Alec Parcell Sample Portfolio

Page 1

CURRICULUM VITAE +

Alec Parcell

PORTFOLIO

Architect ARB Selected works + experience



BACKGROUND • • • • •

Highly motivated and enthusiastic architect with a proven track record of working both independently and as par t of large teams. Experience of high-quality design work on commercial, residential and transpor t lead projects. Experience working across a variety of work stages from concept to construction with site experience in the UK Adept at presenting work to clients and coordinating designs with the wider project team and have demonstrated excellent written and verbal communication skills throughout this. Have an aptitude for organisation and problem solving as well as having over 5 years of experience using Revit and BIM both through practice and university.

Alec Parcell ARB 15 Brooksby Road Reading Berkshire RG31 6N A 07896902128 alecparcell@live.co.uk

EDUCATION 2019-2020

University of Westminster Architecture Postgraduate Diploma Professional Pract ice (Par t III)

2016-2018

Oxford Brookes University M ArchD Applied Design in Architecture (Par t II) Merit

2012-2015

University of Por tsmouth Architecture BA Hons (Par t I) First Class

EXPERIENCE Allies and Morrison LLP : 2018-Present 2 years experience as a Par t II Architectural Assistant 0.5 year experience as an Architect Working on a range of residential-led schemes within London Chapman Taylor LLP : 2015-2016 & 2017 1.5 years Experience as a Par t I Architectural Assistant Working on a range of retail and enter tainment focused schemes in the UK and globally

SKILLS Revit - AutoCAD - Adobe Creative Suite - Rhino3D Grasshopper - Sketchup - Microstation 2D - Enscape

Key Projects Aldgate Place Pha se 2 (PRS) Hale Whar f Phases 1&2 (Resi) Lampton Road Phase 2 (Resi) Key Projects Al Maktoum Int. Airpor t (Dubai) Knightsbridge Baku (Resi) Gatwick North Terminal IDL (Retail)


AMT-201 Proprietary metalwork permanent concrete formwork stair system including balustrade and handrail assemblies

2 240701

FIN-32

240700

Exit door to Office lobby

50

BF

50 8

BE

AMT-200

8mm thick metal plate to head of well 233mm deep to include lip

3 240700

300

2

50

IDR-104 Office Upper Floors Door to Primary Stairwell: Fire rated, single leaf, painted timber doorset with over-panel

SGN-13 Vinyl decal floor level indicators

Sheet linoleum flooring to staircases and secondary residential entrance

Escape stairsand ramps: wall-mounted handrails

2 240700

50

Extent of stringer plate to make stringer continuous with stairmaster

Conduit route for lighting

50

201

201

Dry riser

8

35

9

12

10

300

300

13

11

1100

214

1100

8mm metal stringer

250

15

11

FFL +24481

2

FIN-32 Sheet linoleum flooring to staircases and secondary residential entrance

AMT-201 Sufrace mounted light fitting to landing and half landing ceiling Proprietary metalwork

7

SGN-26 SGN-13

6

19

Dry riser sign - statutory

3

5

permanent concrete formwork stair system including balustrade and handrail assemblies

1000

20x50mm bottom rail

FIN-100

2

Dust sealer to exposed unpainted concrete round column surface

1

FFL + 22.635

8mm thick Stepped Stringer 8mm lip to tread and riser edge on well and wall sides

60

Sheet linoleum flooring to staircases and secondary residential entrance

Graphics to wall

3

Aluminium stair edging with slip resistant inserts

FIN-32

4

FFL +22635 SSL +22627

10mm diameter baluster

FIN-32 Sheet linoleum flooring to staircases and secondary residential entrance Sufrace mounted lightresistant inserts Aluminium stair edging with slip fitting to landing and half landing ceiling

SSL +24473

10

Vinyl decal floor level indicators

FIN-33 Non-slip nosing to stair treads

AMT-200 Escape stairsand ramps: wall-mounted handrails

8

JNY-31 Planted timber skirting

A_Level 02 FFL + 22.635

18

240700

4

0 20

3 240700

12

9

A_Level 02

FIN-32 Sheet linoleum flooring to staircases and secondary residential 3 entrance

13

8

8mm metal stringer 43

14

AMT-200 Escape stairsand ramps: wall-mounted handrails

50

11 00

43

FIN-32 Sheet linoleum flooring to staircases and secondary residential entrance 25mm Stairmaster tolerance

7

14

16

50 50

50 50

58

36

6

98

8

5

58

20

15

17

20

4

8 35

JNY-31 Planted timber skirting

18

8

16

19

Sufrace mounted light fitting to landing and half landing ceiling

1000

17

9 NO. TREADS PER FLIGHT

18

2 240702

FFL + 26.160

8

3

8mm metal stepped stringer with 8mm lip to riser and tread

A_Level 03

225

2

19

Graphics to wall

1

250

250

20

21 20

21 NO. RISERS @ 168MM

1

21

SSL +26152

FFL + 26.160

1000

300 UP

21

10 NO. TREADS PER FLIGHT

300

250

AMT-200 Escape stairsand ramps: wall-mounted handrails

FFL +26160

A_Level 03

AMT-200 Escape stairsand ramps: wall-mounted handrails

8mm metal plate to insitu concrete landing

240702

1000

240701

1 240701

1

AMT-201 Proprietary metalwork permanent concrete formwork stair system including balustrade and handrail assemblies

168

2 11 00

1000

FIN-32 Sheet linoleum flooring to staircases and secondary residential Surface mounted light fitting to entranceand half landing landing

1

50

240702

8mm thick metal plate to head of well 233mm deep to include lip 2

2

3

240700

240700

240700

1

STAIR A1 TYPICAL PLAN DETAIL

2

1 : 25

STAIR A1 TYPICAL SECTION AA 1 : 25

1

STAIR A1 TYPICAL HANDRAIL DETAIL

3

1:5

REV

N

REV

N

A

B

Do not scale from this drawing. Use figured dimensions only. Figured dimensions are in millimetres unless noted P01 otherwise. All dimensions and levels shall be verified on site before proceeding with works. Detailed site survey P02 to be carried out to verify positions and level relationships with site features and ordnance survey. The Architect must be notified of any discrepancy. Boundaries are indicative only and are to be verified by others. Where building components are described in the specification as Descriptive Specification - (Contractor Design) elements shown on this drawing pertaining to those components are to be read as "Issued for Design Intent only". Allies & Morrison LLP is not responsible for any errors caused by the transmission, translation, software or computer systems. Allies & Morrison LLP is not responsible for nor shall be liable for the consequences of any use made of the drawings or models other than that for which they were produced by Allies & Morrison LLP for the Client. All Intellectual Property Rights reserved

DATE

STATUS

04.09.2020 S3 - Suitable for Review and Comment 09.10.2020 S4 - Suitable for Stage Approval

A

CKD

YC SF

B

Do not scale from this drawing. Use figured dimensions only. Figured dimensions are in millimetres unless noted P01 otherwise. All dimensions and levels shall be verified on site before proceeding with works. Detailed site survey P02 to be carried out to verify positions and level relationships with site features and ordnance survey. The Architect must be notified of any discrepancy. Boundaries are indicative only and are to be verified by others. Where building components are described in the specification as Descriptive Specification - (Contractor Design) elements shown on this drawing pertaining to those components are to be read as "Issued for Design Intent only". & Morrison LLP is not responsible for any errors caused by the transmission, translation, software or computer systems. Allies & Morrison LLP is not responsible for nor shall be liable for the consequences of any use made of the drawings or models other than that for which they were produced by Allies & Morrison LLP for the Client. All Intellectual Property Rights reserved

DATE

STATUS

2

1 : 25

CKD

04.09.2020 S3 - Suitable for Review and Comment 09.10.2020 S4 - Suitable for Stage Approval

1:5

Al l i e s a n d M o r r i s o n L L P

ALDGATE PLACE : Block AB

85 Southwark Street London SE1 OHX 020 7921 0100 020 7921 0101 studio@alliesandmorrison.com

STAIR A1 DETAILS

A&M JOB No: 707_03

SCALE 1 : 5 @A1

PROJECT DEVELOPER

Al l i e s a n d M o r r i s o n L L P

ALDGATE PLACE : Block AB

85 Southwark Street London SE1 OHX 020 7921 0100 020 7921 0101 studio@alliesandmorrison.com

STAIR A1 TYPICAL DETAILS

A&M JOB No: 707_03

SCALE 1 : 25 @A1

telephone facsimile email

PROJECT DEVELOPER

telephone facsimile email

TYPICAL STAIR A1 WELL DETAIL SECTION

DESCRIPTION

YC SF

Allies DESCRIPTION

ALDAB-AAM-ZZZ-ZZ-M3-AR-000001

STAIR A1 TYPICAL SECTION BB

STAIRS & LIFTS ALDAB-AAM-OFF-ZZ-DR-AR-240700 1 : 50 @A3

STAIRS & LIFTS ALDAB-AAM-OFF-ZZ-DR-AR-240701 1 : 10 @A3

P02 Revision

ALDAB-AAM-ZZZ-ZZ-M3-AR-000001

ALDGATE PL ACE PH ASE 2

Allies and Morrison

Current Stage Value Client Workstage Involvement

Stage 4 ÂŁ60 million British Land Stages 1-4

Aldgate Place Phase 2 is a mixed-use scheme forming the final par t of the masterplan that redevelops a piece of land near Aldgate East Underground Station. The project consisted of a Nonmaterial amendment to a 25 storey tower changing the use from residential to a private rental sector (PRS) scheme with an adjoining office block and retail at ground level. I was involved in the feasibility study of the tower for its conversion all the way through to coordinating structural and MEP changes that were made throughout the design process. Following a successful planning application my work centred around the stair and lift package for tender, alongside metalwork and floor packages with both drawings and specifications. This process was ver y impor tant as I sat between the internal and external teams for these elements so communication was vital to be successful. This was also managed for the most par t under working from home conditions due to the pandemic.

P02 Revision


02.

01. 03 03.

04.

06.

Level_07

2500

03. 04.

3150

FFL 31500

05. 06.

Level_06

3150

2500

FFL 28350

08.

Level_05 FFL 25200

2500

03.

3150

07.

Level_04

4

3150

2500

FFL 22050

P H A S E 2 R E S E RV E D M AT T E R S

Level_03

3150

2500

FFL 18900

Level_02

Key to Bay Study

FFL 15750

01. Metal Standing Seam Roof 3600

02. Roofsafe Rail 03. Openable Glazing 04. Light Grey Metal Window Frame 05. Light Grey Metal Balustrade 06. Light Grey Metal Cill

Level_01 FFL 12150

07. Brickwork

10. 11. 11. 05.

08. Texture Brickwork 09. Light Grey Solid Metal Panel 2500

12.

10. Louvred Timber Panel

3150

09.

11. Timber Door 12. Timber Window Frame

Level_00 FFL 9000

Elevation BayEast study - Blocks D & E West Elevation

Section AA

HALE WHARF Phase 2 Reserved Matters Design and Access Statement August 2018

Plan - Typical Floor

BLOCK F

97

01. Metal Standing Seam Roof 02. Roofsafe Rail 03. Openable Glazing 04. Light Grey Metal Window Frame 05. Light Grey Metal Balustrade 06. Light Grey Metal Cill 07. Brickwork 08. Texture Brickwork 09. Light Grey Solid Metal Panel 10. Louvred Timber Panel 11. Timber Door 12. Timber Window Frame

BLOCK E

BLOCK C

BLOCK D

BLOCK B

BLOCK A

Plan - Ground Floor REV

Do not scale from this drawing. Use figured dimensions only. Figured dimensions are in millimetres. All levels are in metres. All dimensions and levels shall be verified on site before proceeding with works. Detailed site survey to be carried out to verify positions and level relationships with site features and ordnance survey. The Architect must be notified of any discrepancy. Where building components are described in the specification as Descriptive Specification (Contractor Design) elements shown on this drawing pertaining to those components are to be read as "Issued for Design Intent" only. Allies & Morrison LLP is not responsible for any errors caused by the transmission, translation, software or computer systems. Allies & Morrison LLP is not responsible for, nor shall be liable for, the consequences of any use made of the drawings or models, other than that for which they were produced by Allies & Morrison LLP for the Client.

P1

DATE

DESCRIPTION

03.08.2018 ISSUED FOR PLANNING

CKD

H ALE WH ARF PH ASES 1 & 2

535_05_BlockDEF

Current Stage Value Client Workstage Involvement 68

Allies and Morrison LLP

MC

1:50 0

1

2

85 Southwark Street London SE1 OHX 020 7921 0100 020 7921 0101 studio@alliesandmorrison.com

Hale Wharf - Phase 2 & 3 : Blocks D,E,F

Blocks D & E Bay Study - East Elevation

Allies and Morrison 5m

telephone facsimile email

A&M JOB No: 535_05

535_05_DE_07_501

P1 Revision

SCALE 1 : 50 @A1 SCALE 1 : 100 @A3

All Intellectual Property Rights Reserved

Phase 1 - Construction; Phase 2 - Stage 3 ÂŁ100 million Muse Developments Phase 1 - compliance monitoring on site; Phase 2 - Stage 3 H A LE WH A RF Phase 2 Reserved Matters Design and Access Statement August 2018

69

Hale Whar f is a waterside regeneration project in nor th east London comprising of ten buildings across the masterplan. My earliest involvement was during Stage 3, within Phase 2 of the project, which was producing early tender informat ion for the scheme following its planning approval. This required structural coordination with the wider consultant team, which I led on. Complex refuse and back of house studies were required due to increases in plant requirements on the project. Following on from my Par t III case study where I shadowed the construction work on Hale Whar f Phase 1, I became involved in the compliance monitoring role and witnessed the construction and gained valuable experience on site. This was a ver y helpful process to understand where efficiencies could be made when going for ward to work on Aldgate Place since the same main contractor was engaged.


+47.040 Parapet Height

3365

+45.865 Roof

1175

1.

2.

+42.500 L06

3075

3.

+39.425 L05

3075

3.

4.

+36.350 L04

3075

6.

3075

+33.275 L03

3300

+30.200 L02

5.

3450

+26.900 L01

7.

Folding Line

11.

East Elevation

+23.450 L00

Section AA

Section BB +53.190 Parapet Height

+47.040 Parapet Height

A

01. 02. 03. 04. 05. 06. 07. 08. 09. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19.

B

Groud Level Do not scale from this drawing. Use figured dimensions only. Figured dimensions are in millimetres. All levels are in metres. All dimensions and levels shall be verified on site before proceeding with works. Detailed site survey to be carried out to verify positions and level relationships with site features and ordnance survey. The Architect must be notified of any discrepancy. Where building components are described in the specification as Descriptive Specification - (Contractor Design) elements shown on this drawing pertaining to those components are to be read as "Issued for Design Intent" only. Allies & Morrison LLP is not responsible for any errors caused by the transmission, translation, software or computer systems. Allies & Morrison LLP is not responsible for, nor shall be liable for, the consequences of any use made of the drawings or models, other than that for which they were produced by Allies & Morrison LLP for the Client.

REV

DATE

DESCRIPTION

CKD

SK1 30.11.18 Draft for comment

LS

SK2 22.01.19 For Information SK3 04.02.19 For Information

LS LS

N

telephone facsimile email

REV

DATE

DESCRIPTION

SK1 01.11.18 For Information

L AMPTON ROAD PH ASE 2

SK2 16.11.18 Draft for comment SK3 22.01.19 For Information SK4 04.02.19 For Information

Current Stage Value Client Workstage Involvement

1018_02_Buildings 1018_02_Buildings

+40.890 Parapet Height

+37.815 Parapet Height

D R AF T

A l l i e s a n d M o r r i s o n LL P

Lampton Road Phase 2

85 Southwark Street London SE1 OHX 020 7921 0100 020 7921 0101 studio@alliesandmorrison.com

Block F - Bay Study 1 (Square Front)

A&M JOB No: 1018_02

1018_02_Buildings

Do not scale from this drawing. Use figured dimensions only. Figured dimensions are in millimetres. All levels are in metres. All dimensions and levels shall be verified on site before proceeding with works. Detailed site survey to be carried out to verify positions and level relationships with site features and ordnance survey. The Architect must be notified of any discrepancy. Where building components are described in the specification as Descriptive Specification - (Contractor Design) elements shown on this drawing pertaining to those components are to be read as "Issued for Design Intent" only. Allies & Morrison LLP is not responsible for any errors caused by the transmission, translation, software or computer systems. Allies & Morrison LLP is not responsible for, nor shall be liable for, the consequences of any use made of the drawings or models, other than that for which they were produced by Allies & Morrison LLP for the Client.

Metal Roof Coping Metal Window Frame Openable Glazing Metal Balustrade Solid Metal Panel Brickwork Textured Brickwork Timber Door Louvred Timber Door Louvred Metal Door Metal Fencing Standing Seam Metal Roof Decking RWP Perforated Metal Post Boxes Curtain Wall Concrete separation wall Brick Reveal

BAY STUDY 1018_02_F_07_400 SCALE 1:100 @ A3

SK3 Revision

All Intellectual Property Rights Reserved

CKD

N

LS

Allies and Morrison AS LS LS

0

10.00 m

20.00 m

Stage 3 ÂŁ80 million Notting Hill Genesis Housing Stage 2 (planning)

telephone facsimile email

A l l i e s a n d M o r r i s o n LL P

Lampton Road Phase 2

85 Southwark Street London SE1 OHX 020 7921 0100 020 7921 0101 studio@alliesandmorrison.com

Block F - East Courtyard Section A

A&M JOB No: 1018_02

GENERAL ARRANGEMENT 1018_02_F_07_303 SCALE 1 : 300 @A3

SK4 Revision

All Intellectual Property Rights Reserved

Lampton Road Phase 2 was a residential masterplan for 750 units developed from an outline masterplan Allies and Morrison had designed. The work involved creating a 3D model from scratch within Revit to produce drawings for a Reser ved Matters Application. I was involved in Lampton Road from the inception of the team and therefore had a wide knowledge base to share as the team grew around me. I took a lead on Block F to take for ward the design development of both unit plans and the facade for which we had regular in -house design reviews with the par tners. Elevati onal composition studies formed the bulk of this work and culminated in producing a full set of plans, elevations and sections for the project to be submitted for planning approval.


G R AY

N ’S IN

ROAD

GR AY ’S IN N RO SW I N TO N ST R E E T

AD SW

IN

TO

N

ST

RE

ET

roof Plan

Swinton Street elevation

GRAYS INN ROAD

Allies and Morrison

Current Stage Value Client Workstage Involvement

Competition Bid Undisclosed Private Concept

I was selected to run a competition for a mixed-use scheme consisting of office, hotel and residential in the hear t of central London on the site of the Royal Ear, Nose and Throat Hospital, Kings Cross. This project allowed me to develop relationshps within the office with par tners I had not previously worked with and orchestrate a small team, including graphics and the model shop to produce a competition-standard entr y. It was a great experience to showcase my organisational skills as well as an oppor tunity to voice my opinion on the design at a conceptual stage.


A R C H I T E C T U R E P O RT F O L I O 2

1

3 4 6

5 7

1 2 3 4 5 6 7

Node IDL Node Mall Node Dwell Area Swirl Concept Figure 8 Concept Loop Concept Interlock Concept

Project Brief: Retail masterplanning of the concourse and lounge areas of 12 node terminals at Al Maktoum International with the focus on catering for long haul transfer passengers as the airport bids to be a global super hub.

AL M AKTOUM INT. AIRPORT

Chapman Taylor

Current Stage Value Client Workstage Involvement

Construction Undisclosed Dubai Airpor ts Company Stage 2

Al Maktoum International Airpor t is to become a global superhub airpor t in Dubai by 2050 where the twelve terminals are estimated to be able t o handle 200 million passengers. The work we c arried out here designed the international depar ture lounge environment with retail, enter tainment, lo unges 1 Node IDL Plan and restaurants. These stemmed from early concept sketches and were developed into Revit 2 designs 2 Node Void Space nning of the concourse and lounge 1 3and renders Node VCC Area e terminals atmodels Al Maktoum to generate views from. Structural coordination was vital as the design for a 3 4 Leisure Level th the focus on catering for long haul single was based5 around the airpor t people mover (APM) system which runs between them. Lounge Level ers as the airport bids to beterminal a global 4 5 6 6 IDL Level This had multiple iterations during the design development of the interior which led to coordination issues which had to be resolved and turned around in tight deadlines for presentations with the client. A R C H I T E C T U R E P O RT F O L I O 12


B

K N I G HT S BR I DG E B AK U S CHO O L

B

-13.000

Level 0

Level 1 C

C

Level B1

1:300 @ A3 Ground Floor Plan FFL -13.0m

-17.000

Drn. Drn.

Owner: Owner:

5

B

I

C

J 11

10

9

8

7

6

5

4

3

2

D

K

Stair Core

2

Library / ICT

1

Corridor

First Aid Reception

Author Checked by: Approved by: Checker Approver

5

Scale:

Sheet:

@A1

of: Rev:

-

-

1

© COPYRIGHT CHAPMAN TAYLOR 2015

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.

E

F

G

H

I

J

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON

K

11

A

-

THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE L M N AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND ONCE PRINTED AND DISRIBUTED THIS DOCUMNET IS ASSUMED UNCONTROLLED DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS. © All rights reserved. No part of this drawing may be repoduced or transmitted in any forms and by any means without written permission of the copyright holder.

B

Scale:

D

C

Description

Owner:

PASHA Insaat

Construction Manager:

PASHA Insaat

Drn. Ckd. Appd. Date

10

N

PASHA INSAAT MMC.

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

PASHA INSAAT MMC.

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

Chapman Taylor

URAL Engineering Co. Inc

Architect:

Black & White Engineering Limited

11

Bass Warehouse 4 Castle Street Castlefield Manchester, MLZ T: +44 (0)161 828 6500 F: +44 (0)161 828 6505

Structural Engineer: Akpınar Mahallesi Dikmen Caddesi No:538/14 Çankaya, 06460 Ankara, Turkey T: +90 (312) 475 2848 F: +90 (312) 475 2844 e-mail:info@ural.comtr

Services Engineer: Unit 2.8 First Floor Generator Studios Trafalgar Street Newcastle upon Tyne NE1 2LA T: +44 (0)191 230 0206 e-mail:enquiries@bw-engineering.com

WSP Group (London)

H+H Fire

Approver

WSP House 70 Chancery Lane London WC2A 1AF T: +44 (0)207 314 5000 F: +44 (0)207 314 5111

41-42 London Wall London EC2M 5TB T: +44 (0)207 193 2990 e-mail:glennhorton@hhfire.com

Approved by: Checker

Sheet:

Traffic Consultant:

Checked by:

Scale:

Rev:

1 : 150 @A1 of:

-

BAKU KNIGHTSBRIDGE

Fire Engineer:

Project Description:

Drawing Title:

Author

School_Level 1

Status:

Drawn by:

Orginal Sheet Size:

-

Tender / Construction / As-Built / For Information

Client Project Code:

A1

-

© COPYRIGHT CHAPMAN TAYLOR 2015

1330

AR - BKN -

Drawing Number:

-

THIS DRAWING MUST NOT BE SCALED.

N

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Ckd. Appd. Date

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.

Drn.

PASHA INSAAT MMC.

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON

Description

Owner:

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

9

8

1 2 3 4

3

2

K

G

15

H

I

A R C H I T E C T U R E P O RT F O L I O

N N

Level 1

PASHA INSAAT MMC.

Drn. N

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Ckd. Appd. Date

T: 00 00 994 994 12 12 404 404 48 48 00 00 T: F: 00 00 994 994 12 12 498 498 58 58 01 01 F:

Chapman Taylor Taylor Chapman Bass Warehouse Warehouse Bass 4 4 Castle Castle Street Street Castlefield Castlefield Manchester, MLZ MLZ Manchester, T: +44 +44 (0)161 (0)161 828 828 6500 6500 T: F: +44 +44 (0)161 (0)161 828 828 6505 6505 F:

A R C H I T E C T U RProject E Brief: P O RT F O L I O

16

Baku Knightsbridge S

Design forStructural the school to sit withinURAL Baku Knightsbridge Structural Engineer: Engineer: URAL Engineering Engineering Co. Co. Inc Inc residential development. Prep school for children Akpınar Mahallesi Mahallesi Dikmen Dikmen Akpınar Chapman Taylor Caddesi Caddesi No:538/14 No:538/14 Çankaya, 06460 Ankara, Çankaya, 06460 Ankara, Turkey Turkey from the local area designed over 5 levels and with T: +90 +90 (312) (312) 475 475 2848 2848 T: F: +90 +90 (312) (312) 475 475 2844 2844 F: expansive green space to the rear of the school hall. e-mail:info@ural.comtr e-mail:info@ural.comtr

Current Stage Value Client Workstage Involvement

Construction Undisclosed Private Stage 2

Services Services Engineer: Engineer:

Black Black & & White White Engineering Engineering Limited Limited Unit 2.8

Traffic Consultant: Consultant: Traffic

WSP Group Group (London) (London) WSP

Unit 2.8 First Floor Floor First Generator Studios Studios Generator Trafalgar Street Street Trafalgar Newcastle Newcastle upon upon Tyne Tyne NE1 NE1 2LA 2LA T: +44 +44 (0)191 (0)191 230 230 0206 0206 T: e-mail:enquiries@bw-engineering.com e-mail:enquiries@bw-engineering.com

WSP House House WSP 70 70 Chancery Chancery Lane Lane London London WC2A 1AF 1AF WC2A T: +44 +44 (0)207 (0)207 314 314 5000 5000 T: F: +44 +44 (0)207 (0)207 314 314 5111 5111 F:

H+H H+H Fire Fire The Baku Knightbridge masterplan develop ed by Chapman Taylor comprises residential, office and ed ucation. It was designed in a classical style and was created as an outline masterplan with the residential components having been taken for ward for completion earlier. This left the site BAKU BAKU KNIGHTSBRIDGE KNIGHTSBRIDGE for the school which I was tasked with developing the internal strategy for. I developed the model Section CC CC for creating the drawings within Revit to use inSection documentation. It was an oppor tunity for me to get involved in the early planning and design of how the school could function and we enlisted an education consultant alongside the benchmarking of theAs-Built scheme to existing examples, since this Tender // Construction Construction // As-Built For Information Information Tender // For was the first school that Chapman Taylor had designed. Fire Fire Engineer: Engineer:

N N

41-42 41-42 London London Wall Wall London London EC2M 5TB 5TB EC2M T: +44 +44 (0)207 (0)207 193 193 2990 2990 T: e-mail:glennhorton@hhfire.com e-mail:glennhorton@hhfire.com

Project Project Description: Description:

Drawing Drawing Title: Title:

Status: Status:

Drawn by: by: Drawn

Checked by: by: Checked Author Author

Client Project Project Code: Code: Client

1330 --

Approved by: by: Approved Checker Checker

Orginal Sheet Sheet Size: Size: Orginal

Drawing Number: Number: Drawing

AR -- BKN AR BKN --

THIS DRAWING MUST NOT BE SCALED. THIS DRAWING MUST NOT BE SCALED.

Scale: Scale:

A1 --

Approver Approver

Sheet: Sheet:

of: 1 :: 150 150 @A1 @A1 of: 1 Rev: Rev:

--

--

© COPYRIGHT CHAPMAN TAYLOR 2015 © COPYRIGHT CHAPMAN TAYLOR 2015

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR. OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.

K K

L L

M M

N N

ONCE PRINTED AND DISRIBUTED DISRIBUTED THIS THIS DOCUMNET DOCUMNET IS IS ASSUMED ASSUMED UNCONTROLLED UNCONTROLLED ONCE PRINTED AND dge School/Court 4 | Stage A/B Report

D

Description

Owner:

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

PASHA INSAAT MMC.

Bass Warehouse 4 Castle Street Castlefield Manchester, MLZ T: +44 (0)161 828 6500 F: +44 (0)161 828 6505

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

Chapman Taylor

Rev.

PASHA Insaat

Construction Manager:

PASHA Insaat

URAL Engineering Co. Inc

Akpınar Mahallesi Dikmen Caddesi No:538/14 Çankaya, 06460 Ankara, Turkey T: +90 (312) 475 2848 F: +90 (312) 475 2844 e-mail:info@ural.comtr

Black & White Engineering Limited

Architect:

Structural Engineer:

H+H Fire

WSP House 70 Chancery Lane London WC2A 1AF T: +44 (0)207 314 5000 F: +44 (0)207 314 5111

Unit 2.8 First Floor Generator Studios Trafalgar Street Newcastle upon Tyne NE1 2LA T: +44 (0)191 230 0206 e-mail:enquiries@bw-engineering.com

Approver

Rev:

Sheet:

41-42 London Wall London EC2M 5TB T: +44 (0)207 193 2990 e-mail:glennhorton@hhfire.com

-

Scale:

1 : 150 @A1 of:

WSP Group (London)

-

Approved by: Checker

Services Engineer:

Traffic Consultant:

-

© COPYRIGHT CHAPMAN TAYLOR 2015

A1

Orginal Sheet Size:

Checked by:

BAKU KNIGHTSBRIDGE

Fire Engineer:

Project Description:

Drawing Title:

Author

AR - BKN -

School_Level 2

Status:

-

1330

Central Section Entrance View Car Park Section SCHOOL Rear View Street Elevation

Drawn by:

1 1 2 4 3 KNIGHTSBRIDGE 3 4 5 5

C

Port Baku Baku Towers Towers Port 153, Neftchilyar Neftchilyar Avenue Avenue 153, AZ1010 AZ1010 Baku, Azerbaijan Azerbaijan Baku,

Architect: Architect:

2

Drawing Number:

T: 00 00 994 994 12 12 404 404 48 48 00 00 T: F: F: 00 00 994 994 12 12 498 498 58 58 01 01

B

PASHA PASHA INSAAT INSAAT MMC. MMC.

PASHA Insaat

-17.000

A

Port Baku Baku Towers Towers Port 153, 153, Neftchilyar Neftchilyar Avenue Avenue AZ1010 AZ1010 Baku, Azerbaijan Azerbaijan Baku,

Construction Manager: Manager: Construction

Level B1

2

PASHA INSAAT INSAAT MMC. MMC. PASHA

PASHA Insaat

-13.000

Ckd. Appd. Appd. Date Date Ckd.

3

1

Tender / Construction / As-Built / For Information

Drn. Drn.

L M ONCE PRINTED AND DISRIBUTED THIS D © All rights reserved. No part of this drawing may be 4

THIS DRAWING MUST NOT BE SCALED.

Description Description

Owner: Owner:

K

4 6

5

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.

Rev. Rev.

J

Client Project Code:

17

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON

-7.000

THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE L M N AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND ONCE PRINTED AND DISRIBUTED THIS DOCUMNET IS ASSUMED UNCONTROLLED DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS. © All rights reserved. No part of this drawing may be repoduced or transmitted in any forms and by any means without written permission of the copyright holder.

F

D

Approver

Rev:

Sheet:

1 : 150 @A1 of:

C

Baku Knightsbridge School/Court 4 | Stage A/B Report Baku Knightsbridge School/Court 4 | Stage A/B Report

-

THIS DRAWING MUST NOT BE SCALED.

-

Status:

AR - BKN -

Approved by: Checker

-

-

A1

Drawing Number:

Checked by:

Orginal Sheet Size:

1330

Approver

Drawn by:

Approved by: Checker

Tender / Construction / As-Built / For Information

2

Client Project Code:

Checked by:

© COPYRIGHT CHAPMAN TAYLOR 2015

B

Author

A1

A

Drawn by:

Orginal Sheet Size:

4

Tender / Construction / As-Built / For Information

Author

BAKU KNIGHTSBRIDGE

Status:

AR - BKN -

3

Project Description:

Drawing Title:

Ground Floor Iso

-

H+H Fire

1330

4

WSP House 70 Chancery Lane London WC2A 1AF T: +44 (0)207 314 5000 F: +44 (0)207 314 5111

41-42 London Wall London EC2M 5TB T: +44 (0)207 193 2990 e-mail:glennhorton@hhfire.com

Drawing Number:

WSP Group (London)

Client Project Code:

Traffic Consultant:

Unit 2.8 First Floor Generator Studios Trafalgar Street Newcastle upon Tyne NE1 2LA T: +44 (0)191 230 0206 e-mail:enquiries@bw-engineering.com

Fire Engineer:

1

Rev.

PASHA Insaat

Construction Manager:

Bass Warehouse 4 Castle Street Castlefield Manchester, MLZ T: +44 (0)161 828 6500 F: +44 (0)161 828 6505

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

Chapman Taylor

PASHA INSAAT MMC.

URAL Engineering Co. Inc

PASHA Insaat

Black & White Engineering Limited

Akpınar Mahallesi Dikmen Caddesi No:538/14 Çankaya, 06460 Ankara, Turkey T: +90 (312) 475 2848 F: +90 (312) 475 2844 e-mail:info@ural.comtr

Structural Engineer:

Architect:

Services Engineer:

H+H Fire

WSP House 70 Chancery Lane London WC2A 1AF T: +44 (0)207 314 5000 F: +44 (0)207 314 5111

41-42 London Wall London EC2M 5TB T: +44 (0)207 193 2990 e-mail:glennhorton@hhfire.com

Approver

Rev:

Sheet:

WSP Group (London)

-

Scale:

1 : 150 @A1 of:

Unit 2.8 First Floor Generator Studios Trafalgar Street Newcastle upon Tyne NE1 2LA T: +44 (0)191 230 0206 e-mail:enquiries@bw-engineering.com

-

Approved by: Checker

Traffic Consultant:

-

Checked by:

© COPYRIGHT CHAPMAN TAYLOR 2015

A1

Orginal Sheet Size:

BAKU KNIGHTSBRIDGE

Fire Engineer:

Project Description:

Drawing Title:

School_Level 0

Status:

Drawn by: Author

AR - BKN -

Tender / Construction / As-Built / For Information

-

1330

Drawing Number:

THIS DRAWING MUST NOT BE SCALED.

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.

Client Project Code:

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON

E

Status:

Drawn by:

Rev:

Sheet:

Black & White Engineering Limited

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON

Services Engineer:

7

D

Tender / Construction / As-Built / For Information

-

Scale:

THIS DRAWING MUST NOT BE SCALED.

1 : 150 @A1 of:

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.

-

© COPYRIGHT CHAPMAN TAYLOR 2015

A1

Orginal Sheet Size:

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01 Bass Warehouse 4 Castle Street Castlefield Manchester, MLZ T: +44 (0)161 828 6500 F: +44 (0)161 828 6505

12

Level 0

JJ

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

Chapman Taylor

URAL Engineering Co. Inc Akpınar Mahallesi Dikmen Caddesi No:538/14 Çankaya, 06460 Ankara, Turkey T: +90 (312) 475 2848 F: +90 (312) 475 2844 e-mail:info@ural.comtr

2

+1.000

nightsbridge School/Court 4 | Stage A/B Report

2

PASHA INSAAT MMC.

PASHA Insaat

Structural Engineer:

Rev.

THE L M N E F G H BASIS OF THESE PREDICTIONS, WHETHER ASITO PROJECT VIABILITY, PRE-LETTING, LEASE J AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND ONCE PRINTED AND DISRIBUTED THIS DOCUMNET IS ASSUMED UNCONTROLLED DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS. © All rights reserved. No part of this drawing may be repoduced or transmitted in any forms and by any means without written permission of the copyright holder.

3

6

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Architect:

3

2

Ckd. Appd. Date

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

Construction Manager:

4

1

Drn.

PASHA INSAAT MMC.

PASHA Insaat

1

-3.000

3

AR - BKN -

K

-13.0m

--

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS. DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS.

Level 2

4

7

Description

Owner:

5

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR. OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.

C

5

THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE L M N AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND ONCE PRINTED AND DISRIBUTED THIS DOCUMNET IS ASSUMED UNCONTROLLED DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS. © All rights reserved. No part of this drawing may be repoduced or transmitted in any forms and by any means without written permission of the copyright holder. 8

Rev.

6

Rev: Rev:

Level 3

6

9

7

© COPYRIGHT CHAPMAN TAYLOR 2015 © COPYRIGHT CHAPMAN TAYLOR 2015

Level 5

7

10

1:300 @ A3 Second Floor Plan FFL -5.0m

8

D

--

+3.800

8

J

--

-

K

-13.0m

Sheet: Sheet:

M N M N D DISRIBUTED DISRIBUTED THIS THIS DOCUMNET DOCUMNET IS IS ASSUMED ASSUMED UNCONTROLLED UNCONTROLLED D of this this drawing drawing may be be repoduced repoduced or or transmitted transmitted in in any any forms forms and and by by any any means means without without written written permission permission of of the the copyright copyright holder. holder. 10 tt of may

9

N

C

entral Section

I

THIS DRAWING MUST NOT BE SCALED. THIS DRAWING MUST NOT BE SCALED.

1Level 5 A2R C H I T E C T U R E P O R T F O L I O

9

1 of: 1 :: 150 150 @A1 @A1 of:

THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE L M N AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND ONCE PRINTED AND DISRIBUTED THIS DOCUMNET IS ASSUMED UNCONTROLLED DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS. © All rights reserved. No part of this drawing may be repoduced or transmitted in any forms and by any means without written permission of the copyright holder.

AR AR -- BKN BKN --

1330

10

B

A1

Drawing Drawing Number: Number:

--

Scale: Scale:

11

Approver Approver

K

1330

-17.000

Orginal Orginal Sheet Sheet Size: Size:

11

10

Approved Approved by: by: Checker Checker J

Checked by: by: Checked Author Author

Client Client Project Project Code: Code:

Level B1

11

-17.0m

I

Drawn by: by: Drawn

THIS DRAWING MUST NOT BE SCALED.

N

9

8

7

6

5

4

3

2

1

H

Tender // Construction Construction // As-Built As-Built // For For Information Information Tender

D

A

H

-13.000

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.

Ckd. Appd. Date

Changing Room

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

Classroom

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

PASHA INSAAT MMC.

T: 00 994 12 404 48 00 F: 00 994 12 498 58 01

Port Baku Towers 153, Neftchilyar Avenue AZ1010 Baku, Azerbaijan

Chapman Taylor

Bass Warehouse 4 Castle Street Castlefield Manchester, MLZ T: +44 (0)161 828 6500 F: +44 (0)161 828 6505

Akpınar Mahallesi Dikmen Caddesi No:538/14 Çankaya, 06460 Ankara, Turkey T: +90 (312) 475 2848 F: +90 (312) 475 2844 e-mail:info@ural.comtr

Hall

C

Drawing Number:

Drn.

Store Room

N N

Level 0

Status: Status:

B

Baku Knightsbridge S

Client Project Code:

PASHA INSAAT MMC.

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON

Rev. Description

Owner:

PASHA Insaat

Kitchen / Servery URAL Engineering Co. Inc

Unit 2.8 First Floor Generator Studios Trafalgar Street Newcastle upon Tyne NE1 2LA T: +44 (0)191 230 0206 e-mail:enquiries@bw-engineering.com

WSP Group (London)

H+H Fire

WSP House 70 Chancery Lane London WC2A 1AF T: +44 (0)207 314 5000 F: +44 (0)207 314 5111

Approver

Sheet:

Rev:

41-42 London Wall London EC2M 5TB T: +44 (0)207 193 2990 e-mail:glennhorton@hhfire.com

Approved by: Checker

Scale:

1 : 150 @A1 of:

-

Black & White Engineering Limited

PASHA Insaat

Construction Manager:

Architect:

Structural Engineer:

Services Engineer:

Traffic Consultant:

Checked by:

-

BAKU KNIGHTSBRIDGE

Fire Engineer:

Project Description:

Drawing Title:

Author

School_Level 0

Status:

Drawn by:

Orginal Sheet Size:

A1

-

© COPYRIGHT CHAPMAN TAYLOR 2015

Tender / Construction / As-Built / For Information

Client Project Code:

1330

Drawing Number:

Cloakroom Toilets

A

12

Entrance

Section AA AA // BB BB Section

-13.0m

THE L M N E F G H BASIS OF THESE PREDICTIONS, WHETHER ASITO PROJECT VIABILITY, PRE-LETTING, LEASE J AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND 11 ONCE PRINTED AND DISRIBUTED THIS DOCUMNET IS ASSUMED UNCONTROLLED DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS. © All rights reserved. No part of this drawing may be repoduced or transmitted in any forms and by any means without written permission of the copyright holder. 3

Teaching Space

1:300 @ A3 First Floor Plan FFL -9.0m

AR - BKN -

G

Drawing Title: Title: Drawing

4

Level 1

-

F

BAKU KNIGHTSBRIDGE KNIGHTSBRIDGE BAKU

-7.000

5

THIS DRAWING MUST NOT BE SCALED.

E

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON

41-42 London London Wall Wall 41-42 London London EC2M EC2M 5TB 5TB T: +44 +44 (0)207 (0)207 193 193 2990 2990 T: e-mail:glennhorton@hhfire.com e-mail:glennhorton@hhfire.com

6

-13.0m

ALL DIMENSIONS ARE TO BE VERIFIED AND CHECKED ON SITE. ANY DISCREPANCIES THAT ARE, OR BECOME APPARENT SHOULD BE REPORTED TO CHAPMAN TAYLOR.

B L C M D N E F G THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND ONCE PRINTED AND DISRIBUTED THIS DOCUMNET IS ASSUMED UNCONTROLLED DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS. © All rights reserved. No part of this drawing may be repoduced or transmitted in any forms and by any means without written permission of the copyright holder.

D

Level 1

1:300 @ A3 Se

8

K

C

WSP WSP House House 70 Chancery Chancery Lane Lane 70 London London WC2A 1AF 1AF WC2A T: +44 (0)207 T: +44 (0)207 314 314 5000 5000 F: +44 +44 (0)207 (0)207 314 314 5111 5111 F:

H+H Fire Fire H+H

Project Project Description: Description:

Level 2

9

A

WSP (London) WSP Group Group 1:300 @(London) A3 Ground Floor Plan FFL -13.0m

Level 2

1

11

B

Level 0

Traffic Traffic Consultant: Consultant:

I

J

10

9

8

7

6

5

4

3

2

1

TAY L O R

Generator Studios Studios Generator KNIGHTSBRIDGE B AKU SCHOOL Trafalgar Street

Trafalgar Street Newcastle Newcastle upon upon Tyne Tyne NE1 2LA 2LA NE1 T: +44 +44 (0)191 (0)191 230 230 0206 0206 T: e-mail:enquiries@bw-engineering.com e-mail:enquiries@bw-engineering.com

Level 3

-13.0m

7

A

Unit 2.8 First Floor Floor First

11

10

Akpınar Mahallesi Mahallesi Dikmen Dikmen Akpınar Caddesi Caddesi No:538/14 No:538/14 Çankaya, Çankaya, 06460 06460 Ankara, Ankara, Turkey Turkey T: +90 +90 (312) (312) 475 475 2848 2848 T: F: +90 +90 (312) (312) 475 475 2844 2844 F: e-mail:info@ural.comtr e-mail:info@ural.comtr

Black Black & & White White Engineering Engineering Limited C H A PLimited MUnit AN 2.8

7

-17.0m

URAL URAL Engineering Engineering Co. Co. Inc Inc

+3.800

Fire Engineer: Engineer: Fire

-13.0m

6

2

1

4

H

3

A

2

H

Bass Warehouse Warehouse Bass 4 Castle Castle Street Street 4 Castlefield Castlefield Manchester, Manchester, MLZ MLZ T: +44 +44 (0)161 (0)161 828 828 6500 6500 T: F: +44 +44 (0)161 (0)161 828 828 6505 6505 F:

1

-3.000

G

G

T: T: 00 00 994 994 12 12 404 404 48 48 00 00 F: F: 00 00 994 994 12 12 498 498 58 58 01 01

Chapman Taylor Taylor Chapman

Services Services Engineer: Engineer:

Section

F

F

Port Baku Baku Towers Towers Port 153, 153, Neftchilyar Neftchilyar Avenue Avenue AZ1010 AZ1010 Baku, Azerbaijan Azerbaijan Baku,

Structural Structural Engineer: Engineer:

+1.000

E

T: 00 00 994 994 12 12 404 404 48 48 00 00 T: F: 00 00 994 994 12 12 498 498 58 58 01 01 F:

PASHA INSAAT INSAAT MMC. MMC. PASHA

PASHA Insaat

Level 5

E

Port Port Baku Baku Towers Towers 153, Neftchilyar Neftchilyar Avenue Avenue 153, AZ1010 AZ1010 Baku, Azerbaijan Azerbaijan Baku,

Construction Construction Manager: Manager:

Architect: Architect:

1:300 @ A3 Fir

PASHA PASHA INSAAT INSAAT MMC. MMC.

PASHA Insaat

h Section

Ckd. Ckd. Appd. Appd. Date Date

D

Description Description

D

Rev. Rev.

AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS INDICATED ARE APPROXIMATE GROSS INTERNAL AREA. THEY RELATE TO THE LIKELY AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON AREAS OF THE BUILDING AT THE CURRENT STAGE OF DESIGN. ANY DECISIONS TO BE MADE ON THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE THE BASIS OF THESE PREDICTIONS, WHETHER AS TO PROJECT VIABILITY, PRE-LETTING, LEASE AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND AGREEMENTS, OR THE LIKE, SHOULD INCLUDE DUE ALLOWANCE FOR THE INCREASES AND DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS. DECREASES INHERENT IN THE DESIGN DEVELOPMENT AND BUILDING PROCESS.


AN E D U CATI O N I N E ARTH

S4 CT E8 E7

INTERLO CKING BRI CK COMPO NENTS TO FORM

K1

D1

D2

1 2

Library construction Library situated on-site E7

FIRE DOOR

D2

EDGE PIECE

E8

SPINE

S4

KILN

K1

CATAL AN VAULT

CT

KILN DOOR

D1

EDGE PIECE

CO NC E PT 1

2

1 2

GRYMSDYKE FARM CL AY ROBOTI C Library construction PRINTING TESTING Library situated on-site

A R C H I T E C T U R E P O RT F O L I O

KILN AND ROOF S TRUCT URAL MOD EL THE 3D PRINTED KILN FOUN DAT ION SYSTEM WILL BE FIRED US IN G A TRADITION AL WOOD - S TACK KILN TH AT SURROUN D S IT. ON CE TH IS IS FIRED IT CAN BE USED TO FIRE TH E TILES FOR T H E CATAL AN VAULT.

A R C H I T E C T U R E P O RT F O L I O

6

4

M ATE RI AL AN D FABRI CATI ON SYSTE M

M ATE R I A L A N D FA B R I C ATI O N SYS TE M

AC A D E M I C WOR K - MAr c hD BI O-DI G I TA L CRA FT RU RAL S C HOO L , GA HINI, RWA NDA

I NTE RLOCKI N G BRI CK SYSTE M I NTE R LO C K I N G B R I C K S YST E M

C ATA L A N VAU LTI N G

GUIDE ARCHES

P E R M A N E NT G U I D E A R C H A N D S U P P O RT B E A M

GU I D E ARCH E S

CATAL AN VAU LTI N G

K ILN P L A P R INT TESTING STR UCTUR A LLY THE K ILN IS TOO LONG A ND THE C L AY C OULD NOT SUP P ORT ITSELF IN THE P R INTING P R OC ESS. DUE TO USING P L A P R INTING THE SOFT WA R E C A LC UL ATES TO A DD STR UCTUR A L SUP P ORT TH AT C A N THEN B E R EMOV ED A FTER WA R DS.

PE RM AN E NT GU I D E ARCH AN D SU PPORT BE AM

S4 CT

I NTE R LO C K I N G B R I C K C O M P O N E NTS TO F O R M

K1

D1

D2

2

1 3

5

4

1 2 3 4

Product life cycle Brick arch formation Clay printed pot Clay printed ventilation brick

G RY M SDY K E FA R M C L AY R O B OTI C P R I NTI N G TE S TI N G

A R C H I T E C T U R E P O RT F O L I O

GAHINI SCHOOL

Oxford Brookes University M Arch

Current Stage Value Client Workstage Involvement

Feasibility Undisclosed Gahini Parish Concept

1

2

1 2

INTER LOC K ING B R IC K C OMP ONENTS TO FOR M

Library construction Library situated on-site

G RY MSDY K E FA R M C L AY R OB OTIC P R INTING TESTING

As par t of my final year of masters I visited Rwanda, following the discover y through a school design adver tisement online I made contact with a small village called Gahini. The visit enriched my understanding of place and the impor tance this had to the community. I was able to develop a method of construction using locally available materials, including developing a plant-based cement substitute, which the locals could manufacture themselves. The design utilised simple 3D printing techno logy to construct foundations for a catalan vault that formed the springing points for the vaulted roof. These formed clusters of classrooms as par t of an expansion, which created a sunken playground and provided the other key building material; ear th. Development and testing was done in the UK with a facility at Gr ymes Dyke Farm until the prototype was ready. I have maintained contact with the community I met and hope to one day return to develop this scheme for them.

K IL

E K IL NATHE P LRA LLOWS STR UCTUR FR OM TH C A R RA IED TOO LONG N THE GR O NOT SUP O THE P K IL EA RTH A P R INTING PRO OF TH P L A P R INTIN L C A LC UL ATES T SUP P ORT T R EMOV ED


CAVALCANTE DENSIFICATION

Oxford Brookes University M Arch

Current Stage Value Client Workstage Involvement

Feasibility Undisclosed Cavalcante Tourist Board Concept

In my first year of masters I under took the urban design specialisation which gave me a great insight into masterplanning developments. Through this studio I had an oppor tunity to travel to Brazil with a group of fellow students to help a local community develop a sustainable masterplanning strategy for densifying the village to enable growth in tourism. My por tion of the masterplan looked at how to propose new additions to the edge of the village nearest the National Park, for which the tourists flocked. The development included using local materials as well as hydroponic s and r ainwater collection to ensure that vast journeys across the countr y were not required for materials to this isolated location. The scale and density of this development was strongly considered and we presented our work to the local community in a public consultation event in the village squ are which was really well received and helped us develop our proposals fur ther upon return to the UK.



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.