Allison Conley Professional Experience

Page 1

streetscape future vision

SKINKER CORRIDOR FRAMEWORK studio jantzen, june-dec 2013

Masterplan and future vision for North Skinker corridor for client Washington University in St. Louis. I have been working on this project in the pre-concept phase for six months with Studio Jantzen and completed landscape design, street redesign to include bicycle infrastructure and ground floor building concept plans. Another of my responsibilities is coordination with consultants - urban design, landscape, lighting and traffic engineering.

N Skinker Blvd at Forest Park Parkway

Human scale lighting, seating and new bicycle parking located in green buffer

PROPOSED GENERAL ARRANGEMENT Specification Level: High Utilizing existing stormwater drainage

Sidewalk and bicycle lane is taken across sidestreet and priority is given to pedestrians and bicyclists

Opportunity for small public plaza at corners

Median serves as flexible space that can both act as a buffer for safe pedestrian crossings, and can narrow at points to allow for bus bays.

Clearly marked zebra crossing, from sidewalk to sidewalk

Bus bay located in roadway Access at grade across bicycle track Bicycles slow and stop for pedestrians accessing the bus

Stormwater treatment, Bioswale

FUNCTIONAL BUFFER 2’-8” ZONE FOR WALKING 6’-5” SAFETY BUFFER BICYCLE LANE, RETROFIT 6’-5” GREEN BUFFER 4’-2” LANE 10’

EXISTING CURB

LANE 10’

MEDIAN 11’ LANE 10’ LANE 10’ SAFETY BUFFER 3’-2” BICYCLE TRACK 6’-5” EXISTING CURB GREEN BUFFER/BIOSWALE 7’-5”

SKINKER BOULEVARD CONCEPT DESIGN Specification option assessment

ZONE FOR WALKING 6’-5” GREEN BUFFER 5’

Park is linked directly to sidewalk

N Skinker Blvd at McPherson Ave.

Active streetscape axon by consultants S c h u l z e + G r a s s o v, U r b a n D e s i g n , C o p e n h a g e n

Concept D

ALLISON GRACE CONLEY.com


EDGE MATERIALS: PROPOSED

M CP .

WAS.

WES.

. AT W

ENR.

DEL.

WAS.

WES.

KIN.

MCP.

WAT.

PER.

LON.

PER.

BRO.

LAG.

F.P.P.W.

FOR.

Proposed Edge Materials BIKE LANE

PLANTED EDGE

SIDEWALK

BIKE & PEDESTRIAN CIRCULATION: PROPOSED

CP . M

WAS.

WES.

. AT W

ENR.

DEL.

WAS.

WES.

KIN.

MCP.

WAT.

PER.

LON.

PER.

BRO.

LAG.

F.P.P.W.

FOR.

Proposed Bike & Pedestrian Circulation

Urban Design |

Analysis: Skinker Corridor Mapping

SHARED LANE

BIKE LANE

BIKE CROSSINGS

PHASE II

172

PEDESTRIAN CROSSINGS

Series of Diagrams of Existing and Proposed conditions

by Studio Jantzen with DTLS landscape consultants CHARACTER

unified system supporting and enriching the character of Skinker Blvd

Urban Design |

Analysis: Skinker Corridor Mapping

t

rth no

eas

170

n, rba hood U : t r Eas ighbo ne

th

u so

st we

Distinct character for street activation based on neighborhood context. w i t h S c h u l z e + G r a s s o v, U r b a n D e s i g n , C o p e n h a g e n

b yFramework S t u dand i oVisual J aGlossary ntzen Design: Urban Design

l, ura t a st: N n We burba su

PHASE II

Urban Design |

PHASE II

ALLISON GRACE CONLEY.com

176


A visual cost analysis was developed for the client, Washington University, in order to create a future plan easily achievable in three phases. I worked to develop high, medium and low design options featured on these pages. Low or temporary options being phase 1, whereas high options with new buildings are planned in the later phases. During this cost estimate, I coordinated landscape and urban design consultants and assembled a ‘cost estimating package’ to which costs were assigned by the estimator.

streetscape future vision

SKINKER CORRIDOR FRAMEWORK studio jantzen, june-dec 2013

WESTMINISTER PARK

ON

7.0

PRECEDENT IMAGES BIOSWALES

. SKINKER BOULEVARD

MED. BIOSWALE PARKLET

HIGH PERMANE

N. SKINKER BOULEVARD

ctivate en

10

HARDSCAPE PLAZA

TO NORTH CAMPUS

9

DEL

MAR

BUILT INTERVENTION

4

5 6

7

TMIN

KING

SBU

PHE

1 K

ER

N.

S

N KI

PRECEDENT IMAGES BIOSWALES

3

.

VD BL

WA TER

SH

FO

RE

2

ST

PA R

KP

ING

R PL

.

AVE .

RSO

NA VE.

5’

AVE .

NB

LVD .

SKINKER PARK

1 2

EAST UNIVERSITY PLAZA

MED. BIOSWALE PARKLET

Existing Parking

MCPHERSON CORNER

5

AR BLVD

8

.

PARKING WAS

HING

TON

BLVD

.

WES

TMIN

ISTER

PL.

KING

SBU

RY

AVE.

MCP

HER

SON

CHURCH’S LOT AT&T LOT

AVE.

WAT

ERM

AN

BLV

D.

1 R

N.

Diagram of Streetscape Proposed Interventions Gubei Pedestrian Promenade by SWA Group, Shanghai

TIONS

KE

IN

SK

3

D.

BLV

PER

SHIN

G AVE

.

2

FOR

EST

PAR

K PKW

Y.

EAST UNIVERSITY PLAZA SKINKER PARK KAYAK’S CORNER PARKVIEW GARDEN MCPHERSON CORNER MCPHERSON PLAZA ANIMAL HOSPITAL WESTMINISTER PARK CHURCH’S LOT AT&T LOT

1 2 3 4 5 6 7

6 7

8

10

Univers Studen campus Ground cafe

8 9

WUSTL N. SKINKER CORRIDOR SPECIFICATIONS | AUGUST 9, 2013

0’

20’

DTLS STUDIO RANDY BURKETT LIGHTING BURGEONING CBB ENGINEERS

10’

37

5’

0’

40’

7.5

20’

10’

40’

123 COST ESTIMATING The PACKAGE ideal utilization of this lot is by a mixed-use building with ground floor activation

A temporary improvement to the streetscape would be the introduction of a bioswale and sidewalk parklet. Benches would provide pedestrians a place to gather and the bioswale would capture runoff from the adjacent parking lot.

HIGH MIXED-USE STRUCTURES Bioswale Parklet PERMANENT Existing Parking Mixed-Use Building • •

9

PROPOSED BUILDING ACTIVE GROUND FLOOR PROGRAM

9

• •

TO NORTH CAMPUS

PROPOSED INTERVENTIONS

TAL

10

8

Maintain existing parking servicing adjacent housing

10

5’

Bioswale with pathway

Filters parking lot and sidewalk runoff Wide bridges with benches provide a sidewalk parklet for pedestrians to rest or gather

green space hardscape plaza built intervention

SPECIFICATIONS | AUGUST 9, 2013

MED. BIOSWALE, WEEKEND EVENTS & ACTIVE PROGRAM

N. SKINKER BOULEVARD

TO NORTH CAMPUS

WESTMINISTER PARK

DELM

8 EXISTING 7 6

5

Mixed-Use

Bioswale Parklet

ANIMAL HOSPITAL

4

The ideal util such as retail equidistant a

4

BIOSWALE 9

gather and the bioswale would capture runoff from the adjacent parking lot.

3

MCPHERSON LOT

7.6

40’

HIGH A temporary improvement to the streetscape would be the introduction of a PERMANENT STRUCTURE bioswale and sidewalk parklet. Benches would provide pedestrians a place to

KAYAK’S CORNER

Y.

10

20’

10’

Bioswale with pathway PARKVIEW GARDEN

N. SKINKER BOULEVARD Planted flower bioswale

KW

Planted flower bioswale

8

.

0’

MA

PER

.

BLVD

Gubei Pedestrian Promenade by SWA Group, Shanghai MC

munities.

WESTMINISTER PARK

RY

ISTE

ON

WESTMINISTER PL.

njoyable e ty and hood

INGT

WES

BLVD

EXISTING PARKING

WAS H

8

BIOSWALE

WESTMINISTER PL.

GREEN SPACE

space, built eas een as sing into

WESTMINISTER PL.

Delmar

Filters parking lot and sidewalk runoff Wide bridges with benches provide a sidewalk parklet for pedestrians to rest or gather

Maintain existing parking servicing adjacent housing

such as retail, restaurants, or cafes. Program could include student housing with equidistant access to Danforth campus and North campus.

• •

University building, classrooms, offices Student housing, equidistant from Danforth campus and North campus Ground floor retail, student supplies, coffee shop, restaurant, N. SKINKER• BOULEVARD cafe

DELM

AR BLVD

.

WAS

HING

8

TON

.

TMIN

ISTER

6

5

BLVD

WES

7 4

PL.

KING

SBU

RY

AVE.

MCP

HER

SON

AVE.

WAT

ERM

AN

BLV

D.

1 R

N.

KE

IN

SK

3

D.

BLV

PER

SHIN

G AVE

.

2

FOR

EST

PAR

K PKW

Y.

EAST UNIVERSITY PLAZA SKINKER PARK KAYAK’S CORNER PARKVIEW GARDEN MCPHERSON CORNER MCPHERSON PLAZA ANIMAL HOSPITAL WESTMINISTER PARK CHURCH’S LOT AT&T LOT

1

RESTAURANT / CAFE

2 3 4 5 6

GROUND LEVEL RETAIL/CAFE

7 8 9 10

green space hardscape plaza built intervention

PROPOSED INTERVENTIONS

TO MCPHERSON CORNER

5

7

WUSTL N. SKINKER CORRIDOR SPECIFICATIONS | AUGUST 9, 2013

KINGSBURY AVE.

MCPHERSON AVE.

DTLS STUDIO RANDY BURKETT LIGHTING BURGEONING CBB ENGINEERS

PROPOSED BUILDING

6

5’

0’

COST ESTIMATING PACK

20’

10’

40’

A bioswale and sidewalk parklet is proposed to activate the sidewalk along Skinker Blvd. The existing parking lot could be used for a Saturday fair or seasonal market.

The ideal utilization of these lots is by university buildings with ground level activation such as retail, restaurants, or cafes.

Bioswale, Weekend Events

Restaurant/Cafe

Mixed-Use Building

Seasonal food, goods, or art

Engages the urban

50

ALLISON GRACE CONLEY.com

University building, classrooms, offices


HIGH As a major entry point to the campus, the sidewalk leading to Green Hall is redesigned as a university plaza. The Skinker Metrolink entrance opens to the plaza allowing students a more direct link to the transportation

The narrow 13’ margin between the Skinker Blvd. curb and the Skinker Metrolink entry allows for a narrow southbound bike lane and

LAZA

4

5

6

7

8

9

0

e a n

SKINKER METROLINK WITH CANOPY

The difference in specification from medium to high would be in the urban materials and urban furniture. Cost will vary based on the desired materiality.

1

TO SKINKER PARK

5’

2 10

9

TO NORTH CAMPUS

N. SKINKER BOULEVARD

0’

20’

10’

40’

DEL

MAR

BLVD.

WAS

HING

8

TON

BLVD.

Aerial Existing Plaza not a landscape for public interaction 4

TMIN

ISTE

R PL.

6

5

Proposed University Entry Plaza plaza, new planting, safe pedestrian crossings, enhanced metro redesign with canopy

WES

7

KINGSB

URY

AVE

.

MC

PHE

RSO

N AVE

.

WA TER

MA

N BLV

EAST UNIVERSITY PLAZA SKINKER PARK KAYAK’S CORNER PARKVIEW GARDEN MCPHERSON CORNER MCPHERSON PLAZA ANIMAL HOSPITAL WESTMINISTER PARK CHURCH’S LOT AT&T LOT

D.

1

NS | AUGUST 9, 2013

R

N.

KE

3

D.

BLV

PER

SH

ING

AVE

.

FO

2

IN

SK

RE

ST

PA

RK

PK

WY .

1 2 3 4

DTLS STUDIO RANDY BURKETT LIGHTING BURGEONING CBB ENGINEERS

5 6

38

7 8 9 10

COST ESTIMATING PACKAGE

green space hardscape plaza built intervention

124

PROPOSED INTERVENTIONS WUSTL N. SKINKER CORRIDOR SPECIFICATIONS | AUGUST 9, 2013

AT&T LOT & CHURCH’S LOT

DTLS STUDIO RANDY BURKE BURGEONING CBB ENGIN

7.7

7.4

PRECEDENT IMAGES CONCEPT DESIGN TEMPORARY ACTIVATION GARDEN AND CORNER PLAZA

MED. TEMPORARY ACTIVATION

HIGH PERMANENT STRUCTURES

COST

9

9

PARKET / SEASONAL RETAIL

4

PROPOSED BUILDING STREET-LEVEL RETAIL

TO LOOP LIVING

FOUNTAIN / ART

TO LOOP LIVING

N. SKINKER BLVD.

N. SKINKER BLVD.

N. SKINKER BOULEVARD

TO NORTH CAMPUS

BoxPark is the first container retail mall in London. Similar principal could be used ACTVE GROUND FLOOR for temporary back to school event in an empty lot sponsored by retailers. PROGRAM

5 5’

0’

6

10

40’

High

MAR

HING

TON

WES

TMIN

ISTE

R PL.

KINGSB

URY

5

• •

DEL

WAS

BLVD

.

BLVD.

AVE

.

MC

PHE

RSO

N AVE

.

Introduction of sculpture or art installation - temporary or permanent Water features Specification of higher quality materials and details

WA TER

MA

N BLV

D.

1 R

N.

KE

IN

SK

3

D.

BLV

PER

SH

ING

AVE

.

2

FO

RE

ST

PA

RK

PK

WY .

10

20’

10’

Medium

PROPOSED BUILDING STREET-LEVEL CAFE

TEMPORARY POP-UP EVENT/MARKET

TO MCHERSON PLAZA

UNI QLOcrosswalk pop up retail shop. the Parkview Garden Chevrolet promotionalcorner event. A pedestrian connects with McPherson plaza.

New landscape design, paving materials selection Plantings and trees 10 9 throughout the design 8 7 Urban furniture4 to compliment 6

TO NORTH CAMPUS

DELMAR BLVD.

3

MED.

DELMAR BLVD.

2

narrow pedestrian walk. The wide pedestrian walk west of the Metrolink becomes the major pedestrian passage

3

GREEN HALL

7.1

MCPHERSON AVE

1

TO DANFORTH CAMPUS

FOREST PARK PKWY.

EAST UNIVERSITY PLAZA SKINKER PARK KAYAK’S CORNER PARKVIEW GARDEN MCPHERSON CORNER MCPHERSON PLAZA ANIMAL HOSPITAL WESTMINISTER PARK CHURCH’S LOT AT&T LOT

1

5’

0’

40’

Benefits of Temporary Pop-ups

AT&T Lot [9]

Church’s Lot [10]

• •

• •

• •

8

20’

10’

Temporary Activation Activities

4

7

0’

The ideal utilization of these lots is by university buildings with ground floor activation such as retail, restaurants, or cafes.

3

6

5’

40’

A temporary activation of the southern corners of Delmar Boulevard would engage students and the public in time sensitive solutions.

2

5

20’

10’

Back To School retail event End of Semester/Graduation retail event, used book resale Seasonal food, goods, or art market Promotional fair

Flexible to meet current trends Caters to seasonal student needs, activates lot for safety Temporary phasing before a permanent structure utilizes the site.

Potential land to be acquired by the university. Strong ground floor retail opportunity on Delmar and Skinker

Potential land to be acquired by the university. Strong ground floor cafe or restaurant opportunity.

9 10

green space hardscape plaza built intervention

PROPOSED INTERVENTIONS DTLS WUSTL N. SKINKER CORRIDOR SPECIFICATIONS | AUGUST 9,STUDIO 2013RANDY BURKETT LIGHTING 46 BURGEONING CBB ENGINEERS

COST ESTIMATING PACKAGE

DTLS STUDIO RANDY BURKETT LIGHTING BURGEONING CBB ENGINEERS

132

ALLISON GRACE CONLEY.com

52

COST ESTIMATING


streetscape future vision

SKINKER CORRIDOR FRAMEWORK studio jantzen, june-dec 2013

Phase I- Safe pedestrian priority P h a s e I I - B i c y c l e I n f r a s t r u c t u r e p r i o r i t y, p r o p o s e d p l a z a s , b i o s w a l e s Phase III-Landscape and building development The streetscape drawings below were developed based on technical survey d r a w i n g s f o r a c c u r a c y, w h e n a v a i l a b l e . D u e t o t h e e a r l y s c h e m a t i c l e v e l o f the project, technical drawings have not yet been drawn for the design.

PHASE I Forsyth - Waterman

PHASE II Forsyth - Waterman

PHASE I schematic CAD drawings based on official survey

PHASE I PLAnS

PHASE III Forsyth - Waterman

PHASE II schematic CAD drawings based on official survey

PHASE II

PLAN DRAWINGS - BY PHASE

PHASE III schematic CAD drawings based on official survey

ALLISON GRACE CONLEY.com PHASE III


PHASE I Forsyth - Waterman

CAD drawings below based on technical surveys when available from client.

PHASE II McPherson-Enright

PHASE I PLAnS

PHASE III McPherson-Enright

PHASE II

PLAN DRAWINGS - BY

ALLISON GRACE CONLEY.com


scholarship, internship

SCDA Singapore, 2012

I was selected for the prestigious SCDA scholarship and internship through Washington University in St. Louis. During two summer months in Singapore, I worked with architects, landscape architects and interior designers on projects in Singapore, Malaysia, Indonesia, India and United Arab Emirates. The experience was incredible designing luxury condo towers, master planning for a resort, the conception of a new island and high density housing. This experience in South East Asia broadened my understanding of global architecture.

Ciputra Masterplan, Jakarta, Indonesia [high-end housing, commerical, retail]

S i t e P l a n n i n g f o r R e s o r t S u n g a i Wa n g L a n k a w i , M a l a y s i a

Residences at Meraas Al Fanar Island, United Arab Emirates

ALLISON GRACE CONLEY.com


revit skills

MCGILL UNIVERSITY HOSPITAL TD AMERITRADE PARK HDR, 2010

Between undergraduate and graduate school, I worked as an architectural intern at HDR Architecture’s headquarters in Omaha. During these seven months, the majority of my time was spent working on schematic design for McGill University Hospital, a shared Revit model with the team in Canada. Another portion of my time was spent assisting with construction documents for the suite level of TD Ameritrade Park in Omaha, NE.

McGill University Hospital - level 2

McGill University Hospital - level 3

McGill University Hospital - ground level [space planning and schematic design in REVIT]

*no drawings available

TD Ameritrade Park - Stadium of the College World Series, Omaha, NE [construction details/documents in REVIT for suite level]

ALLISON GRACE CONLEY.com


professional work

CREIGHTON UNIV MED CENTER MESSIAH LUTHERAN CHURCH clh architects, 2006

After completing my first year of undergraduate, I worked with CLH Architects in Omaha during summer 2006. I was tasked with and completed the measurement, verification and compilation of CAD plans for Creighton University Medical Center, a one million sqft existing hospital. Other projects included CAD work for various local credit unions and Messiah Lutheran Church, below.

Messiah Lutheran Church assisted with CAD documents

Creighton University Medical Center [measurement and verification of plans for

approx 1,000,000 sf hospital]

ALLISON GRACE CONLEY.com


historic preservation

CHATEAU DE CHANTILLY french heritage society internship, 2008

After completing a semester abroad in Paris at l’Ecole Speciale d’Architecture in 2008, I was invited through a benevolent exchange at the French Heritage Society to work with the head architect at the Chateau de Chantilly in historic preservation. My main task during the summer was schematic design for les Grandes Ecuries, once the largest horse stables in the world, into loft housing. Other projects included the restoration of water bain walls, reconstruction of les Hameaux and compliance with fire codes.

chateau ground plan

chateau grounds

Cours des Remises

les grandes ecuries

stable plan

coupe AA

Grandes Ecuries

coupe EE

chateau de chantilly

stable sections

ALLISON GRACE CONLEY.com


competition

CHINA CITIC BANK OF SHAOXING burgeoning studio, july 2013

competition plans

I assisted Burgeoning Studio with a competition for a new bank tower, Citic Bank of Shaoxing, China. The project was done in partnership with H2, China who completed the renderings below. The design was lead by the principal of Burgeoning Studio with whom I worked directly in Brooklyn. I assisted with presentation drawings.

competition section

China Citic Bank Of Shaoxing [competition renderings by H2, china]

ALLISON GRACE CONLEY.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.