Interior Design Portfolio

Page 1

A A S T H A

K O T H A R I

I N T E R I O R

D E S I G N


// A GREAT ARTIST IS A SIMPLIFIER

//


aasthakothari98@gmail.com +(91)986 747 5577


C O N T E N T S //

1

2

3

4

C O E X I S T I N G WITH NONHUMAN

TRANSITIONAL HIERARCHY

CONVERGE AND ESCAPE

TRANSPARENT O PA Q U E N E S S

//

//

//

//

PERFORMING ARTS CENTER

WORK PLACE

HOSTEL

DWELLING

//

//

//

//

serpentine

transformation

threshold

connection


5

6

7

8

ASSYMETRIC THRESHOLD

REACTIVATING T H E S PA C E

CONSTRUCTION DOCUMENTS

INTERNSHIP EXPERIENCE

//

//

//

//

FACADE

COMMUNITY

TECHNICAL

DEVELOPMENT

//

//

//

//

partition

unity

black and white

growth


CO-EXISTING WITH NON-HUMAN

C O - E X I S T I N G WITH NON-HUMAN // PERFORMING ARTS CENTER // serpentine

What does it mean to have a human and non-human exist in the same place? Not all spaces are occupied without humans. This performing arts center in Brooklyn, New York, brings together snakes and humans in a six storey building. Along with the rich history of arts in DUMBO and the curvilinear structure of the textured snake skin, the design proposes spaces which are accessible to act as a ritual space, an exhibition path as well as a performing arts space.

4


CO-EXISTING WITH NON-HUMAN


Ritual Space

CO-EXISTING WITH NON-HUMAN

Main Auditorium Green Room Viewing Area

AUDITORIUM GREEN ROOM AUDITORIUM RITUAL WATCH AREA GREEN ROOM RITUAL WATCH AREA

RITUAL SPACE Ritual Zone Viewing Zone

RITUAL SPACE RAMP CIRCULATION

Main Ramp

Ritual Zone

RAMP CIRCULATION RITUAL SPACE RITUAL SPACE STAIRS TO RITUAL SPACE STAIRS TO RITUAL EXHIBITION SPACESPACE

6

RAT HABITAT EXHIBITION SPACE


CO-EXISTING WITH NON-HUMAN

Back Stair

STAIRS TO RITUAL S

Exhibition Space

EXHIBITION SPACE

Rat Movement

RAT HABITAT

Snake Habitat

SNAKE HABITAT

Check In Zone

ORIENTATION ZONE

Programmatic Axonometric

PROGRAMMATIC AXONOMETRIC DIAGRAM 7


nce center

ance center

CO-EXISTING WITH NON-HUMAN

AASTHA KOTHARI INT-401 ECOSYSTEMIC DWELLING: COEXISTENCE WITH THEKOTHARI NONHUMAN AASTHA

INT-401 ECOSYSTEMIC DWELLING: COEXISTENCE WITH THE NONHUMAN

Axonometric Studies

SNAKE DETAIL SECTION

8


IN

A

CO-EXISTING WITH NON-HUMAN DN

B

B’

UP GREEN ROOM + TECHNICAL ROOM

AUDITORIUM IN

OPEN TO BELOW

DN

A’

B PLAN: THIRD FLOOR

B’ SCALE: 1/8” = 1’-0”

UP

AUDITORIUM OPEN TO BELOW

IN

A’

DN

SCALE: 1/8” = 1’-0”

PLAN: THIRD FLOOR RITUAL SPACE

RITUAL SPACE OPEN TO BELOW

OPEN TO BELOW

DN

Third Floor A’ DN

PLAN: THIRD FLOOR

UP

SCALE: 1/8” = 1’-0”

SNAKE RITUAL SPACE HABITAT

RITUAL SPACE

OPEN TO BELOW

SNAKE OBSERVATORY

DN

DN

DN

UP

RITUAL SPACE RITUAL SPACE

SNAKE

RITUAL SPACE

HABITAT RITUAL SPACE

OPEN TO BELOW SNAKE OBSERVATORY DN

DN DN

RITUAL SPACE

RITUAL SPACE

SNAKE DETAIL SECTION UP

SNAKE HABITAT

PLAN: SECOND FLOOR

SCALE: 1/8” = 1’-0”

SNAKE OBSERVATORY

Second Floor DN

UP

PLAN: SECOND FLOOR

RITUAL SPACE

RITUAL SPACE

SCALE: 1/8” = 1’-0”

EXHIBITION SPACE

DN

UP

EXHIBITION SPACE

PLAN: SECOND FLOOR

SECTION A

Section

SNAKE HABITAT

SCALE: 1/8” = 1’-0”

DN UP

UP

SNAKE HABITAT ORIENTATION ZONE

EXHIBITION SPACE

RAT DETAIL SECTION DN

9

UP

First Floor

SNAKE HABITAT

PLAN: FIRST FLOOR

ORIENTATION ZONE

SCALE: 1/8” = 1’-0”

P


CO-EXISTING WITH NON-HUMAN

Second Floor Ramp View

10


CO-EXISTING WITH NON-HUMAN

Back Stair View

11


CO-EXISTING WITH NON-HUMAN

Section

Ritual Space View

12


CO-EXISTING WITH NON-HUMAN


TRANSITIONAL HIERARCHY

TRANSITIONAL H I E R A R C H Y // WORK PLACE // transformation

Your office becomes where you spend the most amount of time of your day This project fulfills the goals of the United Nations. It involves transitioning from public spaces to private spaces, using limited materials. These create a form of hierarchy between different programs in Manhattan’s Financial District.

14


TRANSITIONAL HIERARCHY


TRANSITIONAL HIERARCHY

Diagrammatic Sections

16


TRANSITIONAL HIERARCHY

17


TRANSITIONAL HIERARCHY

Rendered Plan

18


TRANSITIONAL HIERARCHY

Elevation

19


TRANSITIONAL HIERARCHY

Activity Zone View

20

Conceptual Axonometric


TRANSITIONAL HIERARCHY


CONVERGE AND ESCAPE

CONVERGE AND ESCAPE // HOSTEL // threshold

What does it mean to have feel like you have a safe place, like home, when you’re travelling? A surreal combination and mixture of private and public spaces aligning both together and apart. This hostel’s atmosphere provides serenity and peace, with its ability to make people feel cool and comfortable in Qena, Egypt. Teamwork: Aastha Kothari, Erin Lutz, Jingjing Huang, Maggie Wang, Shreya Bhuraria, Parry Yu.

22


CONVERGE AND ESCAPE


CONVERGE AND ESCAPE

Concept and Program Development

24


CONVERGE AND ESCAPE

25


CONVERGE AND ESCAPE

Schematic Development

Section

26


CONVERGE AND ESCAPE

Schematic Development

27


CONVERGE AND ESCAPE

Exterior Entrance View

Corridor View Back

Corridor View Front 28


CONVERGE AND ESCAPE


TRANSPARENT OPAQUENESS

T R A N S PA R E N T O PA Q U E N E S S // DWELLING // connection

What does it mean to live in a home with three different generations of people? This dwelling solves a dichotomy of too much and too little privacy in a typical housing situation. Allowing panels that can be kept open or remained closed, allow people to interact with one another or also keeping them in their own space. This allows for a perfect mix of privatized individual spaces along with public bonding spaces for the family of four, a grandmother, a father, a mother and their son, in Brooklyn, New York.

30


TRANSPARENT OPAQUENESS


TRANSPARENT OPAQUENESS

Cellar

First Floor

32

Second Floor


TRANSPARENT OPAQUENESS


TRANSPARENT OPAQUENESS

34


TRANSPARENT OPAQUENESS


ASSYMETRIC THRESHOLD

ASYMMETRIC THRESHOLD // FACADE // partition

Is the aiport a place where one can sit and peacefully eat, or is the airport a place where people are always in a hurry? This project addresses a restaurant at the JFK Aiport in Queens, New York. The facade is a proposal for people to stand and eat while their luggage remains safe. This backs up the trend where people usually stand and eat or “take-out� their meals at the gate. The facade also allows large numbers of entry and exit points so it is easier for the passangers to be on the go.

36


ASSYMETRIC THRESHOLD


ASSYMETRIC THRESHOLD

Plywood Boundary Studies

38


ASSYMETRIC THRESHOLD

39


ASSYMETRIC THRESHOLD

Boundary Proposal 1

Boundary Proposal 2

40


ASSYMETRIC THRESHOLD


REACTIVATING THE SPACE

R E A C T I VAT I N G T H E S P A C E // COMMUNITY // unity

A community center that brings people together in time of need, for the supplies they would need. This project transforms the Stanton Building, in Sara D. Roosevelt Park, New York, to a community center. It aims to bring people of the Lower East Side together, because of the diversity in cultures. This affords interaction and cross-cultural relationships when people inhabit the space. The proposal provides people an insight of how one can be more sustainable.

42


REACTIVATING THE SPACE


REACTIVATING THE SPACE

Ground Level Plan

Mezzanine Level Plan

Section

44


REACTIVATING THE SPACE

45


REACTIVATING THE SPACE

Ground Level Lighting Plan

Mezzanine Level Lighting Plan

Section

46


REACTIVATING THE SPACE

47


B V A S W

CONSTRUCTION DOCUMENTS

11"

CONSTRUCTION 6'-5" 4'-0" DOCUMENTS

23'-71 2"

TECHNICAL

3"

3'-8"

2"

// //

OPEN TO BELOW 7'-8"

black and white 3'-81 2"

FIRST FINISHED FLOOR

2

What goes into the process of making an interior real? How does a concept turn into a space? 14'-5"

6"

1'-01 2"

3'-1"

9'-31 2"

This shows a series of construction drawings which were made for a cafe, in Manhattan. Although this was a hypothetical exerRISE cise as a part of the syllabus and the cafe was never built, the series demonstrates technical ability and skill.

CELLAR FINISHED FLOOR ELEVATION

SECTION

14'-5" RUN

2

48

ELEVATION 1 1 2"

= 1'-0"

3

SECTION 2 1 2"

= 1'-0"


CONSTRUCTION DOCUMENTS

A

B

D

C

E

F

KEY:

1

NUMBER

AREA / ROOM NAME FIRST FLOOR

101

ENTRANCE / RECEPTION

102

BENCH SEATING - 6 PEOPLE

103

FORMAL SEATING - 2 PEOPLE

104

BAR - 12 PEOPLE

105

KITCHEN

106

SERVICE TABLE

2

001

002

006

UP

3

003

107

ADA BATHROOM

108

INFORMAL SEATING - 2 PEOPLE

109

INDOOR CUBBY SEATING - 4 PEOPLE

110

UP

OUTDOOR CUBBY SEATING - 4 PEOPLE CELLAR

005 001

4

004

UP 5

N

1 CELLAR FURNITURE PLAN 1 4" = 1'-0"

A

B

D

C

E

ROUND SEATING - 4 PEOPLE

002

STORAGE

003

LOUNGE SEATING - 4 PEOPLE

004

BAR - 6 PEOPLE

005

BOILER ROOM

006

CELLAR ADA BATHROOM

F

1 101

2 Ramp Up

109 110

108

DN 107

102

107

3

106

Existing Rear Yard

103

105 4

Up 104 Up 5

N

Furniture Plan

2 FIRST FLOOR FURNITURE PLAN 1 4" = 1-0"

49


CONSTRUCTION DOCUMENTS

NEW FRAME AND DOOR

3"

3"

9

13

ENGINEERED WOOD

PROVIDE TIGHT FLUSH JOINTS AT SADDLES. TYP.

TILE

STORAGE

41 2"

PLYWOOD

1 1 2" 2"

1"

1 1 2" 2"

1 2"

1 4"

ALIGN FLUSH, SMOOTH

1 16"

1 " 2 1"

CARPET

11 2"

PROVIDE NEW STONE/TILE OVER WATER PROOF MEMBRANE. TO BE FLUSH AND SMOOTH WITH EVEN GROUT LINES. GROUT TO BE LATEX EPOXY, COLOR GRAY TYP. PROVIDE NEW CONTINUOUS WATER PROOF MEMBRANE AS REQ'D. TO WRAP ADJOINING WALLS MIN. 6" AFF TYPICAL.

NEW FRAME AND DOOR

11 2"

BATHROOM

SEATING FOAM SOUND PROOF MAT PLYWOOD

FOAM SOUND PROOF MAT PROVIDE CARPET FLOORING PROTECT AND RELAY AS REQ'D. TO BE FLUSH&SMOOTH.

NOTE: REFER TO FINISHES PLAN FOR MORE (G-001.00)

PROVIDE NEW STONE/TILE OVER WATER PROOF MEMBRANE. TO BE FLUSH AND SMOOTH WITH EVEN GROUT LINES. GROUT TO BE LATEX EPOXY, COLOR GRAY TYP. PROVIDE NEW CONTINUOUS WATER PROOF MEMBRANE AS REQ'D. TO WRAP ADJOINING WALLS MIN. 6" AFF TYPICAL.

PROVIDE NEW THIN SET FOR TILE

T1 FLOOR TRANSITION FROM ENGINEERED WOOD (SEATING) TO TILE (BATHROOM) 3" = 1'-0"

Floor Transition

TRIMMED OPENING TO BE APPROX. 6'-10"H X 3'-4"W. VIF IN LAYOUT TRIMMED OPENING TO BE APPROX. 6'-10"H X 3'-4"W. VIF IN LAYOUT PROVIDE NEW WOOD DOOR.SEE DOOR SCHEDULE. TYP.

PROVIDE SPLIT JAMB

0"

STOP

6"

RABBET

1 " 2

PROVIDE 1 3 8" SOLID WOOD DOOR PROVIDE FLOOR GUIDE

PROVIDE NEW WOOD DOOR.SEE DOOR SCHEDULE. TYP.

PROVIDE CHASE WALL

1 " 2

3"

1A

TYPICAL WOOD DOOR DETAIL Solid Wood Door 3" = 1'-0"

PROVIDE WOOD FINISH AS SPEC'D PROVIDE TRACK CHANNEL FOR DOOR

PROVIDE RECEIVER JAMB

1 " 2 1 1 2"

1 " 2

1 " 4

PROVIDE 3 4 " TRIM

3"

PROVIDE FIRE RESISTANT BLOCKING AS REQUIRED. PROVIDE JAMB PROVIDE 1 4" SHIM

DOOR RABBET

4"

PROVIDE ROLLER TRACK PROVIDE TRACK CHANNEL FOR DOOR

PROVIDE NEW WOOD TRIM AS SPECIFIED. PROVIDE JACK STUD PROVIDE KING STUD

1 " 11 2" 2

PROVIDE TWO MORTISED HINGES AS SPECIFIED IN NEW WOOD FRAME, AS REQUIRED. TYP.

2"

1 DOOR DETAILS: PLANS AND SECTION

11 4" 1" 11 2"

W/ PRIVACY SET

PROVIDE SANITARY SADDLE. TO BE GRANITE.

T2 FLOOR TRANSITION FROM CARPET (STORAGE) TO ENGINEERED WOOD (SEATING) 3" = 1'-0"

11 2"

/ PASSAGE SET

PROVIDE NEW ENGINEERED WOOD FLOORING AS SPECIFIED FLOATED OVER UNDERLAYMENT. TYPICAL

INSTALL WOODEN SADDLE

PROVIDE FLOOR ANCHORS

PROVIDE FLOOR GUIDE

1B

DOOR TYPE ONE Wood Door 3" = 1'-0"

2A

DOOR TYPE Pocket Sliding Door; Horizontal Section 3" = 1'-0"

2B

DOOR TYPE Pocket Sliding Door 3" = 1'-0"

Door Detailed Plans and Sections

50


CONSTRUCTION DOCUMENTS

3 3/4 5 8"

PROVIDE CEILING ANCHOR

21 2"

4" 21 2"

5 8"

PROVIDE PENCIL ROD PROVIDE CEE CHANNEL CLIP PROVIDE CEE CHANNEL

US OF SLAB

PROVIDE FIRE RATED SEALANT

US OF SLAB

PROVIDE TOP TRACKS FOR LAYOUT SHOWN

1 " 1 " 2 2

PROVIDE GRID TEE CLIP

CH: 8'-0"

8"

PROVIDE TOP TRACKS FOR LAYOUT SHOWN

PROVIDE TWO LAYERS 5 8" TYPE "X" FIRE RESISTANT GYP. BOARD AS REQUIRED

5 8"

PROVIDE TYPE "X" FIRE RESISTANT GYP. BOARD AS REQUIRED

ACOUSTIC CEILING TILE DETAIL - BATHROOM

SCALE : 3" = 1'-0"

PROVIDE METAL STUDS AS SPECIFIED

PROVIDE METAL STUDS AS SPECIFIED

PROVIDE CEILING ANCHOR

PROVIDE BOTTOM TRACKS FOR LAYOUT SHOWN

1 " 1" 1" 2

PROVIDE CEE CHANNEL CLIP

FF SLAB

PROVIDE CEE CHANNEL PROVIDE HAT CHANNEL PROVIDE GYP. BOARD

1

CH: 13'-0"

1

GYP. BRD. KITCHEN

PROVIDE FIRE RATED SEALANT

FF SLAB

PROVIDE BLOCKING AS REQUIRED

SCALE : 3" = 1'-0"

PARTITION TYPE 1: NONBEARING; NONRATED 2

SCALE: 3" = 1'=0" PROVIDE 221" METAL STUDS; 16" OC; FULL HEIGHT WITH 58 GYP BOARD BOTH SIDES

2

3" 5/8"

91 2"

1 " 2

PROVIDE LIGHT BASE PROVIDE 21" THICKNESS FINISHED PLYWOOD BY ARMSTRONG CEILING SEE RCP A-003.00 FOR MORE

2" 1 " 2 2"

1"

3"

CH: 13'-6"

3

SCALE: 3" = 1'=0" PROVIDE 221" METAL STUDS; 16" OC; FULL HEIGHT WITH 58 TYPE "X" GYP BOARD BOTH SIDES

5/8"

PARTITION TYPE 3 NONBEARING; 2 HR FIRE RATED; INSULATED SCALE: 3" = 1'=0" PROVIDE 221" METAL STUDS; 16" OC; FULL HEIGHT WITH TWO 58 TYPE "X" GYP BOARD BOTH SIDES

3

3" 21 2"

21 2"

PROVIDE TOP TRACKS FOR LAYOUT SHOWN

PROVIDE 58" GYP. BOARD AS REQUIRED TO EXISTING STRUCTURE

PROVIDE COVE LIGHTING FIXTURE SEE RCP FOR SPECS (A003.00)

PROVIDE BOTTOM TRACKS FOR LAYOUT SHOWN

FF SLAB

PARTITION TYPE 2 NONBEARING; 1HR FIRE RATED

US OF SLAB

PROVIDE TRACK

PROVIDE FIRE RATED SEALANT

3"

21 2"

US OF SLAB

31 2"

PROVIDE METAL STUDS AS SPECIFIED

PROVIDE BOTTOM TRACKS FOR LAYOUT SHOWN

PROVIDE PENCIL ROD

2

US OF SLAB

PROVIDE CROSS TEE PROVIDE EDGE TRIM

1

PROVIDE FIRE RATED SEALANT

PROVIDE TOP TRACKS FOR LAYOUT SHOWN

PROVIDE 58" GYP. BOARD AS REQUIRED

PROVIDE MAIN TEE PROVIDE ACOUSTIC CEILING TILE

21 2"

5 8"

3" VARIES

21 2"

US OF SLAB

PROVIDE TOP TRACKS FOR LAYOUT SHOWN PROVIDE 58" GYP. BOARD ON 2 21 " METAL STUDS, 16" OC, FULL HEIGHT AS INDICATED.

PROVIDE 58" GYP. BOARD AS REQUIRED TO EXISTING STRUCTURE

EXISTING STRUCTURE

6"

COVE LIGHTING - CELLAR

COVE LIGHTING - CELLAR 3

SCALE : 3" = 1'-0"

PROVIDE METAL STUDS AS SPECIFIED

PROVIDE CEILING ANCHOR PROVIDE PENCIL ROD

FF SLAB

PROVIDE TRACK PROVIDE CEE CHANNEL

1" 1" 1"

PROVIDE GYP. BOARD PROVIDE PLYWOOD

CH: 11'-0"

4

4

PROVIDE HAT CHANNEL

4

PROVIDE BOTTOM TRACKS FOR LAYOUT SHOWN

FF SLAB PARTITION TYPE 4 LAMINATED 5

SCALE: 3" = 1'=0" PROVIDE NEW LAMINATED GYP BOARD, OVER EXISTING FOR ALIGNMENTS INDICATED. MATCH ADJACENT FOR SMOOTH SURFACE

WOOD CEILING SCALE : 3" = 1'-0"

5

FF SLAB

PARTITION TYPE 4 FURRED OUT 6

SCALE: 3" = 1'=0" PROVIDE NEW ONE SIDED PARTITION, WITH METAL STUDS AND 58" GYP BOARD. TO BE FULL HEIGHT. ALIGNMENTS TO BE INDICATED. MATCH WITH ADJACENT FOR SMOOTH SURFACE

6

PARTITION TYPE 4 CHASE SCALE: 3" = 1'=0" PROVIDE NEW ONE SIDED PARTITION, WITH METAL STUDS AND 58" GYP BOARD. TO BE FULL HEIGHT. IN BETWEEN TO BE INDICATED.

Wall Detail and Sections

Ceiling Detail and Sections

51


CONSTRUCTION DOCUMENTS

PROVIDE 2" THICK BLACKENED STEEL VERTICAL METAL ROD AND MECHANICALLY SECURED TO CEILING WOOD PANEL

3"

6'-5"

4'-0"

23'-71 2"

3"

3'-8"

2"

11"

1'

1'

DN

7'-8"

7'-8"

OPEN TO BELOW

PROVIDE BLACKENED Ø2" HANDRAIL

3'-81 2"

FIRST FINISHED FLOOR

2 PROVIDE HANDRAIL 14'-5"

FIRST FLOOR STAIR PLAN

PROVIDE RISER

1'-01 2"

PROVIDE TREAD

= 1'-0"

PROVIDE CENTER MOUNT CARRIAGE

CELLAR FINISHED FLOOR ELEVATION

SECTION

14'-5" RUN

2

ELEVATION 1 1 2"

3

= 1'-0"

SECTION 2 1 2"

= 1'-0"

PROVIDE IRON ROD AT 2" THICKNESS TREAD 11"

PROVIDE CARRIAGE

RISER

PROVIDE METAL RISER PROVIDE METAL TREAD

1" 2 NOSING

PROVIDE 21" NOSING

CENTER MOUNT CARRIAGE

4

PROVIDE METAL MOUNTING TABS AS INDICATED

DETAIL

Stair Drawings

3" = 1'-0"

52

9'-31 2"

PROVIDE STRINGER

6"

1 2"

6"

1

3'-1"

RISE

9'-31 2"

PROVIDE GUARDRAIL

1


CONSTRUCTION DOCUMENTS

A

B

F

E

D

C

1

NOTES:

RM : 001A

RM : 001B

ALL LAYOUT TO BE APPROVED IN THE FIELD WITH THE DESIGNER PRIOR TO ANY FABRICATION.

RM : 001D

RM : 001C

4 PROVIDE BLOCKING AS NEEDED AND AS REQUIRED BY SITE CONDITIONS, SUBSTRATES, EXISTING WALL ASSEMBLIES 2

21'-01 2"

ALL DIMENSIONS AND ALL EXISTING CONDITIONS TO BE VERIFIED IN FIELD PRIOR TO CONSTRUCTION. REFER TO PARTITION DETAILS (T-004.00)

7'-8"

1

REFER TO DOOR SCHEDULE (T-002.00) 13

Note: Indicates new stair

3

6'-81 2"

RM : 002

UP

RM : 003

LEGEND:

RM : 006

INDICATES NEW PARTITION TO BE BUILT.

3'-101 2"

Note: Indicates Stair design element

6 INDICATES STRUCTURE TO BE BUILT BY EXTERNAL SOURCE AND PLACED ON SITE.

E

RM : 000 INDICATES ROOM NUMBER 9 10'-4" 4'-0"

UP

13'-21 2"

11

#

WALL TYPE: SEE T-001 FOR TYPICAL WALL TYPE DETAILS

1

PROVIDE 221" METAL STUDS; 16" OC; FULL HEIGHT WITH 58 GYP BOARD BOTH SIDES

2

PROVIDE 221" METAL STUDS; 16" OC; FULL HEIGHT WITH 58 TYPE "X" GYP BOARD BOTH SIDE

3

PROVIDE 221" METAL STUDS; 16" OC; FULL HEIGHT WITH TWO 58 TYPE "X" GYP BOARD BOTH SIDES

4

PROVIDE NEW LAMINATED GYP BOARD, OVER EXISTING FOR ALIGNMENTS INDICATED. MATCH ADJACENT FOR SMOOTH SURFACE

5

PROVIDE NEW ONE SIDED PARTITION, WITH METAL STUDS AND 58" GYP BOARD. TO BE FULL HEIGHT. ALIGNMENTS TO BE INDICATED. MATCH WITH ADJACENT FOR SMOOTH SURFACE

RM : 005 E

4

8'-91 2"

2

UP

7'-01 2"

S

10

E

RM : 004

4

12

5

CELLAR PLAN 1 PARTITION 1 4" = 1'-0" N

A

B

F

E

D

C

6 1

#

RM : 101

1

RM : 109A

RM : 109B

RM : 109D

RM : 109C

E

2 Ramp Up

4

RM : 108 5'-8"

5'-4" +0'-0"

DN

6

Note: Indicates new stair RM : 106

3

8'-2"

RM : 102

5

RM : 107B 5

RM : 107A

6 6

6 7

RM : 103

5

15'-11 2"

23'-111 2"

5

4 2

7'-11"

E

3

4

5

N

RM : 104

Up

2

Note: Indicates Bar and Cabinetry by others.

8

Up

3

RM : 1105 12'-7 " 2

PARTITION FIRST FLOOR PLAN 1 4" = 1'-0"

Partition Plan

53

PROVIDE NEW ONE SIDED PARTITION, WITH METAL STUDS AND 58" GYP BOARD. TO BE FULL HEIGHT. IN BETWEEN TO BE CHASE PARTITION DETERMINED INDICATES DOOR NUMBER INDICATES EXISTING PARTITION, TO REMAIN IN GOOD CONDITION


CONSTRUCTION DOCUMENTS

A

B

D

C

E

F

NOTES: 1-ALL CONDITIONS SHOWN ARE APPROXIMATE. ALL TRADES ARE RESPONSIBLE FOR CERTIFYING ALL EXISTING AND FIELD CONDITIONS PRIOR TO ANY WORK ON THIS PROJECT. PROTECT ALL DEVICES AND SERVICES THAT ARE TO REMAIN IN GOOD ORDER.

4'-81 2"

eq

eq

10'-11 2"

8'-01 2"

CL

eq

eq

eq

10'-6"

5'-3" eq

4'-8"

1

eq

2

2- SEE DEMOLITION PLAN, REFLECTED CEILING PLAN AND SECTION/ELEVATIONS FOR EXACT LOCATIONS OF EACH DEVICE AND FULL SCOPE OF ELECTRICAL WORK.

CL

3- ALL OUTLETS TO BE PROVIDED BY LUTRON (BLACK), ALL SOUND SYSTEM TO BE PROVIDED BY SONOS.

10'-0"

eq

Note: Center Line (CL) of device to be CL of wall eq

4. ALL OUTLETS TO BE 18" AFF UNLESS NOTED OTHERWISE.

eq

11'-111 2"

LEGEND: J

Note: Center Line (CL) of device to be CL of wall

PROVIDE SINGLE OUTLET BY LUTRON 15 A SINGLE RECEPTACLE (SATIN) SCR-15 AS INDICATED.

GFCI42" AFF

PROVIDE DUPLEX OUTLET BY LUTRON 15 A RECEPTACLE (SATIN) SCR-152 AS INDICATED. PROVIDE GFCI OUTLET BY LUTRON,15 A DUPLEX TAMPER RESISTANT, GFCI RECEPTACLE (SATIN) SCR-15-GFST AS INDICATED.

Indicates stair design element

UP

1'-0"

Note: Center Line (CL) of device to be CL of wall

4

PROVIDE TRIPLEX OUTLET BY LUTRON 20 A HALF DIMMABLE TAMPER RESISTANT (GLOSS) CAR-20-HDTR AS INDICATED.

2'-11 2"

3'-9"

OPEN TO ABOVE

CL

38" AFFeq

1'-0"

38" AFFeq

PROVIDE QUAD OUTLET BY LUTRON, 20 A HALF DIMMABLE TAMPER RESISTANT RECEPTACLE (GLOSS) CAR020-HDTR44 AS INDICATED. PROVIDE FLOOR MOUNTED OUTLET BY LUTRON 15 A FLOOR MOUNTED RECEPTACLE (GLOSS SS) SCR-15 AS INDICATED.

38" AFF

CL Note: Center Line (CL) of device to be CL of wall

5'-81 2"

UP

PROVIDE HEAVYDUTY OUTLET BY LUTRON, AS INDICATED

3'-111 2"

2'-61 2"

42" AFF

J

CL

INDICATES BASE SYSTEM LOCATION FOR WIRELESS SOUND SYSTEM BY SONOS

5

INDICATES REMOTE WIRELESS BASE STATION LOCATION FOR WIRELESS SOUND SYSTEM BY SONOS

Indicates cabinetry by others. See details

1 CELLAR ELECTRICAL PLAN 1 4" = 1'-0"

PROVIDE JUNCTION BOX AS INDICATED

1'-6"

3

PROVIDE TELEPHONE OUTLET BY LUTRON SINGLE TELEPHONE JACK (SATIN BLACK) SC-PJ AS INDICATED

N

A

B

F

E

D

C

PROVIDE COMPUTER STATION OUTLET AS INDICATED H

1 5'-51 2"

4'-11"

INDICATES NEW PARTITIONS TO BE BUILT. REFER TO A-001.00

5'-31 2" 6'-11 2"

7'-111 2"

PROVIDE HOMEPHONE OUTLET BY LUTRON SINGLE TELEPHONE JACK (SATIN BLACK) SC-PJ AS INDICATED

2 6'

Ramp Up

2'-21 2"

Note: Center Line (CL) of device to be CL of wall

GFCI 42" AFF

42" AFF GFCI

Note: Speaker to be on ceiling. Refer to Reflected Ceiling Plan (A003.00)

3

4

5'-7"

1'-8"

3'-11"

ELEMENT OF STAIR DESIGN

eq

eq

eq

eq

38" AFF

38" AFF

38" AFF

38" AFF

2'-11" 2'-71 2"

eq

eq

42" AFF

42" AFF

42" AFF

1'-0"

Up 5

42" AFF

GFCI

2'-3"

42" AFF

Note: All outlets at bar to be 42" AFF N

Electrical Plan

2 FIRST FLOOR ELECTRICAL PLAN 1 4" = 1'-0"

54


CONSTRUCTION DOCUMENTS

A

RM : 001A

B

RM : 001B

C

RM : 001C

D

RM : 001D

E

F NOTES: 1-ALL CONDITIONS SHOWN ARE APPROXIMATE. ALL TRADES ARE RESPONSIBLE FOR CERTIFYING ALL EXISTING AND FIELD CONDITIONS PRIOR TO ANY WORK ON THIS PROJECT. PROTECT ALL DEVICES AND SERVICES THAT ARE TO REMAIN IN GOOD ORDER. 2- SEE DEMOLITION PLAN, REFLECTED CEILING PLAN, ELECTRICAL PLAN AND SECTION/ELEVATION FOR EXACT LOCATION OF EACH DEVICE AND FULL SCOPE OF ELECTRICAL WORK. 3- ALL NEW DEVICES ON OPEN WALLS TO BE IN RIGID CONDUIT WITH SURFACE MOUNTED ELECTRICAL BOXES TO MATCH EXISTING. 4 - ANY ROOM WITH ONE SWITCH, INDICATED TO HAVE ALL LIGHTS IN THE ROOM CONTROLLED BY THE SWITCH. 5 - ALL QUANTITY OF LIGHT FIXTURES AND SWITCHES INDICATED ON PLAN. 6 - AL SWITCHES TO BE BY LEGRAND YSALIS 3 LEVER 1 WAY 2X4 SWITCH WHITE

1 LV

LV

R

P

LV

LV

LV

P

eq

LV

LV

LV

LV

LV

LV

eq

P

eq

P

eq

LV

11'-6"

LV S

R

S

S

LV

CH : EXIST'G

LEGEND:

D 11'-6"

MD2

D

3'-4"

TO BE DECIDED EXISTING

FT

PROVIDE TASK SINGLE LIGHT LED 48" CHANDELIER IN WOOD FINISH. BY NOUVO LIGHTING. PROVIDE 1 TRACK PER 1 LIN/FT OF TRACK.

INDICATES NEW PARTITION TO BE BUILT

OPEN TO ABOVE

MD1

D $ $ $

S

3 D2 2

S

RM : 005 BOILER ROOM CH : EXIST'G

UC

4

P P P P

P P P P

R

R

eq

R

eq

PROVIDE BEVELED BLOCK 2 CLASSIC DOWN LIGHT BY USAI LIGHTING. SPECS TO FOLLOW. PROVIDE CONTINUOUS SURFACE MOUNTED LED LIGHT BY HAFELE. LOOX LED 2029.

UC

PROVIDE RECESSED DOWNLIGHT, B4SD SQUARE BY USAI LIGHTING.

R

P D1 1

7'-91 2"

PROVIDE REINFORCED GEM BOX FOR PEDANT LIGHT. AIM FIXTURE BY FLOS. INSTALL DECORATIVE FIXTURES BY FLOS IN LOCATION BAR SEATING.

P

$ $

NL EM UP

PROVIDE BEVELED BLOCK RECESSED DOWN LIGHT BY USAI LIGHTING. SPECS TO FOLLOW.

C D

CH : EXIST'G

10'-2"

UP

TBD EXIST'G

CH : EXIST'G

$

R

CEILING HEIGHT

CH

1'-8"

align

4'-41 2"

$

RM : 003 INFORMAL SEATING CH : EXIST'G

LV

align

RM : 006 BATHROOM CH : EXIST'G

R R

ROOM NUMBER

001

R

LV R

3

D eq

7'-111 2"

R

R

D

R

eq

LV R eq

RM : 002 STORAGE CH : EXIST'G

3'-5"

eq

eq

R

LV

eq

eq

eq

2

LV

eq

LV eq

R

LV

4'-81 2"

3'

3'-41 2"

PROVIDE VERTICALLY & HORIZONTALLY MOUNTED LED STRIPS BY MODERN FORMS. WS-80618-AL.PROVIDE MOUNTING CHANNEL AND LENS. SWITCH AS INDICATED.

LV 5

$

RM : 004 BAR CH : EXIST'G

1 RCP CELLAR 1 4" = 1'-0"

PROVIDE SWITCH. INDICATES LOCATION OF SWITCH, SYMBOL IN ROOM INDICATES FIXTURES IN ROOM TO BE SWITCHED AS REQUIRED. BY LUTRON MAESTRO WHITE SWITCH. SEE SPECS.NUMBER INDICATES SWITCH TYPE.

#

PROVIDE SWITCH WITH DIMMER. INDICATES LOCATION OF SWITCH, SYMBOL IN RM INDICATES FIXTURES IN RM TO BE SWITCHED AS REQUIRED. BY LUTRON MAESTRO DIMMER WHITE SWITCH.NUMBER INDICATES SWITCH TYPE. SEE SPECS.

$

N A

B

RM : 109A

E

RM : 109B

D#

F

RM : 109D

RM : 109C

PROVIDE MOTION DETECTOR SWITCH RECESSED IN GEN BOX AS REQ'D. TO HAVE MANUAL ON/OFF CONTROL AS WELL.NUMBER INDICATES SWITCH TYPE.

$

1

D

C

RM : 101

6 789

D

MD

2'-1"

$$$ $

7'-21 2"

2'-8"

7'-8"

C

CH : EXIST'G

C

C 1'-11 2" C

FT

C C C

C

C

C

C

C C

C

C C

S RM : 108 INFORMAL SEATING

FT

C

C

C

C

C

C

C

C

PROVIDE REINFORCED GEM BOX FOR NIGHT LIGHT BY EMERGENCY LIGHTING. INDOOR NIGHT LIGHT 10W TO BE ON SEPARATE CIRCUIT.

EM

PROVIDE EMERGENCY (EM) LIGHTS ON SEPARATED CIRCUIT WITH BATTERY BACKUP. BY EMERGENCY LIGHTING, COMPACT EMERGENCY LIGHT LED ONLY

C

C

C

C

S

INDICATES APPROX. LOCATION OF EXIT LIGHTS. VERIFY QUANTITY AND LOCATION TO COMPLY WITH ALL COVERING COVENANTS. HATCH INDICATED DIRECTION. TO BE EXIT LIGHT MINI GREEN - LED - LAMPS W/ AUTO TEST.

EM NL

FT

EM NL

D R

2'-111 2"

typ.

R R

7"

CH : 8'-0"

CH : EXIST'G

R

ft

Note: Diffuser to be placed at the center of the Acoustic Ceiling Tile

MD4

MD3

R

R

INDICATES APPROX. LOCATION OF FIRE ALARM / STROBES. COORDINATE EXACT QUANTITY AND LOCATION TO COMPLY WITH ALL GOVERNING COVENANTS.

S

RM : 107 BATHROOM CH : 8'-0"

PROVIDE SPRINKLER COVERAGE THRU OUT TO COMPLY WITH LOCAL CODE.

R

PROVIDE NEW HARD WIRED SMOKE DETECTOR ON RIGID CONDUIT AS INDICATED. TO BE IONIZATION CHAMBER TYPE, CODE APPROVED AND/OR CO2 DETECTOR. VERIFY QUANTITY AND LOCATIONS AND COMPLY WITH ALL GOVERNING COVENANTS.

CH : 8'-0"

FT eq

R

9'-81 2"

R

ft

1'-1"

3'-7"

RM : 106 CH : EXIST'G

CH : EXIST'G

5'-21 2"

EM NL

D

eq 7"

ft

FT

typ.

FT

3'-5"

3'-7"

R

Element of stair design

PROVIDE NEW HORIZONTAL AND VERTICAL 6" WIDE WOOD PLANK CEILING BY ARMSTRONG CEILINGS WOODHAVEN CLASSIC 5" X 84"

FT

RM : 103

S

CH : EXIST'G

CH : EXIST'G eq

S

3'-11"

R

FT

UC

EM NL

R

PROVIDE NEW GYP. BOARD CEILING, AS INDICATED, AS REQUIRED.

eq

2'-21 2"

NL

C

C

C

CH : 13'-0"

CH : EXIST'G

4

C

C

C C

FT

3'-31 2"

FT

3

C C

C

9'-0"

9'-91 2"

RM : 102 6'-6"

C C

C

rem.

4'-71 2"

C C

C

2'-8"

S R

C C

C

CH : 10'-0"

New plank ceiling to be trimmed to existing columns

D

C C

C

$

Ramp Up

1'-51 2"

C C

C

2

#

2'-11 2"

$

EM NL

P P P P P P P P

P

FT

P

PROVIDE NEW ACOUSTIC CEILING TILE, AS INDICATED, AS REQUIRED. CL OF TILE TO BE CL OF WALL.

eq

P P P P P P P P

LV

LV

LV

LV

FT

4 5 D3

RM : 105 KITCHEN CH : EXIST'G

2 RCP FIRST FLOOR 1 4" = 1'-0"

55

PROVIDE RETURN FOR HVAC SYSTEMS. COORDINATE WITH HVAC PLAN (A-002.00)

R

eq

$ $$

LV

RM : 104 BAR CH : 11'-0" N

FT

CH : 11'-0"

Up 5

6

R

R

1'-1"

R

$

R

S

PROVIDE SUPPLY FOR HVAC SYSTEMS AND DIRECTION OF AIR FLOW. COORDINATE WITH HVAC PLAN (A-002.00) ONLY EXPOSED DUCT WORK INDICATED.

Reflected Ceiling Plan


INTERNSHIP EXPERIENCE

INTERNSHIP EXPERIENCE // DEVELOPMENT // growth

Designing is a process that changes words and images into spaces that can experienced by people. A series of works completed during summer internships at different firms. This helped gain perspective about how the industry works in reality and the process of designing from translating a concept into schematics and construction documents.

56


INTERNSHIP EXPERIENCE


FOGARTY FINGER ARCHITECTURE, NEW YORK | 2020

Mood Board 1.1

Mood Board 1.2

Mood Board 1.3

Mood Board 1.4

58


FOGARTY FINGER ARCHITECTURE, NEW YORK | 2020

Flushed Door Detail

59


FOGARTY FINGER ARCHITECTURE, NEW YORK | 2020

Sketch Up View Presentation

Sketch Up View Presentation 60


FOGARTY FINGER ARCHITECTURE, NEW YORK | 2020

Sketch Up View Presentation

Sketch Up View Presentation 61


STUDIO PKA, MUMBAI | 2019

SBL 10'-10"

46

BD = 1'-11" BBL= 9'- 5"

13

36

36

13

8

14

24

36

42

13

8

8

22 42

8

D

BD = 2'-4" BBL= 9'- 0"

42

BD = 2'-5" BBL= 8'- 11"

46

BD = 2'-4 1/2" BBL= 8'- 11 1/2"

42

SBL 11'-4"

8

BD = 2'- 10" BBL= 9'-0"

BEDROOM 3

FAMILY ZONE

HOME OFFICE

POWDER ROOM

Section Study

Plan Study

Plan Study

62


STUDIO PKA, MUMBAI | 2019

Section Rendering

Section Rendering

63



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.