Alejandra Rojas Wilckens Architect and Permaculture Designer EMAIL
a.rojas.wilckens@gmail.com | CEL 09-7-5732301
2
Introduction I am an Architect and Permaculture Designer, with a passion in the social Development of the World, particularly creating human settlements that benefit its people and environment. Focus in design that’s in conjunction with nature, using Bioclimatic Design and Permaculture Design while respecting the natural resources that the planet gives us. Two years ago I went to Australia for studying Permaculture with the creator of this discipline, Bill Mollison, at the University of Melbourne, Australia. This was a dream that I could reach, and helped me to receive the knowledge about this system of design which points out to work with the Land and not against it. Coming back to Chile I want to share this, at the time of design our public spaces, applying sustainable and beauty concepts, design patterns respectful to the Earth. I would love to share this with the people that need it most. The need for living in green environments is not just because of its beauty, also it allows us to live in a more harmonious way in contact with the earth, and even more important, it allows us to grow our own food, in community; happy enjoying what nature has provided us. Chile, 2014
EMAIL:
2014
a.rojas.wilckens@gmail.com |
CEL:
09-7-5732301
INTRODUCTION
3
Table of Contents 4 - 7
CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE
2013
8 - 11
PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST
2013
12 - 13
PERMACULTURE DESIGN “THE LIVING IN PEACE PROJECT”, KARAMEA, NEW ZEALAND
2012
14 - 17
DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE
2012
18 - 21
DESIGN OF RESTAURANT SANTA BRASA
2012
22 - 24
STRUCTURAL REPAIR OF S.I.I. BUILDING, RECOLETA, SANTIAGO
2011
25 - 27
DESIGN OF MONTESSORI SCHOOL IN VALPARAISO
2011
28 - 32
DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL
2009
33 - 40
MUSEUM OF MYTHOLOGY OF CHILOE
41 - 44
RESTORATION OF SANTA LUCIA HILL’S NORTH ENTRANCE
2007
45 - 49
DESIGN OF CULTURAL CENTER,EX-PRISON IN VALPARAISO
2007
TABLE OF CONTENTS
2008-09
2014
4
Consulting for Sustainable Design Landscape Consulting and design of a “green plate”, part of the whole design of a Complex of “Inclusive Collective Housing built of wood”, for the city of Concepción, Chile. Calling it a green plate is making reference to the Landscape Design of the project, which are green recreational areas on the first level and turn plate community work, on the second level, which consisted of vegetable beds and leisure areas, always trying to strike a balance between sustainability and in turn separation with private green areas of each department. We also sought to place the trees at strategic points depending on the desired shade. As part of a permaculture concept, we design a system for collecting rain water, carried in underground tanks to have supply during the dry season in Concepción, for irrigation of beds and recreational areas, achieving self-sustainability of the landscape design project.
2013
CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE
5
CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE
2013
6
2013
CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE
7
PANEL SOLAR
ESTANQUE 350 LTS
AGUA IMPULSADA POR BOMBA SOLAR
BAJADA DE AGUA LLUVIA BAJADA AGUA PARA RIEGO
RIEGO DE HUERTOS POR GOTEO RIEGO DE AREAS VERDES ESPACIO COMUNITARIO POR GOTEO
PANEL SOLAR
BOMBA ELEVADORA SOLAR ESTANQUE 5000 LTS
BAJADA DE AGUA LLUVIA
FILTRO
BAJADA AGUA PARA RIEGO
RIEGO AREAS VERDES PUBLICAS POR GOTEO
ESTANQUE 350 LTS
AGUA IMPULSADA POR BOMBA SOLAR
RIEGO AREAS VERDES PUBLICAS POR GOTEO
RIEGO DE HUERTOS POR GOTEO
FILTRO ESTANQUE 5000 LTS BOMBA ELEVADORA SOLAR
TOTAL ÁREAS VERDES: 303,16 m2 CONSUMO: 1.5 lts/m2 - 454 lts/día PLUVIOSIDAD ANUAL CONCEPCION: 1200mm CAPACIDAD DE ALMACENAJE AGUA: 25000 lts 55 DÍAS DE AUTONOMÍA
CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE
2013
8
Permaculture Design, landscape regeneration and food forest, Wanaka, New Zealand After finishing the PDC (Permaculture Design Certificate Course), in the University of Melbourne, Australia, I had the opportunity to design a permaculture project for a family in New Zealand. It was a great chance, with the “kiwi�landscape being similar to the postglacial landscape in the south of Chile, where this type of geography is perfect to project the design of dams and swales. Basically the shape of the landscape allows to reach the basic first purpose in a permaculture design, to capture the water efficiently by moving it over the contour to add in generating soil, therefore the generation of fertility for the creation of a self-sustaining ecosystem.
2013
PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST
9 First it was necessary to recognize the property’s size, and profile shape, especially “key contour lines” for handling the water’s movement over the ground and water retention in this. After thinking ways of soil restoration was critical with the eroded and heavily compacted from many years of grazing and monoculture agriculture explosion in the land. After this came the key and basic exercises for the future design. We designed a windbreaker that did not block the 180 degrees view from the inside of the house, which because of Wanaka council rules needed to be located in this place to not be seen from the road, leaving the house in the windiest place but with the best view of the property. RECODATIONS OF FIXING LAND COMPATIOON HIGH RUN OFF LANDSCAPE
DETAIL OF DESIGN FOR WIND PROTECTION
PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST
2013
10 The next step of the design process was to draw the “key contour lines�; the idea is that these are contour lines where it is more efficient to move the water, along the property, hydrating the different areas of the land, creating soil fertility. At the same time a restoration treatment of the soil was necessary, which is demarcated by dashed lines in the plan. These channels also bind the different dams, moving through the contour line, with an overflow system, which allows the soil to be in constant hydration simply capturing the rainwater year falling during the year over the ground. This was the general scheme worked in the field.
2013
PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST
11 After tracing the swales and dams, edible forest’s areas were traced, the windbreaker on the north side, which was a volume of soil and vegetation, and the west face’s windbreaker. Then the vegetable species were chosen and how to combine them by scale, protection and leaf type, and clearly, as the needs of the clients. Also we taught them how to create their own compost so that they could have the basis of soil generation and ground’s restoration for planting and growing their own vegetables in the future. COMPOST
VEGETABLE PLANTING SYSTEM
SPIRAL GARDEN
WORM COMPOST
PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST
2013
12
Permaculture Design “THE LIVING IN PEACE PROJECT”, Karamea, Nueva Zelanda Named for its pursuit to achieve self-sustainability, specifically energy and food self-sustainable. Located in the southern island of the country, in a natural context, surrounded by national parks, on the west coast, I was greeted by the “Permaculture Manager” David Tailby, Certified Designer Permaculture by Bill Mollison also, assisting him to design different areas of the property such as orchards and edible forest, plus tasks such as creating compost and seedlings (the base of any planting), management of irrigation water based on rainwater harvesting and to choose the association of plant species. This last point allowed me to learn how to find the most beneficial place for each element, always designing for the creation of a natural ecosystem that achieves self-sustainability over time.
2012
PERMACULTURE DESIGN “THE LIVING IN PEACE PROJECT”, KARAMEA, NEW ZEALAND
13
BEFORE
AFTER
COMPOST
PERMACULTURE DESIGN “THE LIVING IN PEACE PROJECT”, KARAMEA, NEW ZEALAND
2012
14
SIMBOLOGIA
3895.8 58.3
472.7
15.0
269.5
15.0
438.0
18.0
293.0
20.0
1337.4
15.0
307.0
66.0
501.0
Proyecto de Reparación Vivienda Patrimonial.
70.0
EXTERIORES:
128.0 48.0
48.0
48.0
48.0
A
2 - Estuco y pintura muro. 3 - Machiembrado en aleros. 4 - Reemplazar Tapacán. 11.d - Pintar puertas y ventanas con sus respectivos marcos.
255.9
Dormitorio 6
TECHUMBRE: 24 - Bajada Aguas Lluvias. 25 - Canaleta Aguas Lluvias.
Adosamiento 169.0
Dormitorio 5
143.0
996.4
1104.4
22.0
135.0
88.0
22.0
2
964.0
Patio
129.0
12.0
349.0
Comedor
Baño
125.0
2
640.5
125.0
191.1
2
Garage
Dormitorio 1
Dormitorio 2
Bodega
Estar
515.4
Dormitorio 3
145.0
Dormitorio 4
Cocina
Baño
479.1
55
0
60.0
15 5.
5. 0
55 .0
A' 2
2
58.3
472.7
2
35.0
398.8
2
273.7
272.0
303.8
2
600.0
20.0 220.0
2
362.0
20.0
129.0
123.0
201.0
20.0
372.0
2
393.4
20.0
588.7
123.0
388.0
20.0
303.0
123.0
288.0
26
60.0
60.0
187.4
187.4
.0
2
501.2
20.0 367.0
70.0
21.8 120.0
664.0
3708.5
Design of Repairs of Heritage Houses in Historic Center of Rancagua, Chile 1073.1
CORTE A-A'
1004.7
ESCALA 1:50
25
650.4
After the huge Earthquake of 27th February 2010, the historic center of the city Rancagua was seriously damaged. All the buildings of this area are adobe-brick constructions, so some of the damages needed to be fixed with this old way of construction. This job was part of the governmental Program of Reconstruction and Repair of Heritage Buildings. We needed to visit the different houses, speak with the owners, measure them, register the damage in a diagnosis resume sheet, than design the repairs, and then go and visit with the Engineers in Construction for explain our Design Purpose, so they could built them according with our plans.
11c
2
11c
3197.4
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
2
2
2
60.0
60.0
60.0
ELEVACION SUR ESCALA 1:50
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
2
Adosamiento
11c
9
4.
26
60.0
.0 60
Pintura
.0 60
60.0
.0 60
60.0
.0
60
60
.0
Segunda capa de rovoque 5mm
Revoque Exterior
Primera capa de revoque 10mm
3 a 4 capas de lechada de cal pura
.0
60
Mezcla de barro/fibras/cal .0
60
26 4.
9
Mayor densidad de agregados gruesos
Relleno grietas superficiales:
revoque de cal hidraúlica
Pintura
Mezcla de barro/Cal hidraúlica/Yeso
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
Guardapolvo madera 0,5 x 6"
60.0
SUBSIDIOS
ESTUDIO
SOLUCIONES TERRITO
de RECONSTRUCCIÓN y REPARACIÓN PATRIMONIAL
Albañilería de Adobe
EGIS Beatriz Valen
UBICACION
N
3
24
4
24
25
24
GAMERO
11c
Adosamiento
11c
2
11c
2
2
11c
2
11c
2
11c
2
FIRMAS
2
11c
ARQUITECTO NOMBRE
: BEATRIZ VALENZUELA VAN TREEK : ALEJANDRA ROJAS WILCKENS : JAVIER GONZÁLEZ : beatrizvalenzuelav@vtr.net
PROPIETARIO ELEVACION PONIENTE
NOMBRE R.U.T.
ESCALA 1:50
DOMICILIO ROL
2012
ZAÑARTU
25
ALMARZA
O' CARROL
DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE
: : : :
L A M I N A 01 CONTENIDO PLANTA ARQUITECTURA ALZADOS CORTES PLANTA DE TECHUMBRE
VºBº DOM
ROSA ELENA RUIZ MOSCOSO 3.701.868-6 GAMERO Nº 185, RANCAGUA
Nº :
FECHA :
15
DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE
2012
16 SIMBOLOGIA
Proyecto de Reparación Vivienda Patrimonial.
Dintel en madera (existente).
EXTERIORES:
20
Listón Madera de Pino Impregnada 2" x 6"
h/2
Perforación o = 10 mm. de un lado al otro de la madera. Listón de Madera de Pino Impregnada 1" x 6".
INTERIORES: 12 - Reforzar, estucar y pintar muro. 12.a. - Filtración humedad de muro (Revisar y reparar). 16. - Cambio de puerta. 17.a - Reemplazar marco de puerta o ventana. 17.b - Pintar marco de puerta o ventana.
Pintura
Listón de Madera de Pino Impregnada 1" x 6".
20
Segunda capa de rovoque 5mm
Revoque Exterior
Primera capa de revoque 10mm
3 a 4 capas de lechada de cal pura
Mezcla de barro/fibras/cal
Perforación o = 10 mm. de un lado al otro de la madera.
h/2
1 - Reforzar, estucar y pintar muro. 3 - Machiembrado en aleros. 11.b - Forrar alero.
Cielo Madera de Pino Impregnada 1" x 4"
20
25
TECHUMBRE:
Listón de Madera de Pino Impregnada de 1" x 6 "
Pintura
Relleno grietas superficiales:
Detalle traslapo madera y fijación con pletina.
Muro Adobe 35 x 70 x 15 cm.
revoque de cal hidraúlica
Mayor densidad de agregados gruesos
22 - Reparación de cerchas. 23 - Sellos en Zicalum techumbre. 24 - Bajada Aguas Lluvias. 25 - Canaleta Aguas Lluvias. 27 - Instalación cobertura de techumbre (zincalum). 27.a - Instalación impermeabilización (fieltro). 28 - Reposición de cerchas en mal estado. 30 - Reposición de volcanita en cielo.
DETALLE 4
Mezcla de barro/Cal hidraúlica/Yeso
Albañilería de Adobe
Guardapolvo madera 0,5 x 6"
50
L1
Perno Roscalata e=10 mm. L= 76 cm.
Perforación del tornillo pasante
Detalle 3 Ensamblaje maderas
L2
Refuerzo vertical
OTROS: 32 - Reemplazar instalación eléctrica.
Madera impregnada con rebaje de 1/2" para ensamblaje.
Tuerca Hexagonal Metálica o = 10 mm. Golilla Metálica o = 10 mm.
Detalle rebaje de madera. Detalle 1
Bajo relieve del Adobe
Perforación o = 10 mm. de un lado al otro del muro. Golilla Metálica o = 10 mm. Tuerca Hexagonal Metálica o = 10 mm.
Refuerzo horizontal
Tabla de Base Pino Impregnado 1" x 3" Montante Madera Pino Impregnada 2" x 3"
Calado en Muro de Adobe 3cm. Profundidad
Entablado de piso madera 1" x 4" Arriostrado Maciso Madera Pino Impregnada 2" x 3" Fieltro e = 1 mm.
Detalle 2 Bajo relieve del adobe Pletina Metálica en "L" e = 3 mm. Tornillo Roscalata Cabeza Plana 8 x 1 21"
Plancha de Zinc 85 cm. x 200 cm.
Perno Roscalata e=10 mm. L= 76 cm.
Listones de Madera de Pino Impregnada 1" x 1" Papel Fieltro Volcán 15 lb. Liso 1 m. x 40 m.
Losa de Concreto e = 10 cm.
Placa OSB Std. 1220 x 2440 x 9,5 mm.
Malla de Refuerzo 6" x 6"
Tirante Inferior Madera de Pino Impregnada 2" x 6"
Terreno Natural Compactado
Bloque de Adobe Perforado 30 x 64 x 15 cm.
Membrana Asfáltica e = 4 mm. Aislante e = 2,5 cm.
Listón de Madera de Pino Impregnada de 1" x 6 "
Varillas Continuas o = 1 mm.
Tuerca Hexagonal Metálica o = 10 mm. Golilla Metálica o = 10 mm.
Tapacán Madera Pino Impregnada 1" x 7"
Pletina Metálica en "L" e = 3 mm.
Alero Machiembrado 1" x 4" L = 3.20 m.
Muro cortafuego F-60
Solera y pie derechos de pino de 2"x4" Doble capa de planchas de permanit e= 6mm Tabique cubierto con plancha de zincalum liso Lana Mineral
Plancha de Zincalum ondulad e= 0.35 cm Fieltro 15 lb Placa de OSB e=9.5 mm Costanera 2"x2" @ 60 cm Cercha de madera 1"x4"
SIMBOLOGIA
Proyecto de Reparación Vivienda Patrimonial.
EXTERIORES:
63.5
Volcanita e= 8 mm
20.0
Sobresolera pino aserrado 2x3'' Solera superior pino aserrado 2x3''
67.6
67.6 10.0
10.0
Cadeneta pino aserrado 2x3''
67.6
67.6
INTERIORES:
67.6
10.0
10.0
10.0
ESTUDIO 360 SOLUCIONES TERRITORIALES
Muro existente
536.0
UBICACION
22 23
N
18.0 15.0
60.0
esparrago anclaje 6'' o 8''
TENIENTE
60.0
: : : :
VºBº DOM
MARÍA JOSÉ MENDEZ SILVA 13.944.502-3 CENTENARIO Nº 260, RANCAGUA
Nº :
60.0 60.0
ELEVACION POSTERIOR
ESCALA 1:50
ESCALA 1:50
28
27b 27a 27 23 22 28 27b 27a 27 23 22
60.0
17
60.0
11
60.0 1479.0
17
11
17
32
1
(AMPLIACION)
ELEVACION NORTE
60.0 60.0 60.0
27 22
60.0
60.0
27
27a
60.0
22 23 27
30
Adosamiento
60.0
16a
60.0
12
182.5
172.0
Dormitorio 1
27a 27b
28
Construir Doble tabique para reforzar muro de adobe
60.0
28
60.0
464.0
B'
12a
22
60.0
12 12a
OTROS: 32 - Reemplazar instalación eléctrica.
60.0 60.0 60.0
60.0 60.0 60.0 60.0
1985.0
1935.0
60.0
387.0
12 39 1
25
ESCALA 1:50
17
Perno anclaje entra tabiques y muro
Muro adobe con desprendimiento de material
16a 39 24 25
esparrago anclaje 6'' o 8''
18.0
17b 17a
57.5
Baño
24
ELEVACION PRINCIPAL
60.0
60.0 60.0 1307.0
28
60.0
22
60.0
285.0
12 Dormitorio 2
39
15.0
10.0
Adosamiento
12 12a
17
B
60.0
60.0
250.0 15.0
12
24 25
FECHA :
60.0
15.0
10.0 460.0
12 11
3 11b
Adosamiento
PLANTA ARQUITECTURA ALZADOS CORTES PLANTA DE TECHUMBRE
60.0
ROL
60.0
L A M I N A 01 CONTENIDO
: BEATRIZ VALENZUELA VAN TREEK : ALEJANDRA ROJAS WILCKENS : JAVIER GONZÁLEZ FUENTES : beatrizvalenzuelav@vtr.net
PROPIETARIO NOMBRE R.U.T. DOMICILIO
39
22 - Reparación de cerchas. 23 - Sellos en Zicalum techumbre. 24 - Bajada Aguas Lluvias. 25 - Canaleta Aguas Lluvias. 27 - Instalación cobertura de techumbre (zincalum). 27.a - Instalación impermeabilización (fieltro). 27.b - Instalación de aislante térmico (fisiterm, poliestireno expandido u otro). 28 - Reposición de cerchas en mal estado. 30 - Reposición de volcanita en cielo.
60.0
(AMPLIACION)
Bodega 1
TECHUMBRE:
27b
60.0
CORTE B-B' ESCALA 1:20
FIRMAS ARQUITECTO NOMBRE
60.0
Bodega 2
27a
22 23 27 27a 27b
1985.0
62.0 20.6
60.0
60.0
40.0 40.0 40.0 40.0
60.0
52.5
60.0
52.5 30.0
425.0
76.0
429.9
40.0 40.0 40.0
27
27a 27b
Ver detalle de cercha propuesta
Emplantillado pobre 15x15cm para anclar tabique
62.0
27
ACEVEDO
C
solera de montaje pino aserrado 2x3''
60.0
376.0 340.0
18.0
BALMACEDA
120.0 120.0
CENTENARIO
10.0 10.0 10.0
Pie derecho pino aserrado 2x3''
solera inferior pino aserrado 2x3''
EGIS Beatriz Valenzuela V.
230.0
40.0 40.0 40.0 40.0
Riostra pino aserrado 2x3''
Alfeizar pino aserrado 2x3''
Adosamiento
de RECONSTRUCCIÓN y REPARACIÓN PATRIMONIAL
Dintel pino aserrado 2x3''
12 - Reforzar, estucar y pintar muro. 12.a. - Filtración humedad de muro (Revisar y reparar). 16 - Cambio de puerta. 17 - Instalación de puerta y marco.
10.0
398.0
SUBSIDIOS Dintel pino aserrado 2x3''
Adosamiento
28.0
1 - Reforzar, estucar y pintar muro. 3 - Machiembrado en aleros. 11 - Instalación ventana. 11.b - Forrar alero.
Canal de agua lluvia de 125 x 125 mm e= 0.3 mm Tapacán de 1"x8" en madera de pino aserrada
Adosamiento
Listones Madera de Pino Impregnado para Clavar 4" x 4"
Canaleta Aguas Lluvias Zinc e = 2 mm.
Adosamiento
Listón Madera Pino Impregnada 2" x 6"
Adosamiento
Perno Roscalata e = 10 mm. L = 7 cm.
Adosamiento
Diagonal Madera Pino Impregnada 2" x 6"
Adosamiento
Tirante Superior Madera Pino Impregnada 2" x 6"
10.0
Plancha de Zinc 85 cm. x 200 cm. Listón Madera Pino Impregnada 2" x 6"
26.5
Perforación del tornillo pasante
Emplantillado pobre para anclar tabique de sección 15x15cm
Estar-Comedor
A'
22
28
CORTE A-A'
CORTE B-B'
ESCALA 1:50
ESCALA 1:50
506.0
27b 27a 27 23 22 506.0
12
Estar-Comedor 12a
238.0
233.0
12 12a
30
12
1
388.0
12 12a
11 A
28
28 27b 27a 27 23 22
30
18.0
1 130.0 848.1
95.0
1
1
482.0 118.0
82.0
18.0 93.1
60.0
60.0
60.0
60.0
60.0 518.0
60.0
60.0
60.0
(AMPLIACION)
SUBSIDIOS
ESTUDIO 360 SOLUCIONES TERRITORIALES
de RECONSTRUCCIÓN y REPARACIÓN PATRIMONIAL
EGIS Beatriz Valenzuela V.
UBICACION
N
33.0
ACEVEDO
Dormitorio 2
Dormitorio 1
CENTENARIO
320.0 320.0
40.0
60.0 10.0 10.0
C'
BALMACEDA
273.0
12 12a
233.0
Cocina americana
12 12a
Estar-comedor
CORTE C-C' ESCALA 1:50
TENIENTE
FIRMAS ARQUITECTO NOMBRE
: BEATRIZ VALENZUELA VAN TREEK : ALEJANDRA ROJAS WILCKENS : JAVIER GONZÁLEZ FUENTES : beatrizvalenzuelav@vtr.net
PROPIETARIO NOMBRE R.U.T. DOMICILIO ROL
2012
: : : :
L A M I N A 01 CONTENIDO PLANTA ARQUITECTURA ALZADOS CORTES PLANTA DE TECHUMBRE
VºBº DOM
MARÍA JOSÉ MENDEZ SILVA 13.944.502-3 CENTENARIO Nº 260, RANCAGUA
Nº :
FECHA :
DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE
17
SIMBOLOGIA
3895.8 58.3
472.7
15.0
269.5
15.0
438.0
18.0
293.0
20.0
1337.4
15.0
307.0
66.0
501.0
Proyecto de Reparación Vivienda Patrimonial.
70.0
EXTERIORES:
128.0 48.0
48.0
48.0
48.0
A
2 - Estuco y pintura muro. 3 - Machiembrado en aleros. 4 - Reemplazar Tapacán. 11.d - Pintar puertas y ventanas con sus respectivos marcos.
255.9
Dormitorio 6
TECHUMBRE: 24 - Bajada Aguas Lluvias. 25 - Canaleta Aguas Lluvias.
Adosamiento 169.0
Dormitorio 5
143.0
996.4
1104.4
22.0
135.0
88.0
22.0
2
964.0
Patio
129.0
12.0
349.0
Comedor
Baño
125.0
2
640.5
125.0
191.1
2
Garage
Dormitorio 1
Dormitorio 2
Bodega
Estar
515.4
Dormitorio 3
145.0
Dormitorio 4
Cocina
Baño
479.1
55 0 15 5.
60.0
5. 0
2 472.7
2
35.0
398.8
2
273.7
272.0
303.8
2
600.0
20.0 220.0
2
362.0
20.0
129.0
123.0
201.0
20.0
372.0
.0
2
393.4
20.0
588.7
123.0
388.0
20.0
303.0
123.0
55
A' 2 58.3
288.0
26
60.0
60.0
187.4
187.4
.0
2
501.2
20.0 367.0
70.0
21.8 120.0
664.0
3708.5
1073.1
CORTE A-A'
1004.7
ESCALA 1:50
650.4
25
11c
2
11c
3197.4
2
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
2
2
60.0 60.0
60.0
ELEVACION SUR ESCALA 1:50
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
2
Adosamiento
11c
9
4.
26
.0
60.0
60 60
Pintura
.0
60
60.0
.0 60
60.0
.0 60
.0
Segunda capa de rovoque 5mm
Revoque Exterior
Primera capa de revoque 10mm
3 a 4 capas de lechada de cal pura
.0
60
Mezcla de barro/fibras/cal .0
60 26
4.
9
Mayor densidad de agregados gruesos
Relleno grietas superficiales:
revoque de cal hidraúlica
Pintura
Mezcla de barro/Cal hidraúlica/Yeso
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
60.0
Guardapolvo madera 0,5 x 6"
60.0
SUBSIDIOS
ESTUDIO 360 SOLUCIONES TERRITORIALES
de RECONSTRUCCIÓN y REPARACIÓN PATRIMONIAL
Albañilería de Adobe
EGIS Beatriz Valenzuela V.
UBICACION
N
3
24
4
24
25
24
GAMERO
11c
Adosamiento
11c
2
11c
2
2
11c
2
11c
2
ZAÑARTU
25
ALMARZA
O' CARROL
11c
2
FIRMAS
2
11c
L A M I N A 01
ARQUITECTO NOMBRE
CONTENIDO
: BEATRIZ VALENZUELA VAN TREEK : ALEJANDRA ROJAS WILCKENS : JAVIER GONZÁLEZ : beatrizvalenzuelav@vtr.net
PROPIETARIO ELEVACION PONIENTE ESCALA 1:50
NOMBRE R.U.T. DOMICILIO ROL
DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE
: : : :
PLANTA ARQUITECTURA ALZADOS CORTES PLANTA DE TECHUMBRE
VºBº DOM
ROSA ELENA RUIZ MOSCOSO 3.701.868-6 GAMERO Nº 185, RANCAGUA
Nº :
FECHA :
2012
18
Design of Restaurant Santa Brasa This was an order of the owner of this company, that wanted to built this Retail project in the new shopping center of Santiago. It was an interior design of a restaurant, trying to give a scenic image, working with layers in the scenery background, different textures and depths, red acrylic and dry aged area behind a wood ribbon moving from the background to the front of the project. The main difficulty was to respond to all the requierements that the shopping centers asked for.
2012
DESIGN OF RESTAURANT SANTA BRASA
19
DESIGN OF RESTAURANT SANTA BRASA
2012
20
2012
DESIGN OF RESTAURANT SANTA BRASA
21
DESIGN OF RESTAURANT SANTA BRASA
2012
ATIESADOR e= 5mm
ATIESADOR e= 5mm
22
V.N IN 30 x 75,4
DETALLE TIPO CN 1
VISTA EN ELE DETALLE
EJE C - PARALELO A EJE 5 ESC. 1:10
ESC. 1:10
MURO H.A. 5
5
MURO H.A.
17.50
15.00
7.50
3.00
9.00
5.00 3.00
3.00
10.50 25.00
18.00
C
C VIGA H.A.
C VIGA H.A.
VN IN 30x75.4
4.00 26.50 32.50
Structural Repair of S.I.I. Building, Recoleta, Santiago
5
After the huge Earthquake of 27th February 2010, many Buildings were damaged from Santiago, capital of Chile, to Concepcion, Earthquakes epicenter. At this Engineer Consulting, AEES, they received many orders for Structural Calculations and Repairs Design for this damaged buildings. This was one of them, the building was having mainly damages in all the beams and columns, and the last level needed to be completely rebuilt, with collaborating slabs, therefore, join a new metallic structure with the old concrete one, strengthened this last one. My roll in this job was drafting and architecture design to support the engineers for the solution of structural problematics.
5
G 10.00
PL 30/38 e= 5mm
PERNO A 325
ACERO A 420-270 ES
7/8"
PARA TODAS LAS COLUMNAS
GROUT DE NIVELACIÓN SIKAGROUT
6
Típico
HORMIGÓN
2.00
TUERCA DE NIVELACIÓN
LC 01
LC 05 6.35 PLACA DE LOSA COLABORANTE
PL 19/11.5 e= 16 mm ALA DE IN 30x75.4
PL e= 8mm ALA DE IN 30x75.4
ACERO A 420-270 ES
ACERO A 420-270 ES
VN IN 20 X 19,8
V.N IN 30 x 75,4
MURO H.A.
DETALLE TIPO CN 4 EJE C - EJE 11A
ESC. 1:10
11A
11A
PL 19/11,5 e= 5mm
19.00
3.50
11.50
32.00
43.00
C
C
VN IN 30x75.4
MURO H.A.
C
6.50 11.50
6.50
6.50 11.50
8.00
5.00
VN IN 30x75.4
MURO H.A.
3.50
Tip.
5.00
STRUCTURAL REPAIR OF S.I.I. BUILDING, RECOLETA, SANTIAGO 9.00
19.00
5.00
5.00
e= 8 mm (ALA DE IN 20x19.8)
ACERO A 420-270 ES
VN IN 20 X 19,8
5.00
VN IN 20 X 19,8
2011
PERNO A 32
3.00
8.00
C
ACERO A 420-270 ES
19.00
14.00
6.50
23 D D
C
B
C
B
A
A
MURO CORTAFUEGO F-120
s/ TABLA DE EMPOTRAMIENTO EN LÁMINA 668-17
CONECTOR Ø16 @ 20 cm.
14.00
CONECTOR Ø16 @ 20 cm.
16
A
2 PERNOS DE 1'' VARILLA HAS, HILTI ó SIMILAR
16
Típico
Típico
30.00
30.00
SUPERFICIE INTENCIONADAMENTE RUGOSA
16
VIGA EXISTENTE 20/59
PERFIL C 30 x 43,4
Típico
MURO H.A 2 PERNOS DE 1'' VARILLA HAS, HILTI ó SIMILAR
8.00 20.00
VIGA EXISTENTE 20/59
10.00
La
16
Típico
VN C 30x43.4
N.P. + 6,33
DET.6 ANCLAJE VIGA NUEVA HORMIGÓN ARMADO
esc. 1:10
ELEVACIÓN EJE C
DET.7
LC 01 V.N IN 30 x 75,4
2+2Ø16
VIGA H.A CONECTOR Ø16 @ 25 cm.
N OTA = SE DEBERÁ REALIZAR ENSAYO DE EXTRACCIÓN EN EL 10% DE LAS BARRAS LOS CONECTORES Y LAS VIGAS SERÁN EN ACERO ASTM A 36 * SUJECIÓN IGUAL AL IN 30x70.54, SÓLO QUE LA PLACA BASE TIENE 14 mm DE ESPESOR
VN IN 20x30.6
VISTA A-A
La= según fabricante
DET. 8 UNIÓN PERFIL C 30 x 43.4 A VIGA H.A. EJE 6- PISO 1
esc. 1:10
M.H.A nuevo
1.00
1.00
23.00
1.00
2 12.
1.00
S
50.00
IPE 180/91/8
2+2Ø12 existentes
IPE 180/91/8
40
EST. Ø8@6
2 12.
Fe' 2 12
2+2Ø16
V.E 20/15
EST. 8 @25
2+2Ø16 L=539 (30+509)
2 10. Fe' 2 10 EST. 8 @5
2+2Ø16 DM Ø8 @20 esp=20
2+2Ø16 L=663 (30+633)
2+2Ø12 L=341 (30+311)
LL
ESPACIO CANALETA AGUA LLUVIA
S1 6
2+2Ø12 existentes
N.P.T + O,O2
CERCHA
S
6
Típico
CERCHA 50.00 6 25.00
12.50
Típico
5.00
12.50
Típico
15.00
Típico
6
1.00 6
12.50 6.00
Típico
6
Típico
12.50
Típico
9.50
6.00
5.00
1.00
15.00
3.00
ATIESADORES e= 10 mm
6
6
Típico
2+2Ø16
N.P.T + O,O2
2+2Ø16
2+2Ø16
2+2Ø16
Típico
12.50 7.00
1.00
ACERO A 420/270 ES
DET.4
y Nota 4
6
7.00
6.00
ATIESADORES e= 10 mm
ELEVACIÓN EJE 8 ESC. 1:50
DET.4
y Nota 4
DET.4
y Nota 4
0.50 Típico
12.50 6.00
31.00
ACERO A 420/270 ES
ACERO A 420/270 ES
5.00
15.00
PL 15/11,5 e= 10mm
31.00
ACERO A 420/270 ES
15.00
0.50
Típico Típico
3.00
PL 15/11,5 e= 10mm
esc. 1:10
2+2Ø16
ELEVACIÓN EJE 6 ESC. 1:50
Típico
Típico
12.50
9.50
UNIÓN VIGAS IN 20x75.4 Y VIGA 20x19.8
6
3.00
Típico
6
Típico
IPE 70/91/8
12.50
IPE 70/91/8
5.00
0.50
1.00
3.00
CERCHA
50.00 25.00
12.50
V.N IN 20 x 75,4
V.N IN 20 x 75,4
CERCHA
ESPACIO CANALETA AGUA LLUVIA
CERCHA
Típico
V.N IN 20 x 75,4
DET.9
DM Ø8 @20 esp=20
M.H.A nuevo
Típico
S1
S1 Típico
6 V.N IN 20 x 75,4
S1
5.00
50.00 6
S
LL
s
V.N IN 20 x 75,4
S LL
1.00
1.00
2+2Ø10 (EXIST.)
VE 20/70
VN IN 20x30.6
6
S1
VN IN 20x19.8
LL
S1
S1
25.00
6.00
6.00
V.N IN 20 x 75,4 Típico
L
S1
S S1
25.00
5.00
ALAS RETIRADAS
LOSA COLABORANTE
VN IN 20x19.8 6 Típico
S1 LL
M.H.A nuevo
6.00
6.00
LOSA COLABORANTE
2+2Ø16
1.00
1.00
V.N IN 20 x 75,4
2+2Ø16
Fe' 2 12
5.00
ALA RETIRADA
DET 5
N.P. + 3,13
CADENA VIGA ex. 15/70
12.50
12.50
5.00
1.00
LC 01 V.N IN 30 x 75,4 DET 5
N.P. + 3,13
VN IN 20x30.6 12.50 23.00
2+2Ø12 L=468 (30+438)
N.P. + 6,33
VN IN 20x30.6
DET 5
esc. 1:10
1.00
2Ø12
15.00
anclado 15 cm con HILTI HIT RE 500
REFUERZOS VIGAS EJES 11A y 13A
12.50
CADENA 20/50
MURO ALBAÑILERÍA ex.
PERFIL C 30 x 43,4
CONECTOR Ø16 @ 25 cm.
anclado 15 cm con HILTI HIT RE 500
Lat. 2+2 Ø 8 EST. Ø 8 @ 15
CERCHA 1 (VER DETALLE TIPO)
2Ø12
MURO H.A. PROYECTADO
VIGA NUEVA
20.00
EST. Ø8@15
50.00
VER ELEVACIÓN ESTRUCTURAL EJE C
VIGA NUEVA 20/50
MURO CORTAFUEGO F-120 DET 11
2Ø12
A
h= 1/3 h viga h= 1/3 h viga ICIE ONADAMENTE RUGOSA
14.00
anclado 14 cm con HILTI HIT RE 500
MURO ALBAÑILERÍA ex.
(1+1Ø8)@30 A 63/42H
MURO ALBAÑILERÍA NUEVO
LOSA HA EXISTENTE 16 CM
COLUMNA RETICULADA DE ACERO (VER DETALLE)
30.00
CADENA 20/50
2Ø12
VN IPE 200
30.00
V N IP E 1 6 0
VN IPE 200
LONGITUD DE ANCLAJE
s/ TABLA DE EMPOTRAMIENTO EN LÁMINA 668-17
LOSA HA EXISTENTE 16 CM
DET 12
Lat. 2+2 Ø 8 EST. Ø 8 @ 15
2Ø12
LONGITUD DE ANCLAJE
D
1.00
C
B
A
C.N C.N
C.N
C.N
DET.11
DET.10 MÉNSULA 1 PILAR /CERCHAS
C.N
MÉNSULA 2/ PILAR / CERCHA / VIGA
esc. 1:10
esc. 1:10
MURO CORTAFUEGO F-120 Lat. 2+2 Ø 8 EST. Ø 8 @ 15
CERCHA 1 (VER DETALLE TIPO)
VN IPE 200
D IPE 160 ACERO ASTM A36
2Ø12
MURO ALBAÑILERÍA NUEVO
8.5 mm
7.4 mm
4.50
IPE 200
CADENA 20/50
2Ø12
VIGA IN 20x19,8
10.00
8.00
VIGA IN 20x19,8
ACERO ASTM A36
S
5.6 mm
5 mm
16.00
S1
20.00
LL 7.4 mm
S1
8.5 mm
IPE 160
IPE 200 6
DET. 12 UNIÓN VIGA TECHUMRE ELEVACIÓN EJE 8
esc. 1:10
6
PERFIL C 200/75/5
Típico
N.P. + 6,33 LC 01 V.N IN 30 x 75,4
Típico
40/40/3
VN IN 20x30.6
DET 5
DET 5
MURO ALBAÑILERÍA ex.
CERCHA
CONSULTORIA
EN INGENIERÍA
PERNO DE ACERO d= 1/2 ''mm ACERO A 420/270 ES
CERCHA
2x2 VARILLA HAS 1'' ó SIMILAR
B
6
Típico
Típico
10.00
2 PERNOS A 325 5/8''
L 100x100x6
Típico
L 115
20.00 13.00
20.00
Nota 1 : empalmes y traslapos verticales y horizontales = 40Ø
L 114
Nota 2 : medidas en cm VN IN 20x30.6
C.N
VE 20/54 6Ø26
V.E 20/70
C.N
Típico 18.00
ep= 12 mm
B
VISTA B-B
DET. 13 UNIÓN CERCHAS A VIGAS DE CIERRE O AMARRE TECHUMBRE ELEVACIÓN EJE G - PISO 3
esc. 1:10
DET. 15 UNIÓN VIGA EN VOLADIZO IN 20x19,8 A PILAR H.A. EJE 13 A ENTRE EJES F y G esc. 1:10
Nota 3: Reutilizar malla de Muro a demoler como confinamiento de armadura de viga y muro.
MURO HORMIGÓN ARMADO ex.
30.00
EN INGENIERÍA
N.P. + 3,13
ACERO A 420/270 ES
PERFIL L 75/75/5 38.00
CONSULTORIA
NOTAS
PL 45/25 e= 10mm
6
N.P.T + O,O2
Nota 4 : Los anclajes de armadura nueva que se inserten en hormigón armado existente, deberán llevar aplicación de adhesivo epóxico HIT RE-500. Y las longitudes de anclaje serán según catálogo del proveedor.
VERIFICARÁN EN OBRA
NOTA: TODAS LAS MEDIDAS SE
VERIFICARÁN EN OBRA
NOTA: TODAS LAS MEDIDAS SE
ELEVACIÓN EJE 8 A ESC. 1:50
10.00
C
C
10.00 10.00
5
221.50
32.50
PERNO A 325
PL 25/32,5 e= 5mm
7/8"
PL 30/27,5 e= 5mm
PARA TODAS LAS COLUMNAS
ACERO A 420-270 ES
PARA TODAS LAS COLUMNAS
3.5
3
GROUT DE NIVELACIÓN SIKAGROUT
ACERO A 420-270 ES GROUT DE NIVELACIÓN SIKAGROUT
PERNO A 325
ACERO A 420-270 ES
PL 25/32,5 e= 5mm
7/8"
PERNO A 325 6
6
Típico
Tip.
Tip.
HORMIGÓN
lb TUERCA DE NIVELACIÓN
6.35 PLACA DE LOSA COLABORANTE
(mm)
Lb (m)
8
30
2
10
2.0
16
6
6
8
30
-
-
-
12
4
Entre ejes 5 y 6 1° Piso
LC03
10
8
25
-
-
-
18
4
Entre ejes C y D 1° y 2° piso
LC04
12
8
20
-
-
-
15
4
Ejes 10 y 11, 11 y 13 - 1° y 2° Piso
LC05
8
8
30
2
10
18
4
Tip.
Tip.
ATIESADOR e= 5mm
10.00
DETALLE TIPO CN 2
VISTA EN ELEVACIÓN DETALLE CN 1
NOTA= SE EXTIENDE 10 cms. LOSA COLABORANTE DESDE EJE C EN DIRECCIÓN A EJE D
V.N IN 30 x 75,4
EJE D - PARALELO A EJE 5
DETALLE TIPO CN 3
ESC. 1:10
EJE C - EJE 8
ESC. 1:10
8
8
2.8
1.80 M EN LOSA DE LUZ MENOR
NOTA= h hormigón y enfierraduras varían según losa, como se muestra en tabla de losas colaborantes adjunta.
DETALLE LOSA COLABORANTE TIPO ESC.1:25
ESC. 1:10
5
5
5
VN IN 30x75.4
VN IN 30x75.4
MURO H.A.
PL 10/30 e= 10 mm (ALA DE IN 20x30.6)
LONGITUD DE ANCLAJE
ACERO A 420-270 ES
17.50
15.00
7.50
3.00
9.00
5.00
PERNO A 325
C
ATIESADOR e= 5mm
5.00 3.00
7/8"
PARA TODAS LAS COLUMNAS
ATIESADOR e= 5mm
PERFORACIÓN PLACA BASE=15/16"
3.00 5.00
30.00
ATIESADOR e= 5mm 5.00
5.00 3.50
10.00
C
Tip.
8.00 V.N IN 20 x 30,6
D VIGA H.A.
VN IN 30x75.4
4.00
VN IN 30x75.4
26.50 32.50
Fe 8
5.50
ATIESADOR e= 5mm
ALMA DE V.N IN 20 x 30,6
D
D
25.00
18.00
C
5.50
30.00
4.50
C
5.50
VN IN 30x75.4
VN IN 30x75.4
5.00
5.00 30.00
30.00
30.00
MALLA
ACERO A 420/270 ES
ACERO A 420/270 ES
VN IN 30x75.4
PERFIL C 200/75/5 ACERO A 420/270 ES
5 5
5
VISTA EN PLANTA DETALLE CN 2
5
8
VISTA EN PLANTA DETALLE CN 2- DEBAJO DE LOSA C.
ESC. 1:10
8
51.00
VISTA EN PLANTA DETALLE CN 3 - DEBAJO DE LOSA C.
VISTA EN PLANTA DETALLE CN 3
G
0.50 2,75
7.00
0.8
ESPECIFICACIONES SEGÚN FABRICANTE
DETALLE CERCHA TIPO
13A
51.00
ATIESADOR @ pl e= 5mm
ACERO A 420/270 ES
NOTA= PARA CERCHAS 2,3 y 4 VARÍA L PERO SON LOS MISMOS PERFILES
40/40/3
200/75/5
ACERO A 420/270 ES
ACERO A 420/270 ES
10.00
11A
6.00
ACERO A 420/270 ES
ESC.1:25
55.00
2.75
PERFIL C 200/75/5
200/75/5
G
10.00
c/30 cm
0.8
ANCLAJE HSL M 10/20 HILTI
4.00 3.00 4.00 G 10.00
Fe 8
LOSA COLABORANTE 16 cm
PERFIL 60/60/5
PERFIL C 200/75/5
ESC. 1:10
ESC. 1:10
ESC. 1:10
A 63/42H EN CADA VALLE
80.00
2 PERFILES L 40/40/3
200/50/15/4 @ 50 cm (general) @ 30 cm entre eje 5 y 8
4.00
C
3.50
44.00
VN IN 30x75.4
7.50
La
ALMA DE V.N IN 30x75.4
18.00
C
D
Típico
Tip.
ALMA DE V.N IN 30x75.4
18.00
27.50
C VIGA H.A.
2.00
4.00
ALMA DE V.N IN 30x75.4
10.50 18.00
C
s/ TABLA DE EMPOTRAMIENTO EN LÁMINA 668-17
PL 5/15 e= 5mm
PILAR H.A. 20/30
5.00 3.00 2.50
3.00
25.00
OBSERVACIONES
30.00
V.N IN 20 x 30,6
MURO H.A. 5
Cantidad
25.00
ATIESADOR e= 5mm
ATIESADOR e= 5mm
ATIESADORES e= 5mm
ESC. 1:10
(mm)
Tip.
ACERO A 420-270 ES
16.00
VN IN 20 X 19,8
Tip.
PL 10/30 e= 10 mm (ALA DE IN 20x30.6)
Tip.
5.00
ATIESADOR e= 5mm
V.N IN 30 x 75,4
EJE C - PARALELO A EJE 5
Conectores de corte por valle
N°
5
LC02
Denominación ts (cm)
2.00
Tip. 9.00
Tip.
ATIESADOR e= 5mm
DETALLE TIPO CN 1
Armadura negativa por valle
sep (cm)
LC01
Entre Ejes 3a y 5 1° piso
200.00
6.35 PLACA DE LOSA COLABORANTE
MURO H.A.
VIGA H.A. Tip.
GROUT DE NIVELACIÓN SIKAGROUT
3.50
2.00
TUERCA DE NIVELACIÓN 6.35 PLACA DE LOSA COLABORANTE
7/8"
PARA TODAS LAS COLUMNAS
3.50
6
Típico
GROUT DE NIVELACIÓN SIKAGROUT HORMIGÓN
2.00
6.35 PLACA DE LOSA COLABORANTE
GROUT DE NIVELACIÓN SIKAGROUT
PERNO A 325
ACERO A 420-270 ES
6
Típico
TUERCA DE NIVELACIÓN
Ejes 8, 8a,8b,13a,13b y 15 Subterráneo 5,6,8,8a,8b,13a,13b, y 15 2° Piso
Ubicación
PL 25/30 e= 5mm
7/8"
PARA TODAS LAS COLUMNAS
3 3.00 10.00 3.00
HORMIGÓN
2.00
Malla
CN 1
14.00
DETALLE AMARRE DE LOSA COLABORANTE A LATERALES DE HORMIGÓN esc. 1:10
7.00
PERFIL C 150/50/5
PL 30/38 e= 5mm
PERNO A 325
ACERO A 420-270 ES
7/8"
PERNO A 325
PARA TODAS LAS COLUMNAS
PL 30/27,5 e= 5mm
6
PL 30/28 e= 5mm
PERNO A 325
ACERO A 420-270 ES
6
GROUT DE NIVELACIÓN SIKAGROUT
PL 30/27,5 e= 5mm
Típico
6
3.0 3.5
6
Típico
14.50
14.50
6.35 PLACA DE LOSA COLABORANTE
PL 19/11.5 e= 16 mm ALA DE IN 30x75.4
PL e= 8mm ALA DE IN 30x75.4
ACERO A 420-270 ES
ACERO A 420-270 ES
Tip.
13.00
ACERO A 420-270 ES 7.50
7.50
MURO H.A.
ACERO A 420-270 ES
16.50 7.50
310.00
D
NOTA: ESTE ES UN DETALLE TIPO QUE SE ACOMODARÁ SEGÚN SITUACIÓN EN TERRENO ARMADURA DE DISTRIBUCIÓN fe Ø 12
PL 30/3
ATIESADORES e= 5mm
VN IN 20 X 19,8
ATIESADORES e= 5mm
VISTA EN ELEVACIÓN DETALLE CN 5
VISTA EN ELEVACIÓN DETALLE CN 5
4.00 3.00 4.00
ESC. 1:10
EJE G - EJE 13A ESC. 1:10
ESC. 1:10
PERFIL C 200/75/5
Típico
ATIESADORES e= 5mm
DETALLE TIPO CN 6
ESC. 1:10
EJE G - EJE 11A
7.50
ATIESADORES e= 5mm
13.00
DETALLE TIPO CN 5
DETALLE TIPO CN 4
PL 10,5/27,5 e= 8 mm (ALA DE IN 20x19.8)
Tip.
Tip.
VN IN 20 X 19,8
VN IN 20 X 19,8 13.00
7.00
Típico
VIGA IN 20x19,8
Tip.
PL 10,5/27,5 e= 10 mm (ALA DE IN 20x19.8)
Tip.
16.50
VN IN 20 X 19,8
V.N IN 30 x 75,4
51.00
Típico
3
2.00
Tip.
Tip.
13.00
VN IN 20 X 19,8
55.00
14.50
14.50
6.35 PLACA DE LOSA COLABORANTE
6.35 PLACA DE LOSA COLABORANTE
2.00
Tip.
Tip.
4.00 3.00 4.00
TUERCA DE NIVELACIÓN
6.35 PLACA DE LOSA COLABORANTE
Tip.
Típico
GROUT DE NIVELACIÓN SIKAGROUT
HORMIGÓN
2.00
TUERCA DE NIVELACIÓN
6.35 PLACA DE LOSA COLABORANTE
ACERO A 420-270 ES
GROUT DE NIVELACIÓN SIKAGROUT
6.50
3.0
ACERO A 420-270 ES
3
PL 30/28 e= 5mm
7/8"
PARA TODAS LAS COLUMNAS
3.0 3.5
Típico
HORMIGÓN
2.00
TUERCA DE NIVELACIÓN
LC 01
LC 05
GROUT DE NIVELACIÓN SIKAGROUT
6.50
3.0
ACERO A 420-270 ES HORMIGÓN
2.00
7/8"
PARA TODAS LAS COLUMNAS
GROUT DE NIVELACIÓN SIKAGROUT
6
Típico
AMPLIACIÓN DE ZAPATA ARMADURA DE ANCLAJE TIPO C CONTINUA fe Ø 16 @ 35 cm.
55.00 40/40/3
EJE C - EJE 11A
ARMADURA DE DISTRIBUCIÓN fe Ø 12 @ 25 cm.
CERCHA
ESC. 1:10
PERFIL C 200/75/5
EMPLANTILLADO DE HORMIGÓN H-5
(CORDÓN INFERIOR CERCHA)
PERFIL L 75/75/5 11A
13A
11A
51.00
13A
7.00
PERNO DE ACERO d= 1/2 ''mm
PERNO DE ACERO d= 1/2 ''mm
ZAPATA ACTUAL
ACERO A 420/270 ES
ACERO A 420/270 ES
UNIÓN: PUENTE ADHERENTE ADHESIVO SIKADUR 32
0.50 7.00 0.50
11A
11A
PARA TODAS LAS COLUMNAS
5.00 3.00
3.00 5.00 2.50
11.50
32.00
27.50
C
C
C
18.00
8.00
G
7/8"
PARA TODAS LAS COLUMNAS
PERFORACIÓN PLACA BASE=15/16"
3.00 5.00
G
G
5.00 3.00 2.50
27.50
18.00
8.00
G
G
G
VN IN 30x75.4
6.50
9.00
VN IN 20 X 19,8 11A
ESC. 1:10
PERFIL 30/4
55.00
0.50
Típico
Típico
30.00
30.00
30.00
25.00
51.00
14.00
EN INGENIERÍA
ACERO A 420/270 ES
PERFIL L 75/75/5
DETALLE AMPLIACIÓN DE ZAPATA
2.00
0.50
C.N
PERFIL L 75/75/5
ESC. 1:20
DETALLE UNIÓN CERCHA A PILAR
15.00
7.00 PERFIL C 150/50/5
11A
13A
13A
VISTA EN PLANTA DETALLE CN 5- DEBAJO DE LOSA C.
VISTA EN PLANTA DETALLE CN 6
VISTA EN PLANTA DETALLE CN 6- DEBAJO DE LOSA C.
ESC. 1:10
ESC. 1:10
ESC. 1:10
CONSULTORIA
PL 45/25 e= 10mm
4
5.50
5.50
30.00
11A
VISTA EN PLANTA DETALLE CN 5
ESC.1:10
24.00 A
ESC. 1:10
4.00
VISTA EN PLANTA
11A
VISTA A-A
VISTA EN PLANTA DETALLE CN 4 - DEBAJO DE LOSA C. ESC. 1:10
Típico
ACERO A 420/270 ES
4
4
7.50
PERFIL C 150/50/5
G
Típico
C.N
A
27.50
5.00
e= 8 mm (ALA DE IN 20x19.8)
ACERO A 420-270 ES
VISTA EN PLANTA DETALLE CN 4
EN INGENIERÍA
Tip.
5.00
5.00
19.00
VN IN 20 X 19,8
5.00
6.50 11.50
8.00
5.00
VN IN 30x75.4
MURO H.A.
3.50
6.50 11.50
G
4.00 3.00 4.00
CONSULTORIA
13.00
13.00
MURO H.A.
ATIESADOR e= 5mm 13.00
27.50
ACERO A 420-270 ES
2.50
4.00
PL 45/25 e= 10mm
7.50 1.00
PL 10,5/27,5 e= 5mm 10.50
10.50
ALMA DE V.N IN 30x75.4
ATIESADOR e= 5mm
ALMA DE V.N IN 30x75.4
8.00 43.00
PERNO A 325
ACERO A 420-270 ES
2.50
4.00
13.00
C
PL 10,5/27,5 e= 5mm 10.50
10.50
VN IN 20 X 19,8
3.50
7/8"
PERFORACIÓN PLACA BASE=15/16"
VN IN 20 X 19,8
PERNO A 325
3.00
VN IN 20 X 19,8
ACERO A 420-270 ES
19.00
14.00
VN IN 20 X 19,8
PL 19/11,5 e= 5mm
19.00
6.50
4
NOTA: TODAS LAS MEDIDAS SE
VERIFICARÁN EN OBRA
DETALLE PILAR RETICULADO DE ACERO TIPO
NOTA: TODAS LAS MEDIDAS SE
VERIFICARÁN EN OBRA
ESC.1:10
STRUCTURAL REPAIR OF S.I.I. BUILDING, RECOLETA, SANTIAGO
2011
24 1
3
3A
5
6
8
10
8A
10A
13A
11A
15
13B
DET.1
CADENA DINTEL 20/15
VE 20/70 20/30
4 12 EST. 8 @15
4 12
2 16.
20/20
20/20
D.M. 8 @20
DET.5
VER NOTA 3
Fe' 2 12
LC 04
2 12
8 @20
DET.5
DET.5
DET.2
LC 05 8 @30 2 10 l.b.= 2,80 m
DET.2
VN IN 20x30.6
25/25
25/25
DET.2
25/25
VN IN 20x30.6
4 16 EST. 10 @20
4 16 EST. 10 @20
4 16 EST. 10 @20
DET.5
LC 05 DET.1
8 @30 2 10 l.b.= 2,80 m
Fe' 2 12 2 12.
CADENA DINTEL 20/50 2 12.
4 12
20/20 4 12
DET.1
20/20
2 10.
VE 20/59
2 12.
Fe' 2 12
20/40
20/20
G
20/20
I
4 12
4 12
4 12
Fe' 2 12
L119
L 120
VE 20/59
CADENA DINTEL 20/50
5 18
+
2 12.
CADENA DINTEL 20/15
2 10.
Fe' 2 10
4 12
F
2 12
Fe' 2 10
DET.16
25/25
4 16 EST. 10 @20
20/40
C
2 12
CADENA DINTEL 20/15
DET.2
20/20
4 12 EST. 8 @15
8 @14
20/20
4 12
VN IN 20 X 19,8
2 12. EST. 8 @19
2 12
Fe' 2 12
5 22
DET.4
2 12
4 12
4 12
2 12.
8 @12
EST. 8 @5 Fe' 2 18 5 22
6 22 Fe' 2 16
VN IN 20 X 19,8
L 103
L 117
2 12 4 10
2 16.
H.A. A DEMOLER
VN 20/40
VE 20/59
VE 20/59
VE 20/70
Fe' 2 16
CADENA DINTEL 20/50
Fe' 2 12
Fe' 2 12
2 12.
C 30x43.4
C 30x43.4
H.A. A DEMOLER
10 @14 8 @20 H.A. A DEMOLER
6 @20 6 @20
VE 20/40
2 12.
Fe' 2 12
CADENA DINTEL 20/50
2 12
2 12.
ESTRUCTURA METÁLICA A EJECUTAR
+
VE 20/70
+
DET.3
VE 20/70
2 12
L 115
2 12.
L 113 DET.8
2 12. Fe' 2 12
A
A1 B1
V.MODIF. 20/59
VE 20/15 EST. 8 @25
Fe' 2 12
Fe' 2 12
2 12.
2 12. Fe' 2 12 EST. 8 @25
15/25
2 10. Fe' 2 10 EST. 8 @5
Fe' 2 12
C 30 x 36,7 (VER DETALLE 8)
VE 15/70
VE 20/70
VE 20/35
VN IN 20x30.6 2 12
MN
MN
EST. 8 @14
2 12. Fe' 2 12 EST. 8 @14
8 @25
4 12 EST. 8 @15
DET.7
Fe' 2 12
15/25
4 12 EST. 8 @15
2 12. Fe' 2 12
6 26
VE 20/70
VE 20/70
10 @16 8 @20
VE 20/54
20/30
DET.5
CAD.ex 20/15 2 10. Fe' 2 10
Fe' 2 12
VN 20/30
8 @30
6 @14
VN IN 20 X 19,8
2 18. EST. 8 @24
H.A. A DEMOLER
VE 20/70
VE 15/70
LC 02
20/20
4 12 EST. 8 @15
VN 20/50
H.A. A DEMOLER
VE 15/70 EST. 8 @25
Fe' = 2 16
4 12 EST. 8 @15 Fe' 2 12
LC 03
VER NOTA 3
3 12
2 16.
D
VE 20/120 S.INVERTIDA
3 22
2 12. EST. 8 @14
10 @16
L 110
Fé =4 18
VN 20/50
DET.6
4 18.
4 10
C
DET.1
L 114
+
6 @17
L 107
VE 20/75
2 18
20/20
6 @20
L 109
Fe' 2 10 20/40 4 12
L 116
DET.8
2 12
V.N IPE 180/91/8 4 10
8 @12 DET.6
6 @20 6 @20
DET.5
20/20
( INVERTIDA )
2 10.
DET.4
2 12.
VIGA MODIFICADA 20/30
Fe' 2 12 2 12.
EST. 8 @14 4 10
6 @20
3 26
L 102
3 22
+
15/30
L 104
3 26 DEL PISO 2 EMPOTRADO EN EL MURO 1.00 m.
REFUERZO INFERIOR 4 25
Fe' 2 12
B
L 106
3 12 Fe' 2 12 EST. 8 @25
VE 20/120 S.INVERTIDA
+
12 @17 8 @20
VIGA PARED EXISTENTE 15/316
DET.4
EST. 8 @25
4 12
VE 15/30
8 26
L 101
CADENA DINTEL 20/15
2 12
2 12
20/20
4 12 EST. 8 @15
DET.8
A1 B1
Fe' 2 10
2 10.
20/20
3 26
CADENA VIGA 15/70
4 12
2 10
Fe 3 16.
EJE MEDIANERO
7 26
A
SIMBOLOGIA
1
3
8A
10A
13 A
11A
15
13 B
A
4 12
N
20/20
DET.1
EJE MEDIANERO
7 26
4 12
2 12
2 12
4 12
2 10
DET.5
L 201
8 @12
DET.6
DET.1
DET.6
8 @30 2 10 l.b.= 2,00 m
LC 01 8 @30 2 10 l.b.= 2,00 m
LC 01 8 @30 2 10 l.b.= 2,00 m
VN IN 30x75.4
LC 01
VN IN 30x75.4
8 @30 2 10 l.b.= 2,00 m
VN IN 30x75.4
VN IN 30x75.4
8 @30 2 10 l.b.= 2,00 m
LC 01
DET.5
VN IN 30x75.4
VN IN 30x75.4 20/30
4 12 EST. 8 @15
VN IN 30x75.4
4 12
4 12
DET.5
8 @20
DET.5
DET.5
DET.2
VN IN 20x30.6
25/25
25/25
8 @30 2 10 l.b.= 2,80 m
DET.2
25/25
VN IN 20x30.6
4 16 EST. 8 @15
4 16 EST. 8 @15
4 16 EST. 8 @15
VN IN 20 x 19,8
LC 01
20/20 4 12
8 @30 2 10 l.b.= 2,00 m
LC 01 8 @30 2 10 l.b.= 2,00 m
DET.5
C DET.5
2 12
DET.5 DET.1
20/20 4 12
DET.1
LC 05 8 @30 2 10 l.b.= 2,80 m
DET.16
DET.2
20/20
4 12 EST. 8 @15
20/20 VN IN 20 x 19,8
DET.2
VN IN 20x30.6
VN IN 20 x 19,8
DET.5
DET.5
LC 05
DET.5
VN IN 20 x 19,8
VN IN 20 x 19,8
LC 04
8 @12
VN IN 20 x 19,8
L 203
VN IN 30x75.4
20/20
20/20
DET.5
DET.5
VN IN 20 x 19,8
VE 20/120 S.INVERTIDA
VN IN 30x75.4 DET.5
CADENA DINTEL 20/50
2 12
DETALLE ANCLAJE LOSA COLABORANTE
D
VN IN 30x75.4
VE
4 12
4 12
CADENA DINTEL 20/15
2 10.
25/25
4 16 EST. 8 @15
CONTINUACION MURO FACHADA / ANTETECHO
Fe' 2 10
F
2 12
CADENA DINTEL 20/50
VN 20/50 20/20
VN IN 20 x 19,8
VN 20/50 3 22
2 12
DET.4
4 10
C
A1 B1
8 @30 2 10 l.b.= 2,00 m
DET.9 DET.3
2 12
LC 01
Fe' 2 12
Fe' 2 16 2 16.
VN IN 20 x 19,8
VE 20/120 S.INVERTIDA
L 202
3 22
8 @30 2 10 l.b.= 2,00 m
VN IN 30x75.4
DETALLE ANCLAJE LOSA COLABORANTE
H.A. A DEMOLER
LC 01
DETALLE ANCLAJE LOSA COLABORANTE
( INVERTIDA )
REFUERZO INFERIOR 4 25
VN 20/60
B
LC 01
L 204
VIGA PARED EXISTENTE 15/316
VN IN 30x75.4
12 @17 8 @20
VER NOTA 3
A
20/40 4 12
DET.5
DET.5
+
H.A. A DEMOLER
A1 B1
DET.5
2 12.
15
15 A
VERIFICARÁN EN OBRA
VE 20/60
NOTA: TODAS LAS MEDIDAS SE
VN IN 20 x 19,8
10
LOSA A DEMOLER
DET.5
DETALLE ANCLAJE LOSA COLABORANTE
VIGA NUEVA LOSA COLABORANTE (NUEVA)
DET.5
Fe' 2 12
3 26
VIGA EXISTENTE
CADENA DINTEL 20/50
20/20
2 12.
4 12
VE 20/120 S.INVERTIDA
L.C
8
2 12. Fe' 2 12
20/20
ALBAÑILERÍA EXISTENTE ESTRUCTURA METÁLICA
NOTA: SE CONSIDERA DEMOLER O DESARMAR A TODOS LOS ELEMENTOS EXISTENTES TALES COMO TABIQUES, REVESTIMIENTOS DE MUROS Y PISOS.
6
EN INGENIERÍA
HORMIGÓN NUEVO - A CONSTRUIR HORMIGÓN A DEMOLER
VN
5
CONSULTORIA
HORMIGÓN ARMADO EXISTENTE
VE
3A
G
I
CONTINUACION MURO FACHADA / ANTETECHO
SIMBOLOGIA
CONSULTORIA
HORMIGÓN ARMADO EXISTENTE
EN INGENIERÍA
HORMIGÓN NUEVO - A CONSTRUIR
N
HORMIGÓN A DEMOLER ALBAÑILERÍA EXISTENTE ESTRUCTURA METÁLICA
VE VN
L.C
VIGA EXISTENTE VIGA NUEVA LOSA COLABORANTE (NUEVA)
10
15 A
15
LOSA A DEMOLER
NOTA: SE CONSIDERA DEMOLER O DESARMAR A TODOS LOS ELEMENTOS EXISTENTES TALES COMO TABIQUES, REVESTIMIENTOS DE MUROS Y PISOS.
2011
NOTA: TODAS LAS MEDIDAS SE
VERIFICARÁN EN OBRA
STRUCTURAL REPAIR OF S.I.I. BUILDING, RECOLETA, SANTIAGO
1.2
2.98 0.73
5.91
2.00 0.20
6.90
0.10 0.80 0.10 0.20
1.20 0.20
1.20
9
Local Técnico
1.20
Duchas
0.20
0.2 9 0.5 0 0.5 0 0.5 0 0.5 0 0.5 0 7.4 2
5.10
Baño Niños
Duchas
5.63
LÍNEA OFICIAL
LÍNEA VEREDA
EJE DE CALZADA
70 NTE RASA
1.80
2.9 1
Baño Niñas
cina
E (1.5 x 1.15)/2 = 0.86 m2 F 1.5 x 4.70 = 5.41 m2 G (1.17 x 1.49)/2 = 0.86 m2 H (1.17 x 4.56)/2 = 2.66 m2 I (0.81 x 6.00)/2 = 2.27 m2 J (11.71 x 6.00)/2 = 70.24 m2 K (1.79 x 5.48)/2 = 10.68 m2 L 6.26 x 5.48 = 39.94 m2 M (5.02 x 7.04)/2 = 17.67 m2 N (1.56 x 6.26)/2 = 4.86 m2 O 4.71 x 1.4 = 6.58 m2 P (1.4 x 1.49)/2 = 3.14 m2 Q (0.35 x 4.69)/2 = 0.81 m2 R 4.69 x 5.56 = 26.09 m2 S (1.86 x 4.69)/2 = 4.35 m2 T (1.58 x 4.00)/2 = 3.16 m2 U 4.71 x 4.00 = 18.82 m2
4.71
0.20 0.20
0.20
3.52
0.10 1.00
0.20
1.50
+ - 0.0
6
1.20
0.20
0.60 1.70 0.20
4.20
5 + - 0.0
3.80
4
LÍ
5.00
Administración
ño ntes
7 8
E (1.5 x 1.15)/2 = 0.86 m2 F 1.5 x 4.70 = 5.41 m2 G (1.17 x 1.49)/2 = 0.86 m2 H (1.17 x 4.56)/2 = 2.66 m2 I (0.81 x 6.00)/2 = 2.27 m2 J (11.71 x 6.00)/2 = 70.24 m2
25
193.47 m2 TOTAL SUPERFICIE CONSTRUIDA = Sup Nivel 1 + Sup. Nivel 2 = 317.90 m2 + 193.47m2 = 511.37 m2 Ocupación Predial = 44,09 % Coeficiente de Constructibilidad = 0.27
317.90 m2 0.20 2.40
2' 0.100.20
2.30
0.70
2.11
4.63
9.06
0.22
9.39
G
QUIEBRE DESLINDE
5.68
2.31
1.20 9.20
MURO ADHOSAMIENTO CORTAFUEGO F-120
0.00
5.04
3.00
2.30
5.48
70
2.90
NTE
MURO ADHOSAMIENTO CORTAFUEGO F-120
RASA
LÍNEA OFICIAL
Design of Montessori School in Valparaiso
EJE DE CALZADA
3.16
5.00
LÍNEA VEREDA
LÍNEA DE EDIFICACIÓN
1 ESC 1:100
1.20
3.52
0.1
N
0.85
0.1
5
E
This was an order from a young couple of Industrial Designers, that since they started to grow their own kids, they decided to create aSUR Montessori School. At the beginning they ELEVACIÓN ESC. 1:100 transformed their own home, and in time it wasn’t enough bigger for the new students that came every year. So they bought a property in Valparaiso, Chile, and decided to built a new School that needed to respond to the Montessori Education Requirements, and at the same time, a building that could be eco-efficient, as much as possible. The project was developed until preliminary draft status, for being presented in Valparaiso’s Council, for receiving the permit for Project Development. 4 5
Taller 2 62 m2
TO
45
IN
M
SA
D
ES
TE
E
O UR M
D A
70
D
NTE RASA
0
0
0
HO
DESLINDE NORTE
6.0 5.8 4.0
MURO ADHOSAMIENTO F-120
5
D
N
SA RA
3.50
5 0.8
C
NIVEL TERRENO VECINO
5.93
6.66
7
2.90
8
6.43
3.53
DESLINDE SUR
6
2'
PROYECTO : • • • • •• • • • • •••• • • • • •• •• • • • • • • • • ••• • •• • • • • • • •• • • • • • • DESTINO : EDUCACIONAL
PROPIETARIO :
G
xxxx
RUT : 7.086.234-4 UBICACION :
CALLE RICARDO H. DE FERRARI N 760 • • • • • • • •• • • • • • • • • • • •
ESC 1:100
PROPIETARIO
CONTENIDO:
ARQUITECTO
DIBUJO :
• • • ••• •••••••• • • • •• •••••••••••••••••••••
FECHA
DESIGN OF MONTESSORI SCHOOL IN VALPARAISO
:
ESCALA :
LAMINA :
1 DE 1
2011
26
2011
DESIGN OF MONTESSORI SCHOOL IN VALPARAISO
27 N
N
4.71
11.71
11.71
4.00
11.71
4.35 m2 1.8 6
8.44
4.30 3.00
1.58
7.04
39.94 m2
5.48
6.30 4.90
6.00
3.16 m2
1.79
10.68 m2
6.00 5.00
11.71
55.17
LOTE 1B-B SUP 1159.74M2
4.00
5.02
6.26
6.49
6 0.81
m2
3.20
EMPLAZAMIENTO ESC 1:250
1.17
2.66 m2
1.15
10.68 m2
4.70
9.92 m2
4.70
4.49
4.70
4.71 4.70
1.50
9
0.86 m2 0.86 m2
6.00
4.6
3.14 m2 6.20
6.20
1.40
6.58 m2
9.92 m2
6.45
5.5 0.35
2.66 m2
4.71
1.15
0.8 1
1 0.8
1.17
1.50
EJE DE CALZ
20.08.2010
2.27 m2 0.86 m2 0.86 m2
10.68 m2
3.56
C.I.P. Nr. 934 de fecha
4.82
3.42
8.44
25.14
4.86 m2
6.00
3.56
Adhosamiento 47 % Muro Cortafuego F-120
6.45 6.49
19.24
6.26
1.56
7 24.5
ADA FERRARI
0.85
0.70
6.45
1.15
3.20
6.45
1.15
ESQUEMA DE SUPERFICIES NIVEL 2 ESC. 1:100
ESQUEMA DE SUPERFICIES NIVEL 1 ESC. 1:100
PLANO DE UBICACIÓN ESC 1:2000
CUADRO DE SUPERFICIES Superficie Terreno: 1159.74 m2 Superficie Construída:
2.9
0.2
0
0 0.8
1
0.2
0
1.1
6
C
6.00
N
1.9
0
2.9
0.20
0 0.7
9 0.20 0.2
0
0
Sala de Profesores
13.07
3.52
1.50
2.98 0.73
+ - 0.0
5.91
LÍNEA OFICIAL
EJE DE CALZADA
70 NTE
4.71
RASA
6
+ - 0.0
+ - 0.0
A
5
1.20
0.20
0.60
4
Baño Docentes
+ - 0.0 Invernadero 2
1'
0.20
0.2
5.00
Administración
2.00
5.85
1.2
LÍNEA VEREDA
B
0
0
5.63
5.22
0
1.70
3.6
4.20
0
3.80
5.8
0.20 0.20
0.2 0
6.0
0
LÍNEA DE EDIFICACIÓN
E
+ - 0.0
1.0
2.00
0.20
+ - 0.0
2.9
1
2
0.10 0.80 0.10 0.20
1.20 0.20
9 0.5
.50
10
1.2
9
Local Técnico
.34
10
Bodega
1
0.20
0.2
1.20
Duchas
Duchas
+ - 0.0
1.20
+ - 0.0
0 0.5
67m2
0 0.5
Casa de Niños
7.4
0 0.5
0 0.5
0
5.10
Baño Niños
Cocina
57.88 m2
6.90
Baño Niñas
Comedor
1.80
1
+ - 0.0
0.20
0.10 1.00
0.20
Invernadero 1
+ - 0.0
7 8
2 3 4 5
Baño de niños 6.8 m2
Superficie Nivel 1
Superficie Nivel 2 A 6.0 x 8.44 = 50.63 m2 B (6.0 x 3.56)/2 = 10.68 m2 C (3.2 x 6.2)/2 = 9.92 m2 D 6.45 x 6.20 = 39.94 m2 E (1.5 x 1.15)/2 = 0.86 m2 F 1.5 x 4.70 = 5.41 m2 G (1.17 x 1.49)/2 = 0.86 m2 H (1.17 x 4.56)/2 = 2.66 m2 I (0.81 x 6.00)/2 = 2.27 m2 J (11.71 x 6.00)/2 = 70.24 m2
0
2
D
A 6.0 x 6.49 = 38.96 m2 B (6.0 x 3.56)/2 = 10.68 m2 C (3.2 x 6.2)/2 = 9.92 m2 D 6.45 x 6.20 = 39.94 m2 E (1.5 x 1.15)/2 = 0.86 m2 F 1.5 x 4.70 = 5.41 m2 G (1.17 x 1.49)/2 = 0.86 m2 H (1.17 x 4.56)/2 = 2.66 m2 I (0.81 x 6.00)/2 = 2.27 m2 J (11.71 x 6.00)/2 = 70.24 m2 K (1.79 x 5.48)/2 = 10.68 m2 L 6.26 x 5.48 = 39.94 m2 M (5.02 x 7.04)/2 = 17.67 m2 N (1.56 x 6.26)/2 = 4.86 m2 O 4.71 x 1.4 = 6.58 m2 P (1.4 x 1.49)/2 = 3.14 m2 Q (0.35 x 4.69)/2 = 0.81 m2 R 4.69 x 5.56 = 26.09 m2 S (1.86 x 4.69)/2 = 4.35 m2 T (1.58 x 4.00)/2 = 3.16 m2 U 4.71 x 4.00 = 18.82 m2
1.9
4.4
193.47 m2 TOTAL SUPERFICIE CONSTRUIDA = Sup Nivel 1 + Sup. Nivel 2 = 317.90 m2 + 193.47m2 = 511.37 m2 Ocupación Predial = 44,09 % Coeficiente de Constructibilidad = 0.27
317.90 m2
Ascensor Minusválidos
+ - 0.0
2
0.20
5.10 0.80
2.40
1.00
2' 0.100.20
2.30
0.70
0.20
2.11
4.63
9.06
0.22
9.39
F
B'
1.31
0.20
1.70
2.70
1.40
0.20
5.68
2.31
1.20
10.80
9.20 4.30
6.35
2.88
5.04
MURO ADHOSAMIENTO CORTAFUEGO F-120
0.00
0.20
QUIEBRE DESLINDE
2.98
G
E'
3.16
2.30
3.00
5.48
70 NTE
RASA
2.90
5.00
EJE DE CALZADA
LÍNEA OFICIAL
MURO ADHOSAMIENTO CORTAFUEGO F-120
LÍNEA VEREDA
LÍNEA DE EDIFICACIÓN
PLANTA NIVEL 1 ESC 1:100
1.20
3.52
20.00
0.1
6.0
N
0
0
0.85
0.1
5
ELEVACIÓN SUR ESC. 1:100
E
TO
70 NTE RASA
0
5.8 4.0
D
45
IN
M
SA
HO
E
D
O UR M
D A
DESLINDE NORTE
5
MURO ADHOSAMIENTO F-120
5 0.8
C
ES
TE
D
N
SA
RA
5.22
B
13.07
2.00
4
3.50
0 6.0 0 5.8
5.85
1'
5
NIVEL TERRENO VECINO
Taller 2
A
62 m2
6
DESLINDE SUR
1
Taller 1
5.93
6.66
7
15 14
8
1
6.43
3.53
85.45 m2
2
13
3
11
5
10
6
9
7
2.90
4
Ascensor Minusválidos
8
2'
2
B'
F
10.80
G
E'
PROYECTO : • • • • •• • • • • •••• • • • • •• •• • • • • • • • • ••• • •• • • • • • • •• • • • • • • DESTINO : EDUCACIONAL
PROPIETARIO :
xxxx
RUT : 7.086.234-4
4.71
UBICACION :
20.00
CALLE RICARDO H. DE FERRARI N 760 • • • • • • • •• • • • • • • • • • • •
PLANTA NIVEL 2 ESC 1:100
PROPIETARIO
CONTENIDO:
• • • ••• •••••••• • • • •• •••••••••••••••••••••
ARQUITECTO FECHA
DESIGN OF MONTESSORI SCHOOL IN VALPARAISO
:
DIBUJO : ESCALA :
LAMINA :
1 DE 1
2011
28
Design of Ruka Eco-Lodge for indigenous Asociation Mapulahual This was the Design for a Concourse, the problematic consisted in design a Lodge for the indigenous community Mapulahual , starting to develop an eco-tourism project, supported financially by the WWF (Worldwide Foundation). They needed to develop this spaces for work in their own economic activities, like weaving and preparation of jams and preserves, and at the same time a place for receiving guests. It was inspired in the Huilliches Indigenous Communities Lifestyle and Culture, living around the Fire place in the center. And the way to come into the project was proposing a series of tracks in the forest, respecting the landscape of the place. They did not have the enough finance to built it in one time. So was necessary to design it for two Building Stages.
2009
DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL
29
DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL
2009
30
2009
DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL
31
DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL
2009
32
2009
DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL
33
Museum of Mythology of Chiloe This was the last Project in the University of Bio-Bio, created over a year for release and diploma. I love the island of Chiloe, that’s why I chose this place of Chile for develop my last project in the career. The Mythology of Chiloe is something really particular of this island, attached to more then 30 legends and mythological beings. At the same time the way to develop the tourism is to spread this culture, and the best way was creating a space, for local artist, who are spinning, dyeing and knitting, wool. Is in the interaction with visitors and local artist, local people, that the Mythology could be transferred in an oral way, and is in the classic museum program how the mythology could be transferred in a tangible way, pictures, reading and visual tools. Therefore the Museum is a multi-programmatic building, anchored to an urban intervention, tracks along the ocean border and classic pile houses or “palafitos” on the bay of the city of Castro, having the project a dialogue through the illusion of the ghost boat “Caleuche”, local legend, with the urban environment.
MUSEUM OF MYTHOLOGY OF CHILOE
2008-09
34
2008-09
MUSEUM OF MYTHOLOGY OF CHILOE
escala
1:100
1``
1,6 2,8 0,3 2,9
2,4 0,3
2
2,9
2,5 0,4
3
8,1
4,0
H
4
3,7 4,0
barrio gamboa - castro - chiloe
08.07.2009 U
V V
W W
I
Alumna: Profesor guía:
NORTE
8,4 4,0 0,3 0,5
Plantas de Arquitectura
MUSEUM OF MYTHOLOGY OF CHILOE 2,4
2,4 3,0
2,6 0,2
22,3
NIVEL -2
Alejandra rojas w.
Museo DE La Mitologia Chilota PROYECTO DE TITULO : 1,6 2,1 0,4
5 1 1,1 2,6 0,4
1``
7,9 2,4 4,7
2
0,4
2,5
8,4
3
3,6
4,0 0,4
H
3,6
4
U U
V V
W W
4,0
Jorge Harris 7,6
5 2,5
1,7 0,3 3,7
26,7
5,7
NIVEL -1 0,2 1,7 0,7
2,1 0,4
I 1 2,0
V
1'' 0,4
7,9
3,6 2,4
3,4 4,7
2 0,4
2,5
1,6
3 3,6
4,0
4,2
H
0,4
4 3,6
barrio gamboa - castro - chiloe
08.07.2009
T
U MUNDO DEL MAR
W
-1.1
T
U
+ 1.90
W
V
Alumna:
Profesor guía:
NORTE
R
F
0,4
0,4
5 5,5
4,1 2,3
0,2 2,7
26,7 4,0
NIVEL 1
Museo DE La Mitologia Chilota
0,2
6,7
2,1 0,4
I 1 2,1
7,9
1`` 0,4
2,4 4,6
2 0,4
9,5 2,5
3 4,0
4,0
4,2
H
3,6 2,6
H
B B
I
C C
J
K
D D
M
N
E E
Q
P
S - 1.65
F
4 H
J
I
K
M
L
O
N
- 1.85
Q
P
S
R
T - 1.45
T
U U
V V
W W
3,0
0,4
2,6
3,0
3,0
0,4
G 3,2
2,6
F
G
0,4
3,0
2,6
6,1
0,4
2,6
3,0
0,4
2,6
3,0
3,9
0,4
2,7
3,0
0,3
E
2,6
F
3,0
D
E
0,4
D
3,0
C
3,4
2,6
0,3
B
C
0,4
3,0
2,7
0,3 8,0 3,0
2,7
0,3
8,0
3,0
2,7
A
3,0
2,6
0,4
3,9
3,0
2,6
2,8
2,8
I
0,4
0,4
B
3,0
2,6
3,0
2,6
H
0,3
72,3
6,1 0,4
3,7
0,4
3,0
2,6
4
3,0
2,6
0,4
0,3
18,1
3,0
3,0
2,6
2,0
2,0
4,2
0,4
0,4
2,9
4,0
3,0
2,6
3,0 3,2 2,6
6,0
0,3
3,7
0,4
0,4
3,0
2,7
3
3,0
2,6
3,0
2,6
0,3 2,0 3,0
4,0
0,3
2,6
0,4
2,0
2,5
0,4
3,0 3,4 2,6
0,3
2
3,0
2,6
0,4
3,0
6,2
0,4
3,0
2,6
1,3
A 6,1
3,0
0,4
0,3
2,4
2,8
2,6
3,0
2,6
3,0
1``
0,4
72,3
0,4
2,7 8,1
0,2
3,0
3,0
2,6
0,3
3,9
3,0
2,6
18,1 0,4
3,0
2,6
3,7
0,4
3,0
2,6
0,4
2,0
7,9
3,0
O
0,2 0,9
3,0
2,6
0,4
L
1,5
0,4
3,0
3,0
2,6
2,8
1
3,0
- 1.45
0,4
0,3
5,9
3,0
R
2,6
S
3,0
2,7
12,0
3,0
2,2 0,2
0,4
F
3,0
- 1.65
8,9
2,6
0,3
5
7,5
S
0,4
2,7
3,0
2,0
0,3
7,3
P
3,0
0,4
2,9 8,0
4,0
3,0
Q
3,0
+ 1.20
2,6
2,6
0,4 1,0
3,0
0,3
4,4
4,8
- 1.85
0,4
N
0,4
1,3
3,0
2,7
26,7
4,8
Q
O 3,0
E 2,6
+ 1.20
0,4
N
3,0
M
2,8
+ 0.75
2,6
+ 0.25
L
0,4
K
3,0
D
3,0
+- 0.0
2,6
RECEPCIÓN CENTRO CULTURAL DE LA MITOLOGÍA CHILOTA
0,4
+ 0.75
3,0
J
3,0
+ 1.20
2,6
+ 1.20
0,4
+ 0.75
I
3,0
D
H
3,0
+ 1.20
B
C 3,0
+- 0.0
3,1
2,6
SECADO DE LANAS
2,6
P
G
0,4
VENTA
F
3,0
+ 0.75
E
7,5
TELARES
D
0,4
0,4
C
3,0
3,0
2,7
8,0
C
3,0
G
2,6
0,4
B
0,4
+ 2.40
EXPOSICIÓN MITO DE ORIGÉN DE LA ISLA TEN-TEN Y COI-COI VILÚ
+ 2.00
A
3,0
2,6
3,0
2,6
0,3
I
6,0
0,4
3,0
4,0
4,0
ACCESO MUSEO DE LA MITOLOGÍA CHILOTA
0,4
3,0 3,2 2,7
0,3
H
3,0
2,6
0,2
3,0
B
0,4
3,0
2,8
+ 1.9
3,7
7,3
2,6
5,9 0,2
MUNDO DE LA TIERRA
4
6,0
3,0
2,8
E
0,4
6,0
M
3,6
0,4
K
4,0
2,6
0,2
+ 1.9
3,6
0,4
J
3
3,0
3,0
2,8
+ 2.40
0,4
3,1
2,6
0,2
+ 1.7
2,5
0,4
3,0
2,8
1,3
D
2
3,0
0,2
0,3
A 5,6
2,9
2,6
3,0
2,8
3,0
7,8
0,4
0,2
2,7 8,0
2,4
3,0
2,6
3,0
2,8
0,4
1``
0,4
0,2
F
0,4
3,0
E
2,6
3,0
F
1,5
3,0
R
0,4
9,0
2,6
3,0 26,8 2,8
3,0
2,6
7,9
0,4
O
1,4 0,5
3,0
2,6
0,2
L
1,6
0,4
3,0
2,8
C
0,2
4,8
2,6
T
B
I
1,1
4,8
Mundo del Mar 0,4
1
6,0
- 1.45
H
0,2
6,3
T R
3,0
3,0
0,4
S
3,2
2,0 2,0
5
2,6
F
0,2
2,6
2,9
0,3
0,4
S
0,4
0,3
4,2
3,0
- 1.85
3,0
2,6
3,0
2,7
10,0
4,0
2,9
P
Q
2,7
P
Q
3,0
N
5,8
0,3
2,8
20,9
0,4
- 1.65
O 2,8
E
0,2
E
3,0
N
3,0
M
11,7
M
L
3,0
D D
3,0
K
3,0
+- 0.0
3,0
K
0,4
J
3,3
J
2,6
I
6,0
H
C
0,4
B
C
0,4
B
I 3,0
H
2,7
2,6
G
0,4
G
3,0
2,6
F
6,0
F
0,4
E
3,0
D
2,6
RECEPCIÓN CENTRO CULTURAL DE LA MITOLOGÍA CHILOTA
2,6
MUNDO DE LA TIERRA
0,4
3,0
4,0
C
72,1
0,3
C
3,0
2,6
3,0
B
EXPOSICIÓN MITO DE ORIGÉN DE LA ISLA TEN-TEN Y COI-COI VILÚ
1,3
0,3
A
0,4
0,3
3,0
I
3,0
2,6
3,0
2,7
8,0
0,3
ACCESO MUSEO DE LA MITOLOGÍA CHILOTA
0,4
0,4
3,0
H
15,0
2,6
3,0
2,6
0,4
B
6,0
0,4
3,0
3,7
0,4
3,0 3,2 2,6
0,4
4
2,6
0,4
3,0
26,9
D
0,4
0,4
3,0
2,6
0,4
4,0
3,0
2,6
5,9 0,4
3,0
4,2
0,4
3,0
2,6
0,4
3,6
3,0
0,4
3,0
2,8
3
0,4
2,6
3,0
2,6
2,7
0,3
8,0
3,0
2,7
0,4
0,4
5,9 0,4
2,7
0,3
2,5
3,0
-1.1
2
3,0
3,0
2,6
3,0
2,7
5,7
9,0
2,6
0,4
72,1 3,0
2,6
0,4
E
5,6
0,4
0,4
2,6
0,4
2,4
3,0
2,6
3,0
2,6
3,0
2,6
1``
0,4
0,4
2,6
0,4
A 0,4
3,0
2,6
15,0
3,0
0,4
3,0
2,6
2,6
3,0
2,6
13,0
2,6
3,0
2,6
0,4
2,6
0,4
0,4
0,4
2,6
3,0
0,4
3,0
2,6
3,0
2,6
3,0
2,6
7,9
3,0
2,6
F
8,0
6,0
R
2,1
0,4
6,0
O
0,2
3,8
U L
1,1
3,0
T
2,6
T 0,4
0,4
1
0,4
S
3,0
3,0
2,6
0,2
3,0
S
2,7
R 0,4
2,6
0,4
0,3
4,1
F
0,4
3,0
3,0
2,6
4,0
0,4
MONTACARGA
3,0
P
2,6
Q
0,4
P
3,0
N
3,0
Q O
2,6
E
0,4
O
3,0
LOCAL 2
3,0
LOCAL 3
2,6
N
0,4
M
3,0
COCINERÍAS -3.25
L
2,6
D
6,0
D
0,4
K
3,0
COCINERÍAS -3.25
2,6
K
0,4
J
3,0
Bodega e Instalaciones
3,0
2,6
Baño Hombres
0,4
I
3,0
2,6
H
C
0,4
B
C
3,0
Baño Mujeres
2,6
B
I
72,3
H
0,4
0,4
G
3,0
3,1
3,0
2,6
G
21,3
0,4
F
2,7
LOCAL 1
2,6
3,0 3,0 2,6
F
0,4
0,4
E
3,0
2,6
3,0
2,6
D
E
0,4
0,4
D
3,0
3,0
2,6
J
2,6
72,3
0,4
C
3,0
3,0
2,6
C
0,4
LLEGADA Y VENTA PRODUCTOS DEL MAR -3,65
2,6
0,4
B
0,4
3,0 20,9 2,6
I
3,0
0,4
M
5
4,1
PLATAFORMA FLOTANTE desde -4.1 a -5.85
2,6
3,0
2,6
H
0,4
0,4
A
B
3,0
2,6
3,0
2,6
A
0,4
0,4
4
3,0
2,6
3,0
2,6
3 3,7
0,4
0,4
LLEGADA Y VENTA PRODUCTOS DEL MAR -3.65
0,4
3,0
3,0
3,0
2,6
2 3,6
24,2
0,4
6,6
0,4
3,1
3,0
2,6
1`` 0,4
0,4
2,6
0,4
22,7
escala
0,4
5,6
1:100
4,2
2,4
3,0
2,6
3,0
2,6
F
0,4
0,4
0,4
R
3,0
3,0
3,0
2,6
7,9
2,2
0,4
13,0
L
0,6
3,8
3,0
3,0
4,6
3,8
6,9
6,9
3,0
35
27,1 4,0 4,4
5 0,5
I
27,1 4,0
4,0
0,4
5
NIVEL 2
Alejandra rojas w.
Jorge Harris
PROYECTO DE TITULO :
logo
Plantas de Arquitectura
2008-09
36 +16.8
+16.8
Nivel 5
+13.8
Nivel 4
+10.8
Nivel 3
+7.8
Nivel 2
Nivel 5
+13.8
Nivel 4
+10.8
Nivel 3
+7.8
Nivel 2
+-0.0
Nivel 1
-0.8
Nivel -1
-3,6
Nivel -2
Corte FF MUSEO DE LA MITOLOGÍA CHILOTA
Bodega
Corte BB
+-0.0
Nivel 1
-0.8
Nivel -1
-3,6
Nivel -2
Corte CC
+16.8
Nivel 5
+16.8
+13.8
Nivel 4
+13.8
Nivel 4
+10.8
Nivel 3
+10.8
Nivel 3
+7.8
Nivel 2
+7.8
Nivel 2
+-0.0
Nivel 1
+-0.0
Nivel 1
-0.8
Nivel -1
-0.8
Nivel -1
-3,6
Nivel -2
-3,6
Nivel -2
+16.8
Nivel 5
+13.8
Nivel 4
+10.8
Nivel 3
+7.8
Nivel 2
+-0.0
Nivel 1
-0.8
Nivel -1
-3,6
Nivel -2
Corte KK
Nivel 5
+16.8
Nivel 5
+13.8
Nivel 4
+10.8
Nivel 3
+7.8
Nivel 2
MUSEO DE LA MITOLOGÍA CHILOTA
?
corte EE
Corte DD
+-0.0
Nivel 1
-0.8
Nivel -1
-3,6
Nivel -2
Corte II
Profesor guía: Alumna:
Museo DE La Mitologia Chilota PROYECTO DE TITULO :
Cortes transversales
2008-09
barrio gamboa - castro - chiloe
Jorge Harris
Profesor guía:
08.07.2009
Alejandra rojas w.
escala
1:25
escala
08.07.2009
1:100
barrio gamboa - castro - chiloe
Alumna:
Jorge Harris
Alejandra rojas w.
Museo DE La Mitologia Chilota PROYECTO DE TITULO :
Corte Trasnversarl ff y cortes longitudinales
MUSEUM OF MYTHOLOGY OF CHILOE
37
Policarbonato con alma de aire e=12mm
Policarbonato con alma de aire e=12mm
Perfil tubular de Acero d=30mm e=2mm
Perfil tubular de Acero d=30mm e=2mm
Arriostrador de Membrana
Arriostrador de Membrana
Tensor de Acero
Tensor de Acero
Araña Mono union con sello de Neopreno
Araña Mono union con sello de Neopreno
Pletina de Aluminio bota aguas e=1mm
Pletina de Aluminio bota aguas e=1mm
Viga de Coigue 14" x 4"
Viga de Coigue 14" x 4"
Vidrio Templado e=10mm color=5%azul
Vidrio Templado e=10mm color=5%azul
Marco de Aluminio
Marco de Aluminio
Membrana
Membrana
Perno Conector Acero Inoxidable d 012mm
Perno Conector Acero Inoxidable d 012mm
Terciado Marino 15mm Pletina Metalica e=10mm Lana mineral 100mm
Emballetado de cobre e=1mm
Emballetado de cobre e=1mm
Emballetado de cobre e=1mm
Papel Fieltro
Viga de Coigue 14" x 6"
Viga de Coigue 8" x 2"
Pletina Ailadora de Calor
Terciado Estructural 15mm
Terciado Estructural 15mm Viga de Coigue 8" x 2"
Vidrio Laminado e=20mm color=5% azul
Costanera de Pino Impregnado 2" x 2"
Marco de aluminio e=2mm Forro Acero Galvanizado
Costanera de Pino Impregnado 2" x 2"
Poliestileno de A.D. 150mm
Vidrio Templado e=10mm color=5%azul Perno Conector Acero Inoxidable d=12mm
Poliestileno de A.D. 150mm
Poliestileno de A.D. 150mm Terciado Estructural 15mm
placa de cobre e= 2mm
Papel Fieltro
Marco de Aluminio
Terciado Estructural 15mm
Forro Metalico Fogon de Cobre e=3m
Emballetado de cobre e=1mm
Terciado estructural 15mm Viga de Coigue 6" x 2"
Terciado Estructural 15mm
Papel Fieltro
Viga 4" x 2"
Costanera de Pino Impregnado 2" x 2"
Papel Fieltro
Emballetado de cobre e=1mm
Terciado Estructural 15mm
Emballetado de cobre e=1mm
Papel Fieltro
Pino Inpregnado 4" x 2"
Terciado Estructural 15mm
Viga de Coigue 8" x 2"
Tablon de Mañio 8" x 11/2"
Costanera de Pino Impregnado 2" x 2"
Vidrio Templado e=10mm color 5% azul Marco de aluminio e=1mm Lana Mineral 150mm
Papel Fieltro
Terciado marino 15mm Impermeabilizado Pino Inpregnado 4" x 2" Terciado marino 15mm Barnizado Platina de Acero e=5mm Perforada Vidrio Laminado e=20mm color=5% azul
Tabla de Cipres 6" x 1"
Terciado Estructural 18mm Hormigon Liviano
Petina de Acero Galvanizado e=4mm con perforaciones
Lamina de acero e=5mm
Tabla de Cipres 6" x 1"
Pino Impregnado 2" x 2"
Ladrillo Reflectario
Viga de Coigue 14" x 4"
Placa de Terciado Marino
Viga de Coigue 16"x 6"
Mortero de Pega Tabla de Cipres 6" x 1" Lana Mineral 100mm Terciado Marino 15mm
Pieza de Cipres de las Guaitecas d=25cm Viga de Coigue 14"x 6" Tabla Cipres 8" x 1"
Viga de Coigue 8" x 2"
Perfil Tubular Acero Galvanizado d=70mm e=3mm
Tabla de Cipres 6" x 1"
Perfil lleno Acero Galvanizado 70 x 10mm
Viga de Coigue 12" x 4"
Pieza de Cipres de las Guaitecas d=40cm Perfil Tubular Acero Galvanizado d=40mm e=3mm
Perno Inoxidable 20" Doble hilo
Vidrio Laminado 3 capas e=25mm color=5% verde
Plenita de Union Soldada con pernos de fijacion Perno Acero Inoxidable de Union 4" d=mm
Pletina Acero Galvanizado e= 10mm
Union Tipo "Telescopica"
Viga de Coigue 14"x 6"
Union Hembra
Viga de Coigue 16"x 6"
Union Macho
Perfil de Aluminio 40 x 80 x 2mm
Perfil Tubular Acero Galvanizado 60 x 40 x 5mm
Platina de Acero Galvanizado 300 x 400 x 10mm
Perlfil Tubular de Acero Galbanizado 100 x 50 x 8mm
Pieza de Coigue 4" x 4" Goma de Apoyo para vidrio laminado
Vidrio Templado e=25mm color=3% azul Sello de Solicona
Plenita de Refuerzo e=5mm
Perno Inoxidable 20" Doble hilo Plenita de Union Soldada con pernos de fijacion
Perno Acero Inoxidable de Union 10" d=10mm
Perno Acero Inoxidable de Union 4" d=mm
Diagonal Acero 30 x 30 x 3mm soldado
Union Tipo "Telescopica"
Refuerzo Acero 30 x 30 x 3mm soldado
Union Hembra
Riel Dentado de Acero
Union Macho
Motor Electrico 500W
Perfil Tubular Acero Galvanizado 60 x 40 x 5mm
Perfil Tubular Acero Galvanizado 60 x 40 x 5mm
Perfil Acero 50 x 50 x e 7mm
Perlfil Tubular de Acero Galbanizado 100 x 50 x 8mm
Baranda de seguridad
Perno Inoxidable 24" Doble hilo Puerta Plegable de aluminio
Tabla de Cipres 6" x 1"
Plenita de Refuerzo e=5mm
Perfil Tubular Acero Galvanizado 60 x 40 x 5mm
Montacarga Electrico 350Kg. Pletina de Acero e=10mm de Compresion Perno Inoxidable 20" Doble hilo
Perfil Acero Tubular 50 x 50 x 5mm
Pletina de Acero e=10mm 35º de Union Union Tipo "Telescopica"
Pletina de Acero e=10mm de Compresion
Perfil C Acero 100 x 75 x 5mm
Union Tipo "Telescopica"
Tabla de Cipres 6" x 1"
Pletina de Acero e=10mm de Union
Perno Acero Inoxidable 5" d=10mm
Rampa Movil Acero e=7mm
Perfil Acero Tubular 50 x 50 x 5mm
Rueda de Caucho d=10mm
Rueda Guia de Caucho Tambor de 200 Lts. con tapa soldada Viga de Pino Inpregnado 6" x 2" Tope de Goma
Pieza de Cipres de las Guaitecas d=40cm Nivel de baja marea.
Pletina Circular de Acero e=20mm
Nivel de baja marea.
Perno Inoxidable 20" Doble hilo Golilla Inoxidable d=50mm Refuerzo de Acero e=20mm Base de Acero d=800mm e=20mm Pilote de Hormigon Armado H-30 d=80cm
Pieza de Cipres de las Guaitecas d=25cm Perno Inoxidable 15" Doble hilo Refuerzo de Acero e=10mm Base de Acero d=550mm e=20mm Pilote de Hormigon Armado H-30 d=55cm
barrio gamboa - castro - chiloe
1:25
escala
08.07.2009
Profesor guía: Alumna:
Jorge Harris
Alejandra Rojas Wilckens
Museo De La Mitologia Chilota
Corte Constructivo
MUSEUM OF MYTHOLOGY OF CHILOE
2008-09
38
Renders and 3D Modelling made by Marcos Vilugnir, Concepcion, Chile.
2008-09
MUSEUM OF MYTHOLOGY OF CHILOE
39
MUSEUM OF MYTHOLOGY OF CHILOE
2008-09
40
2008-09
MUSEUM OF MYTHOLOGY OF CHILOE
41
Restoration of Santa Lucia Hill’s North Entrance In my 5th Year of Architectural Degree, in the Pontificial Catholic University of Chile, took the subject Restoration and Rehabilitation of the Architectural and Cultural Heritage. So this was the last workshop, which consisted in create the Whole Cadastre, Diagnosis and Design of Solutions for the North Entrance of the Emblematic Saint Lucia’s Hill. The workshop was integrated by Architecture and Engineers in Construction Students.
Restauración y Rehabilitación de Patrimonio Arquitectónic
3 1 4
Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural
El acceso norte del Santa Lucía está constituido, a grandes rasgos, por 1. El muro oriental y su correspondiente balaustrada y encuentro con m 2. El muro occidental, que incorpora una intervención reciente en el s en su costado occidental, consistentes en el reemplazo de la albañ la construcción de contrafuertes en el segundo. 3. El sector de la escalera de acceso al Castillo Hidalgo. 4. El descanso o balcón, su jardinera y la escalera que llega a él.
Caso de A
RESTORATION OF SANTA LUCIA HILL’S NORTH ENTRANCE
2007
El
Caso de Análisis: Cerro Santa L
presencia sísmica. Lo anterior se ve acrecentado a la interacción con el medio ambiente, en que la contaminación, la lluvia y el viento han erosionado severamente este Está2 presente en todos los sectores sector. 1 2 enumerados inicialmente.
contemple la incorporación de Por su lado, la vegetación observada adiciones acrílicas de forma de Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural se origina por la infiltración de agua, impermeabilizar las uniones entre 42 con lo que se tiene una condición de piedras. Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural humedad permanente que facilita la Imagen 1 Ninguno de los problemas descritos aparición de este tipo de patología. altera la estabilidad ni la funcionalidad 3
de la estructura.
1
La forma de proceder ante este fenómeno debiera consistir en desbastar las uniones con un esmeril o similar, luego se retira la vegetación, posteriormente se reemplaza el mortero existente por uno que contemple la incorporación de adiciones acrílicas de forma de a la mampostería de piedra que Respecto impermeabilizar las uniones entre constituye este acceso, ésta se ve afectada piedras.
Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural 4
4
Vegetación entre piedras
Restauración y Rehabilitación Restauración y Rehabilitación de Patrimonio Arquitectónico y Culturalde Patrimonio Arquitectónico y Cultural Partes de Acceso Norte
Imagen 1
Por su lado, la vegetación observada se origina por la infiltración de agua, Del resto de los lugares, el sector 1 es aquel en Para reparar este sector se puede reconstruir El acceso norte del Santa Lucía está constituido, a grandes rasgos, por 4 partes: que se han realizado menos reparaciones. completamente o, de ser necesario,con puede lo que se tiene una condición de 1. El muro oriental y su correspondiente balaustrada y encuentro con muro de albañilería. incluso reconstituirse ladrillo por ladrillo con humedad permanente que facilita la Dentro de las patologías encontradas, 2. El muro occidental, que incorpora puntualmente una intervención reciente sector la balaustrada y mezcla de un mortero de cemento se puede comentaren queelen el unade aparición de este tipo de patología.
en los sectores 1 y 4. Sus principales problemas
Caso de Análisis: Cerro Santa Lucía
blanco polvocaso de ladrillo, en su costado occidental, consistentes en elentre reemplazo de la albañilería en elcon primer y ende forma de ir encuentro muros de mampostería se presentan por las fisuras en las uniones materializado en albañilería se observa un dando la forma deseada a cada pieza. Está presente en todos los sectores la construcción de contrafuertes en el segundo. piedras y la vegetación producida por gran desgaste del material. Tal nivel de El daño observado no compromete 2 su enumerados inicialmente. y Rehabilitación de 1Patrimonio entre 3. El sector de la escalera de accesodeterioro al Castillo Hidalgo. Restauración Arquitectónico y Cultural puede deberse a la resultante del funcionalidad ni su estabilidad estructural, no 4 las infiltraciones de agua existentes. 4. El descanso o balcón, su jardinera empuje y la escalera llegaaair en él.dirección obstante, puede enriquecerse su valor de suelo que que tiende de este encuentro, fuerzas que aumentan con arquitectónico al reparar este encuentro, presencia sísmica. Lo anterior se ve además de evitar que siga deteriorándose. acrecentado a la interacción con el medio ambiente, en que la contaminación, la lluvia y el viento han erosionado severamente este sector.
El en caso del sector 1, las fisuras pueden Imagen 1 Restauración y Rehabilitación de Caso Patrimonio Arquitectónico y Cultural constituye este acceso, ésta se ve afectada de Análisis: Cerro Santa Lucía
Caso de Análisis: Cerro Santa Lucía
Respecto a la mampostería de piedra que
1
Imagen 1
haber1sido por la actividad en los sectores y 4. Susprovocadas principales problemas se presentan por las en las uniones sísmica a fisuras la que ha sido sometida la entre piedras y la vegetación producida por estructura. Incluso la atención Los elementos quellama presentan musgosla y las infiltraciones de agua existentes.
incorporación de pueden tensores en el muro quede hongos originados por la humedad, falta El en caso del sector 1, las fisuras haber hacen sido provocadas por la que actividad suponer en algún momento los ventilación y calor solar, pueden ser sometidos 1 sísmica a la que ha sido sometida la muros se abrieronde y se utilizó este sistema para a una aplicación estructura. Incluso llama la atención lacloro (hipoclorito de Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural Fisuras en las uniones incorporación de tensores en elen murosu que volver aal situarlas lugar. Otrolimpiar factory sodio), día siguiente se puede Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural Encuentro de muros oriente hacen suponer que en algún momento los importante es el empuje del suelo presente sellar posteriormente con un hidrofugante deen muros se abrieron y se utilizó este sistema para Caso de Análisis: Cerro SantaImagen Lucía| Imagena2la mampostería de piedra que Respecto 1principales Los Losprincipales problemas problemas y ypatologías patologías Caso de Análisis: Cerro Santa Lucía volver asilicona situarlas enque su lugar. Otro factor toda estructura de contención. asegure su constituye este Los elementos que presentan musgos y impermeabilidad. Imagen 1 acceso, ésta se ve afectada importante es el empuje suelo presente en los sectores y 4. Sus principales problemas encontrados encontrados en en este este acceso acceso consisten en 1en hongos originados por ladel humedad, falta deen Los principales problemas ypatologías patologías Los principales problemas yconsisten toda estructura de contención. se presentan por las fisuras en las uniones ventilación calor solar, pueden ser sometidos Estey tipo de fenómeno no altera la estabilidad fisuras, fisuras,grietas, grietas, desgaste desgaste de consisten demateriales, materiales, encontrados este acceso consisten en encontrados en en este acceso en entre piedras y la vegetación producida por a una aplicación de cloro (hipoclorito de estructural del elemento, pero sí su vegetación, vegetación, hongos hongos y musgos. y musgos. las infiltraciones de agua existentes. sodio), al día siguiente se puede limpiar y fisuras,grietas, grietas,desgaste desgastede demateriales, materiales, fisuras, sellar posteriormente conyun hidrofugante de por lo que debe durabilidad servicialidad, El en caso del sector 1, las fisuras pueden vegetación, hongos y musgos. vegetación, hongos y musgos. Todos Todoslos lossectores sectoresestán estánrelativamente relativamente haber sido provocadas por la actividad Referencia de la Imagen silicona1que asegure su impermeabilidad. Fisuras en las uniones
Restauración Restauración y Rehabilitación y Rehabilitación dede Patrimonio Patrimonio Arquitectónico Arquitectónico y Cultural y Cultural Imagen 2 Restauración y Rehabilitación Patrimonio Arquitectónico y Cultural Restauración y Rehabilitación dede Patrimonio Arquitectónico y Cultural Encuentro de muros oriente
Encuentro de muros oriente
tratada. 1 Caso de Análisis:ser Cerro Santa Lucía| 4 balaustradas Lo encontramos en las del sector
sísmica la que ha sido sometida la afectados, afectados, asectores excepción asectores excepción del del sector sector 2. aÉste 2. Éste Todos están relativamente Todos los los están relativamente estructura. Incluso llama la atención la corresponde corresponde a a una una intervención intervención posterior posterior Fisuras en las uniones afectados, aRehabilitación excepción sector 2. Tensores sobre afectados, a yexcepción del sector 2.Arquitectónico ÉsteÉste de tensores el muro quemuros Restauración dedel Patrimonio y en Cultural Imagen 2incorporación hacenposterior suponer que en algún momento losla Imagen hecha hecha en en albañilería albañilería con con unauna disposición disposición de de Referencia de corresponde intervención corresponde a a unauna intervención posterior Tensores sobre para muros muros se abrieron y se utilizó este sistema Imagen 2 ladrillos ladrillos distinta distinta a la a original la original (aparentemente (aparentemente hecha albañilería disposición de hecha en albañilería concon unauna disposición de volver a situarlas supresentan lugar. Otromusgos factor y Los elementos que Imagen 1 en Imagen 2 en para para identificarla) identificarla) que que incorpora incorpora la la importante es el empuje suelo presente hongos originados pordel la humedad, faltaen de ladrillos distinta a original la original (aparentemente ladrillos distinta a la (aparentemente toda estructura de contención. ventilación construcción construcción de de contrafuertes contrafuertes para para evitar evitar ely calor el solar, pueden ser sometidos para identificarla) incorpora la para identificarla) queque incorpora la a una aplicación de cloro (hipoclorito de desprendimiento desprendimiento del del muro. muro. Sólo Sólo presenta presenta construcción contrafuertes para evitar el sodio), al día se puede limpiar y construcción de de contrafuertes para evitar el siguiente sellar posteriormente con un hidrofugante de problemas problemas estéticos, estéticos, como como la la fractura fractura de de desprendimiento muro. Sólo presenta desprendimiento deldel muro. Sólo presenta silicona 1 que asegure su impermeabilidad. algunas algunas piezas piezas en en la balaustra, la balaustra, reparaciones problemas estéticos, como la fractura problemas estéticos, como la reparaciones fractura de de 4 Estepiezas tipopiezas de fenómeno no altera la estabilidad posteriores posteriores como como la pintura la pintura de de algunas algunas algunas piezas la balaustra, reparaciones algunas piezas en en la balaustra, reparaciones estructural del elemento, pero sí su Tensores sobre muros de de mampostería mampostería y y el el crecimiento crecimiento de durabilidad yde servicialidad, por lo que debe posteriores como la pintura algunas piezas posteriores como la pintura de de algunas piezas Referencia de la Imagen Referencia de la Imagen ser tratada. vegetación vegetación sobre sobre contrafuertes. contrafuertes. de mampostería y el crecimiento deAnálisis: Cerro Santa Lucía de mampostería y el crecimiento Caso de de Lo encontramos en lasReferencia balaustradas del lasector Imagen vegetación sobre contrafuertes. 1 y 2 y en el interior del sector 3. Node vegetación sobre contrafuertes. Imagen 2 se
presenta en el sector 4 probablemente porque está sometido a soleamiento constante y menos humedad que los otros sectores.
Detalles Detalles muromuro occidental occidental
2007
Detalles occidental Detalles muromuro occidental
3
1
4
Referencia de la Imagen Caso Caso de de Análisis: Análisis: Cerro Cerro Santa Santa Lucía Lucía Caso de Análisis: Cerro Santa Lucía Caso de Análisis: Cerro Santa Lucía
4 no altera la estabilidad Este tipo de fenómeno estructural del elemento, pero sí su durabilidad y servicialidad, por lo que debe 1 y 2 y en el interior del sector ser tratada.
3. No se
presenta enbalaustradas elCerro sector 4 Lucía probablemente Caso deen Análisis: Santa Lo encontramos las del sector 1 y 2 yporque en el interior del sector 3. No se a soleamiento está sometido presenta en el sector 4 probablemente constante humedad que los otros porque está sometidoy a menos soleamiento constante y menos humedad que los otros sectores. sectores.
Caso de Análisis: Cerro Santa Lucía
1
14
3
2
3
4
2
Caso de Análisis: Cerro Santa Lucía
Caso de Análisis: Cerro Santa Lucía
2
RESTORATION OF SANTA LUCIA HILL’S NORTH ENTRANCE
Caso de Análisis: Cerro Santa Lucía
43
Restauración y Rehabilitación Rehabilitaciónde dePatrimonio Patrimonio Arquitectónico y Cultural Restauración y Arquitectónico y Cultural Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural
Elevación Grietas, parches de mortero y desprendimiento de trozos
Grietas, parches desprendimiento trozos Grietas, parchesde demortero mortero yy desprendimiento dede trozos
Grietas, manchas , desprendimiento y gastamiento de baldosas Grietas, manchas , desprendimiento y gastamiento de baldosas
Grietas, manchas , desprendimiento y gastamiento de baldosas
Caso de Análisis: Cerro Santa Lucía
Ladrillos erosionados y gastados por tránsito Ladrillos y gastados por tránsito Gastamiento de erosionados mortero donde han crecido malezas Gastamiento de mortero donde han crecido malezas
Ladrillos erosionados y gastados por tránsito
Gastamiento de mortero dondeLucía han crecido malezas Caso de Análisis: Cerro Santa Caso de Análisis: Cerro Santa Lucía
Caso de Análisis: Cerro Santa Lucía
RESTORATION OF SANTA LUCIA HILL’S NORTH ENTRANCE
2007
44
2007
RESTORATION OF SANTA LUCIA HILL’S NORTH ENTRANCE
45
Design of Cultural Center, Ex-Prison in Valparaiso In my 5th Year of Architectural Degree, in the Pontificial Catholic University of Chile, in the subject Architectural Workshop, the semester’s theme was how to recycle the building of the old Prison of Valparaiso. The ex-prison of Valparaiso, for being built over the only flat area in the center of the hills, when the city started to grow, the prison became center in the neighborhoods. In time, because of structural damages (Earthquake of 60 and 80 and ocean atmosphere) the prison needed to be moved to the top of the hills. This old building was abandoned and the local artists started to use it in a spontaneously way, transforming this old building in a Cultural Center. Therefore the Council created an Architecture Concourse for the the design of this new space of the city. This was a really good urban and Infrastructure Design Exercise, with Community participation.
DESIGN OF CULTURAL CENTER,EX-PRISON IN VALPARAISO
2007
46
2007
DESIGN OF CULTURAL CENTER,EX-PRISON IN VALPARAISO
47
DESIGN OF CULTURAL CENTER,EX-PRISON IN VALPARAISO
2007
48 propuesta personal
MU LTIS A
LA
N B'
B tro
circotea
es
ión
bib
wc+ camarin
inistrac
adm
liote
danza
ca
co sala mp de uta ción
- 3.96
plaza circoteatro es
wc+ camarin
ca
sin
o
teatro
breakdance marioneteros
rio escena
B
café
balinas
trasbam
PLAZOLETA EL DESCANSO
enirs
INFO
souv
MUSEO
talleres
AÍSO Y
VALPAR
EL
EX-CÁRC
NAL
RNACIO
N INTE
ad
comunid
EXPOSICIÓ
AL
N LOC
EXPOSICIÓ escultura
ría
carpinte
PATIO
NAL
RNACIO
N INTE
EXPOSICIÓ
- 7.62
A'
A
MU LTI
SA
LA
- 1.44
AUDITO
RIO
BIBL
IOT ECA
SALA CLAROSCURO
- 1.44
GRABADO
venta
GRABA
CIÓN
sala cine
arte
local
bodega
estación graffiti
RADIO
PINTURA
materiales sala de graffiti
2
bodega
talleres y venta arte local
bodega
boletería or
O ÍA
RECI CLAJ
E PAPE
L
ES
+minicomed
sala 2 cine
KÓD
LIABL
ROC
AMP
ORFE BRER
CERÁ MICA
RES
ROM
TALLE
de taller títeres
B
bodega
de taller marionetas
y cafetería comida
venta
taller
arte
venta
de
marionetas
taller
arte
1
centroturística taller
información
bodega
B'
a
bodeg
baño
planta primer nivel 1 : 500
local
talleres y venta arte local caja recepción
a públic plazaespontáneo sala cine
cocina
hombres
PLAZOLETA EL DESCANSO PLAZOLETA EL DESCANSO
bodega
baño
mujeres
baños
rante
restau
A'
PLAZA CIRCOTEATRO CIRCOTEATRO CASINO
SALA CLAROSCURO
A-A' 1 : 500 • •• • •• •• • • •• ••• • • • ••• •• •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • corte • ROCKODROMO
MULTISALA
PLAZA DEL SILENCIO
TALLER DE CIRCOTEATRO
ADMINISTRACIÓN
BIBLIOTECA
TALLER DE CLAROSCURO
AUDITORIO
BIBLIOTECA
CINE
corte B-B' 1 : 500
2007
DESIGN OF CULTURAL CENTER,EX-PRISON IN VALPARAISO
49
DESIGN OF CULTURAL CENTER,EX-PRISON IN VALPARAISO
2007