INSTALLATION & HANDLING GUIDE
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall & Ceiling
Mikodam panel
Ceiling
Mikodam panel
Wall
Mikodam panel
Wall
Mikodam panel
Wall
Ceiling
Ceiling
Mikodam panel
Mikodam panel
Application is quite easy, the panels are mounted on a
The panels comes with Z shaped hanging profiles on it.
rail system and can be changed with another Mikodam
During the installation, U shaped hanging profiles are
panel when desired.
mounted to the wall and the wall panels are assembled to these. The hardware details to be used are shown in the pictures below.
Mikodam panel Z-shaped profile
Wall silicone seal U-shaped profile
Hardware set for U shaped profiles to be mounted to the wall are included in the package.
EPDM seal screw anchor plastic seal
Hardware set for U shaped profiles are included in the package. 2
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall & Ceiling
Wall EPDM seal
U-shaped profile
screw anchor
silicone seal screw plastic seal
We use 2 seal elements in order to separate metal installation elements from screws. To prevent any direct connection between the wall and the wall panels. This is acoustically required for vibration control from noises coming from the inside or the outside.
Z shaped hanging profiles are fixed on the panels comes at a standard height so that if you change the panel with another Mikodam panel you will not have to change the position of the U-shaped profile on the wall.
3
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall (boxed panels)
60x120 cm panels come with pre-inserted nuts at the corners on the back of the panel, ready to fix the Z-shaped profiles. In the box of the panels, Z-shaped profiles, allen bolt, allen key, and lamellos for 60x120 cm panels comes separately in a bag.
pre-inserted nuts
4
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall (boxed panels)
Standard panel size for Mikodam panels is 23.60” x 23.60” (60 cm x 60 cm) or 23.60” x 47.20”(60 cm x 120 cm). While the standard package size is 50.59” x 25.79” (1285 cm x 655 cm) 23.60” x 23.60” panels are boxed as a set of 4. 23.60” x 47.20” panels are boxed as a set of 2. Each Mikodam Panel box is shipped together with a box of fasteners to hang the panel.
The fasteners box contains; 6 pcs of 59 cm (23 1/4”) U- shaped profiles, 3 pcs of connecting piece, 2 bags that contains screws, anchors, plastic seals & EPDM seals
Connecting piece helps to connect 2 U-shaped profiles side by side. The piece also helps to align the profiles. U-shaped profiles can be mounted on the wall adjacent or with a gap in between.
5
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall (boxed panels)
Using these pre-inserted nuts, Z-shaped profiles can be fixed according to the direction of the panel to be hung. 6
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall (boxed panels) The locations of the Z-shaped profiles are the same for all 60 x 120 panels so that if you change the panel with another 60 x 120 cm Mikodam panel you will not have to change the position of the U-shaped profile on the wall.
DETA
KARA
SAPA
FILA
VERO
KOSA
BISA
GETA A & GETA B TORA
LEDA
PIRA A
VATA
DETA
KARA
SAPA
FILA
VERO
KOSA
BISA
1200 [47,24"]
1200 [47,24"] 1000 1200 [39,37"][47,24"] 1000 [39,37"]
VATA
1200 1200 [47,24"] [47,24"]
PIRA A
1200 [47,24"]
LEDA
1200 1200 [47,24"] [47,24"]
GETA A & GETA B TORA
1200 [47,24"]
2400 [94,49"]
2400 [94,49"]
1200 [47,24"]
You can also change the direction of the panels without changiing the position of the U-shaped profiles.
While hanging the panels, both lower and upper z profiles should be used for the panel at the bottom. For the panels
DETA
GETA A & GETA B
TORA
LEDA
PIRA B
PIRA A
VATA
DETA
KOSA
BISA A
BISA B
KARA
SAPA
FILA
VERO
KOSA
BISA A
BISA B
600 [23,62"] 600 600 600 600 600 600 [23,62"] [23,62"] [23,62"] [23,62"] [23,62"] [23,62"]
VERO
600 [23,62"]
600 [23,62"]
FILA
600 600 600 600 600 600 [23,62"] [23,62"] [23,62"] [23,62"] [23,62"] [23,62"]
SAPA
600 [23,62"]
KARA
600 [23,62"] 600 400 600 600 600 600 [23,62"] [15,75"][23,62"] [23,62"] [23,62"] [23,62"]
VATA
400 [15,75"]
PIRA A
600 [23,62"]
PIRA B
600 600 600 400 600 600 [15,75"][23,62"] [23,62"] [23,62"] [23,62"] [23,62"]
LEDA
400 [15,75"]
TORA
600 [23,62"] 600 [23,62"]
GETA A & GETA B
600 600 600 600 600 600 [23,62"] [23,62"] [23,62"] [23,62"] [23,62"] [23,62"] 600 600 600 600 600 600 [23,62"] [23,62"] [23,62"] [23,62"] [23,62"] [23,62"]
600 [23,62"] 600 [23,62"]
above it only the z profiles on the top are used.
7
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall (boxed panels)
60cm [23,62"]
120cm [47,24"]
60cm [23,62"]
120cm [47,24"]
60cm [23,62"]
60cm [23,62"]
120cm [47,24"]
60cm [23,62"]
60cm [23,62"]
In order to hang four 60x120 panel in vertical
In order to hang four 60x120 panel in horizantal
position you will need;
position you will need;
6 pcs of 59 cm (23 1/4”) U- shaped profiles,
10 pcs of 59 cm (23 1/4”) U- shaped profiles,
12 pcs of Z- clips.
10 pcs of Z- clips.
8
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall (boxed panels)
9
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall (boxed panels)
Lamello biscuits are used to join and level the panels to each other. 10
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall (boxed panels)
Lamello biscuits are used to join and level the panels to each other.
11
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall (boxed panels)
12
I N S TA L L AT I O N G U I D E
65 [2 1/2"]
PANEL ENDING - (boxed panels)
135 [5 3/8"]
18 [3/4"]
18 [3/4"] End panels can be easily attached to the panels using lamellos.
13
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Ceiling
14
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Ceiling Given below is the method of installation of our panels hanging on the ceiling by using wire ropes. This method is preferred when the panels need to be hung at a distance from the ceiling instead of being directly mounted to the ceiling. (The examples in the following pages are given using Geta & Tora panels; the same system can also be applied to other Mikodam Panels.)
*Similar system is used Haydar Aliyev Auditorium project 15
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Ceiling
Tora panels
60x120 cm panels come with pre-inserted nuts at the corners on the back of the panel, ready to fix the eyebolts.
pre-inserted nuts
eyebolts 16
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Ceiling
Geta panels
For panels which do not have pre-inserted nuts, in order to fix the eyebolts, preinserted nuts should be inserted to the corners on the back of the panel first.
pre-inserted nuts
eyebolts
17
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Ceiling
eyebolt
shackle
wire rope
shackle
turnbuckle
shackle
eyebolt
zip tie
18
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Ceiling
We use lamello biscuits to join and level the panels to each other.
19
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION ORDER - Ceiling The panels must be installed on ceilings following a certain order. The installation should start at the corner and follow the consecutive sequence in both directions as shown below, making sure the shorter edges join each other and the longer edges join each other as well.
1 2 1
2
2 1
20
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION STAGES- Ceiling
1
2
3
4
After hanging the first panel, the corner of the panel should be stabilized by hanging from three points on the ceiling. The other corners should be fixed by using temporary turnbuckles until the other panels are hung.
21
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION STAGES- Ceiling
5
The second panel should be attached to the first panel on its shorter edge by using lamellos and zip ties. Free corners should be suspended from the ceiling by using temporary turnbuckles.
6
After the second panel is fixed in place temporarily, a wire rope should be inserted through the eyebolts at the outer corner of both panels. To tie the inner corners, the second row should be installed first.
22
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION STAGES- Ceiling
7
8
The same steps should be applied until the installation of the last panel in the row. Then the height of the panels at both ends of the first row must be adjusted. After that the panels in the middle should be adjusted too, so that the height is the same for all the panels in the row. The two corners in the starting row must be connected from 3 points on the ceiling so that the direction of the panels are fixed. In order to provide stabilization, the panels should be hung not only from perpendicular points but also from cross points, on corners and every 5 to 6 panels in a row. 23
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION STAGES- Ceiling
9
10
11
Then the first panel of the next row is installed, again first by using zip ties and hanging free corners from the ceiling by using temporary turnbuckles. Then a wire rope should be inserted through the eyebolts at the outer corners of the panels. 24
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION STAGES- Ceiling
12
13
14
To pull the panels towards each other, the wire ropes must be inserted through the eyebolts at the corners of all adjacent panels. 25
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION STAGES- Ceiling
15
16
17
26
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION STAGES- Ceiling
18
The panels should be hung not only from perpendicular points but also from cross points. In order to provide stabilization, it is necessary to hang them from 3 points on corners and every 5 to 6 panels in a row.
27
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Ceiling
28
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Ceiling
29
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Ceiling Flaps If there is a need to reach behind the panels, some of the panels may be movable. In this situation, for movable panels, wire rope or lamellos should not be used. Moveable panels should be placed with the help of wooden wedges which can be removed when desired thus allowing to access behind the panels.
30
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Ceiling
for concrete ceilings
for ceilings with wooden structure
for ceilings with metal structure
31
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Ceiling - Rod Hangers
Instead of using wire ropes, the same system can also be applied by using rod hangers. Rod hangers are used to
hang the ceiling panels when the distance is low from the structure to hang, where we use wire ropes when the distance to hang is greater. L shaped bracket (according to the ceiling structure, an eyebolt can also be used)
rod hanger
eyebolt
32
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Ceiling - Rod Hangers
33
I N S TA L L AT I O N G U I D E
PACKAGING DETAILS (boxed panels) The package of 23.60” x 23.60” (60cm x 60cm) panels contains 4 panels. The package of 23.60” x 47.20” (60cm x 120cm) panels contains 2 panels. ”All sides of the products are covered with honeycomb cardboard to prevent it from damages and being scratched. The products are wrapped with shrink packaging after being put in boxes specially prepared for the panels.
Labels on the panels have all the information about the panel & package which also can be reached online through the QR code as well. Each box has labels on 3 sides of the box.
34
I N S TA L L AT I O N G U I D E
INSTRUCTIONS FOR STORAGE (boxed panels)
23.60” x 23.60” & 23.60” x 47.20” panels can be stored on top of each other on pallets or can be stored in racking. The pallets should not be stacked on top of each other as it will damage the panels. Pallets can only be stacked only if a special middle pallet (see next page) is used in between.
35
I N S TA L L AT I O N G U I D E
SHIPPING DETAILS
Standard panel size for Mikodam panels is 23.60” x 23.60” (60 cm x 60 cm) or 23.60” x 47.20”(60 cm x 120 cm). While the standard package size is 50.59” x 25.79” (1285 cm x 655 cm) 23.60” x 23.60” panels are packed as a set of 4. 23.60” x 47.20” panels are packed as a set of 2.
Standard pallet size of Mikodam Panels is 50.59” x 25.79” (1285 cm x 655 cm), while the height is up to 7 feet. Boxes on the pallets are strapped. In most cases pallets are arranged to have the same panel type on them. In cases where the number of the same panel type boxes cannot add up to the height of the container a middle pallet can be used in between to separate the panel types. In other cases, mixed items on a pallet are to be minimized. 36
I N S TA L L AT I O N G U I D E
SHIPPING DETAILS
In order to fit our pallets into the container in the best possible way, we are using the layout shown above. The tied pallets are loaded below 7 ft high but in order to stabilize them in the container another box can be placed by hand on top of each pallet and by this way the top space will be filled completely. When unloading, top box can be taken manually, then the pallets can be unloaded from the container easily with a pallet jack or a forklift.
37
I N S TA L L AT I O N G U I D E
INSTRUCTIONS FOR CARRYING THE PANELS (for 95” -240 cm (h) panels)
To prevent cracks on the corners, never put Mikodam Panels with their corners on the floor. The panels should always be placed in an upright position with the entire edge standing on the floor.
For proper handling, Mikodam Panels should be carried with the long edge parallel and vertical to the ground, by 2 persons.
38
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall & Ceiling (for 95” -240 cm (h) panels)
Wall
1004 [3'-3 1/2"]
Mikodam panel h:2400 mm (7'-10 1/2")
1004 [3'-3 1/2"]
Wall
Mikodam panel h:2400 mm (7'-10 1/2")
eal
Mikodam panel
Wall
Baseboard h:100 mm (4") or as required
Mikodam panel
Wall
Mikodam panel
Wall
1003 [3'-3 1/2"]
1003 [3'-3 1/2"]
nchor
300 [11 3/4"]
200 [7 3/4"]
The drawing above shows the standard heights of the U-shaped profiles. (dimensions given are based on the hole centers)
Ceiling
Mikodam panel
Ceiling
Ceiling
Mikodam panel
Mikodam panel
The same railing system can be applied both on walls and on ceilings .
39
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall & Ceiling (for 95” -240 cm (h) panels)
steel profile for fixation
steel profile for fixation
teel profile for fixation
A
B
wooden lath for fixation
A
steel profile for fixation
wooden lath for fixation
(if needed)
(if needed)
(if needed)
wooden lath for fixation
steel profile for fixation
1004 [3'-3 1/2"]
1004 [3'-3 1/2"] 2400 [7'-10 1/2"]
B steel profile for fixation
1004 2400 [3'-3 1/2"] [7'-10 1/2"]
1003 [3'-3 1/2"]
1003 [3'-3 1/2"] 300 [11 3/4"]
200 [7 3/4"]
2400 [7'-10 1/2"]
(if needed)
(if needed)
100 [4"]
1004 [3'-3 1/2"]
wooden lath for fixation
1004 [3'-3 1/2"]
(if needed)
(if needed)
1004 1003 [3'-3 1/2"] [3'-3 1/2"]
steel profile for fixation
2400 [7'-10 1/2"]
It may be necessary to fix the panels to the wall in order to prevent the panels from dislodging in extreme cases
1003 [3'-3 1/2"]
such as earthquakes. We suggest two methods for this. The first is to fix the panel in place by placing a wooden lath between the panel and the ceiling, thus clamping the panel. The second method is to fix the panel to the wall with the
help of a metal profile previously mounted on the back of the panel. If the second method is chosen, acoustic seals included in the assembly kit should be used. The second method can also be applied to the last row of the panels installed on ceilings in order to fix them in place.
40
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall (for 95” -240 cm (h) panels)
LEFT ELEVATION
GETA FRONT ELEVATION
RIGHT ELEVATION
41
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall (for 95” -240 cm (h) panels) Our railing system can be applied both on wooden studs & metal profiles/studs. It can also be applied when there is no drywall on the surface an d only studs & rockwool are available.
wooden lath for fixation (if needed)
wooden lath for fixation (if needed)
Mikodam Hanging System
Mikodam Hanging System
drywall
rockwool steel profile baseboard
GETA
BISA
baseboard
FILA
HAZA
KARA
SAPA
TOBA
VERO
KOSA (old)
42
I N S TA L L AT I O N G U I D E
RAILING SYSTEM
43
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Wall The photos below show an installation process on the wall.
44
I N S TA L L AT I O N G U I D E
PANEL INSTALLATION - Ceiling The photos below show an installation process on the ceiling.
45
I N S TA L L AT I O N G U I D E
INSTRUCTIONS FOR STORAGE (for 95” -240 cm (h) panels)
Never put Mikodam Panels on top of each other.
The pictures above show proper vertical storage of our panels in our warehouse. 46
I N S TA L L AT I O N G U I D E
PACKAGING DETAILS (for 95” -240 cm (h) panels) Packaging details for 95” -240 cm (h) panels: First of all, we cover the product with interlining to prevent it from being scratched. We wrap the 4 edges and corners of the product with blue PE, as shown in the pictures and we cover the surface of the product with 10-12 mm PE. Finally, we wrap it with bubble paper and shrink packaging.
47