Architectural & Interior Design Portfolio 2024

Page 1

YESTERDAY

TODAY

LESLIE LI Selected Work

TOMORROW


LESLIE AIXUAN LI

Architecture & Interior Design CONTACT al4252@columbia.edu 7184143970 New York, NY 10024

SKILLS Programming Research 2D Drawing 3D Rendering Space Planing Construction Documents Coordination with Venders Accessories & Art Selection

SOFTWARES Rhino Revit Auto CAD Adobe Photoshop Adobe Illustractor Adobe Indesign

WORK EXPERIENCE GSAPP Career Center Causal Worker Columbia University | Sep 2023 - Present New York, NY

Devised and facilitated career events at GSAPP, curating guest speaker rosters to elevate student-industry engagement. Spearheaded event logistics, from ideation to execution, ensuring high attendance and seamless experiences. Managed critical event components and resource curation, bolstering the center's career development initiatives. Architectural Design Intern LHP Architects | Jan 2023 - Present New York, NY

Conducted site surveys and gathered information pertaining to programming. Participated in conceptual design proposal. Using BIM software to produce programming and feasibility analysis for mix-use high rise project in Makati, Philippine. Prepared 3D renderings for client. Value engineered products while maintain vendor relationships. Prepared client presentations. • •

Sky City Mix-use High rise, Makati MTA Subway 96st St, 81st St Station Rennovation

SCA Brooklyn 67K School Renovation, New York

Interior Designer Li & Associates Design Studio | Jul 2022 - Dec 2022 Brooklyn, NY

Provide Schematic Design with 2D & 3D renderings for commercial, residential, hospitality Projects. Develop space planing and research products and materials for commercial, residential and hospitality interiors. Prepare construction plans, finish plans and schedule, elevations and reflected ceiling plans with architects for construction. Maintain both local and oversea vendor relationships. Present to clients with design presentation sets. • • •

Falcon Way Airbnb Hostel Project, Utah 819 Dean Street Multi-family Townhouse, Brooklyn 75 Austin Street Asian Food Market, Forest Hills

Interior Design Assistant DADAPT | Nov 2021 - Jul 2022 Brooklyn, NY

Created 2D & 3D renderings to incorporate into design development for residential, hospitality and product use. Researched products and materials for both residential and hospitality interiors. Prepared construction plans, finish plans and schedule, elevations and reflected ceiling plans. Maintain vendor relationships. Prepare clients presentations. • • •

54 Street Apartment Renovation, Manhattan Hollywood Hostel Project, Miami Elder Care Center, Torrington

Excel/ Word

LANGUAGES English Cantonese Mandarin

EDUCATION Master of Architecture, Columbia GSAPP | Aug 2022 - May 2025 Manhattan, NY

Bachelor of Fine Arts: in Interior Design, Pratt Institute | Aug 2017 - May 2021


TODAY Solutions within existing real-world frameworks.

04 - 13 Canyon-ria: Canyon Meets Galleria

Public Restroom Accessibility: An Unseen Indicator of Social Stratification.

TOMORROW

14 - 21

Future societal & cultural challenges & personal expressive approaches.

Housing, Marriage, and Fertility: Inspired By Singapore’s Unique Approach to Tackling its Declining Birth Rate.

Love In The Air: Singapore Dating Commune

22 - 27 Times Sqaure Public Toilet-scape

Public Restroom Accessibility: An Unseen Indicator of Social Stratification.

YESTERDAY

30 - 41

Professional Projects ranging from public infrastructure to intimate interior.

Sky Food Cosmetic Retail Design Retail Interior | Spatial Planing & Custom Millwork Brooklyn 819 Street Townhouse Residential | Architecture & Interior Design SCA Brooklyn K28 School Renovation, New Yor Educational | Interior Architecture Renovation MTA Subway 96st St, 81st St Station Rennovation Transportation | Public Transit Renovation Utah Airbnb Hostel Design Habitability | Interior Rennovation Miami Airbnb Hostel Design Habitability | Interior Rennovation


TODAY Solutions within existing real-world frameworks.

Gallery Meets Valley: The Convergence of Art and Residence Harmonizing Heritage with Innovation: Crafting Community and Art in Harlem’s Urban Fabric “Canyon-ria” is an architectural project that reimagines traditional arcade designs with a canyon-like structure. It mixes various housing types with shared living spaces, creating a seamless blend of private, public, and open areas. This design fosters community interaction. Located on West 128 Street, it extends from the first to eighth floor, integrating open galleries into an existing building. This design goes beyond typical housing, offering spaces for artists and residents (both short and long-term), enhancing local community life and reflecting the area’s rich artistic history. Canyon-ria combines traditional red brick with modern materials, respecting Harlem’s architectural heritage while introducing a new communal aesthetic, described as a “gentle handshake” with neighboring buildings. More than just housing, it reshapes urban interactions, blending residential, educational, and artistic spaces. This layout encourages a natural flow of urban life from West 128 Street to Convent Avenue. Collabrator: Anson Lee Softwares: Rhino, Adobe Illustrator, Adobe Photoshop, Adobe Indesign

4


Canyon-ria, 454 W 128th St, New York, NY 10027


ARTFUL LIVING: WEAVING HOMES INTO GALLERY SPACES

Inspired by the blend of traditional corridor galleries and arcade streets that merge exterior environments with interior programs, this design weaves housing into the mix to form a novel space for art and living.

Art & Galleria, Indoor & Outdoor

Galleria & Housing, Art & Living

6


Existing Site & Surrounding Buildings

New Urban Landscape

Interaction with Surrounding Buildings 7


Ground level as semi-public space that connects the existing neighborhood with the new urban landscape, Offering multiple avenues for community engagement.

Existing Surrounding Buildings New Urban Landscape

8


9


Extruded communal areas encompass the residents’ living spaces.

Coexistence of residential living and art events, new architectural space and its existing surroundings.

10


Canyon-ria Interior: Umlimited Interactions Within The Community

Canyon-ri’s Outdoor Exterior Galleria Garden: Sculpture Park For Art event 11


Converting Turning the the previous former12-foot 12-footlevel leveldifference differenceinto intoananoutdoor outdoorgallery, gallery, establishing a new community hub and art center. center, serving as a focal point for the neighborhood

Canyon-ria North Facing Galleria View: Sculpture Park & Art Exhibition Events 12


13


Turning the previous 12-foot level difference into a fresh urban relaxation area, providing a new entrance to the building and the neighborhood.

Canyon-ria West 128 Street South Facing View 14


15


TOMORROW Research-based Future societal & cultural challenges & personal expressive approaches.

Dating Commune: Reimagining Dating Apps into a Co-Living Mixed-Use Space to Foster Partnership Housing, Marriage, and Fertility: Inspired By Singapore’s Unique Approach to Tackling its Declining Birth Rate. This project investigates the innovative strategies that Singapore and Japan have implemented to address their declining birth rates. It explores how Singapore intertwines marriage policies with housing benefits, intending to stimulate marriage rates among the younger generation. Given Singapore’s unique blend of Eastern and Western cultures, it concurrently grapples with the fertility crisis common in developed Western nations while retaining the Eastern cultural emphasis on family and lineage continuity. This confluence leads the government’s housing and fertility policies to favor newlywed young couples, indirectly prompting them to contemplate marriage as a strategy to alleviate housing affordability pressures. Asian reality shows to promote new dating approaches. This cohabitation with strangers approach may offer a practical ‘pre-marriage trial,’ facilitating the discovery of a compatible partner through shared living experiences while concurrently reducing rental burdens. cooling amenities to the broader community. Softwares: Rhino, Grasshopper, Adobe Illustrator, Adobe Photoshop, Adobe Indesign

16


RESEARCH & BACKGROUND: HOUSING & MARRIAGE IN SINGAPORE The project seeks to fuse the concepts of dating apps and co-living communities with the objective of developing novel housing models that cater to the evolving lifestyle and cultural shifts.

Navigating the Low Birth Rate Crisis

The low birth rate crisis prompts a reimagining of social and housing solutions, underscoring integrated dating and co-living spaces to encourage family formation.

Reality Shows: Catalysts for Romance in Modern Asia

“Terrace House” illustrates contemporary Asian dating, highlighting reality TV’s role in evolving courtship norms. These shows spotlight co-living’s potential to spark romance, shaping our housing design strategy.

Singapore’s Pro-Marriage Housing Policy

Singapore’s “couple first” policy intertwines housing benefits with marriage, demonstrating how spatial design can drive social behaviors and support demographic goals.

The research focuses on two strategies: Singapore’s housing policy and Japan’s media narrative, to develop solutions for demographic challenges. It aims to create living spaces that promote relationships and support higher birth rates, addressing the housing needs of societies with similar demographic trends.

17


STAGES OF DATING: THE ENDLESS LOVE CYCLE

The project thus seeks to merge dating and co-living housing, exploring novel housing models.

Exit: Leaving

The stage that the user decides to leave the commune due to the implacable contradiction

Pause: Isolation

The stage that couples are under argument or temporary separations

Couples

who wants to build a fmily in the city and who may not.

18

Phase 3: Family

who wants to save budget in living and have fun/ /looking for next partner

Phase 2: Matched

Phase 1: Singles

Singles

Family with Kids

who wants to build a fmily in the city.


FROM “CLICKING” TO “EXPERIENCING”

3ft 3ft

DATING APP

1s

1s 1s

1s

Tradditional dating app is fast pace, highly relying on users profile. ∞ ft

DATING COMMUNE

∞ ft

- x ft

- x ft

Datting Commune is breaking down the tradditional dating process into different space experience.

- x ft

- x ft

- 2x ft

- 2x ft Same Building Distance

Same Building Distance

“Clicking” Same Geolocation

Attractive User Profile

“Experience”

Living Within The Same Building Increase meeting opportunities.

Dressing Up, Exercise

Matching Process

Activities

Finding out different hobbies and similarities. Getting Acquaintance

Dating Process

Living Together

The real challenge of a relationship starts at living together.

19


Love In The Air,

It Is Either Movingforward Or Quiting.

Special Dating Spot: Dating Pool, Dating Room

20


Residence: g Your rs

Switching Your Neighbors Spining Residence

ce to help you to meet

Hangout Spot: Community Garden This indoor garden is an area for getting Hangout Spot accquianence. It provides nature and media room for the public.Garden Community

Getting Acquaintance in Nature.... Getting Acquaintance in Nature....

A Glass Ball with garden and media room for hanging out.

Isolated Zone: Isolated Zone Connection Heartbreak Heartbreak TowerConnection Tower

In this tower whoever experienced heartbreak and unexpected separation will come here to heal themsleves and share their pain together.

Sometimes, We Share Sadness together

Sometimes, We Share Sadness together In this tower whoever experienced heartbreak and unexpected separation will come here to heal themsleves .

Feel connected by connecting all the haertbreak moments...

21


1. Residential Unit 2. Isolated Zone 3. Indoor Garden 4. Dating Pool 5. Central Elevator A

2

1

2

Repeating Module Unit A

3

5

4

1

2

1

2

1

1

5

1

Plan - Render 1/64” = 1’-0” 4

3

3

2

Section A 1/40” = 1’-0”

Detail - Indoor Garden 1/32” = 1’-0”

22


23


TOMORROW Research-based Future societal & cultural challenges & personal expressive approaches.

Re-imagining Public Restrooms: Times Square Public Toilet-scape For Inclusive Sanitation Public Restroom Accessibility: An Unseen Indicator of Social Stratification This project mainly focused on the public restroom’s function and its societal expansion. It explored the potential of billboard advertising to fund public restrooms in Times Square, thus enhancing the experience of locating and using these facilities. The goal was to transform the traditional role and function of public restrooms and cater to the needs of overlooked populations in busy areas of New York, such as delivery workers, tourists, leaflet distributors, and food cart operators. I believe that providing access to public restrooms for these individuals is our society’s responsibility.

Softwares: Rhino, Adobe Illustrator, Adobe Photoshop, Adobe Indesign

24


The Times Square Public Toilet-scape, intertwined with the nocturnal glow of streetlights and billboards, emerges not only as an integral visual component of the cityscape but also as a pragmatic solution to the urban challenge of public restroom scarcity. This fusion creates a functional yet aesthetically harmonious element within the city’s vibrant night-time tapestry. 25


MAP OF RESTROOMS AROUND BRYANT PARK

Retail Restrooms Access to store restrooms often requires navigating commercial lures and consumption demands

Dress-Code Restrooms Dress respectability can dictate public restroom access, revealing a socio-economic divide.

Only Dogs can pee free The stark contrast between dogs’ unencumbered relief and the scarcity of free public restrooms for humans.

$ 2.50

Occupational Restroom Barriers Parking constraints exacerbate restroom access challenges for delivery workers and drivers..

26


SITE & TYPOLOGY

Times Square: The Restroom Challenge Despite Times Square’s central role as a transport hub, tourist attraction, and financial district, restroom availability is inadequate. This project addresses the imperative to enhance restroom accessibility for tourists and city-serving service workers alike.

27

Restroom Typologies: A Modular Approach This design approach introduces various typologies, integrating restroom facilities with diverse functions, water storage towers, and rest-filter modules, all harmoniously blending plumbing and aesthetics.


THE SIGHTSEEING RESTROOM: A UNIQUE BLEND OF UTILITY AND ENTERTAINMENT

Times Square, a hotspot for tourists, lacks sufficient public restrooms. This design, a landmark tower, fuses a rainwater collection system, restroom facilities, and a revolving chair ride. It not only serves as an identifiable public restroom but also transforms the entire restroom-seeking and usage experience into an unforgettable part of the journey.

28


DELIVERY-SPONSORED RESTROOM: A SAFE HARBOR FOR DELIVERERS AND STREET VENDORS

B

UP

Sponsored by delivery companies, this restroom design incorporates bike parking to cater specifically to delivery workers in the bustling heart of New York. It offers them a chance to rest assured, knowing their bicycles are secure. Simultaneously, it accommodates nearby street food vendors, providing a shared space that addresses their vital needs in the midst of their demanding routines. This initiative underscores the importance of taking care of the city’s essential workforce, one restroom at a time.

29


FAMILY OASIS: PLAYFUL RESTROOM IN TIMES SQUARE

Bridging sanitation and play, this restroom design serves as a retreat for families amidst Times Square’s commercial hustle. Offering comfort for parents and a playground for kids, it eases urban navigation strains for families.

30


RAINWATER TOWER AND PURIFICATION PONDS

The Rainwater Tower, a ubiquitous element in New York’s skyline, serves as a key component in our integrated plumbing system. Besides being a symbol of water management, it reserves rainwater for drainage. Coupled with subterranean filters in the purificatio pond, the system offers wastewater treatment while providing a peaceful respite for passersby and visitors.

31


YESTERDAY Professional Projects ranging from public infrastructure to intimate interior.

Professional Work From Interior Scales To Public Infrastructure Showcasing a transition from detailed interior design to comprehensive architectural projects, this selection highlights an expanded scope of design expertise and execution.

32


SKY FOOD COSMETIC AREA Project Type: Retail Design, Construction Finished New York, NY | LADS Design Stduio, 2022 Custom Millwork, Modeling, Drawing Documentations, Presentation Board Softwares: AutoCAD, Adobe Photoshop, Adobe Indesign Li & Associates Design Studio was tasked with the design and implementation of the cosmetics section at Skyfood Supermarket in Long Island City, New York. The scope of work included spacial planing, lighting, millwork, and the custom interior fixtures, with all display units being sourced and shipped from manufacturers in China to New York.

Interior Render 33


PLANS

Plan

Custom Design Furnitures

34


Custom Millwork

35


BROOKLYN 819 STREET TOWNHOUSE Project Type: Residential, Construction In Progress Brooklyn, NY | Li & Associates Design Studio, 2023 Site Survry, Modeling, Drawing Documentations, Presentation Board Softwares: Revit, Adobe Photoshop, Adobe Indesign The four-story Brooklyn townhouse with its distinctive fluted molded concrete facade represents Li & Associates Design Studio’s debut residential project in New York, showcasing a commitment to understated elegance and premium materials throughout the interior.

Facade Render

Interior Render 36


South East Facing Section

Plans 37


SCA - PUBLIC SCHOOL EXISTING BUILDING INTERIOR RENNOATION Project Type: Education Institution, Submitted Brooklyn, NY | LHP Architects, 2023 Site Survry, Modeling, Drawing Documentations, Presentation Board Softwares: Revit, Adobe Photoshop, Adobe Indesign The School Construction Authority has initiated the refurbishment of a Brooklyn public school, with a focus on the third-floor facilities designed for special education needs.

K280 - FINISHES PROJECT NAME: PROJECT TYPE: PROJECT ADDRESS: PROJECT CAPACITY: YEAR OF OPENING: GROSS AREA: GRADE LEVEL:

EDUCATIONAL CAMPUS AT 19TH STREET - BROOKLYN LEASE RENOVATION 500 19TH STREET, BROOKLYN, NY - 11215 96 SEPTEMBER 2026 17,338 SF INTERMEDIATE

SIGNAGE FOR SCHOOL CONTACT INFORMATION FOR ACCESS TO EXIT 9 ENTRANCE. REFER TO A900 SERIES.

20TH STREET

PARKING ENTRANCE

EXISTING PARKING LOT ENTRANCE GATE TO REMAIN

DN

EXISTING PARKING LOT TO REMAIN

PROSPECT PARK WEST

PLAY AREA

10TH AVENUE

NO WORK IN EXISTING PLAY AREA

EXIT 9

EXISTING 3-STORIED SCHOOL BUILDING WITH CELLAR

MAIN ENTRANCE

Existing School Building

19TH STREET

STUDENT ADA TOILET 341 STAIR K

STAFF LUNCH CONF RM

Department Legend

EDUCATIONAL STORAGE

339

336

CW S.ED. RESOURCE RM 2

GROUP 1 - INSTRUCTIONAL

337

GROUP 2 - SPECIALIZED INSTRUCTION

CW S.ED CLASSROOM 5

GROUP 7 - CIRCULATION / LOBBY

334

GROUP 9 - STORAGE

CW S.ED CLASSROOM 6

GROUP 10 - ADMINISTRATION

335

GROUP 11 - CAFETERIA / STAFF LUNCH GROUP CW - 80 STORAGE GROUP CW - CITY WIDE SPECIAL ED - DISTRICT 75

CW S. ED CLASSROOM 7

GROUP CW- 12/ 30/ 40 OFFICE / STUDENT SUPPORT

333

CHANGING ROOM 316

CW S. ED CLASSROOM 4 332

CW S. ED CLASSROOM 8

CW S. ED CLASSROOM 3

331

330

JANITOR CLOSET 318 K442 S. ED. RESOURCE RM 2

K442 SM BOOK STORAGE

SUPERVISORY OFFICE

324

322

320

STAFF ADA TOILET GIRLS TOILET 2 314

312

BOYS TOILET 2

CW S. ED. RESOURCE R1

OCCUPATIONAL THER. RM

310

308

306

EQUIP ROOM 329A

CW STORAGE 328 CW STORAGE

DN

329

STAIR A

STAIR B

K442 SM BOOK STORAGE

ELEVATOR

UP

CW STORAGE 302

319

TELECOM ROOM 304

CW S. ED CLASSROOM 1

315

311

K442 S. ED. RESOURCE RM 1 317

CW S.ED CLASSROOM 2

PHYSICAL THERAPY ROOM

309

307

GIRLS TOILET 1 305 BOYS TOILET 1

FARA

GUIDANCE OFFICE

PROJECT ROOM

303 STAFF TOILET

301A

ADMINISTRATIVE SUITE

313

301 PRINCIPAL OFFICE 301B

K280 - BROOKLYN D75 - PROGRAM

Programs & Rooms

38


OPTION 1

Interior design criteria extend beyond ADA compliance, emphasizing a design language and color palette conducive to an enhanced learning atmosphere for students with special needs. The chosen palette leans towards cool hues, deliberately eschewing vibrant warm colors to avoid overstimulation.

ELEVATIONS - CENTRAL WING CORRIDOR

FLOOR PLAN - CW SP. ED. CLASSROOM 4 (CENTRAL WING) 2

OPTION 1

A411.00

NEW TREAD AND RISER FINISHES TO MATCH EXISTING AT THE NEW STAIR

C6

DN

OPTION 1

C8 H1

INCLINED WHEELCHAIR LIFT. REFER TO DETAILS ON A506.00

6"

C9

ATIONS - CENTRAL WING CORRIDOR

FLOOR PLAN - CW SP. ED. CLASSROOM 4 (CENTRAL WING)

5' - 0"

H1

3/4" ROUND RAIL SUPPORT TO WALL, GALVANIZED STEEL POWDERCOATED PTD. 1' - 1" + BEND

NEW 1-1/2" DIA. GALVANIZED STEEL POWDERCOATED PTD. COLOR TO BE SELECTED BY THE ARCHITECT.

C6

2' - 0"

C7

NEW 1-1/2" DIA. GALVANIZED STEEL POWDERCOATED PTD. COLOR TO BE SELECTED BY THE ARCHITECT.

C5

C4

C8

NEW 1-1/2" DIA. GALVANIZED STEEL POWDERCOATED PTD. = 1'-0" SCALE: 1/2" COLOR TO BE SELECTED BY THE ARCHITECT.

1 NEW HANDRAIL AT EXISTING CELLAR RAMP (EAST)

C6

2'

4'

3/4" ROUND RAIL SUPPORT 3/4" ROUND RAIL SUPPORT TO WALL, GALVANIZED TO WALL, GALVANIZED STEEL STEEL POWDERCOATED POWDERCOATED PTD. PTD. 1' - 1" + BEND

NEW 1-1/2" DIA. GALVANIZED STEEL POWDERCOATED PTD. COLOR TO BE SELECTED BY THE ARCHITECT.

2' - 0"

1' - 1" + BEND

CELLAR 160' - 0"

100 2' - 0"

3' - 0"

4'

REPLACE TREAD FINISHES TO MATCH EXISTING AT THE EXISTING STAIR

1' - 6 1/2"

5' - 0"

C6

C8

NEW 1-1/2" DIA. GALVANIZED STEEL 0' 2' POWDERCOATED PTD. COLOR TO BE SELECTED BY THE ARCHITECT.

H1

3' - 0"

5' - 0"

C6

C7

0'

SCALE: 1/2" = 1'-0"

H1 6"

C9

1 THIRD FLOOR CENTRAL WING CORRIDOR PLAN - STAIR

N

C6

AN - CW SP. ED. CLASSROOM 4 (CENTRAL WING) FLOOR PLAN - CW SP. ED. CLASSROOM 4 (CENTRAL WING)

3' - 0"

OPTION 1

CELLAR GROUND 158' - 0"

11 1/2"

CELLAR

1' - 2 3/8"

C4

± 24' - 0"

1 NEW HANDRAIL AT EXISTING CELLAR RAMP (EAST)

C5 C6

0'

AT EXISTING STAIR (THIRD FLOOR) EXISTING ADA RAMP TO 2 HANDRAIL ELEVATION REMAIN

2'

4'

SCALE: 1/2" = 1'-0"

ARMSTRONG VINYL COMPOSITE TILE

2

C10

3/4" ROUND RAIL SUPPORT TO WALL, GALVANIZED STEEL POWDERCOATED PTD.

SCALE: 1/2" = 1'-0"

ELEVATIONS - CWNEW SP. ED. CLASSROOM SOFT COOL GRAY HANDRAIL AT 4EXISTING51860 CELLAR RAMP (WEST) C1 (CENTRAL WING) SCALE: 1/2" = 1'-0"

0'

2'

4'

11"

NEW 1-1/2" DIA. GALVANIZED STEEL POWDERCOATED PTD. COLOR TO BE SELECTED BY THE ARCHITECT.

FINISHED TREAD

1' - 1" + BEND

FLOOR PLAN - CENTRAL WING

ARMSTRONG VINYL COMPOSITE TILE 51903 BLUE/GRAY C11

2' - 0"

3' - 0"

C4

1/2"

ARMSTRONG VINYL COMPOSITE TILE 51906 TEAL C10

ARMSTRONG CELLAR 160' TILE - 0" VINYL COMPOSITE 51820 MARINEELEVATOR BLUE C8 DOOR

3/8" REBAR

NEW 1-1/2" DIA. GALVANIZED STEEL POWDERCOATED PTD. COLOR TO BE SELECTED BY THE ARCHITECT.

ARMSTRONG VINYL COMPOSITE TILE 57539 SHORELINE C9

NEW TREAD AND RISER FINISHES TO MATCH EXISTING AT THE NEW STAIR

1' - 3 3/4"

CELLAR GROUND 158' - 0"

1/4" REBAR

1 1/

5

TERRAZZO TREAD

SCALE: 3" = 1'-0"

± 24' - 0"

NEW LIGHTWEIGHT CONCRETE. SEE STRUCTURAL DRAWINGS FOR STRUCTURAL REINFORCEMENT

SHERWIN WILLLIAMS SEMI GLOSS PAINT SW 6808 (SGP - C6)

2 NEW HANDRAIL AT EXISTING CELLAR RAMP (WEST)

0'

ELEVATIONS - CW SP. ED. CLASSROOM 4 SHERWIN WILLLIAMS GLOSS PAINT (CENTRALSEMI WING)

SHERWIN WILLLIAMS SEMI GLOSS PAINT SW 6432 (SGP - C13)

SHERWIN WILLLIAMS ELEVATOR SEMI GLOSS PAINT DOOR SW 6270 (SGP - C15) ARMSTRONG VINYL COMPOSITE TILE 51860 SOFT COOL GRAY C1

NEW LIGHTWEIGHT CONCRETE. SEE STRUCTURAL DRAWINGS FOR STRUCTURAL REINFORCEMENT

ARMSTRONG VINYL COMPOSITE TILE 51906 TEAL C10

WILLLIAMS SS PAINT SGP - C7)

SHERWIN WILLLIAMS SEMI GLOSS PAINT SW 6695 (SGP - C5)

ARMSTRONG ARMSTRONG VINYL COMPOSITE TILE VINYL COMPOSITE 51820 MARINE BLUE TILE C851903 BLUE/GRAY C11

SHERWIN WILLLIAMS SEMI GLOSS PAINT SW 6967 (SGP - C8)

3' - 0"

SHERWIN WILLLIAMS SEMI GLOSS PAINT SW 6808 (SGP - C6)

ARMSTRONG ARMSTRONG VINYL COMPOSITE TILE VINYL COMPOSITE TILE 57539 SHORELINE C951906 TEAL C10

ARMSTRONG VINYL COMPOSITE TILE 51820 MARINE BLUE C8

ARMSTRONG VINYL COMPOSITE TILE 57539 SHORELINE C9

SHERWIN WILLLIAMS SHERWIN WILLLIAMSEXISTING CONCRETE SEMI GLOSS PAINT STAIR TO REMAIN SEMI GLOSS PAINT SW 6449 (SGP - C10) SW 6482 (SGP - C9)

SHERWIN WILLLIAMS SEMI GLOSS PAINT SW 6449 (SGP - C10)

K280 - BROOKLYN D75 - PROGRAM

Finishes Selection

SCALE: 1/2" = 1'-0"

ARMSTRONG VINYL COMPOSITE TILE 51821 CARIBBEAN BLUE C4

ARMSTRONG VINYL COMPOSITE TILE 51820 MARINE BLUE C8

ARMSTRONG VINYL COMPOSITE TILE 51906 TEAL C10

7" MAX

RISER

5 A410.00

4 A410.00 1 1/2" 1"

SECTION THRU NEW STAIR AT CELLAR LEVEL 53 TERRAZZO TREAD AND RISER DETAIL

ARMSTRONG VINYL COMPOSITE 1'-0" SCALE: 1/2" =TILE 57539 SHORELINE SCALE: 3" = 1'-0" C9

0'

0.25'

0.5'

0'

6"

ARMSTRONG VINYL COMPOSITE TILE 51878 GOLDEN C5

3 1/2" BLACK EPOXY ABRASIVES STOP 3" FROM BOTH SIDES

DOOR TO MECH ROOM

1' - 6"

ARMSTRONG VINYL COMPOSITE TILE 57508 BLUE DREAMS C6 3 7/8"

CELLAR 160' - 0"

ARMSTRONG VINYL COMPOSITE TILE 51866 LITTLE GREEN APPLE C7

ARMSTRONG VINYL COMPOSITE TILE 51821 CARIBBEAN BLUE C4 CELLAR GROUND

ALIGN 1/8" CAULK JOINT

ARMSTRONG VINYL COMPOSITE TILE 51878 GOLDEN C5

11" FINISHED TREAD

158' - 0"

3/8" LATEX MODIFIED THINSET OVER CONCRETE LIGHTWEIGHT CONCRETE. REFER TO STRUCTURAL DRAWINGS. 1/8" CAULK JOINT AT ALL RISER BOTTOM

HD STYROFOAM 5 A410.00

4 A410.00

0'

2'

4'

4 STAIR TREAD AND RISER SECTION SCALE: 1 1/2" = 1'-0"

K280 - BROOKLYN D75 - PROGRAM

ADA Stairs - New Construction

K280 - BROOKLYN D75 - PROGRAM

D75 - PROGRAM

PRECAST CEMENT TERRAZZO LANDING PANEL

3 SECTION THRU NEW STAIR AT CELLAR LEVEL

SHERWIN WILLLIAMS SEMI GLOSS PAINT SW 6808 (SGP - C6) SHERWIN WILLLIAMS SHERWIN WILLLIAMS WILLLIAMS STRONG ARMSTRONG ARMSTRONG ARMSTRONG SEMI GLOSS PAINT ARMSTRONG SEMI GLOSS PAINT PAINT ARMSTRONG LSS COMPOSITE TILE VINYL COMPOSITE TILE VINYL COMPOSITE TILE VINYL COMPOSITE TILE SW 6432 (SGP - C13)VINYL SW 6270 (SGP - C15) - C11) COMPOSITEBLUE TILE VINYL COMPOSITE TILE 8SGP BLUE DREAMS 51866 LITTLE GREEN 51821 CARIBBEAN 51878 GOLDEN 57508 BLUE DREAMS 51866 LITTLE GREEN APPLE C4 C5 C6 APPLE C7 C7

K280 - BROOKLYN

NEW TREAD AND RISER FINISHES TO MATCH EXISTING AT THE NEW STAIR

2' - 0"

2' - 0"

SHERWIN WILLLIAMS SEMI GLOSS PAINT SW 6959 (SGP - C4)

ARMSTRONG VINYL COMPOSITE TILE 51903 BLUE/GRAY C11

1/4" REBAR

39

ALIGN 1/8" CAULK JOINT

CELLAR GROUND 158' - 0"

3 7/8"

EXISTING CONCRETE STAIR TO REMAIN3/8" REBAR

PRECAST CEMENT TERRAZZO TREAD AND RISER

3 5/8"

WILLIAMS SS PAINT SGP - C1) STRONG L COMPOSITE TILE 3 BLUE/GRAY

1' - 3 3/4"

3 5/8"

ARMSTRONG VINYL COMPOSITE TILE

EVATIONS - CW SP. ED. CLASSROOM 4 51860 SOFT COOL GRAY ELEVATIONS - CW C1 SP. ED. CLASSROOM 4 OR PLANWING) - CENTRAL WING ENTRAL (CENTRAL WING)

C10

2' - 0"

SIDES

SW 6449 (SGP - C10)

NEW 1-1/2" DIA. GALVANIZED STEEL POWDERCOATED PTD. COLOR TO BE SELECTED BY THE ARCHITECT. SHERWIN WILLLIAMS SEMI GLOSS PAINT SW 6246 (SGP - C11)

CELLAR 160' - 0"

3 5/8"

SHERWIN WILLLIAMS SEMI GLOSS PAINT SW 6482 (SGP - C9)

C10

RISER

SHERWIN WILLLIAMS SEMI GLOSS PAINT SW 6967 (SGP - C8)

2"

SHERWIN WILLLIAMS SEMI GLOSS PAINT SW 6717 (SGP - C7)

DOOR TO MECH ROOM

2' - 0"

4' ARMSTRONG ARMSTRONG ARMSTRONG ARMSTRONG VINYL COMPOSITE TILE VINYL COMPOSITE TILE VINYL COMPOSITE TILE VINYL TILE 6" COMPOSITE 1' - 6" 57508 BLUE DREAMS 51866 LITTLE GREEN 51821 CARIBBEAN BLUE 51878 GOLDEN 11" ARMSTRONG C6 APPLE C4 C5 (3) 1/2" BLACK VINYL COMPOSITE TILE C7 FINISHED TREAD EPOXY ABRASIVES 51860 SOFT COOL GRAY 1/2" STOP 3" FROM BOTH C1 1/2" 1" FINISH

SCALE: 1/2" = 1'-0"

2'

3 5/8"

SEMI GLOSS PAINT SW 6695 (SGP - C5)

3' - 0"

EXISTING ADA RAMP TO SHERWIN WILLLIAMS REMAIN

SHERWIN WILLLIAMS SEMI GLOSS PAINT SW 6959 (SGP - C4)

SHERWIN WILLIAMS SEMI GLOSS PAINT SW 7001 (SGP - C1)

1

2"

FINISH

0'

2'

4'

2'

1'

4'

4 STAIR TREAD AND SCALE: 1 1/2" = 1'-0"


81ST STREET STATION | MTA ADA RENNOVATION Project Type: Public Transportation, Design Development New York, NY | LHP Architects, 2023 Site Survry, Modeling, Drawing Documentations, Presentation Board Softwares: Revit, Adobe Photoshop, Adobe Indesign Contributed to the MTA’s initiative for enhanced accessibility across a series of subway stations, focusing on the integration of elevators and the redesign of entrance details. Responsibilities encompassed modeling, drafting, and producing architectural renders.

Station Exterior Render

Station Interior Render

40


1' - 0"

25' - 2" 5' - 0"

5' - 0" 9/25/2023 5:29:38 PM

13' - 0"

P10

11' - 11"

13T @ 11"

ELEVO1

13T @ 11"

8' - 2"

ELEV 01

11' - 11"

8' - 10"

UP 157.81 30"X48" AREA OF REFUGE

FIRE RATED STOREFRONT GLAZING

24' - 11"

LHP ARCHITECTS 12' - 9"

DOOR ON HOLD-OPEN

MCR

UNPAID AREA

MVM

AFAS

PL6

UP

PL8

PL7

UP

PAID AREA

PL5

HP

LOWER PLATFORM

TRACKS

SCALE: 1/8" = 1'-0"

PRELIMINARY

MTA ADA Package 5 - 81STH ST STATION - NY

LHP Architects

09/25/23

Copyright © 2023 By LHPArchitects PLLC

S2B

S2A

17' - 5"

19T @ 11"

9' - 6"

9/25/2023 5:29:47 PM

LOWER PLATFORM LEVEL

5' - 0"

P1B

UP

UP

P10

P1A

9' - 6"

11' - 11"

13T @ 11"

10T @ 11"

9' - 2"

8' - 6"

LHP ARCHITECTS ELEV 01

STORAGE

DN

10' - 0"

174.14

BOOTH

UP

P2A

UP

P2B

P3

EMR

DN

DN

PL7

PL5 1

REPLACE GATE

2' - 0"

104

UPPER PLATFORM LEVEL

SCALE: 3/32" = 1'-0"

PRELIMINARY

MTA ADA Package 5 - 81STH ST STATION - NY

LHP Architects

09/25/23

9/25/2023 5:29:54 PM

Copyright © 2023 By LHPArchitects PLLC

AMERICAN MUSEUM OF NATURAL HISTORY ENTRANCE

1 104 10' - 10"

WEST 81ST STREET

DN

BUS SHELTER

5' - 8"

191.39

DN

S2B

S2A

9' - 10"

13' - 9"

14' - 6"

LHP ARCHITECTS NEW ELEVATOR CANOPY

10' - 7"

ELEV 01 10' - 4"

CENTRAL PARK WEST

Station Platform Plans MTA ADA Package 5 - 81STH ST STATION - NY STREET LEVEL

PRELIMINARY 09/25/23

Copyright © 2023 By LHPArchitects PLLC

41

SCALE: 3/32" = 1'-0"

LHP Architects


9216 S FALCON WAY, UTAH | UTAH AIRBNB HOSTEL PROJECT Project Type: Hostel Interior Design Project, Construction Finished Sandy, Utah | Li & Associates Design Studio, 2022 Planing Design, Drawing Documentations, Presentation Board Softwares: AutoCAD, Adobe Photoshop, Adobe Indesign Located in Sandy, Utah, this project renovated a 2 floor height residential housing into an Airbnb hostel project. The bathroom needs a renovation to update the design fixture and plumbing. We tried to bring in Contempory Modern style to mix with the original American Country design language in the spcae.

EL

LEGEND SYMBOL

1

4

PL

5'

2'

04

ACC 01

F

2

2'-6"

EQ

4'

FIXTURE

TL-1

6"

NEW

42

F

TO COMFIRM W/ DESIGNER

87 SQFT + 10% EXTRA, EST. 95.7 SQFT

PL

Checked By

/

Drawing Scale

2'-5"

Drawing No.

IMAGE

NAME ARINA BIANCO PORCELAIN TILE

4"X16" SUBWAY TILE, 31" W NOVA

FINISH MATTE/ WHITE

WHITE

DESCRIPTION 47 SQFT + 10% EXTRA, EST. 51.7 SQFT

84 SQFT + 10% EXTRA, EST. 92.4 SQFT

GROUT TO MATCH BOSTIK H168 SILVER BULLET TO MATCH BOSTIK H195 SHADOW

4'-1"

1'-6" 1'-2" 4'-8"

8'

2'-5"

6'-10"

MIN 6"

1'-11"

04

HD

2'

D

47 DES EX

WA

LEVEL 2 BATHROOM N ELEVATION 3/8"=1'-0"

FLO 84 EX P

TL-#

WHITE

POLISHED

D THR 32 EX

ACC OR HIGH ACCE

GLOSS/ PL WHITE HD

FGLOSSY/

WHITE

DOOR THREAD

WHITE GLOSS MARBLE

BATHROOM PAINT

TO COMFIRM W/ DESIGNER

04

NEW TO BE GIF OUTLET DECIDED 15" A.F.F.

2'-6"

PLU

HAR 15 EX FI S

CO SO BE M

87 EX

FINISH SCHEDULE IMAGE

NAME

05

PL

02

1' 1'-9" EQ

4'-7"

1'-9" EQ

4"X16" SUBWAY TILE, 31" W

6"

1"

7'

8'

NOVA DOLOMITE BRASS POLISHED MARBLE MOSAIC

NEW SWITCH 42" A.F.F.

P

BRIGHT WHITE ICE POLISHED LINER

LL BL

NEW AS SHOWN RIGHT HANDLE TOILET

4'

4

SPRING 2022 DRAWINGS, NOTES AND SPECIFICATIONS OF THE ARCHITECT AND CONSULTANTS ARE COMPLIMENTARY AND WHAT IS CALLED FOR BY ONE WILL BE BINDING AS IF CALLED FOR BY ALL.

01 DESIGN DEVELOPMENT

ARINA BIANCO PORCELAIN TILE

TL-1

ACC 04

NEW WALL MOUNTED TOWEL RACK 46" A.F.F.

LEVEL 2 BATHROOM W ELEVATION A-101 3 4'-2"

2'-6"

PL

NEW TO BE FREESTANDING DECIDED TUB

TAG

Date

ACC 02

Project Manager

NEW SWITCH 3'-6"

2'

BRIGHT WHITE ICE POLISHED LINER

EXISTING CONTROL PANEL

NEW WALL MOUNTED MIRROR LIGHT 72" A.F.F.

NEW WALL MOUNTED MIRROR 42" A.F.F.

Drawn By

BATHROOM PAINT

s sGIF

2

4'-2"

2'

Project No.

1'-6"

L3

DOLOMITE BRASS

03

NEW POLISHED MARBLE WALL & CEILING MOUNTED MOSAIC CURTAIN RACK 78" A.F.F.

7'

2 FL BATHROOM NEW BRASS FAUCET CENTER ON SINK SINGLE HOLE

/

02

NEW GIF OUTLET 42" A.F.F.

FINISH LEGEND

03

3'-4"

CONTRACTOR TO SOURCE SINGLE BEVELED WHITE MARBLE DOOR THREADS

Drawing Title

4'

L3

3'-6"

3'-10"

WHITE GLOSS MARBLE

TO MATCH BOSTIK H195 SHADOW

HD

PL

NAME

ARINA SYMBOL BIANCO MATTE/ WHITE PORCELAIN TILE

NEW 4"X16" WALL MOUNTED SUBWAY SHOWER HEAD TILE, 31" W 82" A.F.F. WITH TUB FILLER NOVA MIN 30" A.F.F. HD

01

6"

HARDWARE15 FEET + 10% EXTRA, EST. 17 GLOSSY/ FEET WHITE FIXTURE SEE A100 FOR DETAILS

04

4'-7"

2' 6" 4'-1" 2' 2'-5"1'-11"

02

3'-7"

L1

6' 11"

6'-6"

3'-5"

2'-8"

8"

1'-2"

1'-6" 5'

9218 Falcon Way Sandy, Utah 84093

2'-5"

6'-10"

HD

NEW GIF OUTLET 15" A.F.F.

7'

IMAGE

TL-1

08/16/2021

9218 Falcon Way Sandy, Utah 84093

DOOR THREAD

01 DESIGN DEVELOPMENT

TO SWITCH MATCH BOSTIK WALL SCONE H195 SHADOW VENTILATION L1 FAN WITH LIGHT

TAG

LEVEL 2 BATHROOM POWER PLAN ACC 4 01

04

3/8"=1'-0"

1' 4'-2"

PL

FINISH SCHEDULE

7'

1'-9" EQ

TO BE DECIDED

4'-1"

4'-1"

6'-2"

1"

04

TAG

1'-9" EQ

4'-7"

8'

8'

HD

NEW GIF OUTLET 15" A.F.F.

2'-6"

F

03HD

NEW NEW GIF OUTLET 4" DIA 42" A.F.F. CEILING MOUNTED PL 01 ACCESSED CAN ACC 03 LIGHT NEW NEW 20" WIDE VANITY SHOWER CURTAIN 14" A.F.F.

1'-11"

1'-6" 1'-2"

04

TO BE NEW DECIDED FREESTANDING TUB

FINISH SCHEDULE

4'-8" 5'

L2

3/8"=1'-0" NEW NEW FREESTANDING FREESTANDING TOILET PAPER TUB HOLDER

EQ 9"

2'

5'

02

MOUNTED EXISTING CURTAIN RACK CONTROL PANEL 78" A.F.F.

3'-4"

DOOR TO MATCH THRESHOLD POLISHED 4"BOSTIK DIA CEILING 32 SQFT + 10% No. Issue / Revision OR HIGH H177 EXTRA, EST. 35.2 MOUNTED ACCESSORIES L3 BRIGHT Seal & Signature GLOSS/ SQFT RECESSED CAN WHITE WHITE LIGHT PLUMBING

WHITE ICE POLISHED F LINER

NEW SWITCH

LEVEL 2 BATHROOM N ELEVATION 3/8"=1'-0"

01

ACC 02

4'-8"

LEVEL 2 BATHROOM POWER PLAN 3/8"=1'-0"

2'

s

NOVA DOLOMITE BRASS ACC POLISHED

03

NEW MARBLE PL WALL & CEILING MOUNTEDMOSAIC CURTAIN RACK HD BRIGHT 78" A.F.F.

PL

4"

FLOOR TILE84 SQFT +6'-7" 10% EXTRA, EST. 92.4 WHITE SQFT L2 PAINT

4"X16" TL-# SUBWAY TILE, 31" W

EXISTING CONTROL PANEL

3'-6"

1'-6"

L3

HD

NEW F 01 PL 03 F 01 GIFNEW OUTLET NEW 42"WALL A.F.F. MOUNTED WALL MOUNTED NEW WALLLIGHT MOUNTED MIRROR HEAD HDSHOWER 03 MIRROR LIGHT 72" A.F.F. 82" A.F.F. WITH NEW 72" A.F.F. TUB& FILLER WALL CEILING F 02 MIN 30" A.F.F. MOUNTED ACC 02 NEW CURTAIN RACK VENTILATION NEW 78" A.F.F. WALL MOUNTED 1'-6" HD 03 MIRROR NEW 42" A.F.F. WALL & CEILING

NAME FINISH DESCRIPTION GROUT TO ELECTRICAL LEGEND LEGEND SPRING 2022 LEVEL 2 BATHROOM E ELEVATION ARINA MATCH LI & ASSOCIATES DESIGN STUDIO INC. 1 47 SQFT + 10% SYMBOL DESCRIPTION BIANCO MATTE/ BOSTIK 3/8"=1'-0" SYMBOL DESCRIPTION DRAWINGS, NOTES AND SPECIFICATIONS OF THE EXTRA, EST. 51.7 WHITE ARCHITECT AND CONSULTANTS ARE COMPLIMENTARY PORCELAIN H168 SQFT AND WHAT IS CALLED FOR BY ONE WILL BE BINDING AS IF GIF OUTLET CALLED TILE SILVER FOR BY ALL. WALL TILE BULLET

6'-10"

ss

2'-5"

2'-5"

L3

GIF

NEW WALL MOUNTED MIRROR LIGHT 72" A.F.F.

NEW WALL MOUNTED

1'-6"

4'

L3

EQ 9"

3'-4"

L3

2'

4'-7"

2' 6" 1"

4'-7"

6"

4

LEVEL 2 BATHROOM E ELEVATION 3/8"=1'-0"

6'-7"

HD 4'

3'-6"

Construction Plans & Elevations

4'-7"

3'-7"

L1

1'-11"

PL

1'-6"

NEW NEW FREESTANDING FREESTANDING TOILET PAPER TUB HOLDER

EQ 9"

7'

4'-1"

3'-5"

TL-1

04

NEW PL 03 GIF OUTLET 15" A.F.F. NEW HD 02 WALL MOUNTED SHOWER HEAD NEW 82" A.F.F. WITH GIF OUTLET 42" A.F.F.TUB FILLER MIN 30" A.F.F.

MIN 6"

6'-10" MIN 6"

3'-4"

LEVEL 2 BATHROOM RCP 3/8"=1'-0" 2'

NEW F 01 NEW 42" A.F.F. WALL MOUNTED NEW WALL MOUNTED MIRROR LIGHT WALL MOUNTED HD HEAD 03 SHOWER A.F.F. LIGHT NEWWITH MIRROR72" 82" A.F.F. 72" A.F.F. WALL & CEILING TUB FILLER F 02 MOUNTED MIN 30" A.F.F. NEW CURTAIN RACK ACC 02 VENTILATION 78" A.F.F. NEW WALL MOUNTED HD 03 MIRROR NEW 42" A.F.F. WALL & CEILING EXISTING MOUNTED F 03 CONTROL CURTAIN RACK PANEL HD 02 NEW NEW 78" A.F.F. 4" DIA GIF OUTLET CEILING42" MOUNTED A.F.F. ACCESSED PL 01CAN LIGHT NEW ACC 03 NEW 20" WIDE VANITY SHOWER CURTAIN 14" A.F.F.

HD

1'-11"

2'-5"

4"

6'-6"

8' 1'-11"

3 EQ 9"

01

6' 11"

L3

3'-8"

F

2'-8"

L3

1'-6"

03

NEW 4" DIA CEILING MOUNTED ACCESSED CAN LIGHT

03 GIF OUTLET

4'-8" 5'

L2 2'

8"

4'

2'-5"

6'-2"

1'-6"

NEW

02

5'

4'-7"

NEW VENTILATION

HD

2' 2'

3'-7"

L1

1'-6"

4'-1"

3'-5" 02

EQ

PL

4'-1" 1'-2"

EQ

1'-3.5" EQ

2'

4'

1'-10" 6" 1' 1' EQ EQ

5'-5" 6'

4'-1"

7'

1'-7" 1'

01

NEW L2 WALL MOUNTED 1'-3.5" MIRROR LIGHT EQ 72" A.F.F.

IMAGE

1'-3.5" EQ

4" DIA CEILING L3 MOUNTED 3'-7" RECESSED CAN LIGHT

LEVEL 2 BATHROOM RCP 3/8"=1'-0"

FINISH SCHEDULE TAG

VENTILATION EQ

L1 FAN WITH LIGHT

3'-8"

3

LEVEL 2 BATHROOM FINISH PLAN 3/8"=1'-0"

2

WALL SCONE

L24'

03

1'-11"

LEVEL 2 BATHROOM PLAN 3/8"=1'-0"

5'-5" 6'SWITCH

11"

4'

F

7'

1

FIXTURE 1'-6"

NEW 4" DIA CEILING MOUNTED ACCESSED CAN LIGHT

4'

1'-10" 6" 1' 1' EQ EQ

2'-8"

EQ 10" 2'-8"

F

04

LEVEL 2 BATHROOM FINISH PLAN 3/8"=1'-0"

2

GIF OUTLET

2'-5"

PL

L1

PLUMBING HARDWARE

VENTILATION

NEW FREESTANDING TUB

EQ

ACCESSORIES 3'-5"

02

8'

1

6'-7"

5'

A-102 4

4"

1

1'-3.5" EQ

HD NEW

TL-1

EQ

3

PL

F

1'-3.5"

ACC 01

F

L2 PAINT

DOOR THRESHOLD

03

NEW WALL MOUNTED SHOWER HEAD 82" A.F.F. WITH TUB FILLER MIN 30" A.F.F.

s

LI & ASSOCIATES DESIGN STUDIO INC.

DESCRIPTION

7'

2'

EQ

NEW WALL MOUNTED MIRROR LIGHT 72" A.F.F.

SYMBOL

4'-7"

02

6'-7"

PL

1'-5" 2

NEW FREESTANDING TOILET PAPER HOLDER

F

F TL-#01

WALL TILE 1'-7" 1' FLOOR TILE

ACC

1'-3"

NEW BRASS FAUCET CENTER ON SINK SINGLE HOLE

F

DESCRIPTION

MIN 6"

PL

NEW RIGHT HANDLE TOILET

05

6'-7"

PL

1'-3.5"

01

NEW 20" WIDE VANITY 14" A.F.F.

SYMBOL

01

NEW DRAIN WITH SLOPE

2'-6" EQ 9"

PL

HARDWARE

F

4'

ELECTRICAL LEGEND

LEGEND

HD

7' 1'-5"

1'-3"

PLUMBING

HD

7'

LEVEL 2 BATHROOM PLAN 3/8"=1'-0"

1

1'-8"

2'-8"

4"

PL

04

NEW FREESTANDING TUB

EQ 10"

Actual Site Picture

TL-1

EQ

NEW FREESTANDING TOILET PAPER HOLDER

A-102

ACCESSORIES

1'-3.5"

3

03

NEW WALL MOUNTED SHOWER HEAD 82" A.F.F. WITH TUB FILLER MIN 30" A.F.F.

6'-7"

PL

1'-5" 2

6'-7"

1'-3"

ACC 01

2"

PAINT DOOR THRESHOLD ACC

NEW BRASS FAUCET CENTER ON SINK SINGLE HOLE

FLOOR TILE

TL-#

02

NEW RIGHT HANDLE TOILET

05

5'

PL

PL

EQ 9"

01

NEW 20" WIDE VANITY 14" A.F.F.

S

WALL TILE

NEW DRAIN WITH SLOPE

2'-6"

6'-7"

PL

7' 1'-5"

1'-3"

DESCRIPTION

01

1'-3.5"

1'-8"

2"

HD

08/16/2021

2'-8"

LEVEL 2 BATHROOM S ELEVATION 3/8"=1'-0"

4"

TO BE DECIDED

DOOR THREAD

TO BE DECIDED

BATHROOM PAINT

C

D


1544 JEFFERSON AVE | MIAMI AIRBNB HOSTEL PROJECT Project Type: Hostel Interior Design Project, Construction Finished Miami, Florida | DADAPT Design Studio, 2022 Planing Design, Drawing Documentations, Presentation Board Softwares: AutoCAD, Adobe Photoshop, Adobe Indesign Located in Hollywood Miami, this project renovated a 2 units, 4 floor height residential housing into an Airbnb hostel project. Each Floor has different design theme and different atmosphere. Our goal is to bring in a mix of Scandinavian and Bohemian style, creating a comfortable, welcoming while filled with unforgettable moments experience to our travelers.

Actual Site Picture: Unit 2

Actual Site Picture: Unit 2

Unit 2 Design Scheme

Furniture Plan

43


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.