Alberto Lancerin Professional Portfolio

Page 1

ALBERTO LANCERIN ARCHITECTURE

PROFESSIONAL PORTFOLIO I 2018


CONTACTS

PROFESSIONAL EXPERIENCE OVERVIEW

Alberto Lancerin BArch +44 74 6326 8975 albertolancerin@gmail.com 71 Fordwych Road Flat 6 London NW2 3TL

Burrell Foley Fischer Architects 2018 Architectural Assistant Part II -Feasibility studies.

EXPERTISE

MorenoMasey. Architecture / Interiors. 2017 Architectural Assistant Part II -Luxury residential renovations. -Planning application for a Grade II listed building.

AutoCAD Vectorworks Sketchup InDesign Illustartor Photoshop macOS Windows

Pollard Thomas Edwards 2007-2017 Architectural Assistant Part II Notable projects: -Barton Park, Phase 1a. Design delivery of 135 dwellings in Oxford. -Chobham Farm, Phase 1. Design delivery of 173 dwellings in Stratford, London. -Grahame Park, Phase 1a. Design delivery of 320 dwellings in Barnet, North London.

CORE

EDUCATION

Residential Architectural design Design delivery Hand drawings Detail design Model making Design development PORTFOLIO

Akademie der bildenden KĂźnste Wien Vienna, Austria Studies at Master degree Level

2011-2013

University Iuav of Venice 2001-2006 Venice, Italy Undergraduate degree in Architectural science Title Awarded: BArch

Online link issuu.com/albertolancerinarchitecture ALBERTO LANCERIN I London, UK

page 2


Project for Akademie der bildenden Künste Wien

ALBERTO LANCERIN I London, UK

page 3


Bootham Park Hospital York, UK Team Dates Type

Burrell Foley Fischer 2018 Residential

Main tasks

Feasibility study; Diagrams and hand drawings.

Bootham Park Hospital designed by Architect John Carr, opened its doors in 1777 and has been in use for 240 years. The principal building is Grade I listed and the chapel, built in 1865 is Grade II. The hospital was declared not fit for purpose in 2015. Our Client saw the opportunity to convert the site into retirement accommodation, the aim was to achieve ten thousand sqm of net internal area and including facilities like restaurant, coffee house and health centre.

ALBERTO LANCERIN I London, UK

Our approach was to demolish part of the building that didn’t belong to the original design and carefully place new buildings while trying to preserve as many of the trees already present on site. We introduced the traditional almshouse typology to strengthen the presence of the chapel and rebalance the West and East side of the site.

page 4


ALBERTO LANCERIN I London, UK

page 5


Barton Park Phase 1a Oxford, UK

Team Client Dates Type Fee Value

Pollard Thomas Edwards Hill 2016 Residential £349k (Phase 1a+1b) over 2 years

Main tasks

Preparation of GA’s drawings and detail packages.

Phase 1 of a larger “garden suburb” extension to Oxford working with ABA architects. 237 dwellings total (PTE 135 dwellings), 40% affordable, in a mixture of houses and flats.

ALBERTO LANCERIN I London, UK

page 6


This drawing is © 2016 PTE archi

All dimensions are in millimetres u

All levels are in metres above ord

This drawing must be read in conj Architect and other consultants If in doubt, ask

FROM SETTING OUT N

PRELIMI NOT FOR

GENERAL N

This drawing

Use figured d

All dimension

All levels are

This drawing Architect and

If in doubt, as / rev

20.09.16 date

drawing status

First issue description

LEVE

CONTINUES ON DRAWING W063-PTE-B3-01-DR-A-2012

1248

1248

1902

3140

1247

2000

1115

1248

3500

E1

4000

4500

Parcel B - Block B1 & B2 South Elevation 2

S1

1248

S1

Bedroom 1

112

1706

108

Bedroom 2

1800

1135

en-suite

Bedroom 1

562

1

SVP

4 en-suite

Bedroom 2

L/D/K

1463

S1

S12

RWP

SVP

E1

st

S1

S1

1903

5 st

st

°

94

L/D/K

85 m²

Plot 39

2B4p PRIVATE

83 m²

SVP

bath

Plot 40

2435

bath

2

2B4p PRIVATE SVP

SVP

889

1208

1032

1248

1902

798

1565

1248

1688

1227

G

F

ALBERTO LANCERIN I London, UK

H

2015

1170 SVP

1464

225

769

1810 242

225

364

SVP

3

E1 797

2128

2035

Barton Park Phase 1 N Oxford drawing title

\\PTEFILESERVER\PROJECTS\16-035 BARTON PARK PI\CAD\2016-05-0-STAGES 4-5\02 PRINT\04 L LAYOUT\L00 GENERAL ARR

SVP

S1

5000

1:50

J

L/D/K 364

RWP

3000

S1

E1

2500

1903

1500

1903

2465

1000

bath

2035

Bedroo m2

1902

1248

H

G

1954

F

500

Millimetres

K

project

0

RWP

CONTINUES ON DRAWING W063-PTE-B1-01-DR-A-2002

GENERAL NOTES

Use figured dimensions only. DO N

1228

J

6

page 7


S

This drawing must be read in conjunctio Architect and other consultants

S

If in doubt, ask

TO eries eries eries eries eries eries eries eries eries eries eries eries eries eries eries eries eries eries

EXTERNAL WALL INTERNAL WALL FLOOR STAIR ROOF EXTERNAL OPENINGS INTERNAL DOORS/JOINERY METALWORK/BALCONIES REFLECTED CEILINGS FINISHES/DECORATION FLOOR FINISHES CEILING FINISHES IRONMONGERY KITCHEN BATHROOMS STORAGE FURNITURE EXTERNAL WORKS

TO CONSTRUCTION 19

1

16

19

2

20

16

1

2

01_Description

WINDOW & DOOR KEY

PIVOT CASEMENT REVERSIBLE

19

2

MATERIALS KEY

SOLID PPC METAL PANEL

LASER-CUT PPC METAL PANEL

KEY TO SYMBOLS

RAL 1035 DT22B

RAL 1035 DT26

EXTERNAL WALL INTERNAL WALL FLOOR STAIR ROOF EXTERNAL OPENINGS INTERNAL DOORS/JOINERY METALWORK/BALCONIES REFLECTED CEILINGS FINISHES/DECORATION FLOOR FINISHES CEILING FINISHES IRONMONGERY KITCHEN BATHROOMS STORAGE FURNITURE EXTERNAL WORKS

01

GRIDLINE REFERENCE

FFL

FINISHED FLOOR LEVEL

SVP

SOIL & VENT PIPE

SS

STUB STACK

AAV

AIR ADMITTANCE VALVE FLOOR GULLY

RWP

RAINWATER PIPE

RWO

RAINWATER OUTLET OVERFLOW OUTLET

MJ

MOVEMENT JOINT

DR

DRY RISER

AOV

AUTOMATIC OPENING VENT

Use figured dimensions only. DO NOT SC

immediately reported to the Architect.

CONCRETE

All dimensions are in millimetres unless n

 All structural setting out to face of structure or grid.

ROOF TYPE Refer to drawing 27 00 series

BRICK

S1

SEPERATING WALL TYPE Refer to drawing 22 00 series

BLOCKWORK

P1

INTERNAL WALL TYPE Refer to drawing 22 00 series

F1

RWO/SH RAINWATER OUTLET/SHUTE

This drawing is © 2016 PTE architects

 All setting out to be confirmed on site prior to construction - any discrepancy must be

EXTERNAL WALL TYPE Refer to drawing 21 00 series

R1

FG

OFO

E1

GENERAL NOTES

SETTING OUT NOTES

KEY TO SYMBOLS

G OUT PLANS NS

ILS R TO series series series series series series series series series series series series series series series series series series

DOOR (HUNG ON LEFT HAND SIDE AS VIEWED)

All levels are in metres above ordnance d

Level 3 construction issue.

 ALL PARTITIONS AND NON LOAD BEARING WALLS SET OUT TO CENTRE.

14.10.16 ThisB drawing must be read in conjunction co-ordinated. Architect and other consultants Level 2 construction issue

 For setting out and specification of M&E services refer to M&E Consultant's documents.  For setting out and specification of structure refer to Structural Engineer's and Timber Frame Manufacturer's documents.

FIRE CAVITY BARRIER

FLOOR TYPE Refer to drawing 23 00 series

Align

05.10.16

/

20.09.16

rev

date

drawing status

CRITICAL CLEAR DIMENSION (From finish to finish)

1200

A

If in doubt, ask

 For setting out and specification of soft and hard landscaping refer to Landscape Architect's documents.

First issue description

LEVEL 3

ADJOINING WALLS TO BE ALIGNED

RAL 1035 WT 14

D.01

RAL COLOUR TYPE NUMBER

EXTERNAL WINDOW/DOOR NUMBERS

8

23

INTERNAL DOOR NUMBERS SPOT HEIGHT project

0

500

1000

1500

2000

Millimetres

2500

3000

3500

4000

4500

5000

1:50

Barton Park Phase 1 Oxford drawing title

Parcel B - Block B1 & B2 South Elevation 2

\\PTEFILESERVER\PROJECTS\16-035 BARTON PARK PI\CAD\2016-05-0-STAGES 4-5\02 PRINT\04 L LAYOUT\L00 GENE

01_Description

1 2108

CONTINUES ON DRAWING W063-PTE-B3-01-DR-A-2012

1 2108

3629

1620

2275

En-suite TYPE 1 .

3425

D.05

300

1 2108

182

910 120

1171 241

1300

3968

120

D.09 558 114

3836

1150

D.11

1200

164 2172

650

402

167 650

287

Bathroom TYPE 1 .

2175

2300

1740

179

P2

1150

1140

1300

1200

1050

D.05

647

D.05 1300

1503

1584

2310

910

1211

179

910

90

149

1050 402

900

°

655 100

P1

D.02

910

D.09

910

167

910

534

182

300

2544

910

1740

346

701

D.02 D.11

211

D.02

910

D.02

D.14

1405

D.02

1150

610

1595

910

1107

1200

2039

167

2850

167

3627

D.02

4544

2054

3425

En-suite TYPE 2 .

2275

D.05

90

°

125

RAL 1035 WT01

Bathroom TYPE 1 . 2300

°

94

2001

2 2108

1 2108

ALBERTO LANCERIN I London, UK

page 8

D

14.10.16

Level 3 construction issue. Sec Overall GA's, plans & elevation

C

05.10.16

Level 2 construction issue.

B

23.08.16

A

02.08.16

\

04.07.16

rev

date

drawing status

Client design changes, M&E's

Building footprint re-positioned

Re-issue of Level 1 submitte description

LEVEL 3 C


ALBERTO LANCERIN I London, UK

page 9


Chobham Farm Phase 1 Stratford, East London, UK

Team Client Dates Type Value

Pollard Thomas Edwards East Thames Group - London & Continental Railways 2013-2015 Residential & Commercial ÂŁ652k Phase 1

Main tasks

Preparation of GA’s drawings and detail packages.

PTE has created the masterplan for this six-hectare site adjoining Stratford City and including part of the Olympic Legacy land. Planning permission for the masterplan was obtained in July 2013, and the construction of the first phase, which stands at the gateway to the Olympic Village, in January 2014: it includes 173 homes and 1061 sq m of commercial floorspace, and features a ten-storey local landmark building.

ALBERTO LANCERIN I London, UK

page 10


FROM PAPER

ALBERTO LANCERIN I London, UK

page 11


TO SITE

Location

Location

Block D3, Ground floor Section through entrance door Ref to S.E.'s Detail 1 DE/3010

01

NOTE: Build up of ground and drainage to P&M and Landscape Architect details

GENERAL NOTES

Location

Block D3, Ground floor Ref to S.E.'s Detail 1 DE/3010

02

NOTE: Build up of ground and drainage to P&M and Landscape Architect details

03

Block D3, Ground floor Ref to S.E.'s Detail 1 DE/3010

This drawing is © 2014 PTE architects

NOTE: Build up of ground and drainage to P&M and Landscape Architect

Use figured dimensions only. DO NOT SCALE. All dimensions are in millimetres unless noted otherwise All levels are in metres above ordnance datum unless noted otherwise

This drawing must be read in conjunction with all other relevant drawings and sp Architect and other consultants

FROM A(16)009 SK WITH BRICK FACE MOVED OUT 1110mm CONCRETE UPSTAND MOVED TO SIT UNDER TIMBER FRAME FOR COMMENT AS INSTRUCTED BY HPL 13.03.15

dK

If in doubt, ask

38

39

392.5 5

387.5 WALL TYPE E8

WALL TYPE E8

WALL TYPE E8 277

F10 110

Brickwork F10 110A Brickwork

Duo window membrane HD ME501 adhered to breather membrane S.O.

Composite window L10 400

Sheathing board

Compressible fill under cill PPC cill

190

F30 248

Slot ties for brickwork

215 F10 110

190

Brickwork 30

F30 180A Cavity closer F30 345A Cavity tray 25

EXT

L20 200

F30 132

Weep hole

F30 248

Slot ties for brickwork

120mm PIR Insulation Board F30 345A Cavity tray

INT

Wood flush door

ToW 115mm wall to planter +10240

9.5 55.5

Compressible fill & shims as required to be supplied by window manufacturer

30mm PIR Insulation Board

102.5

F30 132

465 55

140

65

215

25

J40 120A Damp proofing

30 Damp proofingJ40 120A

FFL +10015

Damp proofing

OLD POSITION OF UPSTAND

FFL +10015

55

J40 120A

140

65

102.5 150 MIN

+10015

Weep hole

Timber stud 30

FFL +10015

ToC +10015

ToC +10000

10 10

155

SSL +9845

FLOOR TYPE 1

J30 110A 160

SSL +9845

300

ToC +9640

300 MIN

160

ToC +9640

Concrete fill

300 MIN

160

55 J30 110A Cold applied tanking

ToC +9640

Concrete fill

F30 111

Cold applied tanking

FLOOR TYPE F1

Cold applied tanking

155

155

10

SSL +9845

10

F30 111

J30 110A

Tanking and detail of planter to AREA / P&M's details

BASEMENT 230

21.04.15

A

11.03.15 \

ALBERTO LANCERIN I London, UK

rev

04.02.15 date

Timber frame set out as instructed by Hill. Upstand moved as instructed by HPL following advise from Timber Frame co. FIRST ISSUE description

FOR CONSTRUCTION - LEV page 12 drawing status


39 tbc

FFL LEVEL

740 BRICK S.O.

SSL LEVEL

50 300 tbc

226 tbc

50

Fall

GL 19

IG L11 Lintel tbc PPC cill

2260 BRICK S.O.

H92 120A Composite Metal Rainscreen Cladding

300 tbc

H92 120A Support Frame System

133 tbc

440

50mm Cavity insulation

TYPICAL DETAIL - SCALE 1:5

FFL LEVEL

740 BRICK S.O.

SSL LEVEL

TYPIC TYPICAL SECTION - SCALE 1:10 (SSL to SSL 3m; Applies to 2nd to 6th & 9th Floor)

ALBERTO LANCERIN I London, UK

page 13


Grahame Park Phase 1a Barnet, North London, UK

Team Client Dates Type Value

Pollard Thomas Edwards Genesis Housing Association 2007-2010 Residential ÂŁ4m for the whole regeneration 2002-2020

Main tasks

Preparation of 3D model; Concept design; GA’s drawings and detail packages.

The first phase of the regeneration, designed by PTE, focuses on the extensive but underused Grahame Park Open Space. 320 new homes wrap around the western edge of the park in a sinuous curve, creating spectacular views. Meanwhile the Open Space itself has been remodelled to designs by LBA, creating new ecological areas and new pathways which connect the surrounding neighbourhoods in order to transform the Open Space into the hub of the new community. Phase one was completed in 2012.

ALBERTO LANCERIN I London, UK

page 14


Rear elevation study

ALBERTO LANCERIN I London, UK

page 15


FROM VISION

ALBERTO LANCERIN I London, UK

page 16


TO REALITY

ALBERTO LANCERIN I London, UK

page 17


THANK YOU ALBERTO LANCERIN I 2018 albertolancerin@gmail.com +44 74 6326 8975


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.