Portfolio

Page 1

Alejandra Rojas Wilckens Architect and Permaculture Designer EMAIL

a.rojas.wilckens@gmail.com | CEL 09-7-5732301


2

Introduction I am an Architect and Permaculture Designer, with a passion in the social Development of the World, particularly creating human settlements that benefit its people and environment. Focus in design that’s in conjunction with nature, using Bioclimatic Design and Permaculture Design while respecting the natural resources that the planet gives us. Two years ago I went to Australia for studying Permaculture with the creator of this discipline, Bill Mollison, at the University of Melbourne, Australia. This was a dream that I could reach, and helped me to receive the knowledge about this system of design which points out to work with the Land and not against it. Coming back to Chile I want to share this, at the time of design our public spaces, applying sustainable and beauty concepts, design patterns respectful to the Earth. I would love to share this with the people that need it most. The need for living in green environments is not just because of its beauty, also it allows us to live in a more harmonious way in contact with the earth, and even more important, it allows us to grow our own food, in community; happy enjoying what nature has provided us. Chile, 2014

EMAIL:

2014

a.rojas.wilckens@gmail.com |

CEL:

09-7-5732301

INTRODUCTION


3

Table of Contents 4 - 7

CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE

2013

8 - 11

PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST

2013

12 - 13

PERMACULTURE DESIGN “THE LIVING IN PEACE PROJECT”, KARAMEA, NEW ZEALAND

2012

14 - 17

DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE

2012

18 - 21

DESIGN OF RESTAURANT SANTA BRASA

2012

22 - 24

STRUCTURAL REPAIR OF S.I.I. BUILDING, RECOLETA, SANTIAGO

2011

25 - 27

DESIGN OF MONTESSORI SCHOOL IN VALPARAISO

2011

28 - 32

DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL

2009

33 - 40

MUSEUM OF MYTHOLOGY OF CHILOE

41 - 44

RESTORATION OF SANTA LUCIA HILL’S NORTH ENTRANCE

2007

45 - 49

DESIGN OF CULTURAL CENTER,EX-PRISON IN VALPARAISO

2007

TABLE OF CONTENTS

2008-09

2014


4

Consulting for Sustainable Design Landscape Consulting and design of a “green plate”, part of the whole design of a Complex of “Inclusive Collective Housing built of wood”, for the city of Concepción, Chile. Calling it a green plate is making reference to the Landscape Design of the project, which are green recreational areas on the first level and turn plate community work, on the second level, which consisted of vegetable beds and leisure areas, always trying to strike a balance between sustainability and in turn separation with private green areas of each department. We also sought to place the trees at strategic points depending on the desired shade. As part of a permaculture concept, we design a system for collecting rain water, carried in underground tanks to have supply during the dry season in Concepción, for irrigation of beds and recreational areas, achieving self-sustainability of the landscape design project.

2013

CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE


5

CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE

2013


6

2013

CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE


7

PANEL SOLAR

ESTANQUE 350 LTS

AGUA IMPULSADA POR BOMBA SOLAR

BAJADA DE AGUA LLUVIA BAJADA AGUA PARA RIEGO

RIEGO DE HUERTOS POR GOTEO RIEGO DE AREAS VERDES ESPACIO COMUNITARIO POR GOTEO

PANEL SOLAR

BOMBA ELEVADORA SOLAR ESTANQUE 5000 LTS

BAJADA DE AGUA LLUVIA

FILTRO

BAJADA AGUA PARA RIEGO

RIEGO AREAS VERDES PUBLICAS POR GOTEO

ESTANQUE 350 LTS

AGUA IMPULSADA POR BOMBA SOLAR

RIEGO AREAS VERDES PUBLICAS POR GOTEO

RIEGO DE HUERTOS POR GOTEO

FILTRO ESTANQUE 5000 LTS BOMBA ELEVADORA SOLAR

TOTAL ÁREAS VERDES: 303,16 m2 CONSUMO: 1.5 lts/m2 - 454 lts/día PLUVIOSIDAD ANUAL CONCEPCION: 1200mm CAPACIDAD DE ALMACENAJE AGUA: 25000 lts 55 DÍAS DE AUTONOMÍA

CONSULTING FOR SUSTAINABLE DESIGN LANDSCAPE

2013


8

Permaculture Design, landscape regeneration and food forest, Wanaka, New Zealand After finishing the PDC (Permaculture Design Certificate Course), in the University of Melbourne, Australia, I had the opportunity to design a permaculture project for a family in New Zealand. It was a great chance, with the “kiwi�landscape being similar to the postglacial landscape in the south of Chile, where this type of geography is perfect to project the design of dams and swales. Basically the shape of the landscape allows to reach the basic first purpose in a permaculture design, to capture the water efficiently by moving it over the contour to add in generating soil, therefore the generation of fertility for the creation of a self-sustaining ecosystem.

2013

PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST


9 First it was necessary to recognize the property’s size, and profile shape, especially “key contour lines” for handling the water’s movement over the ground and water retention in this. After thinking ways of soil restoration was critical with the eroded and heavily compacted from many years of grazing and monoculture agriculture explosion in the land. After this came the key and basic exercises for the future design. We designed a windbreaker that did not block the 180 degrees view from the inside of the house, which because of Wanaka council rules needed to be located in this place to not be seen from the road, leaving the house in the windiest place but with the best view of the property. RECODATIONS OF FIXING LAND COMPATIOON HIGH RUN OFF LANDSCAPE

DETAIL OF DESIGN FOR WIND PROTECTION

PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST

2013


10 The next step of the design process was to draw the “key contour lines�; the idea is that these are contour lines where it is more efficient to move the water, along the property, hydrating the different areas of the land, creating soil fertility. At the same time a restoration treatment of the soil was necessary, which is demarcated by dashed lines in the plan. These channels also bind the different dams, moving through the contour line, with an overflow system, which allows the soil to be in constant hydration simply capturing the rainwater year falling during the year over the ground. This was the general scheme worked in the field.

2013

PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST


11 After tracing the swales and dams, edible forest’s areas were traced, the windbreaker on the north side, which was a volume of soil and vegetation, and the west face’s windbreaker. Then the vegetable species were chosen and how to combine them by scale, protection and leaf type, and clearly, as the needs of the clients. Also we taught them how to create their own compost so that they could have the basis of soil generation and ground’s restoration for planting and growing their own vegetables in the future. COMPOST

VEGETABLE PLANTING SYSTEM

SPIRAL GARDEN

WORM COMPOST

PERMACULTURE DESIGN, LANDSCAPE REGENERATION AND FOOD FOREST

2013


12

Permaculture Design “THE LIVING IN PEACE PROJECT”, Karamea, Nueva Zelanda Named for its pursuit to achieve self-sustainability, specifically energy and food self-sustainable. Located in the southern island of the country, in a natural context, surrounded by national parks, on the west coast, I was greeted by the “Permaculture Manager” David Tailby, Certified Designer Permaculture by Bill Mollison also, assisting him to design different areas of the property such as orchards and edible forest, plus tasks such as creating compost and seedlings (the base of any planting), management of irrigation water based on rainwater harvesting and to choose the association of plant species. This last point allowed me to learn how to find the most beneficial place for each element, always designing for the creation of a natural ecosystem that achieves self-sustainability over time.

2012

PERMACULTURE DESIGN “THE LIVING IN PEACE PROJECT”, KARAMEA, NEW ZEALAND


13

BEFORE

AFTER

COMPOST

PERMACULTURE DESIGN “THE LIVING IN PEACE PROJECT”, KARAMEA, NEW ZEALAND

2012


14

SIMBOLOGIA

3895.8 58.3

472.7

15.0

269.5

15.0

438.0

18.0

293.0

20.0

1337.4

15.0

307.0

66.0

501.0

Proyecto de Reparación Vivienda Patrimonial.

70.0

EXTERIORES:

128.0 48.0

48.0

48.0

48.0

A

2 - Estuco y pintura muro. 3 - Machiembrado en aleros. 4 - Reemplazar Tapacán. 11.d - Pintar puertas y ventanas con sus respectivos marcos.

255.9

Dormitorio 6

TECHUMBRE: 24 - Bajada Aguas Lluvias. 25 - Canaleta Aguas Lluvias.

Adosamiento 169.0

Dormitorio 5

143.0

996.4

1104.4

22.0

135.0

88.0

22.0

2

964.0

Patio

129.0

12.0

349.0

Comedor

Baño

125.0

2

640.5

125.0

191.1

2

Garage

Dormitorio 1

Dormitorio 2

Bodega

Estar

515.4

Dormitorio 3

145.0

Dormitorio 4

Cocina

Baño

479.1

55

0

60.0

15 5.

5. 0

55 .0

A' 2

2

58.3

472.7

2

35.0

398.8

2

273.7

272.0

303.8

2

600.0

20.0 220.0

2

362.0

20.0

129.0

123.0

201.0

20.0

372.0

2

393.4

20.0

588.7

123.0

388.0

20.0

303.0

123.0

288.0

26

60.0

60.0

187.4

187.4

.0

2

501.2

20.0 367.0

70.0

21.8 120.0

664.0

3708.5

Design of Repairs of Heritage Houses in Historic Center of Rancagua, Chile 1073.1

CORTE A-A'

1004.7

ESCALA 1:50

25

650.4

After the huge Earthquake of 27th February 2010, the historic center of the city Rancagua was seriously damaged. All the buildings of this area are adobe-brick constructions, so some of the damages needed to be fixed with this old way of construction. This job was part of the governmental Program of Reconstruction and Repair of Heritage Buildings. We needed to visit the different houses, speak with the owners, measure them, register the damage in a diagnosis resume sheet, than design the repairs, and then go and visit with the Engineers in Construction for explain our Design Purpose, so they could built them according with our plans.

11c

2

11c

3197.4

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

2

2

2

60.0

60.0

60.0

ELEVACION SUR ESCALA 1:50

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

2

Adosamiento

11c

9

4.

26

60.0

.0 60

Pintura

.0 60

60.0

.0 60

60.0

.0

60

60

.0

Segunda capa de rovoque 5mm

Revoque Exterior

Primera capa de revoque 10mm

3 a 4 capas de lechada de cal pura

.0

60

Mezcla de barro/fibras/cal .0

60

26 4.

9

Mayor densidad de agregados gruesos

Relleno grietas superficiales:

revoque de cal hidraúlica

Pintura

Mezcla de barro/Cal hidraúlica/Yeso

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

Guardapolvo madera 0,5 x 6"

60.0

SUBSIDIOS

ESTUDIO

SOLUCIONES TERRITO

de RECONSTRUCCIÓN y REPARACIÓN PATRIMONIAL

Albañilería de Adobe

EGIS Beatriz Valen

UBICACION

N

3

24

4

24

25

24

GAMERO

11c

Adosamiento

11c

2

11c

2

2

11c

2

11c

2

11c

2

FIRMAS

2

11c

ARQUITECTO NOMBRE

e-mail

: BEATRIZ VALENZUELA VAN TREEK : ALEJANDRA ROJAS WILCKENS : JAVIER GONZÁLEZ : beatrizvalenzuelav@vtr.net

PROPIETARIO ELEVACION PONIENTE

NOMBRE R.U.T.

ESCALA 1:50

DOMICILIO ROL

2012

ZAÑARTU

25

ALMARZA

O' CARROL

DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE

: : : :

L A M I N A 01 CONTENIDO PLANTA ARQUITECTURA ALZADOS CORTES PLANTA DE TECHUMBRE

VºBº DOM

ROSA ELENA RUIZ MOSCOSO 3.701.868-6 GAMERO Nº 185, RANCAGUA

Nº :

FECHA :


15

DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE

2012


16 SIMBOLOGIA

Proyecto de Reparación Vivienda Patrimonial.

Dintel en madera (existente).

EXTERIORES:

20

Listón Madera de Pino Impregnada 2" x 6"

h/2

Perforación o = 10 mm. de un lado al otro de la madera. Listón de Madera de Pino Impregnada 1" x 6".

INTERIORES: 12 - Reforzar, estucar y pintar muro. 12.a. - Filtración humedad de muro (Revisar y reparar). 16. - Cambio de puerta. 17.a - Reemplazar marco de puerta o ventana. 17.b - Pintar marco de puerta o ventana.

Pintura

Listón de Madera de Pino Impregnada 1" x 6".

20

Segunda capa de rovoque 5mm

Revoque Exterior

Primera capa de revoque 10mm

3 a 4 capas de lechada de cal pura

Mezcla de barro/fibras/cal

Perforación o = 10 mm. de un lado al otro de la madera.

h/2

1 - Reforzar, estucar y pintar muro. 3 - Machiembrado en aleros. 11.b - Forrar alero.

Cielo Madera de Pino Impregnada 1" x 4"

20

25

TECHUMBRE:

Listón de Madera de Pino Impregnada de 1" x 6 "

Pintura

Relleno grietas superficiales:

Detalle traslapo madera y fijación con pletina.

Muro Adobe 35 x 70 x 15 cm.

revoque de cal hidraúlica

Mayor densidad de agregados gruesos

22 - Reparación de cerchas. 23 - Sellos en Zicalum techumbre. 24 - Bajada Aguas Lluvias. 25 - Canaleta Aguas Lluvias. 27 - Instalación cobertura de techumbre (zincalum). 27.a - Instalación impermeabilización (fieltro). 28 - Reposición de cerchas en mal estado. 30 - Reposición de volcanita en cielo.

DETALLE 4

Mezcla de barro/Cal hidraúlica/Yeso

Albañilería de Adobe

Guardapolvo madera 0,5 x 6"

50

L1

Perno Roscalata e=10 mm. L= 76 cm.

Perforación del tornillo pasante

Detalle 3 Ensamblaje maderas

L2

Refuerzo vertical

OTROS: 32 - Reemplazar instalación eléctrica.

Madera impregnada con rebaje de 1/2" para ensamblaje.

Tuerca Hexagonal Metálica o = 10 mm. Golilla Metálica o = 10 mm.

Detalle rebaje de madera. Detalle 1

Bajo relieve del Adobe

Perforación o = 10 mm. de un lado al otro del muro. Golilla Metálica o = 10 mm. Tuerca Hexagonal Metálica o = 10 mm.

Refuerzo horizontal

Tabla de Base Pino Impregnado 1" x 3" Montante Madera Pino Impregnada 2" x 3"

Calado en Muro de Adobe 3cm. Profundidad

Entablado de piso madera 1" x 4" Arriostrado Maciso Madera Pino Impregnada 2" x 3" Fieltro e = 1 mm.

Detalle 2 Bajo relieve del adobe Pletina Metálica en "L" e = 3 mm. Tornillo Roscalata Cabeza Plana 8 x 1 21"

Plancha de Zinc 85 cm. x 200 cm.

Perno Roscalata e=10 mm. L= 76 cm.

Listones de Madera de Pino Impregnada 1" x 1" Papel Fieltro Volcán 15 lb. Liso 1 m. x 40 m.

Losa de Concreto e = 10 cm.

Placa OSB Std. 1220 x 2440 x 9,5 mm.

Malla de Refuerzo 6" x 6"

Tirante Inferior Madera de Pino Impregnada 2" x 6"

Terreno Natural Compactado

Bloque de Adobe Perforado 30 x 64 x 15 cm.

Membrana Asfáltica e = 4 mm. Aislante e = 2,5 cm.

Listón de Madera de Pino Impregnada de 1" x 6 "

Varillas Continuas o = 1 mm.

Tuerca Hexagonal Metálica o = 10 mm. Golilla Metálica o = 10 mm.

Tapacán Madera Pino Impregnada 1" x 7"

Pletina Metálica en "L" e = 3 mm.

Alero Machiembrado 1" x 4" L = 3.20 m.

Muro cortafuego F-60

Solera y pie derechos de pino de 2"x4" Doble capa de planchas de permanit e= 6mm Tabique cubierto con plancha de zincalum liso Lana Mineral

Plancha de Zincalum ondulad e= 0.35 cm Fieltro 15 lb Placa de OSB e=9.5 mm Costanera 2"x2" @ 60 cm Cercha de madera 1"x4"

SIMBOLOGIA

Proyecto de Reparación Vivienda Patrimonial.

EXTERIORES:

63.5

Volcanita e= 8 mm

20.0

Sobresolera pino aserrado 2x3'' Solera superior pino aserrado 2x3''

67.6

67.6 10.0

10.0

Cadeneta pino aserrado 2x3''

67.6

67.6

INTERIORES:

67.6

10.0

10.0

10.0

ESTUDIO 360 SOLUCIONES TERRITORIALES

Muro existente

536.0

UBICACION

22 23

N

18.0 15.0

60.0

esparrago anclaje 6'' o 8''

TENIENTE

60.0

: : : :

VºBº DOM

MARÍA JOSÉ MENDEZ SILVA 13.944.502-3 CENTENARIO Nº 260, RANCAGUA

Nº :

60.0 60.0

ELEVACION POSTERIOR

ESCALA 1:50

ESCALA 1:50

28

27b 27a 27 23 22 28 27b 27a 27 23 22

60.0

17

60.0

11

60.0 1479.0

17

11

17

32

1

(AMPLIACION)

ELEVACION NORTE

60.0 60.0 60.0

27 22

60.0

60.0

27

27a

60.0

22 23 27

30

Adosamiento

60.0

16a

60.0

12

182.5

172.0

Dormitorio 1

27a 27b

28

Construir Doble tabique para reforzar muro de adobe

60.0

28

60.0

464.0

B'

12a

22

60.0

12 12a

OTROS: 32 - Reemplazar instalación eléctrica.

60.0 60.0 60.0

60.0 60.0 60.0 60.0

1985.0

1935.0

60.0

387.0

12 39 1

25

ESCALA 1:50

17

Perno anclaje entra tabiques y muro

Muro adobe con desprendimiento de material

16a 39 24 25

esparrago anclaje 6'' o 8''

18.0

17b 17a

57.5

Baño

24

ELEVACION PRINCIPAL

60.0

60.0 60.0 1307.0

28

60.0

22

60.0

285.0

12 Dormitorio 2

39

15.0

10.0

Adosamiento

12 12a

17

B

60.0

60.0

250.0 15.0

12

24 25

FECHA :

60.0

15.0

10.0 460.0

12 11

3 11b

Adosamiento

PLANTA ARQUITECTURA ALZADOS CORTES PLANTA DE TECHUMBRE

60.0

ROL

60.0

L A M I N A 01 CONTENIDO

: BEATRIZ VALENZUELA VAN TREEK : ALEJANDRA ROJAS WILCKENS : JAVIER GONZÁLEZ FUENTES : beatrizvalenzuelav@vtr.net

PROPIETARIO NOMBRE R.U.T. DOMICILIO

39

22 - Reparación de cerchas. 23 - Sellos en Zicalum techumbre. 24 - Bajada Aguas Lluvias. 25 - Canaleta Aguas Lluvias. 27 - Instalación cobertura de techumbre (zincalum). 27.a - Instalación impermeabilización (fieltro). 27.b - Instalación de aislante térmico (fisiterm, poliestireno expandido u otro). 28 - Reposición de cerchas en mal estado. 30 - Reposición de volcanita en cielo.

60.0

e-mail

(AMPLIACION)

Bodega 1

TECHUMBRE:

27b

60.0

CORTE B-B' ESCALA 1:20

FIRMAS ARQUITECTO NOMBRE

60.0

Bodega 2

27a

22 23 27 27a 27b

1985.0

62.0 20.6

60.0

60.0

40.0 40.0 40.0 40.0

60.0

52.5

60.0

52.5 30.0

425.0

76.0

429.9

40.0 40.0 40.0

27

27a 27b

Ver detalle de cercha propuesta

Emplantillado pobre 15x15cm para anclar tabique

62.0

27

ACEVEDO

C

solera de montaje pino aserrado 2x3''

60.0

376.0 340.0

18.0

BALMACEDA

120.0 120.0

CENTENARIO

10.0 10.0 10.0

Pie derecho pino aserrado 2x3''

solera inferior pino aserrado 2x3''

EGIS Beatriz Valenzuela V.

230.0

40.0 40.0 40.0 40.0

Riostra pino aserrado 2x3''

Alfeizar pino aserrado 2x3''

Adosamiento

de RECONSTRUCCIÓN y REPARACIÓN PATRIMONIAL

Dintel pino aserrado 2x3''

12 - Reforzar, estucar y pintar muro. 12.a. - Filtración humedad de muro (Revisar y reparar). 16 - Cambio de puerta. 17 - Instalación de puerta y marco.

10.0

398.0

SUBSIDIOS Dintel pino aserrado 2x3''

Adosamiento

28.0

1 - Reforzar, estucar y pintar muro. 3 - Machiembrado en aleros. 11 - Instalación ventana. 11.b - Forrar alero.

Canal de agua lluvia de 125 x 125 mm e= 0.3 mm Tapacán de 1"x8" en madera de pino aserrada

Adosamiento

Listones Madera de Pino Impregnado para Clavar 4" x 4"

Canaleta Aguas Lluvias Zinc e = 2 mm.

Adosamiento

Listón Madera Pino Impregnada 2" x 6"

Adosamiento

Perno Roscalata e = 10 mm. L = 7 cm.

Adosamiento

Diagonal Madera Pino Impregnada 2" x 6"

Adosamiento

Tirante Superior Madera Pino Impregnada 2" x 6"

10.0

Plancha de Zinc 85 cm. x 200 cm. Listón Madera Pino Impregnada 2" x 6"

26.5

Perforación del tornillo pasante

Emplantillado pobre para anclar tabique de sección 15x15cm

Estar-Comedor

A'

22

28

CORTE A-A'

CORTE B-B'

ESCALA 1:50

ESCALA 1:50

506.0

27b 27a 27 23 22 506.0

12

Estar-Comedor 12a

238.0

233.0

12 12a

30

12

1

388.0

12 12a

11 A

28

28 27b 27a 27 23 22

30

18.0

1 130.0 848.1

95.0

1

1

482.0 118.0

82.0

18.0 93.1

60.0

60.0

60.0

60.0

60.0 518.0

60.0

60.0

60.0

(AMPLIACION)

SUBSIDIOS

ESTUDIO 360 SOLUCIONES TERRITORIALES

de RECONSTRUCCIÓN y REPARACIÓN PATRIMONIAL

EGIS Beatriz Valenzuela V.

UBICACION

N

33.0

ACEVEDO

Dormitorio 2

Dormitorio 1

CENTENARIO

320.0 320.0

40.0

60.0 10.0 10.0

C'

BALMACEDA

273.0

12 12a

233.0

Cocina americana

12 12a

Estar-comedor

CORTE C-C' ESCALA 1:50

TENIENTE

FIRMAS ARQUITECTO NOMBRE

e-mail

: BEATRIZ VALENZUELA VAN TREEK : ALEJANDRA ROJAS WILCKENS : JAVIER GONZÁLEZ FUENTES : beatrizvalenzuelav@vtr.net

PROPIETARIO NOMBRE R.U.T. DOMICILIO ROL

2012

: : : :

L A M I N A 01 CONTENIDO PLANTA ARQUITECTURA ALZADOS CORTES PLANTA DE TECHUMBRE

VºBº DOM

MARÍA JOSÉ MENDEZ SILVA 13.944.502-3 CENTENARIO Nº 260, RANCAGUA

Nº :

FECHA :

DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE


17

SIMBOLOGIA

3895.8 58.3

472.7

15.0

269.5

15.0

438.0

18.0

293.0

20.0

1337.4

15.0

307.0

66.0

501.0

Proyecto de Reparación Vivienda Patrimonial.

70.0

EXTERIORES:

128.0 48.0

48.0

48.0

48.0

A

2 - Estuco y pintura muro. 3 - Machiembrado en aleros. 4 - Reemplazar Tapacán. 11.d - Pintar puertas y ventanas con sus respectivos marcos.

255.9

Dormitorio 6

TECHUMBRE: 24 - Bajada Aguas Lluvias. 25 - Canaleta Aguas Lluvias.

Adosamiento 169.0

Dormitorio 5

143.0

996.4

1104.4

22.0

135.0

88.0

22.0

2

964.0

Patio

129.0

12.0

349.0

Comedor

Baño

125.0

2

640.5

125.0

191.1

2

Garage

Dormitorio 1

Dormitorio 2

Bodega

Estar

515.4

Dormitorio 3

145.0

Dormitorio 4

Cocina

Baño

479.1

55 0 15 5.

60.0

5. 0

2 472.7

2

35.0

398.8

2

273.7

272.0

303.8

2

600.0

20.0 220.0

2

362.0

20.0

129.0

123.0

201.0

20.0

372.0

.0

2

393.4

20.0

588.7

123.0

388.0

20.0

303.0

123.0

55

A' 2 58.3

288.0

26

60.0

60.0

187.4

187.4

.0

2

501.2

20.0 367.0

70.0

21.8 120.0

664.0

3708.5

1073.1

CORTE A-A'

1004.7

ESCALA 1:50

650.4

25

11c

2

11c

3197.4

2

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

2

2

60.0 60.0

60.0

ELEVACION SUR ESCALA 1:50

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

2

Adosamiento

11c

9

4.

26

.0

60.0

60 60

Pintura

.0

60

60.0

.0 60

60.0

.0 60

.0

Segunda capa de rovoque 5mm

Revoque Exterior

Primera capa de revoque 10mm

3 a 4 capas de lechada de cal pura

.0

60

Mezcla de barro/fibras/cal .0

60 26

4.

9

Mayor densidad de agregados gruesos

Relleno grietas superficiales:

revoque de cal hidraúlica

Pintura

Mezcla de barro/Cal hidraúlica/Yeso

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

60.0

Guardapolvo madera 0,5 x 6"

60.0

SUBSIDIOS

ESTUDIO 360 SOLUCIONES TERRITORIALES

de RECONSTRUCCIÓN y REPARACIÓN PATRIMONIAL

Albañilería de Adobe

EGIS Beatriz Valenzuela V.

UBICACION

N

3

24

4

24

25

24

GAMERO

11c

Adosamiento

11c

2

11c

2

2

11c

2

11c

2

ZAÑARTU

25

ALMARZA

O' CARROL

11c

2

FIRMAS

2

11c

L A M I N A 01

ARQUITECTO NOMBRE

e-mail

CONTENIDO

: BEATRIZ VALENZUELA VAN TREEK : ALEJANDRA ROJAS WILCKENS : JAVIER GONZÁLEZ : beatrizvalenzuelav@vtr.net

PROPIETARIO ELEVACION PONIENTE ESCALA 1:50

NOMBRE R.U.T. DOMICILIO ROL

DESIGN OF REPAIRS OF HERITAGE HOUSES IN HISTORIC CENTER OF RANCAGUA, CHILE

: : : :

PLANTA ARQUITECTURA ALZADOS CORTES PLANTA DE TECHUMBRE

VºBº DOM

ROSA ELENA RUIZ MOSCOSO 3.701.868-6 GAMERO Nº 185, RANCAGUA

Nº :

FECHA :

2012


18

Design of Restaurant Santa Brasa This was an order of the owner of this company, that wanted to built this Retail project in the new shopping center of Santiago. It was an interior design of a restaurant, trying to give a scenic image, working with layers in the scenery background, different textures and depths, red acrylic and dry aged area behind a wood ribbon moving from the background to the front of the project. The main difficulty was to respond to all the requierements that the shopping centers asked for.

2012

DESIGN OF RESTAURANT SANTA BRASA


19

DESIGN OF RESTAURANT SANTA BRASA

2012


20

2012

DESIGN OF RESTAURANT SANTA BRASA


21

DESIGN OF RESTAURANT SANTA BRASA

2012


ATIESADOR e= 5mm

ATIESADOR e= 5mm

22

V.N IN 30 x 75,4

DETALLE TIPO CN 1

VISTA EN ELE DETALLE

EJE C - PARALELO A EJE 5 ESC. 1:10

ESC. 1:10

MURO H.A. 5

5

MURO H.A.

17.50

15.00

7.50

3.00

9.00

5.00 3.00

3.00

10.50 25.00

18.00

C

C VIGA H.A.

C VIGA H.A.

VN IN 30x75.4

4.00 26.50 32.50

Structural Repair of S.I.I. Building, Recoleta, Santiago

5

After the huge Earthquake of 27th February 2010, many Buildings were damaged from Santiago, capital of Chile, to Concepcion, Earthquakes epicenter. At this Engineer Consulting, AEES, they received many orders for Structural Calculations and Repairs Design for this damaged buildings. This was one of them, the building was having mainly damages in all the beams and columns, and the last level needed to be completely rebuilt, with collaborating slabs, therefore, join a new metallic structure with the old concrete one, strengthened this last one. My roll in this job was drafting and architecture design to support the engineers for the solution of structural problematics.

5

G 10.00

PL 30/38 e= 5mm

PERNO A 325

ACERO A 420-270 ES

7/8"

PARA TODAS LAS COLUMNAS

GROUT DE NIVELACIÓN SIKAGROUT

6

Típico

HORMIGÓN

2.00

TUERCA DE NIVELACIÓN

LC 01

LC 05 6.35 PLACA DE LOSA COLABORANTE

PL 19/11.5 e= 16 mm ALA DE IN 30x75.4

PL e= 8mm ALA DE IN 30x75.4

ACERO A 420-270 ES

ACERO A 420-270 ES

VN IN 20 X 19,8

V.N IN 30 x 75,4

MURO H.A.

DETALLE TIPO CN 4 EJE C - EJE 11A

ESC. 1:10

11A

11A

PL 19/11,5 e= 5mm

19.00

3.50

11.50

32.00

43.00

C

C

VN IN 30x75.4

MURO H.A.

C

6.50 11.50

6.50

6.50 11.50

8.00

5.00

VN IN 30x75.4

MURO H.A.

3.50

Tip.

5.00

STRUCTURAL REPAIR OF S.I.I. BUILDING, RECOLETA, SANTIAGO 9.00

19.00

5.00

5.00

e= 8 mm (ALA DE IN 20x19.8)

ACERO A 420-270 ES

VN IN 20 X 19,8

5.00

VN IN 20 X 19,8

2011

PERNO A 32

3.00

8.00

C

ACERO A 420-270 ES

19.00

14.00

6.50


23 D D

C

B

C

B

A

A

MURO CORTAFUEGO F-120

s/ TABLA DE EMPOTRAMIENTO EN LÁMINA 668-17

CONECTOR Ø16 @ 20 cm.

14.00

CONECTOR Ø16 @ 20 cm.

16

A

2 PERNOS DE 1'' VARILLA HAS, HILTI ó SIMILAR

16

Típico

Típico

30.00

30.00

SUPERFICIE INTENCIONADAMENTE RUGOSA

16

VIGA EXISTENTE 20/59

PERFIL C 30 x 43,4

Típico

MURO H.A 2 PERNOS DE 1'' VARILLA HAS, HILTI ó SIMILAR

8.00 20.00

VIGA EXISTENTE 20/59

10.00

La

16

Típico

VN C 30x43.4

N.P. + 6,33

DET.6 ANCLAJE VIGA NUEVA HORMIGÓN ARMADO

esc. 1:10

ELEVACIÓN EJE C

DET.7

LC 01 V.N IN 30 x 75,4

2+2Ø16

VIGA H.A CONECTOR Ø16 @ 25 cm.

N OTA = SE DEBERÁ REALIZAR ENSAYO DE EXTRACCIÓN EN EL 10% DE LAS BARRAS LOS CONECTORES Y LAS VIGAS SERÁN EN ACERO ASTM A 36 * SUJECIÓN IGUAL AL IN 30x70.54, SÓLO QUE LA PLACA BASE TIENE 14 mm DE ESPESOR

VN IN 20x30.6

VISTA A-A

La= según fabricante

DET. 8 UNIÓN PERFIL C 30 x 43.4 A VIGA H.A. EJE 6- PISO 1

esc. 1:10

M.H.A nuevo

1.00

1.00

23.00

1.00

2 12.

1.00

S

50.00

IPE 180/91/8

2+2Ø12 existentes

IPE 180/91/8

40

EST. Ø8@6

2 12.

Fe' 2 12

2+2Ø16

V.E 20/15

EST. 8 @25

2+2Ø16 L=539 (30+509)

2 10. Fe' 2 10 EST. 8 @5

2+2Ø16 DM Ø8 @20 esp=20

2+2Ø16 L=663 (30+633)

2+2Ø12 L=341 (30+311)

LL

ESPACIO CANALETA AGUA LLUVIA

S1 6

2+2Ø12 existentes

N.P.T + O,O2

CERCHA

S

6

Típico

CERCHA 50.00 6 25.00

12.50

Típico

5.00

12.50

Típico

15.00

Típico

6

1.00 6

12.50 6.00

Típico

6

Típico

12.50

Típico

9.50

6.00

5.00

1.00

15.00

3.00

ATIESADORES e= 10 mm

6

6

Típico

2+2Ø16

N.P.T + O,O2

2+2Ø16

2+2Ø16

2+2Ø16

Típico

12.50 7.00

1.00

ACERO A 420/270 ES

DET.4

y Nota 4

6

7.00

6.00

ATIESADORES e= 10 mm

ELEVACIÓN EJE 8 ESC. 1:50

DET.4

y Nota 4

DET.4

y Nota 4

0.50 Típico

12.50 6.00

31.00

ACERO A 420/270 ES

ACERO A 420/270 ES

5.00

15.00

PL 15/11,5 e= 10mm

31.00

ACERO A 420/270 ES

15.00

0.50

Típico Típico

3.00

PL 15/11,5 e= 10mm

esc. 1:10

2+2Ø16

ELEVACIÓN EJE 6 ESC. 1:50

Típico

Típico

12.50

9.50

UNIÓN VIGAS IN 20x75.4 Y VIGA 20x19.8

6

3.00

Típico

6

Típico

IPE 70/91/8

12.50

IPE 70/91/8

5.00

0.50

1.00

3.00

CERCHA

50.00 25.00

12.50

V.N IN 20 x 75,4

V.N IN 20 x 75,4

CERCHA

ESPACIO CANALETA AGUA LLUVIA

CERCHA

Típico

V.N IN 20 x 75,4

DET.9

DM Ø8 @20 esp=20

M.H.A nuevo

Típico

S1

S1 Típico

6 V.N IN 20 x 75,4

S1

5.00

50.00 6

S

LL

s

V.N IN 20 x 75,4

S LL

1.00

1.00

2+2Ø10 (EXIST.)

VE 20/70

VN IN 20x30.6

6

S1

VN IN 20x19.8

LL

S1

S1

25.00

6.00

6.00

V.N IN 20 x 75,4 Típico

L

S1

S S1

25.00

5.00

ALAS RETIRADAS

LOSA COLABORANTE

VN IN 20x19.8 6 Típico

S1 LL

M.H.A nuevo

6.00

6.00

LOSA COLABORANTE

2+2Ø16

1.00

1.00

V.N IN 20 x 75,4

2+2Ø16

Fe' 2 12

5.00

ALA RETIRADA

DET 5

N.P. + 3,13

CADENA VIGA ex. 15/70

12.50

12.50

5.00

1.00

LC 01 V.N IN 30 x 75,4 DET 5

N.P. + 3,13

VN IN 20x30.6 12.50 23.00

2+2Ø12 L=468 (30+438)

N.P. + 6,33

VN IN 20x30.6

DET 5

esc. 1:10

1.00

2Ø12

15.00

anclado 15 cm con HILTI HIT RE 500

REFUERZOS VIGAS EJES 11A y 13A

12.50

CADENA 20/50

MURO ALBAÑILERÍA ex.

PERFIL C 30 x 43,4

CONECTOR Ø16 @ 25 cm.

anclado 15 cm con HILTI HIT RE 500

Lat. 2+2 Ø 8 EST. Ø 8 @ 15

CERCHA 1 (VER DETALLE TIPO)

2Ø12

MURO H.A. PROYECTADO

VIGA NUEVA

20.00

EST. Ø8@15

50.00

VER ELEVACIÓN ESTRUCTURAL EJE C

VIGA NUEVA 20/50

MURO CORTAFUEGO F-120 DET 11

2Ø12

A

h= 1/3 h viga h= 1/3 h viga ICIE ONADAMENTE RUGOSA

14.00

anclado 14 cm con HILTI HIT RE 500

MURO ALBAÑILERÍA ex.

(1+1Ø8)@30 A 63/42H

MURO ALBAÑILERÍA NUEVO

LOSA HA EXISTENTE 16 CM

COLUMNA RETICULADA DE ACERO (VER DETALLE)

30.00

CADENA 20/50

2Ø12

VN IPE 200

30.00

V N IP E 1 6 0

VN IPE 200

LONGITUD DE ANCLAJE

s/ TABLA DE EMPOTRAMIENTO EN LÁMINA 668-17

LOSA HA EXISTENTE 16 CM

DET 12

Lat. 2+2 Ø 8 EST. Ø 8 @ 15

2Ø12

LONGITUD DE ANCLAJE

D

1.00

C

B

A

C.N C.N

C.N

C.N

DET.11

DET.10 MÉNSULA 1 PILAR /CERCHAS

C.N

MÉNSULA 2/ PILAR / CERCHA / VIGA

esc. 1:10

esc. 1:10

MURO CORTAFUEGO F-120 Lat. 2+2 Ø 8 EST. Ø 8 @ 15

CERCHA 1 (VER DETALLE TIPO)

VN IPE 200

D IPE 160 ACERO ASTM A36

2Ø12

MURO ALBAÑILERÍA NUEVO

8.5 mm

7.4 mm

4.50

IPE 200

CADENA 20/50

2Ø12

VIGA IN 20x19,8

10.00

8.00

VIGA IN 20x19,8

ACERO ASTM A36

S

5.6 mm

5 mm

16.00

S1

20.00

LL 7.4 mm

S1

8.5 mm

IPE 160

IPE 200 6

DET. 12 UNIÓN VIGA TECHUMRE ELEVACIÓN EJE 8

esc. 1:10

6

PERFIL C 200/75/5

Típico

N.P. + 6,33 LC 01 V.N IN 30 x 75,4

Típico

40/40/3

VN IN 20x30.6

DET 5

DET 5

MURO ALBAÑILERÍA ex.

CERCHA

CONSULTORIA

EN INGENIERÍA

PERNO DE ACERO d= 1/2 ''mm ACERO A 420/270 ES

CERCHA

2x2 VARILLA HAS 1'' ó SIMILAR

B

6

Típico

Típico

10.00

2 PERNOS A 325 5/8''

L 100x100x6

Típico

L 115

20.00 13.00

20.00

Nota 1 : empalmes y traslapos verticales y horizontales = 40Ø

L 114

Nota 2 : medidas en cm VN IN 20x30.6

C.N

VE 20/54 6Ø26

V.E 20/70

C.N

Típico 18.00

ep= 12 mm

B

VISTA B-B

DET. 13 UNIÓN CERCHAS A VIGAS DE CIERRE O AMARRE TECHUMBRE ELEVACIÓN EJE G - PISO 3

esc. 1:10

DET. 15 UNIÓN VIGA EN VOLADIZO IN 20x19,8 A PILAR H.A. EJE 13 A ENTRE EJES F y G esc. 1:10

Nota 3: Reutilizar malla de Muro a demoler como confinamiento de armadura de viga y muro.

MURO HORMIGÓN ARMADO ex.

30.00

EN INGENIERÍA

N.P. + 3,13

ACERO A 420/270 ES

PERFIL L 75/75/5 38.00

CONSULTORIA

NOTAS

PL 45/25 e= 10mm

6

N.P.T + O,O2

Nota 4 : Los anclajes de armadura nueva que se inserten en hormigón armado existente, deberán llevar aplicación de adhesivo epóxico HIT RE-500. Y las longitudes de anclaje serán según catálogo del proveedor.

VERIFICARÁN EN OBRA

NOTA: TODAS LAS MEDIDAS SE

VERIFICARÁN EN OBRA

NOTA: TODAS LAS MEDIDAS SE

ELEVACIÓN EJE 8 A ESC. 1:50

10.00

C

C

10.00 10.00

5

221.50

32.50

PERNO A 325

PL 25/32,5 e= 5mm

7/8"

PL 30/27,5 e= 5mm

PARA TODAS LAS COLUMNAS

ACERO A 420-270 ES

PARA TODAS LAS COLUMNAS

3.5

3

GROUT DE NIVELACIÓN SIKAGROUT

ACERO A 420-270 ES GROUT DE NIVELACIÓN SIKAGROUT

PERNO A 325

ACERO A 420-270 ES

PL 25/32,5 e= 5mm

7/8"

PERNO A 325 6

6

Típico

Tip.

Tip.

HORMIGÓN

lb TUERCA DE NIVELACIÓN

6.35 PLACA DE LOSA COLABORANTE

(mm)

Lb (m)

8

30

2

10

2.0

16

6

6

8

30

-

-

-

12

4

Entre ejes 5 y 6 1° Piso

LC03

10

8

25

-

-

-

18

4

Entre ejes C y D 1° y 2° piso

LC04

12

8

20

-

-

-

15

4

Ejes 10 y 11, 11 y 13 - 1° y 2° Piso

LC05

8

8

30

2

10

18

4

Tip.

Tip.

ATIESADOR e= 5mm

10.00

DETALLE TIPO CN 2

VISTA EN ELEVACIÓN DETALLE CN 1

NOTA= SE EXTIENDE 10 cms. LOSA COLABORANTE DESDE EJE C EN DIRECCIÓN A EJE D

V.N IN 30 x 75,4

EJE D - PARALELO A EJE 5

DETALLE TIPO CN 3

ESC. 1:10

EJE C - EJE 8

ESC. 1:10

8

8

2.8

1.80 M EN LOSA DE LUZ MENOR

NOTA= h hormigón y enfierraduras varían según losa, como se muestra en tabla de losas colaborantes adjunta.

DETALLE LOSA COLABORANTE TIPO ESC.1:25

ESC. 1:10

5

5

5

VN IN 30x75.4

VN IN 30x75.4

MURO H.A.

PL 10/30 e= 10 mm (ALA DE IN 20x30.6)

LONGITUD DE ANCLAJE

ACERO A 420-270 ES

17.50

15.00

7.50

3.00

9.00

5.00

PERNO A 325

C

ATIESADOR e= 5mm

5.00 3.00

7/8"

PARA TODAS LAS COLUMNAS

ATIESADOR e= 5mm

PERFORACIÓN PLACA BASE=15/16"

3.00 5.00

30.00

ATIESADOR e= 5mm 5.00

5.00 3.50

10.00

C

Tip.

8.00 V.N IN 20 x 30,6

D VIGA H.A.

VN IN 30x75.4

4.00

VN IN 30x75.4

26.50 32.50

Fe 8

5.50

ATIESADOR e= 5mm

ALMA DE V.N IN 20 x 30,6

D

D

25.00

18.00

C

5.50

30.00

4.50

C

5.50

VN IN 30x75.4

VN IN 30x75.4

5.00

5.00 30.00

30.00

30.00

MALLA

ACERO A 420/270 ES

ACERO A 420/270 ES

VN IN 30x75.4

PERFIL C 200/75/5 ACERO A 420/270 ES

5 5

5

VISTA EN PLANTA DETALLE CN 2

5

8

VISTA EN PLANTA DETALLE CN 2- DEBAJO DE LOSA C.

ESC. 1:10

8

51.00

VISTA EN PLANTA DETALLE CN 3 - DEBAJO DE LOSA C.

VISTA EN PLANTA DETALLE CN 3

G

0.50 2,75

7.00

0.8

ESPECIFICACIONES SEGÚN FABRICANTE

DETALLE CERCHA TIPO

13A

51.00

ATIESADOR @ pl e= 5mm

ACERO A 420/270 ES

NOTA= PARA CERCHAS 2,3 y 4 VARÍA L PERO SON LOS MISMOS PERFILES

40/40/3

200/75/5

ACERO A 420/270 ES

ACERO A 420/270 ES

10.00

11A

6.00

ACERO A 420/270 ES

ESC.1:25

55.00

2.75

PERFIL C 200/75/5

200/75/5

G

10.00

c/30 cm

0.8

ANCLAJE HSL M 10/20 HILTI

4.00 3.00 4.00 G 10.00

Fe 8

LOSA COLABORANTE 16 cm

PERFIL 60/60/5

PERFIL C 200/75/5

ESC. 1:10

ESC. 1:10

ESC. 1:10

A 63/42H EN CADA VALLE

80.00

2 PERFILES L 40/40/3

200/50/15/4 @ 50 cm (general) @ 30 cm entre eje 5 y 8

4.00

C

3.50

44.00

VN IN 30x75.4

7.50

La

ALMA DE V.N IN 30x75.4

18.00

C

D

Típico

Tip.

ALMA DE V.N IN 30x75.4

18.00

27.50

C VIGA H.A.

2.00

4.00

ALMA DE V.N IN 30x75.4

10.50 18.00

C

s/ TABLA DE EMPOTRAMIENTO EN LÁMINA 668-17

PL 5/15 e= 5mm

PILAR H.A. 20/30

5.00 3.00 2.50

3.00

25.00

OBSERVACIONES

30.00

V.N IN 20 x 30,6

MURO H.A. 5

Cantidad

25.00

ATIESADOR e= 5mm

ATIESADOR e= 5mm

ATIESADORES e= 5mm

ESC. 1:10

(mm)

Tip.

ACERO A 420-270 ES

16.00

VN IN 20 X 19,8

Tip.

PL 10/30 e= 10 mm (ALA DE IN 20x30.6)

Tip.

5.00

ATIESADOR e= 5mm

V.N IN 30 x 75,4

EJE C - PARALELO A EJE 5

Conectores de corte por valle

5

LC02

Denominación ts (cm)

2.00

Tip. 9.00

Tip.

ATIESADOR e= 5mm

DETALLE TIPO CN 1

Armadura negativa por valle

sep (cm)

LC01

Entre Ejes 3a y 5 1° piso

200.00

6.35 PLACA DE LOSA COLABORANTE

MURO H.A.

VIGA H.A. Tip.

GROUT DE NIVELACIÓN SIKAGROUT

3.50

2.00

TUERCA DE NIVELACIÓN 6.35 PLACA DE LOSA COLABORANTE

7/8"

PARA TODAS LAS COLUMNAS

3.50

6

Típico

GROUT DE NIVELACIÓN SIKAGROUT HORMIGÓN

2.00

6.35 PLACA DE LOSA COLABORANTE

GROUT DE NIVELACIÓN SIKAGROUT

PERNO A 325

ACERO A 420-270 ES

6

Típico

TUERCA DE NIVELACIÓN

Ejes 8, 8a,8b,13a,13b y 15 Subterráneo 5,6,8,8a,8b,13a,13b, y 15 2° Piso

Ubicación

PL 25/30 e= 5mm

7/8"

PARA TODAS LAS COLUMNAS

3 3.00 10.00 3.00

HORMIGÓN

2.00

Malla

CN 1

14.00

DETALLE AMARRE DE LOSA COLABORANTE A LATERALES DE HORMIGÓN esc. 1:10

7.00

PERFIL C 150/50/5

PL 30/38 e= 5mm

PERNO A 325

ACERO A 420-270 ES

7/8"

PERNO A 325

PARA TODAS LAS COLUMNAS

PL 30/27,5 e= 5mm

6

PL 30/28 e= 5mm

PERNO A 325

ACERO A 420-270 ES

6

GROUT DE NIVELACIÓN SIKAGROUT

PL 30/27,5 e= 5mm

Típico

6

3.0 3.5

6

Típico

14.50

14.50

6.35 PLACA DE LOSA COLABORANTE

PL 19/11.5 e= 16 mm ALA DE IN 30x75.4

PL e= 8mm ALA DE IN 30x75.4

ACERO A 420-270 ES

ACERO A 420-270 ES

Tip.

13.00

ACERO A 420-270 ES 7.50

7.50

MURO H.A.

ACERO A 420-270 ES

16.50 7.50

310.00

D

NOTA: ESTE ES UN DETALLE TIPO QUE SE ACOMODARÁ SEGÚN SITUACIÓN EN TERRENO ARMADURA DE DISTRIBUCIÓN fe Ø 12

PL 30/3

ATIESADORES e= 5mm

VN IN 20 X 19,8

ATIESADORES e= 5mm

VISTA EN ELEVACIÓN DETALLE CN 5

VISTA EN ELEVACIÓN DETALLE CN 5

4.00 3.00 4.00

ESC. 1:10

EJE G - EJE 13A ESC. 1:10

ESC. 1:10

PERFIL C 200/75/5

Típico

ATIESADORES e= 5mm

DETALLE TIPO CN 6

ESC. 1:10

EJE G - EJE 11A

7.50

ATIESADORES e= 5mm

13.00

DETALLE TIPO CN 5

DETALLE TIPO CN 4

PL 10,5/27,5 e= 8 mm (ALA DE IN 20x19.8)

Tip.

Tip.

VN IN 20 X 19,8

VN IN 20 X 19,8 13.00

7.00

Típico

VIGA IN 20x19,8

Tip.

PL 10,5/27,5 e= 10 mm (ALA DE IN 20x19.8)

Tip.

16.50

VN IN 20 X 19,8

V.N IN 30 x 75,4

51.00

Típico

3

2.00

Tip.

Tip.

13.00

VN IN 20 X 19,8

55.00

14.50

14.50

6.35 PLACA DE LOSA COLABORANTE

6.35 PLACA DE LOSA COLABORANTE

2.00

Tip.

Tip.

4.00 3.00 4.00

TUERCA DE NIVELACIÓN

6.35 PLACA DE LOSA COLABORANTE

Tip.

Típico

GROUT DE NIVELACIÓN SIKAGROUT

HORMIGÓN

2.00

TUERCA DE NIVELACIÓN

6.35 PLACA DE LOSA COLABORANTE

ACERO A 420-270 ES

GROUT DE NIVELACIÓN SIKAGROUT

6.50

3.0

ACERO A 420-270 ES

3

PL 30/28 e= 5mm

7/8"

PARA TODAS LAS COLUMNAS

3.0 3.5

Típico

HORMIGÓN

2.00

TUERCA DE NIVELACIÓN

LC 01

LC 05

GROUT DE NIVELACIÓN SIKAGROUT

6.50

3.0

ACERO A 420-270 ES HORMIGÓN

2.00

7/8"

PARA TODAS LAS COLUMNAS

GROUT DE NIVELACIÓN SIKAGROUT

6

Típico

AMPLIACIÓN DE ZAPATA ARMADURA DE ANCLAJE TIPO C CONTINUA fe Ø 16 @ 35 cm.

55.00 40/40/3

EJE C - EJE 11A

ARMADURA DE DISTRIBUCIÓN fe Ø 12 @ 25 cm.

CERCHA

ESC. 1:10

PERFIL C 200/75/5

EMPLANTILLADO DE HORMIGÓN H-5

(CORDÓN INFERIOR CERCHA)

PERFIL L 75/75/5 11A

13A

11A

51.00

13A

7.00

PERNO DE ACERO d= 1/2 ''mm

PERNO DE ACERO d= 1/2 ''mm

ZAPATA ACTUAL

ACERO A 420/270 ES

ACERO A 420/270 ES

UNIÓN: PUENTE ADHERENTE ADHESIVO SIKADUR 32

0.50 7.00 0.50

11A

11A

PARA TODAS LAS COLUMNAS

5.00 3.00

3.00 5.00 2.50

11.50

32.00

27.50

C

C

C

18.00

8.00

G

7/8"

PARA TODAS LAS COLUMNAS

PERFORACIÓN PLACA BASE=15/16"

3.00 5.00

G

G

5.00 3.00 2.50

27.50

18.00

8.00

G

G

G

VN IN 30x75.4

6.50

9.00

VN IN 20 X 19,8 11A

ESC. 1:10

PERFIL 30/4

55.00

0.50

Típico

Típico

30.00

30.00

30.00

25.00

51.00

14.00

EN INGENIERÍA

ACERO A 420/270 ES

PERFIL L 75/75/5

DETALLE AMPLIACIÓN DE ZAPATA

2.00

0.50

C.N

PERFIL L 75/75/5

ESC. 1:20

DETALLE UNIÓN CERCHA A PILAR

15.00

7.00 PERFIL C 150/50/5

11A

13A

13A

VISTA EN PLANTA DETALLE CN 5- DEBAJO DE LOSA C.

VISTA EN PLANTA DETALLE CN 6

VISTA EN PLANTA DETALLE CN 6- DEBAJO DE LOSA C.

ESC. 1:10

ESC. 1:10

ESC. 1:10

CONSULTORIA

PL 45/25 e= 10mm

4

5.50

5.50

30.00

11A

VISTA EN PLANTA DETALLE CN 5

ESC.1:10

24.00 A

ESC. 1:10

4.00

VISTA EN PLANTA

11A

VISTA A-A

VISTA EN PLANTA DETALLE CN 4 - DEBAJO DE LOSA C. ESC. 1:10

Típico

ACERO A 420/270 ES

4

4

7.50

PERFIL C 150/50/5

G

Típico

C.N

A

27.50

5.00

e= 8 mm (ALA DE IN 20x19.8)

ACERO A 420-270 ES

VISTA EN PLANTA DETALLE CN 4

EN INGENIERÍA

Tip.

5.00

5.00

19.00

VN IN 20 X 19,8

5.00

6.50 11.50

8.00

5.00

VN IN 30x75.4

MURO H.A.

3.50

6.50 11.50

G

4.00 3.00 4.00

CONSULTORIA

13.00

13.00

MURO H.A.

ATIESADOR e= 5mm 13.00

27.50

ACERO A 420-270 ES

2.50

4.00

PL 45/25 e= 10mm

7.50 1.00

PL 10,5/27,5 e= 5mm 10.50

10.50

ALMA DE V.N IN 30x75.4

ATIESADOR e= 5mm

ALMA DE V.N IN 30x75.4

8.00 43.00

PERNO A 325

ACERO A 420-270 ES

2.50

4.00

13.00

C

PL 10,5/27,5 e= 5mm 10.50

10.50

VN IN 20 X 19,8

3.50

7/8"

PERFORACIÓN PLACA BASE=15/16"

VN IN 20 X 19,8

PERNO A 325

3.00

VN IN 20 X 19,8

ACERO A 420-270 ES

19.00

14.00

VN IN 20 X 19,8

PL 19/11,5 e= 5mm

19.00

6.50

4

NOTA: TODAS LAS MEDIDAS SE

VERIFICARÁN EN OBRA

DETALLE PILAR RETICULADO DE ACERO TIPO

NOTA: TODAS LAS MEDIDAS SE

VERIFICARÁN EN OBRA

ESC.1:10

STRUCTURAL REPAIR OF S.I.I. BUILDING, RECOLETA, SANTIAGO

2011


24 1

3

3A

5

6

8

10

8A

10A

13A

11A

15

13B

DET.1

CADENA DINTEL 20/15

VE 20/70 20/30

4 12 EST. 8 @15

4 12

2 16.

20/20

20/20

D.M. 8 @20

DET.5

VER NOTA 3

Fe' 2 12

LC 04

2 12

8 @20

DET.5

DET.5

DET.2

LC 05 8 @30 2 10 l.b.= 2,80 m

DET.2

VN IN 20x30.6

25/25

25/25

DET.2

25/25

VN IN 20x30.6

4 16 EST. 10 @20

4 16 EST. 10 @20

4 16 EST. 10 @20

DET.5

LC 05 DET.1

8 @30 2 10 l.b.= 2,80 m

Fe' 2 12 2 12.

CADENA DINTEL 20/50 2 12.

4 12

20/20 4 12

DET.1

20/20

2 10.

VE 20/59

2 12.

Fe' 2 12

20/40

20/20

G

20/20

I

4 12

4 12

4 12

Fe' 2 12

L119

L 120

VE 20/59

CADENA DINTEL 20/50

5 18

+

2 12.

CADENA DINTEL 20/15

2 10.

Fe' 2 10

4 12

F

2 12

Fe' 2 10

DET.16

25/25

4 16 EST. 10 @20

20/40

C

2 12

CADENA DINTEL 20/15

DET.2

20/20

4 12 EST. 8 @15

8 @14

20/20

4 12

VN IN 20 X 19,8

2 12. EST. 8 @19

2 12

Fe' 2 12

5 22

DET.4

2 12

4 12

4 12

2 12.

8 @12

EST. 8 @5 Fe' 2 18 5 22

6 22 Fe' 2 16

VN IN 20 X 19,8

L 103

L 117

2 12 4 10

2 16.

H.A. A DEMOLER

VN 20/40

VE 20/59

VE 20/59

VE 20/70

Fe' 2 16

CADENA DINTEL 20/50

Fe' 2 12

Fe' 2 12

2 12.

C 30x43.4

C 30x43.4

H.A. A DEMOLER

10 @14 8 @20 H.A. A DEMOLER

6 @20 6 @20

VE 20/40

2 12.

Fe' 2 12

CADENA DINTEL 20/50

2 12

2 12.

ESTRUCTURA METÁLICA A EJECUTAR

+

VE 20/70

+

DET.3

VE 20/70

2 12

L 115

2 12.

L 113 DET.8

2 12. Fe' 2 12

A

A1 B1

V.MODIF. 20/59

VE 20/15 EST. 8 @25

Fe' 2 12

Fe' 2 12

2 12.

2 12. Fe' 2 12 EST. 8 @25

15/25

2 10. Fe' 2 10 EST. 8 @5

Fe' 2 12

C 30 x 36,7 (VER DETALLE 8)

VE 15/70

VE 20/70

VE 20/35

VN IN 20x30.6 2 12

MN

MN

EST. 8 @14

2 12. Fe' 2 12 EST. 8 @14

8 @25

4 12 EST. 8 @15

DET.7

Fe' 2 12

15/25

4 12 EST. 8 @15

2 12. Fe' 2 12

6 26

VE 20/70

VE 20/70

10 @16 8 @20

VE 20/54

20/30

DET.5

CAD.ex 20/15 2 10. Fe' 2 10

Fe' 2 12

VN 20/30

8 @30

6 @14

VN IN 20 X 19,8

2 18. EST. 8 @24

H.A. A DEMOLER

VE 20/70

VE 15/70

LC 02

20/20

4 12 EST. 8 @15

VN 20/50

H.A. A DEMOLER

VE 15/70 EST. 8 @25

Fe' = 2 16

4 12 EST. 8 @15 Fe' 2 12

LC 03

VER NOTA 3

3 12

2 16.

D

VE 20/120 S.INVERTIDA

3 22

2 12. EST. 8 @14

10 @16

L 110

Fé =4 18

VN 20/50

DET.6

4 18.

4 10

C

DET.1

L 114

+

6 @17

L 107

VE 20/75

2 18

20/20

6 @20

L 109

Fe' 2 10 20/40 4 12

L 116

DET.8

2 12

V.N IPE 180/91/8 4 10

8 @12 DET.6

6 @20 6 @20

DET.5

20/20

( INVERTIDA )

2 10.

DET.4

2 12.

VIGA MODIFICADA 20/30

Fe' 2 12 2 12.

EST. 8 @14 4 10

6 @20

3 26

L 102

3 22

+

15/30

L 104

3 26 DEL PISO 2 EMPOTRADO EN EL MURO 1.00 m.

REFUERZO INFERIOR 4 25

Fe' 2 12

B

L 106

3 12 Fe' 2 12 EST. 8 @25

VE 20/120 S.INVERTIDA

+

12 @17 8 @20

VIGA PARED EXISTENTE 15/316

DET.4

EST. 8 @25

4 12

VE 15/30

8 26

L 101

CADENA DINTEL 20/15

2 12

2 12

20/20

4 12 EST. 8 @15

DET.8

A1 B1

Fe' 2 10

2 10.

20/20

3 26

CADENA VIGA 15/70

4 12

2 10

Fe 3 16.

EJE MEDIANERO

7 26

A

SIMBOLOGIA

1

3

8A

10A

13 A

11A

15

13 B

A

4 12

N

20/20

DET.1

EJE MEDIANERO

7 26

4 12

2 12

2 12

4 12

2 10

DET.5

L 201

8 @12

DET.6

DET.1

DET.6

8 @30 2 10 l.b.= 2,00 m

LC 01 8 @30 2 10 l.b.= 2,00 m

LC 01 8 @30 2 10 l.b.= 2,00 m

VN IN 30x75.4

LC 01

VN IN 30x75.4

8 @30 2 10 l.b.= 2,00 m

VN IN 30x75.4

VN IN 30x75.4

8 @30 2 10 l.b.= 2,00 m

LC 01

DET.5

VN IN 30x75.4

VN IN 30x75.4 20/30

4 12 EST. 8 @15

VN IN 30x75.4

4 12

4 12

DET.5

8 @20

DET.5

DET.5

DET.2

VN IN 20x30.6

25/25

25/25

8 @30 2 10 l.b.= 2,80 m

DET.2

25/25

VN IN 20x30.6

4 16 EST. 8 @15

4 16 EST. 8 @15

4 16 EST. 8 @15

VN IN 20 x 19,8

LC 01

20/20 4 12

8 @30 2 10 l.b.= 2,00 m

LC 01 8 @30 2 10 l.b.= 2,00 m

DET.5

C DET.5

2 12

DET.5 DET.1

20/20 4 12

DET.1

LC 05 8 @30 2 10 l.b.= 2,80 m

DET.16

DET.2

20/20

4 12 EST. 8 @15

20/20 VN IN 20 x 19,8

DET.2

VN IN 20x30.6

VN IN 20 x 19,8

DET.5

DET.5

LC 05

DET.5

VN IN 20 x 19,8

VN IN 20 x 19,8

LC 04

8 @12

VN IN 20 x 19,8

L 203

VN IN 30x75.4

20/20

20/20

DET.5

DET.5

VN IN 20 x 19,8

VE 20/120 S.INVERTIDA

VN IN 30x75.4 DET.5

CADENA DINTEL 20/50

2 12

DETALLE ANCLAJE LOSA COLABORANTE

D

VN IN 30x75.4

VE

4 12

4 12

CADENA DINTEL 20/15

2 10.

25/25

4 16 EST. 8 @15

CONTINUACION MURO FACHADA / ANTETECHO

Fe' 2 10

F

2 12

CADENA DINTEL 20/50

VN 20/50 20/20

VN IN 20 x 19,8

VN 20/50 3 22

2 12

DET.4

4 10

C

A1 B1

8 @30 2 10 l.b.= 2,00 m

DET.9 DET.3

2 12

LC 01

Fe' 2 12

Fe' 2 16 2 16.

VN IN 20 x 19,8

VE 20/120 S.INVERTIDA

L 202

3 22

8 @30 2 10 l.b.= 2,00 m

VN IN 30x75.4

DETALLE ANCLAJE LOSA COLABORANTE

H.A. A DEMOLER

LC 01

DETALLE ANCLAJE LOSA COLABORANTE

( INVERTIDA )

REFUERZO INFERIOR 4 25

VN 20/60

B

LC 01

L 204

VIGA PARED EXISTENTE 15/316

VN IN 30x75.4

12 @17 8 @20

VER NOTA 3

A

20/40 4 12

DET.5

DET.5

+

H.A. A DEMOLER

A1 B1

DET.5

2 12.

15

15 A

VERIFICARÁN EN OBRA

VE 20/60

NOTA: TODAS LAS MEDIDAS SE

VN IN 20 x 19,8

10

LOSA A DEMOLER

DET.5

DETALLE ANCLAJE LOSA COLABORANTE

VIGA NUEVA LOSA COLABORANTE (NUEVA)

DET.5

Fe' 2 12

3 26

VIGA EXISTENTE

CADENA DINTEL 20/50

20/20

2 12.

4 12

VE 20/120 S.INVERTIDA

L.C

8

2 12. Fe' 2 12

20/20

ALBAÑILERÍA EXISTENTE ESTRUCTURA METÁLICA

NOTA: SE CONSIDERA DEMOLER O DESARMAR A TODOS LOS ELEMENTOS EXISTENTES TALES COMO TABIQUES, REVESTIMIENTOS DE MUROS Y PISOS.

6

EN INGENIERÍA

HORMIGÓN NUEVO - A CONSTRUIR HORMIGÓN A DEMOLER

VN

5

CONSULTORIA

HORMIGÓN ARMADO EXISTENTE

VE

3A

G

I

CONTINUACION MURO FACHADA / ANTETECHO

SIMBOLOGIA

CONSULTORIA

HORMIGÓN ARMADO EXISTENTE

EN INGENIERÍA

HORMIGÓN NUEVO - A CONSTRUIR

N

HORMIGÓN A DEMOLER ALBAÑILERÍA EXISTENTE ESTRUCTURA METÁLICA

VE VN

L.C

VIGA EXISTENTE VIGA NUEVA LOSA COLABORANTE (NUEVA)

10

15 A

15

LOSA A DEMOLER

NOTA: SE CONSIDERA DEMOLER O DESARMAR A TODOS LOS ELEMENTOS EXISTENTES TALES COMO TABIQUES, REVESTIMIENTOS DE MUROS Y PISOS.

2011

NOTA: TODAS LAS MEDIDAS SE

VERIFICARÁN EN OBRA

STRUCTURAL REPAIR OF S.I.I. BUILDING, RECOLETA, SANTIAGO


1.2

2.98 0.73

5.91

2.00 0.20

6.90

0.10 0.80 0.10 0.20

1.20 0.20

1.20

9

Local Técnico

1.20

Duchas

0.20

0.2 9 0.5 0 0.5 0 0.5 0 0.5 0 0.5 0 7.4 2

5.10

Baño Niños

Duchas

5.63

LÍNEA OFICIAL

LÍNEA VEREDA

EJE DE CALZADA

70 NTE RASA

1.80

2.9 1

Baño Niñas

cina

E (1.5 x 1.15)/2 = 0.86 m2 F 1.5 x 4.70 = 5.41 m2 G (1.17 x 1.49)/2 = 0.86 m2 H (1.17 x 4.56)/2 = 2.66 m2 I (0.81 x 6.00)/2 = 2.27 m2 J (11.71 x 6.00)/2 = 70.24 m2 K (1.79 x 5.48)/2 = 10.68 m2 L 6.26 x 5.48 = 39.94 m2 M (5.02 x 7.04)/2 = 17.67 m2 N (1.56 x 6.26)/2 = 4.86 m2 O 4.71 x 1.4 = 6.58 m2 P (1.4 x 1.49)/2 = 3.14 m2 Q (0.35 x 4.69)/2 = 0.81 m2 R 4.69 x 5.56 = 26.09 m2 S (1.86 x 4.69)/2 = 4.35 m2 T (1.58 x 4.00)/2 = 3.16 m2 U 4.71 x 4.00 = 18.82 m2

4.71

0.20 0.20

0.20

3.52

0.10 1.00

0.20

1.50

+ - 0.0

6

1.20

0.20

0.60 1.70 0.20

4.20

5 + - 0.0

3.80

4

5.00

Administración

ño ntes

7 8

E (1.5 x 1.15)/2 = 0.86 m2 F 1.5 x 4.70 = 5.41 m2 G (1.17 x 1.49)/2 = 0.86 m2 H (1.17 x 4.56)/2 = 2.66 m2 I (0.81 x 6.00)/2 = 2.27 m2 J (11.71 x 6.00)/2 = 70.24 m2

25

193.47 m2 TOTAL SUPERFICIE CONSTRUIDA = Sup Nivel 1 + Sup. Nivel 2 = 317.90 m2 + 193.47m2 = 511.37 m2 Ocupación Predial = 44,09 % Coeficiente de Constructibilidad = 0.27

317.90 m2 0.20 2.40

2' 0.100.20

2.30

0.70

2.11

4.63

9.06

0.22

9.39

G

QUIEBRE DESLINDE

5.68

2.31

1.20 9.20

MURO ADHOSAMIENTO CORTAFUEGO F-120

0.00

5.04

3.00

2.30

5.48

70

2.90

NTE

MURO ADHOSAMIENTO CORTAFUEGO F-120

RASA

LÍNEA OFICIAL

Design of Montessori School in Valparaiso

EJE DE CALZADA

3.16

5.00

LÍNEA VEREDA

LÍNEA DE EDIFICACIÓN

1 ESC 1:100

1.20

3.52

0.1

N

0.85

0.1

5

E

This was an order from a young couple of Industrial Designers, that since they started to grow their own kids, they decided to create aSUR Montessori School. At the beginning they ELEVACIÓN ESC. 1:100 transformed their own home, and in time it wasn’t enough bigger for the new students that came every year. So they bought a property in Valparaiso, Chile, and decided to built a new School that needed to respond to the Montessori Education Requirements, and at the same time, a building that could be eco-efficient, as much as possible. The project was developed until preliminary draft status, for being presented in Valparaiso’s Council, for receiving the permit for Project Development. 4 5

Taller 2 62 m2

TO

45

IN

M

SA

D

ES

TE

E

O UR M

D A

70

D

NTE RASA

0

0

0

HO

DESLINDE NORTE

6.0 5.8 4.0

MURO ADHOSAMIENTO F-120

5

D

N

SA RA

3.50

5 0.8

C

NIVEL TERRENO VECINO

5.93

6.66

7

2.90

8

6.43

3.53

DESLINDE SUR

6

2'

PROYECTO : • • • • •• • • • • •••• • • • • •• •• • • • • • • • • ••• • •• • • • • • • •• • • • • • • DESTINO : EDUCACIONAL

PROPIETARIO :

G

xxxx

RUT : 7.086.234-4 UBICACION :

CALLE RICARDO H. DE FERRARI N 760 • • • • • • • •• • • • • • • • • • • •

ESC 1:100

PROPIETARIO

CONTENIDO:

ARQUITECTO

DIBUJO :

• • • ••• •••••••• • • • •• •••••••••••••••••••••

FECHA

DESIGN OF MONTESSORI SCHOOL IN VALPARAISO

:

ESCALA :

LAMINA :

1 DE 1

2011


26

2011

DESIGN OF MONTESSORI SCHOOL IN VALPARAISO


27 N

N

4.71

11.71

11.71

4.00

11.71

4.35 m2 1.8 6

8.44

4.30 3.00

1.58

7.04

39.94 m2

5.48

6.30 4.90

6.00

3.16 m2

1.79

10.68 m2

6.00 5.00

11.71

55.17

LOTE 1B-B SUP 1159.74M2

4.00

5.02

6.26

6.49

6 0.81

m2

3.20

EMPLAZAMIENTO ESC 1:250

1.17

2.66 m2

1.15

10.68 m2

4.70

9.92 m2

4.70

4.49

4.70

4.71 4.70

1.50

9

0.86 m2 0.86 m2

6.00

4.6

3.14 m2 6.20

6.20

1.40

6.58 m2

9.92 m2

6.45

5.5 0.35

2.66 m2

4.71

1.15

0.8 1

1 0.8

1.17

1.50

EJE DE CALZ

20.08.2010

2.27 m2 0.86 m2 0.86 m2

10.68 m2

3.56

C.I.P. Nr. 934 de fecha

4.82

3.42

8.44

25.14

4.86 m2

6.00

3.56

Adhosamiento 47 % Muro Cortafuego F-120

6.45 6.49

19.24

6.26

1.56

7 24.5

ADA FERRARI

0.85

0.70

6.45

1.15

3.20

6.45

1.15

ESQUEMA DE SUPERFICIES NIVEL 2 ESC. 1:100

ESQUEMA DE SUPERFICIES NIVEL 1 ESC. 1:100

PLANO DE UBICACIÓN ESC 1:2000

CUADRO DE SUPERFICIES Superficie Terreno: 1159.74 m2 Superficie Construída:

2.9

0.2

0

0 0.8

1

0.2

0

1.1

6

C

6.00

N

1.9

0

2.9

0.20

0 0.7

9 0.20 0.2

0

0

Sala de Profesores

13.07

3.52

1.50

2.98 0.73

+ - 0.0

5.91

LÍNEA OFICIAL

EJE DE CALZADA

70 NTE

4.71

RASA

6

+ - 0.0

+ - 0.0

A

5

1.20

0.20

0.60

4

Baño Docentes

+ - 0.0 Invernadero 2

1'

0.20

0.2

5.00

Administración

2.00

5.85

1.2

LÍNEA VEREDA

B

0

0

5.63

5.22

0

1.70

3.6

4.20

0

3.80

5.8

0.20 0.20

0.2 0

6.0

0

LÍNEA DE EDIFICACIÓN

E

+ - 0.0

1.0

2.00

0.20

+ - 0.0

2.9

1

2

0.10 0.80 0.10 0.20

1.20 0.20

9 0.5

.50

10

1.2

9

Local Técnico

.34

10

Bodega

1

0.20

0.2

1.20

Duchas

Duchas

+ - 0.0

1.20

+ - 0.0

0 0.5

67m2

0 0.5

Casa de Niños

7.4

0 0.5

0 0.5

0

5.10

Baño Niños

Cocina

57.88 m2

6.90

Baño Niñas

Comedor

1.80

1

+ - 0.0

0.20

0.10 1.00

0.20

Invernadero 1

+ - 0.0

7 8

2 3 4 5

Baño de niños 6.8 m2

Superficie Nivel 1

Superficie Nivel 2 A 6.0 x 8.44 = 50.63 m2 B (6.0 x 3.56)/2 = 10.68 m2 C (3.2 x 6.2)/2 = 9.92 m2 D 6.45 x 6.20 = 39.94 m2 E (1.5 x 1.15)/2 = 0.86 m2 F 1.5 x 4.70 = 5.41 m2 G (1.17 x 1.49)/2 = 0.86 m2 H (1.17 x 4.56)/2 = 2.66 m2 I (0.81 x 6.00)/2 = 2.27 m2 J (11.71 x 6.00)/2 = 70.24 m2

0

2

D

A 6.0 x 6.49 = 38.96 m2 B (6.0 x 3.56)/2 = 10.68 m2 C (3.2 x 6.2)/2 = 9.92 m2 D 6.45 x 6.20 = 39.94 m2 E (1.5 x 1.15)/2 = 0.86 m2 F 1.5 x 4.70 = 5.41 m2 G (1.17 x 1.49)/2 = 0.86 m2 H (1.17 x 4.56)/2 = 2.66 m2 I (0.81 x 6.00)/2 = 2.27 m2 J (11.71 x 6.00)/2 = 70.24 m2 K (1.79 x 5.48)/2 = 10.68 m2 L 6.26 x 5.48 = 39.94 m2 M (5.02 x 7.04)/2 = 17.67 m2 N (1.56 x 6.26)/2 = 4.86 m2 O 4.71 x 1.4 = 6.58 m2 P (1.4 x 1.49)/2 = 3.14 m2 Q (0.35 x 4.69)/2 = 0.81 m2 R 4.69 x 5.56 = 26.09 m2 S (1.86 x 4.69)/2 = 4.35 m2 T (1.58 x 4.00)/2 = 3.16 m2 U 4.71 x 4.00 = 18.82 m2

1.9

4.4

193.47 m2 TOTAL SUPERFICIE CONSTRUIDA = Sup Nivel 1 + Sup. Nivel 2 = 317.90 m2 + 193.47m2 = 511.37 m2 Ocupación Predial = 44,09 % Coeficiente de Constructibilidad = 0.27

317.90 m2

Ascensor Minusválidos

+ - 0.0

2

0.20

5.10 0.80

2.40

1.00

2' 0.100.20

2.30

0.70

0.20

2.11

4.63

9.06

0.22

9.39

F

B'

1.31

0.20

1.70

2.70

1.40

0.20

5.68

2.31

1.20

10.80

9.20 4.30

6.35

2.88

5.04

MURO ADHOSAMIENTO CORTAFUEGO F-120

0.00

0.20

QUIEBRE DESLINDE

2.98

G

E'

3.16

2.30

3.00

5.48

70 NTE

RASA

2.90

5.00

EJE DE CALZADA

LÍNEA OFICIAL

MURO ADHOSAMIENTO CORTAFUEGO F-120

LÍNEA VEREDA

LÍNEA DE EDIFICACIÓN

PLANTA NIVEL 1 ESC 1:100

1.20

3.52

20.00

0.1

6.0

N

0

0

0.85

0.1

5

ELEVACIÓN SUR ESC. 1:100

E

TO

70 NTE RASA

0

5.8 4.0

D

45

IN

M

SA

HO

E

D

O UR M

D A

DESLINDE NORTE

5

MURO ADHOSAMIENTO F-120

5 0.8

C

ES

TE

D

N

SA

RA

5.22

B

13.07

2.00

4

3.50

0 6.0 0 5.8

5.85

1'

5

NIVEL TERRENO VECINO

Taller 2

A

62 m2

6

DESLINDE SUR

1

Taller 1

5.93

6.66

7

15 14

8

1

6.43

3.53

85.45 m2

2

13

3

11

5

10

6

9

7

2.90

4

Ascensor Minusválidos

8

2'

2

B'

F

10.80

G

E'

PROYECTO : • • • • •• • • • • •••• • • • • •• •• • • • • • • • • ••• • •• • • • • • • •• • • • • • • DESTINO : EDUCACIONAL

PROPIETARIO :

xxxx

RUT : 7.086.234-4

4.71

UBICACION :

20.00

CALLE RICARDO H. DE FERRARI N 760 • • • • • • • •• • • • • • • • • • • •

PLANTA NIVEL 2 ESC 1:100

PROPIETARIO

CONTENIDO:

• • • ••• •••••••• • • • •• •••••••••••••••••••••

ARQUITECTO FECHA

DESIGN OF MONTESSORI SCHOOL IN VALPARAISO

:

DIBUJO : ESCALA :

LAMINA :

1 DE 1

2011


28

Design of Ruka Eco-Lodge for indigenous Asociation Mapulahual This was the Design for a Concourse, the problematic consisted in design a Lodge for the indigenous community Mapulahual , starting to develop an eco-tourism project, supported financially by the WWF (Worldwide Foundation). They needed to develop this spaces for work in their own economic activities, like weaving and preparation of jams and preserves, and at the same time a place for receiving guests. It was inspired in the Huilliches Indigenous Communities Lifestyle and Culture, living around the Fire place in the center. And the way to come into the project was proposing a series of tracks in the forest, respecting the landscape of the place. They did not have the enough finance to built it in one time. So was necessary to design it for two Building Stages.

2009

DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL


29

DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL

2009


30

2009

DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL


31

DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL

2009


32

2009

DESIGN OF RUKA ECO-LODGE FOR INDIGENOUS ASOCIATION MAPULAHUAL


33

Museum of Mythology of Chiloe This was the last Project in the University of Bio-Bio, created over a year for release and diploma. I love the island of Chiloe, that’s why I chose this place of Chile for develop my last project in the career. The Mythology of Chiloe is something really particular of this island, attached to more then 30 legends and mythological beings. At the same time the way to develop the tourism is to spread this culture, and the best way was creating a space, for local artist, who are spinning, dyeing and knitting, wool. Is in the interaction with visitors and local artist, local people, that the Mythology could be transferred in an oral way, and is in the classic museum program how the mythology could be transferred in a tangible way, pictures, reading and visual tools. Therefore the Museum is a multi-programmatic building, anchored to an urban intervention, tracks along the ocean border and classic pile houses or “palafitos” on the bay of the city of Castro, having the project a dialogue through the illusion of the ghost boat “Caleuche”, local legend, with the urban environment.

MUSEUM OF MYTHOLOGY OF CHILOE

2008-09


34

2008-09

MUSEUM OF MYTHOLOGY OF CHILOE


escala

1:100

1``

1,6 2,8 0,3 2,9

2,4 0,3

2

2,9

2,5 0,4

3

8,1

4,0

H

4

3,7 4,0

barrio gamboa - castro - chiloe

08.07.2009 U

V V

W W

I

Alumna: Profesor guía:

NORTE

8,4 4,0 0,3 0,5

Plantas de Arquitectura

MUSEUM OF MYTHOLOGY OF CHILOE 2,4

2,4 3,0

2,6 0,2

22,3

NIVEL -2

Alejandra rojas w.

Museo DE La Mitologia Chilota PROYECTO DE TITULO : 1,6 2,1 0,4

5 1 1,1 2,6 0,4

1``

7,9 2,4 4,7

2

0,4

2,5

8,4

3

3,6

4,0 0,4

H

3,6

4

U U

V V

W W

4,0

Jorge Harris 7,6

5 2,5

1,7 0,3 3,7

26,7

5,7

NIVEL -1 0,2 1,7 0,7

2,1 0,4

I 1 2,0

V

1'' 0,4

7,9

3,6 2,4

3,4 4,7

2 0,4

2,5

1,6

3 3,6

4,0

4,2

H

0,4

4 3,6

barrio gamboa - castro - chiloe

08.07.2009

T

U MUNDO DEL MAR

W

-1.1

T

U

+ 1.90

W

V

Alumna:

Profesor guía:

NORTE

R

F

0,4

0,4

5 5,5

4,1 2,3

0,2 2,7

26,7 4,0

NIVEL 1

Museo DE La Mitologia Chilota

0,2

6,7

2,1 0,4

I 1 2,1

7,9

1`` 0,4

2,4 4,6

2 0,4

9,5 2,5

3 4,0

4,0

4,2

H

3,6 2,6

H

B B

I

C C

J

K

D D

M

N

E E

Q

P

S - 1.65

F

4 H

J

I

K

M

L

O

N

- 1.85

Q

P

S

R

T - 1.45

T

U U

V V

W W

3,0

0,4

2,6

3,0

3,0

0,4

G 3,2

2,6

F

G

0,4

3,0

2,6

6,1

0,4

2,6

3,0

0,4

2,6

3,0

3,9

0,4

2,7

3,0

0,3

E

2,6

F

3,0

D

E

0,4

D

3,0

C

3,4

2,6

0,3

B

C

0,4

3,0

2,7

0,3 8,0 3,0

2,7

0,3

8,0

3,0

2,7

A

3,0

2,6

0,4

3,9

3,0

2,6

2,8

2,8

I

0,4

0,4

B

3,0

2,6

3,0

2,6

H

0,3

72,3

6,1 0,4

3,7

0,4

3,0

2,6

4

3,0

2,6

0,4

0,3

18,1

3,0

3,0

2,6

2,0

2,0

4,2

0,4

0,4

2,9

4,0

3,0

2,6

3,0 3,2 2,6

6,0

0,3

3,7

0,4

0,4

3,0

2,7

3

3,0

2,6

3,0

2,6

0,3 2,0 3,0

4,0

0,3

2,6

0,4

2,0

2,5

0,4

3,0 3,4 2,6

0,3

2

3,0

2,6

0,4

3,0

6,2

0,4

3,0

2,6

1,3

A 6,1

3,0

0,4

0,3

2,4

2,8

2,6

3,0

2,6

3,0

1``

0,4

72,3

0,4

2,7 8,1

0,2

3,0

3,0

2,6

0,3

3,9

3,0

2,6

18,1 0,4

3,0

2,6

3,7

0,4

3,0

2,6

0,4

2,0

7,9

3,0

O

0,2 0,9

3,0

2,6

0,4

L

1,5

0,4

3,0

3,0

2,6

2,8

1

3,0

- 1.45

0,4

0,3

5,9

3,0

R

2,6

S

3,0

2,7

12,0

3,0

2,2 0,2

0,4

F

3,0

- 1.65

8,9

2,6

0,3

5

7,5

S

0,4

2,7

3,0

2,0

0,3

7,3

P

3,0

0,4

2,9 8,0

4,0

3,0

Q

3,0

+ 1.20

2,6

2,6

0,4 1,0

3,0

0,3

4,4

4,8

- 1.85

0,4

N

0,4

1,3

3,0

2,7

26,7

4,8

Q

O 3,0

E 2,6

+ 1.20

0,4

N

3,0

M

2,8

+ 0.75

2,6

+ 0.25

L

0,4

K

3,0

D

3,0

+- 0.0

2,6

RECEPCIÓN CENTRO CULTURAL DE LA MITOLOGÍA CHILOTA

0,4

+ 0.75

3,0

J

3,0

+ 1.20

2,6

+ 1.20

0,4

+ 0.75

I

3,0

D

H

3,0

+ 1.20

B

C 3,0

+- 0.0

3,1

2,6

SECADO DE LANAS

2,6

P

G

0,4

VENTA

F

3,0

+ 0.75

E

7,5

TELARES

D

0,4

0,4

C

3,0

3,0

2,7

8,0

C

3,0

G

2,6

0,4

B

0,4

+ 2.40

EXPOSICIÓN MITO DE ORIGÉN DE LA ISLA TEN-TEN Y COI-COI VILÚ

+ 2.00

A

3,0

2,6

3,0

2,6

0,3

I

6,0

0,4

3,0

4,0

4,0

ACCESO MUSEO DE LA MITOLOGÍA CHILOTA

0,4

3,0 3,2 2,7

0,3

H

3,0

2,6

0,2

3,0

B

0,4

3,0

2,8

+ 1.9

3,7

7,3

2,6

5,9 0,2

MUNDO DE LA TIERRA

4

6,0

3,0

2,8

E

0,4

6,0

M

3,6

0,4

K

4,0

2,6

0,2

+ 1.9

3,6

0,4

J

3

3,0

3,0

2,8

+ 2.40

0,4

3,1

2,6

0,2

+ 1.7

2,5

0,4

3,0

2,8

1,3

D

2

3,0

0,2

0,3

A 5,6

2,9

2,6

3,0

2,8

3,0

7,8

0,4

0,2

2,7 8,0

2,4

3,0

2,6

3,0

2,8

0,4

1``

0,4

0,2

F

0,4

3,0

E

2,6

3,0

F

1,5

3,0

R

0,4

9,0

2,6

3,0 26,8 2,8

3,0

2,6

7,9

0,4

O

1,4 0,5

3,0

2,6

0,2

L

1,6

0,4

3,0

2,8

C

0,2

4,8

2,6

T

B

I

1,1

4,8

Mundo del Mar 0,4

1

6,0

- 1.45

H

0,2

6,3

T R

3,0

3,0

0,4

S

3,2

2,0 2,0

5

2,6

F

0,2

2,6

2,9

0,3

0,4

S

0,4

0,3

4,2

3,0

- 1.85

3,0

2,6

3,0

2,7

10,0

4,0

2,9

P

Q

2,7

P

Q

3,0

N

5,8

0,3

2,8

20,9

0,4

- 1.65

O 2,8

E

0,2

E

3,0

N

3,0

M

11,7

M

L

3,0

D D

3,0

K

3,0

+- 0.0

3,0

K

0,4

J

3,3

J

2,6

I

6,0

H

C

0,4

B

C

0,4

B

I 3,0

H

2,7

2,6

G

0,4

G

3,0

2,6

F

6,0

F

0,4

E

3,0

D

2,6

RECEPCIÓN CENTRO CULTURAL DE LA MITOLOGÍA CHILOTA

2,6

MUNDO DE LA TIERRA

0,4

3,0

4,0

C

72,1

0,3

C

3,0

2,6

3,0

B

EXPOSICIÓN MITO DE ORIGÉN DE LA ISLA TEN-TEN Y COI-COI VILÚ

1,3

0,3

A

0,4

0,3

3,0

I

3,0

2,6

3,0

2,7

8,0

0,3

ACCESO MUSEO DE LA MITOLOGÍA CHILOTA

0,4

0,4

3,0

H

15,0

2,6

3,0

2,6

0,4

B

6,0

0,4

3,0

3,7

0,4

3,0 3,2 2,6

0,4

4

2,6

0,4

3,0

26,9

D

0,4

0,4

3,0

2,6

0,4

4,0

3,0

2,6

5,9 0,4

3,0

4,2

0,4

3,0

2,6

0,4

3,6

3,0

0,4

3,0

2,8

3

0,4

2,6

3,0

2,6

2,7

0,3

8,0

3,0

2,7

0,4

0,4

5,9 0,4

2,7

0,3

2,5

3,0

-1.1

2

3,0

3,0

2,6

3,0

2,7

5,7

9,0

2,6

0,4

72,1 3,0

2,6

0,4

E

5,6

0,4

0,4

2,6

0,4

2,4

3,0

2,6

3,0

2,6

3,0

2,6

1``

0,4

0,4

2,6

0,4

A 0,4

3,0

2,6

15,0

3,0

0,4

3,0

2,6

2,6

3,0

2,6

13,0

2,6

3,0

2,6

0,4

2,6

0,4

0,4

0,4

2,6

3,0

0,4

3,0

2,6

3,0

2,6

3,0

2,6

7,9

3,0

2,6

F

8,0

6,0

R

2,1

0,4

6,0

O

0,2

3,8

U L

1,1

3,0

T

2,6

T 0,4

0,4

1

0,4

S

3,0

3,0

2,6

0,2

3,0

S

2,7

R 0,4

2,6

0,4

0,3

4,1

F

0,4

3,0

3,0

2,6

4,0

0,4

MONTACARGA

3,0

P

2,6

Q

0,4

P

3,0

N

3,0

Q O

2,6

E

0,4

O

3,0

LOCAL 2

3,0

LOCAL 3

2,6

N

0,4

M

3,0

COCINERÍAS -3.25

L

2,6

D

6,0

D

0,4

K

3,0

COCINERÍAS -3.25

2,6

K

0,4

J

3,0

Bodega e Instalaciones

3,0

2,6

Baño Hombres

0,4

I

3,0

2,6

H

C

0,4

B

C

3,0

Baño Mujeres

2,6

B

I

72,3

H

0,4

0,4

G

3,0

3,1

3,0

2,6

G

21,3

0,4

F

2,7

LOCAL 1

2,6

3,0 3,0 2,6

F

0,4

0,4

E

3,0

2,6

3,0

2,6

D

E

0,4

0,4

D

3,0

3,0

2,6

J

2,6

72,3

0,4

C

3,0

3,0

2,6

C

0,4

LLEGADA Y VENTA PRODUCTOS DEL MAR -3,65

2,6

0,4

B

0,4

3,0 20,9 2,6

I

3,0

0,4

M

5

4,1

PLATAFORMA FLOTANTE desde -4.1 a -5.85

2,6

3,0

2,6

H

0,4

0,4

A

B

3,0

2,6

3,0

2,6

A

0,4

0,4

4

3,0

2,6

3,0

2,6

3 3,7

0,4

0,4

LLEGADA Y VENTA PRODUCTOS DEL MAR -3.65

0,4

3,0

3,0

3,0

2,6

2 3,6

24,2

0,4

6,6

0,4

3,1

3,0

2,6

1`` 0,4

0,4

2,6

0,4

22,7

escala

0,4

5,6

1:100

4,2

2,4

3,0

2,6

3,0

2,6

F

0,4

0,4

0,4

R

3,0

3,0

3,0

2,6

7,9

2,2

0,4

13,0

L

0,6

3,8

3,0

3,0

4,6

3,8

6,9

6,9

3,0

35

27,1 4,0 4,4

5 0,5

I

27,1 4,0

4,0

0,4

5

NIVEL 2

Alejandra rojas w.

Jorge Harris

PROYECTO DE TITULO :

logo

Plantas de Arquitectura

2008-09


36 +16.8

+16.8

Nivel 5

+13.8

Nivel 4

+10.8

Nivel 3

+7.8

Nivel 2

Nivel 5

+13.8

Nivel 4

+10.8

Nivel 3

+7.8

Nivel 2

+-0.0

Nivel 1

-0.8

Nivel -1

-3,6

Nivel -2

Corte FF MUSEO DE LA MITOLOGÍA CHILOTA

Bodega

Corte BB

+-0.0

Nivel 1

-0.8

Nivel -1

-3,6

Nivel -2

Corte CC

+16.8

Nivel 5

+16.8

+13.8

Nivel 4

+13.8

Nivel 4

+10.8

Nivel 3

+10.8

Nivel 3

+7.8

Nivel 2

+7.8

Nivel 2

+-0.0

Nivel 1

+-0.0

Nivel 1

-0.8

Nivel -1

-0.8

Nivel -1

-3,6

Nivel -2

-3,6

Nivel -2

+16.8

Nivel 5

+13.8

Nivel 4

+10.8

Nivel 3

+7.8

Nivel 2

+-0.0

Nivel 1

-0.8

Nivel -1

-3,6

Nivel -2

Corte KK

Nivel 5

+16.8

Nivel 5

+13.8

Nivel 4

+10.8

Nivel 3

+7.8

Nivel 2

MUSEO DE LA MITOLOGÍA CHILOTA

?

corte EE

Corte DD

+-0.0

Nivel 1

-0.8

Nivel -1

-3,6

Nivel -2

Corte II

Profesor guía: Alumna:

Museo DE La Mitologia Chilota PROYECTO DE TITULO :

Cortes transversales

2008-09

barrio gamboa - castro - chiloe

Jorge Harris

Profesor guía:

08.07.2009

Alejandra rojas w.

escala

1:25

escala

08.07.2009

1:100

barrio gamboa - castro - chiloe

Alumna:

Jorge Harris

Alejandra rojas w.

Museo DE La Mitologia Chilota PROYECTO DE TITULO :

Corte Trasnversarl ff y cortes longitudinales

MUSEUM OF MYTHOLOGY OF CHILOE


37

Policarbonato con alma de aire e=12mm

Policarbonato con alma de aire e=12mm

Perfil tubular de Acero d=30mm e=2mm

Perfil tubular de Acero d=30mm e=2mm

Arriostrador de Membrana

Arriostrador de Membrana

Tensor de Acero

Tensor de Acero

Araña Mono union con sello de Neopreno

Araña Mono union con sello de Neopreno

Pletina de Aluminio bota aguas e=1mm

Pletina de Aluminio bota aguas e=1mm

Viga de Coigue 14" x 4"

Viga de Coigue 14" x 4"

Vidrio Templado e=10mm color=5%azul

Vidrio Templado e=10mm color=5%azul

Marco de Aluminio

Marco de Aluminio

Membrana

Membrana

Perno Conector Acero Inoxidable d 012mm

Perno Conector Acero Inoxidable d 012mm

Terciado Marino 15mm Pletina Metalica e=10mm Lana mineral 100mm

Emballetado de cobre e=1mm

Emballetado de cobre e=1mm

Emballetado de cobre e=1mm

Papel Fieltro

Viga de Coigue 14" x 6"

Viga de Coigue 8" x 2"

Pletina Ailadora de Calor

Terciado Estructural 15mm

Terciado Estructural 15mm Viga de Coigue 8" x 2"

Vidrio Laminado e=20mm color=5% azul

Costanera de Pino Impregnado 2" x 2"

Marco de aluminio e=2mm Forro Acero Galvanizado

Costanera de Pino Impregnado 2" x 2"

Poliestileno de A.D. 150mm

Vidrio Templado e=10mm color=5%azul Perno Conector Acero Inoxidable d=12mm

Poliestileno de A.D. 150mm

Poliestileno de A.D. 150mm Terciado Estructural 15mm

placa de cobre e= 2mm

Papel Fieltro

Marco de Aluminio

Terciado Estructural 15mm

Forro Metalico Fogon de Cobre e=3m

Emballetado de cobre e=1mm

Terciado estructural 15mm Viga de Coigue 6" x 2"

Terciado Estructural 15mm

Papel Fieltro

Viga 4" x 2"

Costanera de Pino Impregnado 2" x 2"

Papel Fieltro

Emballetado de cobre e=1mm

Terciado Estructural 15mm

Emballetado de cobre e=1mm

Papel Fieltro

Pino Inpregnado 4" x 2"

Terciado Estructural 15mm

Viga de Coigue 8" x 2"

Tablon de Mañio 8" x 11/2"

Costanera de Pino Impregnado 2" x 2"

Vidrio Templado e=10mm color 5% azul Marco de aluminio e=1mm Lana Mineral 150mm

Papel Fieltro

Terciado marino 15mm Impermeabilizado Pino Inpregnado 4" x 2" Terciado marino 15mm Barnizado Platina de Acero e=5mm Perforada Vidrio Laminado e=20mm color=5% azul

Tabla de Cipres 6" x 1"

Terciado Estructural 18mm Hormigon Liviano

Petina de Acero Galvanizado e=4mm con perforaciones

Lamina de acero e=5mm

Tabla de Cipres 6" x 1"

Pino Impregnado 2" x 2"

Ladrillo Reflectario

Viga de Coigue 14" x 4"

Placa de Terciado Marino

Viga de Coigue 16"x 6"

Mortero de Pega Tabla de Cipres 6" x 1" Lana Mineral 100mm Terciado Marino 15mm

Pieza de Cipres de las Guaitecas d=25cm Viga de Coigue 14"x 6" Tabla Cipres 8" x 1"

Viga de Coigue 8" x 2"

Perfil Tubular Acero Galvanizado d=70mm e=3mm

Tabla de Cipres 6" x 1"

Perfil lleno Acero Galvanizado 70 x 10mm

Viga de Coigue 12" x 4"

Pieza de Cipres de las Guaitecas d=40cm Perfil Tubular Acero Galvanizado d=40mm e=3mm

Perno Inoxidable 20" Doble hilo

Vidrio Laminado 3 capas e=25mm color=5% verde

Plenita de Union Soldada con pernos de fijacion Perno Acero Inoxidable de Union 4" d=mm

Pletina Acero Galvanizado e= 10mm

Union Tipo "Telescopica"

Viga de Coigue 14"x 6"

Union Hembra

Viga de Coigue 16"x 6"

Union Macho

Perfil de Aluminio 40 x 80 x 2mm

Perfil Tubular Acero Galvanizado 60 x 40 x 5mm

Platina de Acero Galvanizado 300 x 400 x 10mm

Perlfil Tubular de Acero Galbanizado 100 x 50 x 8mm

Pieza de Coigue 4" x 4" Goma de Apoyo para vidrio laminado

Vidrio Templado e=25mm color=3% azul Sello de Solicona

Plenita de Refuerzo e=5mm

Perno Inoxidable 20" Doble hilo Plenita de Union Soldada con pernos de fijacion

Perno Acero Inoxidable de Union 10" d=10mm

Perno Acero Inoxidable de Union 4" d=mm

Diagonal Acero 30 x 30 x 3mm soldado

Union Tipo "Telescopica"

Refuerzo Acero 30 x 30 x 3mm soldado

Union Hembra

Riel Dentado de Acero

Union Macho

Motor Electrico 500W

Perfil Tubular Acero Galvanizado 60 x 40 x 5mm

Perfil Tubular Acero Galvanizado 60 x 40 x 5mm

Perfil Acero 50 x 50 x e 7mm

Perlfil Tubular de Acero Galbanizado 100 x 50 x 8mm

Baranda de seguridad

Perno Inoxidable 24" Doble hilo Puerta Plegable de aluminio

Tabla de Cipres 6" x 1"

Plenita de Refuerzo e=5mm

Perfil Tubular Acero Galvanizado 60 x 40 x 5mm

Montacarga Electrico 350Kg. Pletina de Acero e=10mm de Compresion Perno Inoxidable 20" Doble hilo

Perfil Acero Tubular 50 x 50 x 5mm

Pletina de Acero e=10mm 35º de Union Union Tipo "Telescopica"

Pletina de Acero e=10mm de Compresion

Perfil C Acero 100 x 75 x 5mm

Union Tipo "Telescopica"

Tabla de Cipres 6" x 1"

Pletina de Acero e=10mm de Union

Perno Acero Inoxidable 5" d=10mm

Rampa Movil Acero e=7mm

Perfil Acero Tubular 50 x 50 x 5mm

Rueda de Caucho d=10mm

Rueda Guia de Caucho Tambor de 200 Lts. con tapa soldada Viga de Pino Inpregnado 6" x 2" Tope de Goma

Pieza de Cipres de las Guaitecas d=40cm Nivel de baja marea.

Pletina Circular de Acero e=20mm

Nivel de baja marea.

Perno Inoxidable 20" Doble hilo Golilla Inoxidable d=50mm Refuerzo de Acero e=20mm Base de Acero d=800mm e=20mm Pilote de Hormigon Armado H-30 d=80cm

Pieza de Cipres de las Guaitecas d=25cm Perno Inoxidable 15" Doble hilo Refuerzo de Acero e=10mm Base de Acero d=550mm e=20mm Pilote de Hormigon Armado H-30 d=55cm

barrio gamboa - castro - chiloe

1:25

escala

08.07.2009

Profesor guía: Alumna:

Jorge Harris

Alejandra Rojas Wilckens

Museo De La Mitologia Chilota

Corte Constructivo

MUSEUM OF MYTHOLOGY OF CHILOE

2008-09


38

Renders and 3D Modelling made by Marcos Vilugnir, Concepcion, Chile.

2008-09

MUSEUM OF MYTHOLOGY OF CHILOE


39

MUSEUM OF MYTHOLOGY OF CHILOE

2008-09


40

2008-09

MUSEUM OF MYTHOLOGY OF CHILOE


41

Restoration of Santa Lucia Hill’s North Entrance In my 5th Year of Architectural Degree, in the Pontificial Catholic University of Chile, took the subject Restoration and Rehabilitation of the Architectural and Cultural Heritage. So this was the last workshop, which consisted in create the Whole Cadastre, Diagnosis and Design of Solutions for the North Entrance of the Emblematic Saint Lucia’s Hill. The workshop was integrated by Architecture and Engineers in Construction Students.

Restauración y Rehabilitación de Patrimonio Arquitectónic

3 1 4

Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural

El acceso norte del Santa Lucía está constituido, a grandes rasgos, por 1. El muro oriental y su correspondiente balaustrada y encuentro con m 2. El muro occidental, que incorpora una intervención reciente en el s en su costado occidental, consistentes en el reemplazo de la albañ la construcción de contrafuertes en el segundo. 3. El sector de la escalera de acceso al Castillo Hidalgo. 4. El descanso o balcón, su jardinera y la escalera que llega a él.

Caso de A

RESTORATION OF SANTA LUCIA HILL’S NORTH ENTRANCE

2007

El

Caso de Análisis: Cerro Santa L


presencia sísmica. Lo anterior se ve acrecentado a la interacción con el medio ambiente, en que la contaminación, la lluvia y el viento han erosionado severamente este Está2 presente en todos los sectores sector. 1 2 enumerados inicialmente.

contemple la incorporación de Por su lado, la vegetación observada adiciones acrílicas de forma de Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural se origina por la infiltración de agua, impermeabilizar las uniones entre 42 con lo que se tiene una condición de piedras. Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural humedad permanente que facilita la Imagen 1 Ninguno de los problemas descritos aparición de este tipo de patología. altera la estabilidad ni la funcionalidad 3

de la estructura.

1

La forma de proceder ante este fenómeno debiera consistir en desbastar las uniones con un esmeril o similar, luego se retira la vegetación, posteriormente se reemplaza el mortero existente por uno que contemple la incorporación de adiciones acrílicas de forma de a la mampostería de piedra que Respecto impermeabilizar las uniones entre constituye este acceso, ésta se ve afectada piedras.

Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural 4

4

Vegetación entre piedras

Restauración y Rehabilitación Restauración y Rehabilitación de Patrimonio Arquitectónico y Culturalde Patrimonio Arquitectónico y Cultural Partes de Acceso Norte

Imagen 1

Por su lado, la vegetación observada se origina por la infiltración de agua, Del resto de los lugares, el sector 1 es aquel en Para reparar este sector se puede reconstruir El acceso norte del Santa Lucía está constituido, a grandes rasgos, por 4 partes: que se han realizado menos reparaciones. completamente o, de ser necesario,con puede lo que se tiene una condición de 1. El muro oriental y su correspondiente balaustrada y encuentro con muro de albañilería. incluso reconstituirse ladrillo por ladrillo con humedad permanente que facilita la Dentro de las patologías encontradas, 2. El muro occidental, que incorpora puntualmente una intervención reciente sector la balaustrada y mezcla de un mortero de cemento se puede comentaren queelen el unade aparición de este tipo de patología.

en los sectores 1 y 4. Sus principales problemas

Caso de Análisis: Cerro Santa Lucía

blanco polvocaso de ladrillo, en su costado occidental, consistentes en elentre reemplazo de la albañilería en elcon primer y ende forma de ir encuentro muros de mampostería se presentan por las fisuras en las uniones materializado en albañilería se observa un dando la forma deseada a cada pieza. Está presente en todos los sectores la construcción de contrafuertes en el segundo. piedras y la vegetación producida por gran desgaste del material. Tal nivel de El daño observado no compromete 2 su enumerados inicialmente. y Rehabilitación de 1Patrimonio entre 3. El sector de la escalera de accesodeterioro al Castillo Hidalgo. Restauración Arquitectónico y Cultural puede deberse a la resultante del funcionalidad ni su estabilidad estructural, no 4 las infiltraciones de agua existentes. 4. El descanso o balcón, su jardinera empuje y la escalera llegaaair en él.dirección obstante, puede enriquecerse su valor de suelo que que tiende de este encuentro, fuerzas que aumentan con arquitectónico al reparar este encuentro, presencia sísmica. Lo anterior se ve además de evitar que siga deteriorándose. acrecentado a la interacción con el medio ambiente, en que la contaminación, la lluvia y el viento han erosionado severamente este sector.

El en caso del sector 1, las fisuras pueden Imagen 1 Restauración y Rehabilitación de Caso Patrimonio Arquitectónico y Cultural constituye este acceso, ésta se ve afectada de Análisis: Cerro Santa Lucía

Caso de Análisis: Cerro Santa Lucía

Respecto a la mampostería de piedra que

1

Imagen 1

haber1sido por la actividad en los sectores y 4. Susprovocadas principales problemas se presentan por las en las uniones sísmica a fisuras la que ha sido sometida la entre piedras y la vegetación producida por estructura. Incluso la atención Los elementos quellama presentan musgosla y las infiltraciones de agua existentes.

incorporación de pueden tensores en el muro quede hongos originados por la humedad, falta El en caso del sector 1, las fisuras haber hacen sido provocadas por la que actividad suponer en algún momento los ventilación y calor solar, pueden ser sometidos 1 sísmica a la que ha sido sometida la muros se abrieronde y se utilizó este sistema para a una aplicación estructura. Incluso llama la atención lacloro (hipoclorito de Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural Fisuras en las uniones incorporación de tensores en elen murosu que volver aal situarlas lugar. Otrolimpiar factory sodio), día siguiente se puede Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural Encuentro de muros oriente hacen suponer que en algún momento los importante es el empuje del suelo presente sellar posteriormente con un hidrofugante deen muros se abrieron y se utilizó este sistema para Caso de Análisis: Cerro SantaImagen Lucía| Imagena2la mampostería de piedra que Respecto 1principales Los Losprincipales problemas problemas y ypatologías patologías Caso de Análisis: Cerro Santa Lucía volver asilicona situarlas enque su lugar. Otro factor toda estructura de contención. asegure su constituye este Los elementos que presentan musgos y impermeabilidad. Imagen 1 acceso, ésta se ve afectada importante es el empuje suelo presente en los sectores y 4. Sus principales problemas encontrados encontrados en en este este acceso acceso consisten en 1en hongos originados por ladel humedad, falta deen Los principales problemas ypatologías patologías Los principales problemas yconsisten toda estructura de contención. se presentan por las fisuras en las uniones ventilación calor solar, pueden ser sometidos Estey tipo de fenómeno no altera la estabilidad fisuras, fisuras,grietas, grietas, desgaste desgaste de consisten demateriales, materiales, encontrados este acceso consisten en encontrados en en este acceso en entre piedras y la vegetación producida por a una aplicación de cloro (hipoclorito de estructural del elemento, pero sí su vegetación, vegetación, hongos hongos y musgos. y musgos. las infiltraciones de agua existentes. sodio), al día siguiente se puede limpiar y fisuras,grietas, grietas,desgaste desgastede demateriales, materiales, fisuras, sellar posteriormente conyun hidrofugante de por lo que debe durabilidad servicialidad, El en caso del sector 1, las fisuras pueden vegetación, hongos y musgos. vegetación, hongos y musgos. Todos Todoslos lossectores sectoresestán estánrelativamente relativamente haber sido provocadas por la actividad Referencia de la Imagen silicona1que asegure su impermeabilidad. Fisuras en las uniones

Restauración Restauración y Rehabilitación y Rehabilitación dede Patrimonio Patrimonio Arquitectónico Arquitectónico y Cultural y Cultural Imagen 2 Restauración y Rehabilitación Patrimonio Arquitectónico y Cultural Restauración y Rehabilitación dede Patrimonio Arquitectónico y Cultural Encuentro de muros oriente

Encuentro de muros oriente

tratada. 1 Caso de Análisis:ser Cerro Santa Lucía| 4 balaustradas Lo encontramos en las del sector

sísmica la que ha sido sometida la afectados, afectados, asectores excepción asectores excepción del del sector sector 2. aÉste 2. Éste Todos están relativamente Todos los los están relativamente estructura. Incluso llama la atención la corresponde corresponde a a una una intervención intervención posterior posterior Fisuras en las uniones afectados, aRehabilitación excepción sector 2. Tensores sobre afectados, a yexcepción del sector 2.Arquitectónico ÉsteÉste de tensores el muro quemuros Restauración dedel Patrimonio y en Cultural Imagen 2incorporación hacenposterior suponer que en algún momento losla Imagen hecha hecha en en albañilería albañilería con con unauna disposición disposición de de Referencia de corresponde intervención corresponde a a unauna intervención posterior Tensores sobre para muros muros se abrieron y se utilizó este sistema Imagen 2 ladrillos ladrillos distinta distinta a la a original la original (aparentemente (aparentemente hecha albañilería disposición de hecha en albañilería concon unauna disposición de volver a situarlas supresentan lugar. Otromusgos factor y Los elementos que Imagen 1 en Imagen 2 en para para identificarla) identificarla) que que incorpora incorpora la la importante es el empuje suelo presente hongos originados pordel la humedad, faltaen de ladrillos distinta a original la original (aparentemente ladrillos distinta a la (aparentemente toda estructura de contención. ventilación construcción construcción de de contrafuertes contrafuertes para para evitar evitar ely calor el solar, pueden ser sometidos para identificarla) incorpora la para identificarla) queque incorpora la a una aplicación de cloro (hipoclorito de desprendimiento desprendimiento del del muro. muro. Sólo Sólo presenta presenta construcción contrafuertes para evitar el sodio), al día se puede limpiar y construcción de de contrafuertes para evitar el siguiente sellar posteriormente con un hidrofugante de problemas problemas estéticos, estéticos, como como la la fractura fractura de de desprendimiento muro. Sólo presenta desprendimiento deldel muro. Sólo presenta silicona 1 que asegure su impermeabilidad. algunas algunas piezas piezas en en la balaustra, la balaustra, reparaciones problemas estéticos, como la fractura problemas estéticos, como la reparaciones fractura de de 4 Estepiezas tipopiezas de fenómeno no altera la estabilidad posteriores posteriores como como la pintura la pintura de de algunas algunas algunas piezas la balaustra, reparaciones algunas piezas en en la balaustra, reparaciones estructural del elemento, pero sí su Tensores sobre muros de de mampostería mampostería y y el el crecimiento crecimiento de durabilidad yde servicialidad, por lo que debe posteriores como la pintura algunas piezas posteriores como la pintura de de algunas piezas Referencia de la Imagen Referencia de la Imagen ser tratada. vegetación vegetación sobre sobre contrafuertes. contrafuertes. de mampostería y el crecimiento deAnálisis: Cerro Santa Lucía de mampostería y el crecimiento Caso de de Lo encontramos en lasReferencia balaustradas del lasector Imagen vegetación sobre contrafuertes. 1 y 2 y en el interior del sector 3. Node vegetación sobre contrafuertes. Imagen 2 se

presenta en el sector 4 probablemente porque está sometido a soleamiento constante y menos humedad que los otros sectores.

Detalles Detalles muromuro occidental occidental

2007

Detalles occidental Detalles muromuro occidental

3

1

4

Referencia de la Imagen Caso Caso de de Análisis: Análisis: Cerro Cerro Santa Santa Lucía Lucía Caso de Análisis: Cerro Santa Lucía Caso de Análisis: Cerro Santa Lucía

4 no altera la estabilidad Este tipo de fenómeno estructural del elemento, pero sí su durabilidad y servicialidad, por lo que debe 1 y 2 y en el interior del sector ser tratada.

3. No se

presenta enbalaustradas elCerro sector 4 Lucía probablemente Caso deen Análisis: Santa Lo encontramos las del sector 1 y 2 yporque en el interior del sector 3. No se a soleamiento está sometido presenta en el sector 4 probablemente constante humedad que los otros porque está sometidoy a menos soleamiento constante y menos humedad que los otros sectores. sectores.

Caso de Análisis: Cerro Santa Lucía

1

14

3

2

3

4

2

Caso de Análisis: Cerro Santa Lucía

Caso de Análisis: Cerro Santa Lucía

2

RESTORATION OF SANTA LUCIA HILL’S NORTH ENTRANCE

Caso de Análisis: Cerro Santa Lucía


43

Restauración y Rehabilitación Rehabilitaciónde dePatrimonio Patrimonio Arquitectónico y Cultural Restauración y Arquitectónico y Cultural Restauración y Rehabilitación de Patrimonio Arquitectónico y Cultural

Elevación Grietas, parches de mortero y desprendimiento de trozos

Grietas, parches desprendimiento trozos Grietas, parchesde demortero mortero yy desprendimiento dede trozos

Grietas, manchas , desprendimiento y gastamiento de baldosas Grietas, manchas , desprendimiento y gastamiento de baldosas

Grietas, manchas , desprendimiento y gastamiento de baldosas

Caso de Análisis: Cerro Santa Lucía

Ladrillos erosionados y gastados por tránsito Ladrillos y gastados por tránsito Gastamiento de erosionados mortero donde han crecido malezas Gastamiento de mortero donde han crecido malezas

Ladrillos erosionados y gastados por tránsito

Gastamiento de mortero dondeLucía han crecido malezas Caso de Análisis: Cerro Santa Caso de Análisis: Cerro Santa Lucía

Caso de Análisis: Cerro Santa Lucía

RESTORATION OF SANTA LUCIA HILL’S NORTH ENTRANCE

2007


44

2007

RESTORATION OF SANTA LUCIA HILL’S NORTH ENTRANCE


45

Design of Cultural Center, Ex-Prison in Valparaiso In my 5th Year of Architectural Degree, in the Pontificial Catholic University of Chile, in the subject Architectural Workshop, the semester’s theme was how to recycle the building of the old Prison of Valparaiso. The ex-prison of Valparaiso, for being built over the only flat area in the center of the hills, when the city started to grow, the prison became center in the neighborhoods. In time, because of structural damages (Earthquake of 60 and 80 and ocean atmosphere) the prison needed to be moved to the top of the hills. This old building was abandoned and the local artists started to use it in a spontaneously way, transforming this old building in a Cultural Center. Therefore the Council created an Architecture Concourse for the the design of this new space of the city. This was a really good urban and Infrastructure Design Exercise, with Community participation.

DESIGN OF CULTURAL CENTER,EX-PRISON IN VALPARAISO

2007


46

2007

DESIGN OF CULTURAL CENTER,EX-PRISON IN VALPARAISO


47

DESIGN OF CULTURAL CENTER,EX-PRISON IN VALPARAISO

2007


48 propuesta personal

MU LTIS A

LA

N B'

B tro

circotea

es

ión

bib

wc+ camarin

inistrac

adm

liote

danza

ca

co sala mp de uta ción

- 3.96

plaza circoteatro es

wc+ camarin

ca

sin

o

teatro

breakdance marioneteros

rio escena

B

café

balinas

trasbam

PLAZOLETA EL DESCANSO

enirs

INFO

souv

MUSEO

talleres

AÍSO Y

VALPAR

EL

EX-CÁRC

NAL

RNACIO

N INTE

ad

comunid

EXPOSICIÓ

AL

N LOC

EXPOSICIÓ escultura

ría

carpinte

PATIO

NAL

RNACIO

N INTE

EXPOSICIÓ

- 7.62

A'

A

MU LTI

SA

LA

- 1.44

AUDITO

RIO

BIBL

IOT ECA

SALA CLAROSCURO

- 1.44

GRABADO

venta

GRABA

CIÓN

sala cine

arte

local

bodega

estación graffiti

RADIO

PINTURA

materiales sala de graffiti

2

bodega

talleres y venta arte local

bodega

boletería or

O ÍA

RECI CLAJ

E PAPE

L

ES

+minicomed

sala 2 cine

KÓD

LIABL

ROC

AMP

ORFE BRER

CERÁ MICA

RES

ROM

TALLE

de taller títeres

B

bodega

de taller marionetas

y cafetería comida

venta

taller

arte

venta

de

marionetas

taller

arte

1

centroturística taller

información

bodega

B'

a

bodeg

baño

planta primer nivel 1 : 500

local

talleres y venta arte local caja recepción

a públic plazaespontáneo sala cine

cocina

hombres

PLAZOLETA EL DESCANSO PLAZOLETA EL DESCANSO

bodega

baño

mujeres

baños

rante

restau

A'

PLAZA CIRCOTEATRO CIRCOTEATRO CASINO

SALA CLAROSCURO

A-A' 1 : 500 • •• • •• •• • • •• ••• • • • ••• •• •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • corte • ROCKODROMO

MULTISALA

PLAZA DEL SILENCIO

TALLER DE CIRCOTEATRO

ADMINISTRACIÓN

BIBLIOTECA

TALLER DE CLAROSCURO

AUDITORIO

BIBLIOTECA

CINE

corte B-B' 1 : 500

2007

DESIGN OF CULTURAL CENTER,EX-PRISON IN VALPARAISO


49

DESIGN OF CULTURAL CENTER,EX-PRISON IN VALPARAISO

2007


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.