Oracle 1Z0-567 Certification: Top 5 Tips to Crack Exam
Make 1Z0-567 Certification Easy with DBexam.com
For Oracle 1Z0-567 Exam
Preparation Tips for 1Z0-567 Certification 1. Perform enough practice with Oracle system on related Oracle 1Z0-567 certification subjects. 2. Identify the key configuration, workflow and data flow. 3. Understand all Syllabus Topics of the Exam which are Given in Description. 4. Identify your weak areas from practice test and do more practice with system. 5. Repeat practice exams and try to score 100% on www.DBexam.com.
1Z0-567 Certification Detail Exam Code
1Z0-567
Full Exam Name
Primavera P6 Enterprise Project Portfolio Management 8 Certified Implementation Specialist (OCS)
Number of Questions
84
Practice Exams
1Z0-567 Online Practice Exam
Passing Score
70%
Time Limit
120 minutes
Recommended Training
Primavera P6 Enterprise Project Portfolio Management 8 Essentials Exam Study Guide Primavera P6 Fundamentals Rel17 (primary) Primavera P6 Advanced Rel 17 (optional) Primavera P6 Learning Subscription
Oracle 1Z0-567 Exam Questions
?
01. Identify the True statement regarding the Enterprise Project Structure. Option a) It is defined during installation and cannot be changed
b) It is the default filing system for projects c) Activities represent the lowest level of the hierarchy d) It is defined and maintained in the Optional Client
ANSWER b) It is the default filing system for projects
02. Identify a relevant use case for applying a Must Finish By date to a project. Option
a) Compare Scheduled Finish to Must Finish By dates to negotiate realistic Finish dates b) Apply Must Finish By dates to shorten the duration of the schedule c) Apply Must Finish By dates to build case for requesting resources d) Compare Must Finish By date to Actual Finish Date to negotiate realistic Finish dates
ANSWER a) Compare Scheduled Finish to Must Finish By dates to negotiate realistic Finish dates
03. Identify the field that must be unique in Primavera. Option
a) Project Name b) Project Description c) Project ID
d) Project Manager
ANSWER c) Project ID
04. Identify the TRUE statement regarding Work Breakdown Structures (WBS). Option a) The WBS is enterprise data
b) Lowest level of WBS is Activity c) The EPS is top level of the WBS d) WBS Root level is Project ID and Project Name
ANSWER d) WBS Root level is Project ID and Project Name
05. Your are coaching a Super User at a Customer site that is trying to respond to a specific organization’s request to only view data as they do currently in Excel. Which Activity View functionality should be targeted for a Multi User View for this organization? Option a) Activity Table b) Activity Network
c) GANTT Chart d) Calendar View
ANSWER a) Activity Table
Unique Features of Oracle 1Z0-567 Online Test: ● www.dbexam.com has provided good quality 1Z0-567 sample questions. ● One can go through the Primavera Enterprise Project Portfolio Management Essentials sample questions before buying the 1Z0-567 online practice test. ● One can take unlimited attempts to practice from the 1Z0-567 practice test. ● It is available for two months. ● A candidate is able to measure his speed from the online practice test. ● Best 1Z0-567 book links are also provided on the website syllabus page. Descriptions are given below.
Unique Features Continued…. ● If a candidate wants to know about Primavera Enterprise Project Portfolio Management Essentials training detail, our website provides information about that too. ● A candidate is able to know about his performance depending on the result section of Primavera Enterprise Project Portfolio Management Essentials online test. ● Marks obtained could be a motivator factor to prepare more or less depending on the result. ● Last but not the least, we have a money back policy in our website,that makes us really unique. ● Testimonials written on the website, could be helpful to choose our website, as these are shared by our valuable users, who availed our online practice test.
Information on Oracle 1Z0-567 Certification 1. The Oracle certification is increasingly becoming important for the
career of employees. 2. The fees information are for the informative purposes and do not serve as an official offering and are subject to change. 3. Focus on the guide for online registration and you will very soon find it out. 4. For more information on Oracle Certification please refer to FAQs.
To Know More about Oracle 1Z0-567 Certification VISIT www.dbexam.com