INVESTMENT PROPOSALS OF DNIPROPETROVSK REGION


Dear colleagues and partners! As one of the largest business centers of Ukraine, Dnipropetrovsk region builds open and reliable partnerships with investors. Investment capital is primarily a source for the creation of appropriate job positions, renovation and modernization of existing production, launching promising new projects for business development. External investments are the indicators of the condition of economic development of the region and our country in whole and improve the social component of life in Ukraine. Despite the current challenges, Dnipropetrovsk region remains attractive for investors - all regional investors continue to work in Dnipropetrovsk region. Unique mineral resources of our land, fertile soils, favorable geographical location, developed infrastructure, powerful metallurgical complex and chemical industries, precision engineering, rocket and space technology are of exceptional interest in all parts of the world. But first of all, Dnipropetrovsk region is a hard-working, talented, intellectually developed people whose hands create the future. Dnipropetrovsk Regional Investment Agency (DIA) has been created and successfully operated for over 5 years ago to implement the comprehensive support of investment projects at the regional level. DIA has proved itself to foreign and domestic companies, business associations, local communities in the best possible way. Today DIA continues to effectively carry out the task of maintaining investment activity in the region and provide assistance at all stages of the investment project - from site selection and licensing procedures to the construction of a new facility and start operation. Thanks to DIA, potential investors have access to unbiased information about existing possibilities and priorities of the region.

Foundation of relationship with investor is laid at the national level, and flexible limits of the delegated powers of regional authorities can create conditions for a favorable investment climate in the region. We are open to constructive dialogue and mutually beneficial long-term partnership. All interested investors will be provided from our side with guaranteed support and maintenance of investment projects. Our goal is the promising development of Dnipropetrovsk region! Joint successes and achievements are the key advantages for future victories in an unpredictable competitive environment. Yours faithfully, Chairman of Dnipropetrovsk Regional State Administration

Valentyn REZNICHENKO

2


Dear colleagues and partners! Today Dnipropetrovsk region is one of the largest economic centers in Ukraine and strives for the open and mutually beneficial relationship with investors, because it is expressly understood that investments are the creation of additional employment and improvement of social environment for Ukrainians. Dnipropetrovsk region has all parameters, which make region attractive to foreign investors. The region has advantageous geographical location, powerful industrial, scientific, intellectual development level, high concentration of engineering infrastructure. For our part, the regional government guarantees for investors the availability of government, transparent conduct of business rules, equal access to the land, transport and energy resources. At the regional level we provide the comprehensive and system support of investment projects. For this purpose in 2011, we created the Dnipropetrovsk Regional Investment Agency (DIA), the effectiveness of which was recognized by investors’ companies and representatives of business association. DIA’s function is to present various opportunities of the region to our potential investors as well as possible. Moreover, DIA administrates and provides support at all stages of investment project implementation – from the stage of site selection and passing of licensing procedures to the construction of new object and start of work. DIA allows establishing effective international dialogue and making the process of cooperation most comfortable for potential partners. We are the patriots of our country. Above all things we appreciate peace and stability! That is why we create all necessary conditions for effective, stable and safety entrepreneurial activity. We will be glad to see you in Dnipropetrovsk region, we guarantee support and administration of all investment projects, together we will work for achieving headway! Yours faithfully Chairman of Dnipropetrovsk Regional Council

Gleb Prigunov

3


Dnipropetrovsk Investment Agency (DIA)

Services of the Agency are free Established by Dnipropetrovsk Regional authorities

More than 5 years of successful cooperation with local and foreign companies

12 implemented projects $93 million

Projects portfolio: 72 projects amounting to $ 1,9 billion

4


DIA AS INSTRUMENT FOR ATTRACTING INVESTMENT DІА functions Initiates creation of perspective investment projects Generates and provides primary analytical information Performs primary selection of site

Assists in selection of potential partners

Provides services of personal investment manager

Results of DІА Investment proposals portfolio

Over $ 1,9 billion.

PROJECTS

Land plots base About 350 sites with total area of 13,8 thousand hectares are presented Base of competences More than 150 regional companies of different sectors are presented Investor’s road map The main objective of the road map is to provide full information concerning passing the licensing procedures for starting business in Ukraine 5


INDUSTRIAL PARKS IN DNIPROPETROVSK REGION

6


Industrial parks of Dnipropetrovsk region The strategic goal of industrial parks creation the Dnipropetrovsk region – is regional economy diversification “Pavlograd” Industrial Park (Pavlograd district, city of Pavlograd) Area:

250 ha

Functional zones

• Machine building and energy engineering. • Logistics. • Agricultural processing. • Structural materials. • Light and processing industry and hi-tech

Distance from the nearest transport corridor

• Highway Е-50 (М-04) – 1 km • Railway station “Pavlohrad-2” - 1,2 km

Recourse administrator

Dnipropetrovsk Regional State Administration

Pavlograd

Dnipropetrovsk

Kryvyi Rih

“DNEPRINTERHUB” Industrial Park (Dnipropetrovsk)

“Kryvbas” Industrial Park (Kryvyi Rih) Area:

26,03 ha

Functional zones

• Logistics, • Machine building, • Manufacturing of structural material

Area:

73 ha

Functional zones

• • • •

Machine building and instrument engineering. Structural engineering, Investigation center, Logistics.

Distance from the nearest transport corridor

Highway Н-11 – 5,5 km; Railway station Kryvyi Rih Sorting” 1 km

Distance from the nearest transport corridor

Highway Е-50 (М-04); 3 railway station in a radius 3 km

Recourse administrator

Kryvyi Rih city Council

Recourse administrator

Interpipe company

7


Land plot of “Kryvbas” Industrial Park City of Kryvyi Rih Area:

26,03 ha

Intended use

Industrial land, Greenfield

Functional zones according to the concept

Logistics, Machine building, Manufacturing of structural material

Electricity (nearest electrical substation, its capacity and remoteness)

Kryvyi Rih Metrotram-150; 2500 m.

Gas (nearest gas distribution substation, its carrying capacity and remoteness)

Gas pipe line 5500 m3/hour; 100 m.

Water supply (nearest connection point, its carrying capacity and remoteness)

Network of the city of Kryvyi Rih, ø225mm; 1000m

Water discharge (nearest treatment facilities, their remoteness)

2 000 m

Distance from the nearest transport corridor (highways railway stations)

Highway Н-11; 5500 m Railway station Kryvyi Rih Sorting” ;1000 m

Recourse administrator

Kryvyi Rih city Council

Dnipropetrovsk

Kryvyi Rih

8


Land plot of “Pavlohrad” Industrial Park Pavlohrad district, city of Pavlohrad

Area:

250 ha

Intended use

Industrial land, Greenfield

Functional zones according to the concept

Machine building and energy engineering. Logistics. Agricultural processing. Structural materials. Light and processing industry and hi-tech

Electricity (nearest electrical substation, its capacity and remoteness)

Substation 150/10/6 PJSC «CEC» 500 m.

Gas (nearest gas distribution substation, its carrying capacity and remoteness)

Meter station PMP, 1000 m.

Water supply (nearest connection point, its carrying capacity and remoteness)

Network of the city of Pavlohrad, 63m3/hour; 2000m

Water discharge (nearest treatment facilities, their remoteness)

4 000 m

Distance from the nearest transport corridor (highways railway stations)

Highway Е-50 (М-04) 1000m Railway station “Pavlohrad2” 1200 m

Recourse administrator

Dnipropetrovsk Regional State Administration

Dnipropetrovsk

Pavlohrad district

9


Land plot of “DNEPRINTERHUB” Industrial Park Dnipropetrovsk

Area:

73 ha

Intended use

Industrial land, Brownfield

Functional zones according to the concept

Machine building and instrument engineering. Structural engineering, Investigation center, Logistics.

Electricity (nearest electrical substation, its capacity and remoteness)

24 MW in the territory

Gas (nearest gas distribution substation, its carrying capacity and remoteness)

3 electrical substation (low and middle pressure) in the territory

Water supply (nearest connection point, its carrying capacity and remoteness)

Pumping water in the territory

Water discharge (nearest treatment facilities, their remoteness)

In the territory

Distance from the nearest transport corridor (highways railway stations)

Along the territory of the Slobozhanskyi Ave, which crosses the highway Е-50 (М04); 3 railway station in a radius 3 km, railway lines in the territory

Recourse administrator

Interpipe company

Dnipropetrovsk

73 ha

10


TERRITORIES FOR CREATION OF INDUSTRIAL PARKS OR PLACEMENT OF PRODUCTION FACILITIES

11


PERSPECTIVE PLOTS FOR PRODUCTION PLACEMENT

22,32 ha. Industrial land

Dnipropetrovsk Vilnoghirsk

Synelnykove

Zhovti Vody

16 ha. Industrial land

28 ha. Industrial land

12


Land plot Zhovti Vody

Area:

16 ha

Intended use

The land plots target for industrial use

Dnipropetrovsk

Availability of the communications on the lad plot Zhovti Vody

Electricity (nearest electrical substation, its capacity and remoteness)

35kV, 560m

Gas (nearest gas distribution substation, its carrying capacity and remoteness)

gas distribution substation 3 atm; 6500 m

Water supply (nearest connection point, its carrying capacity and remoteness)

ø400mm; 400m

Water discharge (nearest treatment facilities, their remoteness) Distance from the nearest transport corridor (highways railway stations)

Railway station “Zhovti Vody-2”; 2000 m

Recourse administrator

Zhovti Vody City Council

13


Land plot Vilnohirsk

Area:

22,32 ha

Intended use

Industrial land Dnipropetrovsk

Availability of the communications on the lad plot Electricity (nearest electrical substation, its capacity and remoteness)

DP2; 120 m.

Gas (nearest gas distribution substation, its carrying capacity and remoteness)

gas distribution substation 2500 m3/hour; 120 m.

Water supply (nearest connection point, its carrying capacity and remoteness)

Network of the city of Vilnohirsk, ø200mm; 100m

Water discharge (nearest treatment facilities, their remoteness)

Sewer ø600mm; 150m

Distance from the nearest transport corridor (highways railway stations)

Railway station “Vilnohirsk”, 700m

Recourse administrator

Vilnohirsk City Council

Vilnohirsk

14


Land plot Synelnykove Area:

28 ha

Intended use

Industrial land

Availability of the communications on the lad plot

Dnipropetrovsk

Electricity (nearest electrical substation, its capacity and remoteness)

Spring Substation, 154/35/10 kV, 500m

Gas (nearest gas distribution substation, its carrying capacity and remoteness)

gas distribution substation 3 atm; 11 000 m.

Water supply (nearest connection point, its carrying capacity and remoteness)

ø1200mm; 800m

Water discharge (nearest treatment facilities, their remoteness)

700 m3/day; 300m

Distance from the nearest transport corridor (highways railway stations)

Highway М-18; 500m; Railway station “Synelnykove-1”;2000 m

Recourse administrator

Synelnykove City Council

Synelnykove

15


Land plots for agricultural investment projects

16


Investment-attractive agricultural land

175 plots of agricultural lands of state property included in the list of investmentattractive land

About 3.8 thousand hectares total area of the land masses, offered to investors

Tsarychanka district Novomoskovsk district

Dnipropetrovsk

It is planned to lease lands at open auctions. Kryvyi Rih district

17


LAND PLOTS FOR THE SOLAR POWER PLANTS PLACEMENT

18


Solar power energy in Dnipropetrovsk region Average quantity of sunny hours – 1900 – 2400 Advantages

Level of sun radiation per year – 1300 – 1450 kWt Average level of sun radiation - 3,36 kWt/h/sq. meter per day

Green tariff 01.01.2016 – 31.12.2016 year – 0,19 € 01.01.2017 – 31.12.2019 year – 0,18 € 01.01.2020 – 31.12.2024 year – 0,16 € 01.01.2025 – 31.12.2030 year – 0,14 € Average price for suppliers* 01.03.2016 – 31.08.2016 year – 0,04 € 01.09.2016 – 28.02.2017 year – 0,045 € 01.03.2017 - 0,58 €

Time of action of “Green tariff” – till 2030 year

19

19


Construction of solar power station with 800 MW of power  Project specification – Construction of solar power station:

Project information

• 600 MW Project economic indices •The land plot area for SPS placement– 1350 ha; •The productive efficiency of SPS – 80% • Preliminary economic evaluation of SPS project 600 MW. Indices • The total capacity of solar panels - 600 MW • The surface area for placement of solar panels to 2 ha • Unit value of project implementation - 1.5 EUR/W

 Organization name “Dnipropetrovsk Regional Investment Agency Project’s initiator

 Contact person – Neliubov Andrii  Contact information, web-site, e-mail: (056) 742 81 22,742 86 21 info@dia.dp.ua obl_project@ukr.net

20

20


Land plot for project implementation Nikopol district

Площа:

Cohesiveness of land plot

Solar output per year

Productive efficiency of SPS

Distance from the nearest transport corridor (highways railway stations)

Recourse administrator

1350 га 4 plots 1.422 kW/m2

80%

Nikopol district

5-10 m (highway М-04 Znamianka-LuhanskIzvaryne) DIA

21

21


Construction of solar power station  Project specification – Construction of solar power station: Project information

• 2.4 MW (Pidhorodnie) Project economic indices •The land plot area for SPS placement - 4.86 hectares; •The proximity to external power networks with a capacity of 10-35 kV; •Efficiency in the spring and summer - 70%; •Efficiency in the autumn-winter period - 30%; •Preliminary economic evaluation of SPS project 2400 kW. Indices Quantity. • The total capacity of solar panels - 2,4 MW • The surface area for placement of solar panels to 4.86 hectares • Forecasting volume of minimal electricity (for base year) - 2,9GW · hr. / Yr • Capital investments - EUR 2700000. • The specific cost of the project - 1.4 Euro / W • The period of putting into operation until 31.12.2016 • The value of "green" electricity tariffs - 0.19 EUR / kWh with VAT.

 Company’s name - LLC Arkhrozvytok Project’s initiator

 Contact person – Shatov Volodymyr  Contact information, web-site, e-mail – 067 295 85 37, arhrozvytok@gmail.com

22


Land plot for project implementation Pidhorodnie

Area:

4,86 ha Pidhorodnie

Intended use

Electricity (nearest electrical substation, its capacity) Distance from the nearest transport corridor (highways railway stations)

Recourse administrator

Land plot of energy power 10-35 кВ

5-10 m (highway М-04 Znamianka-LuhanskIzvaryne)

LLC Arkhrozvytok

23


Construction of the solar power plants  Project specification: Construction of the solar power plants: Project information

• 10 MWt (Shyroke district) • 10 MWt (Kryvyi Rih district)

 Company name – Еkotehnik Project’s initiator

 Head – Director, Yurii Zasyadvovk  Contact telephone, website, e-mail: 097 076 92 23, Ekotehnik@ukr.net

24


Land plot for the project implementation Shyroke district, Shestyrnya Village Council

Area: Intended use

21 ha Lands of electric power Dnipropetrovsk

Electricity (nearest electrical substation, its capacity and remoteness) Water supply (nearest connection point, its carrying capacity and remoteness) Distance from the nearest transport corridor (highways railway stations)

Resource administrator

150 m

300-400 m Shyroke district

5-10 m (highway Dnipro-KryvyŃ– RihKherson) Đ•kotehnik

25


Land plot for the project implementation Urban Type Settlement Raduzhne, Kryvyi Rih district Area: Intended use

20 ha Lands of electric power Dnipropetrovsk

Electricity (nearest electrical substation, its capacity and remoteness)

1 km

Gas (nearest gas distribution substation, its carrying capacity and remoteness)

1 km

Water supply (nearest connection point, its carrying capacity and remoteness)

Well bore in the land plot territory

Distance from the nearest transport corridor (highways railway stations)

400 (highway Kryvyi Rih-Nikopol)

Resource administrator

Kryvyi Rih district

Đ•kotehnik

26


ENERGY GENERATING SUBSTATION, WHICH WILL PROMOTE RECOVERING OF WATER BIORESOURCES

27


Comprehensive project of construction of solar power station and fishing industry Project information

 Project specification – Comprehensive project of construction of solar power station and fishing industry • capacity of SPS - 5,5 MW • processing of fish products – 3000 tons Project economic indices •The land plot area for SPS placement – 13 ha; Indices • Total project cost – ЕUR 12 362 673 • Unit value of project implementation – 1,1 EUR/W • Project pay back period – 5 - 8 years

 Organization name “Dnipropetrovsk Regional Investment Agency Project’s initiator

 Contact person – Neliubov Andrii  Contact information, web-site, e-mail: 056)742 81 22, 742 86 21, info@dia.dp.ua, obl_project@ukr.net

28

28


Land plot for project implementation Tsarychanka district

Building area:

13 ha Tsarychanka district

Area of water line:

Distance from the nearest transport corridor (highways railway stations)

Recourse administrator

about 270 ha 300 m (highway Р-52 Dnipro –TsarychankaKobeliaky) DIA

29

29


INVESTMENT PROJECTS

30


Investment projects of Yuzhnoye State Design Office

Project information

 Project specification: Organization of containers manufacturing for transportation of natural compressed gas  Project cost (thousd. USA dollars) and the way of investment funds attraction: 9 600,0 (requirement for investment fund) . Loan funds against state security or targeted budget financing  Project pay back period: 6,3 years  Project specification: Organization of carbon fiber production  Project cost (thousd. USA dollars) and the way of investment funds attraction: 9 000,0 (requirement for investment fund). Loan funds against state security  Project pay back period: 8,7 years  Project specification: Organization of manufacturing of semi-finished goods of aluminumalloys on the production base of steel enterprises of Ukraine  Project cost (thousd. USA dollars) and the way of investment funds attraction: 901 000,0 (requirement for investment fund). Loan funds against state security or targeted budget financing  Project pay back period: 6, 65 years

 Initiator’s title: Yuzhnoye State Design Office Project’s initiator

 Legal address: 49008, Dnipropetrovsk region, city of Dnipropetrovsk, 3, Kryvorizka Str.  Contact information, web-site, e-mail: tel. (0562) 42 00 22; (056) 738 64 03, 770 01 25; e-mail: space@yuzhnoye.com, info@yuzhnoe.com, www.yuzhnoye.com

31

31


Investment projects of the State Enterprise „Production Association Yuzhny Machine-Building Plant named after A.M. Makarov” (1/2) Project information

 Project specification: “Creation of incremental capacity at the State Enterprise „Production Association Yuzhny Machine-Building Plant named after A.M. Makarov” for expanding of landing gear production for plane model AN-140, AN-148 and other air aggregate and systems”

 Project’s aim: to create incremental capacity at the State Enterprise „Production Association Yuzhny Machine-Building Plant named after A.M. Makarov” for expanding of landing gear production for plane model AN-140, AN-148 and other air aggregate and systems  Assigned task: increasing of carrying capability of landing gear production for plane model AN-140, AN-148 and other air aggregate and systems; labour intensity reduction; ensure the stable operation of the enterprise  Project cost (thousd. USA dollars) and the way of investment funds attraction: USD 12,03 mln, USD 10,11 mln from which is the sum of needed investment  Terms of attraction of credit resources: The project provides the loans with repayment period of 4 years at 21.5% per annum. This loan provides the state support in the form of partial reimbursement (50% of the interest rate) from the state budget, the interest rate for availability of credit resources  Project pay back period: discounted payback period (DPB) is 5,43 year, pay back period (PP) is 3,94 years, net present value (NPV) is USD 3,00 mln, profitability index (PI) – 1,26

 Initiator’s title: State Enterprise „Production Association Yuzhny Machine-Building Plant named after A.M. Makarov” (YUZHMASH) Project’s initiator

 Legal address: Ukraine, Dnipropetrovsk, 1, Kryvorizka Str.  Contact person: Nehramotnov Anatolii, Executive director of MK «ZRAA» tel./fax: +38 0562 31 37 41  Contact information, web-site, e-mail: www.yuzhmash.com, e-mail: umz@yuzhmash.com, tel.:+38 (0562) 34-40-07, fax: +38 (0562) 39-95-00

32

32


Investment projects of the State Enterprise „Production Association Yuzhny Machine-Building Plant named after A.M. Makarov” (2/2) Project information

 Project specification: “Organization of tractors production of UMZ brand with 80-100 horsepower on the basis of capacities of the State Enterprise „Production Association Yuzhny Machine-Building Plant named after A.M. Makarov” Project’s aim: bringing to market of new models of domestic production tractors, which hold out for technical indicators own their foreign analogues and thus provide a technical update of technical park of agricultural manufacturers with modern and energy-packed tractors. Universal and cultivating UMZ tractors allow to install the equipment of special purpose for use as excavator, bulldozer, loader. UMZ tractors can be operated in areas with temperate and tropical climates.  Project cost (thousd. USA dollars) and the way of investment funds attraction: USD 23,11 mln is the project costs and sum of needed investment  Terms of attraction of credit resources: The project provides the loans under state guarantee for a period of 7.5 years with a return of 21.5% per annum  Project pay back period: discounted payback period (DPB) is 9,5 year, pay back period (PP) is 7,3 years, net present value (NPV) is USD 15,00 mln, profitability index (PI) is 1,03

Project’s initiator

 Initiator’s title: State Enterprise „Production Association Yuzhny Machine-Building Plant named after A.M. Makarov” (YUZHMASH)  Legal address: Ukraine, Dnipropetrovsk, 1, Kryvorizka Str.  Contact person: Harmash Viktor, Deputy Director of PC “DTZ” tel: +38 (0562) 35-31-61  Contact information, web-site, e-mail: www.yuzhmash.com, e-mail: umz@yuzhmash.com, tel.:+38 (0562) 34-40-07, fax: +38 (0562) 39-95-00

33

33


Construction of residential and commercial micro district "Volodymyrskyi" in uts. Yuvileine of Dnipropetrovsk district  Project specification: Construction of residential and commercial micro district "Volodymyrskyi" in uts. Yuvileine of Dnipropetrovsk district Project information

 Project location: Territory has advantageous location and located at the crossroads of transport routes of international importance. The distance to the central part of Dnipropetrovsk is 10 km

 Cost and project implementation period: approximate period of the project implementation is 710 years  Resources of initiator for the project implementation:  its own construction base with the area of 7 hectares, which is adjacent to the micro district;  90 units of construction equipment;  Its own production line of foam concrete, cinder block, own carpentry shop;

 2 construction units and design team.  Cooperation variants: sublease, assignment of lease rights Opportunities for cooperation

 Other types of joint activities – prospects of using of the construction site: residential construction, commercial real estate (retail parks), the establishment of the regional wholesale market food products

 Initiator’s name: LLC Agrarian-Production Enterprise "Sodruzhestvo" Project’s initiator

 Primary activity:  Legal address: 52005, Dnipropetrovsk region, Dnipropetrovsk district, uts. Yuvileine, 23, 8 March Str.  Head: Director General - Volodumyr Kononov  Contact person: Tetyana, 056 753 89 10

 Contact information, web-site, e-mail: 0503206229, Sodr1@ukr.net

34


Land plot for the construction Area:

40,2626 hĐ°

Intended use

For residential and public construction

The availability of the land plot communications

All engineering networks are supplied to the territory of micro district

Electricity (nearest electrical substation, its capacity and remoteness)

Currently, the electricity supplies to the neighboring residential micro district at a rate of 2 MWt, it is received technical specifications for 6 MWt

Gas (nearest gas distribution substation, its carrying capacity and remoteness)

Gas highway networks were laid and taken into operation

Water supply (nearest connection point, its carrying capacity and remoteness)

Water supply highway networks were laid and taken into operation

Water discharge (nearest treatment facilities, their remoteness)

Water discharge highway networks were laid and taken into operation

Distance from the nearest transport corridor (highways railway stations)

Territory has advantageous location and located at the crossroads of transport routes of international importance. The distance to the central part of Dnipropetrovsk is 10 km

Resource administrator

LLC Agrarian-Production Enterprise "Sodruzhestvo"

uts. Yuvileine Dnipropetrovsk

35


Construction of refrigerator with regulated gas environment for fruits storage and establishment of a fruit and vegetable orchard Project information

Opportunities for cooperation

Company’s profile

Project specification: Refrigerator construction with regulated gas environment is designed for high quality fruits and vegetables storage with subsequent sorting, packing, consumer delivery.  Total refrigerator capacity is 5 000 tones.  Availability of project business plan: under development  Project costs and implementation period: EUR 7 245,90 thousd.; 24 months.  Market outlets: markets-wholesale markets, trade networks of Ukraine.  Project readiness degree: design works are completed.

 Credit, venture capital, project financing.  Other kinds of joint activity – creation of joint venture.

Company’s name: Farm enterprise Vidrodzhennia

Primary activity: Growing agricultural products

Legal address: 51822, Ukraine, Dnipropetrovsk region, Petrykivka district, Khutorske village, 23A, Lenin Str

Company executive: Yarmoliuk Ivan,

Contact information, web-site, e-mail: (05634) 2-35-45; minisad@ukr.net

36


Reconstruction of the modern industrial area of processing and freezing of food products 

Project specification: Modern foreign approach to the production (processing) freezing of food products through reconstruction of the existing refrigerator chambers.

Project location: Industrial building is located on the entrance route to the city of Nikopol on the banks of the Kakhovka Reservoir, 700 m from the road (forked road for Dnipropetrovsk, Kryvyi Rih, Zaporizhzhya). Area of the land plot is 1 ha. The available communications of the land plot are: gas pipeline, electricity, water supply system, wastewater disposal, sealed road. The area of the building is 3000 m2 (production facility for air-and-sunshine drying, smoke drying, fish processing including refrigerating chambers of 800m2, height of ceilings is 5 m, 2 loading platforms). There is water supply intake from the river Dnipro.

Cost and project implementation period: 750 000 $

Resources of initiator for the project implementation: 250 000 $

Cooperation variants is the joint venture creation: LLC TRADE Dil M. is ready to create the new company, where the main owner of the industrial area will be an investor, who would finance preparing of business plan, the reconstruction of the building, develop logistics and others necessary processes.

LLC TRADE DIl M. expects to have a share in this business. LLC "TRADE Dil M. is open and ready to discuss any conditions. The main goal is to create the profitable enterprise with the ability to freezing and storage of food products.

Project information

Opportunities for cooperation

Project’s initiator

Initiator’s name: LLC TRADE DIl M.

Primary activity: Classifier of economic activities 10.20; 03.12

Legal address: Nikopol district, v. Kamyanske

Head: Director - Oleksandr Moroz

Contact information, web-site, e-mail: 050 500 53 51, 067 523 0595, morozai-64@mail.ru

37


Land plot for the project implementation Nikopol district, v. Kamyanske Area:

1 hа Dnipropetrovsk

Water supply (nearest connection point, its carrying capacity and remoteness)

There is water supply intake from the river Dnipro

Water discharge (nearest treatment facilities, their remoteness)

is available

Distance from the nearest transport corridor (highways railway stations)

Sealed road is available. 700 m from the road (forked road for Dnipropetrovsk, Kryvyi Rih, Zaporizhzhya).

Recourse administrator

LLC “TRADE DIl M.”

Nikopol

38


Creation of industrial greenhouse facility in Kryvyi Rih

Project information

 Project specification: Creation of industrial greenhouse facility (protected soil) for growing vegetables (cucumbers, tomatoes) in Kryvyi Rih (Dnipropetrovsk region) in the area of 1 hectare  Project location: Kryvyi Rih  Cost and project implementation period: TBD  Resources of initiator for the project implementation: land plot

Opportunities for cooperation

 Cooperation variants is the joint venture creation: To act as an investor placing own production

 Initiator’s name: Kryvyi Rih City Council Project’s initiator

 Primary activity: Local government body  Legal address: Kryvyi Rih, 1 Radyanska Sq.  Head: Vilkul Yuriy  Contact person: Vera Kharchenko  Contact information, web-site, e-mail: (056)-492-98-48, irm_kr@i.ua

39


Land plot

Kryvyi Rih Area:

1 ha

Land plot location

Kryvyi Rih, Dovhyntsi district, Blahoyeva Str.

The availability of the land plot communications Recourse administrator

Dnipropetrovsk

Kryvyi Rih

Water supply / Electricity networks are available close to the land plot Kryvyi Rih City Council

40


MUNICIPAL SOLID WASTE MANAGEMENT

41


Object construction of MSW management within the “Western Donbas” sub-region of Dnipropetrovsk region Project information

 Project specification: the introduction of Comprehensive effective system of municipal solid waste management involves the implementation of investment project “Object construction of MSW management within the "Western Donbass“ sub-region in the territory of Pavlohrad „.  Project location: Pavlohrad, Pavlohrad district. The plot for the future object is adjacent to the existing polygon of Pavlohrad.  Cost and project implementation period: is determined by the investor.  Resources of initiator for the project implementation: Comprehensive research of MSW management in the "Western Donbass“ sub-region territory is supported by DTEK Pavlogradugol and Federation of Canadian Municipalities (FCM) within the MLED project, Ukrainian Scientific and Research Institute for the development and implementation of municipal programs and projects.

Opportunities for cooperation

 Credit, venture capital, project financing : is determined by the investor in cooperation with Pavlohrad City Council  Other types of joint activities:  providing land plot by the necessary area for the plant construction for the MSW management;  collaboration for the conclusion of agreements for the supply of necessary volume of raw materials to the object;  assistance in obtaining specifications and laying on the communication to the chosen land plot;  assistance in obtaining the necessary permits, licenses and certificates for construction and operation of the enterprise;  collaboration with key customers of products of MSW processing to conclude of long-term agreements.

 Initiator’s name: Pavlohrad City Council Project’s initiator

 Primary activity: local government body  Legal address: 51400, Pavlohrad, 95 Lenin Str.  Head: Anatolii Vershyna , city mayor  Contact person: Department on investment attraction, project implementation and regulatory policy of Pavlohrad City Council  Contact information, web-site, e-mail: (0563)-20-02-88, pavlogradinvest@mail.ua

42


Potential land plot for the construction Pavlohrad Area:

10 hа

Intended use

land plots of industrial use

Key indicators of the project

The total population is: 227 109 persons including: • Urban population is 168 060 persons (74%) • Rural population is 59 049 persons (26%). About 75% of the population of the subregion are dealing with the services of removal of MSW. The annual volume of waste formation in 2015 was approximately 45 ths. tonnes.

Components of MSW, %

Companies, that are involved in MSW removal

Wood (furniture, boards, plywood) Ceramic materials and products (sheet glass, plumbing equipment) Metal (Metal components of electrical and electronic equipment, etc.)

60 15

Paper and cardboard (large-sized packages) Rubber, leather, products made of mixed materials Polymers

6

10

5 4

7 companies are involved in removal and collection of MSW, large-sized and repair waste in the territory of settlements of Subregion: 5 municipal and 2 private ownership.

43


CONTACT INFORMATION

Dnipropetrovsk Regional Council Dnipropetrovsk

Address:

49004, Ukraine, Dnipropetrovsk, 2, Olexander Paul Ave.

Tel.:

+38 056 742 85 24

E-mail:

oblrada@oblinfo.dp.ua

Web:

www.oblrada.dp.ua

Dnipropetrovsk Regional State Administration

Dnipropetrovsk Investment Agency (DIA)

Address:

49004, Ukraine, Dnipropetrovsk, 1, Olexander Paul Ave.,

Address:

49004, Ukraine, Dnipropetrovsk, 2, Olexander Paul Ave., office 538

Tel.:

+38 056 742 89 80

Tel.:

E-mail:

info@adm.dp.ua E-mail:

+38 056 742 86 87 +38 056 742 86 21 info@dia.dp.ua

Web:

www.dia.dp.ua

Web:

www.adm.dp.ua

44


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.