1 minute read
Figure 1 Time-Line of Asarwa
Figure 1
Time-Line of Asarwa
Advertisement
Note. The graphic shows Ahmedabad's land use map of Industries by locating Asarwa in it. Adapted from “Understanding the City,” (Unpublished portfolio for Master of Planning by B. Akhil Vardhan, 2021, CEPT University. Copyright 2021 by B. Akhil Vardhan.
Few major constructions which happened at Asarwa changed the land rates and the values of it in 2000’s. Along with this, during 2009- BRTS (Bus rapid transit system) corridor was introduced near to Chamunda flyover, which is a major junction to industries. Along this BRTS corridor, there are so many new commercial buildingssuch as hospitals, railway manager offices, etc. TheAsarwa lake development (2012) which is one of the most predominant water bodies in and across the region. It is one of the major resources in terms of revenue generation.