Ajane’ Milana Ramsey
PROFESSIONAL DESIGN PORTFOLIO
2022
AJANE MILANA RAMSEY // PORTFOLIO
PAGE 2
born in va grew up in nc college in GA work in fl
AJANE MILANA RAMSEY // PORTFOLIO
design responsibilities project coordination
PAGE 3
AJANE MILANA RAMSEY // PORTFOLIO
fabric shopping site visits
material selections
stone sourcing construction meetings
design responsibilities
project coordination
PAGE 4
AJANE MILANA RAMSEY // PORTFOLIO
FINISH SELECTIONS
MATERIAL SCHEMES redlines
field MEASUREs client meetings
architectural drawings
PAGE 5
AJANE MILANA RAMSEY // PORTFOLIO
drawing + drafting plans
7/25/22 3/16" 1'-0" A139A139 1 Furniture Plan A
PAGE 7 AJANE MILANA RAMSEY // PORTFOLIO drawing + drafting plans AConstruction 5/3/22 AR 215 3/16" = 1'-0" A-102 1 Leve 1 Cons ruc on NEW ADD T ON 2330
drawing + drafting plans
AJANE MILANA RAMSEY A114A114 Bunker Road Guest 3/29/22 AR Cummings Flagler/Bunker Guest House 1/4" 1'-0" A114A114 1 Guest House Level 2 1/4" 1'-0" A114A114 2 Guest House Level 1
drawing + drafting details
| Fireplace
PAGE 9 AJANE MILANA RAMSEY // PORTFOLIO G R E A T R OOM 52" Ce ng F an 73 1 / 2 " 73 1 / 2 " 1 47 75" TV GAS F.P. C L Flat of Wall & T.V. FIREWOOD NEW INSERT IN EXISTING FIRE BOX SIZE; CREATE NEW OPENING ON OTHER SIDE IN SAME SIZE FOR FIREWOOD EQ EQ 1 0 1 2 20 40 EQ EQ Align with edge of opening 21 40 21" Santa Anna Porcelain Matte 126" x 59" x 1/2" 69" 47 1 2" 1 0 " 1 0 " 1 0 1 2 " 1 0 1 2 " A B C E D F G A B C D E F G 1/4" = 1'-0" A -124 1 F i re p a ce H i gh l and Pl a ce
3/8" = 1'-0" A -124 2 F rep la ce H ea rt h 3/8" = 1'-0" A -124 3 S a n t a A nn a P o rc ela i n A -124 4 F i re p a ce 3/8" = 1'-0" A -124 5 F i re p a ce S e ct o n
drawing + drafting custom millwork
Living Room Built-In
Crown Molding (provided by builder, molding will match rest of house) *VIF height of crown*
Circa Lighting Langham Medium Picture Light (provided by CRI, see attached spec sheet)
Wallpaper Backing (by others) Carlisle & Co. Latitude Collection LX1040 Dove *Installed directly on wall in visible,open spaces behind shelves and TV
3" Notch-In Shelves (light wood tbd) Dado Joint Construction
3" Frame Paint-Grade BM Simply White
16" Shelf Spacing (23" at Top Shelf)
3" Seat Cushion (fabric tbd, provided by others)
DrawersDrawers Paint-Grade 2" Frame Drawer Front with Inset Panel on Undermount Self-Closing Glides
Exterior: BM Simply White
Interior: Clear Polished Maple Finish All Hardware (provided by CRI)
PAGE 10 AJANE MILANA RAMSEY // PORTFOLIO
VIF 3" EQ 3" 108" 3" EQ 3" 8 1/2" Overall Height to Crown Needs to Be Confirmed On-Site 8 1/2" 105" 18" 3 1/2" 3" 23" 3"16"3"16"3"16"3"16"3"15"3"
80" TV (Exact Dimensions TBC) 18"18"18"18"18"18"
14" 14" 19" 19" 62 1/2" 62 1/2" 16 1/2" 12" 1/2" 236" 3" 58" 3" 108" 3" 58" 3" 6" EQ EQ 28 1/2" 1/2" 29" 8 1/2"3" 23" 3"16"3"16"3"16"3"16"3"2"13"3" 16 1/2"5 1/4" to 6 3/4" Extension 29" 48" Light
(tbd) 4'-0" AFF
(Placement will be sent to builder) 3" 16 1/2"1/2" 5" 3 1/2"3" 23" 3" 1/2" Top Section 3/8" 1'-0" Elevation 3/8" 1'-0" Side Section 3/8" 1'-0"
Switch to control picture lights
to center of plate
Revised 5.15.20
dimension can be reduced to accomadate exact height of crown Detail of Top Left Corner 1" 1'-0"
Joint Shelf is 16 1/4" deep (1/4" recessed from front face of frame) 1/2" notch-In on both sides of shelving
This
Dado
* N ot e : Design Sketch, not for Construction. Please Confirm all Dimensions.*
50" TV 5'-0" 4'-0" Hanging Hanging Hanging Hanging
False Fronts -Chimney Behind
Recessed Lutron Black-Out Roller in a Channel
Recessed Lutron Black-Out Roller in a Channel
1" 4" 4'-3" 2'-7" B ong i o v i N e w J ers e y |Jesse Bedroom Closet Built-In 1/2" = 1'-0" A -1 1 0 1 J e sse Be d ro o m B ui lt -In 1/2" = 1'-0" A -1 1 0 2 Bu il t -In S e ct i o n
Match Profile per Family Room
Match Door Profile per Family Room Cabinetry
drawing + drafting CABINETRY elevations
AJANE MILANA RAMSEY
6810 9/28/22 1/2" 1'-0" A-301A-301 1 Kitchen East 1/2" 1'-0" A-301A-301 2 Kitchen West 1/2" 1'-0" A-301A-301 3 Kitchen North 1/2" 1'-0" A-301A-301 4 Kitchen East Island 1/2" 1'-0" A-301A-301 5 Kitchen West Island 1/2" 1'-0" A-301A-301 6 KitchenKitchen 1/2" 1'-0" A-301A-301 7 Kitchen RCP 1/2" 1'-0" A-301A-301 8 Kitchen South
drawing + drafting
BATHROOM Elevations
AJANE MILANA RAMSEY 6810 1/2" 1'-0" A-311A-311 1 Master Bath 1/2" 1'-0" A-311A-311 2 Master Bath RCP 1/2" 1'-0" A-311A-311 3 Master Bath West 1/2" 1'-0" A-311A-311 4 Master Bath East 1/2" 1'-0" A-311A-311 5 Master Bath Shower North 1/2" 1'-0" A-311A-311 6 Master Bath South 1/2" 1'-0" A-311A-311 7 Master Bath North 1/2" 1'-0" A-311A-311 8 Master Bath WC South 1/2" 1'-0" A-311A-311 9 Master Bath Shower South Wall Tile Square Shower Wall North Shower Wall East Shower Wall West Dry Walls West Total -------------Floor Tile Square Shower Floor Dry Floor - 92 Total --------------
visual graphics
PAGE 14
AJANE MILANA RAMSEY // PORTFOLIO
renderings
Material studies
PAGE 15
AJANE MILANA RAMSEY // PORTFOLIO
PAGE 16
axonometric
AJANE MILANA RAMSEY // PORTFOLIO
renderings
PAGE 17
renderings views KITCHEN
AJANE MILANA RAMSEY // PORTFOLIO
GREAT ROOM
PAGE 18
AJANE MILANA RAMSEY // PORTFOLIO renderings foyer den
presentation graphics
mood boards
PAGE 19
AJANE MILANA RAMSEY // PORTFOLIO
shopping + sourcing FURNITURE SHOPPING
PAGE 20
AJANE MILANA RAMSEY // PORTFOLIO
PAGE 21
INDESIGN
AJANE MILANA RAMSEY // PORTFOLIO client presentations
PROJECT MANAGEMENT ConsTRUCTION SCHEDULES
6810WashingtonRoad|ConstructionSchedule
BathroomsTile9/25/2210/15/22200%
ImpactDoors&Windows9/25/2210/30/22350%
ExteriorStucco10/3/2210/10/2270%
Drywall&Finish10/5/2210/15/22100%
FinalElectrical10/16/2210/18/2220%
WoodFlooring10/15/2210/30/22150%
InteriorDoors10/15/2210/30/22150%
Baseboards10/15/2210/30/22150%
Stairs10/15/2210/30/22150%
Pool10/15/221/15/23900%
ExteriorPainting10/15/2210/20/2250%
FinalPlumbingandDetails10/16/2210/20/2240%
PAGE 22 AJANE MILANA RAMSEY // PORTFOLIO
Contractor:PalmBeachRemodeling PHASEONEPHASETWO TASKTITLESTARTDATEENDDATEDURATION%OFTASK COMPLETE WEEK (8/228/28) WEEK2 (8/29-9/4) WEEK3 (9/59/11) WEEK4 (9/129/18) WEEK (9/19-9/25) WEEK6 (9/26-10/2) WEEK7 (10/3-10/9) WEEK8 (10/1010/16) WEEK9 (10/1710/23) WEEK10 (10/24-10/30) WEEK11 (10/31-11/6) WEEK12 (11/711/13) MTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/S 222324252627/28293031123/45678910/11121314151617/18192021222324/2526272829301/2345678/9101112131415/16171819202122/23242526272829/303112345/6789101112/13 PermitApproval8/23/338/23/330100% UndergroundPlumbingInspection8/26/228/29/2230% PestControlforSod8/30/228/31/2200% PreptoCoverFloorAfterUndergroundInspection9/1/20229/2/202210% FoundationInspection9/3/229/3/2200% RoughPlumbingandGas9/5/229/9/2240% RoughPlumbingInspection9/9/229/12/2230% PreptoLevelFloor,MakeOpenings,PourFloorin2Rooms9/5/229/15/22100% ExteriorandInteriorFraming9/12/229/19/2270% AC9/12/229/20/2280% Roof9/12/229/20/2280% Electrical9/20/229/30/22100%
ExteriorDemo9/26/229/27/2210% Insulation10/5/2210/6/2210%
PHASETHREEPHASEFOUR TASKTITLESTARTDATEENDDATEDURATION%OFTASK COMPLETE WEEK13 (11/1411/20) WEEK14 (11/21-11/27) WEEK15 (11/28-12/4) WEEK16 (12/512/11) WEEK17 (12/1212/18) WEEK18 (12/1912/25) WEEK19 (12/261/1) WEEK20 (1/21/8) WEEK21 (1/91/15) WEEK22 (1/16-1/22) WEEK23 (1/231/29) WEEK24 (1/302/5) MTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/SMTWRFS/S 141516171819/20212223242526/27282930123/45678910/11121314151617/18192021222324/25262728293031/1234567/891011121314/15161718192021/22232425262728/2930311234/5 Pool10/15/221/15/23900% Kitchen11/15/2212/15/22300% InteriorPainting12/1/2212/31/22300% LandscapingandPavers1/2/221/15/22130% FinalInspections(DependsonPool)1/20/221/31/22110%