SINGING RIVER TRAIL MASTER PLAN Connecting the past, present, and future of North Alabama FINAL DRAFT 2019
CHAPTER 1 INTRODUCTION
East Coast Greenway, Raleigh, North Carolina Source: NCDOT 2 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
FINAL DRAFT
CHAPTER 1 INTRODUCTION
“The Singing River Trail is a wonderful way to connect our communities and explore our beautiful and diverse areas. We are excited to have the trail come through Mooresville and connect people to our neighbor-Wheeler Wildlife Refuge. This trail will be such an asset to North Alabama.” Mayor Margaret Anne Crumlish, Town of Mooresville
TABLE OF CONTENTS
Chapter 1 - Introduction.............................................4 Chapter 2 - Current Conditions............................... 12 Chapter 3 - The Singing River Trail Route..............22 Chapter 4 - Phase One Projects.............................58 Chapter 5 - Implementation Framework................ 84 Appendix A - Design Guidelines.............................96 Appendix B - Public Input Summary......................142 Appendix C - Existing Plan Summary................... 162 Appendix D - Local Trail Connectivity ..................170 Appendix E - Cost Estimates.................................176 S I NG I NG R I VE R T R AI L M AST E R P LAN / 3
CHAPTER 1 INTRODUCTION
1
4 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
American Tobacco Trail Durham, North Carolina Source: Alta
FINAL DRAFT
CHAPTER 1 INTRODUCTION
”The Singing River Trail will provide a quality of life enhancement for the citizens of Limestone, Madison and Morgan Counties and, as a consequence, foster future increased growth for years to come.” Alabama State Senator Arthur Orr
Introduction Project Background and Process
$866,000
$10,890,000
Transportation Benefits
Economic Benefits
$1,400,000 Health Benefits
$13,156,000 TOTAL ANNUAL DIRECT BENEFITS
An economic impact report conducted for the Singing River Trail anticipates significant impact for north Alabama.
The Singing River Trail in North Alabama will connect communities in three counties and serve as an approximately 70-mile trail spine linking to other trail systems throughout the region. The trail will connect our communities, provide active-living opportunities for residents, and spur further economic development for the region. It will also serve as an active transportation corridor providing a safe connection for travel between home, work, and play.
and individuals who are committed to the project and what it means for the region.
The vision for the Singing River Trail was borne out of the Launch 2035 Initiative and from North Alabamians who care about the region’s future. Project branding, an economic impact analysis, and the master plan itself were funded by over 30 separate entities, organizations,
The master planning process included a guiding body, the Launch 2035 Land Use Committee. This Committee included representatives from all the counties and municipalities of the region, along with other key stakeholders and agencies.
The planning process began in the spring of 2018 with the release of the Singing River Trail Economic and Health Impact Analysis report and a public-facing project launch held in Huntsville’s Space and Rocket Center and Calhoun Community College’s Decatur campus. The report predicts 5,000 daily users of the trail and $13,156,000 in total annual direct benefits.
S I NG I NG R I VE R T R AI L M AST E R P LAN / 5
FINAL DRAFT
CHAPTER 1 INTRODUCTION
Master Plan Funding Contributors Huntsville Hospital System
Morgan County Commission
City of Huntsville
Calhoun Community College
Madison County Commission, Chairman Dale Strong
City of Madison
Tennessee Valley Authority Alabama Association of RC&D Councils Robins & Morton
Bentley Pontiac GMC Drs. Amit and Aruna Arora Baker Donelson- Joe Campbell City of Athens
Huntsville/Madison Co. Chamber of Commerce
Regions Bank
Rotary Club of Greater Huntsville
Pathway Health Care
Senator Slade Blackwell
AT&T
City of Decatur
Land Trust of North Alabama
Limestone County Commission
Mike Cole
Greater Limestone County Chamber of Commerce
Steve Raby
Decatur Daily, Clint Shelton Redstone Federal Credit Union
David Spillers Mike Dalen Century Automotive
Madison County Legislative Delegation, Senator Arthur Orr Madison County Legislative Delegation, Senator Mac McCutcheon
6 / S TRAIL PLRAN 6 SIINNGGI N I NGGRIVER RIVER TR AM I LASTER M A S TE PLAN
FINAL DRAFT
CHAPTER 1 INTRODUCTION
Master Plan Process
PUBLIC INVOLVEMENT
Residents were engaged through public meetings, a project website, social media, and other means.
Steering Committee Meetings, Website, Interactive Map, Comment Form, Stakeholder Meetings, & Public Workshops
IMPLEMENTATION Funding
This Singing River Trail Master Plan establishes a framework for the development of the 70-mile trail. The Plan defines the trail routing, identifies a phased approach, provides detail for Phase One projects, and establishes an implementation framework for designing and constructing the trail.
PUBLIC WORKSHOP 1 (March 2018)
PUBLIC WORKSHOP 2 (Feb 2019)
Design
PUBLIC REVEAL (Spring 2019)
Acquisition Construction
1
2
3
4
5
PROJECT LAUNCH & ECONOMIC IMPACT STUDY
EXISTING CONDITIONS ANALYSIS
DRAFT MASTER PLAN REVIEW & REVISIONS
FINAL MASTER PLAN & PRESENTATIONS
PRIORITY SEGMENTS AND PRE-DESIGN
MAR 2018
APR - SEP 2018
OCT 2018 - FEB 2019
MAR - APR 2019
MAY 2019
2019-2024
Launch 2035 Land Use (Singing River Trail) Committee Nancy Robertson TARCOG
Paige Colburn
City of Huntsville
Debbie Gibson
Joe Campbell
Huntsville Hospital System
Mike Dalen
Land Trust of North Alabama Board
Marie Bostick
Land Trust of North Alabama
Scott McLain
Coldwell Banker Commercial
Joey Hester North Central Alabama Regional Council of Governments
Brandi Quick
Ditto Landing
John Meredith
Meredith Advocacy
Huntsville International Airport
Jeanne Payne
Cook Museum
Mary Beth Broeren City of Madison Connie Graham
City of Huntsville
Rick Tucker
Dec/Morgan Co. CVB Pres/CEO
Jeff Pruitt North Central Alabama Regional Council of Governments
Sandra Buroughs Alabama Mountain Lakes Tourist Association
Wally Terry
City of Decatur
Joe Vallely
US Space and Rocket Center
HSV Greenways Committee
Shannon Keith
Alabama Trail of Tears Association
Bruce Weddendorf Straight to Ale
John Allen
Committee of 100
Dewayne Hellums Decatur MPO
Jenna Streeter
Madison Co Commission
Bill Sims
Emery Hoyle
Amy Golden
Athens Utilities
Sarah Toth
Dennis Madsen
City of Huntsville / Huntsville MPO
Carol Rhea
Orion Planning & Design
Les Tillery Planning Commission Member, City of Huntsville Lauren Vandiver
TVA Wheeler Wildlife Refuge
Ben Payment
Alabama A&M
Ricky Ingram
Wheeler Wildlife Refuge
Gary Van Wagnen Limestone Co United Way
Richard Martin
Karen Smith
City of Decatur
James Vandiver
Tom Cunningham 4Site
Erin Tidwell
City of Athens
Craig Beasley
Falguni Patel
TARCOG
David Breland
AL Historic Commission
Rod Huffman
City of Athens
Kaylin Deal
Renta Urban Land Design
City of Huntsville
S I NG I NG R I VE R T R AI L M AST E R P LAN / 7
FINAL DRAFT
CHAPTER 1 INTRODUCTION
Getting to the Plan
“The Committee of 100 is a business organization of 255 CEOs and professionals – including 50 young professionals — committed to long-term strategies that support economic development, highquality public education, and cooperative local government.”
The Singing River Trail is a large regional effort that requires consistent coordination and leadership to ensure cooperation between a wide range of stakeholders. Getting to where we are today required an ambitious vision and bold leadership. This Master Plan effort was born from the Huntsville Committee of 100 who helped
Launch 2035 is a regional planning initiative covering Limestone, Madison and Morgan counties. The regional partnership aims to rethink and imagine our region’s economy 20 years from today.
LAND USE SUBCOMMITTEE
The Land Use Subcommittee of Launch 2035 is tasked with supporting “enhanced regional land-use planning, including outdoor recreation, greenways, land preservation, innovative neighborhood concepts, and integrated transportation planning.” 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
develop Launch 2035. Within Launch 2035, a Land Use Subcommittee was born to focus on physical and community development of the region. This group created the Singing River Trail Master Plan.
FINAL DRAFT
CHAPTER 1 INTRODUCTION
Public Participation - By the Numbers
35
FUNDERS of the master plan
1,038 48
500
from across the region (and growing)
(and growing)
SURVEYS completed
FACEBOOK FOLLOWERS
COMMITTEE MEMBERS
270 attendees at
PUBLIC WORKSHOPS
6,000 WEBSITE users
S I NG I NG R I VE R T R AI L M AST E R P LAN / 9
FINAL DRAFT
CHAPTER 1 INTRODUCTION
Vision and Goals The Launch 2035 Land Use Committee, with input from the public, established a project vision and goals for the Singing River Trail Master Plan. The vision and goals serve as the guiding force for this document and the eventual outcome of the Singing River Trail on the ground in North Alabama.
VISION
7 Plan Components
The Singing River Trail (SRT) is a world-class resource that connects the region, celebrates Native American heritage, provides educational opportunities, contributes to economic development, and enhances the quality of life for residents and visitors throughout North Alabama.
Improve Access to Outdoor Recreation for Health and Wellness
Improve the health and wellness of users by increasing the opportunities for recreation, physical activity, and time spent outdoors and in nature.
4
• A summary of existing conditions analysis that was conducted to develop the recommendations in this Plan • Mapped routing of the Singing River Trail with facility type details
GOALS
1
The Master Plan includes the following:
Support Economic Development and Capitalize on Trail-Based Tourism
Support economic development by promoting the Singing River Trail in a way that invites tourism, creates opportunity for appropriate development along the trail, increases property values, and connects a variety of destinations.
2
Reflect Context Through Trail Design and Accessibility
Reflect the shifting rural-urban landscape of the trail through unique, local design elements and programming that encourages a diverse range of uses.
5
Celebrate the Region Through Trail Features, Education, and Design
Celebrate North Alabama’s Native American history and natural environment through design features, amenities, and interpretation that strengthens the user’s connection to nature and their relationship to place.
1 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
3
Create Trail Connections Between Communities and Destinations
Create trail connections between communities and diverse destinations, such as green spaces, trails, and urban areas.
6
Create Additional Transportation Option for Residents
Create additional transportation options that provide choices for residents of North Alabama, reduce traffic congestion, and improve air quality.
• Phase One implementation that includes detail on priority routes, next steps, and cost estimates • An implementation framework that details the leadership, partnerships, roles, action steps, and funding for the design and construction of the Singing River Trail • Design guidelines for the Singing River Trail that will provide consistency for the trail experience • A summary of public involvement • A summary of existing plans
FINAL DRAFT
CHAPTER 1 INTRODUCTION
The Story of the Singing River THE LEGEND OF THE SINGING RIVER The Yuchi Indian tribe, who lived along the Tennessee River, called it the “Singing River” because they believed a woman who lived in the river sang to them. The tribe was sent to the Indian Territory of Oklahoma as part of the removal of native peoples from the southeast. A young woman named Telah-nay felt that the streams and rivers in Oklahoma did not sing to her. She made the long journey to her homeland and made it successfully. Questioning why a young Native girl would brave a long, perilous journey back to her home land, contemporary discussions with her family lineage
points to the answer being that of Telah-nay’s responsibility to her deceased tribal members. Local Native Americans expanded on the legend saying the Singing River holds a portal to the afterlife. Her responsibility to the tribe included making sure those souls traveled to the safety of the ancestors who had passed before. The Yuchi are not the only tribe that attributes human characteristics to rivers. The North Alabama Cherokee long called the river the “Long Person” or “Long Man” contributing to the river a sort of collective consciousness.
Paula Nelson, an artist who is an Eastern Band Cherokee citizen contributed sketches of Te-lah-nay in three different concept drawings. Paula incorporated an ancient iconic symbol of “water as medicine” into each drawing. Te-lah-nay was also thought of as a healer for her people, so Paula’s decision to place her at the river makes cultural sense. The river is a place of ritual for spiritual cleansing as well as physical cleansing. Paula’s career spans decades of studying iconography across tribal lines and time periods including preand post-contact Native American symbology. Tattooed on her wrist, she carries the symbol of water as medicine. Paula’s work combined with Alta’s design team ultimately led to the logo for the Singing River Trail. It made sense to incorporate a symbol for medicine into the bike trail logo since that is the essence of the Singing River Trail: Bringing medicine to the North Alabama region to encourage physical wellness, mental wellness and spiritual wellness.
S I NG I NG R I VE R T R AI L M AST E R P LAN / 1 1
CHAPTER 1 INTRODUCTION
2
12 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
Wolf River Greenway Memphis, Tennessee Source: Alta
FINAL DRAFT
CHAPTER 2 current conditions
“The Singing River Trail helps accomplish the community’s desire for improved connectivity in a manner that is fun, equitable, safe and beautiful. This landmark project also hits many of the goals outlined in Huntsville’s BIG Picture Master plan to create a vibrant, sustainable and healthy community that is pedestrian and bike friendly.” Mayor Tommy Battle, City of Huntsville
Current Conditions Introduction
The Singing River Trail corridor comprised of Huntsville, Madison, Decatur, and Athens through Madison, Limestone, and Morgan counties has seen and continues to see substantial growth and economic success. With Redstone Arsenal, NASA, Research Park, and major corporations and employers in this region, the region has an influx of populations from around the country and the world. With the varied backgrounds and experiences of people moving to North Alabama, there are expectations of quality-of-life amenities such as parks and trails that they have experienced in their previous communities. The Tennessee Valley has been one of the fastest growing areas for many
years. Huntsville has been a tech center since the 1950s, when the U.S. Army put a group of scientists there to boost the country’s space program. Today, in Huntsville, the largest employers are the US Army (Redstone Arsenal) at 35,000 and NASA (Marshall Space Flight Center) at 6,500. More than a dozen major economic development projects will bring more than 6,000 new jobs to Huntsville and North Alabama. More than $4.1 billion has been committed to the developments in 2017-2018. The Huntsville metro area, including Madison, is bracing for what could potentially be dramatic growth in coming years as the Mazda Toyota Manufacturing USA plant in west Huntsville begins production in 2021. The plant is expected to create 10,000
direct and indirect jobs. With continued growth and new industry, the landscape between Huntsville, Madison, Decatur, and Athens (where the Singing River Trail corridor is located) will continue to change dramatically. The Singing River Trail is an opportunity to weave through the new and changing landscape while telling the Native American, agricultural, and natural histories of the region. Currently, the region is lacking in greenway trails and bicycle and pedestrian facilities. However, there is growing understanding and desire among local governments to provide these amenities for their citizens. This is apparent in recent planning efforts and commitments of the cities along the Singing River Trail corridor (see appendix).
S I NG I NG R I VE R T R AI L M AST E R P LAN / 1 3
STUDY AREA
FINAL DRAFT
CHAPTER 2 current conditions
ATHENS !
¬ 53
72 £
¬ 255
HUNTSVILLE
!
£ 431
31 £
MADISON !
¥ 65
¥ 565
TE N
NE
BELLE MINA !
SS
EE
US Space & Rocket Center
£ 231
Redstone Arsenal
Huntsville International Airport
RI VE
R
!
MOORESVILLE
DECATUR ! !TRIANA Wheeler National Wildlife Refuge
0
2
4 I N G R I V E R TR A I L M A S8TE Miles 14 / SING R PLAN
¸
FINAL DRAFT
CHAPTER 2 current conditions
A thorough analysis of current conditions was performed as part of the master planning process. The analysis included stakeholder and local government interviews, GIS mapping, relevant regional and local planning effort review, and field review. This analysis set the stage for the routing recommendations in Chapter 3.
Analysis of Existing Conditions
LAUNCH 2035
Singing River Trail Routing and Implementation Strategies
STAKEHOLDER INTERVIEWS
GIS MAPPING
REGIONAL AND LOCAL PLAN REVIEW
FIELD ANALYSIS
HISTORIC RESEARCH
S I NG I NG R I VE R T R AI L M AST E R P LAN / 1 5
FINAL DRAFT
CHAPTER 2 current conditions
Highlights of the Region NATIVE AMERICAN HISTORY The history of Native Americans in Madison, Morgan and Limestone counties dates back to around 11,000 years. Indigenous occupation of these counties is revealed through the artifacts left behind. Earliest lithic evidence dates to the archaic period some 11,000 years ago. Continued evidence of woodland period occupation in the form of beautiful carved pipes, ceramics and lithics are still found in large amounts scattered along the landscapes of these counties. By the time of European contact in the 1500’s, tribes had established themselves throughout this region. When traders flooded the tri-county areas in the 1700’s, they found a strong presence of the Cherokee tribe, Chickasaw tribe, and the Creek tribe. In the early 1830’s, the Chickasaw gave up any claim to holdings west up to Huntsville, and primary occupation was held by the Cherokee. The Indian Removal Act of 1830 set the stage for Cherokee removal from the tri-county area, and full relinquishment of any holdings was sealed by the Treaty of New Echota in 1835. The round-up commonly known as the Trail of Tears began in 1838. Following 1838, only a few descendants continued to inhabit the region. Currently, there are many native people living in these counties who are proud of the history and traditions their cultures contributed to these three counties. The Singing River Trail parallels and criss-crosses the routing, providing opportunity for interpretation of the historic Trail of Tears route.
1 6 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
Source: National Park Service - https://www.nps.gov/trte/planyourvisit/upload/2012-TRTE.pdf
FINAL DRAFT
CHAPTER 2 current conditions
AGRICULTURAL HERITAGE Agriculture has been practiced in what is now Alabama for centuries. Prehistoric Native Americans practiced slash-and-burn agriculture, in which they cut and burned forests to make room for their patches of corn, beans, and squash. During Alabama’s territorial period, settlers established the first farms, primarily along navigable rivers near where Native American villages once stood. Cotton expanded rapidly throughout Alabama through the Civil War. Alabama became known as “The Cotton State” with almost four million acres planted to cotton in 1914. In the twentieth century, Alabama’s economy also gradually changed from agriculture to industry (By 2015, only 1.5 million acres were devoted to all agricultural crops). Although cotton dominated Alabama agriculture until after World War II, a gradual diversification of agriculture occurred. Today, the Tennessee Valley is Alabama’s most concentrated row-crop-producing area, with Madison and Limestone counties having some of the most cotton acreage in the state. Soybean, corn, wheat, and cattle are also important commodities in this region. Urban sprawl from Huntsville, Madison, Decatur, and Athens has consumed much of the former farmland in North Alabama. However, large farms can still be found between Decatur and Athens and between Decatur and Madison.
Source: http://www.encyclopediaofalabama. org/article/h-1396. “Agriculture in Alabama.” Charles Mitchell, Auburn University
S I NG I NG R I VE R T R AI L M AST E R P LAN / 1 7
FINAL DRAFT
CHAPTER 2 current conditions
NATURAL HERITAGE North Alabama is blessed with natural beauty. The region is composed of diverse natural areas, with an abundance of caves, sinkholes, mountains, waterways, plants, and wildlife unique to the region. The southern Appalachian mountains start here. The Tennessee River and its tributaries and wetlands provide habitat for hundreds of bird, fish, and mammal species. Wheeler National Wildlife Refuge, a centerpiece to the Singing River Trail corridor, is a 35,000 acre refuge attracting thousands of wintering waterfowl each year. The Refuge manages and protects habitat for 12 federally listed endangered or threatened species. Wheeler National Wildlife Refuge was established July 7, 1938 by President Franklin D. Roosevelt as a refuge and breeding ground for migratory birds and other wildlife. Its great diversity of habitat includes deep river channels, tributary creeks, tupelo swamps, open backwater embayments, bottomland hardwoods, pine uplands, and agricultural fields. This rich mix of habitats provides places for over 295 bird species to rest, nest and winter, including over 30 species of waterfowl (ducks and geese) and an increasing population of Sandhill cranes and a small number of Whooping cranes. The refuge is also home to 115 species of fish, 74 species of reptiles and amphibians, 47 species of mammals, 38 species of freshwater mussels, and 26 species of freshwater snails.
1 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
Wheeler National Wildlife Refuge, Triana, Alabama
FINAL DRAFT
CHAPTER 2 current conditions
DESTINATIONS The Singing River Trail Corridor will connect multiple destinations, or hubs of activity. For the purposes of this study, the corridor begins in Downtown Huntsville and extends to Decatur and Athens. In the long term, the corridor may extend eastward to Ditto Landing and beyond, and westward to the Tuscumbia/Sheffield area. Key destinations will include: • Downtown Huntsville • Lowe Mill • West Huntsville • Huntsville Botanical Gardens • Space and Rocket Center • Redstone Gateway • Research Park • Town Madison - New Ballpark (Rocket City Trash Pandas) • South Madison • Triana • Wheeler National Wildlife Refuge • Mooresville • Decatur • Calhoun Community College • Tanner • Athens
Mooresville, Alabama
Space and Rocket Center, Huntsville, Alabama S I NG I NG R I VE R T R AI L M AST E R P LAN / 1 9
FINAL DRAFT
CHAPTER 2 current conditions
REGIONAL CONNECTIVITY A larger scale trail concept was in its infancy at the time of this study, the Tennessee River Line. Developed by the University of Tennessee-Knoxville, the River Line would traverse Kentucky, eastern Tennessee, and north Alabama. The Singing River Trail should ultimately become a part of this long-distance trail.
Paducah
VI RGI NI A
KE N TUCKY
Bristol
Oak Ridge
Te
nn
es
e se
Knoxville TE NN E SSEE
Chattanooga Florence
Huntsville
A LA B A M A
Singing River Trail Singing River Trail Connector Tennessee RiverLine Trail
2 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
Ri
v
er
Kingsport Johnson City
FINAL DRAFT
CHAPTER 2 current conditions
LOCAL CONNECTIVITY TE NN E SSEE
While this Master Plan covers the Singing River Trail corridor from D owntown Huntsville to Madison, Decatur, and Athens, it is recommended to extend the trail beyond these limits. In the future, the Singing River Trail will become part of a larger regional trail n etwork. Locally, the Singing River Trail should be extended to Ditto Landing and the Tennessee River Trail through the City of Huntsville. North of Athens, the Trail should connect to the Richard Martin Trail. West of Decatur, the Trail would follow the general Trail of Tears route to the Muscle Shoals region in northwest Alabama, ultimately to c onnect to the Natchez Trace.
ALABAMA tin Trail rd Mar Richa
Athens
Muscle Shoals
Huntsville Te
nn
es
se
e
Ri
ve
r
Decatur
Singing River Trail
Ditto Landing
Singing River Trail Connector Tennessee RiverLine Trail
EXISTING TRAILS Athens
The communities of North Alabama have been steadily adding greenway trails due to the demand of their customers. Examples include the Indian Creek Greenway, Bradford Creek Greenway, Bill Sims Trail, Big Spring Park Greenway/Spragins Cycle Track/Depot Greenway/Gateway Greenway, Aldridge Creek Greenway, Tennessee River Trail, and Swan Creek Greenway. In addition, the cities of Huntsville, Madison, Decatur, and Athens have recommended trails on the books whether through a Greenway Master Plan or a comprehensive planning effort. Ongoing projects like the Zierdt Road multi-use path, Lowe Mill Corridor Study, and others were also documented and mapped for the purposes of selecting the preferred Singing River Trail routing.
08
Huntsville
Madison
Te
Ultimately, with the Singing River Trail’s goal of connecting Huntsville to Madison to Decatur to Athens, existing or planned routes were strongly considered due to previous analysis and trails that are on the ground, making for a more feasible and cost-effective Singing River Trail approach.
nn
es
se
Existing Bike Lane Proposed Complete Streets Corridor
Existing Greenway, Shared Use Path, or Greenlink
02
Aldridge Greenway
Proposed Greenway, Shared Use Path, or Greenlink
03
Indian Creek Greenway
Visionary Greenway
04
Mill Creek Greenway
iv
01
Proposed Complete Streets Corridor Existing Greenway, UsePark Path, or Greenlink Big Spring Greenway/ 01 Shared Spragins Cycle Track/ Proposed Greenway, Shared Use Path, or Greenlink Depot Greenway/ Visionary GreenwayGateway Greenway
R
er
Mooresville
Decatur
Existing Bike Lane
Singing River Trail
Belle Mina
e
Big Spring Park Greenway/ Spragins Cycle Track/ Depot Greenway/ Gateway Greenway
07
02 Aldridge Greenway Bradford Creek Greenway 03 Indian Creek Greenway Beaver Dam Nature Trail 04 Mill Creek Greenway Dr. Bill Sims Bike Trail
08
Swan Creek Greenway
05 06
05
Bradford Creek Greenway
06
Beaver Triana Dam Nature Trail
07
Dr. Bill Sims Bike Trail
08
Swan Creek Greenway
S I NG I NG R I VE R T R AI L M AST E R P LAN / 2 1
CHAPTER 3 Singing River Trail Route
3
22 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
Swamp Rabbit Trail Greenville, South Carolina Source: VisitGreenvilleSC
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
“Connecting the proposed new Athens Recreation Center, the expanded Athens Sportsplex and the Swan Creek Greenway National Recreation Trail will be a vital asset to assist in the growth and development of the Athens Area. The Singing River Trail will connect our downtown communities and neighborhoods to the south and east!” Mayor William “Ronnie” Marks, City of Athens
The Singing River Trail Route Introduction
The routing described in the following maps was developed through a combination of input from the Land Use Committee, municipal and county staff, stakeholders, landowners, and general public. The project team of planners and engineers reviewed the corridor using GIS and field analysis. Given the 70-mile length, there will undoubtedly be adjustments to the routing long after this master plan is complete. Adjustments will happen due to cost/funding, respect for landowner considerations, environmental constraints, new developments, roadway reconstruction, and findings uncovered during full design.
The entire route was broken into logical thematic segments for effective map communication through this Master Plan. The segments traverse urban, suburban, and rural areas and connect all the Downtowns of the region intentionally. The route connects major destinations, both cultural and natural, to enhance both local, regional, and national tourism. The route also connects major employers in the region. Finally, the route traverses geography and history and will tell the story of the history of the land and its peoples through educational opportunities.
In some cases, multiple alternatives are provided in order to provide a menu, or toolbox, of options and to remain flexible moving forward. With the vision of a world-class trail, some alternatives will have a greater cost but a greater “wow” factor. It is possible that less costly alternatives may be implemented first as interim steps before additional funding is acquired for the “wow” projects. Finally, it is assumed that the Singing River Trail will be a spine and that local and regional trails would continue being implemented, providing connectivity to/from the Singing River Trail to other regional destinations.
S I NG I NG R I VE R T R AI L M AST E R P LAN / 2 3
e
99
O ld U S
ATHENS
1 y3 Hw
Proposed Singing River Trail Alignment
FINAL DRAFT
S
Hobbs St
Proposed Commuter Route
Co Rd 44
r Jo
e Rt e 2
W nN nL da
St a t
Lee Hw y
¬ Co Rd
Bee Line Hwy
53
Huntsville Brownsferry Rd
Co Rd 95
02
Co Line Rd
MADISON on dis Ma
Co Rd 6
d Blv
20
¥ 565
BELLE MINA
20
MOORESVILLE
S wa
ER
0
1
22 4 / S I N G I N G 4RMiles I V E R TR A I L M A S TE R P L A N
ncott
Zierdt Rd
Rd
ER IV
SW Rockhouse Rd
SS E
Wall Triana Hwy
r R d
NN E
y Hw Old
Pryo
DECATUR
TE
04
Mtichell Rd
State Rte 20
County Line Rd
Martin Rd SW
6t h
St
TRIANA
REDSTONE ARSENAL
231 £
y SW l Pk w
05
HUNTSVILLE
oria Mem
y Hw
01
Bob Wall a ce Ave SW
Rideout Rd
¥ 65
Co Rd 115
Mooresville Rd
Co Rd 45
US Hwy 31 S
31 £
03
431 £
255
Hughes Rd
State Rte 3
127
Co Rd 24
¬
72 £
Slaughter Rd
Rt
51
eR CHAPTER 3 Singing River TrailtatRoute
State Rte 1
e at St
2 te
06
This is a guidance document only and does not commit the trail to being built at a specific location. In some cases, easements will need to be acquired. In those cases, landowners will be included in the process, educated about the project, with respect for private property rights.
¸
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
01
HEART OF HUNTSVILLE
02
DOWNTOWN HUNTSVILLE TO BOTANICAL GARDEN Page
03
BOTANICAL GARDEN TO MADISON BASEBALL PARK
26
MADISON-TRIANA LINK
Page
04
MADISON BASEBALL PARK TO TRIANA Page
05
MOORESVILLE TO DECATUR Page
44
32
WHEELER WILDLIFE TOUR TRIANA TO MOORESVILLE
36
RIVER CITY CONNECTION
THE ROCKET CORRIDOR
Page
06
40
SWAN CREEK CALHOUN COMMUNITY COLLEGE TO ATHENS Page
48
S I NG I NG R I VE R T R AI L M AST E R P LAN / 2 5
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
HEART OF HUNTSVILLE
DOWNTOWN HUNTSVILLE TO BOTANICAL GARDEN
Tracing the Heart of Huntsville from the city center to re-invented textile mills to beautiful botanical gardens Church Street, Downtown Huntsville
Big Spring Park
Museum of Art, Downtown Huntsville
Lowe Mill
Huntsville Botanical Garden
Huntsville Depot
Source: Huntsville/Madison County Convention & Visitors Bureau 2 6 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
The City of Huntsville recently completed its Downtown Master Plan which calls for the development of on-road bikeways on certain roadways including a two-way separated bikeway on Clinton Avenue. This section of Clinton Avenue is a key segment for the Singing River Trail in Downtown Huntsville. With new development slated for this entire corridor between the Downtown and Memorial Parkway, there is an opportunity to create a worldclass multi-modal corridor that also connects the Singing River Trail into the heart of Downtown. Example two-way separated bikeways shown here include Lincoln, NE and Seattle, WA (both designed by Alta Planning + Design).
Separated Bike Lane, Seattle, WA
Existing
N Street Cycle Track, Lincoln, NE
N Street Cycle Track, Lincoln, NE
S I NG I NG R I VE R T R AI L M AST E R P LAN / 2 7
NW Da lla sA ve
SW
St Mon ro Engle Dr S W
D
Monroe St
Summer St SW
Brookside St SW
Seminole Dr SW
Boardman St SW
Artie St SW
Newby Rd SW
1st St SW
r SW Regal D
Winner Ave SW
Drake Ave SW
Leeman Ferry Rd SW
Alpine St SW
Bradley St SW
de
Clopton St SW
Rd S W
go
Ole an
Brown St NW
D errick St NW
2nd St SW
3rd St SW
4th St SW
Omni
Triana Blvd SW
Pacific Dr SW
Biscayne St SW
Holiday Dr SW
Atlantic St SW
am in
Fl
Fairacres Rd SW Hillsboro Rd SW
Ha
Pizitz Dr SW
10th St SW
15th St SW
Larry St SW
17th St SW
S
Morgan St SW
Peel St SW
llard
W St N Lee Dr NW
Cherry St NW
6th St SW
8th St SW
9th St SW
11th St SW
12th St SW
La w
8th St NW
9th St NW
13th St NW
14th 13th St SW
14th St SW
Peachtree St NW Mason Ct NW Appleby St NW
NW Dr
Marguerite Dr NW 10th St NW
Hal St NW
St NW 14th
Rd
W Judith Ln
5th St SW
Oster Dr NW
NW r
Waxl
Killarney Dr
Kil kenny Dr NW Hillmont St NW
Jack Coleman Dr NW
Greenacres Dr NW
NW
ov erd
Cl Mary St SW
d
Hillview Dr NW
Jordan Ln NW
Woodall Ln NW
Brickell Rd NW
Speake Rd NW
Warner St NW
Karter St NW
Ewing St NW
Austin Dr NW
Arthur St NW
College Park Cir NW
NW
Evangel Dr
Dr NW
Erskine St NW
Patton Rd SW
m
Crestwood D
SW
John Wright
r
U
Sparkman Dr NW
Po
Tripp Dr
a lk
SW
Proposed Ferry
nt cha er
N Dr
Proposed Unpaved Shared Use Path
09
M
L and
2 8 / S I N G I N G R I V E R TRExisting A I L M AUnpaved S TE R PShared L A N Use Path
231
W
Proposed Side Path
Dr SW
Existing Sidepath
!!
Blvd SW
Proposed Commuter Route
! ! ! !
Brahan Spring Park
rd Sta nfo
Proposed Shared Use Path
£
53
15th Ave SW
Dr
Princeton
14th Ave
Av e
New Orleans St SW Freeman Rd SW Roland Rd SW
e Low
!
SW
W
!Lowe Mill
08
S t Clair Ave SW
te Sta te R
Proposed On-Street Bicycle Facility
Existing Shared Use Path
fo r d
SW D avis Cir SW
Dr S derbilt Van r Van de rbilt C i
Existing On-Street Bicycle Facility
Proposed Alternative Alignment
W tN
Proposed Alignment
01
Elliott Ave SW
e SW sth i e r D
Ventura Rd SW
!
SW
10
This is aSWguidance document only and does not commit d Ave We oo rw Caymann Rd S W S Dr aturn SW the trail to being built at a specific location. In some cases, W Bermuda Rd SW Elm Ave SW easements will need to be acquired. Inr those cases, SW d Acklen Dr SW landowners willRbe included in the process, educated n a Dr SW a Ivy Ave SW le Rd SW Az a Dr SW 1 Miles Ashlandabout the project, with rrespect for private property rights. Bayless D
!
d llar S t S W Po
06
12th Ave SW
S Dr Woodwa y
Dunn St SW
ton
Rd Branch Spring
Long Ave SW
n Cli
e Av
Bi n
05
10th Ave SW
Bluegrass Rd S W
02
Downtown Huntsville/Big e W Spring Park Av
e
07
11th Ave SW
NW
Cir
NW
SW
HUNTSVILLE Woodson S t
11
8th Ave SW
ton
hS urc
wy NW
W eS Av ce n re
W
n Cli
Ch
l Pk 1 oria Rte Mem
Lo n g
03
NW St to n tN ing sh nS rs o Wa Jeffe
te Sta
W
W tS aS SW SW St i an t Ind Earl ey S NW w St De ke Bla W tN sS ke Sto W tN yS wr W Lo tN sS ile Ba NW Stone S t
0.5
Rd
Gesman Pl SW
Cab a
0.25
7th Ave SW
SW
W
W
Pri ce
W
rS rt s D R obe
SW Dr
r Coffee D
Hughes Dr
0
W eN Av ks c i H
Governors Dr SW
Bob Wallace Ave SW
Thurman Rd
y Toft o
Botanical Garden
REDSTONE ARSENAL
13
!
£
ll Ha 04
4th Ave NW
rS
Simpson Dr
Dyshell Dr SW
FINAL DRAFT !
431
9th Ave SW
!!Huntsville
16
W
6th Ave SW
12
Dr NW
W eN Av
lvd NW
Newton Ave SW
W
15
SW
S
W Cir S Lex r SW D x Le
r SW
Jordan Ln SW
W
Judith Ln
S Dr
SW Ridgeway St
s or rn ve o G
us e Ho
C yp N res Bee R o R os s ch A se e D ve SW Dr r S Ave SW SW
Stanl ey
Huntsville Depot Museum
f ord Ave NW
B Triana
¥ Pine Ave SW
i All Mc Dr S
oo Linw
2nd Ave NW
565
Arlington
r s te
Union Dr NW
Caldwel l Rd N
St
14
NW
Dr NW Barbara
Mitc h ell Dr N
NW
Ave Holmes
Battle Dr
Bell Ave NW ia D Magnol r NW
NW
Dr
er Dr
o u nc i l
Wilson Dr NW
W
ay
Ci
Moore Ave NW
Hart Dr NW
Fai r w
Saundralane Dr NW Dr NW ale
s tline
NW Dr
Austin Ave NW Lakeside Dr
Julia St NW
Hillmo n t
The University of Alabama !! in Huntsville
53
klane Dr NW Par
¬
Richardson Dr NW
W Rd N ne
Clayrest Dr NW
NW
st l i
Horace Dr NW
W S Crestline D r N
C re
aves Dr NW Gr
erson Rd NW Hend
Rd
y sit n i v er
W
ie rest v w Dr NW e Cr
op Lo
NW vd
rN
C
Rd NW
NW
e NW
N
N
Bl rd B ra dfo
Ben
r Ci
Hun t D
al e Hillan d
ve
ik ki P l as Pu
72 £
CHAPTER 3 Singing River State Rte 2 DOWNTOWN HUNTSVILLE TO Trail Route o r thington Dr NW BOTANICAL GARDEN
University Dr NW
ik e A Klond
N Dr ow ad Me
n Dr NW t ma Pu
Marie Ave NW
C
HEART OF HUNTSVILLE
¸
Proposed Trailhead
Interstate
Fish and Wildlife Service Land
Other Destination
US Highway
Redstone Arsenal
Proposed Midblock Crossing
State Road
Municipality
Signalized Intersection
County or Local Road
Water
Railroads
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
For purposes of this Master Plan, the Singing River Trail would begin at Big Spring Park and utilize existing shareduse path under Monroe Street. The trail would then parallel Heart of Huntsville Drive with a shared-use sidepath to Clinton Avenue or follow Pinhook Creek to Clinton Avenue.
01
Add no turn on-red from Heart of Huntsville to Clinton and bike/ped exclusive main crossing of Clinton; conduct traffic analysis to determine best signal phasing.
02
The Singing River Trail would ideally be a shared-use path on the north side of Clinton, to avoid Memorial Parkway ramps. There is adequate space on Clinton Avenue to reduce lanes, as the City of Huntsville is currently adding bike lanes.
03
Upgrade curb ramps for shared use path crossing of Clinton at Seminole; relocate ped actuated signals.
04
05
Sidepath is recommended on west side of Seminole as driveways are infrequent.
A high-quality and comfortable crossing of Governors Drive at Seminole Drive is recommended with countdown signals and high-visibility crosswalks.
06
The Lowe Mill Corridor Study recommends buffered bike lanes and sidewalk on Seminole Drive to Lowe Mill
07
Pedestrian Access and Redevelopment Corridor (PARC) alternative. The City of Huntsville has analyzed possibility of multi-modal bridge to cross Memorial Parkway and Governors Drive ($31,409,570).
08
A trailhead should be provided at 09 Lowe Mill, utilizing existing parking lot. Work with Lowe Mill ownership group to provide access to facilities and bathrooms. Also, if bike/ped bridge is built, the trail should come up the former 10th Avenue easement. West of Lowe Mill, options include 10 either buffered bike lanes and sidewalks on 9th Street, or a side path on 10th Street. Recommended bike lanes on 4th Street connect the side path up to the recommended buffered bike lanes on 9th Street. The selection of a preferred alternative should be coordinated with the Lowe Mill Corridor Study.
The preferred facility type from Triana Boulevard to Jordan Lane is a side path. However, there are some areas with right-of-way constraints that will need to be considered. A bike boulevard may be considered as an alternative for 9th Street, which has relatively low traffic volumes (slightly over 3,000 vehicles per day). Traffic calming and volume reduction strategies would need to be implemented.
12
The 9th Street/Jordan Lane crossing should be comfortable with high-quality intersection treatments. Jordan Lane is a multi-lane, high-volume roadway. Countdown signals, median refuge, and high-visibility crosswalk should be provided.
13
Governors House is a 3-lane road and 39 feet wide. Because driveway entrances are limited and confined on the south side, an on-road shared-use path is being provided on the north side by the City of Huntsville (2019) during roadway resurfacing.
The Singing River Trail will need to cross Bob Wallace Drive. This is a wide, 5-lane section with 35mph speed limit; however, cars are frequently traveling faster. With a roadway curve to I-565, the Singing River Trail should be brought briefly to the east on the north side of Bob Wallace Drive. A bike/ped actuated signal (RRFB, HAWK, or stop signal) should be provided at location of good sight clearance.
15
A shared-use sidepath spur should be provided on the south side of Bob Wallace to connect to the Botanical Gardens.
16
14
Trailhead Bike Shop - Lowe Mill
The 9th Street/Triana crossing should be comfortable and safe with protected intersection features.
11
Governors House Dr SW
S I NG I NG R I VE R T R AI L M AST E R P LAN / 2 9
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
HEART OF HUNTSVILLE
Holmes Ave NW
DOWNTOWN CATALYST
Old Coca-Cola Plant Development
Housing Authority Development
on St Clint
Mo
nro
eS tS W
Ch
urc
Von Braun Center
ek k Cre hoo Pin
Von Braun Center Expansion
City of Huntsville Municipal Buildings
hS tS W
Huntsville Museum of Art Big Spring Park
Von Braun Center
e SW s Av
am Willi Pop Up Activation Space
ar
un
ts vil
le
Dr
DOWNTOWN CATALYST
SW
Mo
The Constellation Development
St SW
to fH
nro e
He
3 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
Downtown Huntsville is experiencing a surge in development. Creating more connections between these new amenities and new residential areas will reduce traffic burden, help support the goals of creating an active district, and attract further investment downtown. The Singing River Trail can be a spine that brings people through Downtown and activates currently underutilized assets. Like the Swamp Rabbit Trail along Reedy River in Greenville, SC (photos to the right), the way people interact with Pinhook Creek could transform the Downtown - the City of Huntsville has already made investments along the Big Spring as it flows into Pinhook Creek. The Trail would either be adjacent to Heart of Huntsville Drive or Pinhook Creek, ultimately.
CHAPTER 3 Singing River Trail Route
FINAL DRAFT
Greenville, SC Swamp Rabbit Trail at Reedy River, Downtown Greenville
S I NG I NG R I VE R T R AI L M AST E R P LAN / 3 1
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
THE ROCKET CORRIDOR
BOTANICAL GARDEN TO MADISON BASEBALL PARK
Madison
US Space and Rocket Center
Indian Creek Greenway
Following a path of innovation, industrial growth, and new inspiring developments
US Space and Rocket Center
Downtown Madison
Source: Huntsville/Madison County Convention & Visitors Bureau and City of Madison 32 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
RIDEOUT ROAD SIGNATURE BIKE/PED BRIDGE CONNECTING THE SPACE AND ROCKET CENTER TO REDSTONE GATEWAY The Singing River Trail will need to cross Rideout Road via a signalized intersection or via a visible, signature bridge that will serve as a gateway to the Space and Rocket Center area. There are a variety of bridge options that range from basic and less expensive to world-class and expensive. The photo simulations here show two possible options.
Singing River Trail Character Alternative
Existing
Proposal Plan View
Modern Alternative
S I NG I NG R I VE R T R AI L M AST E R P LAN / 3 3
Sparkman Dr NW
Voyager Way NW
n
nnett
Rice Dr SW
Dr
Trip p Dr
ghes
Hu
Stee
Rd
04
Skinner Dr SW
y Dr SW
Rip le
Bomford Dr
Hawkin
Golf C ourse Rd
SW
M
Cir
tn
Cline St
k loo er v O
er
SW
565
Dy
Mo Dr
Nike St SW
n
1 Miles
Ca ju
0.5 r
W
Lake
This is a guidance document only and does not commit the trail to being built at a specific location. In some cases, easements will need to be acquired. In those cases, landowners will be included in the process, educated r Homestead Rd about the project, with respect for private property rights. D
Proposed Alignment
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Proposed Commuter Route
Existing Sidepath
Proposed Side Path
3 4 / S I N G I N G R I V E R TR Existing A I L M AUnpaved S TE R PShared L A N Use Path
Proposed Unpaved Shared Use Path Proposed Ferry
! ! ! !
gh
ill ela Sh
C
n tros e
REDSTONE ARSENAL
Ci
H
Lew t er Rd
SW
Rideout Rd
a ter
05
s Dr
Dr
¸
Cir
Ln
Mo
itage er
!
Goss Rd SW
Zierdt Rd
k Blvd oo
0.25
!
ert s R ob
REDSTONE ARSENAL
Anderson Rd SW
anterb tain Br un
Dr
0
Redstone Gateway
Dr
Dr
S
Dr
ury
18
¥
06
03
Simpson Dr
01
02
17
Dr
!
08
0 y2
Town ContMadison/ ec R d Ballpark
!
!
US Space & Rocket Center
!
Dr
on e
Hw
255
Ho f
Fl a
F lag
Ci r g st
o dis Ma
lv nB
Dr N W
HUNTSVILLE
de Wee
w vie
l Hil
W
16
Rd
13d
14
15
¬
Be
t Dr hurs Pine
ht
ple
07 12
Oakland Rd Westsco tt um mer
09
Q uality Cir NW
Slaughter Rd
Diamond Dr NW
Skyline Rd
Foy Rd
Patricia Rd
Nancy Rd
Autumn Wind Dr Morning Vista Dr
! !
W
Marsh Ave NW
11
MADISON
Portal Ln
Davies Ave NW
Dr N ology Techn
W es son C i r
Dr
r Cir
Madison Academy
tford Ct NW Ro bi
Deramus Ave NW
Old Madison Pike NW
10
r NW Stra
gt o
Alderwood
Jan Davis Dr NW
Rodman Dr
Lewter Dr
Ln
W Br
e
M
alo
e
Dr ella
ia
t rga
n Pik M a diso
Shelton Rd
High Rd
B l vd Inwood Trl
Spring Water Dr
Chad Ln
r
land Blvd No Blvd la n No
St
r
Rideout Rd NW
Metaire Ln
n Dr
Mabry Dr n s in
Chadrick Dr
Dr
Dr
ArnoldR
g
n ha Ma
Mil l e
!
cha s e Dr NW
Hi
Bre nd hla a nd D
Doane Dr
Bridge Street Town Centre !
FINAL DRAFT
W nN
Lynn Dr
Gilmer Dr NW Har old sD
dL oo nh
om
Dr
d
ree an Cree k G n w a y di
Sa n
a
r eenwood Dr
tt D r Bre
NW rer Blvd Explo
In
Dr
Rd
G
Wellington
Brentwood Ln
Rd
NW
er
Ashley Wa y
ry er Ch
Odys sey Dr
W n Dr N Wyn
BOTANICAL GARDEN BeaverTO Run Dr Ke Eastview DrPARK MADISON BASEBALL
John W ri g
Sc hri ms h
Scenic
Eld orado Dr
CHAPTER 3 Singing River Trail Route Dr
!!
Lak e side Dr
Cir
ROCKET CORRIDOR
r NW Moquin D
Proposed Trailhead
Interstate
Fish and Wildlife Service Land
Other Destination
US Highway
Redstone Arsenal
Proposed Midblock Crossing
State Road
Municipality
Signalized Intersection
County or Local Road
Water
Railroads
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
The trail would traverse the southern edge of the US Space and Rocket Center property along the utility easement to the west. It would include the new Energy Greenway opened in 2019.
A small trailhead should be provided on the NW corner of the Redstone Gateway property.
A trailhead should be provided at the western edge of current Space Center programmed property with full parking lot, bathrooms, etc.
I-565.
01
02
03
The trail would follow the TVA easement paralleling I-565.
The trail would utilize the signalized crossing. The crossing should be high-quality as it crosses multiple lanes. The crossing should have countdown signals, median refuge, and high-visibility marked crosswalk.
04
An opportunity for a world-class, highly- visible bicycle/pedestrian bridge would connect the Space and Rocket Center to Redstone Gateway across Rideout Road. The bridge would land on the north side of the Redstone Gateway complex. The bridge would ramp up south of major power lines towards SW with a right-hand turn, crossing the highway (300 foot span). The bridge would ramp down to the NW to Redstone Gateway NE corner. The bridge would need to meet lateral clearance requirement of TVA (power lines).
05
06
07
The trail would utilize existing shared-use path underpass below
The trail would be developed as a shared-use path along the east side of Governors West. With the bridge over the railroad measuring 40’, reconfigure roadway to provide 10’ shareduse path.
08
09
Greenway through Cabela’s development is in design phase.
A connection to Bridge Street and Research Park should be provided. Alternate corridor would follow Old Madison Pike to Indian Creek Greenway as a path on the north side.
10
Indian Creek Greenway should be continued along sewer easement to the south (and Madison Academy) and become part of the Singing River Trail corridor.
11
13
Small bridge over Indian Creek would be needed.
A safe, crossing accommodation should be provided at signalized Shelton/Madison Blvd intersection with high-visibility marked crosswalk and countdown signals.
17
The corridor would utilize existing grade-separated underpass of Norfolk Southern along Indian Creek. The trail would follow sewer easement and along dividing lines of existing parcels to minimize impact.
14
The trail would cross Slaughter Road and re-enter utility corridor. An actuated signal should be provided.
The trail should connect to Town Madison and ballpark with shareduse path spur. This spur would eventually connect to Downtown Madison.
18
15
The trail would continue along Shelton Road as a shared-use sidepath on east side (ROW is limited so an easement is required with one property owner). A high-quality midblock crossing should be provided to connect to City of Huntsville sidepath project on west side of Shelton. ROW is more substantial and easement may not be required along west side.
16
Indian Creek Greenway
The trail would be a shared-use path along the utility-power line corridor, adjacent to Cabela’s development. Easements will need to be acquired along this segment.
12
Underpass at I-565
S I NG I NG R I VE R T R AI L M AST E R P LAN / 3 5
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
THE MADISON-TRIANA LINK
MADISON BASEBALL PARK TO TRIANA
Mill Creek Greenway
Weaving through quaint suburban neighborhoods and agricultural fields towards the bottomlands of the Tennessee River floodplain
Madison Farmers’ Market
2018 Madison Street Festival
A rendering of the Rocket City Trash Pandas Baseball Stadium Bradford Creek Greenway
Source: City of Madison, Breland Properties, and Steven Gordon, Minor League Baseball 3 6 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
POWER LINE CORRIDOR CONNECTING HUNTSVILLE TO MADISON One of the alternatives for connecting Huntsville to Madison (Redstone Gateway/ Cabelas to Zierdt Road) is utilizing the power line easement that parallels I-565. Pedestrian access/greenway easements would need to be acquired for this segment to be built. If this becomes the Singing River Trail spine, resting spots with access to shade and benches would enhance the experience.
Proposed
Existing
S I NG I NG R I VE R T R AI L M AST E R P LAN / 3 7
Hale Rd SW
Ta luc ah Rd
r
Ar
n
er to
! !
6th St
Foster Dr
Tybee Dr Murphy Harold Murphy Dr
Co Rd 115
!
J
Truck Trl E
SW Wall St
16
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Proposed Commuter Route
Existing Sidepath
Proposed Side Path Proposed Unpaved Shared Use Path Proposed Ferry
! ! ! !
¸
0
Proposed Alignment
3 8 / S I N G I N G R I V E R TR Existing A I L M AUnpaved S TE R PShared L A N Use Path
17
Wheeler National Wildlife Refuge
Barlowe Rd
te 2
This is a guidance document only and does not commit the trail to being built at a specific location. In some cases, easements will need to be acquired. In those cases, landowners will be included in the process, educated Bilow Rd SW Bilou Rd about the project, with respect forSWprivate property rights.
o lley
d
B R
Co Rd 127
SW B arl owe Rd
Indian Springs Rd Co Rd 131
R 0 Hwy 2 Sta te
2 Miles
Co Hwy 127
Sanla
l n P
d
! !
!
SW
Rd
Rome Rd
Short Pike Rd SW
Harbor Glen Dr
Beadle Ln
Wa
Martin Rd SW
O ld Jim Wil l
Pl
ch
este
Blv d
SW
Wa y
Na Dr
Clipp Disk Dr
Kellner Rd SW
!
t ures
!
Cir Dr Royal Dr
Dunlop Blvd SW
Contec Rd
Cir
olo
C
es t
co rd
tt R
New Bristol Ln
SW
! !
ER
Palmer Rd
V RI
18
nco
County Line Rd
Old
1
Landess Cir
15
Ci r
Alt 72
Rd 0.5
13
S wa
Huntsville International Airport
Re
TRIANA
Carr Ln
s Rd
E SE ES N N TE
14
SW
es
Rd
11
Blvd
J am
R d Har 121
an dim
0
Laracy Dr SW
y Hw US
Ct
Co
kton Dr
Coral
d Blv
B roc
on dis Ma
Co Line Rd
Ave tion Pr oduc
Jetple x
Jetplex Ln
pF
Wall Triana Hwy
10
rn Blvd SW Hea Glen
12
C ir
Bo t to m
Flamingo Park
5th St
r
07
A St
Record St
e C ov
Boeing
06 W
¥
8th St
Dubli n
Dr
dt Rd
08
El e ctron ics Blvd S W
565
Dr
Zie r
09
20
W
D aw n
ry
ut
Sullivan St 05 Iv o
nt St Fro
Downtown Madison
03
Wa ln
iams Rd S W
y Hw
Ln
Lewis
ge
Ln er
Ta lly
SW
C om
me e rc Celtic Dr
Sh ar
nett Rd
Lake F B re m Ln x t Blvd es or
04
Li me Qu a rry Rd
Lanier Rd
D
River Ln
Spin n ak
02er Rid
e Dr
Hughes Rd
Dr
Town Madison/ Ballpark nial Lak
e Ln
or e Sh
H e ri
Fl a g
Misty
Rd
d or
n rso de n A
01
ta g
Q D rap e r Rd
FINAL DRAFT Slaughter Rd
CHAPTER 3 Singing River MADISON BASEBALL PARK TO Trail Route TRIANA REDSTONE ARSENAL Anderson Rd SW
ke La
D
Overlook Rd
Louis Bluff Rd
MADISON-TRIANA LINK
Proposed Trailhead
Interstate
Fish and Wildlife Service Land
Other Destination
US Highway
Redstone Arsenal
Proposed Midblock Crossing
State Road
Municipality
Signalized Intersection
County or Local Road
Water
Railroads
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
The trail will be a shared-use path along west side of Zierdt Road (this facility is already in development by City of Huntsville).
01
Town Madison developers are implementing a shared-use sidepath along the main corridor through Town Madison.
02
03 An existing underpass of I-565 exists on Intergraph Way. While challenging, a sidepath can be implemented below the bridge. A crossing will need to be 04 provided at Madison Blvd. This will be challenging to make comfortable for bicyclists and pedestrians. Coordination with ALDOT will be critical. The spur would follow Celtic Drive as a sidepath along the western side (park and school on west side), ultimately connecting to Lanier Rd/Farmer St/Downtown Madison.
05
A commuter route connecting Downtown Madison to Decatur provides a more direct route for longdistance commuters. See pages 52-53 for a more detailed map and description of this route.
06
The Martin Road Greenway is recommended in the City of Huntsville Greenway Master Plan as one of the near-term projects. The ROW is significant.
07
The trail would need to be a boardwalk structure adjacent to Zierdt Road through this wet area.
08
There is substantial available 09 right-of-way on Beadle Lane to accommodate a side path.
10
Safe accommodation of wide Wall Triana Hwy crossing will be critical.
Wall Triana is a 4-lane mediandivided highway. There is more ROW outside pavement on the east side (approximately 40 feet) which would allow for a sidepath. Easements may be needed in specific locations.
11
Beadle is a 2-lane roadway with wide shoulder on the south side of the roadway (34 feet in width). ROW is substantial ranging from 100 to 120 feet. There is greater ROW on the north side (with 45 feet outside pavement). A sidepath is recommended on the north side.
owned parcels) compared to 43 parcels on the west side, a sidepath along the east side is recommended. This reduces interaction with utilities, residences, and driveways.
Swancott features a narrower, but still substantial ROW (80 feet) with 32 feet of pavement. While there is greater ROW on the south side, there would be less disturbance to existing agricultural fields on the north side. The north side features utility poles but adequate space between the poles and the roadway.
The segment of Jolley B Rd south of the parking area is closed during the winter but remains open to bicyclists and pedestrians.
14
15
At this location, County Line Road is 2-lane, 20’ roadway with ROW ranging from 60 to 82 feet. With 5 parcels along east side (including sizable publicly-
17
A full trailhead parking lot should be provided at existing parking lot.
18
16
E & N restaurant in Triana
From Harold Murphy Drive south, Wall Triana Hwy is a 22-24’ road with 80-90 feet of ROW. A sidepath is recommended on the east side.
12
6th Street is mostly a 3-lane, 34-foot road. There is substantial ROW through majority of link. There is an opportunity to do a road diet (center turn lane removal) or the preferred recommendation is a sidepath along the south side.
13
A flood prone section of Zierdt Rd
S I NG I NG R I VE R T R AI L M AST E R P LAN / 3 9
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
THE WHEELER WILDLIFE TOUR
TRIANA TO MOORESVILLE
Great Horned Owl Fledgling at Wheeler NWR
Experiencing nature’s beauty and exceptional wildlife viewing while connecting two of the oldest incorporated towns in Alabama Wheeler National Wildlife Refuge (NWR)
Sandhill Cranes at Wheeler NWR
Wheeler NWR
Mooresville
Source: Wheeler National Wildlife Refuge 4 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
WHEELER WILDLIFE REFUGE AND TENNESSEE RIVER FRONTAGE – UNPAVED SHARED-USE PATH The Singing River Trail will track along existing unpaved roadway in the Refuge, adjacent to the Tennessee River. The trail will be composed of stone dust, structurally sufficient for vehicle traffic, and fine enough for bicycle traffic.
Proposed
Existing
S I NG I NG R I VE R T R AI L M AST E R P LAN / 4 1
SW River Bend Dr SW
l
n u t Co
v
d
FINAL DRAFT e B lv
ng
Hous ton G o Way odson
08
North St SE
d SW
Legacy Cove Dr
Promenade Dr Moon Creek Cir Zierdt Rd
Willow Crest Ln
Gwinett Dr Barnard St
Wall Triana Hwy
County Line Rd
Harold Murphy Dr
Carr Ln
Foster Dr
Co Rd 127
Vil l
Draper Dr
TRIANA
5th St
Landess Cir
B Rd
05
01
Pl
02 !
e Rd
Tru
04
Rd
Refug
National !Wheeler Wildlife Refuge
John Gordon Rd
W
lly Ta Bottom s
La nds End Dr S
Cowan Rd
oun
ck
03
Trl
M a ddenB ra nc hR
1
2 Miles
Mu ssle
0.5
Ca mp
R
Old Branch Rd
d
d
E
0
!!
Flamingo Park
Fearn Dr
tre e
R
Pitts Griffin Dr
Co Hwy 127
SW Bilou Rd
SW Bilow Rd
New Hope Rd
SW Rockhouse Rd
Murphy
Lakeside Fields Pond Dr Dr 9th S Je Sprin ss age eB 8th St en ne tt Dr 6 th St
J olley
EE RIV ER
Tybee Dr
d
t
SW Henderson Rd
Harbor Glen Dr River Run Ln
gs Dr
Henderson Rd
Tidal Ct
Ervin Ln
SW Wall
06
R ncott S wa
St
Towe Rd
07
Rome Rd
Cir
Avalon Lake Dr Castlecreek Dr SW SW Rabbit LnLakeland Dr S W
SW
r e ek D r Beadle Ln C
Co Rd 115
le bb Pe
Pryor
This is a guidance document only and does not commit g ein Bo the trail to being built at a specificSWlocation. In some cases, Barlowe Rd B arlowe Rd easements will need to be acquired. In those cases, Sa nla l landowners will be included in the process, educated n P about the project, with respect for private property rights.
Bertha Dr
Market St High St
d SW Blv
Rd
TEN NES S
Ba rren Fork R
0 y2
! MOORESVILLE !
Wa
565
TRIANA TO MOORESVILLE
i
¥
Hw Old
Boe Cir
10
09
E
WHEELER WILDLIFE TOUR
lt 2A y7 Hw S U Bibb Garrett CHAPTER 3 Singing River Peoples TrailRdRoute
Proposed Alignment
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Proposed Commuter Route
Existing Sidepath
Proposed Side Path
4 2 / S I N G I N G R I V E R TR Existing A I L M AUnpaved S TE R PShared L A N Use Path
Proposed Unpaved Shared Use Path Proposed Ferry
! ! ! !
¸
Proposed Trailhead
Interstate
Fish and Wildlife Service Land
Other Destination
US Highway
Redstone Arsenal
Proposed Midblock Crossing
State Road
Municipality
Signalized Intersection
County or Local Road
Water
Railroads
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
The trail is recommended for the south side of 6th Street between Zierdt Rd and Wall Triana Hwy. The eastern extent is constrained by a few residences, minimal existing roadway, and steep banks. On-road facilities may be necessary between Zierdt Rd and 5th Street, after which the topography levels and the road widens. A southern orientation will reduce the number of driveway interaction, separate the trail from a lake and potential flood risks. The Town of Triana and Madison County own large parcels at the western end of the corridor. Utilities along the southern edge could be a constraint. If so, a road diet could provide space to accommodate trail facilities.
01
Between 6th Street and a 02 continuation of greenway just south of Ragland Cir. the trail is recommended for east side of road. This reduces interaction with utilities, residences, and driveways. Additionally, there are far fewer parcel owners to coordinate with. Sizable portions of the adjoining parcels on the east side are owned by Madison County and the City of Huntsville. The existing dirt roadway would need to be reconstructed with stone dust, structurally sufficient for vehicle traffic, and fine enough for bicycle traffic. Maintenance will be essential with rain/flood events.
03
This segment follows a narrow sandbar in the Wheeler National Wildlife Refuge between Brakes Branch and the Tennessee River. This road is closed to cars during the winter but remains open for bicyclists and pedestrians all year. Due to proximity of water sources, the road tends to flood once every three years. The existing dirt roadway would need to be reconstructed with stone dust, structurally sufficient for vehicle traffic, and fine enough for bicycle traffic. Maintenance will be essential with rain/flood events.
04
On Rockhouse Rd between the 05 river segment and Henderson Rd, the trail is recommended on the east. This alignment avoids residential driveways and is primarily abutting farmland. After Henderson Rd, it is recommended that the trail transition to the western side of Rockhouse Rd. While there are a few residential driveways, the houses are set-back far from the road.
06
There are large tracts of 07 Department of Interior and Tennessee Valley Authority land along the western side of the road from the curve, to Swancott Rd. A western alignment avoids many residential driveways towards the northern extent of Rockhouse Rd.
All adjacent parcels along Pryor Road belong to the same individual so east/west alignment isn’t dependent on ownership. Additionally, the land use context is predominantly farm/forest land. Utilities run along the eastern extent while a portion of the road comes close to Limestone Slough on the mid-western portion of the segment. More detailed study examining owner preferences, exact ROW buffers, and a comparison of wetland/flood risks vs utility issues will need to be completed.
08
The trail will follow SW Alabama State Hwy 20 on the south side into Mooresville. There should be sufficient ROW and only a few industrial landowners exist adjacent to the proposed alignment. The greatest constraint is the three bridges crossing Limestone Creek, Limestone Slough, and a small creek in between the two. The 28’ wide bridges don’t offer much room for bicycle facilities. Separate bike/ ped bridges will be needed to traverse these water features.
09
Southern Carnage Bike Shop in Mooresville
A commuter route connecting Downtown Madison to Decatur provides a more direct route for longdistance commuters. See pages 52-53 for a more detailed map and description of this route.
10
Refuge Rd - Jolley B parking lot
S I NG I NG R I VE R T R AI L M AST E R P LAN / 4 3
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
RIVER CITY CONNECTION
MOORESVILLE TO DECATUR
Old Decatur Postcard Wheeler NWR Sign
Post Office in Mooresville
Connecting the Refuge backwater of the Tennessee River towards new industrial growth, Calhoun Community College, and Downtown Decatur via a unique river crossing experience.
Downtown Decatur
Princess Theater in Downtown Decatur
Canoers near Decatur and the Wheeler NWR
Source: Decatur Area Convention & Visitors Bureau 4 4 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
MOORESVILLE – SCENIC SHARED-USE PATH SEGMENT ALONG ALABAMA HIGHWAY 20 The Singing River Trail will follow Alabama Hwy 20 through Mooresville towards Arrowhead Landing as a shared use sidepath. At the first bridge crossing just west of Mooresville, two options include a more expensive separated bike/ped bridge and a less costly re-designation of roadway space on a roadway with minimal traffic volumes.
Roadway Reconfiguration Alternative
Existing
Standalone bridge Alternative
S I NG I NG R I VE R T R AI L M AST E R P LAN / 4 5
13
! !
US Hwy 72 Alt
Joe Wheeler Hwy
Huntsville-Decatur Hwy
6t h
¥ 65
03
02
Ar
05
07
Dr. B
Po in
06 il l
E
sB
Ln Ce SE n tu ry
Ct
SE
E
d Blv ry n tu E Ce
24th St
d SE
l
y Cent u r
SE
Tra i
Ma lla rd
B lv
2 Miles Dogwood Ln
21st Ave SE
ike
n cy on end Clar t SE C
S Dr
20th Ave SE
S im
Lasabre Ln SE Cougar Ln SE Apollo Ln SE Harrison St SE
E Summerl a ne S SE Penn ylane
ine ver Wol
9th St SE Medical Dr SE W St S 10th St SE 10th 11th St SE Phillips Bue 12th St SE Cir na 13th St SE Cir Vi st a SE d SW College St SE 0.5 1 SE t hS Magnolia St SE 14t Royal Dr SE 14th St SW
Seton Ave SE
tM Yorkshire SE all ard Enolam Blvd SE Eastbro ok SE Dr S
26th Ave SE
7th St SE
8th St SE
Park Ter SE
Par ksid SE e Ct
18th Ave SE 18 1/2 Ave SE
Locust St SE
19th Ave SE
5th St SE 6th St SE
Piney St
04
North St SE
Wadsworth St Olive St SE Tower St SE
15th Ave SE 16th Ave SE
4th St SE
Ma rk e Ch urc tS tN hS E tS E Grant St SE
Somerville Rd SE 13th Ave S E 14th Ave S E
kwy SW lP
4th Ave S W
3rd Ave SW 2nd Ave SW Au 1st Ave SW st i nv Ne il le wm R an Ave S W
ra
Sherman St SE Gord o n Dr SE
4th Ave SE 5th Ave SE State Rte 3 6th Ave SE 7th Ave SE 8th Ave SE 9th Ave SE 10th Ave SE School Aly
C
Hillside Rd
St Jackson St SE
2nd Ave SE 3rd Ave SE
3rd St SW Central Pk wy
en t
Av G e ibb NE
Holly St NE Moulton St E Johnston St SE
d 2nd St SW 2n
Glen nwood R d SW
10 th
L e Cherry St NE e St NE
!
Co Rd 113 Zeetler Rd
Po Ash Ct NE pla Elm Ct rC t
Gr o
Ba Ca nk n S O al t ak St N S Lin t N E e E St NE St
!
20
01
TE NN ES SE ER IVE R
16
Av e
17
NE
St NW
ve
!
W ! ils Ch on ur St ch NE St NE
1st Ave NE
Dr
ey
1st St NW State Rte 24 Go rdo n Dr SW
0
! !
Rhodes Ferry Park
e Reg
4th Ave NW
Le e
Wheeler National Wildlife Refuge
y Hw Old
MOORESVILLE
Mtichell Rd
15
nd Isla ay W l Fin
08
Riverwalk Marina
¥ 565
State Rte 20
14 Mar Ch ket u S La rch t NW Al fay St m et N a te W St S N t Vine W NW St NW Da v NW is S t NW
Bibb Garrett
Moo nli Way ght
Decatur Day Use Park
Dr
Co Rd 3
Bee Line Hwy
Canary
Co Rd 71 Mooresville Rd
Way
re n tu Ve
Broad St
11
12
FINAL DRAFT
Market St
09
Co Rd 45
nding
10
Calhoun Community College
whea d La
! !
SW Endeavor Way
CHAPTER TO 3 Singing River Trail Route MOORESVILLE DECATUR
ro
Blue Jay Way
Buddy Garrett Rd
Sandy Rd
RIVER CITY CONNECTION
Blv dS
This is a guidance document only and does not commit the trail to being built at a specific location. In some cases, easements will need to be acquired. In those cases, landowners will be included in the process, educated about the project, with respect for private Point Mallard property rights. ! !
Proposed Alignment
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Proposed Commuter Route
Existing Sidepath
Proposed Side Path
4 6 / S I N G I N G R I V E R TRExisting A I L M AUnpaved S TE R PShared L A N Use Path
Proposed Unpaved Shared Use Path Proposed Ferry
! ! ! !
¸
Proposed Trailhead
Interstate
Fish and Wildlife Service Land
Other Destination
US Highway
Redstone Arsenal
Proposed Midblock Crossing
State Road
Municipality
Signalized Intersection
County or Local Road
Water
Railroads
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
This alternative is located in an environmentally sensitive area. Possible routing and permitting will need to be coordinated with appropriate agencies.
01
Broad Street is a small local road 02 with very low traffic. Signage will be used to direct trail users down Broad Street, connecting an existing unpaved road and North Street. The Town of Mooresville developed a concept on State Hwy 20 through town consisting of a lane reduction, landscaping, and parking. The trail would be part of this cross section on the south side.
03
The trail will continue along the south side of Highway 20, where there is substantial right-of-way (100-200 feet) for a sidepath. For the two creek crossings between downtown Mooresville and Arrowhead Landing, alternatives include parallel bicycle/pedestrian bridges alongside the existing bridges, or a shared use path on the existing bridge pavement (approximately 40 feet wide).
04
This segment utilizes existing unpaved road. The road may need to be resurfaced and will need to be maintained with new material periodically. It should be noted that this area is prone to flooding and may not be suitable for use during flood conditions.
05
An existing unpaved Fish and Wildlife Service road provides an opportunity to cross under Interstate 65.
06
This segment will be coordinated with the Fish and Wildlife Service, which is planning the construction of a new unpaved road.
07
The City of Decatur was awarded 08 a BUILD grant of $14.2 million for an interchange improvement at Bibb Garrett Road and Alabama Hwy 20. A shared-use path will be provided through this intersection to the north. In addition, the Trail should connect to the newly developing Calvary Community on Hwy 20. The segment of trail following County Rd 45 (Airport Rd) should be aligned along the south side. The street is a rural two lane road without markings that is between 18 to 22 feet wide. Rightof-way along the corridor ranges from between 44 to 50 feet. The south side has fewer adjacent property owners, driveways, and interactions with utilities.
09
Routing through Calhoun Community College will be coordinated with upcoming construction projects planned at the campus.
10
Hunter Lane is a 16 feet wide frontage road providing access to over 20 homes. The low-volume, lowspeed, narrow character of the road make it an acceptable facility for a trail. Signage and traffic calming treatments will further signify its use as a shared facility.
12
A proposed ferry service will connect trail users to Downtown Decatur.
17
After Hunter Lane, a sidepath will follow US 31 . A cantilevered bridge on the west side of US 31 will accommodate trail traffic over the railroad.
13
The trail will deviate from US 31 to transition onto a boardwalk traversing a stream and wetland. The boardwalk with terminate onto a limited access service road along the east side of the Decatur Day Use Park.
14
Marina Area of Decatur
Along the western side of the bridge, an existing path extending from the marina will be widened to a shared use path. Then another boardwalk will run along the western side of the bridge, from the end of the side path to Decatur Day Use Park.
15
If boardwalk needs to be on other side of US 31 in the future, the trail could cross under the bridge to connect to the Marina.
16
Intersection improvements are needed to facilitate crossing US 31 and CR 45 to Calhoun Community College.
11
Arrowhead Landing Road
S I NG I NG R I VE R T R AI L M AST E R P LAN / 4 7
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
SWAN CREEK
CALHOUN COMMUNITY COLLEGE TO ATHENS
Courthouse Singing on the Square in Athens
Weaving through the agricultural countryside of Limestone County to historic Downtown Athens.
Docked Boats near Athens
Cotton Field near Athens
Athens City Hall
Source: City of Athens 4 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
HOBBS STREET – GATEWAY CONNECTION FROM SWAN CREEK GREENWAY TO ATHENS STATE COLLEGE AND DOWNTOWN ATHENS The Singing River Trail would follow Hobbs Street to connect to Downtown Athens. The 2015 Athens Transportation Plan recommends a “Complete Street” road diet of Hobbs Street. The cross section would include a two-way separated bikeway with sidewalk on the north side of Hobbs Street.
Proposed
Existing
S I NG I NG R I VE R T R AI L M AST E R P LAN / 4 9
St
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Proposed Commuter Route
Existing Sidepath
! ! ! !
3
31 N US Hwy
S waMcCa in Dr Cre n ek D r
Mimosa Ct
Stewart Dr
Bee Line Hwy
4 Co Rd 4 Brook wood Dr E r Norton D
Cool S prings Dr
19
es
Lak Vie e wD r
n Rd Summit Lakes Dr
Thra Blvd sher Kelli Dr
Blvd
!
At he n s-Lime st one B lvd
!
Swan Creek Greenway
Bral y
20
s Cir Texa St Utah
08
Tec Dover St hS cho ol Edinburgh Dr
21 Edison D r
Bolyn St
Iris St
US Hwy 31 S
72 £
Annie Ruth Jamar St
1 Miles
22
Aster St
10
Ole Carriage Dr Plantation Way
Shady Ln
Grove Ln
Shaw St S
Hoffman St
Freeman Ave
09
lch Dr We
Merlin Dr
Rte
Sta te
Dexter St
Cornish Dr Sussex Dr
Rogers St Thomas St N
Hargrove St
Box St
E Forrest St
11
Brookhill Dr
Minuteman Dr
0.5
Swan Dr
Rd Co
Sk y
E Sta te Rte 2
John Hector Dr
State Rte 27
S Monroe St
86
Frazier St
S Beaty St
East St
e St Maize St
S Clinton St
S Marion St
Coleman Ave Grace S Houst on S t Ave S Madison St Jefferson St
Jefferson St S
Proposed Alignment
0.25
Calvin Elkt on Rd Dr
Putm a Pvt D n r
N Clinton St
N Beaty S t
N Marion St
Irvin St
N Madison St
Horton St Sanders St N Malone St Vine St
Lu ca sS t
Levert Cir Levert Ave
0
Durham Dr
!
23
Armory St
12
W Sanderfer Rd
¸
!
N Jefferson St
Mason St Coman St
Newby Rd ani Dr
Mooresville Rd Co Rd 71
Dogwood Flats Rd
Fennell Rd
Ste
BELLE MINA
01
5 0 / S I N G I N G R I V E R TR A I L M AUnpaved S TE R PShared L A N Use Path Existing
Wheeler St
N Houston St
Meadows Rd
McCulley Mill Rd
Ennis
Nabors Rd Co Rd 95A
Co Rd 91 Hall Rd
Newby Chapel Rd Co Rd 89
Line Rd C o Rd 87B re e
Co Rd 93
Stewart Rd Co Rd 69
Sandlin St
Wilk inso n
Yarbrough Rd Co Rd 85 Co Rd 87A
C
Bee Line Hwy
Sommers Rd Railroad Ave Co Pa Rd 6 ge 7 Rd
y
Carter Rd
Co Rd 45
Co Rd 10
Briarwood Cir Meadow Squire Run Way
s Dr
ant Gr St
T
Calhoun Community 3 Miles College
Southwind Dr Montreat Dr
24
Ryan St
Brahma St Winston Dr Hereford Dr Vaughn Dr Evans Dr
65
bon Ln Audu
Rd
Windscape Dr
E
r
Co Rd 6
h omas L Hammons Rd
14
US H wy 7 2
13 Commercial Dr
St
¥
C on g
Z ion Church Ln
15
in
gt o n
Sam Dr
S
Old Rd tur Deca
Station Rd
Da iry
wart Ln Boseck Rd
E South St C hrist opher E Lee St C ir
9th St
US Hwy 12th St 72 W Lee Hwy
Wa sh in
25
wy
i n gt o
W 13th St
Market St E
16Christ
7th St
10th St
Fennell Ln
02
6th St
26
E Prior St
SH ld U at e 5 1 O t S 2 e Rt
31
N Briarwood Rd Rd B rook wood gelawn Dr Rid
Rd
Harris
1.5
17
27
Romeo St
Cloverleaf Dr
Martin Lime Rd
18o Rd 29
C Rd ry 2nd St r fe ns 3rd St 4th St ow Br
! !
28
Buck Island Rd
Pryor St
E McClellan St
Bryan St Hobbs St
t on St Rte ashi ng Sta te us W W 2B
Humphrey Rd
McClellan St E
Cole Pvt Dr
03
Pryor St W Ma lo Cir ne
St
Park Pl ay W ood
£ 31
1st Ave
4th Ave
Willow St Dr w vie Pa Ci nsy r
w Idle
Rosie Rd
Ma r St Wket
Farm Rd
Ve Trl
3rd Ave
E Pine St Walnut St Oak St
6th Ave
ATHENS
lyn Al St
Dogwood Flat
id Br
0.75
Co Rd 95 Co Rd 24 Huntsville Brownsferry Rd
Rd
Pee t e
TE NN RI ESS VE E R E 0
¥
N
65
Co R d 14 Laughmiller Rd
g eforth Rd
£
Pi n e
04
Co Rd 16 Ingram Rd
5th Ave
2nd Ave
72
05
06
Nuclear Plant Rd
Lee Hwy
Lindsay Ln S
US Hwy 31 S
Co Rd 61
07
Co Rd 30
Craft Rd
Capshaw Rd
E Sanderfer Rd
Hightower Rd Co Rd 67A
Lindsay Rd
Linton Rd
86
d
Co R
!
7th Ave
on
ng St pri
Malone Rd
Co Rd 87 Oakdale Ridge Rd
Levert Ave Jefferson S tS
r
Creek !Swan Greenway
Pepper Rd
Rd
kt El
E Elm St
t
W Sanderfer Rd
t
Co Rd 48
Weeping St
Plum St
8th Ave
Monroe St
Lill i
r
an D
d
Co Rd 44
E Forrest St
t ne S Malo
W 13th St State Rte 2
S Clint o n S
n St ingto
King s D
C York Ln B ro o R d wn 29 sfe rry R
N Jefferson St Frazier St
Rd d tW
ATHENS
Hobbs St
Dr
c Bu M
Co Rd 65
99
ash WW
1st Ave
W Hobbs St
FINAL DRAFT t G a rr e C ir
Lindsay Ln N Co Rd 83
US Hwy 31 N
Elkton Elkton R St d
e
Co Rd 52C Quinn Rd
5th Ave
k
Co Rd 63
Rt
ke n tS
This is a guidance document only and does not commit Rdat a specific location. In some cases, the trail to beingBarksdale built Co Rd 54 ch W Elm St In those cases, easements will need to beLoRoapacquired. ea State Rte 99 ls 10th landowners will be included in the process, educated onAve t s Nick Davis Rd Hou Cts private 9th property rights. about the project, with respect for Ave
Co Rd 54A Saint John Rd
Wel l
e at St
CHAPTER 3 SingingCOLLEGE River Trail Route CALHOUN COMMUNITY Co Rd 48 W Elm St E Elm St New Cut Rd k TO ATHENSar Isla
1 51 y3 e2 Hw e R t S U at Old St
S tat e Rt e 12 7
SWAN CREEK
Whit field D r
Winslow St
E Sanderfer Rd
¸
31 £
Wauchula Pvt Dr Wauchula
Proposed Trailhead
Interstate
Fish and Wildlife Service Land
Other Destination
US Highway
Redstone Arsenal
Proposed Side Path
Proposed Midblock Crossing
State Road
Municipality
Proposed Unpaved Shared Use Path
Signalized Intersection
County or Local Road
Water
Proposed Ferry
Railroads
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
The Trail would traverse the Calhoun Community College campus. Currently the campus is discussing redesign of portions of campus. Precise trail routing will be determined at a later date.
01
North of Calhoun College, the Singing River Trail would most ideally follow an easement through current farmland (if landowners are interested). Otherwise, the Trail would extend northward along the east side of US 31 (not as ideal of a trail experience). The US 31 ROW extends in a range of 30-50 feet off the edge of pavement, allowing for the placement of a trail.
02
Where Swan Creek crosses US 31, the Trail would follow the Swan Creek corridor to the northeast to Huntsville Brownsferry Road. This area is characterized by large parcel landowners – easement acquisition would need to be discussed.
03
From Huntsville Brownsferry Road, 04 a significant amount of land along Swan Creek is farmland. Acquisition/easement should be sought along the Swan Creek. Given the relatively narrow 50 foot width of the creek, bridge structures may be placed to avoid uninterested landowners. The Trail should be placed as close to the creek as possible, given the scenic nature of the corridor and to have less impact on adjacent lands. Approaching Strain Road from the south, approximately 0.6 mile of land ownership is City of Athens just east side of the Swan Creek corridor. However, there is more topography on this stretch creating some trail development challenges.
05
From Strain Road north, the Trail would 06 most likely be placed on the west side of Swan Creek. The City of Athens owns land on the west side that extends 0.5 miles of the total 1.5 miles to reach US 72. North of the City-owned
land are multiple parcels owned by same owner. An easement should be negotiated. This trail segment is recommended in the 2015 Athens Transportation Plan.
An easement would be required across commercial parking lots on east side of Jefferson Street for the trail to access Jefferson Street.
A Trail alternative would follow Town 07 Creek from its entrance into the Swan Creek, on the south side of the City of Athens Wastewater Treatment Plant. This Town Creek trail is recommended in the 2015 Athens Transportation Plan
Like Hobbs Street, Jefferson Street 17 is identified in the 2015 Athens Transportation Plan for a “Complete Street” road diet. Jefferson Street traffic volumes are expected to decline. The existing four-lane section is generally 44’ curb to curb (11’ lanes) and extends to Green Street, near Downtown. 2011 ALDOT traffic volumes at Forrest Street intersection are 12,840 and decline towards Downtown. ROW is significant, especially on the eastern side (ranging from 20’-25’ from curb). Jefferson Street should be reconfigured to 3-lane (33’ width) allowing for 11’ on eastern side and ROW space for a shared-use path. Driveway consolidation would be critical as well.
The Trail would follow the sewer easement, utilizing the existing worn path/dirt road.
08
At US 31, the Trail would run underneath the bridge (Further study needed to confirm feasibility of carrying trail under bridge).
09
West of US 31, the Trail would follow the cleared, graded sewer easement on north side of Town Creek.
10 11
An undercrossing of bridge of Old Decatur Road will be needed.
12
The Trail would follow the creek and easement to US 72.
Because bridge under US 72 is a culvert, an underpass is not possible. A pedestrian-actuated stop signal should be provided with elevated median refuge in current striped median refuge.
13
The Trail would continue following the 14 cleared, graded sewer easement on east side of Town Creek. There is substantial clearance to carry 15 the trail under the Railroad bridge. A bridge crossing of Town Creek will also be necessary.
16
A Town Creek restoration project in concert with a Jefferson Street Complete Street reconstruction could transform this entrance into Downtown Athens, encouraging economic development.
18
The City of Athens has RTP grant funding to extend Swan Creek Greenway under US 72 with a parking lot addition on the south side. An evaluation of clearance has been conducted and undercrossing approved under US 72.
19
The new trailhead/parking area will be on the west side of the creek - the parking lot will be located at end of Edison Street.
20
The existing informal parking area and trailhead on the north side of US 72 and trailhead should be improved to a paved entrance with gateway signage.
21
22
The Trail would utilize existing Swan Creek Greenway from US 72 to Athens-
Limestone Park/Athens High School. The trail should be paved and widened to Singing River Trail design standard. From existing Swan Creek Greenway, the Trail would extend west through Athens-Limestone Park, using existing walking loop of the park, to the Hobbs Street/US 31 intersection.
23
The Trail would utilize crossing of US 31 on North Side of Hobbs Street. The crosswalk should be upgraded to countdown signals and the center median refuge should be extended so that crosswalk cuts through the middle. The crosswalk should be widened to accommodate bicyclists and pedestrians.
24
US-31 southbound traffic turning westbound on Hobbs Street should be in a stop or yield configuration.
25
The 2015 Athens Transportation Plan recommends a “Complete Street” road diet of Hobbs Street.
26
From US-31 to Beaty Street (Downtown), Hobbs Street connects the Swan Creek Greenway, Athens-Limestone Park, and Athens Middle School to Athens State University and Downtown Athens. Hobbs Street is a 4-lane road and approximately 50 feet from curb-to-curb. 2011 ALDOT traffic counts are 9,710, decreasing to 6,720 closer to Downtown. This roadway should be converted to a 3-lane cross section (11’ travel lanes) with buffer and north-side separated bikeway of 17 feet to complement existing northside sidewalk.
27
Existing sidewalk on Hobbs Street should be repaired where necessary; a few small gaps should be filled with sidewalk. Driveway crossings should be consolidated where possible.
28
S I NG I NG R I VE R T R AI L M AST E R P LAN / 5 1
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
Commuter Route One of the goals of the Singing River Trail Master Plan is to provide a transportation corridor for bicyclists and pedestrians. With the recreational segment traversing southward to the Wheeler National Wildlife Refuge, a more direct route is needed to complete the Huntsville-Decatur connection. This commuter route will combine off-road and on-road treatments that are comfortable for the majority of experienced cyclists who would make use of the corridor. For example, Old US Hwy 20 is being widened to include bike lanes at the time of this study - that is a key east-west portion of the Commuter Route. Should opportunity present itself in the future through development, a shareduse sidepath should be considered in addition to the bike lanes. The Commuter Route connects back with the recreational segment
The commuter portion of the Singing River Trail should connect through Madison Downtown Recreation Campus/Football Stadium. City of Madison owns one parcel; one easement would be needed through an additional parcel to reach Sullivan Street. Alternatively, the Trail could route up to Downtown Madison and back down Celtic.
01
With further development (and Sullivan being recommended as a "Green Street" in City of Madison plans), a signalized intersection with high-quality bicycle/pedestrian crossing should be provided at Sullivan crossing.
02
A developer is working with the City of Madison to add a shared use sidepath along Kyser Boulevard. This would become part of the commuter route.
03
A developer is working with the City of Madison to connect Kyser Boulevard to Westchester Drive. As part of this project, the shared use path with continue and connect to the future Bradford Creek Greenway. The Bradford Creek Greenway would continue north under the railroad bridge to Palmer Park. The Singing River Trail would continue south, using the Bradford Creek Greenway for a short segment.
04
The Singing River Trail commuter route 05 would continue south along the eastern edge of two large industrially-zoned parcels. An easement would need to be acquired. The Trail commuter route would turn west, along one of the same parcels described in #5. It would hug the southern edge of this parcel providing connectivity to a number of businesses along production avenue.
06
American Tobacco Trail, Durham, NC
52 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
The Trail commuter route would use the new sidepath along the east side of County Line Road briefly southward to the County Line Road/Old Highway 20 intersection.
07
A high-quality bicycle/pedestrian crossing will be needed at County Line Road/Old Highway 20 intersection. Currently, there is no signal, but that will likely change with the widening project of Old Highway 20.
08
The Trail commuter route will extend westward along Old Highway 20 as bike lanes (a current, ongoing City of Huntsville widening project is including bike lanes to Greenbrier Parkway).
09
The current widening project ends at Greenbrier Parkway. Future widening should include bike lanes. An interim solution would be extending a sidepath the Limestone Slough/Creek (future development and roadway reconstruction potential should be monitored).
10
The crossing of the railroad will require coordination with Norfolk Southern. A canopy to protect trail users should be considered. An undercrossing may need a boardwalk due to wet conditions.
11
The commuter route would turn south along the Limestone Slough/Creek. This is identified as a regional proposed greenway. Generally, this crosses only a few parcels owned by one landowner; and easement would be necessary.
12
13
Adequate height and space exists under I-565 to continue the Trail.
The commuter section of the Singing River Trail meets back with the scenic, recreational route as a sidepath along Highway 20 towards Mooresville.
14
Carter Cir
Lanier Rd
Celtic Dr
wis
Sullivan St
Hughes Rd
Bi
Dr
W
in
Rd S W
SW
Dr
g R id
e
!!
Blvd S
W
Dr
Elm
Win ge d Ct SW
plex Jet
W
Dr S
son
J am es Ma di
Co Rd 127 Co Hwy 127
Telloride Ci r Pension Row isperw Stone St Oak St Michli Rd Daffodil Sarah Hughes Cir Dr Landers Rd
Mill Ridge Dr
Ray Sanderson Rd
Balch R d
Gl en nH ea rn Houston Go on Bl v o ds Blvd dSW SW Hertz Dr
Laracy Dr SW
l Ct Alisha Cir
Kento
r
County Line Rd
Ma rt
Mossyleaf Dr SW
r
Greenbrier Rd
Old Jim Wil l
rk D
Co Rd 115
Mose Chapel Rd
Co Line Rd Wit her sJ unction
w Rd
Maecille Dr
Segers Rd Co Rd 119
Powell Rd
Ci
Smokey Way
Ln
ay
Kellner Rd SW
s Rd SW iam
Ln
Wh
C
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Proposed Commuter Route
Existing Sidepath Existing Unpaved Shared Use Path
! ! ! !
Hous ton G o Way odson
Swancott Rd
Proposed Alignment
SW Barlowe Rd
W al
d SW Blv
0.5
1
lT ri
y Hw
Barlowe Rd
0
g ein Bo
a an
Pryor R d
This is a guidance document only and does not commit the trail to being built at a specific location. In some cases, easements will need to be acquired. In those cases, landowners will be included in the process, educated about the project, with respect for private property rights.
la ns ee Qu
2 Miles
nd
Blush Ln SW
Co Rd 71 Mooresville Rd
Cl
Rd
a Tra dem
Jetplex Blvd
lvd S W El e ctron ics B
North St SE
Market St High St
y Dr
Marion
La rr
y arr Qu
Dr
! MOORESVILLE !
14
20
01
Pent ast a r
Peoples Rd
y Hw Old
Arli n gt on
SW
13 Bibb Garrett
e St Wis
Todd Dr
Indian Springs Rd Co Rd 131
Cresent Cir
Co Rd 45 Bibb Garrett Rd
Dr
Huntsville International Airport
Rd
!
Dublin
Dr r D gy er o nol e ech Av xt T se Ne ou
rd
Ha ng er Dr
W lvd S rn B
565
e W
¥
20
0 y2 Hw y w H ur cat De
Hea
Rte
Alt 72
lle svi
06
hes t
Aly
Ln
Dr Ivory Pl d Blv on dis Dr ime Quarry R d Ma L ic s aph Gr Bus Park Bl v d Disk Dr Ludie Richard Dr Interpro Dr Cleghorn Blvd Ln Cochran Rd SW Na r tu S W li ppe re s Dunlop Blvd S W W Beaver Short Pike Rd SW Ridge SW
k Cor
reh Wa
12
te Sta
st c
Glen
N Gin St w n r Vie ire L Ceda Emp
wy
nt Hu
d Kyser Blv
Royal Dr
Jetplex Ln
US H
08
Fr on
orta l
Downtown ! Madison
02t St
03
05
co Re es Ja m
wy Greenbri er Pk
BELLE MINA
09
ay eW Tre
n tto Co y dley ley Wa n u H und H
11
ill Park Ln
nw
95 ell Rd
Orchid Ln
!
Maplewood
Jack so Sally Ln n Ave Dawn Dr Le Grayson Ave
04
n Ave ucti o Prod Cir
!
ood Ln
Dr b TO DECATUR Sharp Blvd Stanley Ave MADISON bFINAL DRAFT Gann Ave VIA MOORESVILLE Mill Rd i ft Dr P
Palmer Rd
07
Greenbrier Restaurant
Co Rd 10
Dr
Dons Ln Garden Hills Rd NW Schrimsher Rd Cobble Creek Rd
10
Zion Church Ln
New Bristol Ln Thornle y Ct Brockton Dr Lena Cain Blvd Millbury Ct
Co Rd 121
C Fe o R nn d
Telluride Dr
ntham
Experimental Loop
Boseck Rd
COMMUTER ROUTE
M
ay
Gra
Rd
Stewart Ln
B rad ee ford Cr eek Gr
!!
Beerli Dr Benoir Trl Ascot Ln Woodvale Ln Bakerfield n Ln Co ra
oll ow
Mazda-Toyota Manufacturing Site
Woodmere Ct Halsey Dr Hardiman Rd
xH
Humphrey Rd
Hi gh Coach Way Ct gly Lan e Hunington C has Dr Fo Matti e Ct
Way Acorn
B u rgreen Rd
CHAPTER 3 Singing River Trail Route
Pine Cir L ong M ea d o
¸
Proposed Trailhead
Interstate
Fish and Wildlife Service Land
Other Destination
US Highway
Redstone Arsenal
Proposed Side Path
Proposed Midblock Crossing
State Road
Municipality
Proposed Unpaved Shared Use Path
Signalized Intersection
Proposed Ferry
S I NG I NG R I VE T R AI L M AST E R P LAN County orRLocal Road Water/ 5 3
Railroads
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
Additional Trail Features
MOBILE/WEB-BASED APP:
The vision for the Singing River Trail is more than just a place to walk or bike. As described in the vision statement and goals, the Trail will be a place to learn, experience, celebrate, treasure, and socialize. Additional recommendations to be pursued with multiple national, state, and local partners include:
The Trail can be experienced through a smartphone app that traces the journey, identifies key stopping points, interprets the historic and natural landscapes, and provides current information and alerts related to trail maintenance issues like flooding in the Refuge area. The app can also provide information about outfitters, nearby bike maintenance, lodging, and meal options along the corridor.
NON-TRADITIONAL, OUTDOOR, LINEAR MUSEUM: The Trail is an opportunity to educate visitors by featuring historical and natural history interpretation through the outdoor experience. The corridor is rich in Native American history, Civil War history, agricultural history, settlement history, industrial history, and natural history. This can be accomplished through interpretive signage and panels along with a smartphone app (described to the right).
Above: Conceptual wayfinding and interpretation apps developed for the Great Rivers Greenway. Source: Darnell Surles, http:// www.studentshow.com/gallery/34745049/ Company-Redesign-Great-Rivers-Greenway
Right: Wayside exhibits provide information about a specific feature on a landscape and help visitors make connections to a site. Source: National Park Service, https://www. nps.gov/orgs/1453/interpretation.htm 5 4 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
ENCOURAGEMENT OF TRAILORIENTED DEVELOPMENT: The Trail can offer prime locations for outfitter rentals, concessions, restaurants, bed and breakfasts, breweries and more. Offering those options will encourage greater trail use and tourism. The greater business community, along with municipal and county governments, can assist in those start-ups.
Rural trail oriented development along the Virginia Creeper Trail in Virginia
Trail oriented development along the Razorback Greenway in Arkansas
TRAIL PROGRAMS: The Trail’s visibility will expand through annual and seasonal programs such as trail races, trail clean-up days, group walks, National Trails Day events, community gardens/edible gardens, classroom trips, charity bike rides, Bike to Work Month events, employer commuter encouragement programs, etc. These programs can be led or assisted by advocacy groups, Launch 2035, and municipal/county parks and recreation departments. In addition, national, state, and local magazines, travel guides, and online platforms can advertise the Singing River Trail as a destination to encourage visitation.
Events along the Swamp Rabbit Trail in South Carolina
S I NG I NG R I VE R T R AI L M AST E R P LAN / 5 5
CHAPTER 3 Singing River Trail Route
WAYFINDING SYSTEM
5 6 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
CHAPTER 3 Singing River Trail Route
FINAL DRAFT
S I NG I NG R I VE R T R AI L M AST E R P LAN / 5 7
CHAPTER 4 Phase One Projects
4
5 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
Razorback Greenway Northwest Arkansas Source: Alta
FINAL DRAFT
CHAPTER 4 Phase One Projects
“Once the Singing River Trails get underway, and then brought to completion, Limestone County will benefit in ways we don’t even yet understand. What we do know and understand is the increased recreational opportunities and healthy lifestyles for walkers and hikers and bicycle riders, young and old. Visitors will not only be impressed, they will come back and add dollars to our local economy, lots of them, I think. So, Limestone County will just become a more and more desirable place to live, work and play.” Rod Huffman, Athens Planning Commission
Phase One Projects
HOBBS STREET page 60
SWAN CREEK TRAILHEAD page 78
SPACE CENTER page 76
Beginning Phase of Trail
GOVERNORS HOUSE DRIVE page 74
INDIAN CREEK TRAIL EXTENSION page 70
LAKE 5 TRAIL TENNESSEE RIVER BOARDWALK
TRASH PANDA TRAIL
page 72
page 68
page 62
ARROWHEAD LANDING TRAIL page 64
WHEELER NWR TRAIL page 66
S I NG I NG R I VE R T R AI L M AST E R P LAN / 5 9
FINAL DRAFT
CHAPTER 4 Phase One Projects
Blac
k&G
East St
t gS rin Sp
Dr
agle
reek
Swa nC
Hill Dr
ATHENS LIMESTONE PARK
SWAN CREEK GREENWAY
South St ! ! ! !
en E
Sam
Crestview St
Green St
Hoffman St
Shaw St
Washington St
ATHENS MIDDLE SCHOOL
Gold
Market St
DOWNTOWN
31 £
Thomas St
Beaty St
BIG SPRING PARK
old
Dr
Hobbs St
Proposed Alignment
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Proposed Commuter Route
Existing Sidepath
Proposed Side Path
Proposed Midblock Crossing
Existing Unpaved Shared Use Path
Proposed Unpaved Shared Use Path
Signalized Intersection
Proposed Trailhead Other Destination 0
375
750
1,500 Feet
Proposed Ferry
HOBBS STREET – GATEWAY CONNECTION FROM SWAN CREEK GREENWAY TO ATHENS STATE COLLEGE AND DOWNTOWN ATHENS The 2015 Athens Transportation Plan recommends a “Complete Street” road diet of Hobbs Street. The current roadway has four lanes and is approximately 50 feet from curb-to-curb. 2011 ALDOT traffic counts are 9,710, decreasing to 6,720 closer to Downtown. This roadway should be converted to a 3-lane cross section (11’ travel lanes) with buffer and north-side separated bikeway to complement the existing north-side sidewalk.
Existing sidewalk on Hobbs Street should be repaired where necessary; a few small gaps should be filled with sidewalk. Driveway crossings should be consolidated where possible. The roadway improvement will improve quality of life, connect to multiple destinations, increase transportation options, and contribute to positive economic development for the City of Athens.
6 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
n Dr
V P hil ictory D ip R iv ers r Dr
E Prior St
Mc C ai
ATHENS STATE UNIVERSITY College St
Buck Island Rd
SWAN CREEK SEGMENT (ATHENS)
Bryan St
Clinto n St
Marion St
CITY HALL
N Monroe St
Jefferson St
HOBBS STREET
TRIP GENERATORS
FROM: SEGMENT LENGTH:
6,400 feet
(1.2 mile)
US HWY 31 TO: CLINTON STREET
Swan Creek Greenway Athens-Limestone Park Athens Middle School Athens State University Big Spring Park City Hall Downtown Athens
¸
FINAL DRAFT
CHAPTER 4 Phase One Projects
ESTIMATED CONSTRUCTION COST Quantity
Item
Cost
6,400 LF
Complete Street Retrofit
$1,749,526.88
See appendix for full engineer's estimate sheet. Estimate does not include acquisition costs or engineering/design/permitting costs.
POSSIBLE PUBLIC/GRANT FUNDING SOURCES: City of Athens, ALDOT TAP, ARC
Proposed 11’
11’
11’
TRAVEL LANE
TURN LANE
TRAVEL LANE
5’
6’
6’
SEPARATED BIKE LANES
Proposed
6’ SIDE WALK
BUFFER
GUTTER PAN
31 £
H ill
Dr
Swa n
Sam
US-31 southbound traffic turning west-bound on Hobbs Street should be in a stop or yield configuration.
Cr ee k
Dr
Gol
Mc C ai n D
den Eag le
r
Dr
US 31 CROSSING DETAIL
The crosswalk should be upgraded to countdown signals and the center median refuge should be extended so that crosswalk cuts through the middle. The crosswalk should be widened to accommodate bicyclists and pedestrians. Utilize existing walking loop of the park, to the Hobbs Street/US 31 intersection.
12’
12’
12’
12’
6’
TRAVEL LANE
TRAVEL LANE
TRAVEL LANE
TRAVEL LANE
SIDE WALK
GUTTER PAN
Existing Existing
GUTTER PAN
S I NG I NG R I VE R T R AI L M AST E R P LAN / 6 1
FINAL DRAFT
CHAPTER 4 Phase One Projects
TENNESSEE RIVER BOARDWALK
RIVER CITY CONNECTION SEGMENT (DECATUR)
Canal St NE
RHODES FERRY PARK
Oak St NE
Dr. Bill Sims Bike Trail
Ferry St NE
Wilson St NE
Lafayette St NE
Vine St NE
Line St NE
Well St NE
31 £
DECATUR DAY USE PARK
RIVERWALK MARINA
ln Wa ut
NE
Market St NE
St
Church St NE
rry
e Ch
E
N St
8th Ave NE
Gibb 10th Ave NE
Proposed Alignment
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Midblock Crossing
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Signalized Intersection
Proposed Commuter Route
Existing Sidepath
Proposed Side Path
Existing Unpaved Shared Use Path
Proposed Unpaved Shared Use Path
0
625
1,250
2,500 Feet
¸
Proposed Ferry
TENNESSEE RIVER BOARDWALK - CONNECTING THE CITY OF DECATUR A central question for the Singing River Trail is the necessary connection to the City of Decatur. A large portion of the water crossing is shallow water apart from the main channel. A concrete boardwalk is recommended that would provide a world-class opportunity to walk across the waterway.
The boardwalk would begin at Decatur Day Use Park and closely parallel US Hwy 31. Overlooks, or respite/viewing areas, should be provided at least every 1/4 mile. A ferry is recommended as an option to connect travelers across the Tennessee River main channel from the Marina to Rhodes Ferry Park.
62 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FROM: SEGMENT LENGTH:
7,300 feet
(1.4 miles)
DECATUR DAY USE PARK TO: RIVERWALK MARINA
TRIP GENERATORS Decatur Day Use Park Riverwalk Marina Rhodes Ferry Park Downtown Decatur
FINAL DRAFT
CHAPTER 4 Phase One Projects
ESTIMATED CONSTRUCTION COST Quantity
Item
Cost
7,300 LF
Boardwalk Trail
$9,685,501.68
See appendix for full engineer's estimate sheet. Estimate does not include acquisition costs or engineering/design/permitting costs.
POSSIBLE PUBLIC/GRANT FUNDING SOURCES: City of Decatur, ALDOT, Limestone County, Morgan County, TVA
Proposed
ADDITIONAL CONSIDERATIONS It is recommended that fishing not be allowed along this boardwalk. It is highly likely that fishermen will want to use this facility. The City of Decatur, ultimately should monitor and decide what is best for its citizens. Concrete (Permatrak, or similar) is recommended for the surface with metal railings. Maintenance of this facility is an important consideration.
A safe connection through the Marina area will be important for travelers to continue their trip. An existing, winding, unpaved 1,200 foot "trail" exists along land and adjacent to Hwy 31 leading away from the Marina. The boardwalk would end at that "trail." The existing "trail" would be more formalized and could be paved in the future for better access. Proposed
S I NG I NG R I VE R T R AI L M AST E R P LAN / 6 3
FINAL DRAFT
CHAPTER 4 Phase One Projects
ARROWHEAD LANDING TRAIL
RIVER CITY CONNECTION SEGMENT (MOORESVILLE)
0
St S
Rte 2
h No rt
State
PINEY CREEK High
y St Pine
E
MOORESVILLE
St
St ket
Mar
Rd ille resv Moo
d he a
Old
2 wy 7 US H
d 71 Co R
Bibb
y 20 Hw
Alt
w Arro
¥
ding
Lan
65
Garr ett
¥ 565
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Proposed Commuter Route
Existing Sidepath
Proposed Side Path
Existing Unpaved Shared Use Path
Proposed Unpaved Shared Use Path
0
875
1,750
3,500 Feet
Proposed Ferry
ARROWHEAD LANDING TRAIL - MOORESVILLE CONNECTION TO THE REFUGE TRAIL Arrowhead Landing Road is an unpaved travelway used mostly by outdoor enthusiasts (kayaking and fishing). The road provides beautiful scenic vistas across the water along with canoe/ kayak access. It is largely an unknown jewel to most North Alabama residents. The roadway would remain unpaved but be smoothed with a stone dust surface. The Singing River Trail would then follow existing unpaved Refuge road under I-65
bridge northward towards Hwy 20. Ultimately, the connection will be made to the new BUILD grant overpass at Bibb Garrett and Hwy 20 and a connection should be made to the Calvary Community development. When parallel to Hwy 20 (near Mooresville), the facility would be a shared-use path.
6 4 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
SEGMENT LENGTH:
22,000 feet
(4.2 miles)
FROM:
TRIP GENERATORS
MOORESVILLE
Mooresville (post office, Southern Carnage, JaVa. Mooresville) Wheeler National Wildlife Refuge
TO: WHEELER REFUGE
POSSIBLE PUBLIC/GRANT FUNDING SOURCES: Limestone County, ARC, RTP, LWCF, TVA
¸
d l er R Zeet Rd 113 Co
Proposed Alignment
FINAL DRAFT
CHAPTER 4 Phase One Projects
ESTIMATED CONSTRUCTION COST Quantity
Item
Cost
3,500 LF
Option 1: Sidepath + Separated Bike Lane on Bridges
$1,575,025.92
3,500 LF
Option 2: Sidepath + Standalone Bike/ Ped Bridges
$3,365,955.42
3.5 miles
Stone Dust Trail Rehabilitation*
$798,934.66
Option 1 Total Cost
$2,373,960.58
Option 2 Total Cost
$4,164,890.08 View under I-65 Tennessee River bridge facing south
* The purpose of this design is to keep a natural trail that can both meet ADA and vehicular load requirements. It is recommended that the entire gravel structure be removed and replaced with stone dust path to ensure ADA compliance. Reconstruction would be conducted in the same footprint with minimal impact to the surrounding environment. If, during testing or during construction, it is determined that the existing gravel is suitable for ADA compliance, only regrading may be needed which would lower cost. See appendix for full engineer's estimate sheet. Estimate does not include acquisition costs or engineering/ design/permitting costs.
ADDITIONAL CONSIDERATIONS A long section (Arrowhead Landing Road) will remain open to motor vehicles. Bicyclists, pedestrians, and motor vehicles will need to share the road with clear signage and low speeds. Wayfinding signage would be provided for bicyclists and pedestrians. In addition, warning signage at locations of blind spots should be added for safety.
Resting locations with benches should be provided at locations along this section. Scenic vistas with benches and interpretive signage should be provided to enhance the experience. Along Hwy 20, near Mooresville, the facility is a shared-use path with option for standalone bridge over two waterways or separated facility on existing bridges.
Arrowhead Landing Road (courtesy of Wheeler Wildlife Refuge)
S I NG I NG R I VE R T R AI L M AST E R P LAN / 6 5
FINAL DRAFT
CHAPTER 4 Phase One Projects
WHEELER WILDLIFE TOUR SEGMENT
Jolley B Rd
John Gordon Rd
Lands End Dr SW
New Hope Rd
Rountree Pl
SW Rockhou se Rd Co Rd 129
WHEELER NWR TRAIL
Mus sle Cam pR
d
Refuge Rd
Truck Trl E
Proposed Alignment
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Proposed Commuter Route
Existing Sidepath
Proposed Side Path
Existing Unpaved Shared Use Path
Proposed Unpaved Shared Use Path
0
Proposed Ferry
1,250
2,500
5,000 Feet
Wheeler National Wildlife Refuge
WHEELER NATIONAL WILDLIFE REFUGE TRAIL - RIVERFRONT SECTION This long stretch of the Singing River Trail is a destination unto itself. The Trail will follow an existing unpaved roadway (called Rockhouse Bottoms Road) with tremendous Tennessee River and backwater views. Wildlife/waterfowl viewing is exceptional through this area. The roadway would remain unpaved but be smoothed with a stone dust surface.
Promoting this section of trail will bring more people to the Wheeler National Wildlife Refuge, which is an underappreciated local and national resource. This will be a great weekend recreational activity that should promote economic development in both Triana and Mooresville.
6 6 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
TRIP GENERATORS
FROM: SEGMENT LENGTH:
28,000 feet
(5.3 miles)
JOLLEY B ROAD TO: ROCKHOUSE RD
Wheeler National Wildlife Refuge Triana
¸
FINAL DRAFT
CHAPTER 4 Phase One Projects
ESTIMATED CONSTRUCTION COST Quantity
Item
Cost
5.3 miles
Stone Dust Trail Rehabilitation + Trailhead/Bathroom Facility
$1,425,718.72
The purpose of this design is to keep a natural trail that can both meet ADA and vehicular load requirements. It is recommended that the entire gravel structure be removed and replaced with stone dust path to ensure ADA compliance. Reconstruction would be conducted in the same footprint with minimal impact to the surrounding environment. If, during testing or during construction, it is determined that the existing gravel is suitable for ADA compliance, only regrading may be needed which would lower cost. See appendix for full engineer's estimate sheet. Estimate does not include acquisition costs or engineering/design/permitting costs.
POSSIBLE PUBLIC/GRANT FUNDING SOURCES: Madison County, Limestone County, RTP, LWCF Proposed
ADDITIONAL CONSIDERATIONS Motor vehicles are currently allowed along this section from mid-February through mid-October. It is closed from mid-October to mid-February (late fall and winter). It is open for foot and bicycle traffic year-round. This will remain the case as it will be a shared facility. Wayfinding signage should be provided for bicyclists and pedestrians.
Resting locations with benches along with overlook sites should be provided to enhance the experience. Maintenance is of critical importance due to rain events and flooding. This must be monitored and programmed into funding needs to maintain a high-quality facility. This project features a trailhead improvement at current Jolley B parking area. Existing S I NG I NG R I VE R T R AI L M AST E R P LAN / 6 7
FINAL DRAFT
CHAPTER 4 Phase One Projects
TRASH PANDA TRAIL ¥ 565
Con
tec R d
TOWN MADISON / BALLPARK (FUTURE) Canterbury Dr
nt
Hu rs
ir
tr o M on
s eD
r
Eucl id
Re
d nR
to
ng mi
Bl v
d
Disk Dr
Proposed Alignment
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Midblock Crossing
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Signalized Intersection
Proposed Commuter Route
Existing Sidepath
Proposed Side Path
Existing Unpaved Shared Use Path
Proposed Unpaved Shared Use Path
0
Ct
Dr
h Way
sle C
Mo u n ta B roo k in
In terg rap
Carli
ir
C ury
erb
Ca
av e n
Wa y
MADISON GOLF CENTER
Hur st H th a ven
Grap hics Dr
375
Clear broo k Ct
r Brazelton Ci
Spa Age ce Rd
MADISON-TRIANA LINK SEGMENT (MADISON)
750
1,500 Feet
Proposed Ferry
TOWN MADISON SIDEPATH During the time of this Master Plan (20182019), the new mixed-use and residential development Town Madison was under construction. Town Madison will be a hub of activity for locals and regional visitors. It will also be an important destination for the Singing River Trail, providing many amenities (food/drink/entertainment) and activities. The new baseball stadium for
the minor league team Rocket City Trash Pandas will be a major destination. The main roadway through Town Madison (Town Madison Blvd) will feature a 10' sidepath that will connect from one end of Town Madison to the other, forming an important segment of the Singing River Trail.
6 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
SEGMENT LENGTH:
9,300 feet
(1.8 miles)
FROM:
TRIP GENERATORS
ZIERDT RD
Town Madison Ballpark Madison Golf Center Intergraph Corporation
TO: INTERGRAPH WAY
¸
FINAL DRAFT
CHAPTER 4 Phase One Projects
ESTIMATED CONSTRUCTION COST* *Trail being constructed by Town Madison developer. Cost below is estimate for project if it were a standalone addition of shared-use path. Quantity
Item
Cost
9,300 LF
Total Cost
$2,088,648
POSSIBLE PUBLIC/GRANT FUNDING SOURCES: Funded by developer
Aerial Master Plan from townmadison.com
ADDITIONAL CONSIDERATIONS The Town Madison developer is constructing Town Madison Boulevard and the accompanying sidepath. Connected biking and walking infrastructure should extend from the Singing River Trail to the retail and Stadium destinations, providing seamless transitions.
Ultimately, the Trail would exit Town Madison Blvd at Intergraph Way and extend under the I-565 bridge. The critical connection to Downtown Madison is dependent on a high-quality crossing treatment at Intergraph Way and Madison Blvd.
10’ TRAVEL LANDSLANE CAPED MEDIAN
TRAVEL LANE
SIDE PATH
LANDSCAPE BUFFER Town Madison Blvd. cross section S I NG I NG R I VE R T R AI L M AST E R P LAN / 6 9
FINAL DRAFT
CHAPTER 4 Phase One Projects
wy 7
d Wi n t Ct f Dri
sto ne Dr
US H
ROCKET CORRIDOR SEGMENT (MADISON)
2A
Hw
ta
Vi s
Dr
h A r c et P l e Str
Fl a g
lt
ng rn i Mo
o M ad i s
y2
S
c pa
ge eA
0
Ma di
Rd
son
d nR
lto
B lv d
e Sh
kD ar nP
r
INDIAN CREEK TRAIL EXTENSION
EK CRE N IA IND
MADISON ACADEMY rs ehu Pin
t Dr
ter
gh
u Sla
AY NW E E GR
Rd
tec
n Co Rd
¥ 565
REDSTONE ARSENAL
Hu n
tsv
il le
De
cat
rso de
ur
Hw
y
dS
nR
W
An
Proposed Alignment
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Midblock Crossing
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Signalized Intersection
Proposed Commuter Route
Existing Sidepath
Proposed Side Path
Existing Unpaved Shared Use Path
Proposed Unpaved Shared Use Path
0
500
1,000
2,000 Feet
¸
Proposed Ferry
INDIAN CREEK EXTENSION The existing Indian Creek Greenway is a jewel of the region's greenway system. It currently ends at Madison Pike with a large trailhead. The greenway would extend under Madison Pike (with adequate clearance), and utilize the sewer easement behind Madison Academy.
The trail would continue under the existing railroad bridge, then curving back to Slaughter Road, rejoining the power line corridor. With the completion of this link and the Zierdt Road sidepath project, there will be nearly 8 miles of continuous shareduse path greenway from the existing northernmost extent of the current Indian Creek Greenway terminus.
70 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
SEGMENT LENGTH:
10,800 feet
(2 miles)
FROM:
TRIP GENERATORS
INDIAN CREEK GREENWAY
Indian Creek Greenway Madison Academy Publix Super Market
TO: ZIERDT RD SIDEPATH
FINAL DRAFT
CHAPTER 4 Phase One Projects
ESTIMATED CONSTRUCTION COST Quantity
Item
Cost
10,800 LF
12' Shared-use Path
$2,039,486.59
See appendix for full engineer's estimate sheet. Estimate does not include acquisition costs or engineering/design/permitting costs.
POSSIBLE PUBLIC/GRANT FUNDING SOURCES: City of Huntsville, City of Madison, Madison County, RTP, LWCF, ALDOT TAP
Proposed
ADDITIONAL CONSIDERATIONS Eight property owners will need to be negotiated with, primarily on the south side of the railroad bridge. Madison Academy is a willing participant for the long section between Madison Pike and the railroad bridge. A high-quality mid-block crossing (likely signalized) at Shelton Road will be needed to connect to the underconstruction sidepath on the west side
of Shelton. Special care should be given to ensuring sight lines are adequate and traffic is slowed. An underpass of the railroad will require a permit; in addition, if the railroad will allow, a canopy should be provided to prevent debris from the tracks from hitting a trail user.
Existing
S I NG I NG R I VE R T R AI L M AST E R P LAN / 7 1
FINAL DRAFT
CHAPTER 4 Phase One Projects
Diamond Dr NW
an
g ePl NW
ch Ex
NW
Harolds Dr NW
dwood D
r
W el
Rockledge Pl NW
W
Utica P l NW
Steeplechase Dr N W
Hwy 20
NW Pik e
n dis o
Ma Ol d
¬
Blv
d
255
Mad
ison
ST. JOHN PAUL II CATHOLIC HIGH SCHOOL
Woods Ln NW
Ridgely Pl NW Blocker St NW
BRIDGE STREET TOWN CENTRE
Roy al Pines Dr NW
ROCKET CORRIDOR SEGMENT (HUNTSVILLE)
Whispering Pines TrlN
LAKE 5 TRAIL
¥ 565
NW
svil
t Hu n
wy
rH
atu
ec le D
REDSTONE ARSENAL
Rideout Rd
Cir Quality
Proposed Alignment
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Midblock Crossing
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Signalized Intersection
Proposed Commuter Route
Existing Sidepath
Proposed Side Path
Existing Unpaved Shared Use Path
Proposed Unpaved Shared Use Path
0
500
1,000
2,000 Feet
Proposed Ferry
REDSTONE GATEWAY TO MADISON PIKE CONNECTION - CABELAS As part of their commitment to expanding the greenway system, the City of Huntsville is moving into the design phase of this project at the conclusion of this Master Plan process. This project will be constructed in 2020.
The project features an "on-road" connection along Governors West, using the wide shoulder widths of the railroad crossing bridge to create a separated facility. The corridor will continue as a 12' shared-use path through the Cabelas development, along Lake 5, and up to Madison Pike.
7 2 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
SEGMENT LENGTH:
6,100 feet
(1.2 miles)
FROM:
TRIP GENERATORS
REDSTONE GATEWAY TRAIL TO:
Cabela’s Hotel Services Employment Apartment Complex
MADISON PIKE
¸
FINAL DRAFT
CHAPTER 4 Phase One Projects
COST INFORMATION At the time of this study, this project was being scoped by the City of Huntsville. Additional information will be available at the conclusion of this Master Plan process and will be reflected here at that time.
POSSIBLE PUBLIC/GRANT FUNDING SOURCES: Funded by City of Huntsville
Proposed
ADDITIONAL CONSIDERATIONS The off-road segment will be a 12' concrete shared-use path.
A pedestrian access/greenway easement is needed at the hotel property.
Given the continued trail development in Research Park, on the north side of Madison Pike, this segment will need a signalized, mid-block crossing for trail users. As a result, this will also provide greater connectivity to Bridge Street.
A high-quality crossing is needed at the existing Governors West/Cabela Road signalized intersection. Effort should be made to protect trees as the trail approaches Madison Pike. Understory will need to be removed.
Existing S I NG I NG R I VE R T R AI L M AST E R P LAN / 7 3
FINAL DRAFT
CHAPTER 4 Phase One Projects
GOVERNORS HOUSE DRIVE
HEART OF HUNTSVILLE SEGMENT (HUNTSVILLE)
r SW
SW
ore S
Jordan Ln
y Cir S W
Syc a m
Mary S
t SW
ay St SW
Ridgewa
n St S
e r Dr
SW
SW
McAl list
Dr SW ister
t SW
All Mc
W
e Dr S
Red fe r
Lex Dr SW
Mobil
Lex Cir SW
W
Cres twoo d Dr
Hawth
orne
Rid gew
eD rs Hous
Ln
o Go vern
Judith
565
Ratn e y Dr S W
¥
Ave S
W
9th A v
e SW
Proposed Alignment
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Midblock Crossing
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Signalized Intersection
Proposed Commuter Route
Existing Sidepath
Proposed Side Path
Existing Unpaved Shared Use Path
Proposed Unpaved Shared Use Path
0
250
500
1,000 Feet
Proposed Ferry
GOVERNORS HOUSE 2-WAY CYCLE TRACK/ON-ROAD SHARED USE PATH As part of a regularly scheduled roadway resurfacing, the City of Huntsville is implementing an in-roadway shared-use path that will run the length of Governors House, from Bob Wallace Avenue to Jordan Lane. This project will occur in 2019.
will remove the center-turn lane as there are no driveways on the north side of this roadway, relatively lower traffic volumes, and limited turning movements. The five foot buffer will include vertical delineators.
The current roadway has two lanes with a center turn lane. The resurfacing project
74 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
TRIP GENERATORS
FROM: SEGMENT LENGTH:
5,700 feet
(1.1 mile)
JORDAN LANE SW TO: BOB WALLACE AVE
US Space and Rocket Center Hotels Low & Mid-Density Residences Huntsville Achievement School
¸
FINAL DRAFT
CHAPTER 4 Phase One Projects
ESTIMATED CONSTRUCTION COST Quantity
Item
Cost
5,700 LF
Cycle Track (thermo $250,000* striping, delineators, relocating one street light)
*Project in progress by City of Huntsville as part of resurfacing program. Cost shown here is the additional cost only for the cycle track (does not include total City cost for resurfacing) Proposed
POSSIBLE PUBLIC/GRANT FUNDING SOURCES: Funded by City of Huntsville
Proposed 11’
11’
TRAVEL LANE
TRAVEL LANE
5’
4.5’
4.5’
BUFFER SEPARATED BIKE LANES
ADDITIONAL DETAILS AND CONSIDERATIONS A highly-visible marked crosswalk with countdown signal and ramp was added during the Jordan Lane resurfacing which gets bicyclists and pedestrians across Jordan Lane from 9th Street. A mid-block, signalized crossing will be necessary to extend bicyclists and pedestrians across Bob Wallace Avenue. Signage will be added to communicate the beginning and end of the cycle track.
Temporary Singing River Trail signage will be added along this corridor. Vertical delineators will provide a greater feeling of separation and safety for bicyclists and pedestrians. In long-term, depending on usage, a sidewalk could be added adjacent to the on-street facility. In the longer term, it is recommended to remove right-hand slip turn lane at Governors House/Bob Wallace.
Existing
12’
12’
12’
TRAVEL LANE
TURN LANE
TRAVEL LANE
Existing
S I NG I NG R I VE R T R AI L M AST E R P LAN / 7 5
FINAL DRAFT
CHAPTER 1 INTRODUCTION
SPACE AND ROCKET CENTER
ROCKET CORRIDOR SEGMENT (HUNTSVILLE) Bob Wallace Av e
SW
¥ 565
Space and Rocket Center
! !
Redstone Arsenal
!! !!
Proposed Alignment
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Proposed Commuter Route
Existing Sidepath
Proposed Side Path
Proposed Midblock Crossing
Existing Unpaved Shared Use Path
Proposed Unpaved Shared Use Path
Signalized Intersection
Proposed Trailhead Other Destination 0
250
500
1,000 Feet
Proposed Ferry
U.S. SPACE AND ROCKET CENTER SHARED-USE PATH This segment of the Singing River Trail will connect to the most visited destination in the state of Alabama, the U.S. Space and Rocket Center. The shared-use path will cross Bob Wallace Avenue with a signalized crossing and enter the east side of the Space Center campus, connecting to the newly opened Energy Greenway (2019).
The path would follow the TVA easement behind the Space Center with a spur to the main entrance. Ultimately, this phased segment will end at a new trailhead at the western side of the Space Center area.
76 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
SEGMENT LENGTH:
8,700 feet
(1.7 miles)
FROM: BOB WALLACE AVE TO: SPACE CENTER
(WEST SIDE)
TRIP GENERATORS US Space and Rocket Center Botanical Gardens Energy Greenway Marriott Hotel Future Exploration Park Redstone Gateway
¸
FINAL DRAFT
CHAPTER 4 Phase One Projects
ESTIMATED CONSTRUCTION COST Quantity
Item
Cost
8,700 LF
12' Shared-Use Path, $1,711,202.06 Signal, etc.
See appendix for full engineer's estimate sheet. Estimate does not include acquisition costs or engineering/design/permitting costs.
POSSIBLE PUBLIC/GRANT FUNDING SOURCES: City of Huntsville, Space & Rocket Center, Redstone Arsenal, RTP, TVA
Proposed Proposed Bob Wallace crossing
ADDITIONAL CONSIDERATIONS Two alternatives remain on the eastern side of this segment. The preferred alternative follows an existing dirt path along a sewer easement, parallel to McDonald Creek. The path would turn westward along an existing paved roadway, ultimately connecting to the Energy Greenway in the TVA easement. This will require coordination with Redstone Arsenal, Space and Rocket Center, and Botanical Gardens.
A mid-block, signalized crossing will be necessary to extend bicyclists and pedestrians across Bob Wallace Avenue. A pedestrian access/greenway easement will be needed with TVA for the length of the utility corridor. A spur shared-use path should be developed to get users directly to the main entrance of the museum.
Existing
S I NG I NG R I VE R T R AI L M AST E R P LAN / 7 7
FINAL DRAFT
CHAPTER 4 Phase One Projects
SWAN CREEK SEGMENT (ATHENS)
State Rte 2
!
!
SWAN CREEK TRAILHEAD
Lee Hwy
72 £
Edison Dr
! ! ! !
Proposed Alignment
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Proposed Commuter Route
Existing Sidepath
Proposed Side Path
Proposed Midblock Crossing
Existing Unpaved Shared Use Path
Proposed Unpaved Shared Use Path
Signalized Intersection
Proposed Trailhead Other Destination 100
200
400 Feet
¸
0
Proposed Ferry
SWAN CREEK GREENWAY EXTENSION AND NEW TRAILHEAD The Swan Creek Greenway is a beautiful, unpaved trail corridor that extends from Swan Creek Park south to Hwy 72. Plans are in place to continue the pathway north and south. Currently, the trail ends on the north side of Hwy 72, with an informal trailhead access. The City of Athens acquired a grant from the Alabama Department of Conservation and Natural Resources to extend the trail south under
the Hwy 72 bridge and also create a formal trailhead on the south side of Hwy 72. This project will be a key extension for the Singing River Trail to set the stage for continued trail development southwards. The trail will not be paved at this time; in the long term, depending upon user needs and funding availability, the trail may be paved.
7 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
TRIP GENERATORS
FROM: SEGMENT LENGTH:
1,200 feet
END OF GREENWAY TO: EIDSON STREET
New Trailhead Businesses along US 72
FINAL DRAFT
CHAPTER 4 Phase One Projects
ESTIMATED CONSTRUCTION COST Quantity
Item
Cost
1,200 LF
Trail Extension, Trailhead, and Acquisition
$250,000
POSSIBLE PUBLIC/GRANT FUNDING SOURCES: Funded through RTP with local match from City of Athens
Proposed layout from City of Athens
ADDITIONAL CONSIDERATIONS The total cost projection was $250,000 ($200,000 from ADECA grant with $50,000 local City of Athens match). The new section of trail will match the current section of trail with dense grade crushed rock. The trailhead will be accessible from Eidson Street and will feature a gravel parking lot.
A short trail spur from the new trailhead to the new section of the Swan Creek Greenway will guide users to the main corridor. Wayfinding signage should also be added (not currently part of this project). This will help residents and travelers identify the Swan Creek Greenway as it is currently "hidden" from most users. Existing - north of US 72
S I NG I NG R I VE R T R AI L M AST E R P LAN / 7 9
FINAL DRAFT
CHAPTER 4 Phase One Projects
TEMPORARY WAYFINDING
8 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
THROUGHOUT TRAIL SYSTEM
FINAL DRAFT
CHAPTER 4 Phase One Projects
ESTIMATED COST Quantity
Item
Cost
29
Aluminum signs with UV protected digitally printed faces (2'x3') + 12' Green 2lb Posts
$5,998.00
29
Installation Cost
$5,841.00
Total Cost
$11,839.00
Estimate from local sign shop. Costs may be reduced slightly by using existing posts where practical. Also, local, municipal or county public works departments could install signs.
POSSIBLE PUBLIC/GRANT FUNDING SOURCES: Private donations
Proposed temporary sign at Indian Creek Greenway/Madison Pike
ADDITIONAL CONSIDERATIONS Temporary signs should be placed on existing posts when practical to save on post and installation costs. Temporary signs placed beside roadway corridors may need review by City, County, or State depending upon roadway ownership.
Permanent signage should be added as more of the Singing River Trail is constructed and longer segments are connected. Effort should be made to locate existing posts/poles for sign attachment. In addition, sign clutter should be avoided. The Singing River Trail temporary signs should be installed where they will be highly visible. Proposed temporary sign at Rotary Fountain-Downtown Huntsville
S I NG I NG R I VE R T R AI L M AST E R P LAN / 81
FINAL DRAFT
CHAPTER 4 Phase One Projects
TEMPORARY SIGNAGE PLACEMENT The temporary signage will be placed at key locations along the route. The goal of this project is two-fold -ÂÂ first, bring awareness and brand recognition to existing segments of the trail and future connections from popular existing trails; and second, to bring awareness of the trail
at popular destinations and urban areas. The following map and table shows where signs should be placed and what type of sign type should be used.
Type
14
Town Madison Entrance West
Trailhead at Existing Facility
15
Triana
Urban Area or Destination
Type
16
Wheeler NWR Existing Parking Area
Trailhead at Existing Facility
These signs should be placed shortly after Master Plan completion as an early action item.
ID Number Location
ID Number Location
1
Big Spring Park Trail North
Trailhead at Existing Facility
17
Wheeler NWR
Trailhead at Existing Facility
2
Big Spring Park Trail South
Trailhead at Existing Facility
18
Wheeler NWR
Trailhead at Existing Facility
3
Lowe Mill ARTS & Entertainment
Urban Area or Destination
19
Wheeler NWR
Trailhead at Existing Facility
4
Governors House East
Trailhead at Existing Facility
20
Mooresville
Urban Area or Destination
5
Huntsville Botanical Garden
Urban Area or Destination
21
Arrowhead Landing North
Trailhead at Existing Facility
6
Governors House West
Trailhead at Existing Facility
22
Arrowhead Landing South
Trailhead at Existing Facility
7
US Space & Rocket Center
Urban Area or Destination
23
Wheeler NWR Entrance Road
Trailhead at Existing Facility
8
Redstone Gateway Trail South
Trailhead at Existing Facility
24
Decatur (Rhodes Ferry Park)
Urban Area or Destination
9
Redstone Gateway Trail North
Trailhead at Existing Facility
25
Swan Creek Trail South - Future
Trailhead at Existing Facility
10
Indian Creek Greenway
Trailhead at Existing Facility
26
Swan Creek Trail South - Existing
Trailhead at Existing Facility
11
Downtown Madison
Urban Area or Destination
27
Trail Junction
Trailhead at Existing Facility
12
Town Madison Entrance East
Trailhead at Existing Facility
28
Swan Creek Park
Trailhead at Existing Facility
13
Town Madison Ball Park
Urban Area or Destination
29
Athens
Urban Area or Destination
82 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
CHAPTER 4 Phase One Projects
ATHENS 29
28 27 26 25
HUNTSVILLE 7
10
MADISON 11
1312
14 TE NN ES SE E
9
6 5
4
3
1 2
8
BELLE MINA RI VE R
21 20
DECATUR 24
MOORESVILLE
23 22
TRIANA
15 16
19 18
0
2
4
8 Miles
17
S I NG I NG R I VE R T R AI L M AST E R P LAN / 83
¸
CHAPTER 5 implementation Framework
5
8 4 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
Virginia Creeper Trail Southwest Virginia Source: Alta
FINAL DRAFT
CHAPTER 5 implementation Framework
”The Singing River Trail will be a great addition to the transportation system in the North Alabama Region by providing relief of traffic congestion, added health benefits and promoting tourism.” Dewayne Hellums, Director, Decatur Area MPO
Implementation Framework Introduction Successful implementation of the Singing River Trail Master Plan will require a coordinated effort among local government agencies, private sector organizations, business and industry, civic groups, and community residents. These groups, organizations and agencies ultimately must assume a leadership position and take necessary actions if the Singing River Trail is to become the valuable, world class, regional asset that this Plan envisions. Local, state and federal agencies will need to provide funding and programs to support the establishment of the Trail and to assist in future implementation of the key elements
of this Plan. This section of the Plan defines some of the most important actions that will need to be undertaken to achieve the vision defined by this Plan. This chapter defines an overall implementation strategy and framework for the Singing River Trail, and outlines some practical “next steps” for implementing this Plan. Action Steps upon Completion of Master Plan
1 WIDE COMMUNICATION AND PRESENTATION OF MASTER PLAN
2 DESIGNATION OF LEAD AGENCY – LAUNCH 2035
to Local Governments, State government, organizations, business community, residents
3 OPERATIONAL FUNDING FOR 5-YEAR PERIOD TO SUPPORT FULL TIME SINGING RIVER TRAIL DIRECTOR
4
5
SEEK DESIGN AND HIRE EXPERT CONSTRUCTION CONSULTANT TO FUNDING MANAGE TRAIL PROGRAM; TEAM OF EXPERTS AND CONSULTANTS
6 ACQUISITION AND DESIGN (PHASE 1 PROJECT FIRST)
Private partners – Lead gifts, Grants, Municipal/County governments, MPOs/ RPOs, State/Federal government S I NG I NG R I VE R T R AI L M AST E R P LAN / 85
FINAL DRAFT
CHAPTER 5 implementation Framework
Action Steps ADOPTION OF THIS GREENWAY ACTION PLAN One of the first steps to be taken by the county and local governments in Limestone, Morgan, and Madison counties would be to adopt this Singing River Trail Master Plan as an element of their comprehensive plans, and implement the recommendations contained herein. This Plan should become components of regional, county, and local transportation plans and be prioritized for state funding. Likewise, other agencies, organizations and businesses within the communities should also incorporate the aspects of this plan that directly relate to their individual mission, goals and objectives.
DESIGNATION OF A LEAD AGENCY
Launch 2035, designated as a 501c3 in mid-2019, would be the Lead Agency for coordination and implementation of the Singing River Trail Master Plan. This nonprofit organization would derive its mission principally from the vision, goals, and recommendations of this Master Plan. As such, Launch 2035 will need to incorporate the recommendations contained in the Operations and Management section of this plan. Launch 2035 would also need to
prepare an operations and implementation strategy for how it will meet the obligations associated with lead agency/organization and file such a strategy with local governments, the State of Alabama, and federal agencies. Launch 2035 would employ staff and would work in partnership with local governments and businesses to implement the recommendations of this Plan. One of the first steps of Launch 2035 is to hire a full-time Singing River Trail Director or Coordinator. This position would be supported by government and/or private funding on an annual basis for a term of five years. The Singing River Trail Coordinator would be responsible for championing the Plan, engaging funding partners, coordinating with local, county, state, and federal agencies, writing grants, assisting with implementation, soliciting design consultants and overseeing their work, working with private developers, and being a steward of funds accumulated to support the project. A secondary part-time hire of a grantwriting specialist is also recommended to ensure that grants are pursued in an efficient and successful manner.
8 6 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
LIKELY RESPONSIBILITIES OF SINGING RIVER TRAIL COORDINATOR •
Coordinating with external design partners, vendors, and construction contractors
•
Scheduling, budgeting, budget management, and managing resources
•
Fundraising (public and private funding sources)
•
Troubleshooting, problem-solving, and resolving operational problems to minimize delays
•
Working with local, state, and federal government agencies
•
Communicating with project partners, stakeholders, general public, and landowners
•
•
•
Identifying and facilitating real estate transactions; assisting with drafting and negotiating conservation easements, contracts, options, and purchase and sale agreements; arranging for appraisals, surveys, title and legal reviews, etc Project progress and performance monitoring; communicating project progress and impacts Attending construction project meetings, approving change orders and contractor invoices
LIKELY RESPONSIBILITIES OF PROGRAM MANAGEMENT CONSULTANT The manager of the Trail Program is typically a lead consultant serving as project manager and design team leader, handling all aspects of the trail development work from planning through construction management. The consultant manager oversees a large team of specialty subconsultants. The team mobilizes when problems happen. Tasks may include: •
ROW acquisition
•
Appraisals
•
Engineering
•
Surveying
•
Permitting
•
Materials testing
•
Regular meetings with Singing River Trail Coordinator
•
Monthly progress reports
•
Public and stakeholder engagement
•
Fundraising assistance/Key presentations
•
Construction standards
•
Stakeholder coordination
FINAL DRAFT
CHAPTER 5 implementation Framework
SECURE OPERATIONAL FUNDING Securing operational funding is absolutely essential for a successful trail program. This has been the case in successful regional trails like the Razorback Greenway and the Wolf River Greenway. Launch 2035 should seek $500,000 of operational funding for a five year period. These funds would be used to support the Director and provide a head start towards the next big step of acquiring funding to design and build the Singing River Trail.
SEEK DESIGN AND CONSTRUCTION FUNDING The biggest dollars are needed to build the Singing River Trail. The Trail construction will require a cobbling together of multiple funding sources, including both private and public funding, and then leveraging funds from lead gifts. Across the United States, one of the fastest emerging funding sources for greenway development is the private sector. This trend is occurring for various reasons, including support for improvements to quality of life, health and wellness, alternative transportation, conservation of natural resources and economic development. Most importantly, private financial support has enabled the greenway development process to move faster, so that facilities can be completed more efficiently. The design of the Singing River Trail should be consistent across jurisdictions to maintain the look and feel of the trail.
Private Sector Support
Public Sector Support
Launch 2035 and the Singing River Trail Coordinator should work with private sector organizations and businesses in the region to gain acceptance and approval for the implementation of the recommendations within this Plan. Launch 2035 and its new Singing River Trail Coordinator will need to be prepared to communicate the recommendations of this Plan and the benefits that the Trail will have to the region.
Launch 2035 and the Singing River Trail Coordinator should work with public sector agencies in the region to gain acceptance and approval for the implementation of the recommendations within this Plan. The counties and municipalities should include funding for the Singing River Trail in their Capital Improvement Project (CIP) lists.
Engaging private funding requires four basic steps: 1 - Develop the “Pitch.” In this case, the Economic and Health Benefits of the Singing River Trail and this Master Plan are part of that pitch.
The Singing River Trail Director should work with local partners to apply for federal, state, and local grants to support implementation of the Trail. The grant list includes, but is not limited to: • Recreation Trails Program (RTP) • Land and Water Conservation Fund (LWCF)
2 - Make the “Ask.” 3 - Leverage a “Lead Gift.” First, a lead gift from a prominent and respected local project sponsor signifies the importance of the project throughout the entire community. Second, a lead gift is often used to leverage other private funds. Third, a lead gift may be used as a matching source of funding for public sector grants. 4 - Create an Invite List. Continue to build momentum by asking additional organizations.
Grantwriting
• Appalachian Regional Commission (ARC) • ALDOT Transportation Alternatives Program (TAP) • US Dept, of Commerce, Economic Development Administration (EDA) • USDA Rural Development Grants • FHWA BUILD Grants
S I NG I NG R I VE R T R AI L M AST E R P LAN / 87
FINAL DRAFT
CHAPTER 5 implementation Framework
Funding Case Studies
Case Study
Case Study
Case Study
Razorback Greenway
Wolf River Greenway
In Northwest Arkansas, the Razorback Regional Greenway was conceived by the Northwest Arkansas Regional Planning Commission as a network of primarily on-road trails spanning the two-county region (Benton and Washington counties). In 2009, the Walton Family Foundation stepped in and spearheaded a public-private partnership that resulted in the development of a 36-mile, primarily off-road, world class regional greenway.
In Memphis, Tennessee, the 36-mile Wolf River Greenway has been the brainchild of the Wolf River Conservancy (a non-profit land trust based in Memphis) for more than 35 years. Using a traditional approach of relying on public sector leadership and funding to build the project, the Conservancy became frustrated with the glacial pace of greenway facility development – in 35 years, approximately 5 miles of trail had been completed. In 2014, the Conservancy decided to fund the development of 22 miles of the trail within the Memphis city limits using private sector funds. As of 2016, the Conservancy has raised approximately $40 million in support of facility development, with more than half of that coming from private sector sources. The Conservancy has then leveraged the private sector support to gain public sector support from the City of Memphis and Shelby County. The Conservancy expects to design, permit and build the entire 22 mile Memphis portion of the Greenway by 2019.
Carolina Thread Trail
The Razorback Regional Greenway was funded from a combination of public and private funds, including a USDOT TIGER 2 grant of $15 million, and a dollar for dollar gift from the Walton Family Foundation of $15 million. Other grant funds were added later bringing the total funding to more than $40 million. Without the lead gift from the Family Foundation, the project would never have happened. The Foundation based its gift on two community goals: 1) improve the health of local residents, and 2) support economic development throughout the region to keep Northwest Arkansas competitive for years to come. The 36mile Razorback Regional Greenway was officially completed and opened for use in May 2015. 8 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
For the Carolina Thread Trail in North Carolina, the “ask” came during a breakfast meeting of philanthropic and corporate groups. This invitation only breakfast generated more than $15 million in support.
FINAL DRAFT
CHAPTER 5 implementation Framework
ORGANIZATIONAL FRAMEWORK Launch 2035 will work in close partnership with multiple agencies throughout the Singing River Trail acquisition, design, construction, and post-construction phases. When acquisition is necessary, Launch 2035 will work closely with the Land Trust of North Alabama to hold those lands. As Trail sections are completed, they will be turned over to the local governing agency (City, County, State, or Federal) where the Trail resides for maintenance and management.
Singing River Trail Land Use Committee
Board of Directors
RESPONSIBILITIES: Serve as liaison between Launch 2035 and partnering agency, contribute to public and stakeholder engagement, assist in funding strategies
RESPONSIBILITIES: Champion trail, develop trail, ensure trail is “world class,” seek funding, assist with land acquisition
PRINCIPAL PARTNER
PRINCIPAL PARTNER
Cities of Huntsville, Madison, Decatur, Athens; Counties of Madison, Limestone, Morgan
TARCOG, NARCOG, Decatur Area MPO, Huntsville Area MPO
PRINCIPAL PARTNER
PRINCIPAL PARTNER
State of Alabama and Federal Agencies
Foundations and Donors
RESPONSIBILITIES: Develop greenway as partner to Launch 2035, contribute funding, own and maintain after trail completed
RESPONSIBILITIES: Serve as funding agent for federally funded segments, assist in seeking federal and state funding, incorporate into planning
RESPONSIBILITIES: Serve as funding agent for federally funded segments, assist in seeking federal and state funding, incorporate into planning
PRINCIPAL PARTNER
Land Trusts
RESPONSIBILITIES: Fund the Trail, seek other funding partners
RESPONSIBILITIES: Assist with land acquisition
PARTNER
PARTNER
PARTNER
PARTNER
Residents, Property Owners, and Developers
Chambers of Commerce/Business and Industry
Small Towns (Triana, Mooresville)
Schools, Universities, and Colleges
S I NG I NG R I VE R T R AI L M AST E R P LAN / 89
FINAL DRAFT
CHAPTER 5 implementation Framework
BEGIN PHASE ONE PROJECTS (CHAPTER 4)
Typical Greenway Development Process
The projects identified in Chapter 4 should be begun as quickly as possible, to keep implementation moving. If it takes longer than anticipated to get operational funding and funding for design and construction, begin with lower-cost projects as possible (including temporary wayfinding signage installment).
The development process for trails will vary from community to community and from project to project, especially depending on the work already completed to-date for each segment of trail. Certain funding sources may have additional requirements, and some steps may occur simultaneously or in a different order. Still, it is useful to have a sense of the typical process and the main steps involved in trail development. The diagram below outlines these steps.
Flexibility is key as opportunities may arise in unexpected ways. For example, a city may have funding they want to immediately dedicate to a particular segment of the Singing River Trail that may benefit the city in multiple ways (even if not part of Phase One). Another example is a private entity wanting to immediately fund a segment of Trail that will positively impact their employees. In these cases, Launch 2035 and its partners should move to adjust the project schedule and implement those trail segments.
Operations, Management, Maintenance, Evaluation
Start Cycle for Priority Trail(s)
Confirm Routing with Landowners/ Stakeholders
Secure Env. Documentation & Funding for 30% Design
Grand Opening Event
Bidding, Procurement & Construction
ADOPT THE PLAN
Secure Funds for Acquisition, Full Design & Construction
Secure Permits/ Construction Authorization ROW Authorization, Acquisition, & Certification
9 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
Complete 30% Design & Update Construction Cost Estimates
100% Plan, Specification & Estimate (PS&E)
FINAL DRAFT
CHAPTER 5 implementation Framework
Guidance for Greenway Operations and Management
Routine Operations and Maintenance Costs
An Operations and Maintenance Program could be developed by a regional coordinating entity, or by individual jurisdictions according to the facilities maintained by each of them. The maintenance costs that follow are provided for planning guidance only; agencies responsible for maintenance and operations should update budgets annually, as more accurate and local costs are available for reference over time. These budgets should take into account routine and remedial maintenance over the life cycle of the improvements, as well as ongoing administrative costs. The section below provides an overview of approximate costs for basic bicycle, pedestrian and greenway trail operations and maintenance services. The estimates include field labor, materials, equipment and administrative costs. These costs vary, depending upon the facility to be maintained, level of use, location, and standard of maintenance.
While actual costs will vary depending upon a number of factors, such as future availability of water and labor rates, the estimates can provide a general idea of potential operations and maintenance obligations. Following are typical annual costs for key components: • Shared-Use/Greenway Trails: Crew sizes tend to range from 0.5 to 5 full time employees (FTE’s) per 10 miles of offstreet trail. A guideline for consideration is to have at least one FTE per 15 miles of trail. Annual routine maintenance costs may range from less than $3,000 to over $7,000 per mile. Routine cleanup and monitoring of facility conditions are often handled by volunteers and maintenance crews. • On-Street Bicycle Facilities: In absence of specific maintenance agreements, bicycle lanes, shared lane markings, separated bikeways, and other on-street facilities should be maintained as part of the roadway environment, by either local, county, or state agencies, depending on ownership. Some provision should be made for regular inspections, to include minor repair or replacement of signs, vegetation grooming and other items that an inspector could remedy in the field. Additional attention should be paid
to debris, potholes, pavement damage, and other obstacles to safe on-street bicycling. Some additional sweeping will be required where bicycle lanes and wider shoulders are provided along roads that regularly collect debris in the path of bicyclists. Some communities use newly developed apps for smartphones that allow users to easily report geocoded maintenance issues. • Pedestrian Facilities (On Road Sidewalk/ Sidepath): In many cities, the public works department maintains sidewalk facilities on locally owned streets. Local property owners or homeowner associations could be made more responsible for routine maintenance of sidewalks with the municipal public works departments responsible for more significant repairs. Crosswalks, pedestrian signals, curb ramps, median crossing islands, and other pedestrian facilities should be maintained as part of the roadway environment, depending on right-of-way ownership. It is recommended that state DOTs maintain all sidewalks on state rights of way. Maintaining these pedestrian facilities is an important part of maintaining the complete right of way for all users. Cracks, surface defects, tree root damage, and other problems should be identified on a regular basis and fixed to ensure that sidewalks remain accessible to all types of pedestrians.
DONOR RECOGNITION PROGRAM Donors of all levels can be recognized through a variety of methods including off-site recognition (thank you letters, awards, publicity, events, commemorative items, mementos, and newsletters) and on-site recognition (signs, recognition boards/walls, permanent plaques, landscape features, public art, bench engravings, etc.) On-site recognition often is placed at trailheads and highly-visible locations. In some cases, donors do not wish to be recognized and that should be respected as well. Typically, different levels of contribution can be recognized. The Singing River Trail Coordinator and Program Manager should establish this program as an early action item once the Master Plan is complete.
S I NG I NG R I VE R T R AI L M AST E R P LAN / 9 1
FINAL DRAFT
CHAPTER 5 implementation Framework
Remedial Operations and Maintenance Costs
• Shared-Use/Greenway Trails (and Sidepaths): A 7-to-15-year life is assumed for asphalt and crushed fine trails after which an overlay may be required. A complete resurfacing after 20-25 years is anticipated. Concrete is assumed to last twice as long.
Toolbox for Greenway Right-of-Way Acquisition
• Pedestrian Facilities (Sidewalk): Sidewalks should be constructed with concrete, which requires replacement in 50 to 75 years.
• Bridges, tunnels, retaining walls and other heavy infrastructure are assumed to have a 100-year life or longer. • On-road Bicycle Facilities: Remedial work for on-road bicycle facilities includes asphalt repaving (5’ on either side of the street for a two-way bike route, total 10’ width) along with curb and gutter, sewer-grate and manhole repair. Pothole and crack repair are considered routine. Pavement markings, such as bicycle lane lines, bicycle stencil markings, and edgelines should be re-installed when other roadway pavement markings are improved. The cost of this work is often covered as part of the overall street maintenance regime, yet it should not be assumed to be covered; local bicycle and pedestrian planners and advocates should monitor street resurfacing and reconstruction project to ensure that bicycle facilities and bicycle facility repair is included in overall street maintenance.
92 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
There are many different ways to secure right-of-way for trails and to protect green spaces, most of which require coordination between land trusts, landowners, and land use planners. The following text provides a list of options that could be considered. Partnerships
Local government agencies could pursue partnerships with land trusts and land managers to make more effective use of their land acquisition funds and strategies. The following offers recommendations on how these partnerships could be strengthened: • Land Trusts: Land trust organizations are valuable partners when it comes to acquiring land and rights-of-way for trails and green space. These groups can work directly with landowners and conduct their business in private so that sensitive land transactions are handled in an appropriate manner. Once the transaction has occurred, the land trust will usually convey the acquired land or easement to a public agency, such as a town or county for permanent stewardship and ownership.
• Private Land Managers: Another possible partnership that could be strengthened would be with the utility companies that manage land throughout the region. Trails and greenways can be built on rights-of-ways that are either owned or leased by electric and natural gas companies. Electric utility companies have long recognized the value of partnering with local communities, non-profit trail organizations, and private landowners to permit their rights-ofways to be used for trail development. This has occurred throughout the United States. Local government agencies should actively update and maintain relationships with private utility and land managers to ensure that parts of the regional trail network can be accommodated within these rightsof-way. The respective municipalities will need to demonstrate to these companies that maintenance will be addressed, liability will be reduced and minimized, and access to utility needs will be provided (and in many cases made easier via paved trail).
FINAL DRAFT
CHAPTER 5 implementation Framework
Government Regulation
Regulation is defined as the government’s ability to control the use and development of land through legislative powers. Regulatory methods help shape the use of land without transferring or selling the land. The following types of development ordinances are regulatory tools that can meet the challenges of growth and development while also conserving and protecting green space resources. • Growth Management Measures (Concurrency): Concurrency based development approaches to growth management simply limit development to areas with adequate public infrastructure. This helps regulate urban sprawl, provides for quality of life in new development, and can help protect open space. In the famous case, Golden v. Planning Board of the Town of Ramapo (1972), the Town initiated a zoning ordinance making the issue of a development permit contingent on the presence of public facilities such as utilities and parks. This was upheld in Court and initiated a wave of slow-growth management programs nationwide. This type of growth management can take the form of an adequate public facilities ordinance. • Performance Zoning: Performance zoning is zoning based on standards that
establish minimum requirements or maximum limits on the effects or characteristics of a use. This is often used for the mixing of different uses to minimize incompatibility and improve the quality of development. For example, how a commercial use is designed and functions determines whether it could be allowed next to a residential area or connected to a greenway. • Incentive Zoning (Dedication/ Density Transfers): This mechanism allows trails to be dedicated for density transfers on development of a property. The potential for improving or subdividing part or all of a parcel can be expressed in dwelling unit equivalents or other measures of development density or intensity. Known as density transfers, these dwelling unit equivalents may be relocated to other portions of the same parcel or to contiguous land that is part of a common development plan. Dedicated density transfers can also be conveyed to subsequent holders if properly noted as transfer deeds. • Conservation Zoning: This mechanism recognizes the problem of reconciling different, potentially incompatible land uses by preserving natural areas, open
spaces, waterways, and/or greenways that function as buffers or transition zones. It can also be called buffer or transition zoning. This type of zoning, for example, can protect waterways by creating buffer zones where no development can take place. Care must be taken to ensure that the use of this mechanism is reasonable and will not destroy the value of a property. • Overlay Zoning: An overlay zone and its regulations are established in addition to the zoning classification and regulations already in place. These are commonly used to protect natural or cultural features such as historic areas, unique terrain features, scenic vistas, agricultural areas, wetlands, stream corridors, and wildlife areas. • Negotiated Dedications: This type of mechanism allows municipalities to negotiate with landowners for certain parcels of land that are deemed beneficial to the protection and preservation of specific stream corridors. This type of mechanism can also be exercised through dedication of greenway lands when a parcel is subdivided. Such dedications would be proportionate to the relationship between the impact of the subdivision on community services and the percentage of land required for dedication-as defined by the US Supreme Court in Dolan v Tigard.
• Reservation of Land: This type of mechanism does not involve any transfer of property rights but simply constitutes an obligation to keep property free from development for a stated period of time. Reservations are normally subject to a specified period of time, such as 6 or 12 months. At the end of this period, if an agreement has not already been reached to transfer certain property rights, the reservation expires. • Planned Unit Development: A planned unit development allows a mixture of uses. It also allows for flexibility in density and dimensional requirements, making clustered housing and common open space along with addressing environmental conditions a possibility. It emphasizes more planning and can allow for open space and greenway development and connectivity. • Cluster Development: Cluster development refers to a type of development with generally smaller lots and homes close to one another. Clustering can allow for more units on smaller acreages of land, allowing for larger percentages of the property to be used for open space and greenways.
S I NG I NG R I VE R T R AI L M AST E R P LAN / 9 3
FINAL DRAFT
CHAPTER 5 implementation Framework
Land Management
Management is a method of conserving the resources of a specific green space parcel by an established set of policies called management plans for publicly owned greenway land or through easements with private property owners. Property owners who grant easements retain all rights to the property except those which have been described in the terms of the easement. The property owner is responsible for all taxes associated with the property, less the value of the easement granted. Easements are generally restricted to certain portions of the property, although in certain cases an easement can be applied to an entire parcel of land. Easements are transferable through title transactions, thus the easement remains in effect perpetually. • Management Plans: The purpose of a management plan is to establish legally binding contracts which define the specific use, treatment, and protection for publicly owned greenway lands. Management plans should identify valuable resources; determine compatible uses for the parcel; determine administrative needs of the parcel, such as maintenance, security, and funding requirements; and recommend short-term and longterm action plans for the treatment and protection of greenway lands.
Acquisition
• Conservation Easement: This type of easement generally establishes permanent limits on the use and development of land to protect the natural resources of that land. When public access to the easement is desired, a clause defining the conditions of public access can be added to the terms of the easement. Dedicated conservation easements can qualify for both federal income tax deductions and state tax credits. Tax deductions are allowed by the Federal government for donations of certain conservation easements. The donation may reduce the donor’s taxable income. • Preservation Easement: This type of easement is intended to protect the historical integrity of a structure or important elements in the landscape by sound management practices. When public access to the easement is desired, a clause defining the conditions of public access can be added to the terms of the easement. Preservation easements may qualify for the same federal income tax deductions and state tax credits as conservation easements. • Public Access Easements: This type of easement grants public access to a specific parcel of property when a conservation or preservation easement
9 4 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
is not necessary. The conditions of use are defined in the terms of the public access easement. • Riparian Easement: This type of conservation easement provides protection only to streamside lands. This is an effective tool for protecting areas important to instream and upland wildlife habitats, flood control, streambank erosion reduction, and water quality protection. Protected areas can function effectively as part of local and regional watershed protection plans.
Acquisition requires land to be donated or purchased by a government body, public agency, trail manager, or qualified conservation organization. • Donation or Tax Incentives: In this type of acquisition, a government body, public agency, or qualified conservation organization agrees to receive the full title or a conservation easement to a parcel of land at no cost or at a “bargain sale” rate. The donor is then eligible to receive a federal tax deduction of up to 30 to 50 percent of their adjusted gross income. Additionally, some states offer tax credits for a percent of the property’s fair market value. Any portion of the fair market value not used for tax credits is often deducted as a charitable contribution. Also, property owners may be able to avoid any inheritance taxes, capital gains taxes, and recurring property taxes. • Fee Simple Purchase: This is a common method of acquisition where a local government agency or private trail or green space manager purchases property outright. Fee simple ownership conveys full title to the land and the entire “bundle” of property rights including the right to possess land, to exclude others, to use land, and to alienate or sell land.
FINAL DRAFT
CHAPTER 5 implementation Framework
• Easement Purchase: This type of acquisition is the fee simple purchase of an easement. Full title to the land is not purchased, only those rights granted in the easement agreement. Therefore, the easement purchase price is less that the full title value. • Purchase / Lease Back: A local government agency or private greenway organization can purchase a piece of land and then lease it back to the seller for a specified period of time. This lease may contain restrictions regarding the development and use of the property. • Bargain Sale: A property owner can sell property at a price less than the appraised fair market value of the land. Sometimes the seller can derive the same benefits as if the property were donated. Bargain Sale is attractive to sellers when the seller wants cash for the property, the seller paid a low cash price and thus is not liable for high capital gains tax, and/or the seller has a fairly high current income and could benefit from the donation of the property as an income tax deduction. • Installment Sale: An installment sale is a sale of property at a gain where at least one payment is to be received after the tax year in which the sale occurs. These are valuable tools to help sellers defer capital gains tax. This provides
a potentially attractive option when purchasing land for open space from a possible seller. • Option / First Right of Refusal: A local government agency or private organization establishes an agreement with a public agency or private property owner to provide the right of first refusal on a parcel of land that is scheduled to be sold. This form of agreement can be used in conjunction with other techniques, such as an easement to protect the land in the short-term. An option would provide the agency with sufficient time to obtain capital to purchase the property or successfully negotiate some other means of conserving the greenway resource. • Purchase of Development Rights: A voluntary purchase of development rights involves purchasing the development rights from a private property owner at a fair market value. The landowner retains all ownership rights under current use, but exchanges the rights to develop the property for cash payment. • Land Banking: Land banking involves land acquisition in advance of expanding urbanization. The price of an open space parcel prior to development pressures is more affordable to a jurisdiction seeking to preserve open space. A municipality
or county might use this technique to develop a greenbelt or preserve key open space or agricultural tracts. The jurisdiction should have a definite public purpose for a land banking project. • Condemnation: The practice of condemning private land for use as a greenway is viewed as a last resort policy. Using condemnation to acquire property or property rights can be avoided if private and public support for the greenway program is present. Condemnation is seldom used for the purpose of dealing with an unwilling property owner. In most cases, condemnation has been exercised when there has been an absentee property ownership, when the title of the property is not clear, or when it becomes apparent that obtaining the consent for purchase would be difficult because there are numerous heirs located in other parts of the United States or different countries.
community’s claim about the property’s value has been prepared and offered to the property owner; 3) all efforts to negotiate with the property owner for the management, regulation, and acquisition of the property have been exhausted and that the property owner has been given reasonable and fair offers of compensation and has rejected all offers; and 4) due to the ownership of the property, the timeframe for negotiating the acquisition of the property will be unreasonable, and in the interest of pursuing a cost-effective method for acquiring the property, the community has deemed it necessary to exercise eminent domain.
• Eminent Domain: The right of exercising eminent domain should be done with caution by the community and only if the following conditions exist: 1) the property is valued by the community as an environmentally sensitive parcel of land, significant natural resource, or critical parcel of land, and as such has been defined by the community as irreplaceable property; 2) written scientific justification for the S I NG I NG R I VE R T R AI L M AST E R P LAN / 9 5
FINAL DRAFT
APPENDIX
“The planned Singing River Trail is a key resource for the future of North Alabama, and will help us attract not only new customers visiting the area for the first time to enjoy it from a new perspective, but even more importantly the active people we need to keep our creative enterprise running and growing. We fully support the development of this beautiful public resource.” Bruce Weddendorf, Straight to Ale Brewery
Appendix A: Design Guidelines Overview The vision of this Master Plan is to create a “world class resource.” The Singing River Trail will connect major destinations and downtowns that draw people already. The trail’s linear experience between destinations must also be a destination, in and of itself, that creates a feeling of uniqueness, comfort, and safety. You will know when you are on The Singing River Trail. The trail corridor and amenities are important to the world-class experience of the Singing River Trail. Just as the logo has become symbolic of the trail, the trail and its amenities become the breadcrumbs of recognizable forms, patterns, texture, color, and rhythm that contribute to a consistent brand expression of safety, comfort, legibility, and community pride. Since the Singing River traverses a range of landscapes, it is essential to provide a pattern of experiences that reflect the local color and context of natural, suburban, and urban settings within 9 6 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
North Alabama. This Design Guide will build upon the trail amenities, wayfinding, and character of North Alabama to create a framework for the trail system as it is built out over time. One of the most important functions of the Singing River brand is to provide a cohesive look and feel for materials and messaging.
National Guidance The following standards and guidelines are referred to in this guide: • The Federal Highway Administration’s (FHWA) Manual on Uniform Traffic Control Devices (MUTCD) defines the standards used by road managers nationwide to install and maintain traffic control devices on all public streets, highways, bikeways, and private roads open to public traffic
The MUTCD is the primary source for guidance on lane striping requirements, signal warrants, and recommended signage and pavement markings. • American Association of State Highway and Transportation Officials (AASHTO) Guide for the Development of Bicycle Facilities (2012) provides guidance on dimensions, use, and layout of specific bicycle facilities. • The National Association of City Transportation Officials’ (NACTO) Urban Bikeway Design Guide (2012) is the newest publication of nationally recognized bikeway design standards, and offers guidance on the current state of the practice designs. • The AASHTO A Policy on Geometric Design of Highways and Streets (2011) commonly referred to as the “Green Book,” contains the current design research and practices for highway and street geometric design.
FINAL DRAFT
APPENDIX
guiding principles of design continuity, connectivity + accessibility The Singing River Trail should be a continuous non-motorized multi-use pathway, where possible, accommodating all user types. When the trail must follow a roadway right-of-way, the trail should experience the greatest separation from vehicular traffic possible. This trunk line will connect directly to residential, commercial, and natural areas, with seamless and accessible connections to on-street facilities and secondary trails.
connectivity
trail experience Trail design must be sensitive to the perspective of the visitor to promote use, enjoyment and a sense of stewardship and pride along the trail as a park space. This includes considering the impact on the five senses of the users and providing diverse and choreographed experiences. The trail corridor should ensure safety, provide visual interest, and stimulate the senses. Where feasible, the Singing River Trail should include passive areas along the trail for respite, socializing, and the enjoyment of public art.
resource stewardship, compatibility + sustainability
experience
Wherever and whenever feasible, use resilient materials that are responsibly sourced. Consider furnishings that are non-polluting, conserve energy, and use natural, recycled or recyclable materials.
public awareness + trail identity The Singing River Trail will have a strong local and regional identity as a model for design excellence. The trail will be a centerpiece for the region’s recreation and transportation, resulting in trail-oriented development and green space preservation.
sustainability S I NG I NG R I VE R T R AI L M AST E R P LAN / 9 7
FINAL DRAFT
APPENDIX
universal access on trails DESCRIPTION The trail must meet accessibility guidelines to ensure that paths, street crossings, signals, and other facilities for pedestrian and bicyclist circulation and use are readily accessible to and usable by those with disabilities.
TYPICAL APPLICATION Constructing outdoor shared-use paths and trails may have limitations that make meeting ADA guidelines difficult and sometimes prohibitive. Prohibitive impacts include harm to significant cultural or natural resources; a significant change in the intended purpose of the trail; requirements of construction methods that are against federal, state, or local regulations; or terrain characteristics that prevent compliance.
GUIDELINES • Path surfaces must be firm, stable surfaces, and are generally limited to hard surface such as asphalt, concrete, wood, and compacted gravel. Some surface materials must be periodically maintained to meet accessibility requirements. • The path running slope must be less than 5% without use of landings. Design with a 4.5% running slope target is recommended to account for variation in construction tolerances. Where the shared use path is contained within a street or highway border, its grade shall not exceed the general grade established for the adjacent street or highway. • The path cross slope must not exceed 2%. Design with a 1.5% cross slope target is recommended to account for variation in construction tolerances. • Paths must provide a 5 ft (1.5 m) minimum clear width to serve as an accessible pedestrian access route. A minimum clear width is 4 ft is acceptable if passing spaces are provided every 200 ft. Most shared used paths designed for bicycle access will meet this requirement (PROWAG 2011). • On trails designated as accessible, provide rest areas or widened areas on the trail, optimally at every 300 feet. • The trail surface should be solid, free of obstacles and tripping hazards. Trail edge vegetation/screening, and signage should be maintained and located so as not to present obstacles for visually impaired trail users.
FURTHER CONSIDERATIONS • Trailhead signage should provide accessibility information, such as trail gradient/profile, distances, tread conditions, location of drinking fountains, and rest stops. • At trailheads there should be at least one accessible parking area per every 25 vehicle spaces. (Above) Some gravel and crushed fine material trail types are considered to be ADA-compliant. Source: National Trails Training Partnership 9 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
• Trail amenities, drinking fountains and pedestrian-actuated push buttons should be placed no higher than four feet off the ground.
FINAL DRAFT
APPENDIX
Trail Typologies TYPES
1
Off-Road
The preferred typology for the Singing River Trail, off-road segments are separated from roadways and provide the ultimate user experience.
Off-Road Trail Treatments This is the preferred trail typology for the Singing River Trail. With the goal of attracting large segments of the population and tourists, off-road trails provide a low-stress and enjoyable journey. Off-road trails may be separated from the roadway completely, following waterways or utility easements. In some cases, they may parallel a roadway (sidepath). Depending on the surrounding land use and land regulations, the trail may be paved or unpaved. The preferred surface is paved for the Singing River Trail to accommodate the widest range of users. However, in locations like Wheeler Wildlife Refuge, the trail must remain unpaved – however, unpaved conditions can be established as flat and stable for the wide majority of the population. For purposes of this master plan, off-road trails may be broken down into the following classifications: • Shared-use path (not in roadway right-of-way) (PREFERRED OFF-ROAD) • Shared-use sidepath (in roadway right-of way)
2
On-Road
• Unpaved shared-use path
Some segments of the Singing River Trail will fall within an existing roadway to allow for a continuous, long-distance trail where off-road trails are not possible.
3
Intersection Treatments
The Singing River Trail must have comfortable, safe accommodations for crossing roadways so that the majority of the population will make the journey.
S I NG I NG R I VE R T R AI L M AST E R P LAN / 9 9
FINAL DRAFT
APPENDIX
Shared-Use Path (Singing River Trail Preferred) Shared use paths can provide a desirable facility, particularly for recreation, and users of all skill levels preferring separation from traffic. Shared-use paths should generally provide directional travel opportunities not provided by existing roadways.
A B
TYPICAL APPLICATION • In utility corridors, such as powerline and sewer corridors. • In active rail corridors, trails can be built adjacent to active railroads (referred to as Rails-with-Trails. • In waterway corridors, such as along canals, drainage ditches, rives and beaches. • In abandoned rail corridors (commonly referred to as Rails-to-Trails or Rail-Trails).
1 0 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
APPENDIX
DESIGN FEATURES WIDTH
A • 8 ft is the minimum allowed for a two-way shared-use path and is only recommended for low traffic situations. • 10 ft is recommended in most situations and will be adequate for moderate to heavy use (this is the preferred minimum for Singing River Trail). • 12 ft is recommended for heavy use situations with high concentrations of multiple users. A separate track (5’ minimum) can be provided for pedestrian use.
LATERAL CLEARANCE
B • A 2 ft or greater shoulder on both sides of the path should be provided. An additional ft of lateral clearance (total of 3’) is required by the MUTCD for the installation of signage or other furnishings.
• If bollards are used at intersections and access points, they should be colored brightly and/or supplemented with reflective materials to be visible at night.
OVERHEAD CLEARANCE • Clearance to overhead obstructions should be 8 ft minimum, with 10 ft recommended.
STRIPING • When striping is required, use a 4 inch dashed yellow centerline stripe with 4 inch solid white edge lines. • Solid centerlines can be provided on tight or blind corners, and on the approaches to roadway crossings.
FURTHER CONSIDERATIONS The provision of a shared use path adjacent to a road is not a substitute for the provision of on-road accommodation such as paved shoulders or bike lanes, but may be considered in some locations in addition to on-road bicycle facilities.
CRASH REDUCTION Shared use paths reduce injury rates for cyclists, pedestrians, and other non-motorized modes by 60 percent compared with on street facilities.1 1Teschke, Kay. Route Infrastructure and the Risk of Injuries to Bicyclists. American Public Health Association. December 2012.
SINGING RIVER TRAIL MASTER PLAN / 101
FINAL DRAFT
APPENDIX
Sidepath Shared use paths along roadways, also called sidepaths, are a type of path that run adjacent to a street.
TYPICAL APPLICATION • Along roadways.
DESIGN FEATURES • Guidance for sidepaths should follow that for general design practices of shared use paths. • A high number of driveway crossings and intersections create potential conflicts with turning traffic. Consider alternatives to sidepaths on streets with a high frequency of intersections or heavily used driveways. • Where a sidepath terminates, special consideration should be given to transitions so as not to encourage unsafe wrong-way riding by bicyclists.
1 02 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
APPENDIX
CROSSING APPROACHES Adjacent Crossing - A separation of 6 feet emphasizes the conspicuity of riders at the approach to the crossing.
Minimum 6’ setback from roadway
Setback Crossing - A set back of 25 feet separates the path crossing from
merging/turning movements that may be competing for a driver’s attention. Yield line placed 6’ from crosswalk
Stop bar placed 6’ from crosswalk
Yield line placed 6’ from crosswalk
W11-15, W16-7P used in conjunction with yield lines
Stop bar placed 25’ from crossing
W11-15, W16-7P used in conjunction with yield lines
FURTHER CONSIDERATIONS • Crossing design should emphasize visibility of users and clarity of expected yielding behavior. Crossings may be STOP or YIELD controlled depending on sight lines and bicycle motor vehicle volumes and speeds. • The provision of a shared use path adjacent to a road is not a substitute for the provision of on-road accommodation such as paved shoulders or bike lanes, but may be considered in some locations in addition to on-road bicycle facilities. • To reduce potential conflicts in some situations, it may be better to place one-way sidepaths on both sides of the street.
CRASH REDUCTION Sidepaths perform similarly to shared use paths, which reduce injury rates for cyclists, pedestrians, and other non-motorized modes by 60 percent compared with on street facilities.1 1Teschke, Kay. Route Infrastructure and the Risk of Injuries to Bicyclists. American Public Health Association. December 2012.
SINGING RIVER TRAIL MASTER PLAN / 103
FINAL DRAFT
APPENDIX
Unpaved Shared-Use Path New shared use paths must meet accessibility guidelines to ensure that paths, street crossings, signals, and other facilities for pedestrian circulation and use are readily accessible to and usable by pedestrians with disabilities.
TYPICAL APPLICATION
DESIGN FEATURES
• Natural surface trails are a low-impact solution and found in areas with limited development or where a more primitive experience is desired.
• Trails can vary in width from 18 inches to 6 ft or greater; vertical clearance should be maintained at 9ft above grade.
• Consider implications for accessibility when weighing options for surface treatments.
• Trail surface can be made of dirt, rock, soil, forest litter, or other native materials. Some trails use crushed stone (a.k.a. “crush and run”) that contains about 4 percent fines by weight, and compacts with use.
• Base preparation varies from machine-worked surfaces to those worn only by usage.
• Provide positive drainage for trail tread without extensive removal of existing vegetation; maximum slope is five percent (typical). 1 0 4 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
APPENDIX
FINAL DRAFT
On-Road Trail Treatments In order to construct a long-distance trail, it is necessary for some trail segments to be on-road. While not the preferred option for the Singing River Trail, on-road trails allow for a continuous, connected trail. It should be noted that major United States greenways such as the East Coast Greenway, Empire State Trail, and Razorback Greenway all have substantial on-road sections, despite their vision of being entirely off-road. This is a result of challenging landscapes, difficulty obtaining easements, or on-road connections being the only feasible option. For purposes of this master plan, on-road trails may be broken down into the following classifications: • Two-way separated bikeway with sidewalk (PREFERRED ON-ROAD) • One-way separated bikeway with sidewalk • Buffered bike lanes with sidewalk • Bicycle boulevards
SINGING RIVER TRAIL MASTER PLAN / 105
FINAL DRAFT
APPENDIX
Two-Way Separated Bicycle Lanes (Singing River Trail On-Road Preferred Option) Two-Way Separated Bicycle Lanes are bicycle facilities that allow bicycle movement in both directions on one side of the road. Two-way separated bicycle lanes share some of the same design characteristics as one-way separated bicycle lanes, but may require additional considerations at driveway and side-street crossings. For purposes of the Singing River Trail, two-way separated bike lanes should be paired with a sidewalk for pedestrians.
A
B
TYPICAL APPLICATION • Works best on the left side of one-way streets. • Streets with high motor vehicle volumes and/or speeds. • Streets with high bicycle volumes. • Streets with a high incidence of wrong-way bicycle riding. • Streets with few conflicts such as driveways or cross-streets on one side of the street. • Streets that connect to shared use paths. 1 0 6 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
DESIGN FEATURES
A • 12 ft operating width preferred (10 ft minimum) width for two-way facility. • In constrained environment, an 8 ft minimum operating width may be considered.
B • Adjacent to on-street parking, a 3 ft minimum width channelized buffer or island shall be provided to accommodate opening doors (NACTO, 2012) (MUTCD 3H.01, 3I.01). • A separation narrower than 5 ft may be permitted if a physical barrier is present (AASHTO, 2013). • Additional signalization and signs may be necessary to manage conflicts.
FINAL DRAFT
APPENDIX
TWO-WAY SEPARATED BICYCLE LANES
A two-way facility can accommodate cyclists in two directions of travel.
FURTHER CONSIDERATIONS • On-street bike lane buffers and barriers are covered in the MUTCD as preferential lane markings (section 3D.01) and channelizing devices, including flexible delineators (section 3H.01). Curbs may be used as a channeling device, see the section on islands (section 3I.01). • A two-way separated bike lane on one way street should be located on the left side. • A two-way separated bike lane may be configured at street level or as a raised separated bicycle lane with vertical separation from the adjacent travel lane. • Two-way separated bike lanes should ideally be placed along streets with long blocks and few driveways or mid-block access points for motor vehicles.
CRASH REDUCTION
CONSTRUCTION COSTS
A study of bicyclists in two-way separated facilities found that accident probability decreased by 45 percent at intersections where the separated facility approach was detected between 2-5 meters from the side of the main road and when bicyclists had crossing priority at intersections. (CMF ID: 3034) Installation of a two-way separated bike lane 0-2 meters from the side of the main road resulted in an increase in collisions at intersections by 3 percent (CMF ID: 4033).
The implementation cost is low if the project uses existing pavement and drainage, but the cost significantly increases if curb lines need to be moved. A parking lane is the low-cost option for providing a barrier. Other barriers might include concrete medians, bollards, tubular markers, or planters.
SINGING RIVER TRAIL MASTER PLAN / 107
FINAL DRAFT
APPENDIX
One-Way Separated Bicycle Lanes When retrofitting separated bike lanes onto existing streets, a one-way street-level design may be most appropriate. This design provides protection through physical barriers and can include flexible delineators, curbs, on-street parking or other barriers. A street level separated bike lane shares the same elevation as adjacent travel lanes. For purposed of the Singing River Trail, sidewalks should be paired with one-way separated bicycle lanes for pedestrian use.
B C
A TYPICAL APPLICATION
DESIGN FEATURES
• Street retrofit projects with limited funds for relating curbs and drainage. A • Pavement markings, symbols and/or arrow markings must be placed at the beginning of the separated bike lane and at intervals along the facility (MUTCD 9C.04). • Streets with high motor vehicle volumes and/or speeds and high bicycle volumes. • Streets for which conflicts at intersections can be effectively mitigated using parking lane setbacks, bicycle markings through the intersection, and other signalized intersection treatments. • Appropriate for most riders on most streets. 1 0 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
B • 7 ft width preferred (5 ft minimum). C • 3 ft minimum buffer width adjacent to parking. 18 inch minimum adjacent to travel lanes (NACTO, 2012). Channelizing devices should be placed in the buffer area. • If buffer area is 4 ft or wider, white chevron or diagonal markings should be used.
FINAL DRAFT
APPENDIX
STREET LEVEL SEPARATED BICYCLE LANES
Street Level Separated Bicycle Lanes can be separated from the street with parking, planters, bollards, or other design elements.
FURTHER CONSIDERATIONS • Separated bike lane buffers and barriers are covered in the MUTCD as preferential lane markings (section 3D.01) and channelizing devices (section 3H.01). Curbs may be used as a channeling device, see the section on islands (section 3I.01). • A retrofit separated bike lane has a relatively low implementation cost compared to road reconstruction by making use of existing pavement and drainage and by using parking lane as a barrier. • Gutters, drainage outlets and utility covers should be designed and configured as not to impact bicycle travel. • Special consideration should be given at transit stops to manage bicycle & pedestrian interactions.
CRASH REDUCTION
CONSTRUCTION COSTS
A before and after study in Montreal of physically separated bicycle lanes shows that this type of facility can result in a crash reduction of 74 percent for collisions between bicyclists and vehicles. (CMF ID: 4097) In this study, there was a parking buffer between the bike facility and vehicle travel lanes. Other studies have found a range in crash reductions due to SBL, from 8 percent (CMF ID: 4094) to 94 percent (CMF ID: 4101).
The implementation cost is low if the project uses existing pavement and drainage, but the cost significantly increases if curb lines need to be moved. A parking lane is the low-cost option for providing a barrier. Other barriers might include concrete medians, bollards, tubular markers, or planters.
SINGING RIVER TRAIL MASTER PLAN / 109
FINAL DRAFT
APPENDIX
Separation Methods Separated bikeways may use a variety of vertical elements to physically separate the bikeway from adjacent travel lanes. Barriers may be robust constructed elements such as curbs, or may be more interim in nature, such as flexible delineator posts.
DELINEATOR POSTS
CONCRETE BARRIER
PARKING STOPS
4 in Minimum Height 4 in Minimum Height 6 ft Typical 10 ft - 40 ft Typical Spacing 10 ft - 40 ft Typical Spacing
6 ft Typical
RAISED MEDIA
6 in Typical Curb Height 6 in Typical Continuous Curb Height (Can allow drainage gaps) Continuous (Can allow drainageStrips gaps) Planting
RAISED LANE
3 ft Typical Minimum
3 in - 6 in Height Typical 3 in - 6 in Height Typical
16 in Preferred Minimum
1 1 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
1 ft - 2 ft Typical
2 ft Preferred Minimum 2 ft Preferred Minimum
Appropriate barriers for retrofit projects:
• Parked Cars • Flexible delineators • Bollards • Planters • Parking stops
1 ft - 2 ft Typical
PLANTERS 1 to 2 ft Shy distance 1 to 2 ft Shy distance Maintain consistent space Maintain between consistent planters space between planters
(optional)
Planting Strips (optional) 16 in Preferred Minimum
6 ft Spacing (variable)
Continuous Spacing 3 ft Typical Minimum
3 ft Preferred 3 ft Preferred
6 ft Spacing (variable)
Continuous Spacing
TYPICAL APPLICATION
3 ft Typical 3 ft Typical
Appropriate barriers for reconstruction projects:
• Curb separation • Medians • Landscaped Medians • Raised separated bike lane with vertical or mountable curb • Pedestrian Safety Islands
FINAL DRAFT
APPENDIX
BIKEWAY SEPARATION METHODS
Raised separated bikeways are bicycle facilities that are vertically separated from motor vehicle traffic.
DESIGN FEATURES • Maximize effective operating space by placing curbs or delineator posts as far from the through bikeway space as practicable. • Allow for adequate shy distance of 1 to 2 ft from vertical elements to maximize useful space. • When next to parking, allow for 3 ft of space in the buffer space to allow for opening doors and passenger unloading. • The presences of landscaping in medians, planters and safety islands increases comfort for users and enhances the streetscape environment.
FURTHER CONSIDERATIONS • Separated bikeway buffers and barriers are covered in the MUTCD as preferential lane markings (section 3D.01) and channelizing devices (section 3H.01). Curbs may be used as a channeling device, see the section on islands (section 3I.01). • With new roadway construction a raised separated bikeway can be less expensive to construct than a wide or buffered bicycle lane because of shallower trenching and sub base requirements. • Parking should be prohibited within 30 ft of the intersection to improve visibility.
CRASH REDUCTION
CONSTRUCTION COSTS
A before and after study in Montreal of separated bikeways shows that this type of facility can result in a crash reduction of 74 percent for collisions between bicyclists and vehicles. (CMF ID: 4097) In this study, there was a parking buffer between the bike facility and vehicle travel lanes. Other studies have found a range in crash reductions due to SBL, from 8 percent (CMF ID: 4094) to 94 percent (CMF ID: 4101).
Separated bikeway costs can vary greatly, depending on the type of material, the scale, and whether it is part of a broader construction project.
S I NG I NG R I VE R T R AI L M AST E R P LAN / 1 1 1
FINAL DRAFT
APPENDIX
Buffered Bicycle Lanes Buffered bike lanes are conventional bicycle lanes paired with a designated buffer space, separating the bicycle lane from the adjacent motor vehicle travel lane and/or parking lane. For purposes of the Singing River Trail, buffered bicycle lanes should be paired with sidewalks for pedestrians.
A
B
TYPICAL APPLICATION
DESIGN FEATURES
• Anywhere a conventional bike lane is being considered.
A• The minimum bicycle travel area (not including buffer) is 5 ft wide.
• On streets with high speeds and high volumes or high truck volumes.
B • Buffers should be at least 2 ft wide. If buffer area is 4 ft or wider, white
• On streets with extra lanes or lane width. • Appropriate for skilled adult riders on most streets.
chevron or diagonal markings should be used.
• For clarity at driveways or minor street crossings, consider a dotted line. • There is no standard for whether the buffer is configured on the parking side, the travel side, or a combination of both.
1 12 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
APPENDIX
BUFFERED BICYCLE LANE
BUFFERED BICYCLE LANE
The use of pavement markings delineates space for cyclists to ride in a comfortable facility.
The use of pavement markings delineates space for cyclists to ride in a comfortable facility.
FURTHER CONSIDERATIONS • Color may be used within the lane to discourage motorists from entering the buffered lane. • A study of buffered bicycle lanes found that, in order to make the facilities successful, there needs to also be driver education, improved signage and proper pavement markings.1 • On multi-lane streets with high vehicle speeds, the most appropriate bicycle facility to provide for user comfort may be physically separated bike lanes. • NCHRP Report #766 recommends, when space in limited, installing a buffer space between the parking lane and bicycle lane where on-street parking is permitted rather than between the bicycle lane and vehicle travel lane.2 1 Monsere, C.; McNeil, N.; and Dill, J., “Evaluation of Innovative Bicycle Facilities: SW Broadway Cycle Track and SW Stark/Oak Street Buffered Bike Lanes. Final Report” (2011).Urban Studies and Planning Faculty Publications and Presentations. 2 National Cooperative Highway Research Program. Report #766: Recommended Bicycle Lane Widths for Various Roadway Characteristics.
CRASH REDUCTION
CONSTRUCTION COSTS
A before and after study of buffered bicycle lane installation in Portland, OR found an overwhelmingly positive response from bicyclists, with 89 percent of bicyclists feeling safer riding after installation and 91 percent expressing that the facility made bicycling easier.3
The cost for installing buffered bicycle lanes will depend on the implementation approach. Typical costs are $16,000 per mile for restriping. However, the cost of large-scale bicycle treatments will vary greatly due to differences in project specifications and the scale and length of the treatment.
3 National Cooperative Highway Research Program. Report #766: Recommended Bicycle Lane Widths for Various Roadway Characteristics.
SINGING RIVER TRAIL MASTER PLAN / 113
FINAL DRAFT
APPENDIX
Bicycle Boulevards Bicycle boulevards are low-volume, low-speed streets modified to enhance bicyclist comfort by using treatments such as signage, pavement markings, traffic calming and/or traffic reduction, and intersection modifications. These treatments allow through movements of bicyclists while discouraging similar through-trips by non-local motorized traffic. For purposes of the Singing River Trail, bicycle boulevards may be short-term, interim solutions or short connections to shared-use paths. Sidewalks are needed for Singing River Trail pedestrians.
C
B
A TYPICAL APPLICATION • Parallel with and in close proximity to major thoroughfares (1/4 mile or less). • Follow a desire line for bicycle travel that is ideally long and relatively continuous (2-5 miles). • Avoid alignments with excessive zigzag or circuitous routing. The bikeway should have less than 10 percent out of direction travel compared to shortest path of primary corridor. • Streets with travel speeds at 25 mph or less and with traffic volumes of fewer than 3,000 vehicles per day. 1 1 4 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
DESIGN FEATURES
A• Signs and pavement markings are the minimum treatments necessary to designate a street as a bicycle boulevard.
B • Implement volume control treatments based on the context of
the bicycle boulevard, using engineering judgment. Target motor vehicle volumes range from 1,000 to 3,000 vehicles per day.
C • Intersection crossings should be designed to enhance safety and minimize delay for bicyclists.
FINAL DRAFT
APPENDIX
BICYCLE BOULEVARDS
TRAFFIC CALMING
Bicycle boulevards are established on streets that improve connectivity to key destinations and provide a direct, low-stress route for bicyclists, with low motorized traffic volumes and speeds, designated and designed to give bicycle travel priority over other modes.
Streets along classified neighborhood bikeways may require additional traffic calming measures to discourage through trips by motor vehicles.
FURTHER CONSIDERATIONS Bicycle boulevard retrofits to local streets are typically located on streets without existing signalized accommodation at crossings of collector and arterial roadways. Without treatments for bicyclists, these intersections can become major barriers along the bicycle boulevard and compromise safety. Traffic calming can deter motorists from driving on a street. Anticipate and monitor vehicle volumes on adjacent streets to determine whether traffic calming results in inappropriate volumes. Traffic calming can be implemented on a trial basis.
CRASH REDUCTION
CONSTRUCTION COSTS
In a comparison of vehicle/cyclist collision rates on traffic-calmed side streets signed and improved for cyclist use, compared to parallel and adjacent arterials with higher speeds and volumes, the bicycle boulevard is found to have a crash reduction factor of 63 percent, with rates two to eight times lower when controlling for volume (CMF ID: 3092).
Costs vary depending on the type of treatments proposed for the corridor. Simple treatments such as wayfinding signage and markings are most cost-effective, but more intensive treatments will have greater impact at lowering speeds and volumes, at a higher cost.
SINGING RIVER TRAIL MASTER PLAN / 115
FINAL DRAFT
APPENDIX
Intersection (Crossing) Treatments As trails traverse landscapes, they inevitably must cross roadways, waterways, and railroads. The treatment of roadway crossings is essential for providing safe and comfortable trail crossings. Most Singing River Trail crossings will be at-grade; however, some crossings must be underpasses or overpasses to truly provide a safe and separated experience. Engineering judgment should be used to determine the appropriate treatment based on number of travel lanes, traffic volumes, and sight distance. In all cases, the most comfortable and safe option is preferred for the Singing River Trail. For purposes of this master plan, crossing treatments may be broken down into the following classifications: • Marked Crossings • Median Crossings • Active Enhanced Crossings (Beacons) • Full Traffic Signal Crossings
PEDESTRIAN CROSSING CONTEXTUAL GUIDANCE
• Grade-Separated Crossings PEDESTRIAN CROSSING CONTEXTUAL GUIDANCE
At unsignalized locations
FACILITY TYPE
Local Streets 15-25 mph 2 lane 3 lane
At unsignalized locations
Collector Streets 25-30 mph 2 lane with median 2 lane refuge 3 lane
Arterial Streets 30-45 mph FACILITY TYPE 2 lane with median 2 lane refuge 3 lane
Local Streets 15-25 mph 2 lane 3 lane
4 Crosswalk lane with (with warning6 lane with EJ median signage and stop signs) median 4 lane refuge 5 lane 6 lane refuge
Collector Str 25-30 mp
2 lane with median 2 lane refuge
Crosswalk (with warning signage and stop signs)
EJ
EJ
EJ
EJ
X
Hybrid Beacon X X
X
XX
X
EJ
EJ
Hybrid Beacon
X
X
EJ
EJ
EJ
EJ
FullTraffic Signal
X
X
EJ
EJ
Full Traffic Signal
X
X
EJ
EJ
EJ
EJ
EJ
EJ
X
EJ
EJ
Grade separation
X
X
EJ
EJ
EJ
X
EJ
EJ
EJ
Grade separation
X
EJ
EJ
LEGEND LEGEND
Most Desirable Engineering Judgement 1 1 6 / SNot I N GRecommended I N G R I V E R TR A I L
EJ MXA S TE R P L A N
Most Desirable Engineering Judgement Not Recommended
EJ X
FINAL DRAFT
APPENDIX
Marked Crossing A marked/unsignalized crossing typically consists of a marked crossing area, signage, and other markings to slow or stop traffic. The approach to designing crossings at mid-block locations depends on an evaluation of vehicular traffic, line of sight, pathway traffic, use patterns, vehicle speed, road type, road width, and other safety issues such as proximity to major attractions.
TYPICAL APPLICATION • Maximum Traffic Volumes ≤9,000-12,000 Average Daily Traffic (ADT) volume • Maximum travel speed of 35 MPH • Minimum Sight Lines 25 MPH zone: 155 ft 35 MPH zone: 250 ft 45 MPH zone: 360 ft
DESIGN FEATURES • On roadways with low to moderate traffic volumes (<12,000 ADT) and a need to control traffic speeds, a raised crosswalk may be the most appropriate crossing design to improve pedestrian visibility and safety. • High visibility “ladder” style crosswalk markings • A Bicycle/Pedestrian warning sign (W11-15) with downward arrow plaque (W16-7P) at the crossing, on both sides. Bicycle and Pedestrian figures on the sign should always face toward the crosswalk. • A Bicycle/Pedestrian warning sign (W11-15) with “ahead” plaque (W16-9) before the crossing. SINGING RIVER TRAIL MASTER PLAN / 117
FINAL DRAFT
APPENDIX
Median Crossing On roadways with higher volumes, higher speeds and multi-lanes of vehicular traffic, a median crossing is preferred. A median refuge island can improve user safety by providing pedestrians and bicyclists space to perform the safe crossing of one side of the street at a time.
TYPICAL APPLICATION â&#x20AC;˘ Maximum Traffic Volumes Up to 15,000 ADT on two-lane roads, preferably with a median Up to 12,000 ADT on four-lane roads with median
1 1 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
DESIGN FEATURES â&#x20AC;˘ Unsignalized crossings of multi-lane arterials over 15,000 ADT may be possible with features such as sufficient crossing gaps (more than 60 per hour), median refuges, and/or active warning devices like rectangular rapid flash beacons or in-pavement flashers, and excellent sight distance. For more information see the discussion of active enhanced crossings.
FINAL DRAFT
APPENDIX
Active Enhanced Crossing Active enhanced crossings are unsignalized crossings with additional treatments designed to increase motor vehicle yielding compliance on multi-lane or high volume roadways. These enhancements include pathway user or sensor actuated warning beacons, Rectangular Rapid Flash Beacons (RRFB) shown below, or Pedestrian Hybrid Beacons.
A
TYPICAL APPLICATION • Guidance for marked/unsignalized crossings applies. • Warning beacons shall not be used at crosswalks controlled by YIELD signs, STOP signs, or traffic control signals. • Warning beacons shall initiate operation based on user actuation and shall cease operation at a predetermined time after the user actuation or, with passive detection, after the user clears the crosswalk.
DESIGN FEATURES
A • RRFBs are user actuated lights that supplement warning signs at unsignalized intersections or mid-block crossings. • Pedestrian hybrid beacons provide a high level of comfort for crossing users through the use of a red-signal indication to stop conflicting motor vehicle traffic. Hybrid beacon installation faces only cross motor vehicle traffic, stays dark when inactive, and uses a unique ‘wig-wag’ signal phase to indicate activation. Vehicles have the option to proceed after stopping during the final flashing red phase, which can reduce motor vehicle delay when compared to a full signal installation. SINGING RIVER TRAIL MASTER PLAN / 119
FINAL DRAFT
APPENDIX
Route Users to Signalized Crossing Path crossings within approximately 400 ft of an existing signalized intersection with pedestrian crosswalks are typically diverted to the signalized intersection to avoid traffic operation problems when located so close to an existing signal.
TYPICAL APPLICATION • For this restriction to be effective, barriers and signing may be needed to direct path users to the signalized crossing. If no pedestrian crossing exists at the signal, modifications should be made. • Path crossings should not be provided within approximately 400 ft of an existing signalized intersection. If possible, route path directly to the signal.
12 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
DESIGN FEATURES • In the US, the minimum distance a marked crossing can be from an existing signalized intersection varies from approximately 250 to 660 ft. • Engineering judgment and the context of the location should be taken into account when choosing the appropriate allowable setback. Pedestrians are particularly sensitive to out of direction travel and undesired mid-block crossing may become prevalent if the distance is too great.
FINAL DRAFT
APPENDIX
Full Traffic Signal Crossings Signalized crossings provide the most protection for crossing path users through the use of a red-signal indication to stop conflicting motor vehicle traffic. A full traffic signal installation treats the path crossing as a conventional 4-way intersection and provides standard red-yellow-green traffic signal heads for all legs of the intersection. W11-15
A Push button actuation
TYPICAL APPLICATION Full traffic signal installations must meet MUTCD pedestrian, school or modified warrants. Additional guidance for signalized crossings: • Located more than 300 feet from an existing signalized intersection • Roadway travel speeds of 40 MPH and above • Roadway ADT exceeds 15,000 vehicles
DESIGN FEATURES
A • Shared use path signals are normally activated by push
buttons but may also be triggered by embedded loop, infrared, microwave or video detectors. The maximum delay for activation of the signal should be two minutes, with minimum crossing times determined by the width of the street.
• Each crossing, regardless of traffic speed or volume, requires additional review by a registered engineer to identify sight lines, potential impacts on traffic progression, timing with adjacent signals, capacity and safety. SINGING RIVER TRAIL MASTER PLAN / 121
FINAL DRAFT
APPENDIX
Shared-Use Path at Roundabouts Single lane roundabouts can provide high intersection throughput and reduced delay while reducing points of conflict between people driving, walking, and riding bikes. Multilane roundabouts can offer similar benefits, but introduce more complexity to the intersection and require special design considerations. At roundabouts, it is important to provide clear right-of-way rules to all people traveling through and guidance through use of appropriately designed signage, pavement markings, and geometric design elements.
C A
B TYPICAL APPLICATION
DESIGN FEATURES
• Where a bike lane or separated bikeway approaches a single-lane roundabout.
A • Design approaches/exits to the lowest speeds possible. Use effective
• Reduce vehicular speeds at crossings to 20 mph or less.
B • Allow people bicycling to exit the roadway onto a separated bike lane or
• Support high yield-compliance behaviors by motorists at crossings. • Provide smooth transitions between on-street bicycle facilities and off-street paths. • Ensure off-street path users can see approaching traffic before initiating crossing maneuvers. 122 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
radius of curvature less than or equal to 130’ for speeds of up to 20 MPH. shared use path that circulates around the roundabout.
• Also allow people bicycling the choice to navigate the roundabout like motor vehicles to “take the lane.”
C • Maximize yielding rate of motorists to people walking and people bicycling at crosswalks with small corner radii and reduced crossing distance.
FINAL DRAFT
APPENDIX
• Ensure good sightlines at crossings, provide lighting at a point immediately upstream of the crosswalk so that drivers on both approaches to the crosswalk have ample time to see and react to those in the crosswalk. • Use mountable aprons/ramps at roundabout entries, exits and the central island to accommodate larger vehicles while keeping passenger vehicle speeds low. • Detectable directional indicators can be used at bike ramps entrances and exits to prevent people with vision disabilities from entering the roadway at these locations.
FURTHER CONSIDERATIONS • Consider using speed tables, or raised crosswalks to increase motorist yielding at crossings. • The publication Roundabouts: Informational Guide states, “... it is important not to select a multilane roundabout over a single-lane roundabout in the short term, even when longterm traffic predictions eventually warrant a higher capacity intersection design” (NCHRP 2010 p 6-71). The purpose of this is to prevent crashes in the interim time period. When intersections have more lanes and are wider than necessary to safely and comfortably accommodate near term traffic, a higher crash rate and more frequent injury crashes occur.
This roundabout features designated ramps that transition people on bicycles from the bike lane on to a shared use path or wide sidewalk. People on bikes are then directed back on to the roadway, or across a marked crosswalk. Crossings are set back from the circulatory lane and orient people walking and on bikes so that they are better able to see oncoming cars.
• Other circulatory intersection designs exist but they function differently than the modern roundabout. These include traffic circles (also known as “Rotaries,” and neighborhood traffic circles. • Multilane roundabouts support higher traffic volumes and higher stress levels for people on bikes. People on bikes should not be encouraged to take the lane while traveling through a multilane roundabout. • At multilane roundabout crossings, consider a jog in the median to enhance intersection awareness and judgement for those crossing.
CRASH REDUCTION Research indicates that single-lane roundabouts benefit people bicycling and people walking by slowing traffic. Multi-lane roundabouts present greater challenges and because of the added complexity and conflicts than the single lane roundabout. Crosswalks across multiple traffic lanes have decreased yielding; and greater crashes regardless of whether the multilane crosswalk is at a signalized intersection, unsignalized intersection, mid-block location, or at a multilane roundabout. The extent and severity of the injury is determined by the speed of impact and frailty of the person in the crosswalk. The City of Bend strives to provide safe crosswalks for all users and prioritizes single lane roundabouts over other intersection forms to maximize injury prevention and optimize intersection operations. SINGING RIVER TRAIL MASTER PLAN / 123
FINAL DRAFT
APPENDIX
Intersection Crossing Markings Bicycle pavement markings through intersections guide bicyclists on a safe and direct path through the intersection and provide a clear boundary between the paths of through bicyclists and vehicles in the adjacent lane.
A
B
TYPICAL APPLICATION • Streets with conventional, buffered, or separated bike lanes. • At direct paths through intersections. • Streets with high volumes of adjacent traffic. • Where potential conflicts exist between through bicyclist and adjacent traffic.
DESIGN FEATURES
A • Intersection markings should be the same width and in line with leading bike lane.
B • Dotted lines should be a minimum of 6 inches wide and 4 ft long, spaced every 12 ft.
• All markings should be white, skid resistant and retro reflective (MUTCD 9C.02.02). • Green pavement markings may also be used.
12 4 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
APPENDIX
INTERSECTION CROSSING MARKINGS
Intersection crossing markings can be used at signalized intersections or high volume minor street and driveway crossings, as illustrated above.
FURTHER CONSIDERATIONS The National Committee on Uniform Traffic Control Devices has submitted a request to include bicycle lane extensions through intersections as a part of future MUTCD updates1. Their proposal includes the following options for striping elements within the crossing: • Bicycle lane markings • Double chevron markings, indicating the direction of travel. • Green colored pavement. 1 Letter to FHWA from the Bicycle Technical Committee for the MUTCD. Bicycle Lane Extensions through Intersections. June 2014.
CRASH REDUCTION
CONSTRUCTION COSTS
A study on the safety effects of intersection crossing markings found a reduction in accidents by 10 percent and injuries by 19 percent.2
The cost for installing intersection crossing markings will depend on the implementation approach. On roadways with adequate width for reconfiguration or restriping, costs may be negligible when provided as part of routine overlay or repaving projects.
A study in Portland, OR found that significantly more motorists yielded to bicyclists after the colored pavement had been installed (92 percent in the after period versus 72 percent in the before period).3 2 Jensen, S.U. (2008). Safety effects of blue cycle crossings: A before-after study. Accident Analysis & Prevention, 40(2), 742-750. 3 Hunter, W.W. et al. (2000). Evaluation of Blue Bike-Lane Treatment in Portland, Oregon. Transportation Research Record, 1705, 107-115.
Typical shared lane markings cost $180 each.
SINGING RIVER TRAIL MASTER PLAN / 125
FINAL DRAFT
APPENDIX
Grade-Separated Crossings Grade-separated crossings provide critical non-motorized system links by joining areas separated by barriers such as railroads, waterways, and highway corridors. In most cases, these structures are built in response to user demand for safe crossings where they previously did not exist. There are no minimum roadway characteristics for considering grade separation.
ADA generally limits ramp slopes to 1:20
A
B D
OVERCROSSING
C D UNDERCROSSING TYPICAL APPLICATION • Where shared-use paths cross high-speed and highvolume roadways where an at-grade signalized crossing is not feasible or desired, or where crossing railways or waterways. • Depending on the type of facility or the desired user group, grade separation may be considered in many types of projects.
12 6 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
DESIGN FEATURES
A • Overcrossings should be at least 8 ft wide with 14 ft preferred and additional width provided at scenic viewpoints.
B • Railing height must be a minimum of 42 inches for overcrossings. C • Undercrossings should be designed at minimum 10 ft height and 14 ft width, with greater widths preferred for lengths over 60 ft.
D • Centerline stripe is recommended for grade-separated facility.
FINAL DRAFT
APPENDIX
Trail Amenities Handrails + Guardrails DESCRIPTION Handrails and guardrails are safety barriers that serve several functions depending on the situation. A “handrail”, for example, is primarily a safety device intended to protect trail users from a potential hazardous condition including keeping small children and toddlers from slipping through the railing. A “guardrail” primarily serves to protect bicyclists, roller skaters and other higher speed wheeled users from a hazardous situation. In some instances, such as above a vegetated embankment where the threat of impact is minimal the railing may be lower in height. Where the threat of impact is substantial, such as over a highway, the rail would be higher. (Heights are determined per national published bicycle design standards.) In many cases, particularly where the drop off is more hazardous, the safety barrier serves both a handrail and guardrail function.
GUIDELINES • For handrails, if there is a drop-off in excess of 18” or other hazard, openings on the rail should not pass a 4” sphere (confirm with local codes). • A guardrail should withstand a 250 lb. load with 1/2” deflection with a w=50 pound per linear foot transverse and vertical load capacity. • Rails should not present sharp or protruding edges and ends should be flanged and marked with MUTCD-specified hazard panels to reduce the chance of injury from collision. • Handrails should conform to local and national building codes. • Guardrails and guardrail/handrail combinations should conform to the specified minimum heights per the AASHTO Guide to The Development of Bicycle Facilities and other local and state standards—ranging from 42” to 54” depending on the situation.
(Above) Cable railing with timber posts and handrail.
• Where bicycle traffic will be present, an off-set “rub rail” should be provided to prevent entanglement of bicycles with the railing structure. Rub-rail is optional on overlooks, or pulloffs out of main stream of bike traffic. • There should be a minimum clear-zone (typically 10’) between the insides of the railings when rail is on both sides of the trail. • Structures should be durable and affordable to build and maintain, such as weathered steel or powder coated steel. • Aesthetic designs should conform to overall branding standards including consistent selection of materials and colors per each branded segment.
(Above) Cable railing with aluminum posts and handrail along boardwalk.
SINGING RIVER TRAIL MASTER PLAN / 127
FINAL DRAFT
APPENDIX
Boardwalks and Bridges Boardwalks and bridges are elevated structures that allow the trail to pass through or over wetlands, water bodies, unstable soils, and other sensitive areas. Depending on conditions and other trail planning considerations, they may be only a few inches off the ground or several feet or more above the surface. Though not required, low decks may have low curbs or railings as low edge restraints. However, in instances where the deck is 30” or more above the finished grade, a safety rail will be required..
B
A
TYPICAL APPLICATION • Boardwalks are usually constructed of wooden planks or recycled material planks that form the top layer of the boardwalk. The recycled material has gained popularity in recent years since it lasts much longer than wood, especially in wet conditions. • In general, building in wetlands is subject to regulations and should be avoided.
12 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
DESIGN FEATURES
A • A boardwalk width should be a minimum of 10 ft when no rail is used. A 12 ft width is preferred in areas with average anticipated use and whenever rails are used.
B • When the height of a boardwalk exceeds 30”, railings are required. • If access by vehicles is desired, boardwalks should be designed to structurally support the weight of a small truck or a light-weight vehicle.
FINAL DRAFT
APPENDIX
GUIDELINES • Boardwalks have a clear unobstructed width (inside of curb or handrails) and should match or exceed the specified widths of the trails they serve. In some instances, however, there may be a transition area to allow tapering to interface the trail with the boardwalk while meeting safety standards. • Sustainable design techniques are used to minimize adverse impacts or intrusion of the structure on the environment during both construction and use.
• Use resilient materials with low maintenance. Concrete decking and steel or cable railing is preferred. Decking may be composite material or concrete for long term maintenance and resiliency. • Boardwalk and bridge design and materials should fit with the branding and furnishing styles of the various character segments of the Singing River Trail.
• Hand railing heights meet local and national code standards for the anticipated use including heights specified in the AASHTO Guide to the Development of Bicycle Facilities. • Provide a minimum 42” high for low drops and 54” for high drop offs. Railings are designed to protect small children with appropriate minimal gaps where conditions dictate.
(Above) Boardwalk example.
(Above) Boardwalk example.
SINGING RIVER TRAIL MASTER PLAN / 129
FINAL DRAFT
APPENDIX
Trailheads Good access to a path system is a key element for its success. Trailheads serve the local and regional population arriving to the path system by car, transit, bicycle or other modes. Trailheads provide essential access to the shared use path system and include amenities like parking for vehicles and bicycles, restrooms (at major trailheads), and posted maps. Trail user information Trail
Restroom and drinking fountain
Trail
Short length of fence Ramp
Trail user information
Trailhead sign
Bicycle rack
Native plantings
Accessible parking
Bicycle access
Entry sign
Sidewalk
Curb and Gutter Pedestrian access
MINOR TRAILHEAD
MAJOR TRAILHEAD TYPICAL APPLICATION • At major and minor trailheads.
DESIGN FEATURES • Major trailheads should include automobile and bicycle parking, trail information (maps, user guidelines, wildlife information, etc.), garbage receptacles and restrooms. • Minor trailheads can provide a subset of these amenities.
1 3 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
APPENDIX
Signage, including maps and other important information, educate visitors to a trail in Utah.
Signage, bike parking, trash cans, and bench seating provide a welcoming trailhead experience at Fanno Creek in Oregon.
FURTHER CONSIDERATIONS Trailheads with a small motor vehicle parking area should additionally include bicycle parking and accessible parking. Neighborhood access should be achieved from all local streets crossing the path. No parking needs to be provided, and in some situations “No Parking” signs will be desirable to minimize impact on the neighborhood. See Local Neighborhood Accessways for neighborhood connection guidance.
CRASH REDUCTION Not applicable.
SINGING RIVER TRAIL MASTER PLAN / 131
APPENDIX
FINAL DRAFT
Rest Areas + Overlooks DESCRIPTION Rest areas and overlooks afford places to stop, rest, eat a snack, have a drink, take refuge from the sun or enjoy a view. These spots may also offer interpretive, cultural and wayfinding information as well as public art. Several kinds of rest areas could be provided including rest pads, larger rest areas, overlooks, and trail pavilions. A larger rest area might include two or more benches and possibly a drinking fountain with a toilet facility nearby. A pavilion rest area might include a shelter and picnic table(s). An overlook is a special kind of rest area tied to a view of special interest. An overlook might include interpretive signage describing the area being viewed.
GUIDELINES • All rest areas and overlooks should be designed to move users and their bicycles off the main trail to eliminate any possible traffic hazard. • Rest areas and overlooks should be located in attractive, quiet, secure-feeling settings away from traffic noise and not close to private residences. • Rest areas and overlooks should be accessible per the ADA and should offer shade with either trees or a sun shelter. • Rest areas, at least rest pads, should be located every 1/4 to 1/2 mile depending on grade. Rest area example. Source: Razorback Greenway, Bentonville, AR.
• Larger rest areas or overlooks should generally be located every one to two miles and should include a crushed stone or concrete pad with benches, a bike rack, informational signage, trash receptacle and drinking fountain. • Larger rest areas and overlooks, especially those with trash receptacles should be readily accessible by maintenance vehicles. • Consider storm shelters, sunshade structures and picnic shelters appropriately grounded for lightning.
1 32 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
APPENDIX
Erosion Control + Slope Protection DESCRIPTION In a number of instances, steep slopes, stream banks, construction cuts, and other areas subject to erosion will require erosion control and stabilization improvements. In instances where retaining walls are not needed, other forms of erosion control and slope protection will be required.
GUIDELINES • Typically erosion control should be considered where grades exceed 3:1 unless well stabilized by vegetation . • Consider incorporating rain gardens and bioretention areas along trail to handle storm runoff from paved sections, especially in areas with steeper slopes to prevent erosion from runoff. • Where feasible, use natural or natural-appearing stabilization that promotes the re-growth of vegetative cover such as woven plant fiber matting.
Shade Structures
• If rock rip rap is used for stabilization provide an adequate buried toe along river and stream banks and bury rock with soil that is stabilized and re-vegetated to conceal rock and promote a more natural slope. • Along river and stream banks and other embankments terrace slopes to create a natural appearance and establish a healthy riparian edge with reforestation. • Wherever feasible restore disturbed slopes with appropriate indigenous vegetation. • Local and state guidelines prevail for all erosion and sediment control in Alabama. Refer to the Alabama Soil and Water Conservation Committee’s manual.
DESCRIPTION Whether it be protection from the rain or a place to rest during a sunny day, shade structures and shelters create comfort and protection for all trail users. Shade structures should be sensitive to context and designed to integrate with intended function of the site and trail user needs. All structures will require approval from staff and should include little to no maintenance. GUIDELINES • The orientation of structures should be considered to provide maximum protection from elements.
• Structures should not block viewsheds of historic, natural, or cultural elements.
• Can be placed in any setting (grass, concrete, asphalt, etc) with considerations for ADA access to and into the structure.
• Structures should incorporate other amenities, especially benches and picnic tables.
• Plants may be incorporated into the design of the structures especially where they can provide additional user benefits (vines or greenwall for cooling effect). Plant material should be context sensitive and low maintenance.
• Colors should fit into a natural setting and not be bright oranges, pinks, blues, etc. • Provide shade structures, particularly where mature trees are not available to provide shade.
• Structures should not impede bicycle and/or pedestrian movement • Appropriate shade tolerant grasses should be used under and shall be located adjacent to the trail (not within the travelway). shade structures when grass is desired underneath.
(Above) Shade sails provide flexibility and numerous color options.
SINGING RIVER TRAIL MASTER PLAN / 133
FINAL DRAFT
APPENDIX
Restrooms + Drinking Water Fountains DESCRIPTION Careful consideration should be given to a number of factors before locating restrooms for the Singing River Trail including available land, size of gateway or trailhead, frequency of use, existing restroom facilities within the trail system, utility availability, and user need. Public restrooms require considerable maintenance and service. Access to these resources should be a strong consideration when planning for restroom buildings. Access to drinking water is crucial to safety and trail enjoyment for multiple user types. Sources of potable water should be identified along the trail alignment with spacing of five miles or less. If access points are more than five miles apart, signs should be placed at potable water access points to indicate distance to the next source.
GUIDELINES • Restrooms should be located at all major access points and recreational areas. (Above) Typical detail.
• Spacing between restrooms should not exceed 5 miles. • Restrooms should be housed in architecturally appropriate facilities and property screened and buffered from adjacent private properties. • Drinking water should be available at all major trailheads/access points. A commercially manufactured water fountain product is recommended and should have a spigot for filling water bottles and pet drinking bowls. • Directional signage should be provided indicating the location and directions to convenience stores and other commercial “waystations” where food and drinks may be purchased. • All facilities should be accessible per the ADA. (Above) Fountain example.
1 3 4 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
(Above) Restroom example.
FINAL DRAFT
APPENDIX
Vegetation Management + Trail Edge Grooming DESCRIPTION There are several areas of landscape management to promote both an ecologically and user-friendly greenway and trail system. For the Singing River Trail, these include areas such as river edge and wetlands; multi-use trail edge/shoulder; “streetside parkways”; parks and feature areas; and managed “natural” areas.
1 Multi-Use Trail Edge — the zone immediately adjacent to and above paved multi-use pathways. Vegetation management refers to trimming the shoulder and beyond to assure a safe, usable trail. It also includes maintaining (trimming and/or mowing) an under-story “clear zone” back into the adjacent vegetation to promote lines of sight for safety and security and a more groomed appearance of the trail corridor. This edge should appear natural and should undulate and can vary in some areas from 5’ to 20’ back into the adjacent forest or meadow.
GUIDELINES • Regularly monitor activities and conditions in natural areas including proposed public works projects such as stream channel and utility work. • Groom larger trees in the buffer zones to 8’-10’ above ground. • Plant and groom low to medium height grasses and wildflowers on opposite side of trail from roadway in a meandering swath 10’ to 50’ in width. • Thin understory and groom trees along opposite side of trail from roadway in a 10’ to 50’ meandering swath. • Regularly monitor tree growth around the trail and remove potentially hazardous overhanging branches and deadwood. • Regularly monitor for invasive and pest species and eradicate using environmental sustainable methods. • Use native species in all landscapes.
2 Streetside Parkways — Greenway sections visible from nearby streets with a more
parklike open landscape setting. These reaches may vary from 50’ to 200 feet wide and are intended to create a more formal park feel. There may be mowed turf grass or other managed landscape including tree groupings with cleared understory.
3 Parks and Feature Areas — more formal areas of the trail that incorporate parks and other attractions along the corridor. Typically these are turf grass areas, plazas or other more formal areas.
• Consider including the removal of exotic and invasive species along the trail system. • Promote a natural look in grooming and mowing with undulating edges that follow the landscape rather than straight lines or shapes that don’t match the local terrain. This might include “articulated” mowing of trail edges to create attractive curves and sweeps. • Where appropriate, provide and maintain vegetated buffer zones between activity areas and sensitive landscapes such as wetlands. • Pruning and tree care should follow ANSI A300 Tree Care Guidelines.
4 Managed “Natural” Areas — are designated areas with scenic enhancement or
interpretation. An example of this might be a meadow planted in wildflowers or a variety of ornamental grasses.
SINGING RIVER TRAIL MASTER PLAN / 135
FINAL DRAFT
APPENDIX
Landscape + Vegetation Screening/Fencing DESCRIPTION In some instances, screening is desired either to conceal visually unattractive objects (such as overhead power lines) from trails or to screen from adjacent land uses such as residences in the interest of privacy. This may be accomplished with plantings, screen fences or other delineators such as a rail-type fence to create a sense of delineation.
SCREENING GUIDELINES
FENCING GUIDELINES
• All ground cover should be trimmed to a maximum of 24” above ground level height. • Where vegetative screens are recommended to provide privacy for private properties, they are not to exceed 4’ in height. • Consider Crime Prevention Through Environmental Design (CPTED) principles when providing screening along trails.
• Minimize use of fencing, height and type of fencing (i.e. simple post and wire to protect an area where security or privacy is not a major concern). A 48” height is preferred to 72” unless higher required by security or safety concerns. • Avoid opaque fencing to permit visibility. • Attempt to conceal fencing behind vegetation where feasible.
• Trees should be trimmed to provide a minimum of 8 ft (2.4 m) of vertical overhead clearance, 10 ft (3.0 m) preferred (AASHTO Bike Guide).
• When securing private property include placards that state: “Private Property: Please Respect Owner’s Privacy”
• Tree canopies should not obstruct pathway illumination.
• As much as possible fencing should blend with the natural trail environment.
• Select and place trail vegetation to provide seasonal comfort; shade in the warmer months and sunlight in colder months.
• Where appropriate affix “Do Not Trespass”, or “Sensitive Wildlife Area” or other appropriate regulatory or informational signage to fences.
12-14 ft (Above) Typical detail with vegetative screening.
1 3 6 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
(Above) Native plants should be used as much as possible for proposed landscape screening along the Singing River trail.
FINAL DRAFT
APPENDIX
Entry Monumentation
Seating
DESCRIPTION
DESCRIPTION
Monumentation consists of decorative structures that demark points of entry to the trail system— from a street, a trailhead/parking area or other entry to the trail. These may vary in size with larger structures for intermodal trailheads (with parking) and smaller structures for local access points. Monumentation should also include larger identity monuments—large structures, prominently located within sight of major roads and highways that provide a high level of visibility and help build community awareness of the trail.
Seating along trails provides a place for trail users to rest, congregate, contemplate, or people-watch along trails and throughout the trail system. Benches can be designed to create identity in a place or along the trail or be strictly utilitarian. Picnic tables provide places for trail users to congregate for meals or to just and relax.
GUIDELINES
GUIDELINES
• Entry monumentation should be consistent with the aesthetic for each character district. • Trail identity monuments should be provided at key locations along the greenway corridor. These should be clearly visible and recognizable from nearby major roadways. • Intermodal entry monumentation should be clearly visible and recognizable from passing vehicles. Size and scale should vary based upon site and location conditions. • At local access points, use monuments that are more modest than those at the intermodal entryways. Local access markers are lower key and should be compatible with local neighborhoods. • Monuments may be placed on one or both sides of trail at both local access and intermodal entry points.
• Locate benches at all gateways, trailheads, picnic areas and at regular intervals along the trail. • Locate all seating (and other site furniture) a minimum of 3’ from the edge of the trail. • Locate benches a minimum of 4’ from restrooms, phone booths and drinking fountains and a minimum of 2’ from trash receptacles, light poles and sign posts. • Seating should be placed in shaded area, especially where there is minimal shade available. • Drainage should slope away from the bench and the trail.
(Above) Examples of entry monumentation.
(Above) Typical detail. SINGING RIVER TRAIL MASTER PLAN / 137
FINAL DRAFT
APPENDIX
Trash Receptacles DESCRIPTION Trash and recycle receptacles provide for proper maintenance and appearance of the trail system. Trash and recycle receptacles should be placed at gateways, rest stops or comfort stations, concession facilities, or area where users might stop to drink and eat.
GUIDELINES • Locate receptacles at each trailhead and each seating area (1 per every 1 picnic table, 1 per every 2 benches). • Placement of other receptacles will depend upon the location of concessions, facilities and areas of group activities. • Receptacles should be selected using the following criteria: • Expected trash amount • Maintenance program requirements • Types of trail users
Lighting DESCRIPTION Lighting for trails should be analyzed per segment context with full consideration for safety needs, sensitive habitats, trail function, and maintenance commitments. In general, lighting is not appropriate for trails in remote areas, trails with low use, or where there is little to no development. Street lighting can improve visibility of the crossing and trail users for motorists. Lighting may also be necessary for daytime use in trail tunnels and underpasses.
• Durability
GUIDELINES • Lighting should be at pedestrian scale. Placement, spacing, and other finish specifications depends on the fixture and optics. • Place lighting at decision points and areas of interest, such as street crossings, intersections with other trails, trail spurs, and near commercial and mixed-use developments.
(Above) Typical detail.
• Avoid light fixtures at eye level that could impair visibility. • Dependent upon trail hours, consider uses in urban and/or commercial land use areas. • All fixtures should be LED 2700K color temperature when possible.
• Consider CPTED principles whenever lighting is introduced, such as color rendering, dimly lit “hiding places” and abstracted illumination. • Lighting should avoid trees and be placed outside of canopy edge where possible. • Solar powered lighting is available where utility connection is difficult or when alternative energy sources are desired. Daylight hours should be analyzed per season prior to specifying solar lighting.
1 3 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
(Above) Examples of trail lighting. Source: https://structura.com/galleries/
Page Intentionally Left Blank
FINAL DRAFT
APPENDIX
Wayfinding Signage DESCRIPTION Developing a consistent regional wayfinding experience through adherence to best practices will improve the user experience along the Singing River Trail and facilitate more regional trips by foot or bike. Bicycle wayfinding signage provides information on direction and distance to key regional destinations and other routes. This plan provides guidelines for the region to develop their own wayfinding, including sign design and placement. A coordinated, well-designed signage system improves the coherency of a greenway network. It also provides a greater sense of security and comfort for users by confirming that riders are on the correct route and are aware of how far they will have to travel to
reach their destination. On-street bicycle wayfinding signs also provide visual cues to motorists that people on bikes may be present and should drive with caution. Signage should provide a sense of identity and utility for the trail network. The signage program should adhere to a consistent, selective, and strategic manner so as not to clutter or dominate the visual character of the trails. The signs should also be easily reproducible, since the implementation and construction could take place over many years.
GOALS
DESTINATION/DIRECTIONAL SIGN GUIDANCE
The following goals were developed to guide the design of the Singing River Trail wayfinding system, to ensure that the proposed design suits the needs of the corridor, and its users.
The ability to navigate through a community is informed by landmarks, natural features, and other visual cues. Wayfinding signs indicate the direction of travel and the location of destinations and access points along the way. These signs increase users’ comfort and accessibility to the trail network. Signs should typically be placed at key locations leading to and along routes, including the intersection of multiple routes. Directional signs serve many purposes, including: 11’ 10 ’ 9’
5B
Rodney Barber Park
Vieh Park
4
RANGE LINE RD.
JAMES RD.
ALLEN RD.
Ba
yo
u
IS SS MI
ALICIA
r
a rr is
DR.
on Cr
40
ee
k
10
Destination Number Two 4.2
Destination Number Three 4.2
Destination Number Three 4.2
Miles
2 Min 10 Min
2 Min 10 Min
11
2 Min 10 Min
Miles
Miles
Miles
2 Min 10 Min
SQUARE POWDER COATED ALUMINUM POST
2 Min 10 Min
2 Min 10 Min
MAN RD. COLE
John F Kennedy Park
MCC ROR YR
RAISED MILEAGE LETTERING
2 Min 10 Min
HWY .
12A
P SIP
D.
COVINGTON PK.
IB
. LVD
Cr e e k
13
STAGE RD.
YALE RD.
ORE
VIEW RD.
GE RD .
STATE RD.
SHELBY OAKS DR.
RD .
14B
t
c
h er
KI
RB Y-W H
Cr
e
e
D ST. N. SE CO N
HU
PH M
YS RE
V BL
e Ov
rt o
n
Ba
yo
u
IS SS MI
. D
P SIP
IB
. LVD
ALICIA
DR.
ra n Co u n t r y C lu b B
EW N
ALLEN RD. MAN RD. COLE
Cr
ee
o
r
k
OLD BROWNSVILLE RD.
SYCAM ORE
VIEW RD.
SHELBY OAKS DR. Cr
I TT E
N PKWY.
k
Rules & Regulations APPLING RD.
U
OAK RD. SHW Y. 70 / 79
RD.
OV AR D.
TRINITY
RD
BROTHER BLVD.
CO
BROTHER BLVD.
HU
RD.
OV AR D.
TRINITY
RD
US-HWY. 64
CO
US-HWY. 64
PKWY.
Shelby Farm Park
RIVER
. RD
REESE RD.
79
3
ER XT
RD.
. RD
REESE RD.
ER XT
79
DE
WOLF
DE
e
STATION
er
Poplar Estates Park
ELMORE RD.
MULLINS
ON RD. MAC
2
F le
WHITTEN RD.
Bartlett Park
.
WJ Freeman Park
14A
SHADY GROVE
AVE
RALE IGHLAGR AN
EW R D.
AVE.
MER
SYCAM
ch
ee
PARK
Cr
BARTLETT RD.
SUM
OLD BROWNSVILLE RD.
SLEY BLVD. IS PRE ELV
n
SAN T VI
t io
12B
ta
Harr in g ton
P LE A
S
MILE 2.4
o
H
Destination Number Two 4.2
Miles
TIN
2 Min 10 Min
Coast Coast
n
9
ou
Audubon Park
Destination Number One 4.2
Coast Coast
rt o
ra n Co u n t r y C lu b B
EW N
8
7
SER-RALEIGH RD. FRAY
e B ay
POPL AR AVE. SOUTHERN AVE.
WALNUT GROVE RD.
72
RAMILL R D.
AUS PEA Y
“2” AND GRASS HYDROCUT THROUGH CORTEN STEEL
2 Min 10 Min
.2 Destination 4 Miles
.2 Destination 4 Miles
Destination Number One 4.2 Miles
FRAYSER BLVD.
R iv e r W o lf
Frayser Park
RD.
.2 Destination 4 Miles
SLEY BLVD. IS PRE ELV
ch
PH M
YS RE
V BL
. D
Coast Coast
Kiosk
Area Map
Directional
Directional CORTEN OPTION 1
CORTEN OPTION 2
SIDE
ALUMINUM OPTION
(Above) Example of a greenway wayfinding package.wayfinding coast 2 coastsignage connector
MILE 2.4
Coast Coast
VINYL PANELS WRAPPED AROUND CORTEN STEEL
WHITNEY AVE.
Coast Coast
15
STAG EA VE .
E. AV
ous
ch
h
RD.
Douglas Park
kh
an
PK.
c
RD.
G
6
W
y B r
MILES
N
1
wa
POPLAR
ELMORE RD.
PKWY.
Shelby Farm Park
RIVER
TOWN
1
CHELSEA AVE.
llo
SO CK JA
Ga
Lichterman Park
STAGE RD.
YALE RD.
GE RD .
3
RD.
WOLF
GERMAN
CRO
SSIN
ek
A
0.5
240
AVE.
Bartlett Park
WJ Freeman Park
RALE IGHLAGR AN
EW R D.
STATION
WEST ST.
5A
AVE.
BARRON
STRAFFORD RD.
it e
RD.
KIRBY RD.
N PKWY.
5C
0
CENTRAL
Frank Tobey Park
Mid South Fairgrounds
78
Cr e e k
SAN T VI
12B
QU INCE
P LE A
Harr in g ton
MULLINS
ON RD. MAC
I TT E
OAK RD. SHW Y. 70 / 79
N
N. HIGHLAND RD.
GRAHAM ST.
RD.
k
NEW RIVERDALE
U
C yp re ss C re
Overton Park
FY 2019
AV E.
12A
STATE RD.
PK.
Poplar Estates Park
RB Y-W H
RTO
WARING RD.
PERKINS RD. EXTD
WHITE STATION
MASSEY RD.
KIRBY PKWY.
KI
APPLING RD.
OVE
N HOLLYWOOD ST.
WARFO RD ST.
YATES RD.
RIDGEWAY R D.
k
FIRESTONE AVE.
R MENDENHALL
QUINCE RD.
WILLOW RD.
Willow Park
John F Kennedy Park
ee
13
Cr
POPLAR
e
51
A
10
11
n
2
t
Mud Island Park
M
40
t io
RD .
14B
F le
WHITTEN RD.
NORTH PA RKWAY
LA
GETWELL RD.
PERKINS RD.
MT. MORIAH RD.
ESTATE DR.
BLVD.
T.
SCOTT ST.
HO LMES ST.
Wh
CLEARWATER trailhead
THOMAS ST.
N. WATKINS ST.
N. MCLEAN
HOLLYW OOD S
TILLMAN ST.
S. HIGHLAND ST.
on
ta
.
E.
PERSON AVE.
is
D.
14A
Lichterman Park
SHADY GROVE
240
AVE.
AVE.
AVE
BLVD.
S. COOPER ST.
MADISON AVE. UNION AVE.
PEABODY AV
a rr
MCC ROR YR
PARK
QU INCE
MER
AVE.
US-78
H
ou
.
ON
9
e B ay
Willow Park
QUINCE RD.
WILLOW RD.
Audubon Park
HWY
40
E.
Phase 2 Walnut Grove to Shady Grove Phase 3 Shady Grove to Germantown
ous
POPL AR AVE. SOUTHERN AVE.
WALNUT GROVE RD.
72
PEA Y
1
ST.
EAST PARKWAY S.
SEMMES ST.
CHERRY RD .
TIN
JEFFERS
SOU TH MCL EA N
PENDLETON ST.
GOODLETT ST.
RAMILL R D.
AUS
US-5
PAULINE ST.
S. CLEVELAND
COVINGTON PK.
BARTLETT RD.
SUM
ST.
ST.
S. BELLEVUE BL VD.
PRESCOTT RD.
ELLISTON RD.
8
E. AV
7
kh
ch
SER-RALEIGH RD. FRAY
N
W
an
ELLISTON RD.
y B r
MILES
Douglas Park
llo
SO CK JA
Ga
1
wa S
Mississippi River
N. FRONT N. THIRD
AVE.
CONSTRUCTION PHASING
E. MCLEMORE AVE.
LINDEN
Open
AIRWAYS BLVD.
Phase 4 McLean to Hollywood VE. RHODES AVE. Phase 5A McLean: Chelsea to Nedra Phase 5B McLean: KIMBANedra LL AVto E.Rodney Baber Park Phase 5C McLean to Evergreen KIMBALL RD. Phase 10 Epping Way to Kennedy Park Phase 12A Kennedy Park to Covington Pike Phase 12B Covington Pike to Summer Avenue
JAMES RD.
6
A
0.5
Phase 15 Second Street to Chelsea
RD.
CHELSEA AVE.
RANGE LINE RD.
FRON T ST.
SOUTH PARKWAY
FY 2020
Rodney Barber Park
4
KETCHUM
5B
Vieh Park
ek
FRAYSER BLVD.
RD.
DUNN RD.
Frayser Park
SSIN
G
BALL RD.
WHITNEY AVE.
CRO
. VD
Phase 7 Douglass Park to North Highland NORRIS RD. Phase 8 North Highland Ave. (Cycle Track) Phase 14B TVA Powerline to Walnut Grove
Phase 1 Confluence Park (Mud Island to Second) Phase 9 Epping Way Phase 11 Kennedy Park
MALLORY PhaseAVE. 6 Hollywood to Douglass Park FY 2018
61FY 2017
STAG EA VE .
5A
5C
C yp re ss C re
AVE.
BARRON
RD.
R iv e r W o lf
0
CENTRAL
STRAFFORD RD.
it e
RD.
KIRBY RD.
RD.
N
N. HIGHLAND RD.
GRAHAM ST.
WARING RD.
RD.
k
NEW RIVERDALE
RTO
N HOLLYWOOD ST.
WARFO RD ST.
YATES RD.
GERMAN
15
BLVD.
T.
HO LMES ST.
PERKINS RD. EXTD
WHITE STATION
TOWN
FIRESTONE AVE.
51
Overton Park
RD.
Frank Tobey Park
Phase 4 McLean to Hollywood VE. RHODES AVE. Phase 5A McLean: Chelsea to Nedra Phase 5B McLean: KIMBANedra LL AVto E.Rodney Baber Park Phase 5C McLean to Evergreen KIMBALL RD. Phase 10 Epping Way to Kennedy Park Phase 12A Kennedy Park to Covington Pike Phase 12B Covington Pike to Summer Avenue
Phase 15 Second Street to Chelsea
Mid South Fairgrounds
78
KETCHUM
FY 2019
FY 2020
AV E.
MENDENHALL
WEST ST.
1
NORTH PA RKWAY
R
MADISON AVE. UNION AVE.
A
1’
KIRBY PKWY.
Mud Island Park
AVE.
US-78
ON
M
GETWELL RD.
PERKINS RD.
MT. MORIAH RD.
ESTATE DR.
OVE
N. WATKINS ST.
N. MCLEAN
HOLLYW OOD S
SCOTT ST.
GOODLETT ST.
RAISED LETTERING AND SYMBOLS
THOMAS ST.
S. THIRD ST.
PERRY RD.
TILLMAN ST.
S. HIGHLAND ST.
Wh
2’
JEFFERS
LA
1 4 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
E.
DUNN RD.
BALL RD.
PERSON AVE.
• Helps users find access points to the trail system.
BLVD.
S. COOPER ST.
ST.
EAST PARKWAY S.
SEMMES ST.
MASSEY RD.
• Helping overcome a “barrier to entry” for people who do not use the trail system.
AVE.
PEABODY AV SOU TH MCL EA N
PENDLETON ST.
PRESCOTT RD.
CHERRY RD .
3’
1
PAULINE ST.
S. CLEVELAND
RIDGEWAY R D.
• Enhance education opportunities about local history, amenities, culture and ecology.
40
LINDEN
E.
Phase 2 Walnut Grove to Shady Grove Phase 3 Shady Grove to Germantown
Phase 1 Confluence Park (Mud Island to Second) Phase 9 Epping Way Phase 11 Kennedy Park
Phase 7 Douglass Park to North Highland NORRIS RD. Phase 8 North Highland Ave. (Cycle Track) Phase 14B TVA Powerline to Walnut Grove
CONSTRUCTION PHASING
E. MCLEMORE AVE.
Open
MALLORY PhaseAVE. 6 Hollywood to Douglass Park FY 2018
4’
ST.
ST.
US-5
BL
S.
Mississippi River
N. FRONT N. THIRD
S. BELLEVUE BL VD.
PERRY RD.
AIRWAYS BLVD.
FRON T ST.
SOUTH PARKWAY
6’
RIVERS IDE
FLORIDA ST.
BL
S.
“COAST” LETTERS RAISED WITH 1/2’’ SPACERS 55
FLORIDA ST. S. THIRD ST.
. VD
7’
5’
• Helping users identify the best routes to destinations.
HIGH PRESSURE LAMINATE MAP PANEL RIVERS IDE
e Ov
8’
61FY 2017
• Improve connections to trail networks from adjacent neighborhoods/communities, improve connections from the trail network to nearby amenities, cultural destinations or recreational destinations.
• Helping users and emergency responders identify locations, in case of emergency on the trails.
12 ’
55
• Improve wayfinding throughout the subareas.
• Helping to familiarize users with the trail system.
D ST. N. SE CO N
• Enhance awareness for users that they are along a larger trail network.
Coast
Coast Coast
Mile Marker
concept march 14, 2016
FINAL DRAFT
APPENDIX
REGULATORY SIGN GUIDANCE
INTERPRETIVE SIGN GUIDANCE
Regulatory signs give a direction that must be obeyed, and apply to intersection control, speed, vehicle movement and parking. The examples below are types of regulatory signage.
Interpretive displays provide trail users with information about the surrounding environment or site, wildlife, vegetation, history and the significance of cultural elements. Interpretive displays may also be combined with public art and sculpture opportunities along the trail.
• Smaller scale signs or plaques may be used for trail applications. • See the MUTCD 9B for a detailed list of regulatory sign application and guidance.
• Consider the character of the trail and surrounding elements when designing these signs. • Work with experts specific to the information you are conveying on the signs such as historians, ecologists, or artists. • Separate interpretive signage panels from the main trail circulation so that users can stop and not impede traffic.
R1-1
R1-2
R9-7
R5-3
(Above) Examples of regulatory signage.
• Consider including interpretive signage at rest stops or areas of congregation. • Panels must be ADA accessible.
INFORMATIONAL KIOSK GUIDANCE Kiosks and message centers provide trails users with information to orient themselves, learn of areas of interest, read the rules and regulations of the trail system, and find the hours of operation. Along the entire trail rules, regulations, and ADAAG accessibility advisories should be included on each kiosk.
• Consider use of technology for interpretation. (i.e. website links, mobile apps, or podcasts)
• Install kiosks at each major and minor trailhead.
ETIQUETTE SIGN GUIDANCE
• When locating kiosks next to parking facilities, set the units back far enough from traffic and protect the support posts or structure with appropriately sized barriers.
Informing trail users of acceptable etiquette is a common issue when multiple user types are anticipated. Yielding the right-of-way is a courtesy and yet a necessary part of a safe trail experience. The message must be clear and easy to understand. The most common trail etiquette systems involve yielding of bicyclists to pedestrians.
• Provide ADA access using established guidelines for visual height, clearance, and surface type where kiosks are located. • Evaluate the use of emerging technology options for implementation of greenway information and messages as part of the signage program (LED displays, mobile friendly links and maps, etc.).
(Above) Example of etiquette signage.
• Trail etiquette information should be posted at access points and periodically along the trail.
(Above) Kiosk at Walnut Creek Trail in Raleigh, NC.
SINGING RIVER TRAIL MASTER PLAN / 141
FINAL DRAFT
APPENDIX
Appendix B: Public Input Summary A key component of the master planning process for the Singing River Trail was stakeholder and public input. This was conducted through multiple methods in an effort to reach as many North Alabama residents as possible. The planning process is described in Chapter 1. Below are the various tools used for public engagement for this master plan.
Steering Committee Meetings The Launch 2035 Land Use Committee formed the Steering Committee, or guiding body, of the Singing River Trail Master Plan process. This included nearly 50 representatives of county and municipal government and other regional and local agencies. The Committee met six times during the course of the project. The Committee helped to establish the vision and goals for the project. Three subcommittees were formed that addressed fundraising, trail routing, and public engagement.
1 4 2 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
APPENDIX
Public Events
270 4
Attendees
Public Meetings
Public Meetings
Project Launch - March 2018
The general public was invited to come to two evening Singing River Trail public workshops on two consecutive evenings (first at the Space and Rocket Center in Huntsville and the second evening at Calhoun Community College). Alongside Alta Planning + Designâ&#x20AC;&#x2122;s Chuck Flink and Matt Hayes, over 200 residents learned about the potential for the Singing River Trail and other regional success stories like the Razorback Greenway (NW Arkansas), the Swamp Rabbit Trail (Greenville SC), and the Wolf River Greenway (Memphis TN). Participants were asked to provide their input on plan vision, trail and amenity preferences, and also on the initial draft routing. Public Meeting presentation boards and input results can be seen on the following pages.
SINGING RIVER TRAIL MASTER PLAN / 143
FINAL DRAFT
APPENDIX
SINGING RIVER TRAIL Trails Create Value + Generate Economic Activity
Trails generate economic returns through improved health, safety, and environmental conditions, raise property values, and attract visitors.
Direct Benefits
In total, it is estimated that the communities of North Alabama will experience $13,156,000 in transportation, health, and direct economic benefits per year with the completed Singing River Trail.
Additional Benefits
$23,631,000
Indirect Economic Spending
$866,000 Marketing examples: Developers understand the positive impact of trails on property value...
Transportation Benefits
$7,079,000
Earnings from Direct Economic Spending
$1,400,000 Health Benefits
$13,156,000 TOTAL ANNUAL DIRECT BENEFITS
900
Temporary Job-Years
100
Permanent Job-Years
$10,890,000 Economic Benefits
MARCH 2018
1 4 4 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
APPENDIX
March 2018 Public Meeting Boards
SINGING RIVER TRAIL Trails Provide Safe Opportunities for Active Living
The rate of crime on trails and greenways does not exceed the rate of crime in the communities that surround trails and greenways. Community trails and trail networks sometimes face skepticism because of a lack of understanding regarding the safe opportunities that trails offer residents for recreation and transportation. In fact, a national study of 372 trails demonstrated that serious and minor crimes were much lower on urban, suburban and rural trails than the national crime rates for urban, suburban and rural areas.
Police Work and Safety: • Targeting Crossings: Crossings are often dangerous locations along trails, and police can target traffic enforcement operations at these high-profile locations subject to heavy use. • Getting Police on Bikes: Bike patrols offer many tactical advantages to police when compared with a cruiser, including lower cost, and more maneuverability. • Establishing an Emergency Locator System: Allows trail users to identify their location on the trail to 911 dispatchers and police officers.
Community Example: A study in Charlotte, North Carolina, examined properties neighboring the 14 Charlotte greenways and found the rates of property crimes to be either insignificantly different or lower than the rates in the surrounding neighborhoods.
Natural Surveillance & Volunteer Patrols For trails and greenways, natural surveillance occurs through increased numbers of trail users, creating an environment where behavior on the trail is monitored by trail users themselves. This type of surveillance can be supplemented with a volunteer-based trail patrol group.
Lighting in Select Areas Most trails operate as linear parks, officially closing at dusk. Certain high-use areas of trails are sometimes kept open after dark to serve the needs of trail commuters who use the trail after dark. MARCH 2018
SINGING RIVER TRAIL MASTER PLAN / 145
FINAL DRAFT
APPENDIX
SINGING RIVER TRAIL Trails Improve Quality of Life
A complete trail network, as part of the local transportation system, offers effective transportation alternatives by connecting homes, workplaces, schools, parks, downtown areas, and cultural attractions.
Health Benefits
Table: Annual Health Benefits (estimated values) Annual Bicycle Trips
400,000
Annual Miles Bicycled
2,080,000
Annual Walk Trips
600,000
Annual Miles Walked
3,120,000
Annual Hours of New Physical Activity
137,000
Annual Healthcare/Productivity Cost Savings
$1,400,000
Transportation Benefits
Daily Trip Distances 79.4%
10 or less 62.7%
Distance 5 or less Traveled (in Miles) 3 or less
48.8% 39.6%
2 or less 1 or less less than 1/2
The implementation of a welldesigned, connected trail system in Madison, Morgan, and Limestone counties would encourage a shift from inactive modes of transportation such as cars and trucks to active modes such as bicycling and walking that help promote active lifestyles.
27.5% 13.7% Percentage of Travel
Trails improve options for active transportation. Two-thirds of all trips we make are for a distance of five miles or less—a distance that can easily be covered by bicycling. Surveys by the FHWA show that Americans are willing to walk as far as two miles to a destination and bicycle as far as five miles.
Protecting Water and Wildlife with Natural Greenway Corridors Trail corridors that connect to and contain large areas of open space serve important functions for our natural ecosystems by: • Creating a natural buffer that protects waterways from soil erosion and pollution caused by agricultural and roadway runoff. • Linking wildlife and habitat that is fragmented by development, thereby supporting greater biodiversity. • Protecting and restoring natural floodplains along rivers and streams (FEMA estimates that implementation of floodplain ordinances prevents $1.1 B in flood damage annually).
MARCH 2018
1 4 6 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
APPENDIX
SINGING RIVER TRAIL
The vision for the Singing River Trail is a regional greenway that will meander through the tri-county area of Madison, Morgan & Limestone Counties in North Alabama, serving over half a million citizens.
Project Background
ATHENS
The Singing River Trail will act as a spine for local greenway connections as it travels through the various jurisdictions. Through these linkages, many additional destinations and attractions will be connected together, thereby multiplying the greenway’s impact. The overarching vision of the Singing River Trail is that it will act as a catalyst for economic investment and community collaboration, serving as a tremendous asset for ecotourism in the region. While initially planned for three counties, it could eventually extend through a larger portion of North Alabama. £ ¤
£ ¤ 431
72
£ ¤ 231
HUNTSVILLE
MADISON US Space & Rocket Center
£ ¤ 31
¥ 565
Redstone Arsenal
¥ 65
Huntsville International Airport Mooresville
Wheeler Lake
Wheeler National Wildlife Refuge
DECATUR Te nn es see Riv er
Funding & Partnerships Triana
The Singing River Trail will be funded through a combination of public and private sources. A campaign to acquire funds through grants and private donations is already underway to support the planning effort.
Priceville MARCH 2018
SINGING RIVER TRAIL MASTER PLAN / 147
FINAL DRAFT
APPENDIX
SINGING RIVER TRAIL Trail Planning Principles
Connectivity and collaboration By creating an environment that fosters inter-jurisdictional cooperation, the goal of connectivity can be attained.
Inclusiveness and free accessibility to all The greenway will be an asset available for the use of all of our citizens in urban, suburban and rural settings. The planning process must be transparent and open.
Leverage Private capital will be used to help stimulate activity and attract state and federal sources that require match funds.
Respect for the land and respect for the landowner It is critical to respect private property rights, educate landowners about the project, and include them in the process.
MARCH 2018
1 4 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
APPENDIX
SINGING RIVER TRAIL Trail Types: The goal is to have a diversity of trail uses and types, including (but not limited to) hiking trails, biking trails, multipurpose trails, equestrian trails, and water trails
HIKING TRAIL (natural surface)
GREENWAY TRAIL (paved surface)
RAIL-TRAILS (along railroad corridors)
EQUESTRIAN TRAILS
SIDE PATHS (along roadways)
BIKE LANES (on-street connections)
SEPARATED BIKEWAYS (on-street connections)
BOARDWALK TRAIL (wetland areas)
SAFE TRAIL CROSSINGS
MOUNTAIN BIKE TRAILS
GRAVEL ROADS/TRAILS
Other Trail Types? (Write-in below)
MARCH 2018
SINGING RIVER TRAIL MASTER PLAN / 149
FINAL DRAFT
APPENDIX
WHAT TYPE OF TRAIL WOULD YOU LIKE TO SEE INTEGRATED INTO THE SINGING RIVER TRAIL SYSTEM? (RANKED IN ORDER OF DOT VOTING RESULTS) GREENWAY TRAIL (paved surface)
#1 GRAVEL ROADS/TRAILS
HIKING TRAIL (natural surface)
#2
BIKE LANES (on-street connections)
#6 MOUNTAIN BIKE TRAILS
SEPARATED BIKEWAYS (on-street connections)
#3
RAIL-TRAILS (along railroad corridors)
EQUESTRIAN TRAILS
#5
BOARDWALK TRAIL (wetland areas)
#4 SAFE TRAIL CROSSINGS
#7 SIDE PATHS (along roadways)
#7 Other Trail Types? (Write-in below) • Birding Trails
#8 1 5 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
#9
#10
• Wide Trails (high traffic areas) • Trail Connections (connect to other trails) • Historic Trails & Markers
FINAL DRAFT
APPENDIX
WHAT AMENITIES WOULD YOU MOST LIKE TO SEE ALONG THE TRAIL? (RANKED IN ORDER OF DOT VOTING RESULTS) Mile Marking
Trailheads & Trail Map Kiosks
#1 Wayfinding Signs
#2
Trail Lighting (in city/town center sections of trail)
#5
Space for Food Trucks or Refreshments (at trailheads or other areas)
Ecotourism (and environmental education)
#9
Camping Sites along the Trail
#7
#8 Agritourism (cycle-to-farm tours)
#11 Trail-Oriented Bicycle Rental
Police Bicycle Patrol
Bicycle Repair Stands
Pet Waste/Trash Stands
Public Art
#10
#4
#3
#6 Drinking Fountains
Sitting Areas/ Pocket Parks
#12 Other Amenities? (Write-in below) • Bathrooms (11 additional votes) • Benches
#13
#14
#15
• Recycling Bins • Campsites, regional through travel
SINGING RIVER TRAIL MASTER PLAN / 151
FINAL DRAFT
APPENDIX
Vision Boards WHO WILL USE THE SINGING RIVER TRAIL? ists Tour Hikers
Everyone
Runners Equestrians Cyclists Active-People
Walkers
Millennials
Stu d
Wildlife
Families
Employees Scouts Walkathons
Bird-Watchers
en
Daycare
Bike
-Tou
rists
s
Co mm un
Touris t
itie
s
connection regional great
Challenging Morg an
are a
alon g
cat
ur
local Trail useful spur miles way signage Bike attraction Wider riders part ASAP periodic e good Useful region som ke i marked larger En ride green b addition e v Aw Peaceful impeironmepermeable accessible benches amenities Hillard tus ntahorse l Museum horse-back ly runners World navigation Downtown County Beautiful Communities congested Connected restaurants Horseback
destination
De
Stat bikin e g
ikers ers/b ay W runn Well together ce
pla tors
ps o shunique communities
visi
1 52 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
ld
transportation Nature
bui
Alabama Downtown Research
lots
accessible
ison
way
Huntsville Redstone
ns
Mad
r ge
n Grietye g
in Park
trails Creek lar
un m com ter Cen
Athens
Limestone restrooms Ca lho locations boone es Connect un history coffee pus Ambitious UAH Accneede m c meaningful sections e ess d a R c ible hostels state/multi enjoy Essential Point network surfaces residents wheelchair State Friendly share various Motivational lunch train picnic quality life Riding ive s r major ok lus hike c Co n I state alike land Class spot ass et Sim he At
ers
cent
networks Greenways future Arsenal Existing Martin Decatur Par k
THE SINGING RIVER TRAIL WILL BE... ?
Park
Mooresville Transportation gr State/Calhoun/UAH Restrooms eenWheeler wa Bradford ys Schools surfaces regional governments Businesses Bicycle Toyota Point Walls local rentals vehicles motor s across shops Zierdt points rth ction relation o a r N along Neighborhoods Mill Aldridge Chair att especially Town used plac light Parks Richard es Safely safer People Gates Elmont rs Racing tte cri ds already Jack en part Rocket Fri ries e connect City ew lands Br Local Gaps Bike low Clubs s Wildlife better ys te Horse m Historic hub lot nature permeable variety A&M planned connecting access stores solar parks Public Rails paved link l Jenido ona big Polaris recreati easements l Pinutoti importantwalking choo Humans s e n n t a c sta Pla Gate planning facilitating possible cooperation work Mallard non-automotive Handicap Corridor lighting Toyota/Mazda Attractions Allies customers
Dog-Walkers Commuters
parking
Kids
Wonder ful
THE SINGING RIVER TRAIL WILL CONNECT... ?
Tri -At hl
ete
s
ts
FINAL DRAFT
APPENDIX
Draft Plan Workshop - February 2019 North Alabama residents attended two public workshops for the Singing River Trail in early February (one in Huntsville and the other in Decatur). Combined, nearly 150 people attended, all in support of the trail and what it could mean to them and to North Alabama. Attendees were able to provide feedback on draft routing maps and listen to a presentation about the project’s status. The project team listened to the public to make modifications to the routing. The Decatur mayor kicked off the Decatur event and communicated the positive economic impact this trail could have in North Alabama. Key things heard include: • Significant support for trail • Trail MUST cross river to Decatur - consider options like cantilever, ferry, or bus • Trail needs amenities like water stations, trailheads, bike repair • Trail must connect well into each community’s greenway system, including Indian Creek Greenway, Huntsville greenways, Richard Martin Trail • Provide trail access for all (recreational uses, commuters, elderly, equestrians, ADA, etc)
FEBRUARY 2019 PUBLIC MEETINGS
SINGING RIVER TRAIL MASTER PLAN / 153
APPENDIX
FINAL DRAFT
Project Website A project website was established for the Singing River Trail Master Plan. The website provided project background, meeting notes, content downloads, and opportunity for input (links to an interactive map and the online comment form). The website was updated regularly with news stories and blog entries. The website had thousands of individual views, reaching residents across North Alabama.
1 5 4 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
APPENDIX
FINAL DRAFT
Online Interactive Map An online interactive map was provided for residents to provide input on trail routing and destinations to connect. Hundreds gave their input through map markups.
SINGING RIVER TRAIL MASTER PLAN / 155
FINAL DRAFT
APPENDIX
Online Interactive Map Results
User Comments
15 13 17 86
1 5 6 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
Destination Connections
Greenway Access Points
Trailheads with Parking
Suggested Routes
APPENDIX
FINAL DRAFT
Page Intentionally Left Blank
SINGING RIVER TRAIL MASTER PLAN / 157
FINAL DRAFT
APPENDIX
Online Comment Form
“I believe trails such as this are an extremely positive asset for any community that they pass through and can also be a source of financial gain for the local businesses.”
Over 1,000 residents completed the online comment form. Results can be seen below: SURVEY RESULTS
1,039 1
Total Responses
HOW MIGHT YOU USE THE PROPOSED SINGING RIVER TRAIL? (Select all that apply) Health and recreation
89%
Walk/bike to run errands, visit friends
47%
Commuting to work
13%
?
Other
4% Commuting to school
3%
1 5 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
2
HOW WOULD YOU TRAVEL ALONG THE TRAIL? (Select all that apply) Walking
With a stroller
Dog walking
Skating/skateboarding
Road or cross bike
With a wheelchair
Running
Other
86% 44%
43%
40% Mountain bike
32%
14%
4%
3%
2%
FINAL DRAFT
APPENDIX
“Would love to see this turn into a reality!”
3
WHAT ARE THE THREE MOST IMPORTANT DESTINATIONS TO CONNECT WITH THE SINGING RIVER TRAIL?
1. Parks (80%)
WHAT TRAIL FEATURES ARE MOST IMPORTANT TO YOU? (Select a maximum of five)
1. Trailheads/Parking areas (55%)
2. Tourist Attractions (45%)
2. Restrooms (47%)
3. Downtowns (44%)
3. Public access points (44%)
4. Residential areas (34%)
8. Places of work (10%)
5. Shopping centers (22%)
9. City services (6%)
6. Community centers (15%)
10. Other (5%)
7. Schools (11%)
4
5
WHAT IS MOST IMPORTANT FOR YOUR SINGING RIVER TRAIL EXPERIENCE?
93% Scenic and less direct, connecting to multiple destinations 7% Direct and quickest route, regardless of scenery
4. Paved Trails (37%)
13. Seating areas (17%)
5. Shade areas (34%)
14. Wayfinding signage (13%)
6. Connections to parks and recreational areas (30%)
15. Water fountains (12%) 16. Access to neighborhoods (11%)
7. Trails that are off-road or separated from roadways (27%)
17. Sculpture/art (4%) 18. Grade-separated roadway intersections (3%)
8. Regular Maintenance (26%) 9. Lighting (24%)
19. Connections to transit (3%)
10. Kiosk/map at trailheads (23%) 11. Connection to shopping areas and downtowns (20%) 12. Natural surface trails (20%)
20. Interpretive signage (3%) 21. Other (3%) 22. Connections to schools (3%)
SINGING RIVER TRAIL MASTER PLAN / 159
FINAL DRAFT
APPENDIX
Social Media The project team leveraged Steering Committee members representing multiple jurisdictions and agencies across the study area. Strategic “blasts” of information were provided to drive traffic to the project website and to the public workshops. A project Facebook page and Instagram were also developed, drawing people to project information. In addition, Facebook project ads were purchased to reach residents in the project area geography.
Collateral Multiple “hard” copy collateral were provided and disseminated across the region during the course of the project. Project workshop flyers were developed. Project info cards (the size of business cards) were distributed to drive people to the website. 11x17 and 24x36 project information posters were developed in digital and hard copy form and displayed at regional locations. Info Card (Front): Poster: The vision for the Singing River Trail is a regional greenway that will meander through the tri-county area of Madison, Morgan & Limestone Counties in North Alabama, serving over half a million citizens.
GET INVOLVED AT SINGINGRIVERTRAIL.COM www.SingingRiverTrail.com
Info Card (Back): WE NEED YOUR INPUT AND SUPPORT:
We need your input and support! Please get involved at www.SingingRiverTrail.com Complete comment form and input map
Give us your email address to stay updated
1 6 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
Like us on Facebook
Complete comment form and input map
Give us your email address to stay updated
Like us on Facebook
Contact your local representative
Contact your local representative
You can do all this at www.singingrivertrail.com
FINAL DRAFT
APPENDIX
Join Us!
Join Us!
SINGING RIVER TRAIL
SINGING RIVER TRAIL
Come learn about trails and help us envision a 70-mile trail that will connect our communities of North Alabama!
Come learn about trails and help us envision a 70-mile trail that will connect our communities of North Alabama!
Draft Plan Workshops
Visioning Workshops
431
Harvest Meridianville ATHENS
72 PROPOSED SINGING RIVER TRAIL CORRIDOR
TWO PUBLIC INPUT OPPORTUNITIES: TUESDAY, FEBRUARY 5, 2019 Space and Rocket Center, Huntsville AL Education Resource Center next to the Marriott Hotel 5:00pm-7:00pm
Redstone Arsenal
65
231
Mooresville L IM M
DECATUR
ES T OR ON GA E C O N CO U N T Y UN TY
Triana
Wheeler National Wildlife Refuge
WEDNESDAY, FEBRUARY 6, 2019 Alabama Center for the Arts, Decatur AL 5:00pm-7:00pm
TWO PUBLIC INPUT OPPORTUNITIES:
MADISON
565
431
72 PROPOSED SINGING RIVER TRAIL CORRIDOR
HUNTSVILLE
US Space & Rocket Center
31
MADISON COUNTY
MADISON COUNTY
LIMESTONE COUNTY
Meridianville
LIMESTONE COUNTY
Harvest
ATHENS
MONDAY, MARCH 5, 2018 Space and Rocket Center, Huntsville AL Education Resource Center next to the Marriott Hotel 5:00pm-7:00pm
HUNTSVILLE MADISON US Space & Rocket Center
565 31
Redstone Arsenal
65
231
Mooresville L IM M
DECATUR
ES T OR ON GA E C O N CO U N T Y UN TY
Triana
Wheeler National Wildlife Refuge
Priceville
For more information contact Marie Bostick at (256) 534-5263 or email marie@landtrustnal.org
TUESDAY, MARCH 6, 2018 Calhoun Community College, Decatur AL Health Sciences Building, Room 109 5:00pm-7:00pm
Priceville
For more information contact Marie Bostick at (256) 534-5263 or email marie@landtrustnal.org
SINGING RIVER TRAIL MASTER PLAN / 161
FINAL DRAFT
APPENDIX
Appendix C Local and Regional Planning Communities along the Singing River Trail are focused on greenway development due to recent planning processes and public priorities. These planning efforts, as they impact the Singing River Trail, are described on the following pages.
HUNTSVILLE
The Big Picture (2014-2016)
The Big Picture is the umbrella comprehensive planning guide for the City of Huntsville. The Big Picture planning process ran from 2014-2016 and featured significant public involvement. One of the most common desires of citizens was to see more greenways. Two of the six principles of the Big Picture are:
1 62 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
Design a Mobile and Accessible Transportation Network: Design a multimodal city that is safe and easy to navigate. Huntsville roadways, public transit, bike lanes, and greenways work together to create a transportation network that serves people of all ages and abilities. Develop Healthy and Active Neighborhoods: Develop Huntsville as a place that recognizes that an active population can reduce the cost of healthcare for its citizens and have a positive economic impact on the cityâ&#x20AC;&#x2122;s overall well-being. Build a community that by its very nature encourages daily activity and healthy lifestyles.
As part of the overall Big Picture effort, the City developed a comprehensive, wellthought-out, Greenway Master Plan, that sets an ambitious target to get greenways on the ground. The Greenway Plan Update, approved in December 2017, reflects the communityâ&#x20AC;&#x2122;s vision for a connected system of trails and greenways. The Plan includes a number of greenway corridors that expand the system westward and southward from Downtown Huntsville many of these corridors were considered for Singing River Trail routing.
FINAL DRAFT
APPENDIX
Greenway Master Plan Key Action: Build 44 miles of greenway trails in 5 years.
Greenway Master Plan Vision:
Specific greenways of interest pertinent to the Singing River Trail routing:
• Every residence in the City of Huntsville is within one mile of a greenway.
• Big Spring Greenway (extending from existing Big Spring Greenway to Constellation development)
• The Greenway network is used as a recruiting tool for new industries and workforce. • The Greenway network is among the most frequently-visited tourist destinations in North Alabama.
• PARC Greenway (bike/ped bridge from Downtown over Memorial Parkway and Governors to Lowe Mill) • Clinton Avenue Complete Street corridor (from Downtown to Campus 805) • Seminole Drive greenway (from Clinton to Lowe Mill) • 9th Avenue Complete Street (from Lowe Mill to Triana) • STEAM Trail Greenway (from 9th and Triana, to Bob Wallace/I-565)
• McDonald Creek Greenway through Botanical Gardens • Redstone Gateway Greenway (along Old Madison Pike from UAH to Research Park and Indian Creek Greenway) • Indian Creek Greenway southern extension (from Old Madison Pike/ Indian Creek Greenway to Zierdt Road Greenway) • Zierdt Greenway (from I-565 to Triana) • Singing River Greenway (from Triana to Wheeler Wildlife Refuge and Tennessee River)
SINGING RIVER TRAIL MASTER PLAN / 163
FINAL DRAFT
APPENDIX
HOLLOW RD
S HARPES
SANDERSON RD
SPENCER DR
RUBE ROBINSON RD
RD
IN
BECKY DR PATTERSO
RAY RD
EAKIN RD
AP
DA
RW
HUR
R ICA
NE
RD
DE
M ERIDIANVILLE BOTTOM RD
RD
N RD
JOHNSON ST
FORD
CHAP EL
PROSPERITY DR
BU
ND RD
AY
COUNT Y LAK E RD
LITTLE LONES
ERTON RIV
N ST
RD
YARBROUGH RD
HIG D
BRADFORD LN
NAUGHER RD
ALLEN RD
R RD
MEL
RD
CAR
E
RD E CREEK HURRICAN
Gr ee
nw
ay
HOMER NAN CE RD
MT
CLEARVUE RD
se
R
STE
C ha
KIN
G
JR
HW
Y
NICK FITCHEARD RD
PETTUS RD
II Greenway
Pinhook Creek Section
OL
NCHE WI
n
way en
MENEFEE RD
rs Mo unt ai
Gre
E TH LU
PIK
IN
KI
MA
RT
HUGHES RD
STEAKLEY RD
LE RD
Ha rris
Wade
Smithe
AS PUL
E FORR E S T ST
LL TRAILWOOD DR
Tr a JEFF R D
RD BE D D OA ILR RA
rail
ail n ch Tr
D
il B e
VE
DOUGLASS RD
MI
DR
ss
LN LO
R
COUNTESS RD
231 £ ¤
ST CLAIR LN
DR BE
RD
COLEMONT LN
S HI HIL
enw
HA RRIS
k ee Cr
DR
se
H RT
ock Tra i l
MOONTOWN RD
at R
B B LAWLER RD
Fl
BROCK RD
my Tr ail
m
COOPER ST DR
SALTY BOTTOM
RD
DILL ST
S DR
DUG HILL RD
Greenway
Flint River
4TH ST
3RD ST
GRAY RD TA
E
RTE R QUA LN
RD GE
TAM M
AK
RAN
EASTERN B YP AS S
N TALLON
JAMES RD
t Ri v er en wa y
y River Gree nw a
R DR
t
GE LIN ESS
SH O OTING STAR TR
TAYLOR RD
Greenway
Tr Tre e
AR
MOHAW K
WADE RD
se
CHERRY TREE RD
w ay
ek
C
e r Run Trail 2
Spa
op
JADE LN
COB B RD
G r e e nway
Lo
N
Bailey Cove Rd Greenway
HICKORY HILL LN
MEMORIAL PK W Y
HA YS
Green ay w
Gri
n
MAGAZI NE RD
HAMPTON
G reen w ay
Scout Trail
Atwood Lin ear Park Gr ee nw ay
BUROSE RD LINDNER RD
PATTON RD
MILLS RD HICKS RD
ROBINSON RD
Ro
WHITESBURG DR
S RUN WAY RD
nway Huntsville Spring Bran ch Gree
RD EN HANS
THOR AV
MORRIS RD
GEMINI AV
SATURN RD
Gree nw ay
LA
S VIL
N N UM A RICHARD BR
E
N MA
NN
RD
T AIN
D AV S N EE
RD
UN
Green w ay
MO
EN
n ntai
DI
T
O
LA
R
D
N
LYONS RD
Wallac e se
e
Riv
er
G
re
en wa
y
G
way
HEGIA BURROW RD
RD
Greenlink ED SPEARS RD
es
BROCKWAY RD
nn
RD
Te
Proposed Greenway (1-5 years) Visionary Greenway (5+ years)
HAMER RD RGAN RD MO UGENE
PO PLAR RIDGE RD
SO WIL
PINEY WOODS RD
D RA RD
Trail
NT
M
ou
D
HONEA LN
VE
w ay cewa pa
Sec tio
n
PK
llace
A
MAR
S
TO
VE CA
Existing Greenway, Paved
Wa
IN DIT
LLS RD
MO
Gre en III
WY
Ri ve rW es tG re en way WE
RAIFORD RD
Tenn essee
WA
D ING
HONEYSUCKLE RD
T
SYCAMORE RD
KNOTTY
OLD GURLE Y PIKE
A
ING R SPR
Greenway Plan LOW GAP RD
diso Ma e n tur Na
CHANEY THOMPSON RD
Aldri dge Creek Gre enway
C IR
GREEN COVE RD
BUXTON RD
S G RE
RD
MARIELLEN RD
LINE
RD
RD W LINE RD
WAREHOUSE BUCKEYE RD
PERSIMMON RD
SOURWOOD RD
STAGHORNE RD
PERS H ING RD
SAWBRIAR RD
CHINABERRY RD
CRABAPPLE RD
HAWTHORNE RD
MCALPINE RD
LANDESS CIR
RD
BELL RD
Grissom Gre enw ay
DODD RD
Zi er
dt
G O VERN O R S BE ND R D
M ONROE S
GALLATIN ST
B ALMOR A L DR
JAYCEE WAY
NT DR
VINCE
ZIERDT RD
DR R
RD
DR
tai Moun n Green
Singing River Trail Greenway
Wheeler Tr ail
OWEN
LLA S
Greenway
LEEMAN FERRY RD
TRIANA BLVD
RIDEOUT RD
Zierdt Greenway DUNLOP BLVD
CLIPPER L N
ANDREW JACKSON WAY
B ra
D
DA
Merrimack
Bra han Spring
6TH ST
ay nw ee REDST
MARKET ST
Greenway
14TH S T
J OHN VOYAGER WAY
SULLIVAN ST
R
D
LARACY
WALL TRIANA HWY
enw Gre
Wh eel e
E RD HO P
W NE
L
MERIDIAN ST
Me NP ARK DR
tion k Cre ek Sec Pinhoo
HUNDLEY DR DR
WY NN
Greenway
R WRI G HT D
DIAMOND DR
n w ay
di an Creek Gr ee
O OD DR DR
COUNTY LINE RD
BOEING BLVD
ay
WALLST
RABBIT LN
TOWE RD DILL ST DR
BL
Gre en ek
BLUE SPRING RD
I Greenway
RIDEOUT DR WAYNE RD
P KWY PERI
E N TERPRISE WAY
RESEARCH PARK BLVD
OV
ER
MidCity
PEGASUS
JAN DAVIS D R
HUGHES RD
BROWNS FERRY RD
MOSE CHAPEL RD
RD N
IMA A RD H
ook Pinh
OWENS
E COVE
SQUARE RD GE
RD
ROCKHOUSE RD
DR
T
C EN VID PRO
y
Cr Indian SLAUGHT ER RD
BURGREEN RD
MORRIS DR
ay
SEGERS RD
Cree k Gr eenw am Be averd
PRYOR RD
MAYSVILLE RD
ANDREW JACKSON WAY
N ST MERIDIA
WAS HINGTON ST
Gr ee n
COVE
FFI
ELD
RIVERV IEW
w
ROCK
RIN SP
Future Greenlink
RD
RD
RD
Flint R iver Gre enw
OD
CAP
ADKINS
Existing Trail, Unpaved
ay
RD
Complete Streets Corridor BAKER ST
GALLAT IN ST
HE R EFORD ST
Highways OAK GROVE RD
DR
COLLEGE AV
N GTON AV
RD CO
VE
RD
MAIN
CHURCH AV
Huntsville City Limits MAYO RD
OUD
B
y M E EKS RD
1 6 4 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
RD DAR POINT
JOHNSON AV
S
CL
5 Miles
HOBBS ISLAND
RD H RT GA
2.5
ON AV
ST
1.25
enwa
1 Miles
r Gre Rive
0.5
see
DR
nes
RG
SBU
Ten
ITE
0.25
CUR T RD
WH
0 0
BOB WALLACE AV
Roads
WASHI
D SR
PINE
HE W
CE PE-
LYNN DR
MADIS MAPLE RD
B ILL MATT
HO
NEBO RD
WESLEY CHILDERS RD
NE W
PARSONS DR
MARTIN ST
WO
RD
RK
PASEUR ST
DR
MULBERRY
CO
HILL RD
nw a
G reenway
llo Ho
TU R NER ST
HIGDON RD
wa
y
NANCE RD
BALCH RD
BLV HOLL AD AY
BOWERS RD POWELL RD
GREENBRIER RD
Lime s tone Cree k Greenway
MITCHELL RD
nway on I Gree k Secti
C ha
BISHOP RD
INDIAN CREEK RD
CLUTTS RD
n
B R AD F ORD RD
NEWBY RD MOORESVILLE RD
one
Cree
re
BIG
ll
Go o se
OLD
Da
n
De
RD
HOBBS RD
lu
AV E
ai
Hid Deer R un Sp d en rin Trail 1 gs Tr a il
RD
LAS
L L OCK RD
BERKLEY RD
431
nt
De
GRE EN
AY
M ou
II Greenway
HW
e rl y
Spacewalk Sect i on
y
EE AWD SH
DA L
BU
HIG
om
wa
BURRESS RD
HORS
TERRY-DRAKE RD
en
S
ST
1
way en
MO
II walk Secti on ce
. Co il Tra
LLA RD PO
DUDLEY RD
STAPLER RD
r t R ive Flin
TAYLOR LN
OLMSTEAD RD
G CAVE RD IN
43
re
RD
W
O
BL
Fl i n
G
ay
way
RD
AY HW
eek Cr
HIG
ve
OLD
g Co Bi
TSIDE RD
UNTAIN RD MO
G reen
LN
RD
il
RC
UNTAIN RD L MO
EIG H
TRE
E LN
ORD D AU
G
Varnedoe Tra
PA
KEE
MCMULLEN
S OR ROW H ON
DR
YB UR N
DEF
Gap re enw
an d on Mari l Trai
ENGEL DR
RD
VE CO
LN
in
BUDDY GARRETT RD
RD
IL L
N
Bl ev
t
B1BB GARRETT DR
KE
WHISTLER LN M
BO
ail t Tr
er
231 £ ¤
Mou nta in Gre
AIN UNT
way
LEEMAN FERRY RD
RD
ay R ST
G DRA
ou
DR
Sc
C
COUNTY RD
RD
ge
D ST
ST
C KINNEY DR
KIN
il
I EW DGE V LE
65
EFO
Rid
RD
I-5
HER
Warpa th
BURY
e re G
n I Green io ect
Greenway
DR
l Trai
Big Cove Cr e ek
ARMST R O
PR GA D
DR
lk
1ST ST
S
ge pat h R id War
RODGE
HIGHWAY 31
YE HA
il
MILL RD
Green
Brahan Spring Greenway
ai
Tra
nway
TRIANA BLVD
Tr
w
k Gree
B IG COVE RD
£ ¤
Trails
6TH ST
w
ro
CH
WALKE
M
RD
L
K LN AC
431
and
231 £ ¤
ill
ain
e
Rails
Spring
Greenway
IAL PKWY
Branch
Huntsville
MEMOR
9th Ave
Cr
GOV E RNOR S DR
STEAM Trail Greenway
e
L
LOW
Y RD
ridg
ST
AV
14TH ST
´
AV
EL SIVLE
RD
ST
IN
S
BLUEBERRY
D AV
RAN
SAINT CLAIR AV
53 ¬ «
BLACKBERRY
WM
RASPBERRY
EN
TOW
DS
53 ¬ «
Ald
NE
n way k Gree
NS
AV
RE
a th We
AN
n Cree
IR
PE L HAM
rl y
AL
Faga DAVIS C
R
Wea th e
NE
KL
ee
AM
Gr
AN
g
AD
rin
E
Sp
LO W
ig
W
e Av
FR
RO
ay
on int
AV
N
h
Cl
B
DD TO
TAI
nc B ra nw
HERMITAGE AV
AV
RD
UN
n
Gr ee
AV UST LOC
D
FO
gla
uth
AV
E ALY
ss
U
H
s
Sugar
HEMLOCK RD
ARSENAL
CIR
Bro
So
LL
US
ail
e
DS R D
CIR
IN CR
JOHN GORDON RD
ER
ETGUM
TA IAM LL
LANDS END DR
COVE
Flin e Gr
FISHER ST
SHIEL
SWE
CALIFORNIA ST
UN WI
AV
Ar
AS
DR
OK
ST
ST
MCCLUNG AV
FO
OE ST NR MO
WOODS ON ST
S AV
S
ra
m
y
LN
NE
CO
EE
LIN
GR
V LS A
TE GA
Big Spring Park Greenway
y
HA
PINE AV
HENDERSON RD
STI
SH E
Greenwa
MA P LE HILL DR
S AV
EU
VE WAY CO
SUTTON RD
RD
ST
AV
CALDWELL LN
Blevins Gap Gre enway
OD
ITE
D epo
ST y ON wa RS en FE t Gre
ES
431 £ ¤
l
WO
WH
RANDOLPH AV
JEF
LM
ECHO
Holmes
r
ON
WELLS AV
HO
ROA
CHUR
ove Greenway
er R u
EWS
AV INT E CL
565
Little C
YMCA
IL ASHBU CEC R N DR
T r ai
Ri Smoke
ON
LK
VEL CLE
231 £ ¤
§ ¨ ¦
RAIL
EA GLE RD
MATH
River Singing
WA
TO
AV
TAYLOR ST
MILLER LN
WILLOWBROO K D R
TT
LL
ER
D AV AN
72 £ ¤
gs
CO
TE GA
Gateway Greenway
r ke a Trail wh n Bush o st Joh n
ES
BRO
R
US AV
R
prin Fa gan S il Tra
IONAL BLVD AT
WEATHERLY RD
W ADO
NIMB
RD BIN
RD
RO
SWANCOTT RD
D
ay
RD
AV
DR
Fanning T
Greenw Trails
ER
LA Y
L EDG ES
ME
RD
PRATT AV
RD
MO
ON
nw
L
D AN
TH
RS
ee
ch
SPRING RD
RO
DE
E
I PIK
an
RD
om Griss Greenway
AN
HUN D LEY DR
SK
Br as
il Tra
JON
ay eenw
BY
D
enw
F O UR MILE POST RD
Gr
A RIN
N I-65 ACCESS
ST
LA
ay Gr WHEELER AV
Gre
ay
T
ch an
AN
WOOD ST
nw
RL
g Br rin
REDSTONE RD
PKWY
DR
RIPPLE LN
RD
RD
DEERBERRY
HEAD
G
S
OA KL
Sp
Beadle Greenway
BEADLE LN
BANK
N
k
PYLE LN
VERMO
ille
M
E
C HU RCH
PU
DR SITY VER UNI
ew al
Jones Farm Park Greenway
sv nt
TL
y Warpat h Ridge Greenwa
D
MILLER
and Rails
FOW
JOE WHEELER HWY
ABINGDON AV
R S DR
BUCKEYE L N
R OA
CA
F
RU
l
c
L
CENTAUR ST
Y DR
PENTA S TA
Downtown Inset
BL V CAST LEG ATE BECK E T DR
RD
RD HARRISON COVE
U
DR
LITTLE
LOGAN DR
MARTIN RD
OAKWOOD AV
ad
Bluff ck
GARTH RD
RT
GO
Martin Greenway reenway
Y 20 HWA
PEOPLES RD
A IRPO
RD
JUNGERMAN
HIG
he
DR
DR NEAL
LE RR D
20 ¬ «
PANO R AMA
W Natural ell T rail
N DR
OY
FINNE
l Trai ne Li
BIG COV E RD
RD
NE
McKay Hollo
WILDWOOD DR
DRAKE AV
SON
COVE RD
TH
GSW
G
HUTCHENS AV
HERMITAGE AV
V SA
L&
FT
BIBB GARRETT RD
AV
NT RD
Hu
DR
Ma rtin G B LV D
ST
LIN
M
Sp ac
TO
RK
ay nw Gree
TRAD E MA
POGO RD
JETPLEX
ST
LO W
P
RE
KELLNER RD
5
CU
ST
RA
ENTAC CIR
MARSH A LL RD
TIROS ST
I-56
LO
IN
ON
ERG
ES
eek Bradford Cr
J AM
D N BLV N HEAR
RD
KL
INT
GLEN
PKWY
RD
DIS
y nwa ree Cre e k G
BRIER
CO
AN
averda m Be
GREEN
ay
AEROBEE ST
W AY
OLD HWY 20
COCHRAN RD
enw rn Gre
H
OR KIL
TO
B
JOHN
RO
SHELBY AV
HIGHLAND PLZ
B
MCCLUNG AV
MA
RD GRAPHI C S
S AV
FR
ay
LL
AIRPORT RD
E QUARRY RD LIM
N BLV
HOL EC
GOVERNORS DR
T
BO
OW
NOL E N AV
D
N NE FE
D
ISO MAD
STI
Greenway
w
565
EU
ND RA
Chelsea Park Greenway
§ ¨ ¦
RANDOLPH AV
ff lu
ay nw ee
en re G
GOSS RD
NS BR
72 £ ¤
AV
reenway Cree k G Fagan
AV
g Sprin an ay Brah nw Gre e
ek Cre
E GATE ON
SHELTON RD
Gr
¬ «
EST
ON
S AV
ST N OL ST LINC NE EE GR ST N
9th Ave
INT CL
WELLS AV
E
G re enw a
Y
AD K HE
STO
TO
9TH AV
Redstone Gateway Greenway
20
HW
ot De p
STEAM Trail Greenway
ORS
Y WA
HIG
E
Big Spring Park Greenway
e n Av
MAE
E
ING
W
ON INT
ld ona McD
G ate
SW NOR
E AV
CL
GO
Y CIR
VER
PIN
AV
VERN
ay
uth
AV
BOB WALLACE AV
QUALIT
GO
DR USE
LL
ail Tr
AV
y
I-565 HO
Redstone Gateway Greenw
into Cl
S
o
OLOGY
53 ¬ «
TRANQUILITY BASE
st R ed
I-65
ST
HA
DR
255
In
PERRY ST
nc
TECHN
D GE ST THE B RI
H HEAT DR
LN
AY
FR O NT
Bra
BOB
Gre e nway
T RD D FLA
TAL
ARNETT ST
h
JORDAN LN NW
r
WOO
PO R HIGH ST
MAPLE W
an
ER
SH
ST
Holmes HOLMES AV
LK
WA
CH
DR
gl
ian C
DOG
MILL RD
WA
AV V ES
BRADFORD DR
r w ay G
PRATT AV
BAN
LOOKOUT DR
Gateway Greenway UR
R
R ESEARCH DR
s rin g Fagan Sp
s la
CH
CORPORATE D
Bradford
Redstone Gateway Greenway
Greenway
Bro
R D
SC
DR
ee k
OLD MADISON PIKE
PALMER RD
UIN
al
UNIVERSITY DR
A
Y
WHEELER AV
S A NDERSON ST
GR
Ind
EA S TVIEW DR
M OQ
nch
B EN
GILLESPIE RD
PKW
Du e n Li
E PIK
LN AN RD
RIME VIL L AGE DR
WALL RD
OAKWOOD AV
ABINGDON AV
EY
JO
DOGWOOD FLATS RD
ADVENTIST BLVD
ER
RL
ET M
OP
E WAY MAIN L IN
GRAY RD
LO
ST
W PARK
LN
a
RD
w Green
DI
the
KELLY HILL RD
RD
NG B I
eek
RN
LN
Research Park Greenway
Sou
POW
D PIKE
E LL ST
FEA
CH
FARR O W RD
lk Norfo
AN
OAKWOOD RD
S
ay
IN MA
MOCKI
E
DR
GARRETT RD
RYL
MORRING RD
RD
ACUFF RD
RD
Greenwa ek y Cre
GOO
HUNTSVILLE-BROWNS FERRY RD
OLD H IGHWAY 20
OLD GURLEY RD
ay
re G
ay nw
WORTHEY
ey
72 £ ¤
Brownsferry Greenway
MARTIN LIME RD
72 £ ¤
nway
TAYLOR DR
MAX LUTHER DR
HIGHWAY 72
HUM PHREY RD
O
EP
N TAIN
SPARKMA N DR
RD
HIGHWAY 72
MOU GH HI
W
y wa
K
G RIZZARD RD
e Gre
Gree
RD
en
DUPREE
CAMBRIDGE LN
IA
S
WESS
OV
ELD
VD
Chap m an
nta in ou M
NR
JO H NS RD
Cr
AN RD
MO
ver Gree
JORDAN RD
LD
G re
t Ri
STANWOOD BLVD
way Gre en
O
ee k
EXPLORER BLVD
HUNTSVILLE BROWNSFERRY RD
RD
RD
Flin
Mountain an
an I ndi
SLO
MCCRARY RD
nox Cre e k
KEL
VOE
pm
RD
WALL TRIANA HWY
SANDERSON RD
SAM THOMAS RD
ha
E AS CH
STRINGFIELD RD
MASTIN LAKE RD
RD
way
ay
53 ¬ «
DAN TIBBS RD
Indian Creek Greenway PLUMMER RD
BROWN
ee nw
BLAKE BOTTOM RD
HARBIN RD
BRANCH RD
Gr
C
MCCULLEY MILL RD
MT ZION RD
M
w
LINDSAY LN
Alabama A&
CAPSHAW RD
Pin
BOB STILES
RD
ITA-ANN LN
ELKINS RD
65 ¦ § ¨
COVE RD
OW LL
HO
LLIPS RD
PHI
PEPPER RD
CRAFT RD
SHARPS TIPTON RD
Y
RR
PINE GROVE
NEAL
E LIMESTONE RD
ll
il
l
JONES RD
Tra
BELL FACTORY RD
NABORS RD
l Trai
Rock Wa
ai
OAKDALE RD
ovel t on Sh
Tr
NEWBY CHAPEL RD
ail Tr
k Trac
KELLY CEMETERY RD
il
n
e
NIC K DAVIS RD
ntai Mou
Bostick T
Rac
nta W a de M ou i n Greenw ay
Greenway
ek Dry Cre
Fo
LINTON RD
KELLY SPRING RD
vil's De
ORVIL SMITH RD
OAK RD PINE DR
stic k Bo Trail
HALL RD
BARKSDALE RD
S
53
ST JOHN RD
MO ORE
AY
ELM ST
GLOVER RD
MEMORIAL PKWY
HW
SMITH-VASSER RD
LOCKHART RD
LINDA S
RD
WELLS RD
T
MEADOWS RD
ELKTO
BOB WADE LN
ED RAY RD
MAY SVIL
25 1
C O PELA
HIG
HW
COMPTON RD
RW
EL
L
RD
STOVALL RD
BALTIMORE HILL RD
DR
HOLMAN RD
FUSSY HILL RD
A SMITH RD
YAR
TURNER LN
BROU
DORNING RD
MT LEBANON RD
RD
GH
EL
RD
MACON LN
MONROE RD
ROUTT RD
YUMA DR
S
FARGO DR
ER
HIGHWAY 231-431
LOVE BRANCH RD
RT
ROBINS RD LIBERTY HILL RD
SHARP RD
MOORESVILLE RD
CA
T RD
BEATLINE RD
P OSIT
LOONEY RD
HA RV ES
RD
I-65
N ATE
CH
SARDIS SPRINGS RD
EL
ER
RD
KT O
ALT
BATRUMVILLE RD
FO
N
HARVES T RD
LEWIS RD
QUARRY RD
IN
SMITH RD
RD
G
HOLT RD
EL
CARROLL RD
RD
AP
CH
RD
COUNTY HIGHWAY 107
VA N DYKE RD
MMOND HA LN
QUARTER MOUNTA IN
BLACK RD
EY PIN
MCCOLLUM RD
B EAVER DAM RD
2017 City of Huntsville Greenway Master Plan
PAINT ROCK RD
FINAL DRAFT
APPENDIX
DECATUR One Decatur (2018)
As the Singing River Trail Master Plan was in progress, the City of Decatur completed and adopted their Comprehensive Plan, called One Decatur, in early 2018. The Plan specifically addresses an objective to “Increase efforts to make City more walkable and bike friendly.” In addition, specific action steps specifically called out the regional trail initiative (the Singing River Trail) and a desire to make progress towards a bicycle/pedestrian crossing of the Tennessee River: • Establish regional trail connections. Additional multimodal trail segments should be constructed in collaboration with the regional Launch 2035 effort to connect Decatur to cultural, educational, and recreational destinations in the region as well as to create a multimodal connection between Decatur and Huntsville.
• Establish a bicycle and pedestrian crossing over the Tennessee River. Currently, the Tennessee River is a major regional barrier with no safe way for cyclists and pedestrians to cross. Providing safe crossing options would improve recreational opportunities, economic connections between communities on both sides of the river, and provide alternate transportation options to alleviate congestion. »» Long term: The City should begin coordination with the State Department of Transportation to plan the provision of fixed bicycle and pedestrian crossing facilities over the Tennessee River. Options are diverse, ranging from retrofitting the existing Hwy 31 bridge, adding a separated pathway to the existing railroad crossing, or planning for an eventual new river crossing to include a
separated multi-use path. The ultimate solution should be the outcome of a long-term regional conversation. Other specific, pertinent objectives and actions pulled from One Decatur include: • Update and formalize a plan to connect the urban trail system • Complete the Bill Sims Bike trail connecting destinations within the City such as parks and schools and linking to the regional trail network. • Develop the trail network within the Refuge. »» Encourage the Refuge to create more opportunities for passive recreation via trails, boardwalks, blueways, and sites for access. Promote awareness of opportunities for the community to enjoy this unique natural area
within the City while supporting its conservation mission (which may mean that some access is seasonal). • Provide greater community access to the river through parks, multi-use trails, inviting public spaces, and amenities for water-based recreation. • Establish a water trail (blueway) through the refuge. • Maximize development opportunities on Decatur’s most valuable waterfront areas (The City recognizes there is potential to have better connection to the river, one of its most valuable resources, in a way similar to Chattanooga, TN and Greenville, SC.
SINGING RIVER TRAIL MASTER PLAN / 165
FINAL DRAFT
APPENDIX
April 2018
Figure 4-5: Planned Bicycle and Pedestrian Facilities
2040 Transportation Master Plan
TRANSPORTATION MASTER PLAN PREPARED BY:
NTS City of Madison Planning & Economic Development Department 100 Hughes Road, Madison, Alabama
MADISON
Madison Growth Plan (2010)
Madison’s Growth Plan of 2010 placed significant weight on expanding the network of greenways in Madison, connecting outwards to the west and south as Madison grows. Madison’s 2040 Transportation Plan, adopted in April 2018, also highlights greenways as being critical infrastructure to continue growing and connecting. A larger scale of this map is viewable at madisonal.gov DRAFT – April 2018
1 6 6 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
4-15
FINAL DRAFT
APPENDIX
The Plan features an updated bike/ped/ greenway recommendations map. Specific greenway projects of impact to the potential Singing River Trail routing are: • Bradford Creek Greenway southern extension (identified also in the Parks and Recreation Master Plan 2025 and Greenway and Trail Master Plan) • The Mill Creek Greenway northern extension (identified also in the Parks
and Recreation Master Plan 2025 and Greenway and Trail Master Plan) Specific roadway projects that were considered during the Singing River Trail routing include: • Old Madison Pike Roadway enhancements (mid-term) – Maintain and improve automobile capacity with targeted enhancements like bridge widening and adding turn/deceleration lanes, while also maintaining and improving traffic flow through access management techniques. • Old Madison Pike widening from three to four lanes from Hughes Road to Slaughter Road (Visionary)
• Widen Slaughter Road from 2 to 4 lanes from Old Madison Pike to Madison Boulevard (Construction Year 2023)
Pike (ROW is favorable) and Slaughter Road (to ultimately connect to Zierdt Road sidepath)
• Extend Zierdt Road as a 2-lane roadway from 1 mile north of Madison Boulevard to Old Madison Pike (Visionary)
Specific corridors were called out for bicycling/walking improvements including Huntsville Brownsferry Road, Old Madison Pike (Complete Street and/or multi-use path to fill critical link between greenways), Zierdt Road (bike/ped infrastructure to connect to Huntsville’s multi-use path south of I-565)
While Madison’s greenway network continues to grow, there is very little connectivity to or between Bradford Creek Greenway, Mill Creek Greenway, Indian Creek Greenway, County Line Road side paths, and Hughes Road side path. Therefore, the Plan calls for adding bicycle accommodations along Old Madison Pike, Mill Road, Gillespie Road, Eastview Drive, Balch Road, and Highland Drive. Roadways were also identified as suitable and feasible for Complete Streets improvements. These include Old Madison
SINGING RIVER TRAIL MASTER PLAN / 167
FINAL DRAFT
APPENDIX
A Vision for Athens: Transportation Plan
A Vision for Athens: A Future Land Use and Development Plan
By Mac Martin, AICP City Planner
By Mac Martin, AICP City Planner
ATHENS A Vision for Athens: A Future Land Use and Development Plan (2013)
The City of Athens has also begun to make greenways and Complete Streets an important objective in recent years. The City’s comprehensive plan is: A Vision for Athens: A Future Land Use and Development Plan (2013). Specific objectives and strategies pertinent to the Singing River Trail include the expansion of the Swan Creek Greenway and a Complete Street road diet of Hobbs Street. One of the objectives of the plan is to “Encourage greater connectivity between developments and existing facilities through more street connections, greenway trails - a more traditional and efficient style of development.”
The Plan identifies the Swan Creek Greenway as a key asset to the development of the western quadrants of the interchange. Access to this resource opens up numerous recreational opportunities for residents and visitors alike, connecting residential and commercial developments at the interchange with a multipurpose path along the creek, preserved forested areas, Swan Creek park, and the Sportsplex. With a transformation of Hobbs Street to a complete street format, with good sidewalks and bike lanes, downtown and Athens State University become accessible to interchange development via means other than automobile.
1 6 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
A Vision for Athens: Transportation Plan (2015)
This plan expands upon the objectives of the 2013 Plan by recommending an expansion of the greenway network and a road diet on Hobbs Street. Objective: Expand greenway network, particularly along Swan Creek, Town Creek, and other tributaries and wooded areas. i) Reasoning: The current greenway trail along Swan Creek is a wonderful recreational trail. However, as we are beginning to see in many other cities, greenway networks can become important transportation routes. By expanding the greenway system as shown on the map, the trail becomes a network for alternative modes of transportation apart from busy major arterial roadways that are not
favorable environments to pedestrians and bicycle use. As it is built out, this network connects neighborhoods and destinations, offering a true means of transport in addition to recreation. With a Athens Transportation Plan 56 crossing over Swan Creek near US 72, the network can connect our regional commercial center at Exit 351 with downtown and multiple recreational destinations. Objective: Provide more opportunities for bicycle travel, particularly along arterials and collectors with lower levels of service. The City can do so in a variety of ways including adding dedicated lanes, constructing multipurpose side paths, widening shoulders, and installing adequate signage and markings.
APPENDIX
FINAL DRAFT
Objective: Improve arterials, collectors, and local streets according to “complete street” design appropriate for said classifications and adjoining land uses. This can include a “road diet” for portions of Hobbs Street and Jefferson Street that have the 4- lane undivided configuration.
SINGING RIVER TRAIL MASTER PLAN / 169
APPENDIX
Appendix D Local Trail Connectivity Maps on the following pages illustrate how the Singing River Trail integrates into, and expands, existing trail networks in urban areas along the route.
170 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
FINAL DRAFT
SE
Dr
Dr
St Clair Ln
ive d r C eR ov
r
Homer Nance Rd
Bradford Ln
Homes tea dR d
v er Ln
Trailwood Dr
Albright Dr
Auror a Dr
Ede
E ula W ay Raleigh Way
Henson Dr
Oldwood Rd
Shields Rd
Townsend Dr SE Tumpkins Ln
NE
Sanders Dr
Lawler Dr
re
Chas e
Dug Hill Rd
il
Tra
0
il
0.75
a
1.5
W
Fla
Trai l
in Sa nPa nora ma oB lv dS E
ff
rs Bend R d SE
Mont e
ig
E dS Rd
Gart h
r it Dr S E
h ea Owens Dr SE
Gill St S E
t Ro ck Tr ai l
g e Dr NE
Giles Dr NE Chambers Dr NE
E
Dall as
St N
Wa shington St NW Virginia Blvd NW Kildare S t NW
Oletimers Rd Case Rd Naugher Rd
Moores Mill Rd
Main Rd NE E
dN
r
Meridian St N
Mee k
h ort Dr NE E pw
B oswe
S ta
Orcha rd St NW y Rd SW
1st St SW
wb
Bell Cir
Ru stic Trl Nina P earl Dr NE
Dr
D
NW rial P k wy
Dr
Forc e Dr NW Acce ss R d
Kenwood Dr
on
n
1
te
R te
St
14th S t NW
Me m o
NW
Blue Spring Rd NW Glenda le Ln NW
W
D r NW
Dr Triana Blvd SW
R d
Laver ne
NW
R ut
v iew Dr NW
Br ookline Dr NW Sha d Lane Dr NW y
Ralph Rd
Hw y 53
l Tr a i
Ha d ar Point Dr NW
a rner Rd NW er K ing Jr Hwy uth
nL rti
NW C
D r NW
NW
Research Park Blvd NW
R d NW
Wynn Dr
e
Nick Fitcheard Rd NW
R
Rideout Rd NW
or S F
p
l
Existing Unpaved Shared Use Path
W
e Trai
B ur
rn o
C De han dle r R d bo a h Dr S E
Tr a
Broa d Dr nd
Existing Sidepath
Da
Ho ll ow
ms
Proposed Commuter Route
Taylor Rd
Dr SE
Ridg ath
SE
SE
ar
Big Cove R d SE
! ! ! !
S t a cy Cir Mo rrin gR d
Mastin Dr
W il lia
Proposed Shared Use Path
Bell Factory Rd
Hil lside R d
Proposed On-Street Bicycle Facility
Ryland Pike
Teague Rd Wall Rd
hea d ow
Existing Shared Use Path
72 £
A rr
Proposed Alternative Alignment
ella Ov
Ave
McK ay
Existing On-Street Bicycle Facility
Wes s
Bell Rd
!
Proposed Alignment
R
n la
Sta te Rte 2 Old Gurley Rd NE
Nolen Ave
St SE
!
ar Fe
Ne
Thornton Ave SW
L
B lu
SE Colice Rd
o odcliff R
k Dr
d ea kh
!
E
head Ba nk g ri n Sp
r Becket D
!
Go vernors D rS
ykeys Way Rd M
Matilda
Rd
r
Botanical Garden
Spring Park
l Rd me
Pk w y NE
n
ve Go
Gesman Pl SW
Locust Av e SE
!
tai n
Car
B
B
SE
! ! Huntsville
Downtown !Huntsville/Big
W
!
Bob Wallace Ave SW
HUNTSVILLE
Cleerm o n t Dr
!
NW ve ve ll A n A Ha linto C W Governors Dr SW 8th Ave SW
d
S Dr rg bu ites Wh Gallatin St S W
US Space & Rocket Center
Holmes Ave
te 5 3 State Ry S W rial Pkw Memo
W Dr N
Wr igh t
NW Holmes Ave
W tN
!
Joh n
n Wy n
Bridge Street Town Centre
!
Juli a
Oakwood Ave NE
Rison Ave NE Ste ens Dr v NE Humes Ave NE McCullough Ave NE SE Ward Ave NE Rd te a lG Tol Clinton Ave E Wells Ave SE
Pratt/Ban k
hS u rc Ch
Bradford Dr
Dr Barbara NW
¥
C
Moun t
l to n
an
Hunstville Depot Museum ! !
lvd NW Tria n a B
R ese ar ch Dr NW
W eN Av
Mo
r Popl a
un
d Rosalie Ri
565
ek
C ha
Orba Dr NE
NW
NW
m ercial Dr NW Putman Dr NW
The University of Alabama in Huntsville
£
Turf Ave
University Dr NW
Bra dford Blvd NW
! !
Oakwood Ave NW
231
Jordan Rd St a nwood Blvd NE
il
ll Dr
M ax Luther Dr NW
lsba d
Dr
255
Cl u b Oster
om
NW
¬
Calvert
Rd
C ar
rov ia
ledge Dr NW
W
M on
nN nL rda Jo
ld
N
Dr
an pm
Ri t a Ln N
Oakwood Rd NW Cam p us Rd Col l e ge Dr t Blvd NW
s venti Ad
O
431
NW
Greenhill Dr L n NW Hes ter Ln NW Mount Ve r G rizzard Rd NW Brett Rd NW Sparkman Dr NW
W
Harris R d
£
Ch
e as
ir
k el Voe
R
Ter ry T r a
Kyle
d NW Lodg e R
Mastin Lake Rd NW
a rk e Dr N W
P
¬ 53
Vogel Dr NW
r NW
L a k eview Dr
y Hw
Rickwood D
e or dm Ar Plummer Rd NW
Stringfield Rd NW
a ndy
S
N
N
W
Alabama A&M ! University !
sD Tre
se
er
p
Medaris Rd NW or wood
aA& M bam a l A
rd C Fo
a Ch
Clearv ue
Dr
E
Riv
fi
Lumary D r
Blake Bottom Rd NW
Ricky Rd
Ocon ee
lemont Ln NE Co
De e r
e ld R d Winchester Rd NW Hillto Ter NW
Whiteston e
5 y6
r
W
Ce
C
w oH
d Pat
nD ea
N
W
Ma
ormont Dr
Burton St
d dlin R
P
e
NW
Sa ndia Blvd NW
i sk r r D N ipe Ju n
Spragin Hollo
w Rd
la Pu ik
NW
Doc
An d o Larue St
S an
B e nch Trai l
Co
Oakcrest Rd Robinson Rd
ock c liff D r
F o ssi l
NW
lton Shove
Steakley Rd
N Rd ster che n i W Alpha Ln
t Flin
r
Dry Creek W a de M ountain
G
HUNTSVILLE NORTH
Countess Rd NE
il ri s T r a
Holli n gtonDr
Bob Wade Ln NW
Bob Wade Ln
Raint r e R d e
h Ridge ar pat
3 Miles
¸
Proposed Trailhead
Interstate
Fish and Wildlife Service Land
Other Destination
US Highway
Redstone Arsenal
Proposed Side Path
State Road
Municipality
Proposed Unpaved Shared Use Path
County or Local Road
Water
Proposed Ferry
Railroads
Jos
Existing Unpaved Shared Use Path
Dale Rd SE
SE Rd
Ha rb or
Ri ve r
! !
Ol d wy
Wilson Rd
Math ew
eH
S EE R TENN ES
s Rd
Existing Sidepath
IVE R
s her St SW
Green Cove Rd SW
e Dr
Hobbs Rd SE Hobbs Rd SW
Villaret Dr SW
Redstone Rd SW
d
Buxt on Rd
Patton Rd SW
4 Miles
¸
2
Flig ht Rd
Cree k Rd
Hawk Rd C a jun Dr
Gray Rd SW
Aerobee Rd
Green Cove Rd SE
uthhu r st Dr SE So
SE
Rd
de
Wi
a in Gap Rd SE
Magna Carta Pl SW
r
Clovis Rd SW
Green Mo Lancelot Dr SE
Vis t a D r
Weatherly Rd SE
Dr SW Ro th m or e
C raigmont Rd
SW
Bel Air Rd SE Dell Ave SE
Dr G
Johnson Rd SW
Chelsea Park
her Dr S W
Tel
Goss Rd SW
t t e Dr S W
SW
No Homewood D r SW
Linden Ave SW
Lily Fla gg Rd SE
E
S
o Coleur M Dr i le P ost Rd SE SE Glen co
Drake Ave SE d
! !
M ou nt
E Toney Dr SE
Fo
Thornton Ave SW
Drake Ave SW
Torino
r SE
SE Blevi
Willowbrook Dr SE
Dr Ledg es D r SE
C D e ha n dle r R d bo a h Dr S E
Governors S tateDr S E Rt e 1
Vicki Ln
Ga
in
r
Fa
i
y
G ap Rd SE
Rd
Te
i ne Dr
Paul Dr
Haden Rd
Dug Hill Rd
nd
d
Ar
Proposed Commuter Route
! ! ! !
of Di xi
Rayford Rd
Proposed Shared Use Path
1
SW
Proposed On-Street Bicycle Facility
Existing Shared Use Path
d
Existing On-Street Bicycle Facility
Proposed Alternative Alignment
0
Rd
Proposed Alignment
Vi
rR pe
Rd
Snooper Rd
Patriot Rd Ajax Rd
nR
effield Rd Sh
Bayle
Rd S
Mi lls
Bob Wallace Ave SW
Rd
SW
Zeus Dr Mauler Rd Vincent D r
n se n
al Ne
! !
use
Magazin e Rd
Rd
Ha
He art
d
Wareho
Rd SW Ar c Newson Rd SW r Ci st a McVay St SW
Fi
D
SW
SE
!
Sla t
Rd
R st Po
!
l l Rd SW
Line Rd
t in
8th Ave SW
Be
ar M
Governors Dr SW 6th Ave SW
231
e a rm a
!
wn C i
£
E
Ditto Landing
a Trl SE maug C hica
Logan Dr
wy 8 d SE Co HIsland R bs Hob
S Rd
Ivory Ln
de Lin
Cam
Rd
Holmes Ave NW
Ditto Marin a
SE wy Pk
ur
rama Dr S E Pa no
ee Trl S E
tr
McClung Ave SE Locust Ave SE
Gr e en
u n ta i n
SW
!
a qu
P
i nh oo k
S
r
Hillwood Dr S E
SW
Riverview
Chaney Thompson Rd SE
Mo
C
ti s D
SE
Ma this
SE
Rd S E ra RdS E M ont e Ved
in
! !
Wi
Branscomb Rd SE
W
Huntsville Botanical Garden
Coys Dr SE
Dr
Triana Blvd SW
r SW
ss Dr SW
W
Hillsboro Rd SW
Fairacres Rd S W
Charl o
SE Dr
E Dr S Crestf ield
r hu a D
llena Dr SE
Redstone Arsenal Boundary
Conger
Holiday Dr
Dr SE
re
rt Ma
t Rd S
Brahan Spring Park
C ro
on Verm
ay Rd
Leeman Ferry Rd SW
Bain
E Dr S ee a wd
Village S
Dr S E
Camelot Dr SE
ina Dr d SE Na d Cov e R Bailey ill Rd SE M d Tod Bluff Dr SE Sh ades Rd SE
Hogan Dr SE da Dr SE Blan
SW
d olf R
in R d S E unta
SE
Louis D r SE Ca mille Dr SE
SW n Dr Loga
Sta
53 te Rte
d Byrd Spring s R
Chadwell Sa nder s Rd
Dr SE e Rd SE
SE
Cannstatt Dr S E
hil l
llow Dr S E
SE
Mart
Rd
rails and T Rails S Runw
4th St SW
St N W
SE
Riley Rd SW
SW
14th
il
S Sh
N Shawdee Dr
Bo
ar
Bailey Cove Rd
At w ood D r SE Hickory Hill LnS E
SE Criner R d S Ey Dr Jones Valle ble Dr Ta nnahill D r S E F
SW
Ave Holmes
565
SW
NW ve ll A Ha
Barba ra Dr NW
¥
r
e on E
Airport Rd SW
SE
Newby Rd
S
Mac on
D nic r S ce Gill S S t SE Dr rg stings Rd E sbu Ha e S t i t Wh sS E S m t a S Ad lin nk Fra
Downtown Huntsville/Big Spring Park
Ca
SE
J lT
r sD
nedo e
Edg e
dy R
nel Fa l
Dr
ha
rco Cir e Ba
Dr SE nt
E
Rd SE
431
ns
Statton Dr SE
Garth Rd SE
r Va
il Tra x Canyon R d SE
SE
Coli c e
£
Artie St SW
53
Ce
F oxfire
on Dr S Dotses DrS rb Dr SE Dobb s
r
Owens Dr SE
¬
Se
I ctio n
T reCha vo nd l er r D r SE
Burri t Dr no B l v d SE
Cl e e rm o
Trail ng ur nn cil Ashb n D
Bl e v
Tree Tr a
r As bu
Sa
D
Su g
lk wa
SE
s
Vie w Ledg e
Spa ce
he Trail row a
Mo nt e
Cathe r
Scout T r ail
nson Dr
Old Big Cove Rd ssie
nC ir
ve C Co ek Dr
re
Ro bi
HUNTSVILLE SOUTH p Dr
Wil
Broad Dr
sa liam
Proposed Trailhead
Interstate
Fish and Wildlife Service Land
Other Destination
US Highway
Redstone Arsenal
Proposed Side Path
State Road
Municipality
Proposed Unpaved Shared Use Path
County or Local Road
Water
Proposed Ferry
Railroads
Lewter Dr
Autumn Wind Dr Morning Vista Dr
Skyline Rd Slaughter Rd
Foy Rd
Patricia Rd
Nancy Rd
High Rd
Chad Ln
B l vd Inwood Trl
Arnold R
Shelt on Rd
Dr
Pinehurst
Seina Vista Dr
u
Pin e Ridge
Hill
st
20
REDSTONE ARSENAL
¥ ! !
W
Dr
Ci
r
Dr ter wa
¸
D
re
g
Ed ge
ose
Lake
e Ln
Herit a
ok Blvd Zierdt Rd
565
Anderson Rd SW
y Hw
ntain Bro
Intergraph Wy
Rodman Dr
Metaire Ln Spring Water Dr
Mabry D r
Athens Blvd Briarwo od Dr Crestview Dr Ashwood Dr
Douglas St
Goldenr
Lanier Rd
Commer
Celtic Dr
Lewis Ln
Sullivan St
Chadrick Dr
t o ria Dr
Dublin Cir
Sunset
Walton Dr
Hughes Rd
Sturdivant St
Church St
Ambrose Dr
Cat
Plaza Blvd
Landers Rd
Blu ebelle Michli Rd
Whisperwoo Pension Row
Willard St
Xin g Wall Triana Hwy
d
ek
ef Dr ie ld
P
L
C ree kG re e nw Si ay l
Park s i
Dr d
A ly
Arlingt o n Dr
Ivor
Co Rd 127 Co Hwy 127
Andra St Evalyn St
Hughes Road Multi-Use Path
Vi
Claytor Ln Mer
Balch Rd
Fieldmaster Dr
Mi l l
Gracie Ln
Re Bibb Dr
Glenwood Dr
Men
Avian
Ln Vine wo od
Red Oak Rd
Carnette Dr
borwood
Pl
A llis
County Line Road Multi-Use Path
County Line Rd Co Line Rd
Mose Chapel Rd
Appleton Ln Way
Alisha Cir
G
Coral C t
Rd
Wate r
r
Dr
Existing Unpaved Shared Use Path
Dr
Mou
Cir
Existing Sidepath
m merv
Dr
Ar
Proposed Commuter Route
! ! ! !
ay Creek Gree nw
Proposed Shared Use Path
ian In d
S
Mo
Proposed On-Street Bicycle Facility
Existing Shared Use Path
!!
Dr
Existing On-Street Bicycle Facility
Madison Academy
e on
lvd
Gr
Westsc o tt
iew
rk B
Dr ella
Oakland Rd
e Lak
Proposed Alternative Alignment
Dr
d Dr
I se I ha
Lime Quarry R d
Disk Dr
Proposed Alignment
Dr
Rd
n tr
Bus Pa
duction Ave P1 ro Miles
d Blv
St
er Mill
an
e Gr ek
phics Gra
Dr
da
Town Madison/ Ballpark Contec Rd
on dis Ma
e
g
Cr e
lin Dr ub W D y Pl
Dr
Alderwoo
nial Lake D r
St
for d
0.5
w ayP
Cir
d
Doane Dr
Fla g
Colo
Lynn Dr
gfield Ln
ay W
Hidd e n Valley
ce
h Ma
Maple S t
Royal Dr
B r ad
en
Cork
Bre n
Hi
od Ln
Dr
d
e enwood Dr
Sp ri n
Dr
Clift Dr
Ca r
Portal Ln
d inal Ave
field ing r il l D vem S ta
S harp Blvd
Cam brid g
Mari on
Walton Rd
Blvd and n Blvd Nol Nola d eR bin Wo od Madison Pike
rR
tt Dr Bre
hla n
Dr W
e
Eld o rado Dr Beaver Run Dr
Brentwood Ln
ma Dr
Princeton Dr
Ashley Dr
!!
S hort
Jackson Ave
WillenaD
o S an
Dublin Park
MADISON !
Sally Ln Mea dow Dr
C
Rd rry he
r
r
!Downtown Madison
Fron t S t
Palmer Rd
D ge R id
Arnett St
Steel e Dr
B ell e
Stewart St
Ashley Way
d
Dr ry
iddle St High St
Perry St
Madison Ave
Carter Dr
R
Maplewo o
Conger Rd
Browns Ferry Rd
Jetp lex Ln
0.25
Eastview Dr
L ar
Mill Rd
whead Trl ro Ar Dr dd To
B
0
Dr
c
Blvd
Path
pr i n gs Pl
Lena Cain Blvd r ockton
dral
Mill Road Multi-Use
d Ln
l kP oo S Br
New Bristol Ln
am Cir
ranth
Cedar S
Mannin g h
Dr
Ct
d Mil dre an Rd Ha rdim
Park Stone Dr Garden Brook D r Dr
Mill Park Ln
Dr on Chase Hun i ngt Dr Hollow F ox
ander
s Dr
denhall Dr
M
nway
n La
sd ow ne
i ll C r e a m Dr Dr Rd he m a rh g u D rid Liza Ln m Ci r B o Hill R Dr Cott onwood Trl de Over brook Dr Spotted Fawn Rd Long Bow Dr
hase
d
e Gre
Dr
H ig h Coach Way
gan ser Blv
II
k ee
n Cir de m
nridge ow
ff Blu
r gD r in Sp
Cr
n Dr Woo dlaw
Ca
Cr
Foxhoun
rve Way se
Chath a gha m llin Be
Bradford
Wa tt erson Way
Kensing
High Point St
r d D
Ln
Dr
Abby Ln
on Dr
Belmont Pl
Mattie
Millsfor d
Liberty Dr
Manor Dr
MADISON
Jarrett Ln
Galt Ln Monument Ln
Sc h rims h
A
m sterdam
Scenic D r ton
Dr
Sh o
Proposed Trailhead
Interstate
Fish and Wildlife Service Land
Other Destination
US Highway
Redstone Arsenal
Proposed Side Path
State Road
Municipality
Proposed Unpaved Shared Use Path
County or Local Road
Water
Proposed Ferry
Railroads
DECATUR
Ingalls Harbor Pavilion ! ! Ne he rS
t
Isl
a n Way NW Isl an d dW ay
W
St NW or e
le -
Hu nt sv il
Existing On-Street Bicycle Facility
Proposed On-Street Bicycle Facility
Proposed Alternative Alignment
Existing Shared Use Path
Proposed Shared Use Path
Proposed Commuter Route
Existing Sidepath Existing Unpaved Shared Use Path
il
! ! ! !
SE
t
Moulton St E
Johnston St SE
Ma rk e tS tN E
Ct
Gi bb Holly St NE
Proposed Alignment
Tra
Po pla rC
E
Elm Ct
ke
wo od
4th Ave SE
Bi
8th Ave NE
4th Ave NE
! !
Cook Museum of Natural Science
tN
Dr ift
E St N Fe rry
NE
t NE
ur ch S
Si
Somerville Rd NE
St NE Lin e
E St N O ak
il a tu rT ra De c
Lee S
2nd Ave NE
1st Ave NE
1st Ave SE
1st Ave SW
Central Pkwy SW
0.5 Miles
E
St
2nd Ave SE
4th Ave NW W
3rd Ave SW
6th Ave SW
7th Ave SW
5th Ave NW
6th Ave NW
7th Ave NW
8th Ave NW
8th Ave SW
Co Rd 41
0.125
E
St
Ch
E
ill
ms
0
State Rte 24
Go rdo 0.25 n Dr S
A Pl
Moulton St W
Ch er ry
St N
St N
Dr .B
E
20
1st St NW
Le e
St N
W al nu t
St NE
St N
Somerville Rd SE
E Ca na lS tN
Ba nk
St
St N Ra ilr oa d
Fin ley Dr NW
Memorial Dr NW
Vi ne
La fa ye tte
31 £
e
2nd St NW
Ca in
W ils on
Rt
Da vis St NE
t
e at St
3rd St NW
S Be tate e R Lin te e 3 Hw y
Daikin Amphitheater at Founder's Park
W
6th St
4th St NW
Rhodes Ferry Park! !
DECATUR ! !
D avis St
! !
NE
10th Ave NE
Ra
St
Fe rr NE y S
W
ad ilro
E
NW
Ash Ct NE
o w rvie Dr w NE Ct
10th Ave SE
Sy ca m
W
catur H De wy
Riverwalk Marina
8th Ave SE
St N
St N
6th Ave NE
W St N
M ad iso n
La fa ye tte
St NW
NW
et St NW
6th Ave SE
hin
ey
St
St
Al t
TE NN ES SE ER IVE R
W el lS tN
b om
Ca rt n ey M c
W as hi ng to
n
l
St N
W
i Tra
St N
72
ve
i ng
Ca in
Hw y
M ar k
Gr o
llk Wa
Ch er ry
M cC ar tn
Vin e
NW
Davis Ct
US
rb Ha rvie rbo Ha
urt
t St
St
Co
Waln u
on gt
Sh or tW as
St NW St W s r er t N St k S n Fi
t NW
s Da vi
Gedd is S
a
Cherry St
W Ne wc
n
tN W
St
Al m
S yk es S
Ca sh i
Vine St
W
NW
St N
NW
t NW is S Dav
h
lso nS tN
St
Wi
Ch ur c
Ch urc h
St S
E
e Av w ie E v r ve S Ri
¸
Proposed Trailhead
Interstate
Fish and Wildlife Service Land
Other Destination
US Highway
Redstone Arsenal
Proposed Side Path
State Road
Municipality
Proposed Unpaved Shared Use Path
County or Local Road
Water
Proposed Ferry
Railroads
APPENDIX
FINAL DRAFT
Page Intentionally Left Blank
SINGING RIVER TRAIL MASTER PLAN / 175
FINAL DRAFT
APPENDIX
ARROWHEAD LANDING (HWY 20 SIDEPATH PORTION OPTION A: USING EXISTING BRIDGES) ENGINEER'S ESTIMATE - CONCEPTUAL DESIGN
Appendix E Cost Estimates Engineering cost estimates were generated by an assessment of each project and using the most current, local bids to make the most accurate estimate possible. These estimates are done at the planninglevel only; costs will vary due to economic conditions and revisions during the design process.
DESCRIPTION: ARROWHEAD LANDING PHASE 1 OPTION A - SIDEPATH + 2 WAY SBL ON EXISTING BRIDGE-12 FT PATH PROJECT NUMBER: 2018-037 COUNTY: LIMESTONE
CITY MOORESVILLE ESTIMATE BY: DEJ/BMB DATE: 5/6/2019 REVISED: CHECKED BY: MSR
ITEM NO. 201A002
DESCRIPTION CLEARING AND GRUBBING (MAXIMUM ALLOWABLE BID $
UNIT LS
QUANTITY 1
UNIT PRICE $2,800.00
AMOUNT $2,800.00
210A000
UNCLASSIFIED EXCAVATION
CUYD
2000
$20.00
$40,000.00
210D001
BORROW EXCAVATION (LOOSE TRUCKBED MEASUREMENT)
CUYD
1500
$30.00
$45,000.00
214A000
STRUCTURE EXCAVATION
CUYD
2250
$20.00
$45,000.00
214B001
FOUNDATION BACKFILL, COMMERCIAL
CUYD
750
$60.00
$45,000.00
305B077
CRUSHED AGGREGATE, SECTION 825, FOR MISCELLANEOUS USE
TON
150
$75.00
$11,250.00
533A098
18" STORM SEWER PIPE (CLASS 3 R.C.)
LF
2750
$60.00
$165,000.00
600A000
MOBILIZATION
LS
1
$75,000.00
$75,000.00
618A000
CONCRETE SIDEWALK, 4" THICK
SQYD
4500
$75.00
$337,500.00
618B003
CONCRETE DRIVEWAY, 6" THICK (INCLUDES WIRE MESH)
SQYD
250
$130.00
$32,500.00
621C008
INLETS, TYPE E
EACH
6
$6,000.00
$36,000.00
623A001
CONCRETE GUTTER (VALLEY)
LF
150
$30.00
623B002
CONCRETE CURB, TYPE A
LF
400
$30.00
$12,000.00
623C000
COMBINATION CURB & GUTTER, TYPE C
LF
3200
$35.00
$112,000.00
634A000
INDUSTRIAL FENCE, 4 FEET HIGH
LF
600
$200.00
$120,000.00
650A000
TOPSOIL
CUYD
450
$20.00
$9,000.00
654A000
SOLID SODDING
SQYD
3750
$8.00
$30,000.00
680A001
GEOMETRIC CONTROLS
LS
1
$11,100.00
$11,100.00
698A000
CONSTRUCTION FUEL (MAXIMUM BID LIMITED TO $
LS
1
$22,100.00
$22,100.00
701G258
BROKEN YELLOW, CLASS 2, TYPE A TRAFFIC STRIPE
LF
900
$0.50
$450.00
701G263
SOLID YELLOW, CLASS 2, TYPE A TRAFFIC STRIPE
LF
1800
$1.00
$1,800.00
703A002
TRAFFIC CONTROL MARKINGS, CLASS 2, TYPE A
SQFT
1300
$5.00
$6,500.00
FLEXIBLE DELINEATORS
EACH
40
$100.00
$4,000.00
SAFETY RAIL
LF
300
$50.00
$15,000.00
TEMPORARY TRAFFIC CONTROL
LS
1
$30,000.00
$30,000.00
ITEMS COST: INFLATION FACTOR
2
YEARS
4.0%
CONSTRUCTION TOTALS (2021)
$1,213,500.00 $99,021.60 $1,312,521.60
CONTINGENCIES
10.0%
$131,252.16
MINOR ITEMS
10.0%
$131,252.16
UTILITIES
0.0%
RIGHTS OF WAY
0.0% TOTAL ESTIMATED COST (2021)
P:\00-2017-318 Huntsville Singing River Trail\Estimates\2017-318_Arrowhead Landing P1 Option A - Sidepath + SBL_12.xlsx
176 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
$4,500.00
1
$0.00 $0.00 $1,575,025.92
FINAL DRAFT
APPENDIX
ARROWHEAD LANDING (HWY 20 SIDEPATH PORTION OPTION B: STANDALONE BIKE/PED BRIDGES)
ARROWHEAD LANDING (ARROWHEAD LANDING DIRT ROAD PORTION)
ENGINEER'S ESTIMATE - CONCEPTUAL DESIGN
ENGINEER'S ESTIMATE - CONCEPTUAL DESIGN
DESCRIPTION: ARROWHEAD LANDING PHASE 1 OPTION B - SIDEPATH + BRIDGES -12 FT PATH
DESCRIPTION: ARROWHEAD LANDING PHASE 2 - STONE DUST TRAIL REHABILITATION
PROJECT NUMBER: 2018-037 COUNTY: LIMESTONE
PROJECT NUMBER: 2018-037 COUNTY: LIMESTONE
CITY MOORESVILLE
TOWN MOORESVILLE
ESTIMATE BY: DEJ/BMB
ESTIMATE BY: DEJ/BMB
DATE: 5/6/2019
DATE: 5/6/2019
REVISED:
REVISED:
CHECKED BY: MSR
CHECKED BY: MSR
ITEM NO. 201A002
DESCRIPTION CLEARING AND GRUBBING (MAXIMUM ALLOWABLE BID $
UNIT LS
QUANTITY 1
UNIT PRICE $12,200.00
AMOUNT $12,200.00
ITEM NO. 201A002
DESCRIPTION CLEARING AND GRUBBING (MAXIMUM ALLOWABLE BID $
UNIT LS
QUANTITY 1
UNIT PRICE $5,000.00
AMOUNT $5,000.00
210A000
UNCLASSIFIED EXCAVATION
CUYD
3500
$20.00
$70,000.00
210A000
UNCLASSIFIED EXCAVATION
CUYD
4250
$30.00
$127,500.00
210D001
BORROW EXCAVATION (LOOSE TRUCKBED MEASUREMENT)
CUYD
3250
$30.00
$97,500.00
210D001
BORROW EXCAVATION (LOOSE TRUCKBED MEASUREMENT)
CUYD
100
$40.00
$4,000.00
214A000
STRUCTURE EXCAVATION
CUYD
2250
$20.00
$45,000.00
430B003
AGGREGATE SURFACING (ALDOT #57)
TON
3250
$50.00
$162,500.00
214B001
FOUNDATION BACKFILL, COMMERCIAL
CUYD
750
$60.00
$45,000.00
430B004
AGGREGATE SURFACING (ALDOT #810)
TON
1750
$50.00
$87,500.00
305B077
CRUSHED AGGREGATE, SECTION 825, FOR MISCELLANEOUS USE
TON
175
$75.00
$13,125.00
600A000
MOBILIZATION
LS
1
$49,400.00
$49,400.00
533A098
18" STORM SEWER PIPE (CLASS 3 R.C.)
LF
2750
$60.00
$165,000.00
650A000
TOPSOIL
CUYD
500
$20.00
$10,000.00
600A000
MOBILIZATION
LS
1
$194,200.00
$194,200.00
654A000
SOLID SODDING
SQYD
4500
$8.00
$36,000.00
618A000
CONCRETE SIDEWALK, 4" THICK
SQYD
4800
$75.00
$360,000.00
665J002
SILT FENCE
LF
19000
$3.50
$66,500.00
618B003
CONCRETE DRIVEWAY, 6" THICK (INCLUDES WIRE MESH)
SQYD
250
$130.00
$32,500.00
680A001
GEOMETRIC CONTROLS
LS
1
$9,900.00
$9,900.00
621C008
INLETS, TYPE E
EACH
6
$6,000.00
$36,000.00
698A000
CONSTRUCTION FUEL (MAXIMUM BID LIMITED TO $
LS
1
$9,900.00
623A001
CONCRETE GUTTER (VALLEY)
LF
150
$30.00
$4,500.00
623C000
COMBINATION CURB & GUTTER, TYPE C
LF
3600
$35.00
$126,000.00
650A000
TOPSOIL
CUYD
400
$20.00
$8,000.00
654A000
SOLID SODDING
SQYD
3600
$8.00
$28,800.00
CONTINGENCIES
20.0%
$122,913.02
680A001
GEOMETRIC CONTROLS
LS
1
$24,300.00
$24,300.00
MINOR ITEMS
10.0%
$61,456.51
698A000
CONSTRUCTION FUEL (MAXIMUM BID LIMITED TO $
LS
1
$48,600.00
$48,600.00
UTILITIES
0.0%
$0.00
703A002
TRAFFIC CONTROL MARKINGS, CLASS 2, TYPE A
RIGHTS OF WAY
0.0%
SQFT
75
$5.00
$375.00
BIKE/PED BRIDGE NO. 1
LF
235
$3,000.00
$705,000.00
BIKE/PED BRIDGE NO. 2
LF
200
$3,000.00
$600,000.00
SAFETY RAIL
LF
800
$50.00
$40,000.00
TEMPORARY TRAFFIC CONTROL
LS
1
$50,000.00 ITEMS COST:
INFLATION FACTOR
2
YEARS
4.0%
CONSTRUCTION TOTALS (2021)
YEARS
4.0%
CONSTRUCTION TOTALS (2021)
TOTAL ESTIMATED COST (2021)
$220,817.76 $2,926,917.76
10.0%
$292,691.78
5.0%
$146,345.89
UTILITIES
0.0%
$0.00
RIGHTS OF WAY
0.0%
1
2
$50,000.00
MINOR ITEMS
P:\00-2017-318 Huntsville Singing River Trail\Estimates\2017-318_Arrowhead Landing P1 Option B - Sidepath + Bridges_12.xlsx
INFLATION FACTOR
$2,706,100.00
CONTINGENCIES
TOTAL ESTIMATED COST (2021)
ITEMS COST:
$0.00 $3,365,955.42
P:\00-2017-318 Huntsville Singing River Trail\Estimates\2017-318_Arrowhead Landing P2 - Stone Dust Rehab.xlsx
1
SINGING RIVER TRAIL MASTER PLAN / 177
$9,900.00 $568,200.00 $46,365.12 $614,565.12
$0.00 $798,934.66
FINAL DRAFT
APPENDIX
WHEELER NATIONAL WILDLIFE REFUGE
HOBBS STREET
ENGINEER'S ESTIMATE - CONCEPTUAL DESIGN
ENGINEER'S ESTIMATE - CONCEPTUAL DESIGN
DESCRIPTION: SINGING RIVER TRAIL, HOBBS STREET FROM CLINTON ST TO US 31
DESCRIPTION: SINGING RIVER TRAIL, WHEELER REFUGE
PROJECT NUMBER: 2017-318 COUNTY: LIMESTONE
PROJECT NUMBER: 2017-318 COUNTY: LIMESTONE/MADISON
CITY ATHENS
TOWN TRIANA TO MOORESVILLE
ESTIMATE BY: BMB
ESTIMATE BY: BMB
DATE: 5/7/2019
DATE: 5/6/2019
REVISED:
REVISED:
CHECKED BY: MSR
CHECKED BY: MSR
ITEM NO. 201A002
DESCRIPTION CLEARING AND GRUBBING (MAXIMUM ALLOWABLE BID $
UNIT LS
QUANTITY 1
UNIT PRICE $3,200.00
AMOUNT $3,200.00
ITEM NO. 201A002
DESCRIPTION CLEARING AND GRUBBING (MAXIMUM ALLOWABLE BID $
UNIT LS
QUANTITY 1
UNIT PRICE $10,000.00
AMOUNT $10,000.00
210A000
UNCLASSIFIED EXCAVATION
CUYD
800
$20.00
$16,000.00
210A000
UNCLASSIFIED EXCAVATION
CUYD
6500
$20.00
$130,000.00
210D001
BORROW EXCAVATION (LOOSE TRUCKBED MEASUREMENT)
CUYD
600
$30.00
$18,000.00
210D001
BORROW EXCAVATION (LOOSE TRUCKBED MEASUREMENT)
CUYD
200
$30.00
$6,000.00
305B077
CRUSHED AGGREGATE, SECTION 825, FOR MISCELLANEOUS USE
TON
175
$75.00
$13,125.00
305B077
CRUSHED AGGREGATE, SECTION 825, FOR MISCELLANEOUS USE
TON
10
$75.00
$750.00
405A000
TACK COAT
GAL
2094
$7.50
$15,705.00
405A000
GAL
72
$7.50
$540.00
407B000
MILE
3
$500.00
$1,500.00
TON
60
$200.00
$12,000.00
SQYD
26166
$3.00
$78,498.00
TON
125
$200.00
$25,000.00
EACH
1
$20,000.00
$20,000.00
TON
2081
$125.00
$260,125.00
424B692
TON
160
$200.00
$32,000.00
600A000
JOINT SEALANT FOR HOT MIX ASPHALT PAVEMENT PLANING EXISTING PAVEMENT (APPROXIMATELY 1.10" THRU 2.0" THICK) MATERIAL REMIXING DEVICE SUPERPAVE BITUMINOUS CONCRETE WEARING SURFACE LAYER, 1/2" MAXIMUM AGGREGATE SIZE MIX, ESAL RANGE E MOBILIZATION
LS
1
$101,200.00
$101,200.00
430B003
TACK COAT SUPERPAVE BITUMINOUS CONCRETE WEARING SURFACE LAYER, WIDENING, 1/2" MAXIMUM AGGREGATE SIZE MIX, ESAL RANGE C/D SUPERPAVE BITUMINOUS CONCRETE UPPER BINDER LAYER, WIDENING, 3/4" MAXIMUM AGGREGATE SIZE MIX, ESAL RANGE C/D SUPERPAVE BITUMINOUS CONCRETE LOWER BINDER LAYER, WIDENING, 1" MAXIMUM AGGREGATE SIZE MIX, ESAL RANGE C/D AGGREGATE SURFACING (ALDOT #57)
TON
4750
$50.00
$237,500.00
618A000
CONCRETE SIDEWALK, 4" THICK
SQYD
2630
$75.00
$197,250.00
430B004
AGGREGATE SURFACING (ALDOT #810)
TON
2500
$50.00
$125,000.00
618B003
CONCRETE DRIVEWAY, 6" THICK (INCLUDES WIRE MESH)
SQYD
700
$130.00
$91,000.00
600A000
MOBILIZATION
LS
1
$79,800.00
$79,800.00
623A001
CONCRETE GUTTER (VALLEY)
LF
625
$30.00
$18,750.00
618A000
CONCRETE SIDEWALK, 4" THICK
SQYD
250
$80.00
$20,000.00
623B002
CONCRETE CURB, TYPE A
LF
8750
$30.00
$262,500.00
623B002
CONCRETE CURB, TYPE A
LF
500
$35.00
$17,500.00
623C000
COMBINATION CURB & GUTTER, TYPE C
LF
400
$35.00
$14,000.00
650A000
TOPSOIL
CUYD
275
$20.00
$500.00
654A000
SOLID SODDING
SQYD
2500
$8.00
$20,000.00
SILT FENCE
LF
55440
$3.50
$194,040.00 $20,000.00
408A052 410H000 424A280
650A000
TOPSOIL
424A369 424B661
CUYD
25
$20.00
$5,500.00
654A000
SOLID SODDING
SQYD
150
$8.00
$1,200.00
665J002
680A001
GEOMETRIC CONTROLS
LS
1
$12,700.00
$12,700.00
680A001
GEOMETRIC CONTROLS
LS
1
$20,000.00
698A000
CONSTRUCTION FUEL (MAXIMUM BID LIMITED TO $
LS
1
$25,300.00
$25,300.00
698A000
CONSTRUCTION FUEL (MAXIMUM BID LIMITED TO $
LS
1
$20,000.00
$20,000.00
701G258
BROKEN YELLOW, CLASS 2, TYPE A TRAFFIC STRIPE
LF
15000
$0.50
$7,500.00
BATHROOM WITH SELF-COMPOSTING TOILETS
LS
1
$100,000.00
$100,000.00
EA
2
$2,500.00
$5,000.00 $4,500.00
701G263
SOLID YELLOW, CLASS 2, TYPE A TRAFFIC STRIPE
LF
10000
$1.00
$10,000.00
BENCH
703A002
TRAFFIC CONTROL MARKINGS, CLASS 2, TYPE A
SQFT
1700
$5.00
$8,500.00
BIKE RACK
EA
3
$1,500.00
PLANTER BOX
EACH
85
$1,000.00
$85,000.00
BICYCLE REPAIR STATION
EA
1
$4,000.00
$4,000.00
SIGNAL IMPROVEMENTS AT BEATY ST
LS
1
$30,000.00
$30,000.00
LANDSCAPING
LS
1
$40,000.00
$40,000.00
SIGNAL IMPROVEMENTS AT SHAW ST
LS
1
$15,000.00
$15,000.00
INFORMATION KIOSK
EA
1
$7,500.00
$7,500.00
SIGNAL IMPROVEMENTS AT US 31
LS
1
$50,000.00
$50,000.00
PICNIC TABLE
EA
2
$3,500.00
$50,000.00
TRASH RECEPTACLE
EA
2
$1,500.00
TEMPORARY TRAFFIC CONTROL
LS
1
$50,000.00 ITEMS COST:
INFLATION FACTOR
2
YEARS
4.0%
CONSTRUCTION TOTALS (2021)
ITEMS COST:
$1,406,553.00 $114,774.72
INFLATION FACTOR
2
YEARS
4.0%
CONSTRUCTION TOTALS (2021)
$1,521,327.72
$7,000.00 $3,000.00 $1,126,630.00 $91,933.01 $1,218,563.01
CONTINGENCIES
10.0%
$152,132.77
CONTINGENCIES
10.0%
$121,856.30
MINOR ITEMS
5.0%
$76,066.39
MINOR ITEMS
5.0%
$60,928.15
UTILITIES
0.0%
$0.00
UTILITIES
2.0%
RIGHTS OF WAY
0.0%
$0.00
RIGHTS OF WAY
TOTAL ESTIMATED COST (2021)
P:\00-2017-318 Huntsville Singing River Trail\Estimates\2017-318_Hobbs Street.xlsx
1
17 8 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
0.0% TOTAL ESTIMATED COST (2021)
$1,749,526.88
P:\00-2017-318 Huntsville Singing River Trail\Estimates\2017-318_Wheeler Refuge.xlsx
1
$24,371.26 $0.00 $1,425,718.72
FINAL DRAFT
APPENDIX
TRASH PANDA TRAIL
DECATUR BOARDWALK
ENGINEER'S ESTIMATE - CONCEPTUAL DESIGN
ENGINEER'S ESTIMATE - CONCEPTUAL DESIGN
DESCRIPTION: TRASH PANDA TRAIL
DESCRIPTION: SINGING RIVER TRAIL, DECATUR BOARDWALK - 12 FT PATH
PROJECT NUMBER: 2018-037 COUNTY: MADISON
PROJECT NUMBER: 2017-318 COUNTY: MORGAN
CITY MADISON
CITY DECATUR
ESTIMATE BY: DEJ/BMB
ESTIMATE BY: BMB
DATE: 5/6/2019
DATE: 5/6/2019
REVISED:
REVISED:
CHECKED BY: MSR
CHECKED BY: MSR
ITEM NO. 201A002
DESCRIPTION CLEARING AND GRUBBING (MAXIMUM ALLOWABLE BID $
UNIT LS
QUANTITY 1
UNIT PRICE $3,800.00
AMOUNT $3,800.00
ITEM NO. 201A002
DESCRIPTION CLEARING AND GRUBBING (MAXIMUM ALLOWABLE BID $
UNIT LS
QUANTITY 1
UNIT PRICE $17,700.00
AMOUNT $17,700.00
210A000
UNCLASSIFIED EXCAVATION
CUYD
6500
$20.00
$130,000.00
210A000
UNCLASSIFIED EXCAVATION
CUYD
1000
$20.00
$20,000.00
210D001
BORROW EXCAVATION (LOOSE TRUCKBED MEASUREMENT)
CUYD
3000
$30.00
$90,000.00
210D001
BORROW EXCAVATION (LOOSE TRUCKBED MEASUREMENT)
CUYD
500
$30.00
$15,000.00
214A000
STRUCTURE EXCAVATION
CUYD
1250
$20.00
$25,000.00
230A000
ROADBED PROCESSING
RBST
12
$500.00
$6,000.00
214B001
FOUNDATION BACKFILL, COMMERCIAL
CUYD
400
$60.00
$24,000.00
405A000
TACK COAT
GAL
130
$7.50
$975.00
305B077
CRUSHED AGGREGATE, SECTION 825, FOR MISCELLANEOUS USE
TON
100
$75.00
$7,500.00
410H000
EACH
1
$20,000.00
$20,000.00
533A098
18" STORM SEWER PIPE (CLASS 3 R.C.)
1500
$60.00
$90,000.00
TON
125
$175.00
$21,875.00
600A000
MOBILIZATION
LS
1
$118,700.00
$118,700.00
618A000
CONCRETE SIDEWALK, 4" THICK
SQYD
10200
$75.00
$765,000.00
TON
150
$175.00
$26,250.00
618B003
CONCRETE DRIVEWAY, 6" THICK (INCLUDES WIRE MESH)
SQYD
653
$130.00
$84,890.00
621C008
INLETS, TYPE E
EACH
4
$6,000.00
$24,000.00
600A000
MATERIAL REMIXING DEVICE SUPERPAVE BITUMINOUS CONCRETE WEARING SURFACE LAYER, WIDENING, 1/2" MAXIMUM AGGREGATE SIZE MIX, ESAL RANGE C/D SUPERPAVE BITUMINOUS CONCRETE UPPER BINDER LAYER, WIDENING, 3/4" MAXIMUM AGGREGATE SIZE MIX, ESAL RANGE C/D MOBILIZATION
LS
1
$563,600.00
$563,600.00
623A001
CONCRETE GUTTER (VALLEY)
LF
400
$30.00
$12,000.00
650A000
TOPSOIL
CUYD
180
623C000
COMBINATION CURB & GUTTER, TYPE C
LF
2000
$35.00
$70,000.00
654A000
SOLID SODDING
SQYD
1600
$8.00
$12,800.00
650A000
TOPSOIL
CUYD
1250
$20.00
$25,000.00
680A001
GEOMETRIC CONTROLS
LS
1
$140,900.00
$140,900.00
654A000
SOLID SODDING
SQYD
10500
$8.00
$84,000.00
698A000
CONSTRUCTION FUEL (MAXIMUM BID LIMITED TO $
LS
1
$140,900.00
$140,900.00
680A001
GEOMETRIC CONTROLS
LS
1
$14,900.00
$14,900.00
CONCRETE BOARDWALK
LF
4500
$1,500.00
$6,750,000.00
698A000
CONSTRUCTION FUEL (MAXIMUM BID LIMITED TO $
SAFETY RAIL
LF
350
$50.00
$17,500.00
703A002
TRAFFIC CONTROL MARKINGS, CLASS 2, TYPE A
TEMPORARY TRAFFIC CONTROL
LS
1
$150,000.00
$150,000.00
LF
TEMPORARY TRAFFIC CONTROL
LS
1
$29,700.00
$29,700.00
SQFT
400
$5.00
$2,000.00
LS
1
$50,000.00 ITEMS COST:
INFLATION FACTOR
2
YEARS
4.0%
CONSTRUCTION TOTALS (2021)
$50,000.00 $1,650,490.00 $1,785,169.98
10.0%
$178,517.00
MINOR ITEMS
5.0%
$89,258.50
UTILITIES
2.0%
$35,703.40
RIGHTS OF WAY
0.0%
$0.00
P:\00-2017-318 Huntsville Singing River Trail\Estimates\2017-318_Trash Panda Trail.xlsx
1
424B661
$20.00
ITEMS COST: INFLATION FACTOR
2
YEARS
4.0%
CONSTRUCTION TOTALS (2021)
$134,679.98
CONTINGENCIES
TOTAL ESTIMATED COST (2021)
424A369
$3,600.00
$7,907,100.00 $645,219.36 $8,552,319.36
CONTINGENCIES
10.0%
$855,231.94
MINOR ITEMS
3.0%
$256,569.58
UTILITIES
0.3%
$21,380.80
RIGHTS OF WAY
0.0% TOTAL ESTIMATED COST (2021)
$2,088,648.88
P:\00-2017-318 Huntsville Singing River Trail\Estimates\2017-318_Decatur Boardwalk_12.xlsx
1
SINGING RIVER TRAIL MASTER PLAN / 179
$0.00 $9,685,501.68
FINAL DRAFT
APPENDIX
SPACE AND ROCKET CENTER
INDIAN CREEK GREENWAY EXTENSION
ENGINEER'S ESTIMATE - CONCEPTUAL DESIGN
ENGINEER'S ESTIMATE - CONCEPTUAL DESIGN
DESCRIPTION: ROCKET CORRIDOR SEGMENT - 12 FT PATH
DESCRIPTION: INDIAN CREEK EXTENSION - 12 FT PATH PROJECT NUMBER: 2018-037 COUNTY: MADISON
PROJECT NUMBER: 2017-318 COUNTY: MADISON
CITY MADISON
CITY HUNTSVILLE ESTIMATE BY: BMB
ESTIMATE BY: DEJ/BMB DATE: 5/7/2019
DATE: 5/7/2019
REVISED:
REVISED:
CHECKED BY: MSR
CHECKED BY: MSR
ITEM NO. 201A002
DESCRIPTION CLEARING AND GRUBBING (MAXIMUM ALLOWABLE BID $
UNIT LS
QUANTITY 1
UNIT PRICE $54,700.00
AMOUNT $54,700.00
ITEM NO. 201A002
DESCRIPTION CLEARING AND GRUBBING (MAXIMUM ALLOWABLE BID $
UNIT LS
QUANTITY 1
UNIT PRICE $21,900.00
AMOUNT $21,900.00
210A000
UNCLASSIFIED EXCAVATION
CUYD
5300
$20.00
$106,000.00
210A000
UNCLASSIFIED EXCAVATION
CUYD
10500
$20.00
$210,000.00
210D001
BORROW EXCAVATION (LOOSE TRUCKBED MEASUREMENT)
CUYD
2650
$30.00
$79,500.00
210D001
BORROW EXCAVATION (LOOSE TRUCKBED MEASUREMENT)
CUYD
6000
$30.00
$180,000.00
230A000
ROADBED PROCESSING
RBST
90
$500.00
$45,000.00
214A000
STRUCTURE EXCAVATION
CUYD
150
$20.00
$3,000.00
305B077
CRUSHED AGGREGATE, SECTION 825, FOR MISCELLANEOUS USE
TON
100
$75.00
$7,500.00
214B001
FOUNDATION BACKFILL, COMMERCIAL
CUYD
50
$60.00
$3,000.00
405A000
TACK COAT
GAL
1000
$7.50
$7,500.00
230A000
ROADBED PROCESSING
RBST
90
$500.00
$45,000.00
410H000
MATERIAL REMIXING DEVICE SUPERPAVE BITUMINOUS CONCRETE WEARING SURFACE LAYER, WIDENING, 1/2" MAXIMUM AGGREGATE SIZE MIX, ESAL RANGE C/D SUPERPAVE BITUMINOUS CONCRETE UPPER BINDER LAYER, WIDENING, 3/4" MAXIMUM AGGREGATE SIZE MIX, ESAL RANGE C/D MOBILIZATION
EACH
1
$20,000.00
$20,000.00
305B077
CRUSHED AGGREGATE, SECTION 825, FOR MISCELLANEOUS USE
TON
850
$150.00
$127,500.00
405A000
TACK COAT
410H000
424A369
TON
10
GAL
900
$7.50
$6,750.00
EACH
1
$20,000.00
$80.00
$20,000.00
$800.00
TON
750
$150.00
$112,500.00
TON
900
$150.00
$135,000.00
LF
150
$65.00
$9,750.00
LS
1
$87,500.00
$87,500.00 $71,250.00
618A000
CONCRETE SIDEWALK, 4" THICK
SQYD
2600
$75.00
$195,000.00
618B003
CONCRETE DRIVEWAY, 6" THICK (INCLUDES WIRE MESH)
SQYD
400
$130.00
$52,000.00
533A098
MATERIAL REMIXING DEVICE SUPERPAVE BITUMINOUS CONCRETE WEARING SURFACE LAYER, WIDENING, 1/2" MAXIMUM AGGREGATE SIZE MIX, ESAL RANGE C/D SUPERPAVE BITUMINOUS CONCRETE UPPER BINDER LAYER, WIDENING, 3/4" MAXIMUM AGGREGATE SIZE MIX, ESAL RANGE C/D 18" STORM SEWER PIPE (CLASS 3 R.C.)
623A001
CONCRETE GUTTER (VALLEY)
LF
200
$30.00
$6,000.00
600A000
MOBILIZATION
623C000
COMBINATION CURB & GUTTER, TYPE C
LF
2000
$35.00
$70,000.00
618A000
CONCRETE SIDEWALK, 4" THICK
SQYD
950
$75.00
650A000
TOPSOIL
CUYD
2100
$20.00
$42,000.00
619A002
18" ROADWAY PIPE END TREATMENT, CLASS 1
EACH
6
$1,500.00
$9,000.00
652A100
SEEDING
ACRE
3.50
$1,500.00
$5,250.00
623B002
CONCRETE CURB, TYPE A
LF
400
$40.00
$16,000.00
654A000
SOLID SODDING
SQYD
3000
$8.00
$24,000.00
650A000
TOPSOIL
CUYD
2000
$20.00
$40,000.00
680A001
GEOMETRIC CONTROLS
LS
1
$13,700.00
$13,700.00
652A100
SEEDING
ACRE
3.00
$1,500.00
$4,500.00
698A000
CONSTRUCTION FUEL (MAXIMUM BID LIMITED TO $
LS
1
$27,400.00
$27,400.00
654A000
SOLID SODDING
SQYD
2000
$8.00
$16,000.00
703A002
TRAFFIC CONTROL MARKINGS, CLASS 2, TYPE A
424B661 600A000
TON
1050
$150.00
$157,500.00
LS
1
$109,300.00
$109,300.00
424A369 424B661
SQFT
300
$5.00
$1,500.00
680A001
GEOMETRIC CONTROLS
LS
1
$21,900.00
$21,900.00
CANOPY (RAILROAD UNDERPASS)
LS
1
$75,000.00
$75,000.00
698A000
CONSTRUCTION FUEL (MAXIMUM BID LIMITED TO $
LS
1
$21,900.00
$21,900.00
CONCRETE BOARDWALK - LOCATION 1
LF
100
$1,000.00
$100,000.00
SAFETY RAIL
LF
500
$50.00
CONCRETE BOARDWALK - LOCATION 2
$25,000.00
LF
100
$1,000.00
$100,000.00
TEMPORARY TRAFFIC CONTROL
LS
1
$60,000.00
$60,000.00
EACH
5
$10,000.00
$50,000.00
TRAFFIC SIGNAL AT BOB WALLACE CROSSING
LS
1
$125,000.00
$125,000.00
SAFETY RAIL
LF
500
$50.00
$25,000.00
SIGNAL IMPROVEMENTS AT MADISON AND ZIERDT
LS
1
$50,000.00
$50,000.00
TEMPORARY TRAFFIC CONTROL
LS
1
$20,000.00
$20,000.00
RECTANGULAR RAPID FLASHING BEACON
ITEMS COST: INFLATION FACTOR
2
YEARS
4.0%
CONSTRUCTION TOTALS (2021)
$1,571,350.00 $128,222.16 $1,699,572.16
CONTINGENCIES
10.0%
$169,957.22
MINOR ITEMS
10.0%
$169,957.22
UTILITIES
0.0%
$0.00
RIGHTS OF WAY
0.0% TOTAL ESTIMATED COST (2021)
P:\00-2017-318 Huntsville Singing River Trail\Estimates\2017-318_Indian Creek Extension_12.xlsx
1
1 8 0 / S I N G I N G R I V E R TR A I L M A S TE R P L A N
ITEMS COST: INFLATION FACTOR
2
YEARS
4.0%
CONSTRUCTION TOTALS (2021)
$1,245,750.00 $101,653.20 $1,347,403.20
CONTINGENCIES
15.0%
$202,110.48
MINOR ITEMS
10.0%
$134,740.32
UTILITIES
2.0%
$26,948.06
RIGHTS OF WAY
0.0% TOTAL ESTIMATED COST (2021)
$0.00 $2,039,486.59
P:\00-2017-318 Huntsville Singing River Trail\Estimates\2017-318_Rocket Corridor_12.xlsx
1
$0.00 $1,711,202.06
APPENDIX
FINAL DRAFT
Page Intentionally Left Blank
SINGING RIVER TRAIL MASTER PLAN / 181
Acknowledgements
APPENDIX
FINAL DRAFT
SYSTEM
Commission Chairman Dale W. Strong
Senator Arthur Orr
Speaker Mac McCutcheon
Senator Slade Blackwell
Drs. Aruna and Amit Arora
Joe Campbell
Century Automotive Friends of Singing River Trail: 1 82 / S I N G I N G R I V E R
Clint Shelton, Decatur Daily; Mike Cole, Wilmer & Lee Attorneys; Steve Raby, Direct Communications; TR A I L M A S TE R P LDavid A N Spillers, Huntsville Hospital; Health System; Mike Dalen, OMI, Inc.
Partner
Prepared By