AHMED ZAKI
Architecture WORKING DRAWINGS
PROFINAL PROJECTS BIN GHANNAM ECO-LOGE RESORT ( QATAR) BAB EL NJOOM HYDRAT RESORT ( UAE ) MARSANA RESORT ( UAE ) ALEXANDRIA METRO ( EGY) HEGRA BOUTIQUE HOTEL (KSA)
AHMED ZAKI PROJECT ARCHITECT | MSA University | Class 2021
GPA CUMULATIVE : 3.77 Honor List From genral “Excellent With Honors “
Graduation Project : Project (Grade = A )
A
PROGRAMS Autocad, 3dmax, Corona render, Revit,Lumion, Rhino, Grasshoper, indesign, Shetchup, Twinmotion, Photoshop, illustrator,Office
ACHIEVEMENTS MSA Star By Dr Nawal (2019) Student Training Committee Architecture Coordinator
CONTACT
Grand Egyptian Museum Trip Organizer
Tel : 0021025580944 E-mail : ahmed.mohamedzaki@dar.com E-mail : amadozaki77@gmail IG : amadozakiii
Barjeel Museum Competition
Honorable Mention( International Competition)
The Social Housing In Saint-Denis For Different Cultures Saint-Gobain 3rd Winner (National)
T Tower Project
V Villa Project
ARCHITECTURE
ARCHITECTURAL SYMBOLS & ABBREVIATIONS
D101 Drawings Table and Symbols D102 D103
D200 D201 D202 D203 D300
D400 D500 A100 A101 A110 A120 A130 A140 A150 A160 A170 A200 A300
Door & Window Schedules Finish Schedule
Typical Details Canopy Details Flooring Details Curtain Wall Details
Stair Details Bathroom Details Wall Section Site Plan Landscape Basement Floor Plan Ground Floor Plan First Floor Plan Roof Of podium Floor Plan Typical Floor Plan Roof plan Reflected Ceiling Plan, Ground Floor Section A North Elevation
GRAPHIC SYMBOLS BEDROOM
NORTH OR MAKKAH DIRECTION INDICATOR
1
GRID
A
GRID (PERPENDICULAR)
Working Drawings IV (ASE552)
MATERIAL INDICATION 1
ROOM 0-0000
ROOM NUMBERING SYSTEM ROOM NAME ROOM NUMBER
NAME :
EARTH
WOOD
AHMED ZAKI
175057
ID :
PROJECT NAME:
DRAWING NUMBERING SYSTEM DISCIPLINE BUILDING NUMBER
SAND OR PLASTER
CARPET
REINFORCED CONCRETE
GLASS
TOWER PROJECT
ELEVATION NUMBER
B
A
RAMP NOTATION
0
ASTART OF SLOPE BEND OF SLOPE & DIRECTION UP.
DRAWING NAME : Drawings Table and Symbols
ELEVATION SCALE 1:100 SCALE OF ELEVATION
STAIR NOTATION
SECTION NUMBER
START OF STAIR
00.000 F.F.L.
10 A2-004
B.S.S.
00.000 T.S.S.
DRAWING NUMBER
FINISHED FLOOR LEVEL
T.O.P.
10 A2-004
P.F.L.
00.000 W.F.L.
00.000 T.S.L.
00.000 S.C.L.
ARTIFICIAL STONE MORTER
WATERPROOFING MEMBRANE
BRICK WALL 25 CM OR 12 CM
RIGID THERMAL INSULATION
TERRACE FLOOR
CERAMIC TILES
COLORED ROOF CLAY TILES
WALL SECTION REFERENCE DRAWING NUMBER
TOP OF STRUCTURAL SLAB
TOP OF PARAPET 10 A4-000
00.000
GRANITE OR MARBLE
BOTTOM OF STRUCTURAL SLAB
ELEVATION NUMBER 00.000
D101
CROSS SECTION REFERENCE ELEVATION REFERENCE IN ELEVATION
WALL SECTION NUMBER 00.000
DRAWING NUMBER : DRAWING SCALE :
END OF STAIR & DIRECTION UP.
PAVEMENT FINISH LEVEL
WALKWAY FINISH LEVEL
ELEVATION REFERENCE IN PLAN DRAWING NUMBER
DO
DOOR TYPE NUMBER
W20
WINDOW TYPE NUMBER
TOP SOIL LEVEL
SUSPENDED CEILING LEVEL
PLUMBING
P100 Site Plan Public Toilets Plan Plumbing ( Drainage) Public Toilets Plan Plumbing ( Water Supply)
ELECTRICAL E100 Typical Floor Plan
NORTH
DOCTORES
Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants
Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
Out
Out
Out
In
In
In
0.91
0.6
0.76
2.20
2.20
2.20
Working Drawings IV (ASE552) NAME :
AHMED ZAKI
175057
ID :
PROJECT NAME:
TOWER PROJECT 0.90
0.6
0.76
Elevation
Section
Elevation
Section
Elevation
DOORS DETAILS
DRAWING NAME :
Section
Number of door leafs: 1
Number of door leafs: 1
Number of door leafs: 1
Door Leaf: Artificial oak wood laminate on mdf
Door Leaf: Artificial oak wood laminate on mdf
Door Leaf: Artificial oak wood laminate on mdf
External accesories: Stainless steel handle, lock set beige acrylic signage
External accesories: Stainless steel handle, lock set beige acrylic signage
External accesories: Stainless steel handle, lock set beige acrylic signage
Door frame: hollow 1.5 mm metal frame with electrostatic grey coating (ral 7001)
Door frame: hollow 1.5 mm metal frame with electrostatic grey coating (ral 7001)
Door frame: hollow 1.5 mm metal frame with electrostatic grey coating (ral 7001)
Notes: door components to be fire rated to comply with Egyptian fire code requirements
Notes: door components to be fire rated to comply with Egyptian fire code requirements
Notes: door components to be fire rated to comply with Egyptian fire code requirements
Door opening direction as indicated in floor plan
Door opening direction as indicated in floor plan
Door opening direction as indicated in floor plan
DRAWING NUMBER :
D102
DRAWING SCALE :
1:20
1.4 1.4
NORTH
DOCTORES
Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Number of door leafs: 1 Door Leaf: GLASS PANEL DOOR External accesories: Stainless steel handle, lock set beige acrylic signage Door frame: hollow 1.5 mm metal frame with electrostatic grey coating (ral 7001) Door opening direction as indicated in floor plan
Number of door leafs: 1 Door Leaf: GLASS PANEL DOOR External accesories: Stainless steel handle, lock set beige acrylic signage Door frame: hollow 1.5 mm metal frame with electrostatic grey coating (ral 7001) Door opening direction as indicated in floor plan
Dr. lamia shehata Teaching assistants
Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
Working Drawings IV (ASE552) NAME :
AHMED ZAKI
175057
ID :
PROJECT NAME:
TOWER PROJECT Typical Details
DRAWING NAME :
D1 A200
joint top connection 1:20
D4 A200
parapet detail 1:20
D7 A200
D8 A200 D2 A200
joint top connection 1:20
D5 A200
DRAWING NUMBER :
A200
DRAWING SCALE :
1:20
basement wall and flooring layers 1:20
false ceiling details 1:20
curtain wall connection with slab 1:20
NORTH
DOCTORES
Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants
Rana Adel
D3 A200
joint bottom connection 1:20
D6 A200
Taher Mahmoud
basement wall detail 1:20
Alshimaa Galal Yousra Mohamed
D9 A200
ramp detail 1:20
Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
3
2
4
9
D1
5
Working Drawings IV (ASE552)
D1
AHMED ZAKI
NAME :
175057
ID : D1
Orsa type 1 from 9 cells cell = 60*60
Orsa type 2 from 81 cells cell = 60*60
Orsa type 3 from 289 cells cell = 60*60 D1
8 15
D1
Marble 60*60 Outline Gray marble White marble central 6 orsa type 1 from 9 cells
Marble 60*60 Outline Gray marble White marble central
Marble 60*60 Outline Gray marble White marble central
2
9
3
4
Marble 60*60 Outline Gray marble White marble central
5
12
Marble 60*60 Outline Gray marble White marble central
13 8
Marble 60*60 White marble central 3 orsa type 1 from 9 cells
D1
11
D1 D1
10
6
D1
D2
18
D2
D2
FLOORING
DRAWING NAME :
D6
DRAWING NUMBER :
D202
DRAWING SCALE :
1:100
D1 D6
D2
16
TOWER PROJECT
D3 D12 D3 D2
17 D2
D2
D2 D1 D6 1
2
3
4
5
6
7
8
Level 12 45.45
Level 12 45.45
roof 40.45
14
Marble 60*60 White marble central 5 orsa type 1 from 9 cells
7
7
PROJECT NAME:
roof 40.45
Level 9 35.45
Level 9 35.45
Level 8 30.45
Level 8 30.45
Level 7 25.45
Level 7 25.45
Level 6 20.45
Level 6 20.45
Level 5 15.45
Level 5 15.45
roof of bodum 10.45
19
D3
roof of bodum 10.45
first floor 5.45
first floor 5.45
ground floor 0.45
ground floor 0.45
basment -5.00
basment -5.00
A
SEC
D3
21
D5 N
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
3 W19
4
W20 W21
2
W22
+40.45
1
W8
W23W24
W9
W10
124.06 7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
6.99
0.25
W14
7.00
7.00
0.14
7.00
0.14
0.24
W11
6.55
6.55
14.48
W11
W26 0.45
0.45
W26
A
15.40
8.80
A
15.40
+40.45 +10.45
B 0.45
B C 2.98
C W25
0.45
W25
D
D +45.45
6.10
20
W7
W14
0.45
22
Marble 60*60 White marble central
Marble 60*60 White marble central
+45.45
E
E
+10.45
+40.45
+40.45
+0.45
Marble 60*60 White marble central
14
Marble 60*60
Marble 30*30 White marble central
16.53
100.60
100.55
16.53
4.02
+0.00
0.45
F 0.45
F G
G
28.46
+10.45
14.91
+10.45
14.91
White marble central 13 orsa type 1 from 9 cells 2 orsa type 2 from 81 cells
8.80
14.55
K
14.55
K
W27 L
W12
0.18
7.00
W13
7.00
W12
White marble central 11 orsa type 1 from 9 cells 1 orsa type 2 from 81 cells
7.00
L
0.45
W27 0.45
21
7.00
17
Marble 60*60
0.24
7.00
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
7.00
0.24
124.06
W7
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3
W19
W20 W21
2
W22
1
W23 W24
W8
W9
W10
A
SEC
Marble 60*60
6
15.06
11
Marble 30*30 White marble central
2.98
13
18
0.45
16
Marble 60*60 White marble central
20.98
Marble 60*60 White marble central
15
6.10
Marble 60*60 White marble central
0.18
10
ELE
Marble 60*60 White marble central
12
D5
23
White marble central 6 orsa type 1 from 9 cells 1 orsa type 2 from 81 cells
22
19 Marble 60*60
20
White marble central 12 orsa type 1 from 9 cells 2 orsa type 2 from 81 cells
24
23
Marble 60*60
Marble 60*60 White marble central 2 orsa type 1 from 9 cells
D5
Marble 60*60 White marble central 2 orsa type 1 from 9 cells
D5
24
Marble 60*60 White marble central 2 orsa type 1 from 9 cells
25
29
NORTH
White marble central 24 orsa type 1 from 9 cells 1 orsa type 3 from 289 cells
DOCTORES
29
25
D5
Marble 60*60 White marble central 3 orsa type 1 from 9 cells
Dr. Ahmed Abdelsalam
28 28
Marble 60*60 White marble central 4 orsa type 1 from 9 cells
27
Marble 60*60 White marble central 4 orsa type 1 from 9 cells
26
Marble 60*60 White marble central 3 orsa type 1 from 9 cells
Prof. Tarek Galal
D5
Dr. salwa el gendy D5
27
26
Dr. lamia shehata Teaching assistants
Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
W13
Parapet Detail roof insulation layers
F
F
F
F
F
F
F
1
2
2
1
1
1
2
F
F
F
2
1
Aluminum cladding
R.C
ANCHOR BOLT
CURTAIN WALL TRANSOM 120mm * 60mm
Curtain wall top detail
1
F
F
F
F
F
F
F
F
F
F
2
1
1
2
2
2
1
2
1
2
F
F
F
F
F
F
F
F
F
F
ALUMINUM COVER 4mm
Working Drawings IV (ASE552) NAME :
GLASS PANEL
D4 D203
parapet detail 1:10
D4 D203
AHMED ZAKI
175057
ID :
PROJECT NAME:
CURTAIN WALL MULLION 200mm *100 mm
parapet detail 1:5
1
2
2
1
1
1
2
F
F
F
F
F
F
F
2
1
1
2
2
2
1
D4 D203
1
2
1
F
F
F
2
1
2
TOWER PROJECT CURTAIN WALLS
DRAWING NAME : DRAWING NUMBER :
D203
DRAWING SCALE :
1:20
CURTAIN WALL ELEVATION 1:10
Curtain wall bottom detail
ANCHOR BOLT false ceiling
1.5
CURTAIN WALL MULLION 200mm *100 mm
CURTAIN WALL TRANSOM 120mm * 60mm
F R.C
2.3
1
GLASS PANEL
D5 D203
curtain wall connection with slab 1:10
D4 D203
Middle connection detail curtain wall 1:5
F 2.3
2 Parapet Detail Aluminum cladding
Curtain wall top detail
roof insulation layers
false ceiling
D4 D203
Curtain wall middle detail
GLASS PANEL
CURTAIN WALL UNIT 1:5
CURTAIN WALL MULLION 200mm *100 mm
NORTH
DOCTORES ANCHOR BOLT CURTAIN WALL TRANSOM 200mm * 100mm
Curtain wall bottom detail
marble flooring for typical floor
TYPE
1
L*W
1.5*2.3
DESECRATION OPERATION COLOR FIXED
GREEN
Prof. Tarek Galal
U-VALUE TRANSPARENCY REFLECTION 3
Dr. Ahmed Abdelsalam Dr. salwa el gendy
100%
30%
Dr. lamia shehata Teaching assistants
D4 D203
BOTTOM DETAIL CURTAIN WALL 1:5
D4 D203
BOTTOM DETAIL CURTAIN WALL 1:50
2
1.5*2.3
FIXED
GREEN
3
100%
70%
Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
9.39 9.39
7.71
0.87
4
5
7
6
8
2.00
5.78
0.18
7.96
225 226 227 228229 230 231232 233 234235 236 237 238 239
30
5.78
Elevator Lobby ROOF FLOOR
1.34
0.64
0.63
1.34
roof 40.45 m
0.64
MARBLE 3 CM
240
239
237
243
236
244
235
1.70
245
234
247
233 232
231
0.40
211
212
214
213
209
0.40
210
0.87
8.52
251
215
208
216
207
217
206
218
205
204
220
203
202
228
222
MARBLE 3 CM 30
183
184
185
182
186
181
187
180
188
179
189
178
190
191
177 176
192
175
+25.45 m
201
30
155
156
158
157
154
153
159
152
160
151
161
150
162
149
163
174
148
164
147
173
30
127
128
129
126
130
125
131
124
132
123
133
122
134
121
135
120
136
119
+15.45 m
145
137
118
MARBLE 3 CM 30
1.68
7.71
0.93
0.50
1.34
0.92
99
100
102 101
0.87
98
1.39
117
0.77
93
92
91
73
72
0.50
70
74
69
68
76
67
77
66
65
64
63
0.17
first floor 5.45 m
2.49
2.70
3.70
43
44
45
42
0.13
2.30
0.03 46
41
47
40
48
39
49
38
51
50
37
36
52
35
+0.45 m
0.45
1.34
1.34
1.34
1.33
1.34
0.64
34
0.85
15
2.17
0.21
0.03
0.24
0.21
0.40
0.50
0.50
2.30
2.63
2.30
2.63
2.30
2.63
3.29
17
NO (F.F.L) BECAUSE OF SLOP
0.50 8.52
0.31
1.75 2.20
0.14
18
13
MARBLE 3 CM 30
PLAIN CONCRET 300 MM MARBLE 3 CM
0.50 0.87
16
14
1.70
0.50
1.70
22
30
( F.F.L )
141
Level 6 20.45 m
115
+15.45 m
30
114
( F.F.L )
113
Level 5 15.45 m
+10.45 m
30
87
86
( F.F.L )
85
84
83
10.45 m
+5.45 m
MARBLE 3 CM
60
54
33
59
30
58
56
55
( F.F.L )
57
first floor 5.45 m
19
12
20
21
23
24
25
26
+0.45 m
MARBLE 3 CM
32
31
30
30
NORTH
( F.F.L )
29
27
0.45 m
DOCTORES
Prof. Tarek Galal 11
10
9
8
7
6
NO (F.F.L) BECAUSE OF SLOP 5
4
3
2
( T.O.S ) -4.55 m
Dr. Ahmed Abdelsalam Dr. salwa el gendy
1
basment -4.55 m
0.50
2.17 1.70
30
142
28
ground floor 0.45 m MARBLE 3 CM
2.17
143
MARBLE 3 CM
88
( F.F.L ) 0.63
( F.F.L ) Level 7 25.45 m
MARBLE 3 CM
82
61
53
+25.45 m
30
169
111
( F.F.L )
2.70
2.46
2.70
3.70
9.87
Elevator Lobby GROUND FLOOR
1.70
89
Level 8 30.45 m
139
116
110
81
62
+5.45 m
30
0.02
90
80
79
78
MARBLE 3 CM
3.00
2.00
71
75
0.20
1.70
5.78
+0.45
0.50
0.50 0.40 2.20
7.96
10.40
30
1.32
2.00
94
roof of bodum 10.45 m
0.16
0.16 0.50
9 10 11 12 13 14 15
0.33 0.18
95
106
+10.45 m
0.50 0.03
2.72
0.08 29 30 31 32 33 34 35 8
103
96
105
109
( F.F.L )
197
MARBLE 3 CM
144
138
( F.F.L )
0.13
+0.45
2.64
97
104
108 107
MARBLE 3 CM
1.20
2.73 3.40
0.50
+2.49
+5.45
28 27 26 25 24 23 22 21 20 19 18 17 16
0.21
1.20
1.34
171 170
112
Level 5 15.45 m
+30.45 m
30
198
167
( F.F.L )
2.20
199
140
MARBLE 3 CM
Level 9 35.45 m
MARBLE 3 CM
172
166
165
146
Level 6 20.45 m
0.50
1:20
( F.F.L )
225
195
( F.F.L )
9.39
D300
DRAWING SCALE :
+35.45 m
30
226
168
MARBLE 3 CM
3.20
227
MARBLE 3 CM
200
194
193
( F.F.L ) Level 7 25.45 m
roof 40.45 m
223
196
Level 8 30.45 m
Staircase Roof Plan 1:50
252
MARBLE 3 CM
229
221
( F.F.L )
9.39
D2 D300
250
224
219
+30.45 m
Staircase Basement plan 1:50
STAIR DETAILS
DRAWING NUMBER :
( T.O.S ) +40.45 m
230
Level 9 35.45 m
8.52 9.39
249
( F.F.L )
30
D2 D300
248
+35.45 m 2.30
2.63
3.29
2.30
1.70
242 241
238
1.70
246
30
2.17
MARBLE 3 CM
0.87
TOWER PROJECT
30
( T.O.S ) +40.45 m
2.17 2.63
2.30
1.33
2.17
1.70
2.63
2.30
2.63
1.34
2.17
1.70
1.70 3.29
1.34
2.63
2.17 2.17
1.34
MARBLE 3 CM
2.63
1.33
2.30
1.34
2.30
1.34
175057
DRAWING NAME : +40.75
+40.75
+40.45
D4 1.34
( T.O.S ) +45.45 m
( T.O.S ) +45.45 m
7.96
0.45
0.45
0.63
Level 12 45.45 m
Level 12 45.45 m
2.00
2
D4 10.40
9.87
2.00
Elevator Lobby Basement
-0.45
3.00
10.40
2.00
1
2.72
2.64
2
0.18
+37.33
+40.45
1
9 10 11 12 13 14 15
9.87
3
PROJECT NAME:
3.00
2
AHMED ZAKI
ID :
1.20
1
NAME :
1.39
0.21
2.73
2.72
3.40
-0.45
2.64
Working Drawings IV (ASE552)
252 251 250 249 248 247 246 245244 243 242 241 240
1.39
1.20
2.73 3.40
7.71
-2.04
+0.45
28 27 26 25 24 23 22 21 20 19 18 17 16
0.21
1.20
0.87
1.68
1.20
1.68
basment -4.55 m
( T.O.S ) -4.55 m
Dr. lamia shehata Teaching assistants
0.50 0.50
Rana Adel
3.20
9.39
Taher Mahmoud Alshimaa Galal
D2 D300
Staircase Ground Floor Plan 1:50
D2 D400
ELEVATOR PLAN 1:20
D2 D400
Sections Of Main Staircase 1:100
Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
0.46
30*30 Marble Tiles
0.81
2.64
1.81
0.12
1.19
1.59
4.35
1.40
D2 1.22
DT402
0.37
0.76
D2
D2
1.01
1.01
DT401
0.31
0.76
1.08
D1
0.91
DT403
0.76
1.03
3.95
21 0.48
D6
2.09
wcw gf
Working Drawings IV (ASE552)
D6
D2 1.01
D2
0.47
4.08
0.76
0.76
0.31 DT403
0.37
4.35
DRAWING NAME :
Bathroom Details
DRAWING NUMBER :
D400
DRAWING SCALE :
1:100
1.02
0.76
DT402
wcm gf
TOWER PROJECT
1.01 D2
0.76
PROJECT NAME:
1.02 DT401
D1
0.91
1.01
D2
1.15
1.01
D2
1.40
1.22
DT401
3.72
D12
4.49
4.08
1.40 0.19
175057
ID :
0.82
30*30 Marble Tiles
AHMED ZAKI
NAME :
0.67
1
2
3
4
5
6
7
8
Level 12 45.45
Level 12 45.45
roof 40.45
roof 40.45
Level 9 35.45
Level 9 35.45
2.22
20
Level 6 20.45
Level 5 15.45
roof of bodum 10.45
D6
roof of bodum 10.45
first floor 5.45
first floor 5.45
ground floor 0.45
ground floor 0.45
1.21 0.46
0.79
DT402
N
W7
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3 W19
W20 W21
2
W22
+40.45
1
W23W24
W8
W9
W10
124.06
0.24
7.00
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
6.99
0.25
7.00
0.14
W14
W11
6.55
6.55
14.48
W11
W14
0.14
2.74
7.00
0.52
A
SEC
0.80
basment -5.00
1.85
basment -5.00
2.72
2.11
Level 7 25.45
Level 6 20.45
Level 5 15.45
4.37 1.65
Toilets Flooring Detail 1:20
Level 8 30.45
Level 7 25.45
ELE
2.18
Level 8 30.45
W26 0.45
0.45
W26 A
A
15.40
15.40
8.80
Public Toilets Plan 1:20
B 0.45
0.45
B
2.98
C 2.98
C W25
0.45 20.98
0.45
W25
D
D
6.10
6.10
+45.45
+45.45
E
E
+10.45
+40.45
+40.45
+0.45
16.53
100.60
100.55
16.53
4.02
+0.00
0.45
F 0.45
F G
G
28.46
+10.45
14.91
+10.45
14.91
D1 D400
+40.45 +10.45
8.80
14.55
K
14.55
K
0.82
7.00
7.00
15.06
7.00 0.18
0.18
7.00
0.38
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
7.00
0.24
124.06
W6
W5
W4
W15 W3
W2
W1
8
7 W16
6
5
W18
4
3 W19
W20 W21
2
W22
1
W23 W24
W8
W9
W10
0.80
0.24
0.12
0.48
0.36
2.40
1.94
0.39
0.39
0.25 NORTH
0.76
0.31
0.79
0.19
0.53
0.39 0.11
0.39 0.25
0.82
3.72
0.82
0.46
0.46
1.31
2.13 0.74
2.31
7.00
0.80 3.72
1.26
2.99
1.41
1.41 2.31
W12
0.24
W7
0.97
0.97
0.97 2.99 3.72
W13
A
1.59
L
W12
SEC
2.13
0.45
L
3.89
0.74
W27 0.45
W27
DT403
DOCTORES
Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants
Rana Adel Taher Mahmoud
D3 D400
Public Toilets ( Section ) 1:20
D2 D400
Public Toilets (Elevation of Mirror/sink) 1:20
Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
W13
Parapet Detail Aluminum cladding
Working Drawings IV (ASE552)
roof insulation layers
NAME :
AHMED ZAKI
175057
ID :
PROJECT NAME:
TOWER PROJECT
1.05
roof
roof ( T.O.S ) +40.45 m
WALL SECTION
DRAWING NAME :
false ceiling
4.57 3.58
Curtain wall top detail
5.00
( T.O.S ) +40.45 m
+35.45 m
D500
DRAWING SCALE :
1:20
4.57 3.58
Level 9
5.00
( F.F.L )
DRAWING NUMBER :
+30.45 m
Level 8
5.00
( F.F.L )
4.57 3.58
Curtain wall middle detail
+25.45 m
( F.F.L )
Level 7
+20.45 m
Level 6
5.00
( F.F.L )
4.57 3.58
Level 9
41.50
+35.45 m
( F.F.L )
4.57 3.58
marble flooring for typical floor 5.00
Curtain wall bottom detail
+15.45 m
4.57 3.58
Level 5
5.00
( F.F.L )
+10.45 m
Curtain wall bottom detail
( F.F.L )
roof of bodum
ground floor
4.57 3.58
( F.F.L )
5.00
+0.45 m
+5.45 m
5.00
4.57 3.58 4.57 3.58
first floor
5.00
( F.F.L )
+0.45 m
ground floor
4.15
( F.F.L )
NORTH
NO (F.F.L) BECAUSE OF SLOP
basment ( T.O.S ) -4.55 m
DOCTORES
Prof. Tarek Galal Dr. Ahmed Abdelsalam
polish concert by helicopter
NO (F.F.L) BECAUSE OF SLOP
Dr. salwa el gendy Dr. lamia shehata
basment
Teaching assistants
( T.O.S ) -4.55 m
Rana Adel Taher Mahmoud Alshimaa Galal
D2 D500
joint bottom connection 1:20
D1 D500
joint bottom connection 1:100
Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
N
ELE
W7
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3W19 W20 W21 2
W22
1
W23W24 W8
W9
Working Drawings IV (ASE552)
W10
124.06 7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45 1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32 2.77
7.00
6.99
W14
7.00
7.00
W11
PROJECT NAME:
TOWER PROJECT
W26
LANDSCAPE
A
DRAWING NUMBER :
A101
DRAWING SCALE :
1:200
15.40
15.40
8.80
A
175057
ID :
DRAWING NAME :
6.55
0.45
W26
0.45
6.55
14.48
W11
AHMED ZAKI
NAME :
0.25
0.14
7.00
0.14
0.24
W14
+40.45 T.O.S
1
B
B
+10.45 T.O.S
2
3
4
5
6
7
8
Level 12 45.45
Level 12 45.45
roof 40.45
roof 40.45
6.10
0.45 2.98 0.45
0.45 2.98 0.45
D
W25 D
Level 9 35.45
Level 8 30.45
C
6.10
W25
20.98
Level 9 35.45
C
Level 8 30.45
Level 7 25.45
Level 7 25.45
Level 6 20.45
Level 6 20.45
Level 5 15.45
Level 5 15.45
roof of bodum 10.45
roof of bodum 10.45
first floor 5.45
first floor 5.45
ground floor 0.45
ground floor 0.45
basment -5.00
+45.45 T.O.S
+40.45 T.O.S
+10.45 T.O.S
E
A
SEC
E
basment -5.00
+0.45
N
4.02
ELE
+0.00
16.53
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3 W19
W20 W21
2
W22
+40.45
1
W23W24
W8
W9
W10
124.06 7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
7.00
2.77
6.99
0.25
W11
6.55
W26 0.45
0.45
W26
100.60
A
15.40
15.40
8.80
A
+40.45 +10.45
B 0.45
0.45
B C
W25
2.98
C 2.98
20.98
0.45
W25 0.45
100.55
W14
14.48
W11
7.00
7.00
0.14
7.00
0.14
0.24
W14
6.55
16.53
W7
+40.45 T.O.S
D
D
6.10
6.10
+45.45
+45.45
E
E
+10.45
+40.45
+40.45
+0.45
16.53
100.60
100.55
0.45
F 0.45
F G
G
28.46
+10.45
14.91
+10.45
14.91
F
8.80
14.55
K
14.55
K
W27 L
15.06
7.00
L
0.45
W27 0.45
G
7.00
0.45
F G
0.45
16.53
4.02
+0.00
0.18
0.18
7.00
W12
7.00
W12
W13
0.24
7.00
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
7.00
0.24
124.06
W6
W5
W4
W15 W3
W2
W1
8
7 W16
6
5
W18
4
3 W19
W20 W21
2
W22
1
W23 W24
W8
W9
W10
14.91
28.46
14.91
W7
+10.45 T.O.S
A
SEC
+10.45 T.O.S
0.45 15.06
W12
NORTH
DOCTORES
7.00 0.18
W13
0.18
7.00
W12
T1
W27 L
7.00
L
7.00
W27
0.45
8.80
14.55
K
14.55
K
W13
Prof. Tarek Galal Dr. Ahmed Abdelsalam
0.24
7.00
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45 1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32 2.77
7.00
7.00
0.24
124.06
T2
Dr. salwa el gendy Dr. lamia shehata
W7
W6
W5
W4
W15 W3
W2
W1
8
7 W16
6
5
W18
4
3 W19W20W21 2
W22
1 W23 W24 W8
W9
W10
Teaching assistants
Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
W13
7
6
N
5
3
4
ELE
8
2
1
54.38 0.39
5.32
9.36
0.45
10.94
1.22
10.92
1.24
10.16
15.38 0.78
0.40
14.60
0.79 0.59
A
13.90
11.69
0.70
0.31
0.78
0.45
A
6.99
6.77
6.66
53.41
-5.00
1.10
31.05
0.79
7.00
AHMED ZAKI
14.82
NAME :
5.72
5.48
5.75
Working Drawings IV (ASE552)
15.40
6.27
0.70
15.40
6.76
175057
ID :
D1 D400
23.84
0.85 D1 D2
D6
3.00 1.34
1.33
DRAWING NUMBER :
A110
DRAWING SCALE :
1:100
1.34 D2
D2
D2
1.70
D1
2.30
2.63
BASEMENT FLOOR
DRAWING NAME :
6.10
1.34
D
TOWER PROJECT
D6
0.66
1.34
2.19
0.80
D2
12.02
0.55 3.92
D2
7.96
2.00
1.50
D6
D3
E
0.84
0.80
2.53
D3
3.94
5.93
5.30
0.45
16.90 6.10
D400
D2
8.63
D6
D2
3.43
0.21
3.69
2.73
3.22
2.82 23.06
D1
D2 0.80
23.28
3.43
C
4.46
D1
1.33
E
0.45
B
0.86
C
3.75
D
PROJECT NAME:
1.49
2.76
D1 D300
D3
0.45
7.00
D400
B
31.85
2.52
1.10
1.25
6.27
2.35
6.76
1
2
3
4
5
6
7
8
Level 12 45.45
Level 12 45.45
25.65
4.02
5.32
roof 40.45
roof 40.45
Level 9 35.45
Level 9 35.45
Level 8 30.45
Level 8 30.45
Level 7 25.45
Level 7 25.45
Level 6 20.45
Level 6 20.45
Level 5 15.45
Level 5 15.45
roof of bodum 10.45
roof of bodum 10.45
0.63
0.63
first floor 5.45
first floor 5.45
ground floor 0.45
ground floor 0.45
basment -5.00
5.59
4.36
0.58
21.63
0.79
7.00
0.73
7.03
basment -5.00
7.04
16.53
6.27
16.53
6.76
-5.00
6.91
73.46
0.80
73.46
11.28
73.17
56.60
A
SEC
10.33
0.87
11.28
0.79
6.63
0.61
N
ELE W7
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3 W19
W20 W21
2
W22
+40.45
1
W23W24
W8
W9
W10
124.06
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
6.99
0.25
W14
W11
6.55
6.55
14.48
W11
7.00
7.00
0.14
7.00
0.14
0.24
W14
W26 0.45
0.45
W26
A
15.40
15.40
8.80
A
+40.45 +10.45
B 0.45
0.45
B
2.98
C 2.98
C W25
0.45 20.98
0.45
W25
D
D
6.10
6.10
+45.45
+45.45
E
E
+10.45
+40.45
+40.45
+0.45
0.45
16.53
100.60 0.45
F 0.45
F G
G
28.46
+10.45
14.91
14.91
+10.45
8.80
14.55
K
14.55
K
0.45
W27 0.45
W27 L
7.00
L
7.00
W12
0.18
0.18
7.00
W12
W13
7.00
G
15.06
0.85
10.63
10.61
0.85
F 0.45
F G
100.55
16.53
4.02
+0.00
0.24
7.00
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
7.00
0.24
124.06
W7
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3
W19
W20 W21
2
W22
1
W23 W24
W8
W9
W10
12.50
A
SEC
7.00
0.75
37.61
-5.00
13.69
0.40
0.85
11.74
10.54
0.40
7.25
7.00
29.30
0.49
7.03
6.97
14.91
7.00
14.91
0.62
K
K
9.97
NORTH
DOCTORES
Prof. Tarek Galal
15.00
0.70
15.00
Dr. Ahmed Abdelsalam 4.92
40.46
0.61
Dr. salwa el gendy
7.00
Dr. lamia shehata Teaching assistants
6.81
6.82
6.81
-5.00
Rana Adel
53.41
0.60
0.59
0.300.70
Taher Mahmoud
L
L
Alshimaa Galal Yousra Mohamed
0.77 0.38
13.90
5.32
0.79 0.45
9.36
11.38 11.69
1.23 0.45
10.16 10.94
0.76
14.62 15.38
0.79 0.40
54.37
8
7
6
5
4
3
2
1
Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
W13
6
5
9.36 14.28
53.99 0.45
10.94
11.29
0.85
10.54
C1
0.20
14.98
0.40
C1
0.38
14.28
1 15.38
0.40
C1
0.38
0.39
0.32
0.40
0.80
2
11.69
0.85
C1
A
3
4
0.45
0.14
8.46
6.48
0.40
7 5.32
0.40
0.80
8 0.20
A
0.14
14.74
SHOP 2 +0.45
9.42
8.62
2.13
0.06 1.53
8.46
6.53
0.28
D1
C1
7.11
175057
ID :
0.37
6.85
7.13
D1
AHMED ZAKI
NAME :
0.16
32.25
4.90
Working Drawings IV (ASE552)
15.40
0.93 0.51 0.91 0.65
6 +0.45
14.81
0.28
2.20
0.54
6.53
0.91
18.53
+0.45
SHOP 4
8.46 0.65
D1
D1
2 18.56
0.93
7.13
14.80
15.40
14.80
BANK
0.91
12.27
9.42 9.86
C1
5
+0.45
0.10
0.16 0.28
SHOP 3
8.18
+0.45
8.18
8.18
3 8.25
1
7.87
8.27
7.85
8.24
SHOP 1
PROJECT NAME:
2.43
1.67
20
2.11
D6 1.85
0.80
2.74
0.80
2.62
0.45
0.85
3.43
1.46
GROUND FLOOR
DRAWING NAME : DRAWING NUMBER :
A120
DRAWING SCALE :
1:100
6.10
7.57
1.46
7.70
D3
3.28
D1
2.14 3.01
D2
wcm gf
TOWER PROJECT
+0.45
1.49 D2
D
1.49
D2
0.85
0.19 0.39 9.64
D3
1.49
D2
7.72
1.49 1.49
6.14
0.66
1.70
C
1.49
5.60 4.35
D12
B
0.28
1.34
1.64
1.81 0.91
D6
D2
0.91
1.33
2.30
2.63
1.34
+0.45
7
0.91
0.20
D1
0.40
0.54
D1
D2
3.00
47 1.34
0.45
0.14
D1
CLEANING ROOM
9.60
0.21
2.73
5.85
0.55
elevator lobby gf
2.00 0.24
D2
7.96
2.17 3.29
7.16
0.00
0.87
1.77
0.41
4
D1 D400
D6
21
D400
D2
5.30
0.91
wcw gf D2
1.08 0.76
0.86
0.76 0.80 6.76
5.30
0.50
Administration
5.60 8.26
17
2.85
0.80
0.80
0.80
1.49 0.80
19
D1
SERVICE
ATM
10.47
12.09
D1 6.61
0.76
1.46
6.22
0.88
18
0.81
D1
2.65
9.92
2.27
3.15
ATM C1
6.10
2.15
1.68
0.80
D1 D200
2.72
0.26 0.91 0.49
2.57
D1 2.83 6.52
E
9.56 14.75
2.34
D
0.76
1.77
2.82
0.87
0.45
0.87
3.43
4.31
6.32 1 2 3
D1
9.92
D3
C
0.81 0.06 0.82
D1 D300
D400
B
10.48
2.61
6.44 0.81
E 1
2
3
4
5
6
7
8
4.34
10.89
1.67
5.85
SHOP 5
3.88
9.83
25.65
0.240.91 0.99
0.23 0.91
first floor 5.45
first floor 5.45
ground floor 0.45
ground floor 0.45
basment -5.00
basment -5.00
0.28
D5
16.53
D5 0.28 1.16
16.56
16.36
Level 5 15.45
roof of bodum 10.45
A
4.38
Level 6 20.45
Level 5 15.45
roof of bodum 10.45
SEC
0.47
19.90
0.91
0.06
12.14
Level 7 25.45
Level 6 20.45
+0.45
14.90
Level 8 30.45
Level 7 25.45
10
0.85
10.34
0.80
N
W7
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3 W19
W20 W21
2
W22
+40.45
1
W23W24
W8
W9
W10
124.06
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
6.99
0.25
7.00
0.14
7.00
W11
W14
0.14
0.24
W14
+0.45
7.00
11
8.38
W11
6.55
11.29
14.48
0.85
6.55
13.87
7.00
7.00 0.63
8.45
SHOP 6
8.69
8.69
73.07
D1 D200
73.07
roof 40.45
Level 9 35.45
Level 8 30.45
7.16
15.53
1.45
1.45 1.45
1.45
1.45 1.45
D3
16.53
D3
Level 12 45.45
roof 40.45
Level 9 35.45
6.04
C1
26.59
4.34
18.39
15.35
ELE
4.34
Level 12 45.45
+0.0
+0.45
W26 0.45
0.45
W26 A
A
15.40
15.40
8.80
6.20
+40.45 +10.45
B 0.45
0.45
B
2.98
C 2.98
C W25
0.45 20.98
0.45
W25
D
D
6.10
6.10
+45.45
100.60
16.53
4.02 16.53 100.55
0.45
0.45
0.45
28.46
14.91
14.91
14.55
14.55
8.80
0.85
0.45
0.45
7.00
7.00
L
0.18
0.18
W13
7.00
W12
7.00
7.00
10.34
0.80
7.00
8.38
W6
7.00
W5
6.67
W4
0.45
W15 W3
6.88
7.00
W2
7.00
W1
5.32
8
0.45
8.91
0.45
7 W16
6
6.55
5.14
5
W18
0.45
4
1.41
3
5.32
W19
0.32
W20 W21
3.89
6.97
2
8.41
W22
3.91
1
0.32
2.77
W23 W24
7.00
W8
7.00
W9
0.24
W10
SHOP 7 12 +0.45
14.31
14.91
0.240.910.24
0.24
C1
0.75 0.91
D5
SHOP 8 13
+0.45
K
0.80
8.10
8.10
0.80
0.80
15.01
0.80
23.57
10.64
23.11
0.48
D5
0.75 0.91
11.21
11.21
0.24 0.91
14.31
4.72
23.57
28.86
K
W27
7.00
0.40
3.50
7.63
8.85
7.00
6.94 15.01
0.80
29.31
+10.45
15.06
0.50
6.67
14.31
14.31
L
A
14.91
F G
+10.45
K
W12
SEC
12.68 1.49
26.42
0.80
F G
G
124.06
C1
K
+0.45
0.24
27.02 7.63
+40.45
+40.45
+0.00
W7
14.34 5.55
0.35
0.04 0.80
+0.45
E
+10.45
W27
1.23
14.35
F 0.67
2.61
2.65
1.23
G
0.40
10.34
11.29
0.85
0.45
13.87
0.50
F
0.20 0.40
+45.45
E
6.67
NORTH 1.20
8.46
0.380.910.46 1.35
6.70
0.40
D5
D5
3.91
1.26
1.38
6.94
8.46
0.38 1.17
16
1.60
6.70
0.40
SHOP 10 15 8.65
+0.45
+0.45
0.43 0.91
SHOP 11
14
Rana Adel
+0.45
Taher Mahmoud
+0.45
C1 14.28
5.32
0.40 9.36
C1
11.74
0.45
11.69
0.85
10.54
0.45
10.94
C1 0.40
14.98 15.38
0.40 0.20
53.99
8
7
6
5
4
3
2
1
0.40
0.80
C1 0.40
Dr. lamia shehata Teaching assistants
SHOP 9
+0.45
0.20
Dr. salwa el gendy
C1
1.23
3.04
0.80
L
0.40
14.28
0.20
11.21
8.11
12.67
5.06
26.82 14.15
Dr. Ahmed Abdelsalam 6.67
15.00
4.72
14.20
7.63
7.31
1.49
Prof. Tarek Galal
10.48
7.63
6.94
5.55
0.37
C1
14.60
14.20
14.20
15.00
2.11
D5
0.63
0.51 0.910.14
0.91 0.77
7.66
7.66
DOCTORES
L
Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
W13
8
7
6
5
3
4
2
1
53.99 0.20
5.32
9.36
0.45
11.69
0.45
10.94
15.38
0.20
0.40
0.40
53.99
25
8.82
1.41
0.91
8.82
1.41
0.91
3.54
SHOP 14 26
6.30
0.91
0.91 0.68
D1
D1
SHOP 15 27
6.53
14.84
2.20
0.45 D2
D2
0.05
12.09
9.83
0.80
0.04
2.73
3.43
1:100
0.80
E
1.07
6.60
5.74
19.93
46.99
26.45
1
SHOP 17
2
3
4
5
6
7
8
Level 12 45.45
Level 12 45.45
roof 40.45
60
10.01
9.81
9.63
D5
0.91 1.67
A130
DRAWING SCALE :
39
D6
1.44
10.89
DRAWING NUMBER :
1.68
wcm ff
MEZZANINE FLOOR
DRAWING NAME :
C1
SHOP 16
D1
2.30
2.63
D2
5.28
1.10
0.48
0.480.40 D2
7.72
7.30
6.60
D6
1.34
1.70
2.17
D 4.00
1.33
4.00
1.34
0.65
26.92
1.34
29
8.93
D6
C
STOREGE
TOWER PROJECT
D1
6.15
43
3.74
0.910.34
4.41
B
6.10
D2
5.28
0.300.91
2.74 2.95
D1
D2
0.40
D1
28
6.66
D6
44
3.00
3.00
elevator lobby ff 1.34
7.30
0.80
D1
PROJECT NAME:
CLEANING ROOM
D1
2.55 D2
0.91
2.73
2.73
3.40
wcw ff D2
45
E
1.42
2.21 0.91 0.91
5.49
175057
ID :
0.87
2.06 6.41
6.61
6.86
22 1.51
2.64
7.96
Room
3.91
0.80
D400
9.20
36
6.10
9.92
D2
Room 36
1.19
7.11
6.71
7.11
1.01 2.47 0.39
1.68
2.00
5.11
10.48
AHMED ZAKI
NAME :
6.56
D1 D400
0.91
1.60 0.91
D
D1
D1
D1 D300
0.81
0.86
5.75
0.45 3.43
C
37
6.53
0.68
31.82
D3
Room 37
0.39
D400
B
2.08
14.55
3.10
0.14
3.10 0.91
0.09
0.14
D1
Working Drawings IV (ASE552)
0.91
1.02 6.20
4.24
0.25 0.25 2.20
D1
16.45
15.40
23
0.54
A
6.60
15.40
SHOP 13
24
0.28
8.34
8.67
SHOP 12
8.16
8.57 12.81
Room 23
10.83
12.28
11.57
8.16
14.55
8.16
A
roof 40.45
Level 9 35.45
Level 9 35.45
Level 8 30.45
Level 8 30.45
Level 7 25.45
Level 7 25.45
Level 6 20.45
Level 6 20.45
Level 5 15.45
Level 5 15.45
roof of bodum 10.45
roof of bodum 10.45
first floor 5.45
0.26
1.42
D5
D5
D5
1.36
1.54
D5
basment -5.00
C1
6.60
73.07 1.58
D5
73.07
D5
ground floor 0.45
basment -5.00
A
D5
first floor 5.45
ground floor 0.45
D5
8.78
16.53
3.40
2.90
15.94
4.20
1.37
0.62
1.43
4.38
2.90
1.14 4.30
0.60
0.47
6.10
1.19
16.53
3.00
SEC
3.66
CAFE 4
CAFE 5
68
67
8.84
4.20
73
7.00
5.89
CAFE 3
72
7.00
1.49
CAFE 3
6.30
4.30
6.64
71
6.64
6.14
CAFE 2
6.64
70
6.64
CAFE 1
6.64
5.30
6.64
0.20
SHOP 18 62 N
ELE
73.07
5.30
0.20
W7
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
3 W19
4
W20 W21
2
W22
+40.45
1
W8
W23W24
W9
W10
124.06 6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
6.99
0.25
W14
7.00
7.00
0.14
7.00
6.55
6.55
14.48
W11
W26 0.45
0.45
15.40
15.40
8.80
A
+40.45 +10.45
B
2.98
2.98
C
0.45 20.98
0.45
W25
D
D
6.10
6.10
+45.45
+45.45
E
E
+10.45
+40.45
+40.45
+0.45
100.60
16.53
4.02
+0.00
16.53
F 0.45
F 0.45
G
6.60
0.45
0.45
B
W25
100.55
0.50
8.38
0.80
G
G
28.46
14.91
+10.45
14.91
4.77
K
8.80
14.55
K
14.55
4.81
19.88
0.45
0.45
7.00
7.00
15.06
7.00 0.18
7.00 0.18
7.00
8.89
7.00
7.00
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
7.00
2.77
7.00
0.24
124.06
W6
W5
W4
W15 W3
W2
W1
8
7 W16
6
5
W18
4
3 W19
W20 W21
2
W22
1
W23 W24
W8
W9
W10
15.15 1.39 1.91
14.91
1.15 0.48
D5
6.85
2.80
6.60
0.75
75
W12
0.24
W7
6.17
10.64
8.10
8.10
30.05
21.00
0.91 0.89
K
64
NORTH
0.77
Prof. Tarek Galal 6.60
Dr. Ahmed Abdelsalam
11.69
15.80
Dr. lamia shehata SHOP 21 Teaching assistants
65
Rana Adel
8.78 4.28
19.88
0.40
0.46
0.40
Taher Mahmoud
0.35 0.45
10.42
8.45
6.17
8.45
1.91
D4
0.85
9.36
10.94
15.38
0.20
53.99
8
7
6
5
4
3
2
L
Alshimaa Galal Yousra Mohamed
26.32
0.45
Dr. salwa el gendy
D4
2.22
0.15 1.23
0.42
0.40
26.82 5.32
4.93 4.28
1.23
1.72
1.31
8.10
0.20
12.47
4.93
0.24
14.35
77
15.00
D5
1.57
0.91
1.38
D5
7.09
1.56
D5
DOCTORES
0.63
69
3.56
4.78
5.14
7.62
5.14
1.49
5.06
15.00
14.20
7.62
27.11
0.40
SHOP 20
CAFE 9 5.55
0.20
D4
FOOD COURT
76
L
D4
0.51
CAFE 8
3.66
5.52
5.52
4.93
0.91
0.30
21.00
15.02
4.93 23.57
15.02
23.57
15.02
15.02
0.80
K
30.22
3.74
5.12
CAFE 7 5.12
D5
0.91
1.95 D5
D5
W13
D4
CAFE 6 74
7.62
L
W12
63
D4
0.24
0.30 3.50
4.93
SHOP 19
A
14.31
8.78
W27
SEC
7.62
6.17
1.26
4.82 5.23
7.62
5.23
1.49
3.49
1.26
4.93 12.77
7.62
7.00
C
0.45
1.10
0.90 1.23
0.15
7.10
F
L
27.11 5.55
7.00
A
W27
14.34
14.91
W11
W26
+10.45
2.61
1.00
10.34
0.41
1.23
G
5.20
0.40
5.88
63.71
5.93
0.40
6.05
0.45
0.45
F
7.70
0.14
0.24
W14
7.08
1
Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
W13
Working Drawings IV (ASE552)
N
ELE hotel
$200,000.00
hotel
hotel
$200,000.00
$200,000.00
presupuesto hotel
presupuesto hotel
presupuesto hotel
5
3
4
2
1
11.29
0.40 0.40 0.05
10.54
0.85
10.54
11.69 11.89
0.40
0.20
14.98
0.40
PROJECT NAME:
0.40
0.04
A
TYPICAL FLOOR
DRAWING NAME : DRAWING NUMBER :
A150
DRAWING SCALE :
1:100
15.40
14.81
15.21
15.62
15.21
15.62
15.40
15.20
15.62
15.22
15.62
TOWER PROJECT
15.18 26.53
38.46
14.82
175057
ID : 15.38
0.40
10.94
0.80
A
0.45
0.80
0.40
11.69
AHMED ZAKI
NAME :
38.86 0.20
38.46
0.40
1
2
3
4
5
6
7
8
Level 12 45.45
Level 12 45.45
roof 40.45
roof 40.45
Level 9 35.45
Level 9 35.45
Level 8 30.45
Level 8 30.45
Level 7 25.45
C
Level 7 25.45
Level 6 20.45
Level 6 20.45
Level 5 15.45
Level 5 15.45
3.43
roof of bodum 10.45
0.91
3.43
3.40
D2
B
0.45
0.390.05
0.03
0.47
12.34
0.03
D1 D400
0.84
2.64
1.81
0.87
0.03
0.03
0.85
0.04
0.80
D3
0.40 0.40
26.53 9.92
D400
roof of bodum 10.45
first floor 5.45
first floor 5.45
ground floor 0.45
ground floor 0.45
basment -5.00
basment -5.00
D400
8.93 6.10
42.51
8.93
41.91
4.35
41.91
W7
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3 W19
W20 W21
2
W22
+40.45
1
W23 W24
W8
W9
W10
124.06
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
6.99
0.25
W11
W14
7.00
7.00
0.14
7.00
0.14
0.24
W14
W11
6.55
6.55
14.48
E
0.80
0.80
0.40
0.80
N
ELE
E
1.85
3.69
0.91
A
SEC
6.10
41.91
41.91
2.04
D 8.92
D 42.51
furniture plan (type 1) 1:200
C
0.04 1.68
D1 D300
0.45
11.89 11.08
B
W26
A
A
15.40
8.80
12.46
15.40
14.91
0.45
0.45
W26
11.09
+40.45 +10.45
26.53
B 0.45
0.45
B C
W25
2.98
C 2.98
W25 20.98
D
38.46
0.45
0.04
0.45
11.89
D
6.10
6.10
+45.45
+45.45
E
E
+10.45
+40.45
+40.45
+0.45
16.53
100.60
100.55
26.26
0.45
0.45
F
G
G
+10.45
28.46
26.26
26.26
26.26
14.91
+10.45
14.91
25.85
16.53
4.02
+0.00
F
8.80
14.55
K
14.55
K
0.45
W27 0.45
W27
typical floor
L
7.00 15.06
7.00
L
0.18
W13
0.18
38
7.00
W12
7.00
W12
0.24
7.00
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
7.00
W13
0.24
124.06
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3
W19
W20 W21
2
W22
1
W23 W24
W8
W9
W10
16.53
15.93
16.13
16.39
16.53
16.31
15.53
W7
A
SEC
38.46 0.04
26.53
0.85
10.34
0.80
11.29
0.40 0.05 0.40
10.34
0.80
11.69
0.45
10.94
14.98
0.40
F 0.40 0.20
14.38 15.38
0.20
11.89 11.49
F
0.80 0.20
NORTH
38.86
DOCTORES
5
4
3
2
1
Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata
furniture plan (type 2) 1:200
Teaching assistants
Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
0.77
2.51 0.370.93
1.37
1.71
0.75 2.52
0.82
1.37
3.43
5
6
7
8
Level 12 45.45
roof 40.45
Level 9 35.45
Level 8 30.45
Level 7 25.45
Level 6 20.45
Level 6 20.45
Level 5 15.45
1.64
3.48
Level 5 15.45
first floor 5.45
first floor 5.45
ground floor 0.45
0.74
ground floor 0.45
basment -5.00
basment -5.00
1.03
+4.03
roof of bodum 10.45
0.84
1.03 0.73
0.73 D5
7.03
7.05
3.65
+4.03
D5
3.57
N
W7
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3 W19
W20 W21
2
W22
+40.45
1
W23 W24
W8
W9
W10
124.06
3.48
0.84
W11
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
6.99
0.25
W14
W11
W26
W26 0.45
0.82
7.00
0.14
0.24
W14
7.00
1.37
6.55
3.63
0.38
+4.13
0.45
+4.03
1.80
4
Level 7 25.45
roof of bodum 10.45
2.13
1.08
1.08
2.52
3.40
3
Level 8 30.45
1.46
3.99
3.65
7.03
6.93
3.65
3.65
6.93
3.65
8.01
4.26
2.66
2
roof 40.45
Level 9 35.45
A
3.40
1
Level 12 45.45
E
0.14
4.30
4.50
1:100
SEC
1.40
1.37
A170
DRAWING SCALE :
D3
1.36 0.85
D1
DRAWING NUMBER :
1.13
D2
+4.13
D3
+4.13
3.32
0.67 1.35 1.35
2.96
REFLECTED CEILING
DRAWING NAME :
7.00
3.80
4.85
D
TOWER PROJECT
14.48
3.60
0.74 0.84
2.42
1.37
175057
6.55
3.92
+4.03
B C
1.88
D2
2.68
2.65 1.08 3.99
2.56
1.94
D2
1.84
+4.03
4.26
3.13
1.08 0.92
1.94
1.87
2.34
3.48
D3
+4.03
+4.03
+4.13
3.95
D6
1.08
1.08 4.15
1.37
1.58
D3
1.80
3.08
2.42
0.56
3.99
3.48
PROJECT NAME:
1.08
1.59
4.48
3.99
3.11
0.33
1.43
5.89
D6
D2
+4.03
4.26
+4.03
D1
1.52
1.37
1.08
2.42
D6
3.89
2.87
D2
3.89
3.43
1.40
0.27
D1
D12
1.37
1.28
3.16
1.08
3.89
0.95 0.79
5.92
D2
2.52
1.63 1.37
3.89
3.43
1.49
0.60 0.95 C1
1.37
2.01
+4.03
1.20
D2
2.65
0.85 1.42
3.89
+4.03
E
0.59 1.02
1.02
+4.03
2.45
2.45
+4.13
0.95
1.60
1.16 1.08
D1
1.72
1.37 3.99
0.60
0.77
1.87
1.98
1.87
2.42
D1
3.72
+4.03
D2
3.60
2.43
0.92 0.69 0.27
1.55
3.38
3.38
1.03
1.50
3.78
1.61
1.61
1.61
2.65
+4.03
0.70
C1
1.48
1.61
D
0.95
1.37
1.08 0.89
1.55
D1
1.72
2.66
3.32
1.80
+4.03
D1
1.90
ID :
+4.03
0.74 1.08
3.99
1.37
6.87
10.59
10.59 0.36
0.73
1.34
2.68
4.26
5.92
0.28
1.40
1.37
2.10
2.31
3.14
0.78
3.99
1.11
C
2.87
1.37
AHMED ZAKI
NAME :
3.40 +4.13
1.12
1.71
0.71 1.08 0.91
1.69
0.68 0.72
0.70
0.620.77
D1
3.43
1.11
1.72
+4.13
1.18
1.88
0.69
B
5.92
3.38
0.46 1.37
+4.13
3.38
+4.13
0.77
1.60
1.11
4.79
1.08
3.38
11.61
Working Drawings IV (ASE552)
C1
3.07
0.90
+4.13
1.09
3.47
3.80
6.45
D1
1.05
0.59
2.56
3.60
+4.03
5.18
6.96
0.57
1.11 2.51
3.40
D1
1.69
0.50
0.68
0.59
1.08 1.01
1.08 1.17 3.15
0.91
3.13
0.52 0.50
9.20
2.37
1.31
A
1.54
3.48
3.89
0.64
+4.13
3.15 1.26 +4.03
0.50 3.99
5.78
0.85
D1
2.37
0.50 1.49
4.26
+4.03
0.59
0.44
0.361.08
0.66
1.40
3.80
1.28
2.28
2.35
1.37
1.21
3.60
1.37
2.04
5.92
9.55
2.13
9.10 +4.13
0.85
+4.03
+4.03
0.99
4.08
0.66 1.06
1.37
2.96 0.82
1.37
0.58 1.41
9.79
0.64
4.69
1.06 2.00
+4.03
1.83
1.55
0.99
+4.13
0.80
0.92
0.68 3.13
3.99
3.65
2.51
1.30
1.63
2.51 3.32
C1
4.26
0.54
1.30
4.31
0.74
0.50 1.08
1.00
1.37
C1
9.10
6.98
3.99
11.90
0.77
2.51
2.87
2.05
3.43
6.77
+4.13
1.72
1.11
4.11
1.75
3.15
1.37
1.08 1.10
0.85 5.92
1
C1
0.59
C1
3.98
1.08 0.85
0.60 2.96
1.37
2
0.64 1.08
C1
A 1.49
3
4
3.89
5
6.98
6
0.56 1.44
7
ELE
8
A
15.40
15.40
1.08
0.45
0.45
B
2.98
2.98
C
W25
0.45
0.45
W25 20.98
4.32
1.08
1.06
4.32
2.40
D
D +45.45
0.55
1.96
1.37
1.81
6.10
1.37
+40.45 +10.45
C
6.10
7.68
4.32
1.08
1.08
4.32
4.32
4.32
1.08
8.80
A
B
+45.45
0.74
E
E
+10.45
+40.45
+40.45
+0.45
16.53
100.60 0.45
0.45
F G
14.91
+10.45
14.91
0.67
28.46
4.20
K
8.80
14.55
K
14.55
4.20
0.45
W27
7.00
L
7.00
L
0.45
W27
W12
0.18
0.18
W13
7.00
W12
7.00
+4.03
15.06
F
1.86
2.33
F G
+10.45
2.33
4.20
4.03 2.33
2.33
0.96
4.21
+4.13
F
100.55
2.25
2.84
16.53
4.02
+0.00
2.21
1.61
3.48
1.37
4.30
7.00
W1
5.32
8
0.45
7
8.91
W16
0.45
6
6.55
5.14
5
W18
0.45
4
1.41
3
5.32
W19
0.32
W20 W21
3.89
6.97
2
8.41
W22
3.91
1
0.32
2.77
W23 W24
7.00
W8
7.00
W9
0.24
W10
3.40
1.96
1.37
1.81
D5
2.50
0.74
C1
2.05
3.80
7.00
W2
0.82
2.02
0.40
3.60
0.55 D5
5.91
1.08
1.08
5.91
5.91
9.04
9.04
1.68
6.88
3.57 +4.03
C1
0.45
W15 W3
2.10
0.98 8.13
1.37
6.67
W4
1.08
3.70
+4.13
4.85
7.00
W5
0.84
3.70
0.82
3.70
3.99
7.00
W6
2.19
0.69
1.43
1.43
1.43 1.37
4.26
2.48
4.15
7.42
3.99
3.70
9.88 1.08
2.87
7.42
1.37
1.08
9.14
3.43
W7
A
1.58
7.00
124.06
G
SEC
0.56 1.37
2.45
2.45
+4.03
0.74
0.24
G
3.48
0.84
4.45
+4.03
1.08
3.57
9.13
9.13
4.45
3.57
+4.13
+4.03
4.85
1.37
8.13
1.37
NORTH
L C1
C1
3.01 1.08 0.55 1.45
0.49 3.13
1.16
1.96
1.37
1.72
0.96 1.48
C1
1.37
1.81
Dr. Ahmed Abdelsalam Dr. salwa el gendy
0.74
C1
Dr. lamia shehata
3.59 2.04
1.56
0.82
+4.13
1.99
1.37
2.63
3.48
+4.13
1.01
Teaching assistants
0.84
Rana Adel
1.08
3.40
3.57
1.02
0.74
3.06
1.00
1.37
+4.03
0.68
3.57
3.80 3.57
3.60
3.57
1.11 1.12
1.20
1.08 2.10
2.10
+4.03
0.56
DOCTORES
0.74
Prof. Tarek Galal
0.45 +4.13
0.56 +4.03
1.98
2.40
1.08
1.37
1.43
9.88
1.81
1.45 D5
0.39 1.37
0.53
9.14
0.56 1.37
1.37
+4.03
3.75 D5
1.08
1.80
1.69
3.99
0.74
4.26
0.80
4.15
1.21
3.99
+4.03
1.08
6.40
1.08
1.08
5.52
3.75 2.87
1.53
3.43
1.96
D5
3.13
1.58
0.55
12.09
12.09
6.40
+4.03
C1
K
3.65
Taher Mahmoud
1.63
+4.03
0.51
+4.03
2.27
K
0.79
1.08
1.08
+4.03
L
C1
Alshimaa Galal Yousra Mohamed Nermine Ibrahim
8
7
6
5
4
3
2
1
PAPER SIZE : A0
DATE: 16- 2 - 2021
W13
1
2
3
4
5
6
7
Working Drawings IV (ASE552)
8
AHMED ZAKI
NAME :
175057
ID :
PROJECT NAME:
Level 12
TOWER PROJECT
12 Level
( T.O.S ) +45.45 m
( T.O.S ) +45.45 m
NORTH ELEVATION
DRAWING NAME :
5.00
5.00
roof
DRAWING NUMBER :
A300
DRAWING SCALE :
1:100
roof
( T.O.S ) +40.45 m
( T.O.S ) +40.45 m
5.00 +35.45 m
( F.F.L )
F
F
F
F
F
F
F
1
2
2
1
1
1
2
F 1
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
2
1
2
1
2
2
1
2
1
1
2
2
2
1
1
2
1
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
2
1
1
2
2
2
1
2
1
2
1
2
1
1
2
1
2
2
1
1
1
2
2
1
2
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F 1
5.00 +35.45 m
( F.F.L )
Level 9
9 Level
5.00
2
2
1
1
1
2
2
1
2
1
2
2
1
2
1
1
2
2
2
1
1
2
F
F
F
F
F
F
F
1
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
2
1
1
2
2
2
1
2
1
2
1
2
1
1
2
1
2
2
1
1
1
2
2
1
2
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
5.00 +30.45 m
A
1
SEC
+30.45 m
( F.F.L )
( F.F.L )
Level 8
8 Level
N
1
1
1
2
F
F
F
F
F
1
2
1
2
1
2
2
1
2
1
1
2
2
2
1
1
2
1
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
5.00
W7
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3 W19
W20 W21
2
W22
+40.45
1
W23 W24
W8
W9
W10
124.06
0.24
W14
7.00
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
6.99
0.25
W11
6.55
6.55
14.48
W11
W26
W26 0.45
+25.45 m
0.45
F
W14
0.14
2
F
A
A
1
2
2
2
1
2
1
2
1
2
1
1
2
1
2
2
1
1
1
2
2
1
( F.F.L )
2
+40.45 +10.45
B
B 0.45
1
0.45
2
15.40
( F.F.L )
15.40
8.80
+25.45 m
7.00
2
F
0.14
1
7.00
5.00
ELE
D1 D203
W25
20.98
0.45
W25 0.45
7 Level
2.98
C 2.98
C
D
D
6.10
+45.45
6.10
Level 7
+45.45
E
E
+10.45
+40.45
+40.45
+0.45
F
F
F
F
2
1
1
1
2
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
2
1
2
1
2
2
1
2
1
1
2
2
2
1
1
2
1
16.53
100.60
F
2
F
F 0.45
F
0.45
F 1
100.55
16.53
4.02
+0.00
G
G
28.46
+10.45
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
2
1
2
1
2
1
2
1
1
2
1
2
2
1
1
1
2
2
1
2
14.55
14.55
0.45
F
2
+20.45 m
( F.F.L )
L
7.00
F
2
W12
W13
W12
7.00
F
1
0.18
F
1
K
W27 0.45
F
L
7.00
F 2
14.91
14.91
+10.45
K
W27
15.06
+20.45 m
( F.F.L )
45.00
8.80
5.00
7.00
1
5.00
0.18
45.00
0.24
7.00
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
7.00
0.24
124.06
W7
Level 6
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3
W19
W20 W21
2
W22
1
W23 W24
W8
W9
W10
6 Level
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
2
2
1
1
1
2
2
1
2
1
2
2
1
2
1
1
2
2
2
1
1
2
1
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
2
1
1
2
2
2
1
2
1
2
1
2
1
1
2
1
2
2
1
1
1
2
2
1
2
1
F
F
F
F
A
F
SEC
F
1
5.00
5.00
+15.45 m
( F.F.L )
+15.45 m
( F.F.L )
Level 5
5 Level
5.00
5.00
+10.45 m
+10.45 m
( F.F.L )
( F.F.L ) roof of bodum
roof of bodum
F
5.00 D2 D201
+5.45 m
( F.F.L )
F
F
F
F
F
F
F 1
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F 1
1
2
2
1
1
1
2
2
1
2
1
2
2
1
2
1
1
2
2
2
1
1
2
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
2
1
1
2
2
2
1
2
1
2
1
2
1
1
2
1
2
2
1
1
1
2
2
1
2
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
5.00 D2 D201
+5.45 m
( F.F.L )
first floor
first floor
F
F
F
F
F
F 1
F
F
F
F
F 1
F
F
F
F
F
F 1
F
F
F
F
F
1
1
F
F
2
1
1
2
2
1
1
2
1
2
2
2
1
2
1
2
2
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
2
1
1
2
2
2
1
2
1
2
1
2
1
1
2
1
2
2
1
1
1
2
2
1
2
2
1
F
2
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
5.00 +0.45 m
( F.F.L )
5.00 NORTH
+0.45 m
( F.F.L )
ground floor
ground floor
DOCTORES
0.45
Prof. Tarek Galal NO (F.F.L) BECAUSE OF SLOP
NO (F.F.L) BECAUSE OF SLOP
basment
( T.O.S ) -5.00 m
Dr. Ahmed Abdelsalam Dr. salwa el gendy
basment
( T.O.S ) -5.00 m
Dr. lamia shehata Teaching assistants
Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
W13
A
B
C
E
D
F
G
K
L
Working Drawings IV (ASE552)
AHMED ZAKI
NAME :
175057
ID : Level 12
12 Level
D1 D501
D1 D500
5.00
TOWER PROJECT
0.51
0.81
roof
PROJECT NAME:
( T.O.S ) +45.45 m
5.00
( T.O.S ) +45.45 m
5.00
4.57
3.58
4.57
3.58
4.57 3.58
4.57
3.58
5.00
( T.O.S ) +40.45 m
+35.45 m
SECTION
DRAWING NAME : roof
( T.O.S ) +40.45 m
DRAWING NUMBER :
A200
DRAWING SCALE :
1:100
+35.45 m
( F.F.L )
( F.F.L ) 9 Level
5.00
4.57
3.58
4.57
3.58
+30.45 m
4.57 3.58
4.57
3.58
5.00
Level 9
+30.45 m
( F.F.L )
( F.F.L ) 8 Level
5.00 29.79
4.57
3.58
4.57
3.58
4.57
4.57 3.58
A
+25.45 m
SEC
3.58
5.00
Level 8
( F.F.L )
+25.45 m
( F.F.L ) 7 Level
Level 7
N
ELE
5.00
W5
W4
W15 W3
6.67
0.45
W2
6.88
W1
8
7.00
7.00
7
5.32
W16
0.45
6
8.91
5
0.45
W18
6.55
4
5.14
3 W19
0.45
1.41
W20 W21
5.32
0.32
2
W22
+40.45
3.89
6.97
1
8.41
W23W24
3.91
0.32
W8
2.77
W9
7.00
W10
6.99
0.25
W14
7.00
7.00
0.14
7.00
0.14
7.00
6.55
6.55
14.48
W11
W26 0.45
0.45
A
15.40
8.80 15.40
+40.45 +10.45
B 0.45
0.45
B C
W25
2.98
C 2.98 0.45
W25 0.45
( F.F.L )
20.98
D
D
6.10
+45.45
6 Level
6.10
4.57
3.58
4.57
3.58
7.00
A
+20.45 m
41.50
Level 6
W6
124.06
0.24
W11
W26
41.50
4.57 3.58
+20.45 m
( F.F.L )
4.57
3.58
5.00
W7
W14
+45.45
E
E
+10.45
+40.45
+40.45
+0.45
16.53
100.60
100.55
16.53
4.02
+0.00
0.45
F 0.45
F G
G
28.46
+10.45
14.91
14.91
+10.45
8.80
14.55
K
14.55
5.00
0.45
0.45
W27
( F.F.L )
15.06
0.18
W13
7.00
W12
7.00
+15.45 m
( F.F.L )
7.00
L
7.00
L
W12
0.18
4.57
3.58
4.57
3.58
4.57 3.58
4.57
3.57
+15.45 m
3.58
5.00
K
W27
0.24
7.00
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
7.00
W13
0.24
124.06
W7
W6
W5
W4
W15 W3
W2
W1
8
7 W16
6
5
W18
4
3 W19
W20 W21
2
W22
1
W23 W24
W8
W9
W10
5 Level
Level 5
1.02
1.50
( F.F.L )
5.00
1.23 0.97
+5.45 m
( F.F.L )
11.69
first floor
5.00
9.58
3.63
9.58
2.50
4.57
+10.45 m roof of bodum
2.50
( F.F.L )
3.58
4.57
3.58
4.57
4.57 3.58
+0.45 m
3.58
5.00
first floor
1.25 0.91 1.61
( F.F.L )
3.63
4.57
3.58
4.57
3.58
4.57 3.58
4.57
3.58
5.00
roof of bodum
+5.45 m
5.00
1.48
4.57
3.58
4.57
3.58
4.57 3.58
4.57
3.58
5.00
A
SEC
+10.45 m
( F.F.L )
+0.45 m
( F.F.L )
ground floor
ground floor
5.00
4.57 3.58
4.57 3.58
4.57 3.58
4.57 3.58
4.57 3.58
5.00
NORTH
DOCTORES
NO (F.F.L) BECAUSE OF SLOP
NO (F.F.L) BECAUSE OF SLOP
basment
( T.O.S ) -4.55 m
Prof. Tarek Galal
basment
( T.O.S ) -4.55 m
Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants
Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
0.46
0.81
2.64
1.81
0.12
1.19
1.59
4.35
D2
1.40
1.22
0.37
0.76
0.31
D2
D2
1.01
1.01
0.76
1.08
WATER HEATER
0.91
0.76
1.03
3.95
21 0.48
D6
2.09
wcw gf
D1
WATER SUPPLY 2''
Working Drawings IV (ASE552)
D6
D2 1.01
PVC 4'' FOR TOILET DRAING
wcw gf
D6
4.35
3.72
0.82
4.49
D2
D2
D2
PROJECT NAME:
D1 D2
D6
D2
D2
175057
ID :
D1 D12
AHMED ZAKI
NAME :
D6
21
PVC 3'' FOR BASIN DRAINAGE
0.67
D2
TOWER PROJECT
D6
D2
DRAWING NAME :
GULLY TRAP 30*30
PLUMBING
DRAWING NUMBER :
P100
DRAWING SCALE :
1:100
1.40
D2 0.31
0.76
0.37
wcm gf
1.02 1.02
PVC 2'' FOR VENTILATION
D1
INSPECTION ROOM 60*90
D12
D12
PVC 4'' FOR TOILET DRAING
1
2
3
4
5
6
7
8
Level 12 45.45
GULLY TRAP 30*30
Level 12 45.45
roof 40.45
roof 40.45
Level 9 35.45
Level 9 35.45
Level 8 30.45
Level 8 30.45
Level 7 25.45
20
Level 6 20.45
Level 5 15.45
roof of bodum 10.45
D6
4.37 1.65
Level 7 25.45
Level 6 20.45
Level 5 15.45
roof of bodum 10.45
first floor 5.45
first floor 5.45
ground floor 0.45
ground floor 0.45
basment -5.00
D2
D2
D2
D2
D2
D2
D2
basment -5.00
D2
0.46
0.52
A
SEC
1.21
2.72
1.85
2.18
D2 0.76
1.15
0.76
4.08
0.47
0.91
D2
0.76
1.01
4.08
D2
0.19
1.01
2.22
1.40
PVC 4'' FOR TOILET DRAING
1.01
1.22
0.79
D1
D1
wcm gf 20
N
D6
W7
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3 W19
W20 W21
2
W22
+40.45
1
W23W24
W8
W9
W10
124.06
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
6.99
0.25
W11
W14
7.00
7.00
0.14
7.00
0.14
0.24
W14
W11
6.55
6.55
D6
14.48
2.74
ELE
0.80
2.11
W26 0.45
0.45
W26 A
A
15.40
15.40
8.80
public toilets (Plan) 1:20
+40.45 +10.45
B 0.45
0.45
B
0.45 20.98
0.45
W25
D
D
6.10
6.10
+45.45
+45.45
E
E
+10.45
+40.45
+40.45
+0.45
100.60
100.55
16.53
4.02
+0.00
16.53
WATER SUPPLY 2''
2.98
C 2.98
C W25
0.45
F 0.45
F G
G
28.46
+10.45
14.91
+10.45
14.91
K
8.80
14.55
K
14.55
WATER HEATER
INSPECTION ROOM 60*90 EVERY 25m
0.45
W27 0.45
W27 L
7.00 15.06
7.00
L
0.18
0.18
W13
7.00
W12
7.00
W12
MAIN LINE
0.24
7.00
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
7.00
0.24
124.06
W7
6
5
9.36
53.99
11.69
0.45
11.29
0.85
1 15.38
0.40
0.20
14.98
0.40
C1
0.38
0.39
0.38
0.32
0.40
2 10.94 10.54
C1 0.14
8.46
0.14
14.74
6.48
A
SHOP 2
18.53
18.56
0.54
9.42
2.13
0.06 1.53
8.46
8.62
8.18
D1
6
5
W18
4
3 W19
W20 W21
2
W22
1
W23 W24
W8
W9
W10
Public Toilets (Water Supply) 1:20
C1
0.93 0.51 0.91 0.65
6.53
0.28
0.16
D1
7.13
7.11
4.90
6.85
7 W16
12.27
6
0.28
14.81
6.53
32.25
7.13
8
0.91
D1
0.65
0.37
14.80
15.40
14.80
BANK
SHOP 4
8.46
0.91
0.93
2
C1
Public Toilets (DRAING ) 1:20
W1
15.40
9.42 9.86
W2
0.10
0.16 0.28
5
W15 W3
2.20
1
SHOP 3
8.18
8.25
8.18
3
7.87
8.27
7.85
8.24
SHOP 1
W4
A
0.80
3
4
0.45 0.85
C1
14.28
W5
SEC
14.28
C1
0.40
7 5.32
0.40
0.80
8 0.20
A
W6
2.43
D1
0.45
0.85
0.85
0.19 0.39
1.49
3.43
3.01 1.49
7.57
6.10
1.49
5.85
SHOP 5
3.88
9.83
NORTH
73.07 13.87
0.85
11.29
0.85
10.34
0.80
8.38
0.80
8.38
7.00
7.00 0.63
11
DOCTORES
8.45
SHOP 6
8.69
8.69
73.07
0.28
D5
16.53
D5 0.28 1.16
16.56
4.38
16.36
0.23 0.91
19.90
0.47
0.06
12.14
10
0.91
14.90
25.65
1.67
26.59
10.89
15.53
1.45
1.45 1.45
1.45
1.45 1.45 16.53
D3
1.46
15.35 6.04
C1
D3
E
2.72
2.62
1.46
9.64
D6
2.74
0.80
1.49 1.49
D2
0.80
D
3.28
D2
20
2.11
D3
1.49
D2
wcm gf
7.72
B C
D3
7.70
6.14
0.28
D2
1.70
2.14
1.64
1.81 0.91
5.60 4.35
D12
0.66
1.85
2.00
0.91
0.20 0.55
D6
D2
3.00 1.34
0.91
1.33
9.60
2.73
0.21
1.34
7
0.40
0.80
0.54
D1
D2
17
4.34
4.34
18.39
D2
7.96
1.67
4.34
D1
D6
21
47 1.34
2.17
0.14
wcw gf
elevator lobby gf
2.63
0.240.91 0.99
3.29
0.24
7.16
0.00
8.26
D2
0.45
0.91
4 7.16
5.60
CLEANING ROOM
0.80
5.30
5.30
0.50
Administration
2.65
0.87 10.47
5.85
0.80
D1
0.80
9.92
2.30
0.26 0.91
0.41
0.49 0.86
1.77
0.81
0.76
9.92
1.68
12.09
SERVICE
2.85
0.80
D1
0.81 0.06 0.82
2.27 0.88
6.22
D1
2.34
6.10
1.46 1.49
19
D1
0.76
3.15
18
ATM
0.80
E
2.15
ATM C1
6.61
6.52
10.48
D1
1.77
2.57
14.75
6.32 2.83
D
9.56
1.08 0.76
0.87
0.76
6.76
0.45
0.87 2.82
3.43
4.31
2.61
6.44 0.81
B C
8.85
0.45
0.85
12
Dr. salwa el gendy
14.31
14.91
0.24
C1
SMOKE AND HEAT EXHAUST VENTILATION SYSTEM
0.75 0.91
0.75 0.91
0.48
0.240.910.24
0.24 0.91
14.31 11.21
D5
D5
SHOP 8 13
K
0.80
8.10
8.10
0.80
0.80
10.64
23.11
11.21 15.01
0.80
23.57
28.86
23.57
15.01
0.80
26.42
29.31
Dr. Ahmed Abdelsalam
SHOP 7
4.72
C1
0.80
7.00
7.00 7.63
Prof. Tarek Galal
G
0.50
0.50 2.61 1.49
10.34
14.31
14.31
14.91
7.63
0.40
3.50
27.02 5.55
0.35
0.04 0.80
1.23 2.65
12.68
F 0.67
6.67
1.23
6.94
14.34
K
0.40
10.34
11.29
0.85
0.45
13.87
14.35
0.20 0.40
6.20
F G
WATER HEATER
Dr. lamia shehata Teaching assistants
6.67 0.40
D5
6.94
0.91
SHOP 11 16
SHOP 10 15
14.20
1.60 0.40
PVC 3'' FOR BASIN DRAINAGE
SHOP 9 14
PVC 2'' FOR VENTILATION
1.38
8.65
C1 14.28
5.32
0.40 9.36
C1 0.85
11.74
0.45
11.69
10.54
0.45
0.40
0.80 C1 0.40 0.20
STEEL FIRE PROOFED WATER SUPPLY 5'' FOR FIRE SYSTEM
C1
1.23
3.04
6.70
0.80
L
0.40
14.28
0.43
WATER SUPPLY 2''
6.67
0.20 0.38 1.17
10.48
5.06
3.91
8.11
8.46
7.31
D5
11.21 1.26
6.94
4.72
12.67
15.00
0.91 0.77
D5
2.11 7.63
1.49 26.82
14.15
0.37
7.63
5.55
14.60
14.20
14.20
15.00
C1
0.63
6.70
0.51 0.910.14
0.380.910.46 1.35
7.66
8.46
7.66
1.20
7
6
5
4
3
14.98 15.38
2
Taher Mahmoud Alshimaa Galal
PVC 4'' FOR TOILET DRAING
Yousra Mohamed
GULLY TRAP 30*30
Nermine Ibrahim
L
C1 0.40
10.94
0.40 0.20
53.99
8
Rana Adel
1
public toilets GROUND FLOOR 1:200
INSPECTION ROOM 60*90
PAPER SIZE : A0
DATE: 16- 2 - 2021
W13
Working Drawings IV (ASE552)
hotel
$200,000.00 $200,000.00
hotel
$200,000.00
hotel
presupuesto hotel
presupuesto hotel
AHMED ZAKI
presupuesto hotel
NAME :
175057
ID :
PROJECT NAME:
TOWER PROJECT TYPICAL ELECTRICAL
DRAWING NAME :
DRAWING NUMBER :
E100
DRAWING SCALE :
1:100
1
2
3
4
5
6
7
8
Level 12 45.45
Level 12 45.45
roof 40.45
roof 40.45
Level 9 35.45
Level 9 35.45
Level 8 30.45
Level 8 30.45
Level 7 25.45
Level 7 25.45
Level 6 20.45
Level 6 20.45
Level 5 15.45
Level 5 15.45
roof of bodum 10.45
roof of bodum 10.45
first floor 5.45
first floor 5.45
ground floor 0.45
ground floor 0.45
basment -5.00
furniture plan (type 1) 1:200
basment -5.00
TYPICAL ELECTRICAL LOOKING UP A
SEC
N
ELE W7
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
3 W19
4
W20 W21
2
W22
+40.45
1
W8
W23W24
W9
W10
124.06 7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
6.99
0.25
W14
W11
6.55
6.55
14.48
W11
7.00
7.00
0.14
7.00
0.14
0.24
W14
W26 0.45
0.45
W26
A
15.40
15.40
8.80
A
+40.45 +10.45
B 0.45
0.45
B
W25
2.98
C 2.98
C
0.45 20.98
0.45
W25
D
D
6.10
6.10
+45.45
+45.45
E
E
+10.45
+40.45
+40.45
+0.45
16.53
100.60
100.55
16.53
4.02
+0.00
0.45
F 0.45
F G
G
28.46
+10.45
14.91
14.91
+10.45
8.80
14.55
K
14.55
K
L
0.45
W27 0.45
W27
7.00 15.06
7.00
L
0.18
0.18
7.00
W12
7.00
W12
W13
0.24
7.00
7.00
7.00
6.67
0.45
6.88
7.00
7.00
5.32
0.45
8.91
0.45
6.55
5.14
0.45
1.41
5.32
0.32
3.89
6.97
8.41
3.91
0.32
2.77
7.00
7.00
0.24
124.06
W7
W6
W5
W4
W15 W3
W2
W1
8
7
W16
6
5
W18
4
3
W19
W20 W21
2
W22
1
W23 W24
W8
W9
W10
A
SEC
NORTH
DOCTORES
Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata
furniture plan (type 2) 1:200
Teaching assistants
TYPICAL ELECTRICAL LOOKING DOWN
Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim PAPER SIZE : A0
DATE: 16- 2 - 2021
W13
NOTE: ALL DRAWINGS ARE IN A1 SIZE
ARCHITECTURE Symbols
Door & Window Schedules Finish Schedules
Typical Details Canopy Details Typical Details Flooring
Site Plan Plans Ground Floor Plan First Floor Plan Roof Floor Plan Sections Section 1 Section B Elevations North Elevation Southe Elevation East Elevation West Elevation Reflected Plans Reflected Ceiling Plan, Ground Floor Reflected Ceiling Plan, First Floor Wall Section Stair Details Bathroom Details Kitchen Details Wardrobe Detailing
LANDSCAPE site plan hardscape softscape landscape details
Working Drawings IV (ASE552) NAME :
AHMED ZAKI ID :
PLUMBING First Floor Plan Plumbing ( Drainage) Site Plan And Ground Floor Plan Plumbing ( Drainage) First Floor Plan Plumbing ( Water Supply) Site Plan And Ground Floor Plan Plumbing ( Water Supply)
175057 PROJECT NAME:
VILLA PROJECT
NORTH
ELECTRICAL
DOCTORES
Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy
First Floor Plan Ground Floor Plan lighting details
Dr. lamia shehata Teaching assistants
Rana Adel Taher Mahmoud Alshimaa Galal
HVAC
Yousra Mohamed Nermine Ibrahim
First Floor Plan Ground Floor Plan Details PAPER SIZE : A1
DATE: 13 - 11 - 2020
WINDOW STIL 3.09
BOLT FOR FIXING
Working Drawings IV (ASE552)
2.20
1.20
NAME :
AHMED ZAKI ID :
Detail
6
175057
ROOF PROOFING DETAIL 1:25
PROJECT NAME:
WINDOW SETING
Detail
3
VILLA PROJECT
DETAIL FOR LIGHTING AND POWER SUPPLY 1:25
BOLT FOR FIXING
MORTAR
BRICK WALL
MORTAR STEEL NET ( SHABAKA) Detail
4
WASTE OF AC
FREON GAS
DETAIL FOR AC PIPES IN WALL 1:5
Detail
7
Detail
TYPICAL FLOORING DETAIL 1:25
Prof. Tarek Galal
WINDOW DETAIL
1
NORTH DOCTORES
Dr. Ahmed Abdelsalam
1:5
Dr. salwa el gendy Dr. lamia shehata Teaching assistants
Rana Adel Taher Mahmoud
15 cm
3.08
3.91
Alshimaa Galal
2.20
Yousra Mohamed Nermine Ibrahim
25 cm
AC FAN
drawing
3.0 m
typical details 20 cm
scale
Detail
2
LIGHT DETAIL
1:5
Detail
9
1:50
LIGHT DETAIL
1:20
Detail
5
SECTION DETAIL FOR AC UNIT 1:25
Detail
8
GROUND PROOFING DETAIL 1:25 PAPER SIZE : A1
DATE: 13 - 11 - 2020
TILES 10*10
TILES 10*10
TILES 10*10
TILES 30*30 MARBLE 40*40
MARBLE 40*40
MARBLE 40*40 MARBLE 40*40
MARBLE 40*40
Working Drawings IV (ASE552)
MARBLE 40*40
NAME : W1
W1
W1
W2
W1
D3
W2
9 10111213 8 7 6 5 4
W1
W3
W1
W3
AHMED ZAKI 14 15 16 17 18 19 20 UP
W1
ID :
W1
D3
175057
D3 D2
D2
D2 D2
1
D2
2
UP
UP
D1
PROJECT NAME:
VILLA PROJECT
W1
11 W1 W1
W1
W1
W1 W1
FIRST FLOOR PLAN FLOORING 1:50
W1
GROUND FLOOR PLAN FLOORING 1:50
NORTH DOCTORES
Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata TILES
Teaching assistants
MORTAR
Rana Adel
SAND WATER INSULATION CONCERT SLAB
CONCERT SLAB
Taher Mahmoud
SAND
Alshimaa Galal Yousra Mohamed
S10 MORTAR + 7.45 T.O.S
Nermine Ibrahim drawing
MARBLE TILES
typical details flooring scale
ROOF FLOOR PLAN FLOORING 1:50
FLOORING DETAIL 1:10
1:50
PAPER SIZE : A1
DATE: 13 - 11 - 2020
1
2
3
4
5
6
Working Drawings IV (ASE552) NAME :
AHMED ZAKI E
E ID :
175057 D
D
C
C
B
B
A
A
PROJECT NAME:
VILLA PROJECT
NORTH DOCTORES
Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants
1
2
3
4
5
Rana Adel
6
Taher Mahmoud Alshimaa Galal
T1 T2
Yousra Mohamed Nermine Ibrahim drawing
T3
site plan
T4 scale
T5
1:100
PAPER SIZE : A1
DATE: 13 - 11 - 2020
N
2
ELE
1
3
4
5
6
B
SEC 17.06
4.00
3.60 0.71
1.18
0.48
2.92 2.13
1.19
W1
0.13 0.93 0.48 1.06
4.90
1.00
D2
11
0.13
175057
1.09
0.84
1.03
3.06
2.62
ID :
2.00
2.00
3.85
3.84
3.98
3.92
A
0.13
3.06
0.51
E
B + 3.95
+ 3.95
1.77
AHMED ZAKI
C
S5 S4
2.78
NAME :
D 8.26
0.19
0.97
D2
1.24 D2
3.34
Working Drawings IV (ASE552)
0.48 3.30
3.92
1.19
2.79
E
+ 3.95
1.07
1.02
0.11 0.81
1.37
1.43
0.60 8.26
0.48 0.43 3.06
W1
D3
S10
1.19
0.73
S6 + 3.95
4.44
W1
0.54
+ 3.95
0.97
1.05
2.39
2.85
S7
2.27
4.88
0.48 0.48
0.12
1.79
1.00
0.48
+ 3.95
D2
2.18
+ 3.95
A
0.55
0.81
S8
14 15 16 17 18 19 20 UP
2.60
2.73
2.02
+ 3.95
1.05
+ 2.83
9 10111213 8 7 6 5 1.12 4
+ 1.98
0.71 0.33
0.93
2.82
1.77
S9
3.74
A
SEC ELE
B
1.00
1.04
W1
1.43
0.61
0.12
0.67 0.48 1.19
3.30
W1
0.05 0.12
0.82
1.77
D3
C
0.55
W2
1.10
3.49
0.91
D
W
1.87
W1 W2
E
3.50
0.71
ELE
1.74
0.13
0.48
0.60
1.19
1.05
0.48
A
1.89 0.97
SEC
0.13
PROJECT NAME: W1
W1
W1
1 0.90
0.98
0.13
0.48
1.12
1.89
1.19
0.48
1.76
0.48
1.19
3.94
0.48
3.60
4.00
0.48
1.19
0.48
0.54 0.37
3.50
2.92
2
3
4
5
VILLA PROJECT
6
1.00 17.06
1.00
0.12
1.89
4.00
3.60
2.92
3.50
1.01
3
4
S
5
6
E
E
0.13
2
0.13
1
0.13
17.06
ELE
B
SEC
3.30 8.25
S10
B
6
B
B
SEC A
0.44
1.89
4.00
0.76
1.43
0.76
3.60
2.92
0.76
1.41
3.50
7.51
0.48
1.19
0.13 0.48
0.97
0.12 0.00
0.12 0.48 3.30
0.48 0.97
0.45 0.12
0.76
0.67
1.14
1.89
0.48
1.19
W1
0.48
7.84
0.48
3.60
4.00
1.19 3.50
2.92
0.48
2
3
ELE
S
4
5
E
Yousra Mohamed
Drawing A
plans
1.03 0.13
16.18
1
Dr. salwa el gendy
Nermine Ibrahim
0.12
13.80
Dr. Ahmed Abdelsalam
Alshimaa Galal ELE
1.19 0.48
1.77
Prof. Tarek Galal
Taher Mahmoud
C
1.35
8.21
1.29
0.12
1.77
1.01
6
3.06
1.77
4.48
W1
2.80 1.08
3.50
5
Rana Adel
D
B
5.16
0.68 0.48
W1
W1
B
SEC
GROUND FLOOR PLAN 1:50
1.19 0.48
+ 0.45
+ 0.15
1.19
3.06
0.76
S1
+ 0.45
0.48 0.48
0.12
1.77
+ 0.45
1.10
D1
W1
+ 0.45
0.60
0.62 0.60 8.26
0.91 0.40
UP
2
2.92
4
Dr. lamia shehata
1.05
SEC 1.05
0.32
D2 1
UP
ELE
B
A
0.76
1.79
1.41
3.60
3
Teaching assistants
8.25
0.76
14 15 16 17 18 19 D3 20
2.16
A
+ 0.45
C W
9 10111213 8 7 1.08 6 5 4 3 2 1
7.75
REF.
3.02
+ 0.45
4.35
D
E
0.82
0.50 2.53
3.30
S2
6.29
S3
ROOF FLOOR PLAN 1:50
A
0.12
W3
+ 0.45
1.10
4.00
2
W1
SEC
E
1.89
17.06
1
W3
A
DOCTORES
16.18 0.13
NORTH
3.06
5
0.12
4
T.O.S 3.06
3
C
+ 7.45
0.12
2
ELE
1
N
D
1.05
8.12 1.05
C
0.60
D
8.00
FIRST FLOOR PLAN 1:50
0.60
3.30
16.81
6
Scale
1:50 PAPER SIZE : A1
DATE: 13 - 11 - 2020
E
D
C
B
A
Detail
6
2.76
1.50
1.31
1.50
roof floor 7.45 m
T.O.S
WHITE PAINTING
2.76
+7.45
+7.45 roof floor 7.45 m
Detail
Working Drawings IV (ASE552)
T.O.S
1
0.13
1
0.13 1.20
WHITE PAINTING
B
F.F.L
landscape level 0.15 m
PROJECT NAME:
VILLA PROJECT
zero level
zero level
SEC
175057
+0.58
ground floor 0.45 m
0.91
Detail
8
landscape level 0.15 m
AHMED ZAKI
F.F.L ID :
3.07 0.78
3.50
0.74 0.18
ground floor 0.45 m
F.F.L
8.50
0.24
Detail
+4.08
first floor 3.95 m
2.00
Detail
1.20
+0.45
NAME : 3.50
1.14
3.07
1.20
WHITE PAINTING
0.13
2.00
first floor 3.95 m
F.F.L
7
3.50
8.50
+3.95
Detail
WHITE PAINTING
0.18
3.50
0.13
1
SECTION B 1:50
NORTH DOCTORES
Prof. Tarek Galal 6
5
Detail
6
4
3
2
1
Dr. Ahmed Abdelsalam
Detail
6
1.50
1.31
1.50
roof floor 7.45 m
+7.45 roof floor 7.45 m
2.89
T.O.S
2.77
+7.45
WHITE PAINTING
Detail
T.O.S
Rana Adel
3.50
1.14
3.07
3.07
3.07
7
Detail 0.24
8.50
1.04
10
+4.08 first floor 3.95 m
F.F.L
0.54
WHITE PAINTING
Detail
3.50 2.58
3.07
ground floor 0.45 m
WHITE PAINTING 0.08
Detail
8
Taher Mahmoud Alshimaa Galal Yousra Mohamed
1
3.07
0.13 3.50
zero level
0.30
landscape level 0.15 m
0.74 0.24
ground floor 0.45 m
1.14
+0.45 F.F.L
WHITE PAINTING
0.24
8.50
first floor 3.95 m
0.96
F.F.L
1.04
+3.95
Dr. lamia shehata Teaching assistants
Detail 3.07
3.50
1.14
0.13
1
Dr. salwa el gendy
+0.58 F.F.L
Nermine Ibrahim Drawing
landscape level 0.15 m
zero level
sections Scale
SEC
A
SECTION A 1:50
1:50 PAPER SIZE : A1
DATE: 13 - 11 - 2020
6
1.50 2.77 1.50 2.58
ground floor 0.45 m
0.08
ground floor 0.45 m
ID :
3.50
WHITE PAINTING
zero level
ELE
N
2
3
4
5
175057 PROJECT NAME:
SOUTH ELEVATION
1
AHMED ZAKI
0.96 3.50
zero level
E
first floor 3.95 m
0.74
3.50
1.50 0.74
3.50
1.50 0.74
ground floor 0.45 m landscape level 0.15 m
landscape level 0.15 m
ELE
Working Drawings IV (ASE552) NAME :
1.57
first floor 3.95 m
WHITE PAINTING
ground floor 0.45 m
roof floor 7.45 m
8.50
3.50
1.04
first floor 3.95 m
2.00
2.00
first floor 3.95 m
WHITE PAINTING
3.50
1.50 2.77 3.50
roof floor 7.45 m
8.50
3.50
roof floor 7.45 m
8.50
1.50
2.77
1.50
WHITE PAINTING
1.50
E
1.50
roof floor 7.45 m
1
2.77
D
2
1.50
C
3
8.50
B
4
1.50
A
5
VILLA PROJECT
SOUTH ELEVATION
NORTH
6 DOCTORES
E
D
C
B
A
Prof. Tarek Galal
roof floor 7.45 m
1.50
Dr. salwa el gendy roof floor 7.45 m
1.39
roof floor 7.45 m
2.77
1.50
roof floor 7.45 m 1.27
WHITE PAINTING 2.77
1.50
WHITE PAINTING
1.50
1.50
1.50
Dr. Ahmed Abdelsalam WHITE PAINTING
Dr. lamia shehata
S
1.50
3.50
ground floor 0.45 m landscape level 0.15 m
landscape level 0.15 m
zero level
ELE
W
SOUTH ELEVATION
Taher Mahmoud Alshimaa Galal Yousra Mohamed
3.50
1.50 0.74
3.50
ground floor 0.45 m
WHITE PAINTING
0.74
ground floor 0.45 m
1.50
1.09
WHITE PAINTING 3.50
1.20 0.91
SOUTH ELEVATION
first floor 3.95 m
2.00
2.00
first floor 3.95 m
zero level
ELE
Rana Adel 8.50
3.50
1.50
8.50
3.50
0.13
first floor 3.95 m
0.30
3.50
1.33 0.30
0.91
WHITE PAINTING
0.30
8.80
1.04
8.80 1.04 0.97
first floor 3.95 m
ground floor 0.45 m
1.25
WHITE PAINTING
1.50
3.50
Teaching assistants
Nermine Ibrahim Drawing
elevations Scale
1:50 PAPER SIZE : A1
DATE: 13 - 11 - 2020
W1
W3
0.42
0.42
0.50 1.52
+ 7.15
AHMED ZAKI
0.77
+ 3.55
+ 3.65
0.80
0.59
D2
+ 3.55
5.52
0.65
D1
W1
0.74
D3
0.60
+ 3.55
2.80
0.61
0.63 0.87
+ 3.65
0.25
0.76 2.16
2.70
1.07 1.46
0.41
NAME :
5.23
0.48
0.68 0.61 1.52
0.48
0.60 0.74
0.95
2.47 1.07
0.34
+ 3.65
+ 3.55
2.47
3.14
0.56
0.93
1.05
+ 3.55
1.56
3.03
0.51
1.01
1.17
1.47
+ 3.651.56
1.05 + 3.55
Working Drawings IV (ASE552)
W1
W3
0.31
1.15
6.30
ID :
1.15
7.11
4.64
0.52
0.60
0.69 0.41
1.69
1.64
1.69
1.64
0.92
0.37 3.66
1.55
3.07 3.66
0.94
2.99
2.16
2.02
1.69
W1
+ 3.55
0.48
0.94 + 3.55
W1
+ 3.55 1.69
1.64
PROJECT NAME:
0.51
0.81
0.69 0.19
0.25
3.16
0.48
+ 3.65
0.43
175057
1.30
0.92
+ 3.55
3.16
1.48
VILLA PROJECT
+ 3.55
0.43
W1
W1
GROUND Reflected FLOOR PLAN 1:50
NORTH DOCTORES
Prof. Tarek Galal W1
W1
W1
W2
0.29
0.37
0.66
+ 7.15
0.63
0.63
W1
+ 7.15
0.40
+ 7.15
1.21
1.23
0.68
1.27
0.58
0.32
0.61
0.37
0.24
0.59
1.31
+ 7.05
0.76
+ 7.15
0.58
0.26
+ 7.15
1.60 0.99
0.59 0.34
1.04
0.62 1.02
0.19
W1
FRIST Reflected FLOOR PLAN 1:50
W1
+ 7.15
11
2.04
0.62
0.19
W1
Yousra Mohamed
0.49
Nermine Ibrahim
0.21
1.80 + 7.15
0.62
+ 7.15
0.62
0.31
0.60
Alshimaa Galal
0.20
0.62
1.12
0.991.60
0.62
0.25 0.46
2.02
0.15 0.83 0.53
+ 7.0
0.99
+ 705
1.98
0.62
1.11
+ 7.05
2.18
0.62 3.04 1.94
0.39
+ 7.15
Teaching assistants
Taher Mahmoud
0.39
1.00
0.62
1.11
+ 7.00
2.23 1.87 1.27
1.21
1.23
4.52 1.07 0.62
0.50 3.11 + 7.15
W1
0.22 0.59
W1
Rana Adel
+ 7.15
D2 0.33
+ 7.15
1.27
1.26
+ 7.05
D2
0.96
1.35
0.69
1.27
0.63
0.39
3.18
3.20
0.59
+ 7.15
0.39
0.41 1.01
0.64 3.17 + 7.05
1.33
0.58
D2
Dr. lamia shehata
1.31
0.40 3.20
D3 0.58
0.78 0.54
+ 7.15
1.32
0.54
D3 D2
0.69
+ 7.15
0.95
+ 7.15
0.41
0.49
1.04
0.59
0.56
0.57 0.44
0.24 0.27
1.31
1.48
0.50
3.11 + 7.15
+ 7.15
+ 7.15
1.00
0.50
3.18 2.55
Dr. salwa el gendy
0.74
1.23
0.49
0.50 0.42
+ 7.15
1.31
+ 7.05
0.74
0.58
0.54 0.88
0.58 1.35
Dr. Ahmed Abdelsalam
W2
0.13 0.97
Drawing
reflected plans Scale
1:50 PAPER SIZE : A1
DATE: 13 - 11 - 2020
+ 2.83
C
B
AHMED ZAKI
Detail
WHITE PAINTING
roof floor 7.45 m
2.76
1.50
ID :
2.76
1.50
1.31
6
175057
roof floor 7.45 m
Detail
PROJECT NAME:
1
Detail
landscape level 0.15 m
VILLA PROJECT
3.50
0.13
Detail
1
8.50
first floor 3.95 m
1
Detail
8
WHITE PAINTING
DOCTORES
3.50
1.20
3.07
0.13
NORTH
0.91
ground floor 0.45 m
0.24
WHITE PAINTING
0.78
3.50
W1
1.14
7
0.13
2.00
first floor 3.95 m
Detail
2.00
WHITE PAINTING
0.18
3.50
+ 0.45
3.07
+ 3.95
+ 2.83
Working Drawings IV (ASE552)
A
NAME :
8.50
UP
D
1.20
1.10
E
0.13
1.12
14 15 16 17 18 19 D3 20
1.20
9 10111213 8 7 6 5 4 3 2 1
0.74 0.18
+ 1.98
Prof. Tarek Galal ground floor 0.45 m
landscape level 0.15 m
Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants
Rana Adel + 1.98
9 10111213 8 7 6 5 4 1.12
1.43
0.3
14 15 16 17 18 19 20
zero level
zero level
Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim Drawing
stair details UP
Scale
1.10
1:50 PAPER SIZE : A1
DATE: 13 - 11 - 2020
UPPER CABINET Working Drawings IV (ASE552) NAME :
HOB (as per slection) TENDOM BOX TENDOM BOX TENDOM BOX
SHELF TO KEEP INGREDIENTS
TRY TRY
SHELF
TRY
SINGLE PULL OUT DRAWER TO KEEP VESSELS
AHMED ZAKI ID :
175057 PROJECT NAME:
4" SKIRTING KT
SECTIONAL ELEVATION 1
VILLA PROJECT
SEC 1
NORTH DOCTORES
Prof. Tarek Galal
UPPER CABINET
UPPER CABINET
Dr. Ahmed Abdelsalam Dr. salwa el gendy
19mm THICK PLYWOOD
Dr. lamia shehata Teaching assistants
20mm GRANITE COUNTER TOP 20mm GRANITE ADDITON
Rana Adel Taher Mahmoud
19mm THICK PLYWOOD SHUTTER WITH 1mm LAMINATE OF APPROVED COLOUR
Alshimaa Galal Yousra Mohamed
20mm THICK GRANITE TOP
Nermine Ibrahim Drawing
KITCHEN DETAILS
19mm THICK PLYWOOD SHUTTER WITH 1mm LAMINATE OF APPROVED COLOUR 19mm THICK PLYWOOD PARTION
SS KITCHEN BASKET (as per selection)
4" SKIRTING
KT
SECTIONAL ELEVATION 2
Scale
SEC2
1:50 PAPER SIZE : A1
DATE: 13 - 11 - 2020
4 4 0.04 0.04
1.64
0.05
0.04
0.04
2.24
0.04
0.04 0.15
0.15
0.05
1.64
0.05
2.23
1.64
0.15
2.23
0.47
0.47
0.47
LED
LED
LED
LED
i 1.20 x 1.60m mirror
1.2
h 1st plywood pine frame door with double wheelbarrow
1.67
1st plywood pine frame door with double wheelbarrow
0.05
0.05
Working Drawings IV (ASE552)
0.7
1.5
2.46
0.03
0.36
2.27
NAME :
0.35
0.35
1.20 x 1.60m mirror
1.2 2.46
0.62
LED
i
1.17
h
1.67
LED
AHMED ZAKI
0.38
0.1
0.01 0.2
1.65
l
0.03 0.23
0.03 0.03 0.16 0.23
1st plywood pine plywood sheet 1 "brushed
0.16
0.2
0.23
0.23
0.23
0.23
Round stick made of pine wood from 1st. 1 "brushed
0.57
0.57
PROJECT NAME:
0.36
k
0.05 0.99
0.65
0.05
1.04
1.2
0.04
0.04
0.99
0.65
ELEVATION 1:10
0.19 0.45
c
0.59
D2 c
a
c
1st grade pine wood slat 1 "brushed
d
6 x 75 x 20mm plywood sheet, 1st pine wood, brushed
e
1st grade pine wood slat 1 1/2 "brushed
f
1/2 "Plywood Sheet 1a. Pine Wood, brushed
g
1st grade pine wood slat 3/4 "thick, brushed
h
1st plywood pine frame door with double wheelbarrow
i
1.20 x 1.60m mirror
j
Round stick made of pine wood from 1st. 1 "x 12 cm
k
Round stick made of pine wood from 1st. 1 "brushed
l
1st plywood pine plywood sheet 1 "brushed
0.04 0.05
1.5
0.03 0.02 0.02 0.04
VILLA PROJECT
0.6
0.82 0.59
0.15
b
0.19
NORTH
b
D2
DOCTORES
0.66
0.6
1a. 1/2 "Plywood Sheet Pine Wood, brushed
0.03
0.05
a
LED
b
0.7
0.82 0.15
c 0.5
1mm pinewood 6mm plywood plywood, brushed
0.05
ELEVATIONAL SECTION 1:10 0.65 0.57
a
175057
0.2
1
0.03
ID :
h h 2.46
2.35
0.35
a
1.2
a
Dr. Ahmed Abdelsalam Dr. salwa el gendy
0.3
Dr. lamia shehata 2.46
a 0.17
a
0.3
Prof. Tarek Galal a
a 0.36
2.27
D6
a
a
a
2.35 2.27
a 2.46
h
h
Rana Adel Taher Mahmoud Alshimaa Galal
0.17
0.25
Teaching assistants
Yousra Mohamed
0.17
0.23
Nermine Ibrahim 0.31
0.23
0.52
0.55
CS1
D3
0.05
0.63
D3 0.09
k
Drawing
k
0.6 0.05
CS2 CROSS SECTIONS
CS3
WARDROBE DETAILING Scale
1:50 PAPER SIZE : A1
DATE: 13 - 11 - 2020
4 1.68
0.04
0.7
0.04
1.5
a a
D5 0.79
0.65
D7
l
0.03
a h
0.63
0.28
k
0.1
0.14
CS2
Working Drawings IV (ASE552)
0.04 0.03
0.04
h CS1
0.05
0.11 0.03 0.13
a
a
0.04 0.04
k
a
a
LS
0.04
a
NAME :
CS3
PLAN
AHMED ZAKI
1.68 0.05
2.33 0.05
1.63
0.05
2.23
b 0.49
c
0.04
LED
LED
1.71
a
1.19
D1
LED
0.63 0.66
c
a
c
a
a
l
a
0.04
1mm pinewood 6mm plywood plywood, brushed
1st plywood pine plywood sheet 1 "brushed
1mm pinewood 6mm plywood plywood, brushed
0.74
a 0.04
0.17
a 0.17
0.25
0.19
1.8
D4
0.17
0.67
0.04
0.23
0.19
0.23
0.19
0.31
k
DOCTORES
Prof. Tarek Galal 0.04
0.98
0.64
0.7 0.06
1.53 0.05
4
Dr. lamia shehata
a
1mm pinewood 6mm plywood plywood, brushed
b
1a. 1/2 "Plywood Sheet Pine Wood, brushed
c
1st grade pine wood slat 1 "brushed
d
6 x 75 x 20mm plywood sheet, 1st pine wood, brushed
e
1st grade pine wood slat 1 1/2 "brushed
f
1/2 "Plywood Sheet 1a. Pine Wood, brushed
g
1st grade pine wood slat 3/4 "thick, brushed
h
1st plywood pine frame door with double wheelbarrow
i
1.20 x 1.60m mirror
j
Round stick made of pine wood from 1st. 1 "x 12 cm
k
Round stick made of pine wood from 1st. 1 "brushed
l
1st plywood pine plywood sheet 1 "brushed
0.33
b
Teaching assistants
Rana Adel
0.03
1.23
D4
a
Taher Mahmoud
b 0.39
0.05 1.25
DRAWER DETAIL
1.28
FRONT CUT
j
0.05 0.18
0.17 0.39
b
Drawing b
0.05
0.33
a
0.17
0.05 0.24
Yousra Mohamed
1.1 1.04
0.18
0.58
Alshimaa Galal
Nermine Ibrahim
1.4
0.4
Dr. Ahmed Abdelsalam Dr. salwa el gendy
LONG SECTION 1:10 0.03
NORTH
0.94 Round stick made of pine wood from 1st. 1 "brushed
0.05 0.05
VILLA PROJECT
0.04
1mm pinewood 6mm plywood plywood, brushed
0.36
1mm pinewood 6mm plywood plywood, brushed
PROJECT NAME:
1mm pinewood 6mm plywood plywood, brushed
0.35
1mm pinewood 6mm plywood plywood, brushed
1mm pinewood 6mm plywood plywood, brushed
175057
1a. 1/2 "Plywood Sheet Pine Wood, brushed
1mm pinewood 6mm plywood plywood, brushed
a
ID :
0.04
0.58
FRONT ELEVATION
1.07
SIDE CUT
* NOTE: All the furniture will be finished with two layers of Var-Express synthetic varnish natural color, spray applied of area.
WARDROBE DETAILING Scale
1:50 PAPER SIZE : A1
DATE: 13 - 11 - 2020
45
1
2
3
4
5
6
2.94
5.14
Working Drawings IV (ASE552)
8.45 9.74
25.62
2.43
9.80
NAME :
4.30
1.77
AHMED ZAKI
7.91 2.34 1.71
E
E 0.47
ID : 1.90
3.61
175057
9.59
D C
D 4.11
PROJECT NAME:
C
4.13
25
B
B 16.58
VILLA PROJECT
2.34 7.01
3.15
3.28
A
1.23
3.61
9.99 2.05
NORTH DOCTORES
2.86 4.35
3.44 5.88
16.23
Prof. Tarek Galal
3.82
Dr. Ahmed Abdelsalam 2.86 2.23
Dr. salwa el gendy Dr. lamia shehata Teaching assistants
3
4
5
6
Rana Adel Taher Mahmoud Alshimaa Galal
1450
2
Yousra Mohamed Nermine Ibrahim
405
1
drawing
HARDSCAPE 2600
A
scale
1:100 2600
PAPER SIZE : A1
DATE: 13 - 11 - 2020
45
1
T1
T3
7.13
2
3
4
5
6
5.77 1.53
2.21
T3
13.50
T1
1.54
1.47
1.30
T4
T3
T4 1.05
4.96
T4
Working Drawings IV (ASE552)
1.24
T5
4.54
2.07
1.13
T4
3.47
3.38
E
1.55
T4
1.56
T1
T1
6.14
2.23
7.79
T4
T3
1.12
4.78
0.87
T4
T4
NAME :
1.16
T4
2.73
0.68
6.25
T4
T4
1.62
T4
11.79
3.72
E
3.38
3.83
1.98
T5
1.53
ID :
T5
T5
175057
1.35
D
1.85
C
D
3.72
C
T2
5.46
5.50
AHMED ZAKI
1.48
T5
3.87
B
3.86 3.81
B
1.81
3.11
2.19
T2
T5
T5
T1
A 2.07
1.22
PROJECT NAME:
VILLA PROJECT
1.85 4.08
A
T5
2.16 0.97 4.22
T4
T4
3.42
T4 T4
1.02
T4
2.36
2.99
T4
NORTH
T5
0.84 12.02
2.58
DOCTORES 0.30 1.25
1.39 2.14
T4 T4
2.77
1.36
0.98
T1
1.21
T1
T4
T1
Prof. Tarek Galal
T4
7.34
T4
1.01
1.20 1.05
T4
T4
7.26 1.59
4.66 13.43
T3 1.33
0.86
T3
T1
Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants
1
2
3
4
5
Rana Adel
6
Taher Mahmoud Alshimaa Galal Yousra Mohamed
T1 T2
Nermine Ibrahim drawing
T3 T4 T1
T2
T3
T4
T5
T5
SOFTSCAPE
scale
1:100
PAPER SIZE : A1
DATE: 13 - 11 - 2020
3.91
Detail
2
Working Drawings IV (ASE552)
Detail
9
NAME :
15 cm
AHMED ZAKI
3.0 m
ID :
175057
25 cm
PROJECT NAME:
Entrance Gates
VILLA PROJECT
1:50 20 cm
Detail
2
LIGHT DETAIL
Detail
1:5
9
LIGHT DETAIL
1:20
Detail
2
Detail
2
NORTH DOCTORES
Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy ETERNAL WALL EAST 1:100
Dr. lamia shehata
ETERNAL WALL WEST 1:100
Teaching assistants
Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Detail
Detail
2
2
Nermine Ibrahim drawing
LANDSCAPE DETAILS
ETERNAL WALL NORTH 1:100
ETERNAL WALL SOUTH 1:100
PAPER SIZE : A1
DATE: 13 - 11 - 2020
W1
W1
W1
W2
W2
9 10111213 8 7 6 5 4
W1
D3
14 15 16 17 18 19 20 UP
Working Drawings IV (ASE552) NAME :
W1
AHMED ZAKI
D3 D2
D2 D2
D2
ID :
175057
11 W1
PROJECT NAME:
W1
W1
VILLA PROJECT
W1
FIRST FLOOR PLAN 1:50
NORTH DOCTORES
Prof. Tarek Galal W1
W3
Dr. Ahmed Abdelsalam
W1
W3
Dr. salwa el gendy
REF.
Dr. lamia shehata W1
Rana Adel
D3 D2 1
2
Teaching assistants
Taher Mahmoud
UP
UP
D1
Alshimaa Galal W1
Yousra Mohamed Nermine Ibrahim
W1
drawing
W1
W1
ELECTRICAL
scale
GROUND FLOOR PLAN 1:50
1:50
PAPER SIZE : A1
DATE: 13 - 11 - 2020
Working Drawings IV (ASE552) NAME :
AHMED ZAKI ID :
175057 PROJECT NAME:
VILLA PROJECT
NORTH DOCTORES
Prof. Tarek Galal Dr. Ahmed Abdelsalam Dr. salwa el gendy Dr. lamia shehata Teaching assistants
Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed Nermine Ibrahim Drawing
LIGHTING DETAILS
PAPER SIZE : A1
DATE: 13 - 11 - 2020
MORTAR
BRICK WALL
MORTAR Detail
STEEL NET ( SHABAKA)
4
W1
W1
W1
W2
W2
Detail
4
Detail
4
9 10111213 8 7 6 5 4
W1
D3
14 15 16 17 18 19 20 UP
WASTE OF AC
FREON GAS
DETAIL FOR AC PIPES IN WALL 1:5
Working Drawings IV (ASE552) W1
NAME : D3 D2
D2 D2
AHMED ZAKI
D2
ID : 11 W1
175057 3.08
PROJECT NAME:
2.20
W1
W1
W1
VILLA PROJECT
Detail
4
Detail
4
AC FAN
FIRST FLOOR PLAN (HVAC) 1:50
NORTH SECTION DETAIL FOR AC UNIT 1:25
DOCTORES
Prof. Tarek Galal Dr. Ahmed Abdelsalam
W1
W3
W3
Detail
FIRST FLOOR UNIT
4
Detail
REF.
4
D2 1
2
UP
9 10111213 8 7 6 5 4 3 2 1
14 15 16 17 18 19 D3 20
W1
Detail
4
4
GROUND FLOOR PLAN CONTAIN GROUND FLOOR AND FIRST FLOOR FAN UNITE TO SEE ALL UNITS TOGETHER
Teaching assistants
FIRST FLOOR PLAN CONTAIN FIRST FLOOR FAN UNIT ONLY BECAUSE ADDING GROUND FLOOR UNIT WILL BE IN THE MIDDLE OF SOME ROOMS
Dr. lamia shehata Rana Adel Taher Mahmoud Alshimaa Galal Yousra Mohamed
W1
Detail
Dr. salwa el gendy
FIRST FLOOR UNIT
UP
D1
NOTE:
AC SPLIT UNIT
Nermine Ibrahim
W1
PIPES IN WALL
FIRST FLOOR UNIT
FIRST FLOOR UNIT
W1
drawing
PIPES IN WALL
FIRST FLOOR UNIT
W1
HVAC
PIPES UNDER GROUND
AC FAN UNIT scale
FREON GAS PIPE
1:50 GROUND FLOOR PLAN (HVAC) 1:50 PAPER SIZE : A1
DATE: 13 - 11 - 2020