Heydar Aliyev Centre, Zaha Hadid Architects
The Courtyards House, Sanjay Puri Architects
King Abdullah Petroleum Studies and Research, Zaha Hadid Architects
Pierres Vives, Zaha Hadid Architects
curriculum vitae languages Advanced Advanced Intermediate Beginner Beginner
English Tamil Kannada Hindi French
skills Advanced Advanced Advanced Advanced Advanced Advanced Intermediate Intermediate Intermediate Intermediate Intermediate Intermediate Beginner
profile
workshops
Akshay Khumar 14th September, 1998. akshay.khumar14@gmail.com @akshaykhumar
2021
about me
2019
Architecture is something that I believe is ever changing. The future of architecture will look towards nature achieve maximum efficiency with the help of the latest computational facilities available.
2021 2021 2021 2021 2020
2017-2022
2015-2017
2003-2015
BMS College of Architecture Bangalore, Karnataka. St. Joseph’s Pre-University College Bangalore, Karnataka. Bishop Cotton Boys’ School Bangalore, Karnataka.
Fluidity Masterclass by Mariana Cabugueira Anexact Aescapes by Design Morphine Houdini 2.0 for Architects by Futurly Intro to A.I in Architecture by DigitalFutures Parametricism 7.0 by Epoch India Interplay of Mediums 2.0 by Vamsi Krishna Calligraphy workshop at ANC
competitions 2019 2020 2019 2020
education
AutoCAD Sketchup Vray Adobe Photoshop Twinmotion Microsoft Office Revit Keyshot Rhino & Grasshopper Adobe Premiere Pro Adobe InDesign Maya Houdini
2020 2021 2021
62nd Annual NASA Design Competition - Shortlisted 63rd Annual NASA Design Competition - Shortlisted HUDCO Trophy by NASA India G-SEN Trophy by NASA India Sacred Spaces by ArchDais House 2.0 by ArchDais The Dharavi Project by ArchDais
extracurricular 2021 2019 2019 2019 2018,2019 2019
Volunteering at Project Sitara Student exchange by AIESEC at Philippines BMSCA Annual Fest (Envisage) as Secretary. BMSCA Cultural Secretary. BMSCA Basketball (Captain). BMSCA Fashion Team (Captain).
Campus Design Revitalizing a Node The Triangular Site
workshops. Softwares used: Rhino, Grasshopper, Maya, Houdini, Keyshot, Twinmotion .
fluidity masterclass 1. Softwares used: Maya, Rhino, Grasshopper, Keyshot. Hosted by Mariana Cabugueira, Zaha Hadid Architects.
fluidity masterclass 2. Softwares used: Maya, Rhino, Grasshopper, Twinmotion. Hosted by Mariana Cabugueira, Zaha Hadid Architects.
fluidity masterclass 3. Softwares used: Maya, Rhino, Grasshopper, Twinmotion. Hosted by Mariana Cabugueira, Zaha Hadid Architects.
houdini for architects. Softwares used: Houdini, Keyshot. Hosted by Mümün Keser.
parametric workshop. Softwares used: Rhino, Grasshopper, VRAY. Hosted by Epoch India..
sports campus design. Academic project 6th semester Softwares used: Sketchup Pro, VRAY, Rhino, Grasshopper, AutoCAD, Photoshop, InDesign.
Academic - VI Semester- 2020 Site: Rayanasandra Main Road, Bangalore 560099
introduction. This project is an attempt at designing a sports campus of international standards to cater to the international athletes in South India. The program focuses on the professional cycling community in southern India and also looks at other indigenous sports such as Kho-Kho, Netball and Hockey. Facilities for sports sciences to be taught at the campus are available. The campus also includes the needs of the local community in terms of a clubhouse, retail and a walking park..
Giving Back to the community A walking park, a retail center and a clubhouse all seek to cater to the local community.
Place-making Elements Allows the public to relax and watch the sporting activities.
Medical Care Proximity
Vehicular Pathways
Medical Facility is located equidistant to all sporting activities.
To major portions of the site, in case of emergencies or events
6
5 4
7
9
8 9 3
1
11
2
12 10
10 13
15
14
16
Masterplan
0 5
15
30
1. Admin 2. Retail 3. Parking 4. Club House 5. Boys’ Hostel 6. Science Block 7. Girls’ Hostel 8. Field Hockey 9. Kho Kho Court 10. Netball Court 11. Toilets 12. Indoor Training facility 13. Medical Block 14. Velodrome 15. Auditorium 16. Walking Park.
urban design. academic project 8th semester softwares used: AutoCAD, Revit, Photoshop, InDesign, Twinmotion.
Academic - VIII Semester- 2021
A
B
4th Semester AD Onsedis as debis natet aut aut asped quo endem autem quame exeriati unt ipitatem sam quam quati ist, corporit dolorestem. Ed quatur rem venihitiis dernatiaerit as exerchici offictur aut ut inctaque re, occaept atiore soluptati blaut aliqui bearum ra prae volesto milit volorum et as reperov idellor estrum doluptae molendigeni ut ari nobitia ecatur maios exeratur? Tur sinulparum harum quisi dolorionem ratempor am facerum dolupta quibus nis esequam re elestestem resequo quam, tem quosaeptat haruptatum utes de laborpo repellab iumet omnitio tem facculpa precto dolore vidis quas cum alite entio. Ut omnimilis solupta tionsequi as cor milloribus maximos adis de pa dolum eos aut audamusanti aborporrore verum volorer eribusam vercipis et atus.
housing design. academic project 4th semester softwares used: AutoCAD, Revit, Sketchup Pro, VRAY, Photoshop, InDesign,
introduction. This project was designed to accommodate 8 different professionals from diverse fields. The challenge was how to create a unique yet homely atmosphere for each of these professionals while still weaving them together. The housing works on the concept of positive and negative spaces to create a spill out spaces through out the housing project. The project is located in the bustling J.P Nagar, to help promote a sense of community amongst the residence. To increase social and cultural interactions, the housing wraps around a piece of land which houses the communal, social and cultural aspects.
floor plans. 4
11
4
11
11 4 1
3
2
11
11
4 6
6 4
1 2
4
3 5
7 11
6 8 9
floor plan at +107m.
4
1 4
6
3
5
2
floor plan at +110m.
1. Living Area 2. Dining 3. Kitchen 4. Bedroom 5. Lawn Space 6. Lobby 7. Gym 8. Reading Space 9. Dance studio 10. Garden 11. Balcony
form development
The Triangular site extruded as it is.
The middle portion of the land is utilized for social and cultural events.
The rest of land is utilized to create a housing over looking the central piece of land. Like a courtyard.
Positive and negative spaces are demarcated and deleted or added to the housing.
A
1
2 4 3 5 6
7
8
B Masterplan
0
1
3
1. Visitors Parking 2. Seating Area 3. Communal Space 4. Water Body 5. Lawn Space 6. Kids Play Area 7. Park 8. Multipurpose Hall 9. Parking
5
other academic work. Interior Design Working Drawings
interior design. concept. Victorian interior design is a product of the Industrial Revolution, where machinery made it possible for the middle class to own highly ornate pieces. ... These items included architectural features that are common in Victorian decorating, such as tin ceiling panels, wall sconces and tapestries. Victorian interiors feature beautiful colors, lots of ornate details, and skilled fakery to make the home a welcoming and beautiful place. The industrial revolution led to a revolution in interior decorating, and for the Victorians, high style was all about the appearance of luxury, whether real or imitation.
Ceramic Handwash Mahogony Wood Bookshelf Ceramic Tiles For toilet flooring White Cushion with Mahogany Maple Wooden Flooring White Stucco Wall Finish Edwardian Style wooden Windows ground floor plan
Mahogany Wooden Table Mahogany Wooden Panels Mahogany Wooden Table White Stucco Wall Finish Maple Wooden Flooring Edwardian Style Windows
first floor plan
working drawing. Working drawing for a 2BHK duplex with parking space and other basic amenities. The technical drawings shown are covered across 5th and 6th semester. SOUTH ELEVATION
A Lobby
10 9
11
8
12
7
13
6
14
5
15
4
16
3
17
2
18
1
19
Kitchen
Bedroom
WEST ELEVATION
Living room Dining area
EAST ELEVATION
PRODUCED BY AN AUTODESK STUDENT VERSION
Toilet
B
B
Walk-in Wardrobe Toilet
Powder Room
Bedroom
Walk-in Wardrobe
3200*1700
3000*1900
A
ground floor plan.
NORTH ELEVATION
GROUND FLOOR PLAN SOUTH ELEVATION
13600 3900
2300
1100
1000
1100
1200
2000
1200
A W1
W2
3700
1450
2300
4100
3100
10
2000
W2
9
11
8
12
7
13
6
14
5
15
4
16
3
17
2
18
4700
Lobby +3.45
PRODUCED BY AN AUTODESK STUDENT VERSION
6900
19
1
6600
7600
UP
Bedroom +3.45
WEST ELEVATION 3500
EAST ELEVATION
1000
W2
11200
11200 D2
1300
D2
650 10400
700V3
4500
B
3000 2000
Bedroom
4000
3100
D2
Walk-in Wardrobe
2200
D3
B
D3
3200
Bedroom
Toilet
3000*1900
Toilet
Walk-in Wardrobe
1700*3200
W1
1300
2100
1200
900
2000
900
2300 18300
first floor plan.
V3
A
NORTH ELEVATION
FIRST FLOOR PLAN
2000
V3
700 450450 700
3200
4400
KE
B
C
A
Highest level Lvl 7.06
SC S.NO
DO
Terrace room
10 thk WATERPROOFING
3000
150 thk RCC FLOOR SLAB 150 thk BRICK PARAPET WALL Roof Level Lvl 6.5 480
1. 2. 3. 4. 5. 6.
W
VE
7.
DEA
AKS
3000 2670
Bedroom
Lobby
D2
150 thk RCC FLOOR SLAB
NOTES
Lintel level Lvl 6.1
PRODUCED BY AN AUTODESK STUDENT VERSION
1100
Lintel Level Lvl 3.05
230 thk BRICK WALL 3000 2670
Dining area
Bedroom 2100
400 thk PCC PLINTH
D2
D2
10 thk FINISHED FLOOR LEVEL
LEGENDS
First Floor Level Lvl 3.5 230*450 RCC BEAM
480
ISSU DATE
25 thk DAMP PROOF COURSE Plinth Level Lvl 0.45 450
Ground level Lvl 0.0
400
SIDE STONE MASONRY FOOTING 800*300 RCC FOOTING
400 300
ARC
AR. A 447/2B Ph- 99 akshay
SH
SE
C
A
B
NOR
section AA.
B
Highest level
3
PRODUCED BY AN AUTODESK STUDENT VERSION
2
1
4
5
6 10 thk WATERPROOFING
D2
150 thk RCC FLOOR SLAB 150 thk BRICK PARAPET WALL
570
Roof Level Lvl 6.5 480
3000
Lintel level Lvl 6.1
2670 Toilet
D3
D2
Toilet
D2
Walk-in Wardrobe
150 thk RCC FLOOR SLAB 10 thk FINISHED FLOOR LEVEL First Floor Level Lvl 3.5
480
Lintel Level Lvl 3.05 230*450 RCC BEAM
800
230 thk BRICK WALL 3000
2720
Walk-in Wardrobe
Bedroom
D3
D3
2100
Toilet
Powder Room
Walk-in Wardrobe
400 thk PCC PLINTH
D2
10 thk FINISHED FLOOR LEVEL 25 thk DAMP PROOF COURSE Plinth Level Lvl 0.45 450
Ground level Lvl 0.0
400 400
BRICK STEPPED FOOTING 800*300 RCC FOOTING
300 800
1
section BB.
2
3
4
5
6
staircase details.
A
B
10 @ 150C/C OR ADJACENT SLAB - SPAN TOP FIRST FLOOR REINFORCEMENT LEVEL
00
10
NOSING TIMBER CLADDING
SOFFIT BEAM 230X600 8 TOR 200 C/C 10 TOR 125 C/C
50
10
10
11
9
12
8
13
7
14
6
15
5
16
4
17
3
18
2
19
COLUMN 230X450 MID-LANDING LEVEL
A
8 TOR 200 C/C
SECTION BB
MAIN BEAM 230X450
COLUMN 230X450 MID-LANDING LEVEL
10 TOR 125 C/C
10
00
NOSING TIMBER CLADDING
8 TOR 200 C/C 10 TOR 125 C/C
MAIN BEAM 230X450
20
1
10 TOR 125 C/C
10
50
B
SECTION AA
SOFFIT BEAM 230X600
PRODUCED BY AN AUTODESK STUDENT VERSION
PLAN
10 TOR @150 C/C (ADJACENT SLABSPAN TOP REINFORCEMENT) GROUND FLOOR LEVEL
door details.
D1
D2
Y
1000
WOODEN PANEL
150
70
HOUSE MAIN ENTRANCE
100
TOP RAIL WOODEN FRAME
100
100 62
1300
KEYPLAN
230 60
TOP RAIL WOODEN FRAME
1
2 CAR PARKING 6900
WEST ELEVATION
3 11200
6
1300 7
LOCK STILE
A
HINGE STILE
MIDDLE RAIL
1. 2. 3. 4.
X
160
BOTTOM RAIL
Y
100
150
70
TOP RAIL WOODEN FRAME
250
HINGE STILE
194
LOCK STILE
2100
500
LOCK STILE
MIDDLE RAIL
ISSUE STATU
HINGE STILE MIDDLE RAIL
DATE
2100
985
40
MULLION
1035
WOODEN PANEL
200
500
WOODEN PANEL
1035
100
TOP RAIL WOODEN FRAME
25
X
BOTTOM RAIL Y
Y
95
230 60
100
OUT
370
370
SECTION XX
IN
SECTION YY
OUT
100
800
95
1300
230 60
IN
450
X
160
BOTTOM RAIL
187
160
X
160
450
500
BOTTOM MULLION X
* ALL DIME SPECIF * ALL OMIS ELEME BROUG BEFOR * DO NOT S
230 60
D3
Y
1300
AKSHAY K
NOTES
SECTION XX
230 60
D4
DEALT BY:
LEGENDS
OUT
SECTION AA
S
1200 900 700 1300
200 W-01 1000 W-02 VENTILATORS V-01 700
195
250
OUT
195
150
1300
100
100 70
230 60
380
NAME DOORS D-01 D-02 D-03 D-04 WINDOWS
1000
95
IN
7.
SECTION YY
Y
IN
5. 6.
MULLION
160
400
X
500
500
WOODEN PANEL BOTTOM RAIL
SCHEDUL
S.NO
200
200
MIDDLE RAIL
400
2100
PRODUCED BY AN AUTODESK STUDENT VERSION
HINGE STILE
380
3
1130
A
1130
LOCK STILE
9 4500
YY
200
1060
WOODEN PANEL
SECTION YY
DE
ARCHITECT
AR. Akshay Khumar 447/2B JLB road, My Ph- 9986980104 akshaykhumar@gmai
SHEET TIT
DOOR DETAI
NORTH:
RESI
BULL TEM
360
U
SECTION XX
#23, LAV EM
toilet details. B
B
1
FLOOR MOUNTED WC
PLAN
1 2PRODUCED BY3AN AUTODESK STUDENT VERSION
SP
50MM PVC PIPE
600 1200
2
TAP
2100
600
3
770
3
670
12 MM THK. PLASTER 300MM*300MM CERAMIC TILE 230MM THK. BK. WALL SOAP STAND
230
2
300
A
LVL+0.45
500
1
SP
230MM THK. BK. WALL
150
VENTILATOR V3
600
LVL+0.43
1
750
500 250
1980
A
12 MM THK. PLASTER
WATER HEATER SHOWER HEAD
1200
2
300
300MM*300MM ANTI SKID CERAMIC TILES 15MM TH. ANTI SKID CERAMIC TILE
300
300MM*300MM CERAMIC TILE DADOING R
3
FLOOR MOUNTED WC
450
C
R
300
HS
WASH BASIN
150
R.C.C BEAM 230 X 350MM
230MM TH. BRICK WALL
FD
100MM PVC PIPE 450 MM THK. BK. BAT COBA FILLING
SECTION A-A
footing layout.
600
300MM*300MM CERAMIC TILE DADOING
NOTES
1. All dimensions in mm 2. Do not manually measu 3. Refer structural drawing 4. All masonry in Burnt Br 5. Any discrepancies in the to the notice of the Arch until discrepancies are re
KEY PLAN 1
1
5
4
3
2
7
6
8
4477
F1
G
C1
F
F2
E
C9
D C
B A
4477
2629
3682
1935
3020
F2
C19
2362 1
MIRROR F1
G
F2
S TRAP
LEGEND
F1
C
G
DATE
DA
F
C7 2854
C8
BRICK STONE
ISSUE STATUS S.NO
F1
F
REVISION STATUS F2
F1
F3
C11
C10
C9
C12
F3
C13
C14
F2
855
F2
E
PRODUCEDD BY AN AUTODESK STUDENT VERSION C
B
300
15MM TH. ANTI SKID CERAMIC TILE 100MM PVC PIPE
G
C6
207 991
500
WASH BASIN
C5
2242
2100
TOWEL HANGER
F2
F3
C4
C3
4056
PRODUCED BY AN AUTODESK STUDENT VERSION
12 MM THK. PLASTER
F3
F3
C2
C1
F2
A
C19
C18
F3
C17
F3
F3
C15 F2
C16
S.NO REVISION NO
E
C
B
DEALT BY: Akshay Khumar DATE
A
footing details.
1
3
2
5
4
6
CLIENT Mr. You know who? 447/2B JLB road, My Ph-9191919188 iamwd@gmail.com
8
7
:
ARCHITECT AR. Akshay Khumar Ph- +91 9686954793 akshay.khumar14@gm
50MM PVC PIPE
SECTION B-B
DATE
D
PROJECT TITLE Proposed residence for at 100ft road, Indiranag DRAWING NO.
AR2020/WD
DRAWING NAME GROUND LINE
GROUND LINE
TEMPLATE : Footing Layout
GROUND LINE
COLUMN TIES
COLUMN TIES
COLUMN TIES
PRODUCED BY AN AUTODESK STUDENT VERSION
COLUMN MAIN REINFORCEMENT COLUMN MAIN REINF
COLUMN MAIN REINF COLUMN
250
COLUMN
150
M20 MIX
325
150
COLUMN M20 MIX
M20 MIX
1500
PCC 1:4:8 SOILING
SHORT BARS
LONG BARS d
LONG BARS
SHORT BARS D
SHORT BARS
199 150 150 151
LONG BARS
d
194 155 150 151
PRODUCED BY AN AUTODESK STUDENT VERSION
200 150 150 151
325
D
150 175 179
PRODUCED BY AN AUTODESK STUDENT VERSION PCC 1:4:8 SOILING
PCC 1:4:8 SOILING
1500
1200 150 175 179
250
F1 150
F2
254
W1
F3
Y
LINTEL LEVEL
150
338
ALUMINIUM FRAME TOP RAIL HINGE STILE LOCK STILE
1500
6 mm thk GLAZING
X
OUT
160
X
BOTTOM RAIL
2100
IN
SILL LEVEL
Y
2000
2400
1800
150
230
ELEVATION
IN
8 - 150 C/C
TIES
230X450
SIZE
X
OUT
IN 160
TOP RAIL HINGE STILE
W2
6 mm thk GLAZING
230 60
IN
75
60
895
895
SECTIONC1,C2,C3,C4,C5,C6,C7,C8,C9 XX COLUMN NO. C.C MIX
C10,C11,C12,C13,C14,C15,C16 C17,C18,C19 M20
XX 1400
2300
LINTEL LEVEL
2400
1800 1800
C5
2400
1800
12
14
16 17 18
650 1300 700V3
Toilet +0.44 300*300 CERAMIC FLOOR TILING
2200
MAPLE WOODEN FLOORING OF SELECT GRAIN AND QUALITY
4600 4300
+0.44
2000
2300 1850
18300
1200
C9
1500X
IN
OUT C10
2400
160
C8
C11
SILL LEVEL 1200
C14
1500
GROUND FLOOR PLAN
1. 2. 3. 4. 5. 6. 7.
NAME 1800
SIZE 1200*2100 900*2100 700*2100 1300*2100
W-01
2000*1800
SILL HEIGHT
1200 1200
1500 X 900
900 1000*1800 2400 W-02 1800 VENTILATORS V-01
1800 Y
DEALT BY: 2100
700*500
1800
150
750
115 thk BRICK WALL
2500
4600
1800
6mm thk GLAZING
1200
1200
HINGE STILE LINTEL HEIGHT
1800
NUMBER
LOCK STILE 2100 1800 2100 2100 2100
1 4 3
2100
1
2100 2100 1800
2 3
2100
3
BOTTOM RAIL 1800
12 @150 C/C
12 @150 C/C
230X450
12 @150 C/C
12 @150 C/C
230X450
150
150
12 @150 C/C
12 @150 C/C
230X450
150
150 IN
12 @100 C/C
12 @100 C/C
230X450
150
150
12 @100 C/C
12 @100 C/C
450X230
150
150
12 @100 C/C
12 @100 C/C
450X230
150
12 @100 C/C
12 @100 C/C
230X450
150
12 @100 C/C
12 @100 C/C
230X450
150
12 @100 C/C
12 @100 C/C
150
12 @100 C/C
12 @100 C/C
230X450
150
12 @100 C/C
12 @100 C/C
450X230
150
12 @150 C/C
12 @150 C/C
450X230
150
12 @150 C/C
12 @150 C/C
450X230
1800
1200
1800
1200
150
2400
XX
1800 1800
2400 2400
1800 1800
X SILL LEVEL
150
150
2400
450X230
700
150
150
* ALL DIMENSIONS ARE IN MM, UNLESS OTHERWISE 400 75 400 SPECIFIED. 2100 2100 * ALL OMISSIONS OR1500 CONFLICT BETWEEN THE VARIOUS ELEMENTS OF THE CONTRACT DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT 2400 1800 BEFORE PROCEEDING WITH ANY WORK INVOLVED. 1800 * DO NOT SCALE THE DRAWING
X
150
2400
C17
12 @150 C/C
450X230
150
1800
SECTION 2400
450X230
12 @150 C/C
135 2400
C16
12 @100 C/C
150
CHECKED BY: 2100 1500
OUT AKSHAY KHUMAR 1000 IN
12 @100 C/C
150
1800
1500
230X450
12 @100 C/C
WOODEN 12FRAME @100 C/C TOP RAIL 6mm thk GLAZING 12 @100 C/C SHUTTER FRAME
12 @100 C/C
V3
700 450450 700
3100
2100 1500 FOR OPENINGS
DOORS D-01 D-02 1800 D-03 D-04 2100 WINDOWS
C15
C18
2400
2100 SCHEDULE S.NO
150
YY
LINTEL LEVEL
1300
1150
4300
NORTH ELEVATION
1500
150
1800 ALUMINIUM FRAME150
1800
4400
TOP RAIL V3
900 2600
2400 700
EAST ELEVATION
11200
1300
300*300 CERAMIC FLOOR TILING
W1
1200
150
1600 1000
MAPLE WOODEN FLOORING OF SELECT GRAIN AND QUALITY
3000*1900
XxY 230X450
2200
Walk-in Wardrobe
3200
Powder Room
COLUMN SIZE
12 @100 C/C
D2 D3
Toilet
+0.44 300*300 CERAMIC FLOOR TILING
D3
SHORT BARS
Y
12 @100 C/C
3200*1700
2400
D2
3389
C7
150
W2
D2
FOOTING REINFORCEMENT LONG BARS
3000 2200
MAPLE WOODEN FLOORING OF SELECT GRAIN AND QUALITY
4000
Walk-in Wardrobe +0.45
V1 d 150
900*1600 RCC CHAJJA
900
2100
Dining area +0.45
MARBLE FLOORING OF SELECT GRAIN AND QUALITY
D2
Bedroom +0.45 D3
3000 3100
MAPLE WOODEN FLOORING OF SELECT GRAIN AND QUALITY
7600
7200
3000 1700
4500
150
230 thk BRICK WALL
Bedroom +0.45
6600
19
230*450 RCC COLUMNS
4700
MARBLE FLOORING OF SELECT GRAIN AND QUALITY
15
UP
1500
3500 11200
YY
Kitchen +0.45
13
5 4 3
D
700
W1
MARBLE FLOORING OF SELECT GRAIN AND QUALITY
6959
C6
3000
4100
11
6
2
6600
230 thk COMPOUND WALL
B 1800
700
3100
10 9 8 7
3700
W2
900
2400
1100
W2
Living room +0.45
Y
C4
1000
2300
Lobby +0.45
2000
2100
1500
1100
W2
3700
CAR PARKING
C3
SECTION YY C13
110
D1
1450
1
230C12
2000 135
1200
1000
+0.45
150 150 150 150
OUT
PRODUCED BY AN AUTODESK STUD
OUT
1500
900
2000
ELEVATION
A 1200
6900
C2
LOCK STILE
230
SECTION YY
C1
0
Y 1800
HOUSE MAIN ENTRANCE
WEST ELEVATION
BOTTOM RAIL Y
895
SECTION XX
FOOTING DEPTH
SOUTH ELEVATION
13600
ALUMINIUM FRAME
X
SILL LEVEL
FOOTING SIZE
PCC SIZE X
XX
8MM-16
MAIN BARS
COLUMN NO.
NOTES
COLUMN SCHEDULE
60
895
1800
KEYPLAN
S
W1
75
110
1500
230 60
Y
LINTEL LEVEL
1500
PRODUCED BY AN AUTODESK STUDENT VERSION
window details.
2000 135
500
1200
OUT 230 60
150
Y
550
SECTION XX
PRODUCED BY AN AUTODESK STUDENT VERSION
150
PRODUCED BY AN AUTODESK STUDENT VERSION
SECTION YY
SECTION YY 230X450
competitive works. 62nd Annual NASA Design Competition - Shortlisted 63rd Annual NASA Design Competition - Shortlisted HUDCO Trophy by NASA India G-SEN Trophy by NASA India Sacred Spaces by ArchDais House 2.0 by ArchDais The Dharavi Project by ArchDais
the house 2.0. The competition invited participants to design an ideal house - one that is a constant space of solace and shelter for the body , as well as the mind. The competition seeks the house that respects the tangible practices of everyday life ,and reflects upon the tangible idea of living itself .The site is located in Tung, a town in the district of Pune in Western India, close to the Pawna lake. This highly contoured area has a temperate climate with hot summers and mild winters. During the pandemic times the line between indoor and outdoor is sharp, this house balances the indoor and outdoor spaces. Multipurpose private and semi-private decks allow the user a sense of freedom in a controlled environment.
Massing model
Adding levels
Adding outdoor decks towards view points
Vertical circulation
the dharavi project. The aim of this competition was to develop a place making project that will act as a center for change and community empowerment, in the heart of Dharavi , that will wholly and truly be owned by the people there is. The people of Dharavi need a space that allows them to express their ideas , participate in their own growth and learn from each other. The design philosophy revolves around the efficiency, resourcefulness and flexible use of resources and spaces that Dharavi is known for. The project aims at rejuvenating Dharavi and creating a new imagibility of Dharavi in contemporary world. The contemporary approach caters to users of all age groups and socio-economic backgrounds paving a way to bridge the gap between the people of Dharavi and rest of Mumbai. The old ship containers forms the multi-functional built spaces which are designed with flexible
Co-working and Night school
Multifunctional use of Workshop
Multifunctional use of Public Plaza
second floor. 8.Toilets 9.Core 16. Walkway 17. Library 18. Day - Co-working spaces / Night - Night school 19. Outdoor meeting area
first floor 5.Temporay local market 6.Information desk 7.Art gallery 8.Toilets 9.Core 10. Local market 11. Public plaza 12. Outdoor workshop 13. Metal fabrication & carpentry workshops 14. Outdoor canteen seating 15. Kitchen
ground floor
basement
1. Tailoring workshop 2. Pottery workshop 3. Performance area 4. Practice rooms
miscellaneous. artificial intelligence.
t r a v e l p h o t o g r a p h y.
photoshop artwork.
model making.
artwork.
thank you. A K S H AY K H U M A R akshay.khumar14@gmail.com