A. Plasencia Portfolio

Page 1

Alejandro Plasencia Tapia

Topics and projects REVIEW 2009/2011

TOPICS

alejandro.plasencia.tapia@gmail.com +34 606602872

Interfaces

Challenging the notion of

Artificiality

Working actively with

The well-being of

Aesthetics and Society The User

as the “reason to be” of architecture

Energetic and Economic Viability

DETROIT PROJECTS

TRANSFORMATION

ALTA GRACIA

flux

OFF-SHORE SURGICAL CLINIC

Polyurethane Moulds

PHOTO CREDITS: Phyllis Galembo [Baby Dance of Etikpe, Cross River, Nigeria, 2004], Francisco Javier Martínez [Parque Regional del Sureste 2008], Santiago Falcón [Ephesus Arthemis, 2009], Steven Meizel [Makeover Madness, 2005].



Alejandro Plasencia Tapia

Topics and projects REVIEW 2009/2011

TOPICS

alejandro.plasencia.tapia@gmail.com +34 606602872

Interfaces

Challenging the notion of

Artificiality

Working actively with

The well-being of

Aesthetics and Society The User

as the “reason to be” of architecture

Energetic and Economic Viability

DETROIT PROJECTS

TRANSFORMATION

ALTA GRACIA

flux

OFF-SHORE SURGICAL CLINIC

Polyurethane Moulds

PHOTO CREDITS: Phyllis Galembo [Baby Dance of Etikpe, Cross River, Nigeria, 2004], Francisco Javier Martínez [Parque Regional del Sureste 2008], Santiago Falcón [Ephesus Arthemis, 2009], Steven Meizel [Makeover Madness, 2005].


The expanded telephone SEPTEMBER 2008

Fully functional mechanism of a rotary dial phone. When the device receives a call the vibration of the ringer causes the mesh to vibrate.


flux

ALDEANUEVA DE LA VERA. MAY 2009. Fluvial Instalation. Food colorant (water), natural clay (rocks), galvanized steel cable and tulle neting.




Estructure

Fo

urt

lo hF

Flo

ird

or

Steel

Th

or

co Se

nd

Flo

st

Flo

or

Co ncre te

Fir

or

Ba

u Fo

sem

nd

ati

en

t

on

s


Construction Project The aim of the course was to design a building in full constructive detail. From the metal bars inside the reinforced concrete at the foundations up to the metal cladding in the faรงade.

MAIN AXONOMETRIC

An integrated system



ALTA GRACIA

___________________ OFF-SHORE SURGICAL CLINIC

55m

Vidrio soplado

3 Quirófanos

Corian ® [DuPont TM.]

Salas de Postoperatorio

Grúa montacargas

Salas de consulta

Plataforma de antiguo Helipuerto

31,3m

Tobogán de agua

Desalinizadora Big Blue [MyCelx]

Red eléctrica

Suministro de agua potable

0m

7,9m Baterías de entropía x8 Azipods CZ ®

x8 Azipods CZ ®

[ABB Tm]

[ABB Tm]

Válvulas de entrada a los reactores

Depósitos. 22,00 litros

28,7m


ALTA GRACIA

___________________ OFF-SHORE SURGICAL CLINIC

Prosthetics

STRUCTURE HIERARCHY Structure Slabs Electricity Vertical communication LEVEL 3: ENERGY CAPTURING DEVICES

LEVEL 2: MEDICAL SERVICES

LEVEL 1: ROOMS & LEISURE FOR POSTOPERATORY PACIENTS LEVEL 0: STRUCTURE & SERVICES CORE

WATER LEVEL: STRUCTURE & SERVICES CORE

THE CLINIC

OPERATING ROOMS STRUCTURE

ARDUINO PROTOT YPE HAMMOCK WITH SOLAR TRACKER

UV SHIELD

Microfan 12V

WATER LEVEL

FIBERGLASS MOUNTAIN RANGE COVERED WITH A NEOPRENE SKIN.

Silicon Joints Neoprene upholstery

LDR

THE BRIDGE Arduino Uno

Servo S30N 9V

FIBERGLASS MODEL

LIGHT, WATERPROOF, FOSFORESCENT 1. Foam Structure 2. Acrylic Paint 3. Epoxy resin 4. Fiberglass 5. Polyester resin with fosforescent pigments

SUSPENDED STRUCTURE CONNECTS THE MAIN DECK WITH THE WATER LEVEL.


LEVEL 1 路 MAIN DECK ROOMS AND LEISURE FACILITES POR PATIENTS

ORIGINAL DRAWING SIZE 2 x 0.5m HEJDUK AXONOMETRIC

SUR

z ESTE

-10潞C



Water Level ANIMATION VIDEO [03:08] High density leisure platform. The outdoor areas are sepparated by a mountain range made out of fiberglass and epoxy resin with a neoprene skin. This topography defines a set of spaces with diffrent levesls of temperature, sun radiation, humidity and privacy.

The Clinic ANIMATION VIDEO [06:40] Off-shore clinic designed to help patients overcome a deep body transformation. The rooms are organized depending on the intensity of the postoperatory care required for each person. The facilities are designed to promote leisure and outdoor activies in the recovery period.


Post-natural Tutors: Cristina Díaz Moreno and Efrén García Grinda [AMID.cero9], Unit Masters at the Architectural Association. 527.83 647.83

591.68

527.11 527.11

Tc

597.42

615.30 595.15

634.07

nta

622.11

526.80

Ju

Aran jue

641.12

525.76

525.55

z

Rf

583.89 587.81

526.49

526.80

Tc

613.45 603.42 607.36 614.48

525.35

la

639.95 604.48

a

527.00 634.69

526.80

Rf

613.76

Tc

601.34

526.49

621.94

650.92 648.65

O

RI

Tc

648.08 649.27

S 525.46

525.45

de

640.92

AN M

RE

NA

ZA

527.31 617.06

526.49

652.26

526.28

de

525.35

526.90

Tc

JAR AM A

616.71

Rf

RIO

624.10 611.91

615.85 605.73

531.13

Cam ino

610.48

616.54

Ma drid

611.49

526.38

629.48

Tc 525.87

Re al

525.97

Tc

525.35

644.12 648.86

525.97

526.28

526.18

616.55

527.00

530.92

527.00

525.87 637.51

537.01

622.66 583.21 596.37

635.35 643.19

Cuesta del Ascensor

617.27

647.83

ino

532.37

m Ca

530.82

529.69

549.54 554.13

616.03

546.32

524.07

529.73 525.56

532.26

526.38

526.38

525.10

649.89

536.18

640.30

525.82 524.65

573.37

530.87

524.08

537.99

629.12

526.08

525.16 524.07 524.54

537.47

639.53 618.66 622.68

ESCOMBRERAS

525.27

526.69

524.75

Rf

524.90

620.99

Site

524.08

592.96 603.30

618.96

524.60

524.44

618.76

613.04

523.15

524.03

524.17

JARAMA

Barr anco

525.11

524.34

King’s Dam

524.29

524.29

Casa de Guardas

522.69

587.99 594.22

Rf

621.85

611.49

de

523.41 526.23 526.54

0

la

520.30

614.43 525.92

521.75

Riverbanks are populated by a kind of animal The Regional Southeast Park is a vast area of 31,522 hectares around Jarama and Manzanares whoch is also half natural - half artifical. rivers occupied by a peculiar mix of abandoned When a tree falls into the current it starts industrial complexes, shaft lagoons, europe’s largest capturing matter that flows in the current. Broken dump, gigantic quarries and residential areas. branches, leaves, bottles, papers, plastic bags, This site defines a new kind of landscape, in garments, ropes and all types of waste slowly form a the midpoint between a post-industrial site and gigantic jumble. degraded nature. I would say it is post-natural. Birds fly here, but they nest around factory chimneys, they are lit up by night and it makes it easier for them to capture flying insects. Fish live on the riverbanks, but they swim in polluted water with industrial debree.

50m

100m



Post-natural

PRSE VISITOR CENTER

Structure, Transpirability, Permeability and Interaction

Color Key for textile enclousures POLYETHELENE MEMBRANE ETFE MEMBRANE METAL MESH (HOLES >1MM)

HESSIAN

Interaction Transpirability

WOVEN WOOL (HOLES > 20MM)

Estructure Permeability LAMINAR LINEAL NET

PERMEABLE IMPERMEABLE


vat Ele st We

on

ion

ati

lev

E ast

E

lan

P or Flo

Performative Architecture

Falco Naumani

Nests Filters

The Unit Lenght of the cable: 9.24m Diameter: 24mm We i g h t : 1 8 . 3 8 k g Skeleton: Oak wood

d=15ะด(m)

ะด Lenght of the cable: 9.24m Diameter: 24mm We i g h t : 1 8 . 3 8 k g Skeleton: Oak wood

_______

31,8 mm

________

________

From a linear material to a three-dimensional structure

______

28,8mm

Lenght of the cable: 6.3m Diameter: 24mm We i g h t : 1 2 . 5 k g Skeleton: Oak wood


ou ON S rce YS Co. TEM

G

LL UR

ES

TH UR CA MA

US

DE

BE

TE

EN

DB

PU

ELE

FU

EI SL E SPA Ins W stu tal NIN rge led G on by BED s b DT S ree E t d. o le

t

DE

AS

G BIO

BR IS

DE M PR OLIT OC ION ES S

Bo P ok To R U HY ESIDBLIC wer BR EN AN ID. TI D AL SPA CE

P T AR

DE RANSKPING NS OR TOW IFI T HU ERS CA BS AT TIO MA N IN

AN BI BIO AE OC DIE RO O S BIC N EL BIO ST PLA DIG RU NT ETO CT RS

R

PIV O

HIP KD TING ÓD o IR RO AG RIG MO r A es TI

T B RA N R A NS WO ORT NCH POR OD HER CO T WA N NN RD SUB ECT AV UR ING E BS AL ON

DETROIT

LE

OP

PE

18

ns sta tio

2,0

00

MW

po we r

D pu ATA F bli RO she M d i “T n C HE hro GR nic AN le b D V y M ALL ark EY =1 80 Do STA big nn TE elly UN nu cle . IVE ar

I A NINTR EW ODU EC CTIO OS N YS OF TE M

RS

ITY

R

VE MO

Matter and Energy Flux

ELECTRICITY MATTER STEAM (DTE)

Transformation Process

New Ecosystem

#2

BALD EAGLE

#1 Unused buildings and ruins are finally demolished.

#3 New parking lots and biodigestor plants are built on the empty lots surrrounding de CBD.

<HALIAEETUS LEUCOCEPHALUS>

INDIANA BAT

<MYOTIS SODALIS>

Debris is withdrawn and deposited in Belle Isle to form new spawning beds for sturgeons.

#4 Maize fields are planted, they work as gigantic ad displays and leisure venues, the crops feed the newly built biodigestors.

MOSQUITO <CULICIDAE>

AMERICAN LOTUS <NÉLUMBO LUTEA>

#5 Empty unusable lots are flooded to create a new ecosystem.

ESTURIÓN <ACIPENSER FULVESCENS>

The new ecosystem integrates various endagered spacies from the region in an artificial wetland.


Energetic and Economical Transformation

[DATA FROM THE SWEDISH GAS CENTER] Source: Åke Nordberg, Biogas from crops, JTI. Presentation at ”10th year Anniversary for Biogas in Trollhättan” May 31st 2006. Methane production from cereals is re-calculated assuming 400 l/kg VS, DW-86 %, VS-97%.

People Mover The New Hub

Maize Fields

1

ha

Bog WATER CONSUPTION

95

L/24h/pers

x

x tons/year 43 x 450 m methane/ton 3

9,67

KWh/m3

=200 KWh

Waste Production

CASE STUDY: COMPUWARE HEADQUARTERS

2000 workers

Outdoor Piping

1,95 = 7800 x Debris Kg Debris/day Kg [U.S. ENVIRONMENTAL PROTECTION AGENCY]

x 44,6% = 3479

380

m3

Kg ORGANIC

x 0,2 = 800 Kg EX.

Kg EX./day

Kg ORGANIC/day

= 433

COOLING

ton/m3 Methane

= 225

GAS

ton/m3 Methane

4279

Organic Matter (Kg)

DTE



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.