ARCHITECTURE PORTFOLIO

Page 1

ARCHITECTURE

PERSONAL PORTFOLIO

STUDENT UNDERGRADUATE - GRIGORAS ALINA





content _____________________________________ 6 10 18 26 34 36 40 42 43

****hotel - apartament buildings - landscape garden - art museum - student hub - technical project - summer practice - 3d model - graphic techniques -


6

6

.I .1

I

I

,

. .. �

J

■ I

• •

..• ■

I

• I

• .n

■ ■

••

I

I

r1

;

:.:;po - .,. i .

\ -

-.�,..' •<

.,

.

�,-,:!\� �- ;-

I

t•

,.,:.:..."" •: '•

..�:� ..· · ·••

-�,t.

, >j;''

-:: ��

. .

- ■ ■-

I

1

(

1

-

I

r. •I

■ ■

I

1•

I

I

I

■ ----1

._ r r I

I

-

-

r

'

--

-

I

•..· i

..

• I ■

I

•r ·-

0 •

I

-

I

I

r.-

I

I

r

I I

r

II I

LEGENDA

...

C)

ACCES PRINCIPAL ACCES PARCARE

• • • STUDIED AREA

{

e

PARKING

**** HOTEL PROJECT

'

'

II


7

7

GALATI, ROMANIA

.,,, -I

/

/

THE CONCEPT STARTED FROM A CIRCLE, DEFINED BY THE STRUCTURE OF THE VOLUME - ROUND CONCRETE PLATFORMS WITH INDEPENDENT STRUCTURE.

I

I

I I I I

THE INSIDE SPACES ARE FORMED AFTER AN ORTHOGONAL SYSTEM, WITH CENTRAL CIRCULATION. THE ROOMS ARE RECTANGULAR IN PLAN, INDEPENDENT IN POSITIONING, GIVING THE POSIBILITY OF FUTURE RESHAPING IN THE MODEL.

I I I \ \ \ \

',

- ---------

I I

I I I

THIS SHAPE CUBIC VOLUMETRY IS TRANSLATED INTO THE INFERIOR FLOORS, WHERE 2 MAIN SHAPES FOLD AROUND THE CIRCULAR CENTER

'

''

'

,,

PUBLIC

/I

''

,

.... ....

_____ _ - --

_,,,/

;

;

/

STRUCTURAL CONCRETE PLATFORMS

I

I

\

.,,, - ' \

\

'--/

I

PRIVATE

-

-

.

.....,

TEHNICAL

'

'

\ J

PUBLIC


8

15TH FLOOR

8

BASEMENT FLOOR

GROUND FLOOR

SECTION S1

MEZZANINE FLOOR

SECTION S2

6TH FLOOR

5TH FLOOR


9

9

CONFERENCE CENTER


10

10

RESIDENTIAL BUILDINGS - YEAR 2018-2019 - GROUP PROJECT GRIGORAS ALINA & PERDICA ADRIAN

The main focus was to capture the essence and freedom of the nature and translate it inside the project. The volumes are protected from the city creating a safe space inside the site and at the same time represent a major point of interest for the outsiders which are atracted by the public zones. We did not want just to extend the limits of the city, but to create a new area that acts as a barier that separates the natural habitat from the visual and phisical pollution of the city. We did that by translating the hill of the forest inside to residential complex. Underneath it we added an underground road, which has a practical use, to relieve the traffic and the area and to facilitate the acces to the underground parking, but also to avoid spliting the site from the forest itself .


11

11


12

12


13

13


14

14

PLAN ETAJ 1 SCARA 1:100

11

PLAN PARTER C1 SCARA 1:100 M

M

L

L

10

9

8

K PUB

7

6

J

11

I J'

H

H

LIBRARIE

2

G

G F

1

E F'

FARMACIE

E'

D

D

C

C COFETARIE

B

B

A

A

1 2


15

15


16

16


17

17


18

18

LANDSCAPE PROJECT - YEAR 2017 - 2018 Remodel of the MOMA museum’s garden LOCATION : NEW YORK - USA


19

19


20

20

From the beginning I imagined my garden with exuberant vegetation and oversize trees, that seem to conquer the place, to balance somehow the heaviness of the heavy buildings that surround the city. The detail was in the central tree, that was the first thing you see when you enter the garden and stays in your mind with the whole garden even if you don’t consciously notice its presence.

In the Japanese garden I saw for the first time the beauty of raw nature intertwined with structures made by man. The display of elements in layers, to slowly absorb you into the heart of the garden.


21

21


22

22


23

23


24

24

These are the first sketches, with a totally different garden but with the same goal. To create a space where the overbearing vegetation is put in value by artificial surfaces, creating a parcourse, a story of the garden, not only an image.


25

25


26

26


27

27


28

28


29

The project started from the area of the train station and the existing museum, connecting them and the new project undergound, with a rectangular shape that cuts through the site. The museum is connected to the new building not only underground but also on the superior floors, becoming one of the areas of exhibition. The train station elongates into a tall tower, in which are located the small living areas for the artists.

29


30

30


31

31


32

32


33

33


34

34

STUDENT HUB year 2017

THIS PROJECT IS A LANDMARK WHICH IS MEANT TO UNITE AND CONNECT STUDENTS AND THE LARGE PUBLIC INTO ONE SPACE THAT CAN BE A PLACE OF BOTH WORK AND ENTERTAINMENT

Because on the site there were hardly any favorable perspectives, I had to transform the building itself into a landscape. The parametric green roof is accesible from the ground floor but also from the superior floors. Because of its shape, the building blends into the background, underlining the angled roof of the houses that surround it.


35

35


B

2.00

2.45

2.85 2.64

2'

7.46

70

3'

70 26 2.50

hp= 70 70 30 2.00

F03

47

1.10

4

3.08

F10

3.65

U01

U

5 6

1.50 2.10

F10

60

F10

1.10

50 50 10

F10

70

1.95

20

1.95 51

50

1 18.2 0 4.8

F10

90 2.10

4.30

U06

7

F10

S.U

F10

3.99

2.70

4.75

F E

4.50

F10

U

F10

4.00

90 2.10

5.49

F10

70 hp=

1.80

5.95

U STICL

2.00

12

50

27

, , EI-15

1 15 3

F05

2.43

2.20

2.36

U

27

13

8.19

6.05

1.50 2.10 2.80

6.18

5.67

P03.SALA DE CLASA S.UTILA = 61.17MP PARCHET H. LIBER 3.30 M

m 30 c 6 tr. 5 cm 1 7 ct.

90

10

23 tr. 30 cm

47

F11

Suprafe tactilo-vizuale

1.50 2.10

12

+ 2.00

H.P.B. 1.00 23 ct. 16.50 cm

balustrada metalica

4.23

±0,00

U01

P01.HOL S.UTILA = 202.76MP GRESIE H. LIBER 3.30 M

50 22 31

2.40

47

20

9

44 8

U01

31

6 5 4 3 2 1

1.31

-1,05

-0,08

1.40 2.00

70 hp=

90 6.00

2.14

2.70

F02

70 hp=

8

7 15 4

85

4 10.2

8.82

1.40 2.00

5.49

P10.SALA DE CLASA S.UTILA = 58.26MP PARCHET H. LIBER 3.30 M

1.94

F05

70 hp=

80

F09 F10

U01

13 1.35

2.11

AL EDIC ET M CABIN 4 MP P14. A = 18.5 IL S.UT IE S GRE ER 3.30 M 2.65 H. LIB

90 2.10

5.84

m . 30 c 23 tr 16.50 cm 23 ct.

0 . 1.0 H.P.B

3.84

15

4.50

1547

14

+0,95

2.31

-0,25

-1,05

1.70

5.35

+0,88

11'

S1

-1,05

1.20

3.53

S3

1.20

-0,65

15

2.55

1.85

2.70 2.00 5.00

2.25

1.50

1.50

4714

S1

F10

50

1.40 2.00

4.01

47

F05

7

5.49

31

1.35

5.05

m 30 c 6 tr. 5.00 cm 1 7 ct.

0 41.6

1.65

5.49 2.70 2.00 4.80

hp= 70

60

3.05

6.20

40

20 30 10

1.66

14 89

4.50

50

P02.CASA SCARII S.UTILA = 16.62MP GRESIE

4.50 50

hp= 70

2.89

47

41

4.50 501050

4.50

55

52 55

1.50 2.10

52

2.04

F02

F01

panta 8.7%

SIE GRE 3.30 M ER H. LIB

4.90

70 hp=

F02

20

U

2.00

RE IZOLA P M CAM. P16. A = 12.64 IL S.UT ET H PARC R 3.30 M E H. LIB

60

2.25 47

15

5 6

F02

50 U06 2.31 90 31 1 78 2.10 1 LASA 10 DE C 2MP ALA P11.S ILA = 60,2 S.UT ARCHET M P .30 ER 3 H. LIB

F10

50

3120

1.79 -1,05

2.95

fe Supra -vizuale o tactil

3.65

panta 8.7%

85

45

4

U01"

1.40

1.03 1.50 2.10 1.35

60 3.05

hp= 70 20

5.00 2.70 2.00 2.11 3.60

OLA RIG

E 90 ILIER 0 0 .1 2 ONS 10 50 7 ET C ICA 31 ABIN OG 14 P12.C PSIHOL 7.01MP 23 =2 65 TILA

U 13 ARE INTR MP EST 9 POD ILA = 5,0 S.UT RESIE M G .30 ER 3 H. LIB ±0,00

07

1.50 2.10

3.25

3.15

65

2.90

F06

13 1 2 3 4 5 6 7 8 9 10 11

a strad balu lica meta

45

3.10

50

50 55

80 50 , 5 , EI-1

51

9 2 1.5 0 1 51 4

23 22 21 20 19 18 17 16 15 14 13 31

ARII A SC MP 23 8 CAS P13. A = 18.8 IL S.UT IE S ±0,00 GRE

U01'

1.500 2.1

2.32

F10

S2

1.93 55

U STICL

F14

1.10

1.04

10

3.15

65

3

panta F12 9.5%

3.15 70 2.50

hp= 70 4.08 -2.60

hp= 70

U06

90 2.10 EI-15 1.76

U06

3.05

90 2.10

13

70 hp=

F05

1.68 1.40 2.00 3.60

IFOC N ANT OBLO

1.60

12

S2

2

5.33 24

1

36 1.36

62

-1.05

10 tr. 30 cm 10 ct. 15 cm

2.83

55

70 2.00

30

11 22 33 44 5 6 7 8 9 10 11

23 22 21 20 19 18 17 16 15 14 13

4.33

31

4.08

70 2.00

31

2.75

1.28

U06 17 90 0 2.1

hp=

F03

13 .62 13 1 70

4.85

1.60

G.S 2MP P15. A = 3,5 IL S.UT IE M S GRE ER 3.30 H. LIB

1.400 2.0

2.91

F03

2.50

90 2.10 13 40

U06

90 2.10

13

P19. G.S. PF. B. S.UTILA = 10,00MP GRESIE H. LIBER 3.60 M

hp= 70

90 2.10

U06 4 47 3

2.09

3.88

3.02

70 hp=

F05

3 11 80 13 13 80 14 47 2.10 3 2.10 3 3 11 80 11 96 2.10 1.70

47 14

80

fe Supra -vizuale o tactil

1

1.27

IFOC N ANT OBLO

±0,00

4.23

1.16 11 1.14

17 1.60 2.40

6 5 4 3 2 1

P18. G.S. PF. F. S.UTILA = 11,57MP GRESIE H. LIBER 3.60 M

16

S3

H.P.B. 0.90

ET PICH

U03

1.73

U06

F03 F03

hp= 70 hp= 70 3.45

U

RE ZITA P DEPO P17. A = 7.42M IL S.UT IE S GRE ER 3.60 M H. LIB

A

OBLON ANTIFOC

U05 6 tr. 30 cm 7 ct. 15.00 cm

30 1.10 2.60 70 2.30 1.80 1.15 70 2.00 1.00 90 2,70 3.17

D

C

36

6.00

36

F E

C

A


M OBLON ANTIFOC

L OBLON ANTIFOC OBLON ANTIFOC

K

J

8'

15

14

2.17

m 30 c 6 tr. 5 cm 1 7 ct.

10

15.85 2.70

10'

2.05

P06. G.S. B. S.UTILA = 13.93MP GRESIE H. LIBER 3.30 M

90 2.60

F04

2.9

1.94

15 hp= 3

3.24

13

6.70

F04

90 2.60

15 hp=

3.38

90 2.10

3.34

81

13

2.45

1.78

13

4.41

80 30 80 30 80 30 80 2.10 2.10 2.10 2.10

6.44

P04.SALA DE CLASA S.UTILA = 57.19MP PARCHET H. LIBER 3.30 M

5.00

5.14

5.14

14

47

47

11'

3 3 13 3 90 20 15 80 1414 80 14 14 80 14 14 80 15 2.10 2.10 2.10 2.10 2.10

U06

U06

80

1.90

P05. G.S. F. S.UTILA = 23,92MP GRESIE H. LIBER 3.30 M

U06

30

10 90 30 2.10

90

U06

31 10 90 30 2.10

50

31

31

31

14 90 2.10

15

1.38

P07. G.S. PERS.DIZ. S.UTILA = 6.39 MP GRESIE H. LIBER 3.30 M

4 17.6 13 48 60 90 2.10

0 . 0.9 H.P.B

3.00

13

U02

±0,00

2.39

2.39

2.19 5.00

2.39

40.94

9'

60

31

31

31

38

11

90 10

U06 1.40 2.10

31

79 5 70 5 80 2.57

6.45

90 2.60

PODEST INTRARE S.UTILA = 5,09MP GRESIE H. LIBER 3.30 M

U

-1,05

F04 15 hp=

30

30

U06 90 10 2.10

3.65

5.45

1.18

3

95

3

95

2.36

31 18 90 18 31 2.10

4.18

ET PICH

TIFOC N AN OBLO

6.17

6.04

P08. DEPOZITARE S.UTILA = 23.56MP GRESIE H. LIBER 3.30 M 5.93

6.19

P09.SALA DE CLASA S.UTILA = 54,73MP PARCHET H. LIBER 3.30 M

4.75

4.89 4.91

30

87

4.77

70 2.00

1.80

70 2.00

2.40

1.30

2.70 2.00 4.50

3.20

2.70 2.00 3.20

70 50 2.00

1.30

70 2.00

50

2.70 2.00 3.20

1.30

F02

F02

F03

F03

U06

80 17 80 17 80 2.10 2.10 2.10 3.07

1.26

31

3.68

42

F03

F03

F02

1.39

90 2.10

1.38

26

31

1.56

3.88

22

hp= 70

hp= 70

hp= 70

hp= 70

hp= 70

hp= 70

hp= 70

31

1.62

2.69

8.96

31

9.81

7.28

1.79

7.28

50

I

47

4.90

2.70

19.19

4.00

50

3.72

9

50

2.70 2.70

U06

1.50

1.05 26

3.89

2.70

50

50

4.00

50

1.25 90 2.10 2.43 50

50 2.70 2.70

50 50 50

2.86 9.09

13 4.33 31 7.50 1.60 29 1.61 2.69 50

hp= 70 hp= 70 hp= 70 hp= 70 hp= 70 hp= 70 hp= 70

9.79

H

G

26.89

F03 F03 F02 F02 F03 F03 F02

70 60 2.00 3.00 70 75 2.00 1.32 4.50 2.70 2.00 1.30 3.20 2.70 2.00 70 51 2.00 3.20 1.30 70 2.00 50 3.20 2.70 2.00 1.29

37 37

TECHNICAL DRAWINGS

Year : 2019 These drawings were realised during my work at the office SC SUBMIT SRL. I had to realise the technical drawings after the existing volumetry of the project.

M

L

K

J

I

H

G


38

38 Membran cu ardezie Membran 2% Membran Polistiren extrudat 10cm Barie contra vapori Plac 15cm

Var lavabil Pro il metalic atic 65cm

GIPS-CARTON Pro il rost tavan

PARCHET LAMINAT DE 0.8 CM FOLIE PEE SAPA DE EGALIZARE 7 CM PARDOSEALA B.A. 15 CM VAR LAVABIL

MEMBRANA HIDROIZOLANTA CU ARDEZIE MEMBRANA HIDROIZOLANTA SAPA DE PANTA 2% (INALTIME MEDIE 5CM) MEMBRANA GEOTEXTILA POLISTIREN EXTRUDAT 10 CM BARIERA VAPORI PLACA BETON ARMAT 15 CM VAR LAVABIL

10

9

8

7

6

VAR LAVABIL GLET TENCUIAL PERETE GIPS-CARTON VAT 10 CM ZID 29 CM TENCUIAL GLET VAR LAVABIL

+12,40 +11,85 +11,40

Pro il rost tavan +7,60

D-04

PARCHET LAMINAT DE 0.8 CM FOLIE PEE SAPA DE EGALIZARE 7 CM PARDOSEALA B.A. 15 CM VAR LAVABIL

GSPublisherVersion 0.0.100.100

+3,80

PARCHET LAMINAT DE 0.8 CM FOLIE PEE SAPA DE EGALIZARE 7 CM PARDOSEALA B.A. 15 CM FOLIE PVC POLISTIREN EXTRUDAT 5 CM BALAST COMPACTAT 20 CM PAMANT COMPACT

±0,00 -1,05

-2,60

10

2.80

6.00

4.50

4.80

6

2.80

6.00

4.50

4.80

6

9

8

7

6


GIPS-CARTON

39

Pro il rost tavan

39

PARCHET LAMINAT DE 0.8 CM FOLIE PEE SAPA DE EGALIZARE 7 CM PARDOSEALA B.A. 15 CM VAR LAVABIL

Pro il rost tavan

VAR LAVABIL GLET TENCUIAL PERETE GIPS-CARTON VAT 10 CM ZID 29 CM TENCUIAL GLET VAR LAVABIL

GSPublisherVersion 0.0.100.100

MEMBRANA HIDROIZOLANTA CU ARDEZIE MEMBRANA HIDROIZOLANTA MEMBRANA GEOTEXTILA ATIC BETON ARMAT 14 CM POLISTIREN EXPANDAT 10 CM PLASA DIN FIBRA DE STICLA MASA DE SPACLU TENCUIALA DECORATIVA

5

4

2

+12,40 +11,85 +11,40

+7,60

VAR LAVABIL GLET TENCUIALA ZIDARIE DIN BLOCURI CERAMICE 35 CM POLISTIREN EXPANDAT 10 CM PLASA DIN FIBRA DE STICLA MASA DE SPACLU TENCUIALA DECORATIVA

+3,80

D-05

±0,00 -1,05 D-06

-2,60

60

3.65

9.10

60

3.65

9.10

5

4

2

*The project is not yet finished, as I have to receive the final analysis from the structural engineer. Afterwards, I can finish the foundation and the details regarding it.


40

40

SUMMER PRACTICE “OLD HOUSE” GALASOAIA - GORJ, ROMANIA Project year: 2017 In this particular project we had to do a analysis on the house and redraw the project by han d, as we would do for a technical project.


41

41


42

42

3D model Golf House

Architect: Luciano Kruk

During this project we had to analise a chosen existing project and construct the 3d model after it. Project year: 2016


43

GRAPHIC TECHNIQUES LINES VS DOTS (REALISED AFTER EXISTING PICTURES)

43


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.