Landscape Architecture 2018 - 2020

Page 1

Alyssa Humarang Landscape Architecture Selected Works 2019-2020

1


EDUCATION

Penn State University, State College, PA Major: Landscape Architecture Expected graduation Fall 2022

Mifflin County High School, Lewistown, PA

LEADERSHIP Arts Ambassadors

2018 - Current

Second Year Class Representative

2019- Current

Communication Director in Landscape Architecture Student Society

2019- Current

LA (Landscape Architecture) leaders

2018 - Current

Give Club

2018 - 2019

Establishing the Student Council for Arts & Architecture

Monthly meeting with the Department Head and provide issues or ideas to improve student life

RESUME

In charge of PSULARCH instagram where I post events & projects of students. I create posters for club events such as Fall fest, Parking Day, etc.

2

Lead tours to welcome accepting & potential students in Stuckeman

Participated in community services & learn ways to incorporate sustainability in everyday life

Vice President in Technology Student Association

2017 - 2018

Raised fundraiser for student to compete and community building events

Vice President in Student Council

2017 - 2018

Organized school events for the student


PROFICIENCIES Adobe

Photoshop, Illustrator & InDesign

CAD

AutoCAD & Sketchup

ALYSSA HUMARANG

akh5629@psu.edu 814 - 232 - 6124 linkedin.com/in/alyssa-humarang-0751b4197

Microsoft Office

Powerpoint, Word & Exel

Fabrication

Laser cutting & physical model

WORKING KNOWLEDGE ON: ArcMap & Rhino

INVOLVEMENT

Musser Gap to Valleylands Project Volunteer

Owned by Penn State, a community outreach where I talked and gathered data from the community members

Career Day Student Ambassador Robert Reed Drawing Workshop

Worked as a team to create an abstract charcoal mural

United Way Day of Caring Volunteer

Helped clean up & restore the Centre Furnace Mansion in State College

3


4

CONTENTS


PAGE 06 PAGE 14

BEATIFIC GARDEN

INCREMENTUM GARDEN PAGE 18

PAGE 16 PAGE 20

ARNITY PARK

MODEL MAKING

ARCMAPS CURRENT WORK 5


SITE ANALYSIS FOR ARNITY PARK PROGRAMS USED: AutoCad, Illustrator, & Photoshop

There are not a lot of green spaces surrounding the site. Trash and graffiti are filling up the abandoned dark areas. PIDCC proposed design takes over the land and not provide a big space for the surrounding community. LAND USE

Analysis shows how our site is dominated by infrastructure with the lack of green space.

HYDROLOGY

Where the tides will be by 100 to 500 years.

BLOC

KEY:

KEY: ABANDONED INDUSTRIAL UNIVERSITY

6

PUBLIC SCHOOL CHURCHES

COMMERCIAL AREAS HEALTHCARE & REHABITATION

HIGH TIDE LOW TIDE

500 YEAR TIDAL PLAIN 100 YEAR TIDAL PLAIN


COMMERCIAL

CHURCHES

COMMERCIAL

plain flood

500

flood

plain

PLAZA

100

EDUCATION/SCHOOL

CKED ENTERANCE UNATTENDED UNDER THE BRIDGE ENTRANCE

ABANDONED BUILDINGS

7


ARNITY PARK

FALL 2019

PROGRAM USED: AutoCad, Photoshop, Illustrator

TO WANDER WITHIN

This is a place where the community can gather and enjoy the beautiful view of the Schuylkill river. To bring people together by revitalizing the abandoned dark corners of the site and create artistic entrance to lead people to the plaza where they can gather and be one. Philadelphia is filled with fun and colorful murals which can be done on the site.

SWING BRIDGE LAWN

A

MOUND

A'

PIDC BUILDINDS MOUND

B

8

WET MEADOW

B'


KEY

A B C D E

PERMEABLE PARKING THE CEHER PLAZA PIDC BUILDING LAWN THE POP

VIEWING DECK

F

BOAT HOUSE

MOUND HEDGEROW

B

A

G H I J K L M

MARSH THE ROUNDABOUT WET MEADOW STAIRS

M

C

J

V1

A

B D

H

L L

I

G

K

E V2

F

SCHUYKILL RIVER

9


V1: BOARDWALK

10

PATHWAY IN MARSH & MEADOW AREA


V2: THE POP

UNDER THE BRIDGE HANG OUT FOR THE PEOPLE

11


THE CEHER PLAZA

LOCATED IN ARNITY PARK

ENTRANCE

B

D

ENTRANCE

C

A A

B QUAKING ASPEN

E HONEY LOCUST

KEY

TEMPORARY ART INSTALLMENT PEDESTRIAN BIKE PARK BUS STOP SITTING

12

A B C D E

ENTRANCE


MATERIALS:

PROCESS

Cobblestone Road pattern (Where the cars would drive on)

Pattern in the middle When the concrete intersects in the main plaza.

Concrete pavers As it progressively go into the site the cobblestone has grass on it.

Decomposed granite Ground pattern for sitting area.

A GETAWAY FROM THE BUSY LIFE OF PHILADELPHIA

COBBLESTONE

LIGHTING

SITTING ROAD

A THE CENTRAL PLACE OF ARNITY PARK WHERE PEOPLE CAN BE ONE COBBLESTONE

DECOMPOSED GRANITE

A'

SITTING ROAD

B

PLAZA

LIGHTING

CONCRETE PAVERS

SITTING

B'

13


BEATIFIC GARDEN

SPRING 2019

PROGRAM USED: Photoshop

WE ARE BORN TO WANDER...

Filled with vivid seasonal vegetation that would make you believe you are entering to an enchanted area. A garden that creates a discovery place where people can relax and be one with nature. Mounds were use to provide different experience on different areas.

STONE WALL WITH VEGETATION

PURPLE LOBE LOCUST

MOUND SIDEWALK

A

RED LOCUST

A' PURPLE LOBE MOUND

DOGWOOD

STONE SITTING

STONE WALL WITH VEGETATION

DECK

MUSICAL GROTTO

SILENE ACAULIS WITH MOSS BENCH

B

14

B'

C

C'

D

D'


UPS

WEEPING WILLOW

SILENE ACGULIS WITH MOSS

RETAINING WALL

A

C

F

G

B

A A

DOGWOOD

B

A B C D E F G

DECOMPOSED GRANITE CHERRY BLOSSOM

D

C KEY

D ALLEY

S FRASER ST

E

PURPLE ROBE LOCUST

MUSICAL GROTTO MOUND VIEWING AREA FOR FOOTBALL SLOPE SITTING AREA PERSPECTIVE DECK STAIRS

REDBUD

D

FOOTBALL FIELD

15


INCREMENTUM GARDEN FALL 2018

PROGRAMS USED: SketchUp & Photoshop

AN OASIS TO ESCAPE TO

Everyone, especially students, can go to where they would feel safe and enclosed into a different world.

Existing Site

Enclosed area, where students love to study. 16

Existing Site

Open space with deciduous plants on the side.


PROPOSED DESIGN

SKETCH UP

ENTRANCE ENTRANCE

A B ENTRANCE C

LAWN

PLANTER

KEY

COLORED GLASS

STAIRS

Students can study the growth of plants from the specific color provided by the glass.

A B C

17


MODEL MAKING Beatific Garden

18


Arnity Park Programs Used: AutoCad, Rhino & CNC Machine

19


ARCMAPS CURRENT WORK To design the whole boundary that would accommodate to 200,000 people and create 100,000 jobs. While protecting 30% of agricultural lands.

CURRENT RESEARCH ABOUT SPRING CREEK WATERSHED

Individual research about different soil types around the stream. 20


Water System Synthesis: We

Group A | Emily Adler, Grayce Amspacher, Peniel Anifowoshe, Aub Fradella, Alyssa Humarang, Abigail Merlos

Different Land Use That Affects Impaired Streams

Bellefonte

!

Bellefonte

!

!

Pleasant Gap

Pleasant Gap

!

State College

State College

!

!

Boalsburg

Boalsburg

!

!

Pine Grove Mills

!

!

Pine Grove Mills

Âą

Legend !

Wells Closed to Impaired Streams

Major cities creek watershed SCW_Surface_Boundary

Elevation Class

Leg

Value 690 - 1000

Individual research about topographic and 2.5 1.25 0 2.5 Miles elevation to see impact to water resource. 1000 - 1500 1500 - 2000 2000 - 2500 2500 - 3000

ÂŻ

Group research, where we looked into land use and how they affect impaired streams

Imp

(Strah

21


Alyssa Humarang 814.232.6124 akh5629@psu.edu

22


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.