OVERVIEW OF DEVELOPMENT PROJECTS
NOV 2016 – MAY 2017
TO ENSURE PRO-PEOPLE AND EFFICIENT LOCAL GOVERNANCE IN CANTONMENTS AND EFFECTIVE DEFENSE LAND MANAGEMENT.
CHAKLALA & RAWALPINDI CANTONMENT BOARD
MILITARY LANDS AND CANTONMENTS DEVELOPMENT PROGRESS 2016 - 2017
AT A GLANCE
CHAKLALA CANTONMENT BOARD
RAWALPINDI CANTONMENT BOARD
CHAKLALA CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
CCB – OFFICE BUILDING C H A K L A L A C A N T O N M E N T
B O A R D
DEVELOPMENT PROJECTS
CCB 2016 - 2017
– B E A U T I F I C AT I O N – LIGHTING – E D U C AT I O N – H E A LT H – BUILDING PROJECTS – ROADS – SEWERAGE
– W AT E R M A N A G E M E N T – S A N I TAT I O N – SAFETY MEASURES – ENFORCEMENT
DEVELOPMENT SECTOR
Ongoing DEVELOPMENT PROJECTS
STEPS
TOWARD SUSTAINABILITY
MORE GREENER CANTTS
BEAUTIFICATION • • • • •
FLAG PARK PRESIDENCY PARK AMMAR CHOWK JHANDA CHICHI BRIDGE CHAKLALA GARRISON
CHAKLALA CANTONMENT BOARD
DEVELOPMENT PROJECTS
DEVELOPMENT PROGRESS 2016 - 2017
BEAUTIFICATION WORK CHAKLALA CANTONMENT BOARD
PRESIDENCY PARK
1
•
PLANTATION
•
LIGHTING
BEAUTIFICATION
PRESIDENCY PARK
2
BEAUTIFICATION
3
AMMAR CHOWK
BEAUTIFICATION
AMMAR CHOWK
4
BEAUTIFICATION
5
BEAUTIFICATION OF JHANDA CHICHI BRIDGE
R E V I TA L I Z I N G CITYSCAPE
BEAUTIFICATION
UPLIFTING OF WALL AT ST. 12 CHAKLALA-III
6
BEAUTIFICATION
7
CHAKLALA GARRISON
BEAUTIFICATION
CHAKLALA GARRISON
8
BEAUTIFICATION
9
CHAKLALA GARRISON
BEAUTIFICATION
CHAKLALA GARRISON
10
BEAUTIFICATION
11
CHAKLALA GARRISON
BEAUTIFICATION
SARWAR PARK
12
BEAUTIFICATION
13
NEW BENCHES & DUSTBINS IN DIFFERENT PARKS
BEAUTIFICATION
NEW BENCHES & DUSTBINS IN DIFFERENT PARKS
14
BEAUTIFICATION
15
UPLIFTING OF COMMERCIAL AREA CKL-III
BEAUTIFICATION
UPLIFTING OF COMMERCIAL AREA CKL-III
16
CHAKLALA CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
DEVELOPMENT PROJECTS
EXHIBITIONS CHAKLALA CANTONMENT BOARD
SPRING
FLOWER SHOW 2016
17
BEAUTIFICATION
SPRING FLOWER SHOW 2016
18
LIGHTING
Energy Efficiency in the Urban Environment • PRESIDENCY PARK – ILLUMINATION • JHANDA CHICHI – VICTORIAN LIGHTS • JHELUM ROAD – UNDER PASS
BEAUTIFICATION
19
PRESIDENCY PARK
BEAUTIFICATION
PRESIDENCY PARK
20
BEAUTIFICATION
21
JHANDA CHICHI BRIDGE BEAUTIFICATION
BEAUTIFICATION
UNDERPASS NIGHT VIEW
22
ENERGY EFFICIENCY
23
NEW LOW VOLTAGE LED LIGHTS INSTALLED TO OVERCOME POWER SHORTAGE
ENERGY EFFICIENCY
NEW LOW VOLTAGE LED LIGHTS INSTALLED TO OVERCOME POWER SHORTAGE
24
EDUCATION
Up-gradation of Existing Schools • CB PUBLIC HIGH SCHOOL & COLLEGE, SABZAZAR • CB PUBLIC HIGH SCHOOL, LALAZAR
CHAKLALA CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
DEVELOPMENT PROJECTS
DEVELOPMENT IN EDUCATION SECTOR CHAKLALA CANTONMENT BOARD
CONSTRUCTION OF SABZAZAR SCHOOL BUILDING – 3D
25
EDUCATION
CONSTRUCTION OF NEW BUILDING AT SABZAZAR SCHOOL
26
EDUCATION
27
CONSTRUCTION OF LALAZAR SCHOOL BUILDING– 3D
EDUCATION
CONSTRUCTION OF NEW BLOCK – HIGH SCHOOL LALAZAR
28
EDUCATION
29
BETTER EDUCATION ENVIRONMENT
EDUCATION
BETTER EDUCATION ENVIRONMENT
30
HEALTH • MAINTENANCE • ENHANCEMENT OF HEALTH FACILITIES
CHAKLALA CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
DEVELOPMENT PROJECTS
DEVELOPMENT IN HEALTH SECTOR CHAKLALA CANTONMENT BOARD
CONSTRUCTION OF DISPENSARY AT DK. CHIRAGH DIN CHAKLALA CANTT
31
DEVELOPMENT PROJECTS
CHAKLALA CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
DEVELOPMENT IN HEALTH SECTOR C H A K L A L A C A N T O N M E N T B O A R D
UNDER CONSTRUCTION DISPENSARY IN LALAZAR
32
PROJECT DETAIL
33
UPGRADATION OF TARIQABAD DISPENSARY
PROJECT DETAIL
WAITING AREA FOR TARIQABAD DISPENSARY
34
BUILDING PROJECTS • PANORAMA CENTER • TRIANGLE PLAZA • UP COMING FUTURE PROJECTS
CHAKLALA CANTONMENT BOARD PRESENTATION 2014
DEVELOPMENT PROJECTS
DEVELOPMENT PROJECTS CHAKLALA CANTONMENT BOARD
CONSTRUCTION OF PANORAMA CENTER AT TARIQABAD
35
COMMERCIAL BUILDING
PANORAMA CENTER
36
• • • • • •
AREA SHOPS FLATS COST OF CONSTRUCTION PREMIUM RECEIPT RENT
= = = = = =
1436.47 SFT (5.28 MARLAS) 06 NOS.(02 ON EACH FLOOR) 02 NOS. (01 ON EACH FLOOR) RS. 15 M RS. 21 M RS. 0.870 M (P.A)
PROJECT BRIEF
37
TRIANGLE PLAZA
CHAKLALA CANTONMENT BOARD PRESENTATION 2014
DEVELOPMENT PROJECTS
FUTURE PROJECT CHAKLALA CANTONMENT BOARD
CONSTRUCTION OF COMMERCIAL PLAZA AT OLD ICE FACTORY MURREE ROAD
AREA OF PLOT 6,732 SFT
38
ROADS • ST. NO. 12, SCHEME - III • IMRAN KHAN AVENUE • PCC STREETS
MAINTENANCE
39
CONSTRUCTION OF ST. 03 AT GULISTAN COLONY CHAKLALA CANTT
BEAUTIFICATION
LANE MARKING OF VIP ROUTES CHAKLALA CANTT
40
SEWERAGE IMPROVEMENT IN DRAINAGE SYSTEMS •
CONSTRUCTION, LAYING AND MAINTENANCE AT VARIOUS LOCATIONS
CHAKLALA CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
DEVELOPMENT PROJECTS
CCB – UPGRADATION WORKS CHAKLALA CANTONMENT BOARD
IMPROVEMENT OF SEWERAGE AND CONSTRUCTION OF STREET IN QAZIABAD CHAKLALA CANTT
41
RAIN FLOOD DRAIN
CONSTRUCTION OF RETAINING WALL AT NULLAH LAI GULISTAN COLONY TO PROTECT PEOPLE AND THEIR PROPERTIES FROM FLOOD
42
SEWARAGE
43
CONSTRUCTION OF RETAINING WALL AT NULLAH LAI GULISTAN COLONY
Sewerage Lines
Laying of Sewerage Line at various Locations
44
WATER MANAGEMENT CLEAN WATER FOR RESIDENTS • 1. TUBE WELLS • 2. WATER SUPPLY LINES
CHAKLALA CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
DEVELOPMENT PROJECTS
WATER SUPPLY CHAKLALA CANTONMENT BOARD
BORING INSTALLATION OF NEW TUBE WELL MAIN BAZAR MARRIR HASSAN
MILITARY LANDS AND CANTONMENTS - 2017
45
DEVELOPMENT PROJECTS
CHAKLALA CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
WATER SUPPLY – TUBE WELL CHAKLALA CANTONMENT BOARD
BORING INSTALLATION OF NEW TUBE WELL MAIN BAZAR MARRIR HASSAN
46
CHAKLALA CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
C H A K L A L A
LAYING OF WATER SUPPLY NET WORK IN CKL-III
47
DEVELOPMENT PROJECTS
WATER SUPPLY C A N T O N M E N T B O A R D
DEVELOPMENT PROJECTS
CHAKLALA CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
C H A K L A L A
WATER SUPPLY C A N T O N M E N T B O A R D
48
SANITATION • CLEANLINESS • FIRE BRIGADE
SANITATION
49
CLEANING OF DRAINS
SANITATION
COLLECTION OF GARBAGE
50
SANITATION
51
ROAD SWEEPING MACHINE
SANITATION
FIRE BRIGADE
52
CHAKLALA CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
C H A K L A L A
SANITATION WEEK 2017
53
DEVELOPMENT PROJECTS
SANITATION WEEK C A N T O N M E N T B O A R D
SANITATION WEEK CLEANING OF NULLAH’S
SANITATION WEEK 2017
54
SANITATION WEEK
55
SANITATION WEEK
REVIVAL OF ABANDONED PARKS
56
SANITATION WEEK
57
ROAD SWEEPING AND REMOVAL OF STIFFEN GARBAGE
SANITATION WEEK
CLEANING CITYSCAPE AT EVERY LEVEL
58
SAFETY MEASURES • SIGNAGES • SPEED HUMPS
SIGNAGE
59
CITY SINAGE
DEVELOPMENT PROJECTS
CHAKLALA CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
TRAFFIC TTYSAFETY MEASURES C H A K L A L A
C A N T O N M E N T
B O A R D
INSTALLATION OF SPEEDS HUMPS & CAT EYES AT VARIOUS LOCATION
0
60
0
0
ENFORCEMENT • Temporary Encroachment removal • Building encroachment removal
0
0
ENCROACHMENT
61
REMOVAL OF ENCROACHMENTS
ENCROACHMENT
DEMOLISHING OF ENCROACHMENTS
62
RCB
RCB
RAWALPINDI CANTONMENT BOARD
0
0
AT A GLANCE
RAWALPINDI CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
RCB – OFFICE BUILDING R A W A L P I N D I C A N T O N M E N T
B O A R D
RCB 2016-2017
– B E A U T I F I C AT I O N – ROADS – SEWERAGE – W AT E R M A N A G E M E N T
DEVELOPMENT SECTOR
ONGOING DEVELOPMENT PROJECTS
0
0
BEAUTIFICATION
• FLASHMAN'S GREEN BELT • MAIN PESHAWAR ROAD TRIANGLE • QASIM MARKET TRIANGLE • ROOM PARK FIXATION OF BARS
BEAUTIFICATION
1
FLASHMAN'S GREEN BELT
RAWALPINDI CANTONMENT BOARD
DEVELOPMENT PROJECTS
DEVELOPMENT PROGRESS 2016 - 2017
BEAUTIFICATION RAWALPINDI CANTONMENT BOARD
FLASHMAN'S’S GREEN BELT •
CONCRETE BASE FOR CARPETING
•
SYNTHETIC CARPETING
•
LIGHTS WITH FIXATION
2
BEAUTIFICATION
3
TRIANGLE MAIN PESHAWAR ROAD LANDMARK
BEAUTIFICATION
LANDMARK
4
DEVELOPMENT PROJECTS
RAWALPINDI CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
R A W A L P I N D I
QASIM MARKET TRIANGLE U P G R A DAT I O N
5
BEAUTIFICATION WORK C A N T O N M E N T B O A R D
BEAUTIFICATION
QASIM MARKET – TRIANGLE UPGRADATION
6
DEVELOPMENT PROJECTS
RAWALPINDI CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
R A W A L P I N D I
FIXATION OF BARS IN FRONT OF ROOMI PARK
BARS + STONES CONCRETE WORKS LIGHTS WITH FIXATION
7
BEAUTIFICATION C A N T O N M E N T B O A R D
MULTICOLOUR NIGHT DISPLAY
FIXATION OF BARS IN FRONT OF ROOMI PARK
8
RAWALPINDI CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
DEVELOPMENT PROJECTS
EXHIBITIONS RAWALPINDI CANTONMENT BOARD
SPRING
FLOWER SHOW 2016
9
0
EXHIBITION
SPRING FLOWER SHOW 2016
10
DEVELOPMENT PROJECTS
RAWALPINDI CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
R A W A L P I N D I
FLOWER PLANTATION MALL ROAD TRIANGLES & PARKS
11
C A N T O N M E N T
B O A R D
PLANTATION
BEAUTIFICATION
12
GREEN AREA
13
GREEN BELT PLANTATION MAIN PESHAWAR ROAD
INSTALLATION OF FANCY GARDEN LIGHTS
PLANTATION AT ROMI PARK
14
DEVELOPMENT PROJECTS
RAWALPINDI CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
R A W A L P I N D I
BEAUTIFICATION WORKS C A N T O N M E N T B O A R D
FLOWERING MALL ROAD TRIANGLES & PARKS
15
ROADS
INFRASTRUCTURE DEVELOPMENT • STREETS & DRAINS
PCC STREET NEAR MASJID ALHUDA 16
IMPROVEMENT OF STREET DISPENSARY DK GUJRAN
GHOURI STREET NEAR BILAL MASJID FRIENDS COLONY
PCC STREET NEAR MASJID ALHUDA
INFRASTRUCTURE DEVELOPMENT
IMPROVEMENT OF STREET DISPENSARY DK GUJRAN
GHOURI STREET NEAR BILAL MASJID FRIENDS COLONY
PCC STREET NEAR MASJID ALHUDA RAWALPINDI CANTT INFRASTRUCTURE DEVELOPMENT
17
STREET NO.1, MISRIAL ROAD NEAR ARMY UNIT 18
IMPROVEMENT / REPAIR OF SEWERAGE LINE AWAN STREET
STREET NO.1, MISRIAL ROAD NEAR ARMY UNIT
UPGRADATION PROJECTS
IMPROVEMENT / REPAIR OF SEWERAGE LINE AWAN STREET
PCC STREET NEAR MASJID ALHUDA
19
WATER
CLEAN WATER FOR RESIDENTS • INSTALLATION OF WATER FILTRATION PLANT IN DIFFERENT LOCALITIES FOR SAFE AND HEALTHY DRINKING WATER
RAWALPINDI CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
DEVELOPMENT PROJECTS
WATER SUPPLY RAWALPINDI CANTONMENT BOARD
INSTALLATION OF NEW FILTRATION PLANT MUGHAL ABAD, RAWALPINDI
20
RAWALPINDI CANTONMENT BOARD DEVELOPMENT PROJECTS 2016 - 2017
DEVELOPMENT PROJECTS
WATER SUPPLY – TUBE WELL RAWALPINDI CANTONMENT BOARD
FILTERATION PLANT ALLAMA IQBAL COLONY.
21
DEVELOPMENT PROJECTS
RAWALPINDI CANTONMENT BOARD DEVELOPMENT PROGRESS 2016 - 2017
M&R WORKS R A W A L P I N D I MAINTENANCE WORKS OUT OF CANTT FUND
M&R WORKS COMPLETED SINCE NOV 2016 TILL DATE
C A N T O N M E N T
S NO NATURE OF WORK
B O A R D
NO. OF WORKS
AMOUNT (M)
1
Road/Streets
123
90.995
2
Drain / Sewerage
110
69.042
3
Misc Public Imp
12
7.6995
245
167.7365
G. Total
22
CHAKLALA & RAWALPINDI CANTONMENT BOARD DEVELOPMENT PROJECTS H E A LT H – E D U C AT I O N – E N V I R O N M E N T – S A N I TAT I O N -
FACILIT IES