Portfolio

Page 1

T +37060920094 E ••••••••!"#$"@%&•$'.•(&

ALGIMANTAS VARPUČANSKIS

PORTFOLIO



Architektų st. 22-21 78281 Šiauliai Lithuania +37060920094 avarpucanskis@gmail.com

LANGUAGES Lithuanian - mother tongue English - fluent

WORK EXPERIENCE 02/2016 - 04/2016

CAD draftsman (part-time job besides studies)

PLAXIS

Russian - intermediate

www.plaxis.nl

German - beginner

COMPUTER SKILLS

08/2013 - 08/2015

Junior architect

Andrijauskas ir partneriai www.partneriai.com

▪ Autodesk REVIT, BIM modeling ▪ Autodesk autoCAD ▪ ArcGIS

10/2012 - 08/2013

Junior architect

Algimanto Černiausko architektūros studija "a&u"

▪ Adobe Photoshop ▪ Adobe Illustrator ▪ Adobe Indesign

07/2012 - 10/2012

Freelancer architect

Vilniaus investiciniai projektai

▪Rhino ceros ▪Grasshopper ▪ ArchiCAD

06/2011 - 06/2012

Internship

▪ Artlantis

Vilniaus architektūros studija

▪Lumion

www.vas.lt

▪Microsoft Office tools

SPECIALIZATION

EDUCATION

My specialization in the professional field is housing. With my scope of knowledge cover every aspect of housing provision - financing models, implementation strategies, monitoring housing operation in time, correspondence with city development strategies, social impact and design.

2015/08 - 2017/07

Master's degree of urbanism

TU Delft, The Netherlands 2008 - 2012

Bachelor's degree of architecture

Vilnius academy of arts, Lithuania 09/2011 - 02/2012

Erasmus exchange program

Hochschule Bremen, university of applied sciences, Germany

ADDITIONAL INFORMATION Workshop Competition Lecture for students Movie screening Workshop for kids Exhibition Competition Seminar Workshop Workshop Competition

▪2016 "Overcoming tourism" ▪2015 I prize in public procurement competition for Bastionų bridge in Klaipėda ▪2014 "City today" ▪2014 "Detropia" ▪2014 "My city" ▪2013 "City of bicycles without bicycles" ▪2012 II prize in competition "Hohesufer" ▪2012 Public press in Bremerhaven "EXPERIMENT - LEHER PAUSENHOF" ▪2011 "architecture as an organizational matter" ▪2010 "Beepart pilaite" concept of sustainable temporary community center ▪2010 II prize in competition "Gediminui Baravykui atminti"


RECENT PROJECTS New centralities in post-socialist Vilnius School - TU Delft Tutors - Rients Dijkstra, Lidewij Tummers Year - 2017 Location - Vilnius, Lithuania

Apartment house Office - Andrijauskas ir partneriai Year - 2015 Size - 3909m² Location - Bijūjų st. 9, Klaipeda, Lithuania Client - YIT Kausta

Workshop - Overcoming tourism School - TU Delft Year - 2016 Location - Split, Croatia

Apartment house Office - Andrijauskas ir partneriai Year - 2015 Size - 9711m² Location - Bangų st. 7, Klaipeda, Lithuania Client - SBTF (Šiaulių bankas)

Redevelopment strategy for new town of Alamar School - TU Delft Tutors - Wouter Vanstiphout, Michelle Provoost Year - 2016 Location - Havana, Alamar, Cuba

Shop with tennis courts Office - Andrijauskas ir partneriai Year - 2014 Size - 3313m² Location - Tauralaukio st. 1, Klaipeda, Lithuania Client - Homburg property management

Expanding with the city School - TU Delft Tutors - Rients Dijkstra, Esther Gramsbergen Year - 2016 Location - Leiden, The Netherlands

Urban plan of Danges riverside Office - Andrijauskas ir partneriai Year - 2014 Area - 46000m², Estimated actual area 50000m² Location - Klaipeda, Lithuania Client - Verdispar

Spatial strategy for Flevoland polder School - TU Delft Tutors - Stephen Read, Lidewij Tummers Year - 2016 Location - Flevoland, The Netherlands

Port warehouse with business headquarters Office - Andrijauskas ir partneriai Year - 2014 Size - 26000m² Location - Klaipeda, Lithuania Client - Klasco

Rotterdam. Facing urbanity School - TU Delft Tutor - Camila Pinzon Cortes Year - 2015 Location - Weena st., Rotterdam, The Netherlands

Mixed use housing project “Trinyčiai” Office - Andrijauskas ir partneriai Year - 2014 Size - 90000m² Location - Klaipeda, Lithuania Client - Architelio statyba

City with a hidden potential - Breda School - TU Delft Tutor - Birgit Hausleitner Year - 2015 Location - Breda, The Netherlands

Old mill refurbishment (urban concept) Office - Andrijauskas ir partneriai Year - 2013 Area - 13000m² Location - Klaipeda, Lithuania Client - SBTF (Šiaulių bankas)

I prize in public procurement competition for Bastionų Bridge Office - Andrijauskas ir partneriai Year - 2015 Location - Klaipeda, Lithuania Client - Municipality of Klaipeda

Exhibition: “City of bicycles without bicycles” This exhibition was devoted to attract people attention on harm of urban sprawl and lack of urbanity in nowadays city Year - 2013


Re-use of farm building Office - EGES (freelancing) Year - 2013 Size - 1356m² Location - Miško tako st. 3, Šventoji, Lithuania

Information center in Bremer Überseestadt School - Hochschule Bremen Tutor - Prof. Frank Assmann Year - 2012 Location - Überseestadt, Bremen, Germany

Revitalization strategy of “Elnias” factory Office - A. Černiausko architektūros studija A&U Year - 2013 Area - 138000m² Location - Elnias factory, Šiauliai, Lithuania

Model of Nation home Office - Vilnius architecture studio Year - 2011 Size - 1,5 x 2m Location - Vilnius, Tauro kalnas, Lithuania

Individual house Office - A. Černiausko architektūros studija A&U Year - 2013 Size - 113m² Location - M. Mažvydo g. 28I, Šiauliai, Lithuania

Arts gallery in Vilnius School - Vilnius academy of arts Tutor - Doc. Vytenis Gerliakas Year - 2011 Location - Tymo kvartalas, Vilnius, Lithuania

LOFTS Office - Vilniaus investiciniai projektai Year - 2012 Location - Naugarduko pr. 41, Vilnius, Lithuania Size of whole building - 8600m², project size - 5115m²

Open competition “Changing the Face” Moscow Year - 2011 Location - Pushkin Square, Moscow, Russia

Guest house in Baden Baden (bachelor thesis) School - Vilnius academy of arts Tutor - Prof. Kęstutis Pempė Year - 2012 Location - Werderstraße 7, Baden Baden, Germany

Workshop “architecture as an organizational matter” Moderators - Daniel Köhler, Rasa Navasaityte Year - 2011

Urban plan for Güterbahnhof Bremen School - Hochschule Bremen Tutor - Prof. Klaus Schäfer Year - 2012 Location - Güterbahnhof, Bremen, Germany

Concept of sustainable pavilion for annual construction exhibition “RESTA” Year - 2010 Location - Litexpo, Vilnius, Lithuania

Public press “EXPERIMENT - LEHER PAUSENHOF”, managing the problem of shrinking city School - Hochschule Bremen Tutor - Prof. Klaus Schäfer Year - 2012 Location - Lehe, Bremerhaven, Germany

“Beepart Pilaite”. Design workshop for a community center in periphery neighborhood of Vilnius. Moderators - Andrius Ciplijauskas Year - 2009

II prize in competition for temporary bridge “Hohesufer” School - Hochschule Bremen Tutor - Prof. Dr.-Ing. Martin Speth Year - 2012 Location - Hohes ufer, Hanover, Germany

II prize in student competition “Gediminui Baravykui atminti” Year - 2009


SELECTED PROJECTS


NEW CENTRALITIES IN POST-SOCIALIST

VILNIUS Master thesis of urbanism. This project mainly deals with absence of planning in Vilnius, which results in chaotic city development. Proposed strategy and collective ďŹ nancing models allows to take immediate action and replace drift of city planning department. School - Technical university of Delft Tutors - Rients Dijkstra Lidewij Tummers Year - 2017 Location - Vilnius, Lithuania


Types of urban area

Deficiency of safety

Segregation

Polarization

Noise

Pollution

Population and workplace distribution

Sub urban sprawl - lack of density

Densification strategy

Power supply Water supply Pipelines Streets Sewerage

distance distance

Maintenance of infrastructure Possible options of commuting:

Many city problems arise because of low population density. • Expensive infrastructure • High maintenance costs • Long commuting distances • Loss of time • Inefficient public transport

Possible options of commuting:

City area can be reduced to 73km² (18% of current area). Entire population accommodated within this area would create density of 79 residents per 1ha.


Current development model

RESIDENTIAL

WORKING PLACES

Monocentric

Polycentric

ALL TRAFFIC FLOWS COMPILES TOWARD THE CITY CENTER CREATING CONSTANT PROBLEM OF TRAFFIC JAMS

POLYCENTRIC MODEL WOULD CREATE OPPOSITE TRAFFIC FLOWS CREATING BALANCE ON THE ROADS

SHORTENED DISTANCES FOR DRIVERS FROM SUB-URBS

TRAFFIC FLOWS TOWARD CITY CENTER WOULD STILL BE PREVALENT, BUT NUMBERS COULD BE DRASTICALLY REDUCED

DEVELOPMENT METHODS: Current development trends creates extremely polarized city. • Workplaces are separated from residential use, causing inevitable commuting and immense need for infrastructure. • Uncontrolled market driven development cause sharp population division by income and creates fertile ground for increasing segregation. In order to oppose these harmful processes thesis project is devoted to test alternative, collective development models. The base reference for this project is “Baugruppen” movement in Germany, especially the case of Tübingen, Französisches Viertel.

Price: ~ €100.000

Real estate developer

State

Price: ~ €170.000

Private home ownership

Price: ~ €110.000

Private home ownership

+ THESIS FOCUS

+ + + + Price: ~ €50.000

TÜBINGEN FRANZÖSISCHES VIERTEL SOURCE: Geolinde, Manfred Grohe

Collective development


Thesis contain four different proposals for distinct parts of the city, where collective development models would have to applied in a different manner. All proposals contain design principles, implementation guidelines and financial models. The focal point of entire work is proposal for Šnipiškės, which deals with difficult context of urban village and is under threat created by predatory market forces.

lawyer should be hired by residents in order to avoid mistrust

Lawyer

Contract

arrange funding

"baugruppe" Bank

Implementation/financing model External investor External investor

New residents

New residents

securing residents rights against possible speculation

arrange funding

collective loan

NGO

New residents

Residents

Final product

savings

Funding

setting platform

community mobilization

NGO

displaying availability/conditions

NGO

Residents

Architect

Assessment

NGO

EU

NGO

Residents Digital platform

Residents

Construction company help on a construction site

selected by current residents

INITIATION

FINDING INVESTORS

PROJECT EXECUTION

CONSTRUCTION

GRANTING OWNERSHIP RIGHTS FOR NEW RESIDENTS / INVESTORS

Creating conditions for self-transformation

Current situation TEST SITE

KALVARIJŲ MARKET

Building heights

Building configuration TEST SITE

Additional uses

TEST SITE

SPECULATIVE DEVELOPMENTS

TEST SITE PLOT SUITABLE FOR PROSPECTIVE SCHOOL

3 storey 2 storey

Buildings aligned with the street and blocked together with neighboring buildings (forming street front/active plinth) 3m setback is allowed, street front can be disrupted Space can be built up only partly 30-60%, depending on plot size

Land plots which potentially could be used for industrial activities Land plots which potentially could accommodate public or commercial activities * These locations indicated only as one of the multiple possibilities, it is not


Assumed conditions for external investor: Situation in Šnipiškės is extremely urgent, therefore waiting for state institutions to take over the initiative is not an option. There has to be direct engagement with local residents, which would allow immediate action. Principle of redevelopment allows to work in direction which complements proposed strategy, at the same time improve poor living conditions of local residents of Šnipiškės. This could be achieved harnessing rising real estate prices, huge demand for living space in the city center and turning difficult situation of local residents into a motivation to participate in proposed redevelopment schemes.

Construction phasing:

EXISTING RESIDENTIAL SPACE ~330m²

OUTBUILDING

Before

LAND PLOT 8.9ares

WATER BOREHOLE

ON-SITE WASTE WATER TREATMENT PLANT 2.1m x 5.1m x 2.2m

NEW SPACE FOR CURRENT OWNERS 310m²

EXTRA RESIDENTIAL SPACE ~500m²

NEW SPACE FOR CURRENT OWNERS 290m²

After POTENTIAL SPACE WHICH CAN BE USED TO GENERATE INCOME 370m²

ROOF GARDEN

PERGOLA

GARDEN

CHILDREN PLAYGROUND

MAX 5 PARKING LOTS



BASTIONŲ BRIDGE I prize in public procurement competition which was held in order to design a bridge over Dangės river. Estimated building completion date – 2020. Location: Klaipeda, Lithuania Year: 2015 Team: Algimantas Varpučanskis Edmundas Andrijauskas Simona Skinkytė

Richard Spijkerman Marius Bosselaar

Žana Lašienė Mindaugas Paknys

Client: municipality of Klaipeda


This competition was launched in order to lay out a section of street and to design a new bridge, which would connect future district on the left side of the river with the rest of the city. At the moment both riversides are sparsely used, as they are on the edge of vibrant part of downtown. By designing a bridge in this particular place, it is expected to make further areas more attractive for future development and everyday uses. This bridge would make these embankments more connected and hopefully provide with an opportunity to expand attractive spaces, along the river. Main intention was to create type of bridge, which would serve all kinds of resident activities with the same respect (without prioritizing car).

4 lane street One of the main demands for this competition was to serve 4 lanes street. Since this kind of street is completely unnecessary in the area, which is located next to down town - two lanes of the street were dedicated for busses. This would slow down future trafďŹ c and put the ďŹ rst step for making public transport more convenient in KlaipÄ—da.

Underground passageway There was also a demand for under bridge passage. However usually underground passing becomes unattractive and people feel unsafe while using them. For this reason passageways were designed as temporary pontoons, which would be cheaper to build and later on could be removed. Simple pedestrian cross over the bridge is proposed as a prior way to cross the road.

Site plan


Lifting mechanism Putting lifting mechanism on top of the bridge allows to keep road altitude as low as possible, because there is no need to have a space for counterweight underground. At the same time visible balancing arms would work as an esthetic element - icon of this place.

Design process - different alterations


SUPERMARKET WITH TENNIS COURTS

Location - Klaipėda, Lithuania Size - 3313 m² Year - 2014 Status - Built Team - Algimantas Varpučanskis Edmundas Andrijauskas Aurimas Baužys Martynas Urbikas Client - Homburg property management


Site plan

Building structure

This building was designed in a very unusual manner - placing tennis courts on top of supermarket. This decision was taken because fitting both facilities in one floor was not possible. Building was composed out of two shapes intersecting each other, clearly indicating two separate uses. Staircase was openly exposed on a front facade, highlighting the way to the second floor with sports activities. Building was constructed using prefabricated reinforced concrete structure. Tennis hall - plywood frame combined with steel columns. Finish - ceramic tiles.

Section


APARTMENT HOUSE IN KLAIPĖDA Location - Klaipėda, Lithuania Size - 3909 m² Year - 2014 Status - Building permission Team - Algimantas Varpučanskis Edmundas Andrijauskas Vilmanta Vaupšienė Darius Narmontas Client - IYT Kausta


II floor plan

Site plan This project aims to create cozy, comfortable and affordable place for living. There is only four floors what helps to maintain “human scale” and involve all residents to the street life. Building together with neighbor block forms courtyard, which makes a place for children games, barbecues etc. In order to keep cars out of the courtyard, design contains an underground parking.


I floor plan

LOFTS Location - Vilnius, Lithuania Size of whole building - 8600m², Project area - 5115 m² Year - 2012 Status - Built Team - Algimantas Varpučanskis Mindaugas Šutavičius Client - Vilniaus investiciniai projektai

Site plan

This project was one of the most challenging assignments that I ever had. It was implemented while working at a construction site, where I had to manage all the building process – provide builders with drawings, order materials and make sure that everything is implemented according to my design. These lofts were developed in a former sewing factory which is located in a district now being rapidly populated by young residents, artists etc. It was decided to transform this complex into residential lofts, leaving part of it for retail and day clinics. Building itself is one of the highest in this area, plus it is placed on a hill, so it reveals wonderful views on a whole city.


Ground floor plan

Section

GUEST HOUSE IN ŠVENTOJI Location - Šventoji, Lithuania Size - 1356 m² Year - 2013 Team - Algimantas Varpučanskis Ingrida Karkalienė Status - Concept design This project is a reconstruction of an old farm building, which is located in a well known resort of Šventoji. The area is only two kilometers away from the sea and it is surrounded by beautiful pine forest. One of customers wishes was to place their own house in this plot, besides that it was decided to make a guest house and workshops as a family business.


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.