1 minute read

ARCHITECTURAL ANALYSIS ISOMETRIC VIEW

Next Article
PUBLIC SPACE

PUBLIC SPACE

Velazco Astete Airport Parking Lots

Commercialmodules

Advertisement

Functional Organization

FIRSTFLOORPLAN

SECONDFLOORPLAN

User Flows

FIRSTFLOORPLAN

02. FUNCTIONAL ORGANIZATION

User Flows

On the first level is the counter area extended along the façade and after the entrance, within which travel management activities are carried out, so it is practical that they are attached to the administrative offices.

These offices occupy a closed area for greater privacy, while the boarding area located next to it is characterized by being a block without dividing walls and with abundant light sources.

FIRSTFLOORPLAN

The vertical accesses (stairs) are distributed evenly throughout the entire floor for better accessibility; and under the same criteria, the toilet block was located at the central point of the airport.

The second level proposal repeats the programming, with the absence of the counter area and instead it locates a double-height void to achieve visual connections and respond to bioclimatic conditions.

SECONDFLOORPLAN

03. USER FLOWS

After analyzing the flow of travelers that the airport receives daily, it was found that:

1. The access flows extend throughout the counter area, this due to its proposal of multiple accesses along the façade.

2. The access flows continue on the second level through a main staircase located in the central area of the airport.

3. The boarding flows are divided into those on the first and second levels, with greater permeability on the ground floor, while on the second floor some flows are destined for a viewing terrace and the rest for the boarding.

SECONDFLOORPLAN

This article is from: