.28

k

0.1

0.14

CS2

Working Drawings IV (ASE552)

0.04 0.03

0.04

h CS1

0.05

0.11 0.03 0.13

a

a

0.04 0.04

k

a

a

LS

0.04

a

NAME :

CS3

PLAN

AHMED ZAKI

1.68 0.05

2.33 0.05

1.63

0.05

2.23

b 0.49

c

0.04

LED

LED

1.71

a

1.19

D1

LED

0.63 0.66

c

a

c

a

a

l

a

0.04

1mm pinewood 6mm plywood plywood, brushed

1st plywood pine plywood sheet 1 "brushed

1mm pinewood 6mm plywood plywood, brushed

0.74

a 0.04

0.17

a 0.17

0.25

0.19

1.8

D4

0.17

0.67

0.04

0.23

0.19

0.23

0.19

0.31

k

DOCTORES

Prof. Tarek Galal 0.04

0.98

0.64

0.7 0.06

1.53 0.05

4

Dr. lamia shehata

a

1mm pinewood 6mm plywood plywood, brushed

b

1a. 1/2 "Plywood Sheet Pine Wood, brushed

c

1st grade pine wood slat 1 "brushed

d

6 x 75 x 20mm plywood sheet, 1st pine wood, brushed

e

1st grade pine wood slat 1 1/2 "brushed

f

1/2 "Plywood Sheet 1a. Pine Wood, brushed

g

1st grade pine wood slat 3/4 "thick, brushed

h

1st plywood pine frame door with double wheelbarrow

i

1.20 x 1.60m mirror

j

Round stick made of pine wood from 1st. 1 "x 12 cm

k

Round stick made of pine wood from 1st. 1 "brushed

l

1st plywood pine plywood sheet 1 "brushed

0.33

b

Teaching assistants

Rana Adel

0.03

1.23

D4

a

Taher Mahmoud

b 0.39

0.05 1.25

DRAWER DETAIL

1.28

FRONT CUT

j

0.05 0.18

0.17 0.39

b

Drawing b

0.05

0.33

a

0.17

0.05 0.24

Yousra Mohamed

1.1 1.04

0.18

0.58

Alshimaa Galal

Nermine Ibrahim

1.4

0.4

Dr. Ahmed Abdelsalam Dr. salwa el gendy

LONG SECTION 1:10 0.03

NORTH

0.94 Round stick made of pine wood from 1st. 1 "brushed

0.05 0.05

VILLA PROJECT

0.04

1mm pinewood 6mm plywood plywood, brushed

0.36

1mm pinewood 6mm plywood plywood, brushed

PROJECT NAME:

1mm pinewood 6mm plywood plywood, brushed

0.35

1mm pinewood 6mm plywood plywood, brushed

1mm pinewood 6mm plywood plywood, brushed

175057

1a. 1/2 "Plywood Sheet Pine Wood, brushed

1mm pinewood 6mm plywood plywood, brushed

a

ID :

0.04

0.58

FRONT ELEVATION

1.07

SIDE CUT

* NOTE: All the furniture will be finished with two layers of Var-Express synthetic varnish natural color, spray applied of area.

WARDROBE DETAILING Scale

1:50 PAPER SIZE : A1

DATE: 13 - 11 - 2020


45

1

2

3

4

5

6

2.94

5.14

Working Drawings IV (ASE552)

8.45 9.74

25.62

2.43

9.80

NAME :

4.30

1.77

AHMED ZAKI

7.91 2.34 1.71

E

E 0.47

ID : 1.90

3.61

175057

9.59

D C

D 4.11

PROJECT NAME:

C

4.13

25

B

B 16.58

VILLA PROJECT

2.34 7.01

3.15

3.28

A

1.23

3.61

9.99 2.05

NORTH DOCTORES

2.86 4.35

3.44 5.88

16.23

Prof. Tarek Galal

3.82

Dr. Ahmed Abdelsalam 2.86 2.23

Dr. salwa el gendy Dr. lamia shehata Teaching assistants

3

4

5

6

Rana Adel Taher Mahmoud Alshimaa Galal

1450

2

Yousra Mohamed Nermine Ibrahim

405

1

drawing

HARDSCAPE 2600

A

scale

1:100 2600

PAPER SIZE : A1

DATE: 13 - 11 - 2020


45

1

T1

T3

7.13

2

3

4

5

6

5.77 1.53

2.21

T3

13.50

T1

1.54

1.47

1.30

T4

T3

T4 1.05

4.96

T4

Working Drawings IV (ASE552)

1.24

T5

4.54

2.07

1.13

T4

3.47

3.38

E

1.55

T4

1.56

T1

T1

6.14

2.23

7.79

T4

T3

1.12

4.78

0.87

T4

T4

NAME :

1.16

T4

2.73

0.68

6.25

T4

T4

1.62

T4

11.79

3.72

E

3.38

3.83

1.98

T5

1.53

ID :

T5

T5

175057

1.35

D

1.85

C

D

3.72

C

T2

5.46

5.50

AHMED ZAKI

1.48

T5

3.87

B

3.86 3.81

B

1.81

3.11

2.19

T2

T5

T5

T1

A 2.07

1.22

PROJECT NAME:

VILLA PROJECT

1.85 4.08

A

T5

2.16 0.97 4.22

T4

T4

3.42

T4 T4

1.02

T4

2.36

2.99

T4

NORTH

T5

0.84 12.02

2.58

DOCTORES 0.30 1.25

1.39 2.14

T4 T4

2.77

1.36

0.98

T1

1.21

T1

T4

T1

Prof. Tarek Galal

T4

7.34

T4

1.01

1.20 1.05

T4

T4

7.26 1.59

4.66 13.43

T3 1.33

0.86

T3

T1

Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants

1

2

3

4

5

Rana Adel

6

Taher Mahmoud Alshimaa Galal Yousra Mohamed

T1 T2

Nermine Ibrahim drawing

T3 T4 T1

T2

T3

T4

T5

T5

SOFTSCAPE

scale

1:100

PAPER SIZE : A1

DATE: 13 - 11 - 2020


3.91

Detail

2

Working Drawings IV (ASE552)

Detail

9

NAME :

15 cm

AHMED ZAKI

3.0 m

ID :

175057

25 cm

PROJECT NAME:

Entrance Gates

VILLA PROJECT

1:50 20 cm

Detail

2

LIGHT DETAIL

Detail

1:5

9

LIGHT DETAIL

1:20

Detail

2

Detail

2

NORTH DOCTORES

Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy ETERNAL WALL EAST 1:100

Dr. lamia shehata

ETERNAL WALL WEST 1:100

Teaching assistants

Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Detail

Detail

2

2

Nermine Ibrahim drawing

LANDSCAPE DETAILS

ETERNAL WALL NORTH 1:100

ETERNAL WALL SOUTH 1:100

PAPER SIZE : A1

DATE: 13 - 11 - 2020


W1

W1

W1

W2

W2

9 10111213 8 7 6 5 4

W1

D3

14 15 16 17 18 19 20 UP

Working Drawings IV (ASE552) NAME :

W1

AHMED ZAKI

D3 D2

D2 D2

D2

ID :

175057

11 W1

PROJECT NAME:

W1

W1

VILLA PROJECT

W1

FIRST FLOOR PLAN 1:50

NORTH DOCTORES

Prof. Tarek Galal W1

W3

Dr. Ahmed Abdelsalam

W1

W3

Dr. salwa el gendy

REF.

Dr. lamia shehata W1

Rana Adel

D3 D2 1

2

Teaching assistants

Taher Mahmoud

UP

UP

D1

Alshimaa Galal W1

Yousra Mohamed Nermine Ibrahim

W1

drawing

W1

W1

ELECTRICAL

scale

GROUND FLOOR PLAN 1:50

1:50

PAPER SIZE : A1

DATE: 13 - 11 - 2020


Working Drawings IV (ASE552) NAME :

AHMED ZAKI ID :

175057 PROJECT NAME:

VILLA PROJECT

NORTH DOCTORES

Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants

Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim Drawing

LIGHTING DETAILS

PAPER SIZE : A1

DATE: 13 - 11 - 2020


MORTAR

BRICK WALL

MORTAR Detail

STEEL NET ( SHABAKA)

4

W1

W1

W1

W2

W2

Detail

4

Detail

4

9 10111213 8 7 6 5 4

W1

D3

14 15 16 17 18 19 20 UP

WASTE OF AC

FREON GAS

DETAIL FOR AC PIPES IN WALL 1:5

Working Drawings IV (ASE552) W1

NAME : D3 D2

D2 D2

AHMED ZAKI

D2

ID : 11 W1

175057 3.08

PROJECT NAME:

2.20

W1

W1

W1

VILLA PROJECT

Detail

4

Detail

4

AC FAN

FIRST FLOOR PLAN (HVAC) 1:50

NORTH SECTION DETAIL FOR AC UNIT 1:25

DOCTORES

Prof. Tarek Galal Dr. Ahmed Abdelsalam

W1

W3

W3

Detail

FIRST FLOOR UNIT

4

Detail

REF.

4

D2 1

2

UP

9 10111213 8 7 6 5 4 3 2 1

14 15 16 17 18 19 D3 20

W1

Detail

4

4

GROUND FLOOR PLAN CONTAIN GROUND FLOOR AND FIRST FLOOR FAN UNITE TO SEE ALL UNITS TOGETHER

Teaching assistants

FIRST FLOOR PLAN CONTAIN FIRST FLOOR FAN UNIT ONLY BECAUSE ADDING GROUND FLOOR UNIT WILL BE IN THE MIDDLE OF SOME ROOMS

Dr. lamia shehata Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed

W1

Detail

Dr. salwa el gendy

FIRST FLOOR UNIT

UP

D1

NOTE:

AC SPLIT UNIT

Nermine Ibrahim

W1

PIPES IN WALL

FIRST FLOOR UNIT

FIRST FLOOR UNIT

W1

drawing

PIPES IN WALL

FIRST FLOOR UNIT

W1

HVAC

PIPES UNDER GROUND

AC FAN UNIT scale

FREON GAS PIPE

1:50 GROUND FLOOR PLAN (HVAC) 1:50 PAPER SIZE : A1

DATE: 13 - 11 - 2020