Wayfinding Design
KSB Pumps Limited, Pimpri
Aishwarya Padhye Communication Designer - Wayfinding & Sigange Design
Table of Content
Project Brief ........................................................................
1
About Company ..................................................................
2
Project Task, Scope & Objective ........................................
3
Wayfinding Study ...............................................................
4
Project Research ................................................................
5
Present Signages ...............................................................
6
Observations ......................................................................
7
Sign Planing Checklist ........................................................
8
Data Collection ...................................................................
9
Design Exploration ..............................................................
14
Typeface .............................................................................
15
Legibility ..............................................................................
17
Color Palette .......................................................................
19
Color Contrast ....................................................................
23
Wayfinding System Design ................................................
24
Nomenclature System ........................................................
25
Exterior Directional Board - Proposal A .............................
28
Proposal B .............................
31
Proposal C .............................
34
Table of Content
Entrance Board ..................................................................
37
Corporate Signature Board ................................................
39
Interior Directional Boards ..................................................
41
Orientation Boards .............................................................
46
Directory Boards .................................................................
51
Location Boards ..................................................................
57
Safety Boards .....................................................................
63
Signage System at a Glance ..............................................
66
Project Brief
Wayfinding and Signage Design
Efficient, Economical and Reliable...
Market Leader...
Value for Money...
Established in India in 1960...
13,300 employees...
Satisfying Customers...
KSB Pumps Limited
Top - Class Packages...
Regional Service Centres...
- To develop Wayfinding and Signage Design to enhance the customer, employee, and visitor experience. - To make corporate campus space easy to use and navigate and visually dramatic.
Comprehensive Care...
- Also, to promote the brand in the physical space, advancing the corporate mission and strengthening relationship with the clients.
Wayfinding Design 1
About Company
Company : KSB Pumps Limited, Pimpri
KSB
About Company : KSB Pumps Ltd., India established in 1960. KSB pumps and valves provide and distribute water to private, public and industrial buildings. They solve heating and air-conditioning problems. Chemical, petrochemical and many other companies use them to transport aggressive, corrosive, explosive, solidsladen and viscous liquids. KSB products deal with industrial and municipal waste water. And they stand up to every temperature and pressure that power generation can throw at them. Wherever these products are in use, they ensure that processes run smoothly and economically - and that stay that way. KSB is a market leader around the globe. 13,300 employees know that success comes from more than just pumps and valves. Satisfying customers means keeping in close touch with them. It means offering them top-class packages, value for money, comprehensive care, regional service centres, and all the back-up they want. Wayfinding Design 2
Project Task, Scope & Objective Project
-
Wayfinding and Signage Design
Task 1 To study and understand corporate culture, policy and mission of the client. 2 To conduct a detailed interviews of management, service and users to understand and identify problems and needs. 3 To understand the flow of work, people and function of a space. 4 To understand the future expansion plans for the company. 5 To explore design opportunities and concepts. 6 To design representative mockups/prototypes. 7 To formulate final design proposal. Scope 1 To develop environmental graphics for indoor and outdoor places projecting corporate aspiration, mission and identity. 2 Signage for security, safety and other general facilities. 3 To develop a campus map design. Objective 1 To help find the way quickly and easily 2 To save valuable time 3 To reduce stress out of unfamiliar surroundings and to encourage self-reliance 4 To promote brand in physical space Wayfinding Design 3
Wayfinding Study
Wayfinding is the ability to: 1 Know where you are 2 Where you are headed 3 How best to get there 4 Recognize when you have reached your destination 5 Find your way out 6 All accomplished in a safe and independent manner. Wayfinding design blends: 1 Science 2 Psychology 3 Graphics. Wayfinding System includes: 1 Direction Signage 2 Information Signage 3 Identification Signage 4 Safety and Security Signage
( These are just basic factors of Wayfinding Study, detailed information is given in Annexure. )
Wayfinding Design 4
Project
Research
Safety Signages
Present Signages
Parking Signage
Directory Board
Corporate Signature
Information Signage
Personal Nameplates
Identification Signage
Gate Pass
Wayfinding Design 6
Observations
Signage for Parking ( Not clear )
Directional Signages ( Absent ) Individual Nameplates ( Not sufficient )
Signages ( Insufficient and unclear ) Display Boards ( Absent )
Permanent Nameplates ( Not feasible to change ) Existing Signages ( Not readable from distance )
Directory Boards ( Not present ) Location Boards ( Absent )
Outdoor Signages ( Not visible during night )
Wayfinding Design 7
Sign Planing Checklist
Interior Signs
Exterior Signs • Primary building identification, freestanding or on facade (name of bldg) • Monument sign (primary or secondary signature, freestanding in landscape) • Building address (often required by Fire Dept for emergency purposes) • Building entry ID (eye level at pedestrian entrance(s) • Restriction sign (No smoking, no food or drink, no skateboards, etc.) • Hours of operation • Delivery entrance • Directional signing (to key Entrances) • Parking ID • Directional signs
• Main building directory (departments, personnel, resources) • Building floor directories on each level (departments, destinations, facilities) • Directional signing to key destinations • Area ID (i.e., Circulation, Information, Registration) • Desk bar (reception, station closed, circulation, etc.) • Weekly calendar of events board • Conference room ID with (in-use) slider panel • Room ID sign • Office and Workstation ID sign (flexible/changeable) • Informative signs (i.e. instructions for computers, copiers, etc.) • Telephone and other services • Restriction signs (No smoking, No food or drink, No Cell Phones, etc.) • Emergency door ID (to restrict exiting / alarm will sound) • Code, Regulatory And Universal Access Signing • Restroom ID • Accessible facility maps (showing Elevators, room numbers, restrooms, phones, etc.) • Room occupancy / emergency Procedures booklet • Evacuation map Wayfinding Design 8
WORKSHOP ENTRANCE
B PANY
COM
AR DING
OP
SH
EA RE WAY CE F PT OR IO N
WA OF Y F FI OR CE
N
MSEB PLOES
CONCRETE ROAD GA R
EN
RD
GA
N
DE
FO UR
NG
KI
PA R
CE
FI WH EE LE R
OF
EN
RD
GA
IR
&
CA
NG
TE R
CE N
PA OT IN OR TI NG ST CU BA TT R OC IN K G RI NG
BA R
DE BU
BA SE YA FR R AM R D E
ST IN G PO YA HO W RD E US R E
NI
AI
TR
OL D SH ( SH M ED A OP CH I SH NE ED )
ETP
RAN
EN
RD
GA
PA TT ER
NE (A W SS SH EM ED BL Y SH ED )
SCRAP YARD
AD ION RO I STAT
PUNE SUB STATION
PIMPR
N SEPTIC TANK
OR AT ST
EE PUMP HOUSE
R TO RO
NT
SLUDGE BEDS
CE
CA
OXIDATION TANK
FI
OF
SHREE PRODUCTS
Data Collection
KSB Campus Plan
KRUPP INDUSTRIES SCRAP YARD
MD BUNGALOW
GUEST HOUSE FIRST AID OFFICE
SECURITY
PARKING OFFICE ENTRANCE
MUMBAI Wayfinding Design 9
Data Collection
MD’S Building - Ground Floor Networking And UPS Room
Pantry
MRP
IT Support Department
RIGHT WING GROUND FLOOR
LEFT WING GROUND FLOOR
RIGHT WING GROUND FLOOR
Maintenance
CENTRAL WING GROUND FLOOR
Machine Shop
IED
Assembly
Discussion Room
Assembly
Dark Manager Room Cabin
Time Office
MD’S Building - First Floor
Discussion Room
Production
Reception
Ladies Toilet
SOUTH WING
NORTH WING
Open Space
EAST WING
Manager Cabin
Store Room
Manager Cabin
Archive Room
Library
Director Cabin
Manager Cabin
GM Cabin
GM Cabin
Conference Room
Gents Toilet
Ladies Toilet
Open Space
GM Cabin
Secretary To GM
Staff Area
Manager Manager Cabin Cabin
Manager Cabin
Pantry
Customer Service Staff
Secretary To GM
Product Management Staff
Secretary To Director
Spare Manager Cabin Depar tment
Ladies Toilet Gents Toilet
CAD Room
Manager Cabin
RIGHT WING FIRST FLOOR PLAN
Conference Room
Manager Cabin
Pantry
Machine Shop , Sub-Contract & Assembly Department
Gents Toilet
Manager Cabin
MRP
Discussion Room
CENTRAL WING GROUND FLOOR
Manager
LEFT WING FIRST FLOOR PLAN
Waiting Room Manager
Office
Manager Cabin
Tool Engineering IED Depar tment
Discussion Room
Dispensary
LEFT WING GROUND FLOOR
Conference Room
Pantry
CENTRAL WING FIRST FLOOR PLAN
Wayfinding Design 10
Data Collection
MD’S Building - Old Machine Shop Shed
Incoming Inspection
Toilet
Shaft Cell
Misc. Cell
Bearing Bracket Cell
Impeller Cell
Casing Cell
Sleevel Cell
OLD SHED (MACHINE SHOP SHED)
Incoming Receipt
Toilet
Receipt Area
Assembly
Testing
Marking & Piping
Packing
Mounting
Spares Packing
Test Field
Paint Booth
Marking & Piping
Despatch
Main Stores
Toilet
Spares Stores
Inspection Area
Pattern Shop
Main Building - New Assembly Shed
Wayfinding Design 11
Data Collection
Main Building - Mezzanine Floor [ Purchase Department ]
Gents
Ladies
Pantry
PURCHASE
Technical Pool Waiting Area
Discussion
Main Building - First Floor [ Accounts Department ]
Conference
Secretary
Secretary
Secretary
Discussion Manager Cabin
Gents Toilet Pantry
Technical Pool
Discussion ACCOUNTS
Waiting Area
Secretary To Director
Audit Room
Manager
DGM
Manager
Manager
Manager
Manager
Conference
Waiting Area
Discussion
Manager
Director
Wayfinding Design 12
Data Collection
MARKETING
Gents Toilet
Main Building - Second Floor [ Marketing Department ]
Discussion
IT Pannel
Ladies
Technical Pool Discussion
Pantry
Secretary To Director
DGM
Manager
Conference
Manager
Visiting Cabin
Manager
Director DGM
GM Cabin
DGM
Wayfinding Design 13
Design
Exploration
Typeface
Helvetica
Cap ht 1in
Cap ht 2in
Wayfinding Design
Maximum reading from 25 to 50 ft
Wayfinding Design
Maximum reading from 50 to 100 ft
Cap ht 2.5in
Wayfinding Design Maximum reading from 62 to 125 ft
- Large x-height - Excellent counter forms - Light weight and thin stroke - Delicate structure - Allows the viewer to easily distinguish the individual letter, thus improving readability - The neutrality enables to fully focus on the design as a whole, keeping concept as clear and pure as possible Wayfinding Design 15
Typeface
Futura Md BT
Cap ht 1in
Cap ht 2in
Wayfinding Design
Maximum reading from 25 to 50 ft
Wayfinding Design
Maximum reading from 50 to 100 ft
Cap ht 2.5in
Wayfinding Design Maximum reading from 62 to 125 ft
- Sharp and pointed terminals - Compact - Based on strict geometric shapes, which give an overall effect of simplicity and clarity Wayfinding Design 16
Legibility
Recomended for ADA Compliance
Under Ideal Conditions
For optimal legebility letter height should fall into shaded range
Letter Cap Height in Inches
At 100 feet away it is recommended for ADA compliance that letter height be 4 inches.
At 100 feet away 2 inche letter height is legible under ideal conditions
Viewing Distance In Feet
Viewing type at a distance Wayfinding Design 17
Legibility
According to the placement and viewing distance, following font sizes are chosen: EDB ( A ) - Exterior Directional Board ( Proposal A ) EDB ( B ) - Exterior Directional Board ( Proposal B ) EDB ( C ) - Exterior Directional Board ( Proposal C ) ES - Entrance structure IDB - Interior Directional Board DB - Directory Board OB - Orientation Board LB - Location Board SSB - Safety and Security Board
16 pt
36 pt
48 pt
100 pt 1”cap ht
150 pt
200 pt
300 pt
400 pt
1.5”cap ht
2”cap ht
3”cap ht
4”cap ht
EDB ( A ) EDB ( B ) EDB ( C ) ES
Helvetica
OB
OB
LB
LB
IDB
IDB
DB
DB
LB LB
Futura SSB
SSB
SSB
Wayfinding Design 18
Color Palette
These are the signature colors of KSB, thus are used consistently all over in Signage Design.
These colors are used for :
1 Entrance Boards 2 Corporate Signature Boards
C:100 M:58 Y:0 K:70
C:0 M:0 Y:0 K:30
Wayfinding Design 19
Color Palette
These colors are used for :
1 Exterior Directional Boards 2 Interior Directional Boards 3 Directory Boards
C:100 M:058 Y:000 K:070
C:000 M:000 Y:000 K:030
C:100 M:100 Y:100 K:100
Wayfinding Design 20
Color Palette
These colors are used for :
1 Location Boards
C:100 M:058 Y:000 K:070
C:081 M:047 Y:000 K:001
C:000 M:000 Y:000 K:010
C:000 M:000 Y:000 K:070
Wayfinding Design 21
Color Palette
These colors are used for :
1 Evacuation Map Board 2 Safety Boards
C:000 M:100 Y:100 K:000
C:100 M:100 Y:100 K:100
Wayfinding Design 22
Color Contrast
Color contrast is the simplest and most effective areas for improving legibility. According to the study the foreground color of a sign should have a contrast of at least 60% with the background color of the sign.
Wayfinding Design 23
Wayfinding
System Design
Nomenclature System
OFFICE OFFICE
MD Building
MN Building OFFICE
MAIN BUILDING
BASE FRAME YARD
MD’S BUILDING
DEBURING
OFFICE IR & TRAINING CENTER
B SE S M OE PL
OFFICE
R PA KI NG
R NC
CO
GARDEN
AD RO
T ES E GU OUS H
E ET
The Room Numbering System is developed according to the present Naming System. There are two office buildings in this plant, the following are the previous and new names proposed for Nomenclature : MD’s Building - MD Building Main Building - MN Building The names are kept short but are derived from the previous names to avoid confusion. Wayfinding Design 25
Nomenclature System
MD Building : There are total 2 floors for office purpose in MD Building. At present they are called - Ground floor and First floor. So while developing Room Numbering System, the floors are named G and F respectively. On each floor there are three wings presently called as Left, Right and Central. These wings are thus named L, R and C respectively. Now on each floor there are several cabins and departments, thus to avoid confusion and to save time, room numbers are assigned. Proposed Nomenclature for MD Building :
Building name
MDG-R 01 Ground Floor
Room Number
Right Wing
Nomenclature for different floors: MDG-C 02 ( MD - MD Building, G - Ground Floor, C - Central Wing, 02 - Room Number ) MDG-L 03 ( MD - MD Building, G - Ground Floor, C - Left Wing, 03 - Room Number ) MDF-R 04 ( MD - MD Building, F - First Floor, R - Right Wing, 04 - Room Number ) MDF-C 05 ( MD - MD Building, F - First Floor, C - Central Wing, 05 - Room Number ) MDF-L 06
( MD - MD Building, F - First Floor, L - Left Wing, 06 - Room Number ) Wayfinding Design 26
Nomenclature System
MN Building : There are total 3 floors for office purpose in MN Building. At present they are called - Mezzanine floor, First floor and Second floor. So the while developing Room Numbering System, the floors are named M, F and S respectively. All the three floors have three different departments - Purchase, Accounts and Marketing. Now on all these three departments there are several cabins, thus for more clarity room numbers are assigned.
Proposed Nomenclature for MN Building :
Building name
MNM 01
Room Number
Mezzanine Floor
Nomenclature for different floors :
MNF 02 ( MN - Main Building, F - First Floor, 02 - Room Number ) MNS 03 ( MN - Main Building, S - Second Floor, 03 - Room Number ) Wayfinding Design 27
Exterior Directional Board System
Proposal A - Cubes
6� Revolving cube with KSB written on all four sides.
2 ft
Backlit cubes which would help it make visible at night. 6 ft
2 ft
9 ft
2 ft
3 ft
Wayfinding Design 28
Exterior Directional Board System
Proposal A - Cubes
MD Building Reception MDG - R MDF - R, C, L MD Bunglow Parking for Guests
Old Machine Shop Shed New Assembly Shed
2ft MDG - C, L
Main Entrance
Power House
Guest House
Pump House
Security First Aid Office
2ft
Parking MN Building
Dimension : Structure - 9ft
MNM - Purchase Department MNF - Accounts Department
Individual Directional Board - 2ft x 2ft
MNS - Marketing Department Canteen
Branding Boxes - 4ft and 2ft vertical
Delivery Entrance
Font : Helvetica Size : 200 pt Color : Material : Metal Coating Sheet Costing : Structure - Rs 75,000/- approx Wayfinding Design 29
Simulated Presentation
Proposal A - Cubes ( 3D Renderings )
Wayfinding Design 30
Exterior Directional Board System
Proposal B - Squares on Ring
11 ft
6 ft 8 ft
Characters and numbers on signs shall be a minimum of 3� in height ( when suspended or projected overhead 80� or more along a path of travel.
Wayfinding Design 31
Exterior Directional Board System
Proposal B - Squares on Ring MD Building Reception MDG - R MDF - R, C, L MD Bunglow Parking for Guests
Old Machine Shop Shed
2 ft
6” New Assembly Shed
6”
MDG - C, L
Main Entrance
Power House
Guest House
Pump House
Security First Aid Office Parking MN Building
Dimension : Structure - 11ft
MNM - Purchase Department MNF - Accounts Department
Individual Directional Board - 2ft x 2ft
MNS - Marketing Department Canteen
Arrow - 6” x 6”
Delivery Entrance
Font : Helvetica Size : 300 pt Color : Material : Metal Coating Sheet with reflecting text Costing : Structure - Rs 35,000/- approx Wayfinding Design 32
Simulated Presentation
Proposal B - Squares on Ring ( 3D Renderings )
Wayfinding Design 33
Exterior Directional Board System
Proposal C - Squares on Pole
11ft 4�
6 ft
8 ft
9 ft
7 ft
Wayfinding Design 34
Exterior Directional Board System
Proposal C - Squares on Pole
Base Frame Yard Bar Stock Rotator Stator Scrap Yard IR & Training Center
Casting Yard Power House Old Machine Shop Shed New Assemblt Shed Office Gate
Dimension : Structure - 11ft 4” Individual Directional Board - 2ft x 2ft Arrow - 6” x 6” Font : Helvetica Size : 300 pt
Canteen Changing Rooms Dispatch Yard
2 ft
Pattern Shop
Color :
Delivery Entrance
Material : Metal Coating Sheet with reflecting text Costing : Structure - Rs 30,000/- approx Wayfinding Design 35
Simulated Presentation
Proposal C - Squares on Pole ( 3D Renderings )
Wayfinding Design 36
Entrance Board
Freestanding Structure at Main Gate 3 ft
Entrance 5½ ft
6 ft 7 ft
3½ ft
6 ft
Dimension : Structure - 6ft x 7ft Font : Helvetica Size : 400 pt - Entrance Color : Material : Metal Coating Sheet with backlit Costing : Structure - Rs 80,000/- approx Wayfinding Design 37
Simulated Presentation
Freestanding Structure at Main Gate (3D Renderings)
Wayfinding Design 38
Corporate Signature Board System
Freestanding Structure in Campus
5 ft
5 ft
2 ft
8½ft
Dimension : Logo - 5ft x 5ft KSB - 2ft height Color : Material : Metal Coating Sheet with backlit Costing : Neon - Rs 95,000/- approx LED - Rs 1,30,000/- approx Wayfinding Design 39
Simulated Presentation
Freestanding Structure in Campus (3D Renderings)
Wayfinding Design 40
Interior Directional Board System
2ft 6”
You are in MD Building MDG-R
IT Services Quality Assurance Personnel
MDF-R
G.M.- Visiting
4ft
G.M.- Controling M.D. MDF-C
Dimension : Large Boards - 4ft x 2ft 6”
G.M.- Operations G.M.- Quality Assurance HR
Small Boards - 2ft x 2ft 6” MDF-L
Logo b - 1ft x 1ft
2 ft
Customer Service Visiting Product Manger
Font : Helvetica Size : 150 pt - Heading
CAD Room
1ft
100 pt - Wing name and Location Color :
1ft
Material : Vinyl on 3mm Foam Board Costing : Rs - 3000/- each approx Wayfinding Design 41
Individual Interior Directional Board
You are in MD Building MD - BUILDING MDG-C
MRP Machine Shop IED Department Old Machine Shop Shed
MDG-L
You are in MD Building
Production Assembly
MDG-L
Machine Shop
Production
IED Department
Assembly
Maintenance
Machine Shop
MRP
IED Department Maintenance MRP MDF-C, L, R
G.M. M.D. HR Customer Service
MD - BUILDING
Wayfinding Design 42
Individual Interior Directional Board
You are in MD Building MD - BUILDING MDG-L
Production Assembly Machine Shop IED Department Maintenance MRP
MDG-C
MRP Machine Shop IED Department Old Machine Shop Shed
You are in MN Building MNM
Purchase
MNF
Finance & Accounts
MNS
Marketing
MN - BUILDING
Wayfinding Design 43
Individual Interior Directional Board
You are in MN Building MNM
Purchase
MNF
Finance & Accounts
MNS
Marketing
MN - BUILDING
You are in MN Building
MNF
Finance & Accounts
MNS
Marketing
Wayfinding Design 44
Simulated Presentation
Interior Directional Board
6ft
7 ft 3½�
Mounting location must allow a person to approach without encountering protruding objects Wayfinding Design 45
Orientation Board System
A directional sign placed here ( a decision point ) helps visitors find their way quickly.
4” 3”
6” 2” RIGHT WING GROUND FLOOR
3” LEFT WING GROUND FLOOR
MD Building
Position of that particular wing on the company map gives an exact idea of where they are.
½ ft
1½”
CENTRAL WING GROUND FLOOR
Ground Floor Right Wing
G
L MDG-R 04
MDG-R 09
MDG-R 10
MDG-R 08
MDG-R 06
MDG-R 07
MDG-R 05
MDG-R 03
MDG-R 02
YOU ARE HERE
MDG-R 01
1 ft
Rooms MDG-R 01 to 10
Dimension : 1ft 2” x 1ft 8” Font : Helvetica
1 ft 8”
YOU ARE HERE
Size : 36 pt - Area identification / Room Numbering 16 pt - Room Numbers on the wing chart Color : Material : Vinyl on 3mm Foam Board Costing : 120 Rs / Sq.ft approx Wayfinding Design 46
LEFT WING GROUND FLOOR
MD Building
RIGHT WING GROUND FLOOR
Individual Orientation Board
CENTRAL WING GROUND FLOOR
Ground Floor Central Wing
YOU ARE HERE
MDG-C 17
MDG-C 16
MDG-C 15
Rooms MDG-C 11 to 17
MD Building
CENTRAL WING GROUND FLOOR
RIGHT WING GROUND FLOOR
Ground Floor
LEFT WING GROUND FLOOR
MDG-L 21
MDG-L 19 MDG-L 20
MDG-L 22
MDG-L 24
MDG-L 25 MDG-L 23
MDG-L 26
MDG-L 27
MDG-L 28
MDG-L 29
MDG-L 30
MDG-L 31
MDG-L 32
Left Wing
MDG-L 33
MDG-C 12
MDG-C 11
MDG-C 14 MDG-C 13
MDG-L 18
YOU ARE HERE
Rooms MDG-L 18 to 33
Wayfinding Design 47
Individual Orientation Board
SOUTH WING
EAST WING
MD Building
NORTH WING
First Floor Right Wing
YOU ARE HERE
MDF-R 08
MDF-R 04
MDF-R 07
MDF-R 02
MDF-R 06 MDF-R 05
MDF-R 01
MDF-R 03
Rooms MDF-R 01 to 08
SOUTH WING
EAST WING
MD Building
NORTH WING
First Floor Central Wing
MDF-C 16
MDF-C 14
MDF-C 11
MDF-C 12
YOU ARE HERE
MDF-C 09
MDF-C 13
G
MDF-C 10
L
MDF-C 17 MDF-C 18
MDF-C 15
MDF-C 19
Rooms MDF-R 09 to 19
Wayfinding Design 48
MDF-L 30
NORTH WING
MD Building
SOUTH WING
Individual Orientation Board
EAST WING
First Floor MDF-L 29
MDF-L 28 MDF-L 26
MDF-L 27
MDF-L 22 MDF-L 21 MDF-L 25
MDF-L 23
Rooms MDF-L 20 to 30
PURCHASE
MN Building Mezzanine Floor
G
Purchase Department
MNM 09
L
MNM 06 MNM 05
MNM 07
MNM 03
MNM 02
MNM 04
MNM 08
MNM 01 YOU ARE HERE
MDF-L 24
YOU ARE HERE MDF-L 20
Left Wing
Rooms MNM 01 to 09
Wayfinding Design 49
Individual Orientation Board
ACCOUNTS
MN Building First Floor G
Accounts Department
MNF 13
MNF 19
MNF 18
Rooms MNF 01 to 20
MARKETING
MN Building Second Floor Marketing Department
YOU ARE HERE
MNS 03
MNS 06
MNS 08
MNS 05
MNS 01 MNS 02
MNS 09
MNS 07
MNS 16
MNS 17
MNS 04
MNF 14
MNF 16
MNF 07
MNF 17
MNF 06
YOU ARE HERE
MNF 11
MNF 15
MNF 12
MNF 10
MNF 09 MNF 05
MNF 04
MNF 03
MNF 02
MNF 08
MNF 01
MNF 20
MNS 15
MNS 10
MNS 14 MNS 11 MNS 12
MNS 13
Rooms MNS 01 to 17
Wayfinding Design 50
Directory Board System
You are in MDG-R
Stack ends for changeable inserts. MD - BUILDING
3ft 5½”
MDG-R 01
Conference Room
MDG-R 02, 03
IT Services
MDG-R 04
Dark Room
MDG-R 05, 06
Quality Assurance
MDG-R 07, 08, 09
IT Services
MDG-R 10
Server Room
4ft 7½” Dimension : 3ft 5½” x 2ft 6” - 10 plates board 4ft 7½” x 2ft 6” - 15 plates board Font : Helvetica
4”
Size : 150 pt - Heading 4”
2ft 6”
100 pt - Room Number and Room Name Color : Material : Metal Coating Sheet + Acrylic / Vinyl + 3mm - Foam Board Costing : Stack ends design - 7000/- each approx Regular design - 3500/- each approx Wayfinding Design 51
Individual Directory Board
You are in MDG-L MD - BUILDING
MD- Building G-Floor C-Wing
You are in MDG-C MDG-C 11
Dispensary
MDG-C 12
Manager
MDG-C 13
MRP
MDG-C 14
Machine Shop
MDG-C 15
Discussion Room
MDG-C 16
IED Department
MDG-C 17
Pantry
MDG-L 18, 19
Manager
MDG-L 20, 23
Discussion Room
MDG-L 21, 25
Production
MDG-L 22, 24, 26
Assembly
MDG-L 27
IED Department
MDG-L 28
Machine Shop
MDG-L 29, 30
Maintenance
MDG-L 31
Conference / Lean Room
MDG-L 32
MRP
MDG-L 33
Pantry
MD- Building G-Floor L-Wing
MD - BUILDING
Wayfinding Design 52
Individual Directory Board
You are in MDF-C MDF-C 09
Conference Room
MDF-C 10
G.M. Operations
MDF-C 11, 12
Secretary
MDF-C 13
G.M. Quality Manager
MDF-C 14
Director HR
MDF-C 15, 16, 17
HR
MDF-C 18, 19
IT Services
MD - BUILDING
MD-Building F-Floor R-Wing
You are in MDF-R MDF-R 01
Conference Room
MDF-R 02
Service Counter
MDF-R 03, 04
G.M. Visiting
MDF-R 05
G.M. Controlling
MDF-R 06
M.D.
MDF-R 07
Secretary
MDF-R 08
Pantry
MD-Building F-Floor C-Wing
MD - BUILDING
Wayfinding Design 53
Individual Directory Board
You are in Purchase Department MNM 01, 06
Discussion Room
MNM 02, 03
Manger Purchase
MNM 04
Conference Room
MNM 05
Technical Pool
MNM 07
Secretary
MNM 08
G.M. Purchase
MNM 09
Pantry
MN - BUILDING
MD-Building F-Floor L-Wing
You are in MDF-L MDF-L 20
Pantry
MDF-L 23
Customer Service
MDF-L 24
Visiting Product Manger
MDF-L 21
Spare Department
MDF-L 22, 25, 27
Manager
MDF-L 26
CAD Room
MDF-L 28
Library
MDF-L 29
Archive Room
MDF-L 30
Store Room
MN-Building M-Floor
MD - BUILDING
Wayfinding Design 54
Individual Directory Board
You are in Accounts Department MN - BUILDING
MN-Building S-Floor
MNF 01, 19
Discussion Room
MNF 02, 03, 05
Sr. Manager
MNF 04, 15, 16
Manager
MNF 06
Conference Room
MNF 07
DGM Finance & Accounts
MNF 08
Export
MNF 09
Credit Control
MNF 10
Costing
You are in Marketing Department MNS 01
Visiting Zonal
MNS 02
Conference Room
MNS 03
DGM Competence Centre
MNS 04, 05
Manager
MNF 11
Finance & Accounts
MNS 06
Sr. Manager
MNF 12
Excise
MNS 07
Marketing Services
MNF 13
Internal Audit
MNS 08
Competence Centre
MNF 14
Audit Room
MNS 09, 10
Discussion Room
MNF 17
Secretary
MNS 11
DGM Agency
MNF 18
Director
MNS 12
G.M. Competence Centre
MNF 20
Pantry
MNS 13
DGM Marketing Services
MNS 14
Director
MNS 15
Secretary
MNS 16
ITS Panel
MNS 17
Pantry
MN-Building F-Floor MN - BUILDING
Wayfinding Design 55
Simulated Presentation
Orientation Board & Directory Board
6”
6”
7 ft 3½”
5 ft
Mounting location must allow a person to approach without encountering protruding objects Wayfinding Design 56
Location Board System
Lettering raised
7.5”
MDF-C 10 Dimension : Room Boards - 10” x 7.5” Area Boards - Small - 6” x 1ft 4”
10”
Large - 6” x 2ft
Mr. Paranjpe G. M. Operations
Register Board - 1ft x 1ft 4” Font : Room Number - Helvetica Name - Futura Md BT
Designation is written for more clarity.
Size : Room Boards - 48 pt - Room Number 36 pt - Name, 16 pt - Designation
Stack ends for changable inserts
Area Boards / Register Board - 150 pt 3”
Color : Material : Regular Design - Vinyl + 3mm - Foam Board
6”
Canteen
Stack end Design - Vinyl + Foam Board + Acrylic Costing : Regular - 120 Rs / Sq ft approx Other - 200 - 250 Rs / Sq ft approx
1ft 4” 2ft
Wayfinding Design 57
Location Board System
Flexible stack end : Template for standard letter 8.5” x 11” paper
11.0”
Paper inserted here 5.6”
8.5”
Mr. Paranjpe
2.83”
Mr. Paranjpe
Mr. Paranjpe
G. M. Operations
G. M. Operations
Mr. Paranjpe
Mr. Paranjpe
G. M. Operations
G. M. Operations
5.5”
G. M. Operations
Close up of sign
2.82”
Mr. Paranjpe
Mr. Paranjpe
G. M. Operations
G. M. Operations
6 up each 2.82” x 5.5”
Wayfinding Design 58
Individual Location Board
MDG-C 11
Conference Room
MDG-C 11
Conference Room
In-use
In-use Vaccant
MDG-C 11
Conference Room Vaccant
This design would be used for: - Conference room - Discussion room
Wayfinding Design 59
Individual Location Board
MDF-C 10
Mr. Paranjpe
This design would be used for :
G. M. Operations
- M.D. - Director - G.M. - D.G.M.
Register Here
MNS 06 This design would be used for : - Registration Desk This design would be used for:
Sr. Manager Competence Center
See M.e G.M
!
- Secretary - Manager - Sr. Manager - H.R. - Visiting Product Manager - Visiting Zonal
Note pad Wayfinding Design 60
Individual Location Board
This design would be used for: - Parking - Canteen - Workshop Entrance - Assembly Shed - Machine Shop Shed - Pattern Shop - Casting Yard - Power House - Changing Rooms - Guest House
- Security Office - First-Ais Office - Base Frame Yard - Bar Stack - IR & Training center - Scrap Yard - Accounts Department - Purchase Department - Marketing Department
Canteen
Worshop Entrance
MDG-R 10 This design would be used for:
Server Room
- IT Services - Dark Room - Quality Assurance - Server Room - Dispensary - MRP - Machine Shop - IED Department - Pantry - Production - Assembly - Maintenance - Service counter
- Customer Service - Spare Department - CAD Room - Library - Archive Room - Store Room - Marketing Services - Competence Center - ITS Panel - Export - Credit Control - Costing - Finance & Accounts
- Excise - Internal Audit - Audit Room
Wayfinding Design 61
Simulated Presentation
Location Board
60�
Permanent signage to be installed on the wall adjacent to the latch side of the door. Mounting location must allow a person to approach without encountering protruding objects or standing within the swing path of the door.
Door Swing Path
Wayfinding Design 62
Safety Board System
Evacuation Map
3ft 5½” Emergency Exit Points Meeting & Assembly Point Direction For Emergency Exit Fire Extinguisher - CO 2
1ft
Fire Extinguisher - Soda Acid Fire Extinguisher - Dry Chemical Powder Fire Extinguisher - Oil Fire First Aid Office
1ft 4”
Dimension : Evacuation Map Board - 3ft 5½” x 3ft 8”
3ft 8” 4ft 10”
Key - 1ft 4” x 1ft Font : Heading - Futura Md BT Key - Helvetica Size : 150 pt - Heading 36 pt - Key Color : Material : Metal Coating Sheet Costing : 200 Rs / Sq.ft approx Wayfinding Design 63
Safety Board System
Emergency Exit Point
First Aid Office
6”
Fire Extinguisher 2ft
1ft 4”
Assembly Point
Dimension : Rectangular Boards - 2ft x 6”
1ft 4”
Square Boards - 1ft 4” x 1ft 4” Font : Futura Md BT Size : 300 pt Emergency Exit
Color : Material : Metal Coating Sheet Costing : 200 Rs / Sq.mt approx Wayfinding Design 64
Simulated Presentation
Overhead Signage
Mounted Signage
Emergency Exit 6ft
7ft 8”
3ft 10”
Wayfinding Design 65
Signage Design at a Glance
Simulated Presentation
11’ 10’ 9’ 8’
Emergency Exit
Register Here
MDG-C
6’
MDF-C 09
Conference Room
MRP
MDF-C 10
G.M. Operations
Machine Shop
MDF-C 11, 12
Secretary
IED Department
MDF-C 13
G.M. Quality Manager
MDF-C 14
Director HR
MDF-C 15, 16, 17
HR
MDF-C 18, 19
IT Services
Evacuation Map
Marketing department
You are in MDF-C
MD Building
LEFT WING GROUND FLOOR
You are in MD Building
MDG-R 10
RIGHT WING GROUND FLOOR
7’
CENTRAL WING GROUND FLOOR
Ground Floor Central Wing
Old Machine Shop Shed
MDG-C 15
MDG-C 16
MDG-C 14 MDG-C 13
Server Room
Assembly
Meeting & Assembly Point
Rooms MDG-C 11 to 17
5’
Emergency Exit Points
MDG-C 17
MDG-C 11
Production
MDG-C 12
MDG-L
YOU ARE HERE
Direction For Emergency Exit Fire Extinguisher - CO 2 Fire Extinguisher - Soda Acid
Machine Shop IED Department
Fire Extinguisher - Dry Chemical Powder Fire Extinguisher - Oil Fire First Aid Office
Maintenance
4’
MRP
3’
2’
1’
0
Wayfinding Design 67
Simulated Presentation
11’ 10’ 9’ 8’
7’
6’
5’
4’
3’
2’
1’
0
Wayfinding Design 68
Simulated Presentation
11’ 10’ 9’ 8’
7’
6’
5’
Entrance 4’
3’
2’
1’
0
Wayfinding Design 69
Thank You