Construction Document

Page 1

VIRGINIA COMMONWEALTH UNIVERSITY NEW DENTAL CLINIC WISE COUNTY, VIRGINIA

PRELIMINARY DESIGN SUBMITTAL GENERAL NOTES 1. ALL CONSTRUCTION SHALL CONFORM TO THE LATEST "STANDARDS AND SPECIFICATIONS FOR DESIGN AND CONSTRUCTION OF PUBLIC IMPROVEMENTS." CONTRACTOR SHALL HAVE A SET ON SITE AT ALL TIMES. 2. THE OWNER SHALL SCHEDULE A PRE-CONSTRUCTION MEETING WITH ENGINEERING STAFF AT LEAST 48 HOURS PRIOR TO THE START OF CONSTRUCTION. THOSE IN ATTENDANCE SHALL INCLUDE THE OWNER, HIS ENGINEER, REPRESENTATIVES OF THE CONTRACTORS AND OTHER AFFECTED AGENCIES. PLANS SIGNED AND ACCEPTED WILL BE DISTRIBUTED AT THE PRE-CONSTRUCTION MEETING. CONTRACTOR SHALL HAVE (1) COPY OF THE SIGNED PLANS ON SITE AT ALL TIMES. 3. THROUGH ACCEPTANCE OF THIS DOCUMENT NO RESPONSIBILITY FOR THE COMPLETENESS AND/OR ACCURACY OF THIS DOCUMENT IS ASSUMED. THE OWNER AND DESIGN ENGINEER UNDERSTAND THAT THE RESPONSIBILITY FOR THE ENGINEERING ADEQUACY OF THE FACILITIES DEPICTED IN THIS DOCUMENT LIES SOLELY WITH THE REGISTERED PROFESSIONAL ENGINEER WHOSE STAMP AND SIGNATURE ARE AFFIXED TO THIS DOCUMENT. REPORT ALL DISCREPANCIES TO THE DESIGN ENGINEER IMMEDIATELY. 4. PRIOR TO BEGINNING THE WORK, THE CONTRACTOR SHALL OBTAIN ANY/ALL WRITTEN AGREEMENTS FOR INGRESS AND EGRESS TO THE WORK SITE FROM ADJACENT PRIVATE PROPERTY OWNERS. A COPY OF ALL AGREEMENTS SHALL BE PROVIDED TO THE TOWN. ACCESS TO ANY ADJACENT PRIVATE PROPERTY SHALL BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD. 5. ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION BY THE ENGINEERING STAFF. THEY RESERVE THE RIGHT TO ACCEPT OR REJECT ANY SUCH MATERIALS AND WORKMANSHIP THAT DOES NOT CONFORM TO THE STANDARDS AND SPECIFICATIONS. INSPECTIONS AND ONSITE VISITS ARE NOT TO BE CONSTRUED AS A GUARANTEE BY THE ENGINEERING STAFF OF THE CONTRACTORS’’ CONTRACTUAL COMMITMENT. REQUESTS FOR INSPECTION SHALL BE MADE BY THE CONTRACTOR A MINIMUM OF TWENTY-FOUR (24) HOURS IN ADVANCE. GENERAL NOTES CONSTRUCTION 6. THE CONTRACTOR SHALL COORDINATE HIS ACTIVITIES WITH THE AFFECTED UTILITY COMPANIES AND SHALL NOTIFY THE UTILITY NOTIFICATION CENTER. 7. UTILITIES IN THE AREA OF CONSTRUCTION ARE APPROXIMATE ONLY. THEY HAVE BEEN LOCATED FROM FIELD INVESTIGATION AND THE BEST AVAILABLE UTILITY RECORDS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION, PROTECTION AND REPAIR OF ALL UTILITIES ENCOUNTERED DURING CONSTRUCTION WHETHER SHOWN ON THESE PLANS OR NOT. THE CONTRACTOR SHALL CONTACT ALL RESPECTIVE UTILITIES AND HAVE ALL UTILITIES FIELD-LOCATED PRIOR TO CONSTRUCTION. IF ANY UNKNOWN SUBSURFACE STRUCTURES ARE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ENGINEERING STAFF AND DESIGN ENGINEER PRIOR TO PROCEEDING. 8. THE CONTRACTOR SHALL NOTIFY THE ENGINEERING STAFF OF ANY PROBLEM IMPACTING WATER AND WASTE WATER FACILITIES THAT WOULD POTENTIALLY REQUIRE A VARIANCE FROM THE APPROVED PLANS AND SPECIFICATIONS. ANY VARIANCE FROM THE APPROVED DOCUMENTS SHALL BE AT THE SOLE DISCRETION OF THE ENGINEERING STAFF. 9. CONTRACTOR SHALL OBTAIN, AT HIS OWN EXPENSE, ALL APPLICABLE SPECIFICATIONS AND PERMITS NECESSARY TO PERFORM THE PROPOSED WORK. 10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REPLACING ANY EXISTING SIGNS, STRUCTURES, FENCES, ETC., ENCOUNTERED ON THE JOB AND RESTORING THEM TO THEIR ORIGINAL CONDITION. 11. DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS AT AND ADJACENT TO THE JOB INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN, OR OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC SAFETY.

I. GENERAL DESCRIPTION: A. PROJECT DESCRIPTION THE PROJECT CONSISTS OF A 8,000 SF, ONE STORY DENTAL BUILDING SITUATED ADJACENT TO AN EXISTING UNIVERSITY BUILDING AND STUDENT APARTMENTS. THERE IS SURFACE PARKING ON THE SITE SERVING BOTH BUILDINGS. B. APPLICABLE CODES INTERNATIONAL BUILDING CODE (2006 EDITION) VIRGINIA UNIFORM STATEWIDE BUILDING CODE-VUSBC (2003 EDITION, EFFECTIVE MAY 1, 2008) ADAAG-AMERICANS WITH DISABILITIES ACT (ADA) ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES (1994 EDITION) C. OCCUPANCY CLASSIFICATION 1. OCCUPANCY DESIGNATION- THE DENTAL CLINIC IS CLASSIFIED TYPEII B OCCUPANCY D. CONSTRUCTION TYPE DESIGNATION 1. AREA 8,000 SQ FT_HEIGHT: 16’0”_1 LEVEL AREA INCREASE DUE TO FRONTAGE (PERCENT) AS CALCULATED IN ACCORDANCE WITH SECTION 506.2 IS EQUAL TO 75% 2.TYPE OF CONSTRUCTION- II-B IS THE MINIMUM CONSTRUCTION TYPE THAT WILL ACCOMMODATE THE BUILDING AREA 3. ALLOWABLE AREA PER FLOOR WITH INCREASE FOR SPRINKLER AND FRONTAGE- 24,000 sq ft. 4. ALLOWABLE STORIES-4 5. PROPOESED STORIES- 1 6. ALLOWABLE HEIGHT-55 ft. 7. PROPOSED HEIGHT-16 ft. VI. EXITING REQUIREMENTS A.OCCUPANCY - 80 VII. RESTROOM REQUIREMENTS A. PLUMBING FIXTURE COUNT REQUIREMENTS 1. THE NUMBER OF PLUMBING FIXTURES WITHIN A BUILDING SHALL NOT BE LESS THAN SET FORTH IN SECTION 2902. 2. 2902.3 STATES THAT THE REQUIRED DISTRIBUTION OF FIXTURES BETWEEN SEXES SHALL BE 50 PERCENT TO EACH SEX. EXCEPTION: WHERE CIRCUMSTANCES DICTATE THAT A DIFFERENT RATIO IS NEEDED, THE ADJUSTMENT SHALL BE APPROVED BY THE BUILDING OFFICIAL. 3. WATER CLOSETS_ MALE-2 FEMALE-2 4.LAVATORIES_ MALE-1 FEMALE-1

VCU DENTAL OFFICE

NORTH ARROW 1 A101

1

1

SIM

BUILDING SECTION

1

COLUMN GRID CENTERLINE

A101

SIM CALL OUT SECTION

SIM

BUILDING SECTION TAIL

3

ROOM NAME AND NUMBER

BUILDING SECTION

A101

A101

ELEVATION

No. Description 1 CARTOON SET 2 COLUMNS, GRID, LEVELS 3 FOUNDATION & SLAB PLAN 4 WALLS, WINDOWS, DOORS 5 ROOF PLAN, WALL SECTIONS 6 ELEVATIONS, WALL SECTIONS 7 DETAILS, DIMENSIONING 8 RCP, SITE PLAN 9 BATHROOMS, INTERIOR ELE, SCHEDULES 10 GENERAL SHEET, RCP & SITE LEGENDS CODE STUDY, LINE WEIGHTS 11 CHECK SET 12 FINAL SET 13

Date 1.27.10 2.3.10 2.10.10 2.17.10 2.24.10 3.3.10 3.10.10 3.24.10 3.31.10 4.7.10 4.14.10 4.19.10 4.26.10

GENERAL LEGEND 1/4" = 1'-0"

1

{3D}

A0.0- GENERAL A1.0- SITE A2.1- FLOOR PLANS A2.2- FOUNDATION & SLAB PLAN A3.0- INTERIOR ELEVATION & SCHEDULES A4.0- REFLECTED CEILING PLAN (RCP) A5.0- ROOF PLAN A6.1- NORTH/ SOUTH ELEVATION A6.2- EAST/WEST ELEVATION A7.0- LONG./TRANSVERSE BUILDING SECTION A8.0- WALL SECTIONS A9.0- DETAILS

GENERAL ARCH 3352 DATE DRAWN BY

10:00AM APRIL,26 2010 ALEXANDER BINGHAM

A0.0


PROPOSED ELECTRICAL, CABLE, PHONE AND WATER LINES PROP ERTY LINE

EXSITING 12" WATER LINE

EXSITINE ELECTRIC, CABLE AND PHONE LINES

VCU DENTAL OFFICE

RT Y

LIN E

Y AR NIT SA E N ED OS ER LI OP PR SEW

PR OP O SE SED W E SA R L NIT IN AR E Y

PR OP E

No. 1 2 3 4 5

PRO PER TY LI

Description CARTOON SET RCP, SITE PLAN GENERAL SHEET, RCP & SITE LEGENDS CHECK SET FINAL SET

Date 1.27.10 3.24.10 4.7.10 4.19.10 4.26.10

NE

EXSTING CONTOUR PROPOSED CONTOUR PROPERTY LINE

PR OP ER TY

LIN E

PRO PERT Y LINE

PROPOSED UTILITY EXITING TREE TO REMAIN

EXISTING VEGETATION TO REMAIN

ACCESSIBLE PARKING SPACE

SITE PLAN LEGEND 1/4" = 1'-0"

SITE

PROPESED SANITARY SEWER LINE ARCH 3352 DATE DRAWN BY

1

SITE 1" = 30'-0"

10:00AM APRIL,26 2010 ALEXANDER BINGHAM

A1.0


1

3

2

4

6

5

8

7

9

A6.2

11

10

12

13

1 200' - 7 3/4" 10' - 0"

10' - 0"

10' - 0"

10' - 0"

20' - 0"

20' - 0"

20' - 0"

20' - 0"

10' - 2 1/2" 5' - 9"

4' - 0"

8' - 0"

4' - 0"

10' - 0"

4' - 0"

16' - 7"

1' 0' -- 4" 8 1/4"7' - 5 1/4" 1' - 0" 5' - 9" 3' - 0 3/8" 2' - 9 7/8" 2' - 9 7/8"

4' - 0"

8' - 0"

4' - 0"

10' - 0"

4' - 0"

16' - 7"

0' - 11"

9' - 4"

20' - 0"

16' - 0"

16' - 0 1/2"

3' - 11 3/4"

8' - 0"

8' - 0"

3' - 11 3/4"

4' - 0 1/2"

62' - 3 3/4"

15' - 11 1/2"

8' - 0 1/4"

8' - 0 1/4"

2

1

A7.0

A8.0

B

VCU DENTAL OFFICE

19

17

16

5' - 2" A8.0 0' - 2 1/2"

4' - 4"

4' - 4"

9' - 1"

4' - 5 1/2" 4' - 5 1/2"

4' - 5 1/2" 4' - 5 1/2"

9' - 4"

9' - 4"

4' - 5"

4' - 5"

4' - 5 3/8" 4' - 5 3/8"

21' - 4"

9' - 3 3/4"

20' - 11"

9' - 3"

4' - 8 3/8" 4' - 10 7/8"4' - 10 7/8" 4' - 6 1/8" 4' - 8 0' 7/8" - 2 4' 1/2" 5/8" - 2 4' 1/2" - 7 5/8" 4' - 7 0' - 7 5/8" 19' - 2 5/8"

21' - 3 1/8"

2' - 11"2' - 11"

14' - 0 1/2"

8' - 9 1/2"

19' - 4 5/8"

5' - 2 3/4"

4' - 3"

19' - 0 3/4"

21' - 0 5/8"

6' - 0 1/2"

13' - 6"

8' - 11"

20' - 0"

20' - 0"

20' - 0"

4' - 9 1/2"

4' - 7"

180' - 7 3/4" 10' - 0"

10' - 0"

10' - 0"

10' - 0"

20' - 0"

20' - 0"

41' - 1 3/4"

24

27

28

30

31

26

A8.0

3

0' - 11"

2 A6.1

18' - 7 3/4"

2

25

29

9' - 4 1/4"

3' - 0"

18

15 A3.0

35' - 11 3/4"

12

2

5' - 2"

1

A 360 3

A3.0

22

3

A 360 4

A3.0

7

6

10

1 A7.0

14

4

13

11

9

8

5

14' - 4"

3

A 350 2

8' - 6"

10' - 0 1/2"

1' - 6" 41' - 1 1/4"

29' - 6 3/4"

31' - 1 1/4"

A6.1 1

4' - 11 5/8"4' - 11 5/8" 4' - 9 1/8" 5' - 1 1/8" 4' - 10 5/8" 4' - 8 1/8" 1' - 8 1/2" 2' - 10"2' - 10" 2' - 7 1/2"

9' - 1"

20' - 0"

20' - 0"

20' - 0"

180' - 4"

A

No. Description Date 1 CARTOON SET 1.27.10 2 COLUMNS, GRID, LEVELS 2.3.10 3 WALLS, WINDOWS, DOORS 2.17.10 2.24.10 4 ROOF PLAN, WALL SECTIONS 5 ELEVATIONS, WALL SECTIONS, DETAILS 3.3.10 6 DETAILS, DIMENSIONING 3.10.10 7 BATHROOMS, INTERIOR ELEV,SCHEDULES 3.31.10 CHECK SET 4.19.10 8 FINAL SET 4.26.10 9

3' - 2 1/2" 3' - 2 1/2" 3' - 5 1/2" 6' - 10"

3' - 3"

20' - 0"

20' - 0"

20' - 0"

20' - 0"

200' - 7 3/4"

2 A6.2

1

CLINIC FLOOR PLAN 1/8" = 1'-0"

FLOOR PLANS 10:00AM

ARCH 3352 DATE DRAWN BY

APRIL, 26 2010 ALEXANDER BINGHAM

A2.1


A6.2 1

1

3

2

4

6

5

7

9

8

10

12

11

13

200'-0"

10'-0"

10'-0"

10'-0"

10'-0"

20'-0"

20'-0"

20'-0"

20'-0"

20'-0"

2

1

A7.0

A8.0

20'-0"

20'-0"

20'-0"

VCU DENTAL OFFICE

B

THICKENED SLAB (TYP.)

1'-4" CONSTRUCTION JOINT (TYP.)

1

THICKENED SLAB (TYP.)

1'-4"

2

A6.1

40'-73/4"

A6.1

1 A7.0

4" SLAB-ON-GRADE

2 A8.0

FOOTING (TYP.)

A

Description CARTOON SET COLUMNS, GRID, LEVELS FOUNDATION & SLAB PLAN DETAILS, DIMENSIONING CHECK SET FINAL SET

Date 1.27.10 2.3.10 2.10.10 3.10.10 4.19.10 4.26.10

3

2'-0"x12"

COLUMN FOOTING 4'-0"x4'-0"x12" (TYP.)

No. 1 2 3 4 5 6

A8.0

2 A6.2

1

DENTAL CLINIC FOUNDATION & SLAB PLAN 1/8" = 1'-0"

FOUNDATION & SLAB PLAN ARCH 3352 DATE DRAWN BY

10:00AM APRIL, 26 2010 ALEXANDER BINGHAM

A2.2


PANEL SCHEDULE Type Height Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed

2' - 7" 2' - 7" 2' - 7" 2' - 7" 2' - 7" 2' - 7" 2' - 7" 2' - 7" 2' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 6' - 8 1/4" 6' - 8 1/4" 0' - 8 1/4" 0' - 8 1/4" 0' - 6 1/2" 7' - 7" 7' - 7" 9' - 0" 9' - 0" 8' - 7" 8' - 7" 8' - 7" 9' - 0" 8' - 7" 8' - 7" 8' - 7"

Width 4' - 6 1/8" 4' - 4 7/8" 4' - 6 1/8" 4' - 6 1/8" 4' - 6 1/8" 4' - 4 7/8" 4' - 6 1/4" 4' - 5" 4' - 6 1/4" 4' - 9 13/32" 4' - 7 27/32" 4' - 9 3/32" 4' - 7 27/32" 4' - 8 5/32" 4' - 6 29/32" 4' - 5 3/4" 4' - 8 11/32" 4' - 8 11/32" 4' - 8 11/32" 4' - 7 3/32" 0' - 5 1/2" 4' - 7 21/32" 4' - 7 21/32" 4' - 7 21/32" 4' - 7 21/32" 4' - 0 1/2" 5' - 1 1/2" 4' - 7" 3' - 1 1/4" 3' - 1 1/4" 3' - 1 1/4" 3' - 1 1/4" 3' - 3 1/2" 2' - 9 23/32" 2' - 9 23/32" 4' - 0" 4' - 0" 2' - 6 1/4" 2' - 6 1/4" 2' - 7 1/2" 4' - 0" 2' - 8 19/32" 2' - 9 27/32" 2' - 8 19/32"

Mark

Count

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

DOOR SCHEDULE Type Height 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" 36" x 84" Curtain Wall Dbl Glass

7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 8 1/4"

Width

Thickness

3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 7' - 1 1/2"

0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2" 0' - 2"

DECORATIVE LIGHT FIXTURES, TYP.

2" D. BRUSHED STAINLESS STEEL TRANSACTION COUNTERTOP SUPPORT POSTS, TYP. SSM02 COUNTERTOP. TYP. PL02. BEHIND WD01 WOOD SLATS, TYP. 1 1/2" X 4" WD01 WOOD SLATS, TYP.

SEE INTERIOR ELEVATIONS FOR MORE INFO ON WALL BEYOND

1' - 8" 1' - 0" 1' - 8" 1' - 0" 1' - 8"

1' - 0"

CLINIC FLOOR PLAN 0' - 0"

3' - 0"

13' - 10 1/2"

0' - 1 1/2"

1

VCU DENTAL OFFICE

6' - 1"

RECEPTION FRONT ELEVATION 1/2" = 1'-0"

No. 1 2 3 4

Description CARTOON SET BATHROOMS, INTERIOR ELE, SCHEDULES CHECK SET FINAL SET

Date 1.27.10 3.31.10 4.19.10 4.26.10

A

LEVEL 3 16' - 3"

SLOPED CEILING, ALL SIDES IPT05

LEVEL 2 13' - 3"

IPT03 SOFFIT ALL SIDES INCLUDING CEILING

WOOD SLATS ALIGNING WITH OTHERS ON ADJOINING WALL, (WD01) TYP.

CLINIC FLOOR PLAN 0' - 0"

EXAM 1020 NORTH ELEVATION 1/4" = 1'-0"

1/2" THICK SSMO2a SLAB MOUTED ON WALL AS SIGNAGE BACKDROP

VCU DENTAL CLINIC

BRUSHED STAINLESS STEEL INDMDUAL LETTERS MOUNTED ON SSM02a, (NIC)

3

RECEPTION 1002A SOUTH ELEVATION 1/4" = 1'-0"

INTERIOR ELE. & SCHEDULES

3" WALL RECESS, PAINTED IPT05, SAME WIDTH AS TARNSACTION COUNTERTOP

CLINIC FLOOR PLAN 0' - 0"

12' - 0"

WD01

2

LEVEL 2 13' - 3"

SEAM IN SSMO2a

ART 3' - 4"

ART

LEVEL 3 16' - 3"

1/2" D X 2" H WOOD SLATS WITH A 2" SPACE BETWEEN EACH (WDO1)

0' - 4 5/8"

SLOPING CEILING SOFFIT, IP05 ON ALL EXPOSED SIDES

3' - 0 5/8"

Count 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

3' - 7 1/2"

Width 0' - 8 1/4" 0' - 8 1/4" 0' - 8 1/4" 0' - 8 1/4" 7' - 1 1/2" 4' - 5 29/32" 4' - 7 3/4" 4' - 7 5/32" 4' - 7 5/32" 4' - 5 29/32" 4' - 5 1/4" 4' - 7 5/32" 4' - 7 5/32" 4' - 5 19/32" 4' - 5 1/4" 4' - 6 27/32" 4' - 6 27/32" 7' - 8 1/4" 7' - 8 1/4" 7' - 8 1/2" 7' - 8 1/2" 7' - 8" 7' - 8" 4' - 1 3/4" 4' - 1 3/4" 4' - 2 3/4" 4' - 2 3/4" 4' - 1 3/4" 4' - 1 3/4" 4' - 4 1/4" 4' - 4 1/4" 4' - 4 1/4" 4' - 4 1/4" 4' - 4 1/8" 4' - 1 3/4" 4' - 1 1/4" 4' - 1 1/4" 4' - 3 3/4" 4' - 1 3/4" 4' - 1 1/4" 4' - 1 1/4" 4' - 4 1/8" 4' - 3 3/4" 4' - 4 7/8" 4' - 4 7/8" 4' - 5"

5' - 5 1/4"

7' - 8 1/4" 0' - 8 1/4" 7' - 8 1/4" 0' - 8 1/4" 0' - 8 1/4" 2' - 9 1/2" 2' - 9 1/2" 2' - 9 1/2" 2' - 9 1/2" 2' - 9 1/2" 2' - 9 1/2" 2' - 9 1/2" 2' - 9 1/2" 2' - 9 1/2" 2' - 9 1/2" 2' - 9 1/2" 2' - 9 1/2" 1' - 7" 1' - 7" 1' - 7" 1' - 7" 1' - 7" 1' - 7" 2' - 7" 2' - 7" 7' - 7" 7' - 7" 2' - 7" 2' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 7' - 7" 2' - 7" 2' - 7" 2' - 7" 7' - 7" 2' - 7" 2' - 7" 2' - 7" 7' - 7" 7' - 7" 2' - 7" 2' - 7" 2' - 7"

0' - 2" 0' - 3" 0' - 3"

PANEL SCHEDULE Type Height Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed Glazed

0' - 2"

Count 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

WD01 WALL BASE DEPTH OF WORK SURFACE PLUS 1" SHALL BE RECESSED WITHIN WALL

ARCH 3352 DATE DRAWN BY

10:00AM APRIL,26 2010 ALEXANDER BINGHAM

A3.0


NORTH ARROW GYP BD CEILING SUPPLY AIR RETURN AIR CEILING MOUNTED FIXTURE FLUORESCENT LIGHT PENDANT TYPE LIGHT FIXTURE WALL MOUNTED LIGHT FIXTURE

RCP LEGEND 1/4" = 1'-0"

1

2

3

4

5

6

7

8

9

11

10

12

VCU DENTAL OFFICE

13

No. 1 2 3 4 5

SLOPING SOFIT

Description CARTOON SET RCP, SITE PLAN GENERAL SHEET, RCP & SITE LEGENDS CHECK SET FINAL SET

Date 1.27.10 3.24.10 4.7.10 4.19.10 4.26.10

WOOD GLULAM GIRDER, TYP, AT COLUMN LINE

FACULTY OFFICE

VESTIBULE

FACULTY OFFICE

DENTAL LAB

5' - 0" 5' - 0"

BUSINESS MANAGER

PUBLIC FAMILY TOILET

STERILIZATION

ELECTRIC

5' - 0" 5' - 0"

STAFF TOILET

COMPRESSOR

WOOD DIRECTION

REGISRATION WORK AREA

RECEPTION

STAFF TOILET

X- RAY

MECH

4' - 4"

WOOD DIRECTION

B

HSKP

FACULTY OFFICE

PUBLIC TOILET

COMMUNICATION

PATIENT TOILET

EXAM ROOM

WOOD DIRECTION

CONFERENCE ROOM/ CLASSROOM

STAFF LOCKER

STAFF BREAKROOM

WOOD DIRECTION

REFLECTED CEILING PLAN (RCP)

CLEAN SUPPLY STORAGE

A

ARCH 3352 DATE DRAWN BY

1

RCP 1/8" = 1'-0"

10:00AM APRIL,26 2010 ALEXANDER BINGHAM

A4.0


1

3

2

4

6

5

7

9

8

10

12

11

13

A6.2

GARDEN ROOF ASSEMBLY

1:12 SLOPE

1:12 SLOPE

1

GIRDER BELOW

DS

DS

DS

INTERNAL GUTTER

DS

DS

DS

DS

B

2

A6.1

STANDING SEAM METAL ROOF GARDEN ROOF ASSEMBLY

1:12 SLOPE

1:12 SLOPE

GARDEN ROOF ASSEMBLY

1:12 SLOPE

1

1:12 SLOPE

A6.1

VCU DENTAL OFFICE

A

FACE OF WALL BELOW

No. 1 2 3 4

Description CARTOON SET ROOF PLAN, WALL SECTIONS CHECK SET FINAL SET

Date 1.27.10 2.24.10 4.19.10 4.26.10

GIRDER BELOW

2 A6.2

1

DENTAL CLINIC ROOF PLAN 1/8" = 1'-0"

ROOF PLAN ARCH 3352 DATE DRAWN BY

10:00AM APRIL, 26 2010 ALEXANDER BINGHAM

A5.0


B

A

2

1 A7.0

VEGETATION LATH

FINISH GRADE

A8.0

LAM WOOD BEAM

GARDEN ROOF

GARDEN ROOF

LEVEL 3 16' - 3" LEVEL 2 13' - 3"

WOOD SIDING BOX WINDOW BEYOND

VERTICAL WOOD BLINDS BEYOND

CLINIC FLOOR PLAN 0' - 0"

ENTRANCE BRIDGE

VCU DENTAL OFFICE

FINISH GRADE

FOOTING BEYOND

1

NORTH ELEVATION 1/8" = 1'-0"

A

B

2 A8.0

A7.0 GARDEN ROOF

2

GARDEN ROOF

Description CARTOON SET COLUMNS, GRID, LEVELS WALLS, WINDOWS, DOORS ROOF PLAN, WALL SECTIONS ELVATIONS, WALL SECTIONS, DETAILS CODE STUDY, LINE WEIGHTS CHECK SET FINAL SET

Date 1.27.10 2.3.10 2.17.10 2.24.10 3.3.10 4.14.10 4.19.10 4.26.10

LEVEL 3 16' - 3" LEVEL 2 13' - 3"

LAM WOOD BEAM

VERTICAL WOOD BEAMS BEYOND

No. 1 2 3 4 5 6 7 8

1

HVAC EQUIPMENT ENCLOSER

CLINIC FLOOR PLAN 0' - 0"

SOUTH ELEVATION 1/8" = 1'-0"

NORTH / SOUTH ELEVATION ARCH 3352 DATE DRAWN BY

10:00AM APRIL,26 2010 ALEXANDER BINGHAM

A6.1


13

12

11

9

10

8

1

3

2

A8.0

A8.0

A7.0

6

7

GARDEN ROOF

STANDING SEAM

5

STANDING SEAM MTL ROOF

4

GARDEN ROOF

3

1

2

STANDING SEAM

LEVEL 3 16' - 3" LEVEL 2 13' - 3"

LAM WOOD BEAM BOARD &BATTEN LOUVERS

WOOD SIDING

CLEARSTORY GLAZING

LAM WOOD BEAMS

MECH LOUVER CLINIC FLOOR PLAN 0' - 0"

BOX WINDOWS

FOOTING BEYOND

1

FINISH GRADE

ENTRANCE BRIDGE

WOOD VERTICAL FINS

STACKED STONE

VCU DENTAL OFFICE

EAST ELEVATION 1/8" = 1'-0"

1

2

3

4

5

6

7

GARDEN ROOF

STANDING SEAM

8

10

9 2

3

1

A7.0

A8.0

A8.0

STANDING SEAM MTL ROOF

11

12

GARDEN ROOF

No. 1 2 3 4 5 6 7 8

13

STANDING SEAM

Description CARTOON SET COLUMNS, GRID, LEVELS WALLS, WINDOWS, DOORS ROOF PLAN, WALL SECTIONS ELVATIONS, WALL SECTIONS, DETAILS CODE STUDY, LINE WEIGHTS CHECK SET FINAL SET

Date 1.27.10 2.3.10 2.17.10 2.24.10 3.3.10 4.14.10 4.19.10 4.26.10

LEVEL 3 16' - 3" LEVEL 2 13' - 3" LAM WOOD BEAMS

WOOD COLUMN BEYOND WOOD SIDING

CLEARSTORY GLAZING

BOARD & BATTEN LOUVERS

VERTICAL WOOD BLINDS

SCREEN CLINIC FLOOR PLAN 0' - 0"

FOOTING BEYOND

2

STACKED STONE

EAST / WEST ELEVATION

WEST ELEVATION 1/8" = 1'-0"

ARCH 3352 DATE DRAWN BY

10:00AM APRIL,26 2010 ALEXANDER BINGHAM

A6.2


1

2

3

4

5

6

8

7

9

10

2

1

A7.0

A8.0

11

12

13 2 A9.0

LEVEL 3 16' - 3" LEVEL 2 13' - 3"

LEVEL 1 0' - 0"

1

VCU DENTAL OFFICE

LONGITUDINAL BUILDING SECTION 1/8" = 1'-0"

No. 1 2 3 4 5 6 7

A

3 A8.0

1 A7.0

Description CARTOON SET COLUMNS, GRID, LEVELS FOUNDATION & SLAB PLAN ROOF PLAN, WALL SECTIONS ELVATIONS, WALL SECTIONS, DETAILS CHECK SET FINAL SET

Date 1.27.10 2.3.10 2.10.10 2.24.10 3.3.10 4.19.10 4.26.10

B 1 A8.0

LEVEL 3 16' - 3" LEVEL 2 13' - 3"

LEVEL 1 0' - 0"

LONG./TRANSERVE BUILDING SECTION ARCH 3352

2

TRANSVERSE BUILDING SECTION 1/8" = 1'-0"

DATE DRAWN BY

10:00AM APRIL, 26 2010 ALEXANDER BINGHAM

A7.0


A 13

B STANDING SEAM MTL ROOF PANELS

GARDEN ROOF ASSEMBLY

PREFINISHED ALUM FASCIA TRIM

ROOF BEYOND

STRUCTURAL INSLUATED ROOF PANEL (R-30)

ICE & WATER SHIELD 1:12 SLOPE

STANDING SEAM MTL ROOF PANELS

GARDEN ROOF ASSEMBLY

1 A9.0

ICE & WATER SHIELD

STRUCTURAL INSULATED ROOF PANEL (R-30)

4 A9.0

LEVEL 3 16' - 3"

WOOD SOFFIT

GARDEN ROOF ASSEMBLY STRUCTURAL INSLUATED ROOF PANEL (R-30)

WOOD CEILING

1:12 SLOPE

6.75"x15.125" LAMINATED WOOD PURLIN

10.5"x 35.75" LAMINATED WOOD GIRDER BEYOND

BRG HEIGHT

STANDING SEAM MTL ROOF PANELS ICE & WATER SHIELD INTERNAL GUTTER

LEVEL 3 16' - 3"

2' - 0"

WOOD CEILING

ALUMINUM STOREFRONT TYPE WINDOW

6.75"x15.125"LAMINATED WOOD PURLIN

WOOD SOFFIT

WOOD CEILING

LAMINATED WOOD PURLIN BEYOND

PREFINISHED ALUM FASCIA TRIM

INSULATED LOW-E GLAZING LEVEL 2 13' - 3"

PREFINISHED ALUM FASCIA TRIM

LEVEL 3 16' - 3"

LAMINATED WOOD GIRDER LEVEL 2 13' - 3"

LEVEL 2 13' - 3" WOOD SOFFIT

VCU DENTAL OFFICE

INSULATED LOW-E GLAZING

ELEV= +2493.50'

ALUMINUM STOREFRONT TYPE WINDOW

10.5"x35.75" LAMINATED WOOD GIRDER BEYOND

2x6 WOOD STUD WALL

AIR/ MOISTURE BARRIER 3/4" TNG WOOD SIDING

6" FOIL-FACED BATT INSULATION (R-19)

1/2" OSB SHEATHING

5/8" GWB

6" FOIL-FACED BATT INSULATION (R19)

ELEV=+2490.50'

8" NOM WALL THICKNESS

ALUMINUM STOREFRONT TYPE WINDOW

3/4" TNG WOOD SIDING

2x6 WOOD STUD WALL VARIES

2 A9.0

12' - 0"

AIR/MOISTURE BARRIER

BRG HEIGHT

5/8" GWB

1/2" OSB SHEATHING

AIR/ MOISTURE BARRIER 6" FOIL-FACED BATT INSULATION (R-19)

8" NOM WALL THICKNESS

2X6 WOOD STUD WALL

No. 1 2 3 4 5 6

5/8" CWB INSULATED LOW-E GLAZING

3/4" TNG WOOD SIDING

9' - 0"

1/2" OSB SHEATHING

Description CARTOON SET ROOF PLAN, WALL SECTIONS ELEVATIONS, WALL SECTIONS DETAILS, DIMENSIONING CHECK SET FINAL SET

Date 1.27.10 2.24.10 3.3.10 3.10.10 4.19.10 4.26.10

INSULATED LOW-E GLAZING ALUMINUM STOREFRONT TYPE WINDOW

WOOD BOX FRAME

SHEET MTL FLASHING

CLINIC FLOOR PLAN 0' - 0"

FINISH FLOOR ELEV= +2481.50"

2" PERIMETER RIGID INSULATION (R-10)

2" PERIMETER RIGID INSULATION (R-10)

CONCRETE SLAB-ON-GRADE CLINIC FLOOR PLAN 0' - 0"

CONCRETE SLAB-ON-GRADE

VAPOR BARRIER 2" PERIMETER RIGID INSULATION (R-10)

WALL SECTIONS

8" CMU PER STRUCT DWGS

8" CMU

8" CMU

12" CMU CONCRETE FOOTING

12" CMU

CONCRETE FOOTING

FINISH GRADE

VAPOR BARRIER

VAPOR BARRIER

FINISH GRADE

PER STRUCT DWGS

STONE VENEER

STONE VENEER

PER STRUCT DWGS

SHEET MTL FLASHING

SHEET MTL FLASHING CLINIC FLOOR PLAN 0' - 0"

CONCRETE SLAB-ON-GRADE

PER STRUCT DWGS

3 A9.0

ARCH 3352 DATE DRAWN BY

10:00AM APRIL, 26 2010 ALEXANDER BINGHAM

PER STRUCT DWGS PER STRUCT DWGS

WEST WALL SECTION 3 3/4" = 1'-0"

1

EAST WALL SECTION 3/4" = 1'-0"

2

SOUTH WALL SECTION 3/4" = 1'-0"

A8.0


A STANDING SEAM MTL ROOF PANELS

ROOF BEYOND

STRUCTURAL INSULATED ROOF PANEL (R 30)

ICE WATER SHIELD WOOD SOFFIT AIR/MOISTURE BARRIER

WOOD CEILING

3/4" TNG WOOD SIDING 1/2" OSD SHEATHING SRUCTURAL INSULATED ROOF PANEL (R-30)

6" FOIL-FACED BATT INSULATION (R-19)

LEVEL 3 16' - 3"

5/8" GWB

LEVEL 3 16' - 3"

2 x 6 WOOD STUD WALL

WOOD SOFFIT

PREFINISHED ALUM FASCIA TRIM ALUMINUM SCREEN FRAME 1/4" DOUBLE PLATE GLASS

LAM WOOD PURLIN BEYOND

Callout of SOUTH WALL SECTION 4 3" = 1'-0"

10.5"x35.75" LAM WOOD GIRDER BEYOND

Callout of WEST WALL SECTION 1 3" = 1'-0" 3/4" TNG WOOD SIDING

VCU DENTAL OFFICE

5/8" GWB

AIR/ MOISTURE BARRIER 6" FOIL- FACED BATT INSULATION (R-19)

2x6 WOOD STUD WALL

1/2" OSB SHEATHING

ALUMINUM SCREEN FRAME

No. 1 2 3 4 6

1/4" DOUBLE PLATE GLASS

2

Description CARTOON SET ELVATIONS, WALL SECTIONS, DETAILS DETAILS, DIMENSIONING CHECK SET FINAL SET

Date 1.27.10 3.3.10 3.10.10 4.19.10 4.26.10

Callout (2) of WEST WALL SECTION 3" = 1'-0" 1/4" DOUBLE PLATE GLASS

ALUMINUM SCREEN FRAME

2" PERIMETER RIGID INSULATION (R-10)

LEVEL 1 0' - 0"

STEEL MTL FLASHING

CONCRETE SLAB-ON-GRADE STONE VENEER

DETAILS

VAPOR BARRIER

8" CMU

ARCH 3352 DATE DRAWN BY

12" CMU

3

Callout (3) of WEST WALL SECTION 3" = 1'-0"

10:00AM APRIL, 26 2010 ALEXANDER BINGHAM

A9.0


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.